Project management system, project management method, and project management program

The project management system addresses the challenge of unrealized profit tracking in consolidated accounting by providing a mechanism to calculate and manage unrealized profits, enabling timely and accurate financial reporting for parent companies.

JP2024153418AActive Publication Date: 2024-10-29OBIC CO LTD

Patent Information

Application Number
JP2023067300
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-17
Publication Date
2024-10-29
Estimated Expiration
2043-04-17

AI Technical Summary

Technical Problem

Existing project management systems fail to provide a mechanism for parent companies to quickly grasp unrealized profits associated with transactions with subsidiaries during consolidated accounting, leading to delayed and inaccurate financial reporting.

Method used

A project management system that includes a control section for managing consolidated accounting targets, with features for registering and calculating unrealized profits by linking parent and subsidiary project information, enabling the calculation of unrealized profit amounts through a storage area that stores asset-contract details and cost information.

Benefits of technology

Enables parent companies to promptly understand and manage unrealized profits, facilitating faster consolidated financial reporting and settlement, enhancing management efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024153418000001_ABST
    Figure 2024153418000001_ABST
Patent Text Reader

Abstract

To provide a project management system that allows a parent company to quickly grasp an unrealized profit arising from transaction with a subsidiary company when a project is shared and executed among companies within a scope of consolidated accounting objects.SOLUTION: A project management system of an embodiment includes: project registration means that registers contract details including project identification information and a status class indicating whether a project is completed or not for a parent company; cost registration means that registers purchase data including a date, an invoice number, a supplier, a product, a tax-excluded amount, and project identification information for the parent company; and unrealized profit amount calculation means that tallies up, on the basis of the purchase data, for each project identification information of the parent company, subtracts a net asset amount, which is a total amount of cost amounts of cost information for project identification information of a subsidiary company linked to the project identification information of the parent company by the unrealized profit aggregated asset-contract details master, from a tax-excluded amount of the product registered in an asset target product master, and calculates an unrealized profit amount.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a project management system, a project management method, and a project management program. [Background technology]

[0002] For example, in the IT industry, software package development is often shared among consolidated group companies. In such cases, the costs incurred in developing a single piece of software involve buying and selling. In the case of group companies, the parent company's software suspense account includes unrealized profits, so when viewed on a consolidated basis, it is necessary to understand the amount that has been excluded. For example, Patent Document 1 is a conventional system for managing unrealized profits in consolidated accounting. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2023-3320 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, the above-mentioned Patent Document 1 does not state anything about a parent company being able to quickly identify unrealized profits arising from transactions with its subsidiaries when a project is shared and executed by companies within the scope of consolidated accounting.

[0005] The present invention has been made in consideration of the above, and aims to provide a project management system, a project management method, and a project management program that enable a parent company to grasp unrealized profits associated with transactions with subsidiaries at an early stage when a project is shared and executed by companies within the scope of consolidated accounting. [Means for solving the problem]

[0006] In order to solve the above-mentioned problems and achieve the object, the present invention provides a project management system having a control unit, the control unit being configured to be able to access a storage area storing a consolidated supplier master in which subsidiaries that are suppliers to be consolidated are registered, an asset target product master in which products to be capitalized, account items at completion, and account items at incomplete are registered in association with each other, cost information including project identification information, cost items, and cost amounts for the subsidiaries, and an unrealized profit summary asset-contract detail master in which project identification information of a parent company and project identification information of a subsidiary are registered in association with each other, and a storage area storing a consolidated supplier master in which project identification information, completion or incomplete designation ... the cost registration means for registering purchase data for a parent company, including a date, a slip number, a supplier, a product, a tax-excluded amount, and project identification information; and an unrealized profit calculation means for calculating an unrealized profit amount by performing an aggregation for each project identification information of the parent company of the contract details based on the purchase data and subtracting a net asset amount, which is the total amount of cost amounts of the cost information for the project identification information of a subsidiary company linked to the project identification information of the parent company by the unrealized profit aggregation asset-contract detail master, from the tax-excluded amount of the product registered in the asset target product master.

[0007] In addition, according to one aspect of the present invention, the unrealized profit calculation means may further create and output an unrealized profit statement including project identification information, supplier, product, amount excluding tax, unrealized profit amount, net asset amount, and account name.

[0008] According to another aspect of the present invention, the unrealized profit calculation means may not tally up any products that are not registered in the asset target product master.

[0009] Furthermore, according to one aspect of the present invention, the unrealized profit calculation means may set the "account name" of the unrealized profit statement by retrieving a "completed account item" from the asset target product master using the product as a key if the status classification in the contract details is "completed," and by retrieving a "not completed account item" from the asset target product master using the product as a key if the status classification in the contract details is "not completed."

[0010] According to another aspect of the present invention, the control unit may further include an asset information processing means for creating asset information based on the unrealized profit statement and outputting the asset information to a fixed asset system.

[0011] According to another aspect of the present invention, the completed account item may include software, and the uncompleted account item may include a software suspense account.

[0012] In order to solve the above-mentioned problems and achieve the object, the present invention provides a project management method executed by an information processing device having a control unit, the control unit being configured to be able to access a storage area storing a consolidated supplier master in which subsidiaries that are suppliers to be consolidated are registered, an asset target product master in which products to be capitalized, account items at completion, and account items at non-completion are registered in association with each other, cost information including project identification information, cost items, and cost amounts for the subsidiaries, and an unrealized profit summary asset-contract detail master in which project identification information of a parent company and project identification information of a subsidiary are registered in association with each other, and the control unit is configured to be able to access a storage area storing a consolidated supplier master in which subsidiaries that are suppliers to be consolidated are registered, an asset target product master in which products to be capitalized, account items at completion, and account items at non-completion are registered in association with each other, and an unrealized profit summary asset-contract detail master in which project identification information of a parent company and project identification information of a subsidiary are registered in association with each other, the step of registering contract details including a status class specifying whether a project is completed or not in the storage area; the step of registering purchase data including a date, a slip number, a supplier, a product, a tax-excluded amount, and project identification information for a parent company; and the step of calculating an unrealized profit amount by performing an aggregation for each project identification information of the parent company of the contract details based on the purchase data and subtracting a net asset amount, which is the total amount of cost amounts of the cost information for the project identification information of a subsidiary company linked to the project identification information of the parent company in the unrealized profit aggregation asset-contract detail master, from the tax-excluded amount of the product registered in the asset target product master, to calculate an unrealized profit amount.

[0013] In order to solve the above-mentioned problems and achieve the object, the present invention provides a project management program to be executed by an information processing device having a control unit, the control unit being configured to be able to access a memory area storing a consolidated supplier master in which subsidiaries that are suppliers to be consolidated are registered, an asset target product master in which products to be capitalized, account items at completion, and account items at uncompletion are registered in association with each other, and, for the subsidiaries, cost information including project identification information, cost items, and cost amounts, and an unrealized profit summary asset-contract detail master in which project identification information of a parent company and project identification information of a subsidiary are registered in association with each other, and the control unit is configured to access a memory area storing, for the parent company, project identification information, project completion or uncompletion information, and an asset-contract detail master in which project identification information of the parent company and project identification information of a subsidiary are registered in association with each other, the project management program is characterized in that the program executes a project registration step of registering contract details including a status class that specifies the composition of a project in the storage area; a cost registration step of registering purchase data including a date, a document number, a supplier, a product, an amount excluding tax, and project identification information for a parent company; and an unrealized profit amount calculation step of calculating an unrealized profit amount by performing an aggregation for each project identification information of the parent company of the contract details based on the purchase data and subtracting a net asset amount, which is the total amount of cost amounts of the cost information for the project identification information of a subsidiary company that is linked to the project identification information of the parent company by the unrealized profit aggregation asset-contract detail master, from the amount excluding tax of the product registered in the asset target product master. Effect of the Invention

[0014] According to the present invention, when a project is shared and executed by companies within the scope of consolidated accounting, it is possible for a parent company to quickly grasp unrealized profits arising from transactions with its subsidiaries. [Brief description of the drawings]

[0015] [Figure 1] FIG. 1 is a diagram showing an example of a configuration of a project management system according to the present embodiment. [Diagram 2] FIG. 2 is a diagram showing an example of the configuration of the linked supplier master data. [Diagram 3]FIG. 3 is a diagram illustrating an example of the configuration of the asset target product master. [Figure 4] FIG. 4 is a diagram showing an example of the configuration of the unrealized profit totalization asset-contract details master. [Diagram 5] FIG. 5 is a flow diagram showing an example of the overall processing of the project management system according to this embodiment. [Figure 6] FIG. 6 is a flow diagram showing an example of the overall processing of the subsidiary system according to this embodiment. [Figure 7] FIG. 7 is a diagram for explaining a specific example of the processing of the control unit of the project management system and the subsidiary system according to the present embodiment. [Figure 8] FIG. 8 is a diagram for explaining a specific example of the processing of the control unit of the project management system and the subsidiary system according to the present embodiment. [Figure 9] FIG. 9 is a diagram for explaining a specific example of the processing of the control unit of the project management system and the subsidiary system according to the present embodiment. [Figure 10] FIG. 10 is a diagram for explaining a specific example of the processing of the control unit of the project management system and the subsidiary system according to the present embodiment. [Figure 11] FIG. 11 is a diagram for explaining a specific example of the processing of the control unit of the project management system and the subsidiary system according to the present embodiment. [Figure 12] FIG. 12 is a diagram for explaining a specific example of the processing of the control unit of the project management system and the subsidiary system according to the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0016] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of a project management system, a project management method, and a project management program according to the present invention will be described in detail with reference to the accompanying drawings. Note that the present invention is not limited to the preferred embodiments.

[0017] [1: Overview] For example, in the IT industry, it is common for a company to outsource software development to a consolidated corporation, entrusting all or part of the software development to the company. In such cases, it is assumed that the outsourcing costs paid to the consolidated corporation include profits. In other words, if you only look at individual accounting figures, the software in progress account will include unrealized profits for consolidated accounting purposes until the software is completed, and the assets that are capitalized when the software is completed will also include unrealized profits for consolidated accounting purposes. Since the software in progress account, excluding unrealized profits, is the actual amount, understanding it without waiting for legal consolidation will lead to improved management efficiency.

[0018] However, in the past, accurate suspense accounts could not be determined without waiting for a quarter due to complex consolidated financial statements.

[0019] In this embodiment, a system has been constructed that, when a project is shared and executed by companies within the scope of consolidated accounting, makes it possible to grasp early the unrealized profits associated with the transaction.

[0020] Specifically, in the project management system of this embodiment, a system that takes consolidated accounting into consideration, which is not found in conventional project management system + fixed asset systems, has been constructed. By aggregating the cost amounts of each company, it is possible to manage unrealized profits and consolidated asset amounts (net asset amounts). In addition, by linking accurate costs in project management, it is possible to grasp precise figures. Furthermore, by utilizing the project management system + fixed asset system, it is possible to centrally manage unrealized software suspense accounts + software on a detail basis, and grasp the latest amounts that take depreciation costs into account on a monthly basis.

[0021] In addition, in the project management system of this embodiment, by managing unrealized profits, the consolidated asset amount can be confirmed immediately before linking to the fixed asset system or consolidated accounting system, so that the processing can proceed faster than the consolidation procedure of a normal consolidated accounting system, and consolidated settlement can be accelerated. By managing the depreciation calculation of the consolidated asset amount in parallel with the fixed asset management of each company, the figures can be grasped at an earlier stage than when depreciation is calculated after linking to the consolidated accounting system, and consolidated settlement can be accelerated. Furthermore, even if the unit of consolidated settlement in the consolidated accounting system is not monthly, by utilizing the project management system + fixed asset system, figures can be grasped on a monthly basis for each individual company, and management figures taking into consideration the consolidated accounting can be grasped at an earlier stage.

[0022] The project management system of the present invention is widely applicable to industries in which projects are shared and executed by companies within the scope of consolidated accounting, such as IT companies, the service industry, and the construction industry.

[0023] [2. Configuration] An example of the configuration of a project management system according to this embodiment will be described with reference to FIG. 1 and the like. FIG. 1 is a block diagram showing an example of the configuration of a project management system 100 according to this embodiment. The project management system 100 according to this embodiment is communicably connected to a server 200, a fixed asset management system 400, a consolidated accounting system 500, a subsidiary system 600, etc., via a network 300. The project management system 100 is used, for example, by a parent company (e.g., parent company X) when a project is to be shared and executed by companies within the consolidated accounting. The subsidiary system 600, etc. is used by a subsidiary (e.g., subsidiary Y) when a project is to be shared and executed by companies within the consolidated accounting.

[0024] The project management system 100 is, for example, a commercially available desktop personal computer or a workstation.

[0025] The project management system 100 includes a control unit 102, a communication interface unit 104, a storage unit 106, and an input / output interface unit 108. The units included in the project management system 100 are connected to each other so as to be able to communicate with each other via any communication path.

[0026] The communication interface unit 104 communicably connects the project management system 100 to the network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with other devices via the communication line. Here, the network 300 has a function of connecting the project management system 100 to the server 200, the fixed asset management system 400, and the consolidated accounting system 500 so that they can communicate with each other, and is, for example, the Internet or a LAN (Local Area Network). The project management system 100 is configured to be able to access the storage unit 606 of the subsidiary system 600, and can acquire data in real time from the contract details table 606a, the purchase table 606b, the cost information table 606c, etc. of the storage unit 606.

[0027] An input device 112 and an output device 114 are connected to the input / output interface unit 108. The output device 114 may be a monitor (including a home television), a speaker, or a printer. The input device 112 may be a keyboard, a mouse, a microphone, or a monitor that cooperates with a mouse to realize a pointing device function. In the following, the output device 114 may be referred to as the monitor 114, and the input device 112 may be referred to as the keyboard 112 or the mouse 112. Displaying information on the monitor 114 and the user operating the input device 112 may be referred to as a "user operation via a UI."

[0028] Various databases, tables, files, etc. are stored in the storage unit 106. Computer programs for cooperating with an OS (Operating System) to give instructions to a CPU (Central Processing Unit) to perform various processes are recorded in the storage unit 106. For example, memory devices such as RAM (Random Access Memory) and ROM (Read Only Memory), fixed disk devices such as hard disks, flexible disks, optical disks, etc. can be used as the storage unit 106.

[0029] The memory unit (memory area) 106 stores, for example, a consolidated supplier master 106a, an asset target product master 106b, an unrealized profit total asset-contract detail master 106c, a contract detail table 106d, a purchase table 106e, an unrealized profit statement, an asset information table 106f, and the like. Fig. 2 is a diagram showing an example of the configuration of the consolidated supplier master 106a. Fig. 3 is a diagram showing an example of the configuration of the asset target product master 106b. Fig. 4 is a diagram showing an example of the configuration of the unrealized profit total asset-contract detail master 106c.

[0030] The consolidated supplier master 106a is a master for setting the suppliers that are subsidiaries of the consolidated accounting target, and can be configured with a table or the like in which the suppliers that are subsidiaries of the consolidated accounting target (supplier CD and / or supplier name) are registered, as shown in Fig. 2. The supplier CD is the primary key.

[0031] The asset target product master 106b is a master for setting information on products to be converted into assets, and can be configured with a table or the like in which products (product CD and / or product name), completion account CD, completion account item name, non-completion account CD, and non-completion account item name are associated and registered, as shown in Fig. 3. The supplier CD is the primary key.

[0032] The unrealized profit aggregated asset-contract detail master 106c is a master for linking the parent company's project identification information with the subsidiary company's project identification information, and can be configured as a table or the like in which the asset number, asset name, project identification information (contract detail number and / or contract detail name), and supplier (supplier CD and / or supplier name) of parent company X are associated with and registered with the project identification information (contract detail number and / or contract detail name) of subsidiary company Y, as shown in Fig. 4. The asset number is the primary key.

[0033] The contract details table 106d is a table for storing the contract details of the parent company. The contract details may include project identification information (contract detail number and / or contract detail name), a direct / indirect cost classification that specifies the classification of direct or indirect costs, a classification name that specifies the direct or indirect cost, a department CD, a division name, and a status classification that specifies the completion or incomplete status of the project. The contract detail number is the primary key.

[0034] The purchase table 106e is a table for storing the parent company's purchase data. The purchase data may include the date, invoice number, supplier (supplier CD and / or supplier name), product (product CD and / or product name), tax-excluded amount, and project identification information (contract specification number and / or contract specification name). The contract specification number, supplier CD, and product CD are primary keys.

[0035] The asset information table 106f is a table for storing asset information. The asset information may include an asset number, an asset name, an asset type CD, an asset type name, and taxation and accounting (depreciation method, durability method, memorandum value, acquisition amount, durability method, memorandum value, net depreciation method, net durability method, net memorandum value, net acquisition amount, net durability method, and net memorandum value).

[0036] Returning to Fig. 1, the control unit 102 is a CPU or the like that performs overall control of the project management system 100. The control unit 102 has an internal memory for storing control programs such as an OS, programs that define various processing procedures, required data, and the like, and executes various types of information processing based on these stored programs.

[0037] The control unit 102 is configured to control the consolidated supplier master 106a, the asset target product master 106b, the unrealized profit total asset-contract details master 106c, the contract details table 106d, the purchase table 106e, the unrealized profit statement, and the asset information table 106f, which are stored in the storage unit 106. etc. may be provided in another location (for example, server 200) as long as they are accessible by control unit 102.

[0038] The control unit 102 conceptually includes, in terms of functions, a master maintenance unit 102a, a project registration unit 102b, a cost registration unit 102c, an unrealized profit calculation unit 102d, an asset information processing unit 102e, and a screen display control unit 102f.

[0039] The master maintenance unit 102a performs settings such as data input, addition, change, and update for the consolidated target supplier master 106a, the asset target product master 106b, and the unrealized profit aggregated asset-contract detail master 106c in response to, for example, an operator's operation on a master maintenance screen (not shown) displayed on the monitor 114.

[0040] The project registration unit 102b inputs contract details regarding direct costs and indirect costs in response to, for example, an operator's operation on a project registration screen (not shown) displayed on the monitor 114, and registers the details in the contract details table 106d.

[0041] The cost registration unit 102c is for registering cost information such as purchase data, and for example, inputs purchase data in response to an operator's operation on a purchase input screen (not shown) displayed on the monitor 114, and registers the data in a purchase table 106e.

[0042] The unrealized profit calculation unit 102d performs an aggregation for each project identification information of the contract details based on the purchasing data, and calculates the amount of unrealized profit by subtracting the net asset amount, which is the total amount of cost amounts of the cost information in the cost information table 606c for the project identification information of the subsidiary company that is linked to the project identification information of the parent company by the unrealized profit aggregation asset-contract detail master 106c, from the tax-excluded amount of the product registered in the asset target product master 106b.

[0043] The unrealized profit calculation unit 102d further creates an unrealized profit statement including project identification information, supplier, product, amount excluding tax, unrealized profit amount, net asset amount, and account name, and displays it on the unrealized profit statement screen while also registering it in the memory unit 106.

[0044] Moreover, the unrealized profit calculation unit 102d may not tally up products that are not registered in the asset target product master 106b.

[0045] In addition, the unrealized profit calculation unit 102d may set the "account name" of the unrealized profit statement by retrieving the "account item at completion" from the asset target product master 106b using the product as a key if the status classification in the contract details is "completed," and by retrieving the "account item at uncompleted" from the asset target product master 106b using the product as a key if the status classification in the contract details is "incomplete."

[0046] The asset information processing unit 102e creates asset information based on an unrealized profit statement in response to, for example, an operator's operation on an asset information creation screen displayed on the monitor 114, registers the same in the asset information table 106f, and outputs the same to the fixed asset management system 400.

[0047] The screen display control unit 102f controls the display and input of various screens (for example, a project registration screen, a purchase input screen, an unrealized profit statement screen, an asset information creation screen, a master maintenance screen, etc.) displayed on the monitor 114.

[0048] The subsidiary system 600 can be configured with hardware similar to that of the project management system 100, and is equipped with a control unit 602, a communication interface unit (not shown), a memory unit 606, and an input / output interface unit (not shown), and a description of the similar hardware configuration will be omitted.

[0049] The memory unit (memory area) 606 stores, for example, a contract details table 606a, a purchase table 606b, a cost information table 606c, and the like.

[0050] The contract details table 606a is a table for storing the contract details of subsidiary company Y. The contract details may include project identification information (contract detail number and / or contract detail name), a direct / indirect cost classification that specifies the classification of direct or indirect costs, a classification name that specifies direct or indirect costs, department CD, division name, and a status classification that specifies whether the project is completed or incomplete. The contract detail number is the primary key.

[0051] The purchase table 606b is a table for storing purchase data for subsidiary company Y. The purchase data may include date, invoice number, supplier (supplier CD and / or supplier name), product (product CD and / or product name), tax-excluded amount, and project identification information (contract specification number and / or contract specification name). The contract specification number, supplier CD, and product CD are primary keys.

[0052] The cost information table 606c is a table for storing the cost information of subsidiary company Y. The cost information may include project identification information (contract detail number and / or contract detail name), cost CD, cost item name, and cost amount. The contract detail number, supplier CD, and product CD are primary keys.

[0053] The control unit 602 conceptually comprises a project registration unit 602a and a cost registration unit 602b.

[0054] The project registration unit 602a inputs contract details in response to, for example, an operator's operation on a project registration screen (not shown) displayed on the monitor 114, and registers them in a contract details table 606a.

[0055] The cost registration unit 602b is for registering cost information such as purchase data, and for example, inputs purchase data in response to an operator's operation on a purchase input screen (not shown) displayed on a monitor, and registers the data in a purchase table 606b.

[0056] In addition, the cost registration unit 602b creates cost information by aggregating cost amounts (purchase costs of the products in the purchase data, labor costs, outsourcing costs, transportation costs, indirect costs, sales costs, administrative costs, etc.) based on the purchase data in the purchase table 606b, and registers the cost information in the cost information table 606c.

[0057] [3. Specific Examples] A specific example of the overall processing of the control unit 102 of the project management system 100 and the subsidiary system 600 in this embodiment will be described with reference to FIGS.

[0058] (3-1. Overall Processing of the Project Management System 100) FIG. 5 is a flowchart for explaining an outline of the overall processing of the control unit 102 of the project management system 100 in this embodiment.

[0059] With reference to FIG. 5, an outline of the overall processing of the control unit 102 of the project management system 100 in this embodiment will be described. In FIG. 5, the project registration unit 102b executes a contract details registration process (step S1). Specifically, in the contract details registration process, the project registration unit 102b registers contract details for direct costs in the contract details table 106d, for example, in response to an operator's operation on a project registration screen (not shown) displayed on the monitor 114. The project registration unit 102b also executes an indirect project registration process (step S2). Specifically, in the indirect project registration process, the project registration unit 102b registers contract details for indirect costs in the contract details table 106d, for example, in response to an operator's operation on a project registration screen (not shown) displayed on the monitor 114.

[0060] The cost entry unit 102c executes a purchase input process (step S3). Specifically, in the purchase input process, the cost entry unit 102c, for example, inputs purchase data in response to an operator's operation on a purchase input screen (not shown) displayed on the monitor 114, and registers the data in the purchase table 106e.

[0061] The master maintenance unit 102a executes the unrealized profit total asset-contract detail master maintenance process (step S4). In the unrealized profit total asset-contract detail master maintenance process, the master maintenance unit 102a sets data in the unrealized profit total asset-contract detail master 106c in response to, for example, an operator's operation on a master maintenance screen (not shown) displayed on the monitor 114.

[0062] The unrealized profit calculation unit 102d executes the unrealized profit statement output process (step S5). Specifically, in the unrealized profit statement output process, the unrealized profit calculation unit 102d performs aggregation for each project identification information based on the purchase data, subtracts the net asset amount, which is the total amount of the cost amount of the cost information of the cost information table 606c for the project identification information of the subsidiary linked to the project identification information of the parent company by the unrealized profit aggregation asset-contract detail master 106c, from the tax-excluded amount of the product registered in the asset target product master 106b to calculate the unrealized profit amount, creates an unrealized profit statement including the project identification information, the supplier, the product, the tax-excluded amount, the unrealized profit amount, the net asset amount, and the account name acquired from the asset target product master 106b, and displays and outputs the unrealized profit statement screen displayed on the monitor 114, and stores it in the storage unit 106.

[0063] In this case, unrealized profits may not be calculated for suppliers that are not subject to consolidated accounting in the consolidated supplier master 106a. Products that are not registered as asset target products in the asset target product master 106b may not be tallied. Regarding the "account item", if the status category in the contract details is "completed", the "account item at completion" is obtained and set from the asset target product master 106b using the product as a key, and if the status category in the contract details is "uncompleted", the "account item at uncompleted" is obtained and set from the asset target product master 106b using the product as a key.

[0064] The asset information processing unit 102e executes an asset information additional input process (step S6). Specifically, in the asset information input process, the asset information processing unit 102e extracts and displays information from the unrealized profit statement and the contract details for the contract detail number linked in the unrealized profit total asset-contract detail master 106c, using the asset number designated as a key in response to an operator's operation on the asset information creation screen displayed on the monitor 114, and further creates asset information by adding information related to assets to the extracted information, and registers the information in the asset information table 106f.

[0065] The asset information processing unit 102e executes an asset information output process (step S7). Specifically, the asset information processing unit 102e outputs the asset information registered in the asset information table 106f to other systems such as the fixed asset management system 400 and the consolidated accounting system 500.

[0066] (3-2. Overall processing of the subsidiary system 600) FIG. 6 is a diagram showing a flow for explaining an outline of the overall processing of the control unit 602 of the subsidiary system 600 in this embodiment.

[0067] An outline of the overall processing of the control unit 602 of the subsidiary system 600 in this embodiment will be described with reference to Fig. 6. In Fig. 6, the project registration unit 602a executes a contract details registration process (step T1). Specifically, in the contract details registration process, the project registration unit 602a registers contract details in a contract details table 606a in response to, for example, an operator's operation on a project registration screen (not shown) displayed on a monitor.

[0068] The cost entry unit 602b executes a purchase input process (step T2). Specifically, in the purchase input process, the cost entry unit 602b enters purchase data in response to an operator's operation on a purchase input screen (not shown) displayed on a monitor, and registers the data in the purchase table 606b.

[0069] The cost registration unit 602b executes a cost calculation process (step T3). Specifically, in the cost calculation process, the cost registration unit 602b creates cost information by tallying up the cost amounts (purchase costs of products in the purchase data, labor costs, outsourcing costs, transportation costs, overhead costs, sales costs, management costs, etc.) based on the purchase data in the purchase table 606b, and registers the cost information in the cost information table 606c.

[0070] (3-3. Sample data) 7 to 12 are diagrams showing sample data for explaining a specific example of the processing by the control unit 102 of the project management system 100 and the control unit 602 of the subsidiary system 600 in this embodiment. A specific example of the processing by the control unit 102 of the project management system 100 and the control unit 602 of the subsidiary system 600 will be explained with reference to Figs. 7 to 12.

[0071] (Master maintenance process of project management system 100) A specific example of the master maintenance process of the project management system 100 will be described with reference to Fig. 7. The master maintenance unit 102a sets data in advance in the linked supplier master 106a and the asset target product master 106b in response to, for example, an operator's operation on a master maintenance screen (not shown) displayed on the monitor 114.

[0072] 7A is a diagram showing a setting example of the linked supplier master 106a. The linked supplier master 106a has the fields of supplier CD and supplier name. In the example shown in the figure, the supplier CD is "S001" and the supplier name is "Company Y".

[0073] 7B is a diagram showing a setting example of the asset target product master 106b. The asset target product master 106b has the items of product CD, product name, completion account CD, completion account item name, incomplete account CD, and incomplete account item name. In the example shown in the figure, the first line is product CD "H001", product name "outsourcing cost (asset)", completion account CD "K001", completion account item name "software", incomplete account CD "K002", and incomplete account item name "software provisional account", and the second line is product CD "L001", product name "outsourcing cost (building)", completion account CD "K101", completion account item name "building", incomplete account CD "K102", and incomplete account item name "construction provisional account".

[0074] (S1: Contract Detail Registration Processing and S2: Indirect PJ Registration Processing of the Project Management System 100) A specific example of the contract details registration process and the indirect project registration process of the project management system 100 will be described with reference to Fig. 8. The project registration unit 102b inputs contract details regarding direct costs and indirect costs in response to, for example, an operator's operation on a project registration screen (not shown) displayed on the monitor 114, and registers them in the contract details table 106d.

[0075] FIG. 8A is a diagram showing an example of contract details registered in the contract details table 106d. The contract details include the following items: contract detail number, contract detail name, direct / indirect cost category specifying the category of direct cost (1) or indirect cost (2), category name specifying direct cost or indirect cost, department (CD), division name, and status category specifying the status of the project, whether completed or incomplete.

[0076] In the example shown in the figure, the first line shows contract details regarding direct costs, with contract detail number "X0001," contract detail name "XPJ-01," direct / indirect category "1," category name "direct," department CD "XB1," department name "System 1," and status category "completed." The fourth line shows contract details regarding indirect costs, with contract detail number "X1001," contract detail name "X System 1 PJ," direct / indirect category "2," category name "indirect," department CD "XB1," department name "System 1," and status category "not completed."

[0077] (T1 in subsidiary system 600: Contract details registration process) A specific example of contract details registration processing in the subsidiary system 600 will be described with reference to Fig. 8. The project registration unit 602a inputs contract details in response to, for example, an operator's operation on a project registration screen (not shown) displayed on a monitor, and registers them in a contract details table 606a.

[0078] FIG. 8B is a diagram showing an example of contract details registered in the contract details table 606a. The contract details include the following items: contract detail number, contract detail name, direct / indirect cost category specifying the category of direct cost (1) or indirect cost (2), category name specifying direct cost or indirect cost, department (CD), division name, and status category specifying the status of the project, whether completed or incomplete.

[0079] In the example shown in the figure, the first line shows the contract detail number "Y0001," the contract detail name "YPJ-01," the direct / indirect classification "1," the classification name "direct," the department CD "YB1," the department name "System 1," and the status classification "completed." The second line shows the contract details regarding indirect costs, and shows the contract detail number "Y0012," the contract detail name "System 1 PJ," the direct / indirect classification "2," the classification name "direct," the department CD "YB1," the department name "System 1," and the status classification "not completed."

[0080] (S3 of the project management system 100: Purchase input processing) A specific example of the purchase input process will be described with reference to Fig. 9. The cost registration unit 102c registers purchase data in the purchase table 106e in response to, for example, an operator's operation on a purchase input screen (not shown) displayed on the monitor 114.

[0081] 9(A) is a diagram showing an example of purchase data registered in the purchase table 106e. The purchase data includes the following items: date, slip number, supplier CD, supplier name, product CD, product name, amount excluding tax, contract specification number, and contract specification name. In the example shown in the figure, the first line contains the date "2022 / 4 / 1", slip number "123456789", supplier CD "S001", supplier name "Company A", product CD "H001", product name "Outsourcing cost (asset)", amount excluding tax "1,000,000", contract specification number "0001", and contract specification name "PJ-01".

[0082] The suppliers "Company B, Company C, and Company D" on lines 3 to 8 are not registered as suppliers subject to consolidated accounting in the consolidated supplier master 106a, and are not subject to consolidated accounting, so unrealized profits are not calculated in the unrealized profit statement. The product "Advance Payment" on lines 9 to 11 is not registered as an asset target product in the asset target product master 106b, and is not subject to asset accounting, so it is not included in the calculations in the unrealized profit statement.

[0083] (Subsidiary System 600 T2: Purchase Input Processing) A specific example of purchase input processing of the subsidiary system 600 will be described with reference to Fig. 9. The cost registration unit 602b inputs purchase data and registers it in the purchase table 606b in response to, for example, an operator's operation on a purchase input screen (not shown) displayed on a monitor.

[0084] 9B is a diagram showing an example of purchase data registered in the purchase table 106e. The purchase data includes the following fields: date, slip number, supplier CD, supplier name, product CD, product name, amount excluding tax, contract specification number, and contract specification name. In the example shown in the figure, the first line contains the date "2022 / 4 / 1", slip number "234567890", supplier CD "S005", supplier name "Company A", product CD "H003", product name "Consumables", amount excluding tax "900,000", contract specification number "Y0001", and contract specification name "YPJ-01".

[0085] (Project Management System 100 S4: Unrealized Profit Aggregation Assets - Contract Detail Master Maintenance Processing) A specific example of the unrealized profit total asset-contract detail master maintenance process of the project management system 100 will be described with reference to Fig. 10. The master maintenance unit 102a sets data in the unrealized profit total asset-contract detail master 106c in response to, for example, an operator's operation on a master maintenance screen (not shown) displayed on the monitor 114.

[0086] 10 is a diagram showing a setting example of the unrealized profit totaling asset-contract detail master 106c. The unrealized profit totaling asset-contract detail master 106c includes items of asset number, asset name, contract detail number, contract detail name, supplier CD, and supplier name of parent company X, and contract detail number and contract detail of subsidiary company Y.

[0087] In the example shown in the figure, the first line contains parent company X's asset number "XSW0001," asset name "XPJ-01SW," contract detail number "X0001," contract detail name "XPJ-01," supplier CD "S001," and supplier name "Company Y," as well as subsidiary company Y's contract detail number "Y0001" and contract detail "YPJ-01." The second line contains parent company X's asset number "XSW0002," asset name "XPJ-21SW," contract detail number "X1001," contract detail name "X Inter-System Project," supplier CD "S001," and supplier name "Company Y," as well as subsidiary company Y's contract detail number "Y0002" and contract detail "YPJ-02."

[0088] (T3: Cost Accounting Processing in Subsidiary System 600) A specific example of the cost calculation process of the subsidiary system 600 will be described with reference to Fig. 11. The cost registration unit 602b creates cost information by tallying up the cost amounts (purchase costs of products in the purchase data, labor costs, outsourcing costs, transportation costs, overhead costs, sales costs, management costs, etc.) for each contract detail number based on the cost data of the purchase data and the like in the purchase table 606b, and registers the cost information in the cost information table 606c. Note that it is assumed that the memory unit 606 has registered cost data other than the purchase data, such as labor costs, outsourcing costs, transportation costs, overhead costs, sales costs, management costs, etc., and creates the cost information by referring to this data.

[0089] 11 is a diagram showing an example of cost information of subsidiary company Y registered in the cost information table 606c. The cost information has the following fields: contract detail number, contract detail name, cost CD, cost item name, and cost amount. In the example shown in the figure, the first line shows subsidiary company Y's contract detail number "Y0001", contract detail "YPJ-01", cost CD "K003", cost item name "consumable cost", and cost amount "900,000", and the second line shows subsidiary company Y's contract detail number "Y0001", contract detail "YPJ-01", cost CD "K004", cost item name "labor cost", and cost amount "10,000".

[0090] (S5 of the project management system 100: Unrealized profit statement output process) A specific example of the unrealized profit statement output process of the project management system 100 will be described with reference to Fig. 7. The unrealized profit calculation unit 102d performs aggregation for each contract detail number based on the purchase data, subtracts the net asset amount, which is the total amount of cost amounts of the cost information in the cost information table 606c for the contract detail number of the subsidiary linked to the contract detail number of the parent company by the unrealized profit aggregation asset-contract detail master 106c, from the tax-excluded amount of the product registered in the asset target product master, calculates the unrealized profit amount, creates an unrealized profit statement including the contract detail number, contract detail name, supplier CD, supplier name, product CD, product name, tax-excluded amount, unrealized profit amount, net asset amount, account CD and account name acquired from the asset target product master 106b, and displays and outputs it on the unrealized profit statement screen displayed on the monitor 114, and stores it in the storage unit 106.

[0091] In this case, unrealized profits are not calculated for suppliers that are not subject to consolidated accounting in the consolidated supplier master 106a. Products that are not registered as asset target products in the asset target product master 106b are not tallied. For "account item", if the status category in the contract details is "completed", the "account item at completion" is obtained and set from the asset target product master 106b using the product CD as a key, and if the status category in the contract details is "uncompleted", the "account item at uncompleted" is obtained and set from the asset target product master 106b using the product CD as a key.

[0092] 11B is a diagram showing an example of data for an unrealized profit statement. The unrealized profit statement includes a contract detail number, a contract detail name, a supplier CD, a supplier name, a product CD, a product name, a tax-excluded amount, an unrealized profit amount, a net asset amount, an account CD, and an account name.

[0093] In the example shown in the figure, the first line contains the contract detail number "X0001," contract detail name "XPJ-01," supplier CD "S001," supplier name "Company Y," product CD "H001," product name "Subcontract cost (asset)," amount excluding tax "1,000,000," unrealized profit amount "87,655," net asset amount "912,345," account CD "K001," and account "Software."

[0094] Specifically, the first line is the supplier "Company Y", which is registered as a consolidated accounting target in the consolidated supplier master 106a, so the unrealized profit amount is calculated. Since the contract detail number of subsidiary company Y linked to the contract detail number "X0001" of parent company X in the unrealized profit aggregation asset-contract detail master 106c is "Y0001", the contract detail number "Y0001" is used as a key to refer to the cost information table 606c of the subsidiary system 600 to aggregate the cost amount, which is "912,345" as shown in FIG. 11(A), and this is the net asset amount. Since the tax-excluded amount of the product "outsourcing cost (asset)" registered in the asset target product master 106b is "1,000,000", the unrealized profit amount is calculated as the tax-excluded amount "1,000,000" - "912,345" = 87,655. As the status category is "Completed" in the contract details, the account name is set by obtaining the completed account item "Software" from the asset target product master 106b using the product CD "H001: Outsourcing cost (asset)" as the key.

[0095] In the example shown in the figure, unrealized profits are not calculated for "Company B, C, D," which are not registered as consolidated accounting targets in the consolidated supplier master 106a. No aggregation is done for the product "Advance Payment," which is not registered as an asset target product in the asset target product master 106b. Note that for the first to third lines, the status category is "Completed" in the contract details, so the completed account item "Software" obtained from the asset target product master 106b using the product CD "H001: Subcontract Cost (Asset)" as the key is set as the "Account Name." For the fourth and subsequent lines, the status category is "Uncompleted" in the contract details, so the uncompleted account item "Software Suspense Account" obtained from the asset target product master 106b using the product CD "H001: Subcontract Cost (Asset)" as the key is set as the "Account Name."

[0096] (S6 of the project management system 100: Asset information additional input process) A specific example of the asset information additional input process will be described with reference to Fig. 12. The asset information processing unit 102e extracts and displays information from the unrealized profit statement and contract details for the contract detail number linked in the unrealized profit total asset-contract detail master 106c, using the asset number specified by the operator's operation on the asset information creation screen displayed on the monitor 114 as a key, and further creates asset information by adding information related to assets to the extracted information, and registers it in the asset information table 106f. For fixed asset linkage, the amortization information of the net amount after the elimination of unrealized profits is duplicated and held.

[0097] FIG. 12(A) is a diagram showing an example of information extracted from the unrealized profit statement and contract details for the contract detail number linked in the unrealized profit summary asset-contract detail master 106c, using the specified asset number as a key.

[0098] As shown in Fig. 12(A), the asset information creation screen displays the following items: asset number, asset name, contract detail number, contract detail name, account CD, account name, acquisition amount, net asset amount, department CD, and department name. The example shown in the figure shows an example when the asset number "XSW0001" is specified.

[0099] Fig. 12(B) is a diagram showing an example of information related to an added asset. On the asset information creation screen, the following items are displayed: asset number, asset name, asset type CD, asset type name, depreciation method, durable method, memorandum value, net depreciation method, net useful life, and net memorandum value for tax purposes, and acquisition amount, depreciation method, durable life, memorandum value, net acquisition amount, net depreciation method, net useful life, and net memorandum value for accounting purposes. The acquisition amount and net acquisition amount are automatically displayed. When the operator inputs the items other than the amount and presses a registration button (not shown), for example, asset information as shown in Figs. 12(A) and (B) is registered in the asset information table 106f.

[0100] (S7 of the project management system 100: Asset information output process) A specific example of the asset information output process of the project management system 100 will be described with reference to Fig. 12. The asset information processing unit 102e outputs the asset information registered in the asset information table 106f to the fixed asset management system 400 in cooperation with the fixed asset management system 400, and also outputs the asset information to other systems such as the consolidated accounting system 500.

[0101] As described above, according to this embodiment, there is a consolidated supplier master 106a in which subsidiaries that are suppliers to be consolidated are registered, an asset target product master 106b in which products to be capitalized, account items at completion, and account items at incomplete are registered in association with each other, an unrealized profit aggregated asset-contract details master 106c in which project identification information of the parent company and project identification information of the subsidiary are registered in association with each other, a project registration unit 102b that registers in the storage unit 106 contract details including project identification information and a status class specifying whether a project is completed or not for the parent company, and purchase data including date, slip number, supplier, product, amount excluding tax, and project identification information for the parent company. in the memory unit 106, and an unrealized profit calculation unit 102d which performs an aggregation for each project identification information of the parent company in the contract details based on the purchasing data, and calculates the unrealized profit amount by subtracting the net asset amount, which is the total amount of cost amounts of the cost information in the cost information table 606c for the project identification information of the subsidiary linked to the project identification information of the parent company by the unrealized profit aggregation asset-contract detail master, from the tax-excluded amount of the product registered in the asset object product master 106b. Therefore, when a project is shared and executed by companies within the consolidated accounting target, it becomes possible for the parent company to grasp the unrealized profit associated with transactions with the subsidiary at an early stage.

[0102] [4. Contribution to the United Nations-led Sustainable Development Goals (SDGs)] This embodiment can contribute to improving business efficiency and promoting appropriate management decisions by companies, thereby contributing to goals 8 and 9 of the SDGs.

[0103] Furthermore, this embodiment can contribute to reducing waste and promoting paperless and electronic systems, thereby contributing to the achievement of goals 12, 13, and 15 of the SDGs.

[0104] Furthermore, this embodiment can contribute to strengthening control and governance, making it possible to contribute to Goal 16 of the SDGs.

[0105] 5. Other embodiments The present invention may be embodied in various different embodiments other than those described above within the scope of the technical concept set forth in the claims.

[0106] For example, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually, or all or part of the processes described as being performed manually can be performed automatically using known methods.

[0107] In addition, the processing procedures, control procedures, specific names, registered data for each process, information including parameters such as search conditions, screen examples, and database configurations shown in this specification and drawings may be changed as desired unless otherwise specified.

[0108] Furthermore, with regard to the project management system 100, each of the components shown in the figures is merely a functional concept, and does not necessarily have to be physically configured as shown in the figures.

[0109] For example, the processing functions of the project management system 100, particularly the processing functions performed by the control unit, may be realized in whole or in part by a CPU and a program interpreted and executed by the CPU, or may be realized as hardware using wired logic. The program is recorded on a non-transient computer-readable recording medium that includes programmed instructions for causing an information processing device to execute the processes described in this embodiment, and is mechanically read by the project management system 100 as necessary. That is, a computer program for giving instructions to the CPU in cooperation with the OS and performing various processes is recorded in a storage unit such as a ROM or HDD (Hard Disk Drive). This computer program is executed by being loaded into a RAM, and cooperates with the CPU to form the control unit.

[0110] In addition, this computer program may be stored in an application program server connected to the project management system 100 via any network, and it is also possible to download all or part of it as needed.

[0111] In addition, the program for executing the process described in this embodiment may be stored in a non-transient computer-readable recording medium, or may be configured as a program product. Here, the "recording medium" includes any "portable physical medium" such as a memory card, a Universal Serial Bus (USB) memory, a Secure Digital (SD) card, a flexible disk, a magneto-optical disk, a ROM, an Erasable Programmable Read Only Memory (EPROM), an Electrically Erasable and Programmable Read Only Memory (EEPROM (registered trademark)), a Compact Disk Read Only Memory (CD-ROM), a Magneto-Optical disk (MO), a Digital Versatile Disk (DVD), and a Blu-ray (registered trademark) Disc.

[0112] Moreover, a "program" is a data processing method written in any language or description method, and may be in any form, such as source code or binary code. Note that a "program" is not necessarily limited to a single configuration, but also includes a distributed configuration as multiple modules or libraries, and a program that works with a separate program, such as an OS, to achieve its function. Note that the specific configuration and reading procedure for reading a recording medium in each device shown in the embodiments, as well as the installation procedure after reading, may use well-known configurations and procedures.

[0113] The various databases etc. stored in the memory unit are storage means such as memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and optical disks, and store various programs, tables, databases, and web page files etc. used for various processes and providing websites.

[0114] The project management system 100 may be configured as an information processing device such as a known personal computer or workstation, or may be configured as the information processing device to which any peripheral device is connected. The project management system 100 may be realized by installing software (including programs, data, etc.) that causes the device to realize the processing described in this embodiment.

[0115] Furthermore, the specific form of distribution and integration of the devices is not limited to that shown in the drawings, and all or part of them can be functionally or physically distributed and integrated in any unit according to various additions or functional loads. In other words, the above-mentioned embodiments can be implemented in any combination, or the embodiments can be implemented selectively. [Explanation of symbols]

[0116] 100 Project Management Systems 102 Control section 102a Master Maintenance Department 102b Project Registration Department 102c Cost Registration Department 102d Unrealized Profit Calculation Section 102e Asset Information Processing Department 102f Screen display control unit 104 Communication interface section 106 Storage section 106a Consolidated Supplier Master 106b Asset target product master 106c Unrealized Profit Aggregation Assets - Contract Detail Master 106d Contract Details Table 106e Purchasing Table 106f Asset Information Table 108 Input / Output Interface Section 112 Input Devices 114 Output Device 200 Servers 300 Network 400 Fixed Asset Management System 500 Consolidated Accounting System 600 Subsidiary Systems 602 Control section 602a Project Registration Department 602b Cost Registration Department 606 Storage section 606a Contract Details Table 606b Purchase Table 606c Cost information table

Claims

1. A project management system including a control unit, The control unit is The consolidated supplier master record in which the subsidiaries that are the suppliers of consolidated accounting are registered, Asset target product master that associates and registers the product to be capitalized, the completed account item, and the uncompleted account item, and For subsidiaries, cost information including project identification information, cost items, and cost amounts; The unrealized profit summary asset - contract detail master registered by linking the parent company's project identification information and the subsidiary's project identification information, The storage area storing the a project registration means for registering, in the storage area, contract details including project identification information and a status class specifying whether the project is completed or not, for the parent company; a cost registration means for registering purchase data including date, invoice number, supplier, product, tax-excluded amount, and project identification information for the parent company in the storage area; an unrealized profit calculation means for calculating an unrealized profit amount by performing an aggregation for each project identification information of the parent company of the contract details based on the purchase data, and subtracting a net asset amount, which is the total amount of the cost amount of the cost information for the project identification information of the subsidiary linked to the project identification information of the parent company by the unrealized profit aggregation asset-contract detail master, from the tax-excluded amount of the product registered in the asset target product master, A project management system comprising:

2. 2. A project management system as claimed in claim 1, wherein the unrealized profit calculation means further creates and outputs an unrealized profit statement including project identification information, supplier, product, amount excluding tax, unrealized profit amount, net asset amount, and account name.

3. 2. A project management system according to claim 1, wherein said unrealized profit calculation means does not tally up any product that is not registered in said asset target product master.

4. A project management system as described in claim 2, characterized in that the unrealized profit calculation means, for the "account name" of the unrealized profit statement, if the status classification in the contract details is "completed", sets it by obtaining a "completion account item" from the asset target product master using the product as a key, and if the status classification in the contract details is "incomplete", sets it by obtaining a "not completed account item" from the asset target product master using the product as a key.

5. The control unit further 3. A project management system according to claim 2, further comprising an asset information processing means for creating asset information based on said unrealized profit statement and outputting the information to a fixed asset system.

6. 6. A project management system according to claim 1, wherein the completed account item includes software, and the uncompleted account item includes a software provisional account.

7. A project management method executed by an information processing device having a control unit, The control unit is The consolidated supplier master record in which the subsidiaries that are the suppliers of consolidated accounting are registered, Asset target product master that associates and registers the product to be capitalized, the completed account item, and the uncompleted account item, and For subsidiaries, cost information including project identification information, cost items, and cost amounts; The unrealized profit summary asset - contract detail master registered by linking the parent company's project identification information and the subsidiary's project identification information, The storage area storing the Executed in the control unit, a project registration step of registering, in the storage area, contract details including project identification information and a status class designating whether the project is completed or not for the parent company; a cost registration process for registering purchase data including date, invoice number, supplier, product, tax-excluded amount, and project identification information for the parent company; an unrealized profit amount calculation step of calculating an unrealized profit amount by performing an aggregation for each project identification information of the parent company of the contract details based on the purchase data, and subtracting a net asset amount, which is the total amount of the cost amount of the cost information for the project identification information of the subsidiary linked to the project identification information of the parent company by the unrealized profit aggregation asset-contract detail master, from the tax-excluded amount of the product registered in the asset target product master, to calculate an unrealized profit amount; 1. A project management method comprising:

8. A project management program to be executed by an information processing device having a control unit, The control unit is The consolidated supplier master record in which the subsidiaries that are the suppliers of consolidated accounting are registered, Asset target product master that associates and registers the product to be capitalized, the completed account item, and the uncompleted account item, and For subsidiaries, cost information including project identification information, cost items, and cost amounts; The unrealized profit summary asset - contract detail master registered by linking the parent company's project identification information and the subsidiary's project identification information, The storage area storing the In the control unit, a project registration step of registering, in the storage area, contract details including project identification information and a status class designating whether the project is completed or not for the parent company; a cost registration step of registering purchase data including date, invoice number, supplier, product, tax-excluded amount, and project identification information for the parent company in the storage area; an unrealized profit amount calculation step of calculating an unrealized profit amount by performing an aggregation for each project identification information of the parent company of the contract details based on the purchase data, and subtracting a net asset amount, which is the total amount of the cost amount of the cost information for the project identification information of the subsidiary linked to the project identification information of the parent company by the unrealized profit aggregation asset-contract detail master, from the tax-excluded amount of the product registered in the asset target product master, to calculate an unrealized profit amount; A project management program for implementing.

Citation Information

Patent Citations

  • Commercial law account document creation system, consolidated financial statement creation system, commercial law account document creation processing program and consolidated financial statement creating program

    JP2003196449A

  • Unrealized profit management system, unrealized profit management method, and unrealized profit management program

    JP2023003320A

  • Consolidation financial statements processing system

    KR100821701B1

Cited By

  • Method for manufacturing semiconductor device, and semiconductor device

    CN121645924A