Liner integrated with long anchor
The integration of a long anchor with a liner enables pre-installation of anchor bolts and equipment components on reinforced concrete, addressing the inefficiencies of conventional methods by reducing construction time and improving precision.
Patent Information
- Application Number
- JP2023067288
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-17
- Publication Date
- 2024-10-29
AI Technical Summary
Conventional methods for installing mechanical equipment require lengthy construction periods due to the need for multiple marking operations, concrete filling, and complex centering adjustments, especially when positioning anchor bolts after assembling and pouring reinforced concrete.
The integration of a long anchor with a liner that allows for precise positioning of anchor bolts before assembling and pouring reinforced concrete, using a shaft with a threaded part to secure the anchor to the slab and adjust the installation height, enabling pre-installation of equipment components.
This approach significantly shortens the construction period by eliminating the need for marking and concrete filling, reduces the complexity of centering adjustments, and ensures high-precision installation of equipment components.
Smart Images

Figure 2024153409000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a base plate (called a sole plate in the case of a large pump base) for machinery and equipment (hereinafter sometimes simply referred to as equipment) to be installed on a reinforced concrete machinery foundation, a temporary template (a plate shaped like the underside of the equipment base) (hereinafter sometimes simply referred to as a plate), or an anchor-integrated liner (a combination of a slope liner and a flat liner) for precisely adjusting the position of the machinery and equipment itself. [Background technology]
[0002] FIG. 13 is a side view of a large-sized water pump for installation. As shown in the figure, the large-sized water pump 100 includes a pump body 102, a discharge pipe 104, a water lift pipe 106, and an impeller 108, and pumps water from a water tank 110 and discharges it to the outside. The large-sized water pump 100 needs to be installed with high accuracy (0.01 mm to 0.001 mm) in a horizontal and vertical state on a machine foundation 114 provided around an opening 112 in a slab 1 on the top surface of the water tank 110. Conventionally, horizontal adjustment has been performed using a push bolt jig, and vertical adjustment has been performed using a gradient liner, a flat liner, and the applicant has used an anchor-integrated liner (Patent Documents 1 and 2). FIGS. 14 to 22 are explanatory diagrams of a conventional method of installing equipment. Below, a conventional method of installing equipment such as a large pump will be explained.
[0003] (Foundation work) Fig. 14 is a plan view of the reinforced concrete machine foundation for a conventional large-scale water pump foundation construction as viewed from the arrow DD in Fig. 13. Fig. 15 is a cross-sectional view as viewed from the arrow EE in Fig. 14. Fig. 16 is a side view as viewed from the arrow FF in Fig. 14 (excluding the formwork 4). 1. In order to assemble and pour the reinforced concrete machine foundation 2, mark out (score) the reference lines (X and Y directions) on the plane of the reinforced concrete machine foundation 2 on the slab 1 (also called the existing structure) and score the planar dimensions of the foundation. The Z direction, which is the height dimension of the foundation, is scored as a secondary reference line on a nearby wall, pillar, etc. The X and Y positions of the anchor bolts 20 (also called equipment anchor bolts) are marked out. It is a good idea to score the height (Z direction) of the anchor bolts 20 on a nearby wall, pillar, etc. (See Figure 14) Also, score the planar position of the reinforcing bars 3 on the slab 1. 2. Install the insert bars (Z direction). The insert bars (Z direction) can be installed by chipping out the structural rebars and tying the foundation rebars (see the right cross section of Figure 15), or by driving rebar 3 into slab 1 as a post-installed anchor (see the left cross section of Figure 15). The rebars in the X, Y, and Z directions are assembled by twisting them around the insert bars. 3. Attach the formwork 4 (same as the box hole 5) in Figure 15. Fill the box hole 5 with polystyrene foam or the like. Attach the formwork 4 as an anchor box hole. (See Figure 15) 4. Assemble and pour the reinforced concrete 2 for the machine foundation shown in Figure 14, excluding the box-punching hole area. Assemble and pour the concrete, leaving about 50mm to 70mm back from the foundation height L (see Figure 16) for the foundation grout. Allow the concrete to harden for 28 days.
[0004] (Box cutout hole) Fig. 17 is a plan view of a reinforced concrete machine foundation when a conventional box punch hole is provided. Fig. 18 is a cross-sectional view taken along the line HH in Fig. 17. Fig. 19 is a side view taken along the line GG in Fig. 17 (excluding the formwork 4). 5. Remove the polystyrene foam etc. from the box punch hole 5 to provide space for installing the anchor bolt 20. Mark out reference lines on the top surface of the formed reinforced concrete for the machine foundation 2 (X direction, Y direction). Position the anchor bolt 20 on the reinforced concrete for the machine foundation 2 (X direction, Y direction see Figure 17). Check that the box punch hole position is large enough to accommodate the anchor bolt 20. 6. A temporary liner 6 (flat liner, slope liner, liner with integrated anchor) or packer for primary centering is attached to the top surface of the reinforced concrete 2 for the machine foundation. 7. Place the plate 7 (the upper side is the base plate of the equipment, and the lower side is the sole plate (with anchor bolt mounting holes)) on the temporary liner 6 and perform the (primary) centering (X, Y, Z directions). Fix the anchor bolts 20 attached to the machine to the plate 7 by tightening the nuts from the front and back. (See Figures 18 and 19) 8. Concrete or mortar is filled into the box hole 5. 28 days of curing are required until the concrete hardens. Alternatively, non-shrink mortar may be used to shorten the time and ensure the concrete strength. In this case, a curing period of 3 days is required. The anchor bolt 20 is now fixed.
[0005] (Equipment centering) Fig. 20 is a plan view of a reinforced concrete machine foundation for centering conventional equipment. Fig. 21 is a cross-sectional view taken along the line II in Fig. 20. Fig. 22 is a side view taken along the line JJ in Fig. 20. 9. Install the liner 8 (a combination of flat liner, gradient liner, or liner with an integrated anchor) on both sides of the anchor bolt 20 in the circumferential direction (concentric circles centered in the X and Y directions) (see Figure 20). Install the pump and adjust the liner 8 for (secondary) centering. Adjust using shims. Fix the liner 8 in place by spot welding. 10. Grouting is performed. Foundation grout 116 is fixed to the underside and periphery of the plate 7 with non-shrink mortar or mortar (see FIG. 21). Mortar finish 118 is applied to the periphery of the machine foundation reinforced concrete 2 (see FIG. 21).
[0006] In the conventional equipment installation method, the temporary liner could not be installed and the permanent anchor bolts could not be positioned until the reinforced concrete for the machine foundation was assembled and poured. In addition, the permanent centering could not be performed until the box hole was filled with concrete and the permanent anchor bolt was fixed with concrete. For this reason, the construction period from the start of foundation work to the completion of the equipment centering work was long. In addition, the overall positioning had to be done on the top surface of the slab, and after the reinforced concrete for the machine foundation was assembled and poured, the reference lines had to be marked out again on the top surface of the reinforced concrete for the machine foundation. This resulted in double marking work, and each time an inspection had to be carried out to proceed with the process, lengthening the construction period. Furthermore, when performing secondary centering to install the equipment, in addition to the adjustment using the liner, delicate adjustment work using shims was required, which made the work complicated and lengthened the construction period. The shortening of the construction period by installing the anchor-integrated liner in Patent Documents 1 and 2 also shortens the time required for the conventional centering work process. The shortening of the construction period is about 4 to 72 hours. Reducing the time required from foundation work to the completion of equipment installation by another month or more was a major challenge for the construction workers. [Prior art documents] [Patent documents]
[0007] [Patent Document 1] Patent No. 3775717 [Patent Document 2] Patent No. 4065957 [Non-patent literature]
[0008] [Non-Patent Document 1] Edited by the Japan Sewage Works Agency, published by the Sewerage Works Support Center, “Essential for Mechanical Equipment Construction: Construction Management Records (Main) FY2021”, Chapter 3, Main Pump Equipment, P12~P21 Summary of the Invention [Problem to be solved by the invention]
[0009] The problem to be solved by the present invention is to provide a liner integrated with a long anchor that can position and attach anchor bolts attached to equipment before assembling and pouring the reinforced concrete for the machine foundation on which the equipment is to be installed, in consideration of the problems of the prior art described above. Another object of the present invention is to provide a long anchor-integrated liner that mathematically determines the total length of the anchor-integrated liner to be installed before assembling and pouring the reinforced concrete for the machine foundation. [Means for solving the problem]
[0010] As a first means for solving the above-mentioned problems, the present invention provides a long anchor-integrated liner, characterized in that one end is fixed to a slab beneath a reinforced concrete machine foundation and the other end has a threaded portion protruding from the upper surface of the reinforced concrete machine foundation and a shaft having a liner portion which screws into the threaded portion to form a mounting surface for a plate or equipment to be installed on the upper surface and which makes it possible to adjust the installation height of the plate or equipment, and the total length L from the upper surface of the liner portion to the lower end of the shaft is set to the total length (L = H + H1) of the machine foundation H and the post-installed anchor fixing allowance H1 of the shaft. According to the first means, the machine foundation can be fixed to the slab before the reinforced concrete is assembled and poured, so that the machine foundation is firmly fixed after the concrete is poured, and the process of installing the equipment can be significantly shortened. In addition, since the overall length of the liner can be determined, a design price can be provided in the design documents for the installation site, or the liner can be standardized and listed as a construction material price in a price book. Effect of the Invention
[0011] According to the present invention, the anchor bolts can be positioned before the assembly and pouring of the reinforced concrete for the machine foundation, the number of marking out operations can be reduced, the work of creating box-punching holes can be eliminated, the work of filling concrete can be eliminated, the curing period after assembly and pouring of concrete can be eliminated, shim adjustment can be eliminated, and quality inspection for each step can be eliminated, thereby significantly shortening the equipment installation process. [Brief description of the drawings]
[0012] [Figure 1] FIG. 2 is a front view of the long anchor integrated liner of the present invention. [Diagram 2] FIG. 13 is an installation diagram of a liner integrated with a long anchor. [Diagram 3] FIG. [Figure 4] This is a plan view of a reinforced concrete machine foundation with box holes. [Diagram 5] 5 is a cross-sectional view taken along the line AA in FIG. 4 with a box punch hole. [Figure 6] 5 is a side view of the box with a hole cut out therein, taken along the line BB in FIG. 4. [Figure 7] 5 is a cross-sectional view of the A1-A1 arrows in FIG. 4 after a box punch hole has been cast. [Figure 8] FIG. 5 is a side view of the BB arrow in FIG. 4 after the box punching holes have been cast. [Figure 9] This is a plan view of a reinforced concrete machine foundation without box punching holes. [Figure 10] FIG. 10 is a side view of the CC arrow in FIG. 9 before concrete is poured for the machine foundation. [Figure 11] FIG. 10 is a side view of the CC arrow in FIG. 9 after the foundation concrete has been poured. [Figure 12] FIG. 10 is a side view of the CC arrow in FIG. 9 after the foundation grouting. [Figure 13] FIG. 2 is a side view of the installation of a large water lifting pump. [Figure 14] FIG. 14 is a plan view of a reinforced concrete machine foundation for a conventional large-scale water pump foundation construction as viewed from the DD arrow in FIG. 13. [Figure 15] 15 is a cross-sectional view taken along the line EE in FIG. 14. [Figure 16] FIG. 15 is a side view taken along the line FF in FIG. 14. [Figure 17] FIG. 1 is a plan view of a reinforced concrete machine foundation in the case where a conventional box punch hole is provided. [Figure 18] FIG. 18 is a cross-sectional view taken along the line HH in FIG. 17. [Figure 19] FIG. 18 is a side view taken along the line GG in FIG. 17. [Figure 20] FIG. 1 is a plan view of a reinforced concrete machine foundation for centering conventional equipment. [Figure 21] 21 is a cross-sectional view taken along the line II in FIG. 20. [Figure 22] FIG. 21 is a side view taken along the arrow JJ in FIG. 20. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a liner integrated with a long anchor according to the present invention will be described in detail below with reference to the drawings. In the following description of this embodiment, the horizontal and vertical directions of the slab surface on which the equipment is installed are defined as the X and Y directions, and the height direction from the slab surface is defined as the Z direction. [Long anchor integrated liner 10] Fig. 1 is a front view of the long anchor integrated liner of the present invention, and Fig. 2 is an installation view of the long anchor integrated liner. The equipment is installed with high precision via the plate 7 on a machine foundation 114 formed on a slab 1 at the site. The machine foundation 114 is composed of a machine foundation reinforced concrete 2 and foundation grout 116. The machine foundation reinforced concrete 2 has foundation rebars (also called foundation cage rebars) arranged inside. The foundation rebars are made by combining rebars 3 in a cage shape to increase the strength of the concrete. The long anchor integrated liner 10 of the present invention is attached to the slab 1 and the machine foundation 114. The long anchor integrated liner 10 is made of metal, one end of which is fixed to the slab 1 under the machine foundation reinforced concrete 2, and the other end of which is provided with a screw part 13a with a diameter larger than the shaft diameter, and a liner part 13b whose upper surface is arranged at the same height as the upper surface of the machine foundation 114 and which is screwed into the screw part 13a to form the mounting surface of the plate 7 on which the equipment is installed, and which is capable of adjusting the installation height of the plate 7. The total length L from the upper surface of the liner part 13b to the lower end of the shaft 12 is set to the total length (L=H+H1) of the length (thickness or depth) (H) of the machine foundation 114 and the post-installed anchor fixing allowance 115 (H1) of the shaft. The machine foundation 114 (H) is determined by the design drawing. The liner adjustment is performed between the top of the machine foundation and the first rebar close to the surface of the machine foundation 114 (concrete fixing allowance). The concrete anchorage is represented by the dimension (A) in Fig. 2, which is 70mm or less in a particularly severe corrosive environment according to the Standard Specifications for Concrete (2002 Standard Specifications for Concrete [Structural Performance Verification Edition], p. 120, published by the Japan Society of Civil Engineers). The long anchor integrated liner 10 of the present invention is driven into the structural slab 1 as a post-installed anchor. For example, the driving depth (H1) of an earthquake-resistant post-installed anchor into the slab is 13D (Post-Installed Anchor [Adhesive System] Technical Data, p. 2, manufactured by Nippon Decolux Co., Ltd.). Therefore, the total length L of the long anchor integrated liner is defined by the above formula (L=H+H1). The shaft 12 is longer than the step difference dimension between the upper and lower bars of the foundation cage bars that form the machine foundation reinforced concrete 2 (see Figure 2), and the bottom end of the metal shaft is fixed to the slab 1 as a post-installed anchor. The bottom end of the shaft 12 can be fixed by embedding it into a drilled hole in the slab 1 using adhesive or a concrete wedge driving method. The shaft 12 has a threaded portion 13a at its upper end, the diameter of which is larger than the shaft diameter, and a liner portion 13b whose upper surface is disposed at the same height as the upper surface of the machine foundation 114 and which is screwed into the threaded portion 13a to form a mounting surface for a plate on which equipment is installed, thereby enabling the installation height of the plate to be adjusted. The upper surface of the liner portion 13b coincides with the upper surface of the machine foundation 114, and serves as a contact surface with the plate 7. The plate 7 is a base plate, a sole plate, a temporary template, or the like. Note that in the case of small equipment, the equipment may be installed directly on the machine foundation 114 without using a plate. Note that the liner portion 13b has four rotation holes (of which the two holes facing the center also serve as resin filling holes) on its circumferential surface (side surface), and the shaft can be inserted into these rotation holes and rotated to adjust the installation position of the plate 7 or equipment. Therefore, since the plate or equipment can be placed and the anchor bolts can be positioned before assembling and pouring the reinforced concrete for the machine foundation, the equipment installation process can be significantly shortened. In addition, since the machine foundation can be fixed to the slab before the reinforced concrete is assembled and poured, it is firmly fixed after the concrete is poured, significantly shortening the equipment installation process. [Centering nut 40] 3 is an explanatory diagram of a centering nut. The centering nut 40 is a nut that is fitted into the anchor bolt mounting hole 7a of the plate 7 or the equipment. The centering nut 40 is a nut that is integrally formed with a cylindrical body 42 that fits into the anchor bolt mounting hole 7a and a head 44 that is larger than the hole diameter of the anchor bolt mounting hole 7a. The outer diameter of the cylindrical body 42 is slightly smaller than the hole diameter of the anchor bolt mounting hole 7a, and is formed so that a gap of 1 mm or less, preferably 0.5 mm or less, is formed so as not to generate a large gap when the cylindrical body 42 is fitted, and the inside of the cylindrical body 42 has a female thread structure into which the anchor bolt 20 can be screwed. The head 44 is hexagonal (or may be polygonal, including rectangular), and can be fastened or removed with a tool such as a hexagonal wrench. Since the hole diameter of the anchor bolt mounting hole 7a of the plate 7 or equipment is set larger than the axial diameter of the anchor bolt 20 in order to finely adjust the installation position, the anchor bolt 20 can be mounted in the anchor bolt mounting hole 7a via the centering nut 40 so that the axial center of the anchor bolt 20 coincides with the center of the anchor bolt mounting hole 7a without loosening. Therefore, the anchor bolt 20 can be aligned in the X and Y directions with high precision without loosening.
[0014] The method of installing the device of the present invention having the above configuration will be described below. (Example 1: Equipment installation method (installation method with a box-punched hole for the anchor)) Fig. 4 is a plan view of the reinforced concrete machine foundation with a box punch hole. Fig. 5 is a cross-sectional view along the AA arrow in Fig. 4 with a box punch hole. Fig. 6 is a side view along the BB arrow in the reinforced concrete machine foundation with a box punch hole (with the liner 30 integrated with the main core anchor). Fig. 7 is a cross-sectional view along the A1-A1 arrow in Fig. 4 with a box punch hole cast (with the liner 30 integrated with the main core anchor). Fig. 8 is a side view along the BB arrow in Fig. 4 with a box punch hole cast (with the liner 30 integrated with the main core anchor). The installation method of the device in the first embodiment is a method of making a hole for a box of an anchor, similar to the conventional technique. When making a hole for a box of an anchor bolt, the long anchor-integrated liner 10 of the present invention is used as a liner for a temporary core (a conventional temporary liner). Also, the short anchor-integrated liner 30 (a conventional type) is used as a liner for a main core. 1. The reference lines (X direction, Y direction) of the reinforced concrete machine foundation 2 are marked out on the slab 1. The Z direction is marked out on a nearby wall, pillar, etc. Also, the X and Y reference lines for the position of the anchor bolts 20 are marked out. The foundation height (Z direction) is marked out on a nearby wall, pillar, etc. The position of the long anchor integrated liner 10 for the temporary core is marked out (see Figure 4). The position of the long anchor integrated liner 10 for the temporary core is away from the box punch hole 5 where the anchor bolts 20 are placed, similar to the installation position of the temporary liner in the conventional construction method. At this time, the position of the foundation rebar 3 is also marked out so that it does not overlap with the position of the long anchor integrated liner 10 for the temporary core. 2. Adjust the length of the long anchor integrated liner 10 for the temporary core (set the length of the shaft 12 to α) and embed and fix the lower end into the drilled hole in the slab 1 using adhesive or a concrete wedge driving method. 3. Insert the reinforcing bars (Z direction). Chip out the reinforcing bars of the slab 1 and tie the foundation reinforcing bars together, or drive the reinforcing bars 3 into the slab 1 as post-installed anchors. Arrange the reinforcement bars for the machine foundation reinforced concrete 2. 4. Place plate 7 on long anchor integrated liner 10 for temporary core (see Figure 5). When the shaft diameter is small, the plate 7 will wobble when placed, so it is a good idea to provide a horizontal support bar and fix it to the nearby rebar. When the shaft diameter is large, the plate 7 is stable when placed. Attach anchor bolt 20 so that it hangs from anchor bolt mounting hole 7a of plate 7 (see Figure 6). Create box punch hole 5 surrounding anchor bolt 20. Create the box punch hole with anchor bolt 20 and anchor integrated liner 30 removed. 5. Assemble and pour the reinforced concrete 2 for the machine foundation. Allow the concrete to harden for 28 days. Disassemble and remove the formwork 4 to create a space for removing the anchor box holes. 6. Place two sheets of slide paper 50 on the top surface of the long anchor integrated liner 10 for the temporary core (see Figure 6). The primary centering of the plate 7 is performed by adjusting the liner portion 13b of the long anchor integrated liner 10 for the temporary core. At this time, the slide paper 50 significantly reduces the sliding resistance, making it easy to adjust the centering of heavy objects. After centering, the long anchor integrated liner 10 for the temporary core is lowered one by one, the slide paper is removed, and the plate is returned to its original position. The centering nut 40 is inserted into the anchor bolt mounting hole 7a of the plate 7. The anchor bolt 20 is inserted into the centering nut 40 and fixed. This minimizes the gap in the anchor bolt mounting hole, achieving precise mounting of the anchor bolt in the X and Y directions. Two core anchor integrated liners 30 are installed on both sides near the anchor bolts 20. They are fixed to the back surface of the plate 7 with magnets 60. A conventional anchor integrated liner 30 can be easily fixed there by the simple act of attaching a magnet to the plate 7 or the back surface (made of iron) of the equipment in the space of the box punch hole 5. The core anchor integrated liner 30 uses the liner disclosed in Japanese Patent No. 4065957, which is an application filed earlier by this application. 7. Fill the box hole 5 with concrete. Leave it for 28 days until the concrete hardens. The anchor bolt 20 is fixed in place. The main core anchor integrated liner 30 is also fixed in place. Remove the magnet from the main core anchor integrated liner 30 and place two sheets of slide paper 50 on the top surface (see Figure 7). 8. Install the pump. Perform secondary centering. Adjust the main core anchor integrated liner 30. Lower the main core anchor integrated liner 30 one by one, remove the slide paper, and return it to its original position. After final confirmation of centering, inject resin into the opening of the liner portion 13b to fix it in place. This prevents the liner portion 13b from rotating due to vibration, etc., and ensures installation accuracy. 9. Grouting is performed to form the foundation grout 116. The underside and periphery of the pump base (sole plate) are fixed with concrete or mortar. A mortar finish is applied around the periphery of the foundation. According to the equipment installation method of Example 1, the plate or equipment, anchor bolts, and long anchor integrated liner for temporary core can be installed before assembling and pouring the reinforced concrete for the machine foundation, thereby significantly shortening the process.
[0015] (Example 2: Equipment installation method (installation method without drilling holes for anchors)) Fig. 9 is a plan view of a reinforced concrete machine foundation without a box punch hole. Fig. 10 is a side view of Fig. 9 before the concrete for the machine foundation is poured as seen from the CC arrow. Fig. 11 is a side view of Fig. 9 after the concrete for the foundation is poured as seen from the CC arrow. Fig. 12 is a side view of Fig. 9 after the foundation is grouted as seen from the CC arrow. If no box punch holes for the anchor bolts are provided, the temporary liner of the conventional construction method is not used. The long anchor integrated liner 10 of the present invention is used as a liner for the main core. 1. Mark out the reference lines (X direction, Y direction) of the reinforced concrete machine foundation 2 on the slab 1. Mark the Z direction on a nearby wall, pillar, etc. Mark out the X and Y reference lines for the anchor bolt 20 position. Mark the foundation height (Z direction) on a nearby wall, pillar, etc. (See Figure 9). 2. Two long anchor-integrated liners 10 for the main core are attached to both sides, centered on the marking position of the anchor bolt 20. At this time, the length of the shaft 12 of the anchor-integrated liners 10 is adjusted to α (see FIG. 10). 3. Install the insert bars (X direction, Y direction). Chip out the rebars of slab 1 and tie the foundation rebars together, or drive the rebars into the slab as post-installed anchors. Arrange the rebars. Install the formwork. 4. Place the plate 7 on the long anchor integrated liner 10 for the main core. If the shaft diameter is small, the plate 7 may be wobbly when placed, so it is advisable to provide a horizontal support bar and fix it to the nearby rebar. The centering nut 40 is inserted into the anchor bolt mounting hole 7a of the plate 7. The anchor bolt 20 is inserted into the centering nut 40. This makes it possible to minimize the gap within the anchor bolt mounting hole, thereby achieving precise mounting of the anchor bolt in the X and Y directions. 5. Assemble and pour reinforced concrete for the machine foundation up to the grout position level. Allow the concrete to harden for 28 days. 6. Place two sheets of slide paper 50 on the top surface of the long anchor integrated liner 10 for the main core (see Figure 11). Primary centering of the plate 7 is performed. At this time, the slide paper 50 significantly reduces the sliding resistance, making it easy to adjust the primary centering of heavy objects. This is done by adjusting the liner part 13b of the long anchor integrated liner 10 for the main core. Marking of the anchor bolt 40 is completed. Primary centering of the long anchor integrated liner 10 for the main core is completed. 7. Install the pump. Perform secondary centering. Adjust the long anchor integrated liner 10 for the main core. The slide paper 50 significantly reduces slip resistance, making it easy to adjust the centering of heavy objects. In addition, the secondary centering can be done with the same long anchor integrated liner 10, eliminating the need for the conventional complicated shim adjustment work that uses many different shim plates, and allowing efficient work to be done in a short time. Lower the long anchor integrated liner 10 for the main core one by one, remove the slide paper, and return to their original positions. After final confirmation of centering, inject resin into the opening of the liner portion 13b to fix it in place. This prevents the liner portion 13b from rotating due to vibration, etc., ensuring installation precision. 8. Grouting is performed to form the foundation grout 116. The underside and periphery of the pump base (sole plate) are fixed with concrete or mortar. A mortar finish is applied around the periphery of the foundation (see FIG. 12). According to the equipment installation method of the second embodiment, the plate or equipment, anchor bolts, and the main core anchor integrated liner can be installed before assembling and pouring the reinforced concrete for the machine foundation, and the process can be significantly shortened because the process of forming the box hole and the process of filling the box hole with concrete can be omitted. There is no need to provide the box hole as in the conventional construction method, and the process can be significantly shortened. The present invention has been described as a method for installing a base on a reinforced concrete machine foundation, but it can also be applied to cases where small equipment is installed directly on a reinforced concrete machine foundation without using a base. The present invention can also be applied to any structure in which anchor bolts are embedded in reinforced concrete machine foundations. Although the preferred embodiments of the present invention have been described above, the present invention is not limited to the above-described embodiments and various modifications can be made without departing from the spirit and scope of the present invention. Furthermore, the present invention is not limited to the combinations shown in the embodiments, but can be implemented in various combinations. [Industrial Applicability]
[0016] It can be applied to machinery and equipment installed on reinforced concrete machine foundations, work of erecting steel towers on basin concrete or slabs, construction work of erecting steel frames and columns on basin concrete or slabs, bridge construction, road construction, electrical work to install electrical equipment, and dam construction. [Explanation of symbols]
[0017] 1. Slab 2. Machine foundation reinforced concrete 3. Steel Bars 4. Formwork 5 Box cutout hole 6 Temporary Liner 7 Plate 8 Liners 10 Long anchor integrated liner 12 Shaft 13a Threaded part 13b Liner section 20 Anchor bolt 30 Liner with integrated anchor for main core (conventional type) 40 Centering nut 50 Slide Paper 60 Magnet 100 Large water pump 102 Pump body 104 Discharge pipe 106 Lift pipe 108 Impeller 110 Aquarium 112 Aperture 114 Mechanical Basics 116 Foundation Grout 118 Mortar Finish
Claims
[Claim 1] A long anchor-integrated liner is characterized in that it has one end fixed to a slab under a reinforced concrete machine foundation and the other end having a threaded portion protruding from the upper surface of the reinforced concrete machine foundation and a shaft having a liner portion that screws into the threaded portion to form a mounting surface for installing equipment on the upper surface or a plate for installing equipment, and that allows the installation height of the plate or equipment to be adjusted, and the total length L from the upper surface of the liner portion to the lower end of the shaft is set to the total length H of the machine foundation and the post-installed anchor fixing allowance H1 of the shaft (L = H + H1).
Citation Information
Patent Citations
Anchor integrated liner and equipment installation method
JP3775717B2
Anchor integrated liner and equipment installation method
JP4065957B2