Slab erection machine moving method

The method allows for the deck slab erection machine to be moved perpendicularly to the bridge axis using lifting devices and rails/trolleys, addressing the need for dismantling in existing methods and reducing construction time.

JP2024154188AInactive Publication Date: 2024-10-30YOKOKAWA KYORYO SEISAKUSHO KK

Patent Information

Application Number
JP2023067887
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-18
Publication Date
2024-10-30
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing methods for deck slab renewal on bridges require dismantling and reassembly of lifting devices when moving in directions perpendicular to the bridge axis, prolonging the construction period.

Method used

A method involving a lifting and lowering device connected to a deck slab erection machine, allowing steps of lifting, installing rails or trolleys, moving the machine perpendicularly, and repositioning without disassembly, using rails or trolleys to support and relocate the machine.

Benefits of technology

Enables the deck slab erection machine to be moved perpendicularly to the bridge axis without dismantling, significantly shortening the construction period and reducing assembly time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024154188000001_ABST
    Figure 2024154188000001_ABST
Patent Text Reader

Abstract

To provide a slab erection machine moving method that contributes to shortening of a construction time.SOLUTION: A slab erection machine moving method according to the present invention includes the steps of: installing a lifting and lowering device in a position capable of supporting a slab erection machine; lifting the slab erection machine with the lifting and lowering device; installing rails in a position lower than the lifted slab erection machine; placing a load of the slab erection machine on the rails; moving the slab erection machine on the rails in a direction perpendicular to a bridge axis; installing the lifting and lowering device in a position capable of supporting the slab erection machine after the movement; lifting the slab erection machine by the lifting and lowering device; removing the rails; and lowering the lifted slab erection machine to a specified position.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for moving a deck erection machine. [Background technology]

[0002] In recent years, construction infrastructure such as bridges and tunnels, which were developed intensively during the period of high economic growth, has been aging, and there is a need for maintenance and management of infrastructure that ensures safety and security.

[0003] For example, the decks of road bridges over which vehicles travel can suffer a lot of damage due to factors such as the spraying of de-icing agents and the effects of increased traffic loads, and if left untreated there is a risk of them falling out, so deck renewal work is required at such sites.

[0004] When carrying out deck renewal work, the road needs to be closed to traffic, but from the perspective of users, it is desirable to keep the period of road closure as short as possible.

[0005] However, when using heavy machinery such as cranes or trucks to remove or erect decks, it may be necessary to reinforce the main girders in the areas where the heavy machinery rests, and the time required for this reinforcement work is an obstacle to shortening the construction period.

[0006] Conventionally, when carrying out deck renewal work, a method that uses a lifting device equipped with a lifter, an erection beam, and a lifting mechanism (Patent Document 1) is known as a method that does not require the loading of heavy machinery and does not require reinforcing the main girders. [Prior art documents] [Patent documents]

[0007] [Patent Document 1] JP 2018-204427 A Summary of the Invention [Problem to be solved by the invention]

[0008] The method of Patent Document 1 does not require reinforcement of the main girders, and therefore can shorten the construction period. However, the lifting device cannot be moved perpendicular to the bridge axis, and it is necessary to dismantle and reassemble the lifting device when working on another lane, so there is still room for improvement in terms of shortening the construction period.

[0009] The present invention has been made in consideration of the above circumstances, and an object of the present invention is to provide a method for moving a deck erection machine that contributes to shortening construction time. [Means for solving the problem]

[0010] The method for moving a deck erection machine of the present invention is a method for moving a deck erection machine in a direction perpendicular to the bridge axis, and includes the steps of installing a lifting and lowering device for raising and lowering the deck erection machine in a position where the deck erection machine can be supported, lifting the deck erection machine with the lifting and lowering device, installing a rail at a position lower than the lifted deck erection machine, lowering the lifted deck erection machine and placing the load of the deck erection machine on the rail, moving the deck erection machine on the rail in a direction perpendicular to the bridge axis, installing the lifting and lowering device in a position where the deck erection machine after movement can be supported, lifting the deck erection machine with the lifting and lowering device, removing the rail, and lowering the lifted deck erection machine to a predetermined position.

[0011] The method for moving a deck erection machine of the present invention is a method for moving a deck erection machine in a direction perpendicular to the bridge axis, and can also include the steps of installing a lifting and lowering device for raising and lowering the deck erection machine in a position where the deck erection machine can be supported, lifting the deck erection machine with the lifting and lowering device, installing a trolley at a position lower than the lifted deck erection machine, lowering the lifted deck erection machine and transferring the load of the deck erection machine to the trolley, moving the deck erection machine on the trolley in a direction perpendicular to the bridge axis, installing the lifting and lowering device in a position where the deck erection machine after movement can be supported, lifting the deck erection machine with the lifting and lowering device, removing the trolley, and lowering the lifted deck erection machine to a predetermined position.

[0012] The method for moving a deck erection machine of the present invention is a method for moving a deck erection machine in a direction perpendicular to the bridge axis, and can also include the steps of installing a lifting and lowering device for raising and lowering the deck erection machine in a position where the deck erection machine can be supported, lifting the deck erection machine with the lifting and lowering device, attaching moving wheels to the lifted deck erection machine, lowering the lifted deck erection machine and grounding the moving wheels attached to the deck erection machine, moving the deck erection machine with the moving wheels attached in a direction perpendicular to the bridge axis, installing the lifting and lowering device in a position where the deck erection machine after movement can be supported, lifting the deck erection machine with the lifting and lowering device, removing the moving wheels from the deck erection machine, and lowering the lifted deck erection machine to a predetermined position. Effect of the Invention

[0013] According to the present invention, the deck erection machine can be moved in a direction perpendicular to the bridge axis without being dismantled, thereby shortening the construction period compared to conventional methods that require the deck erection machine to be dismantled. [Brief description of the drawings]

[0014] [Figure 1] (a)(b) is an explanatory diagram outlining the method for moving the deck erection machine. [Diagram 2] 1A is a perspective view showing an example of a deck erection machine, FIG. 1B is a perspective view showing an example of a lifting and lowering device, and FIG. 1C is a perspective view showing another example of a lifting and lowering device. [Diagram 3] 14(a) to 14(d) are front views showing an example of the procedure for moving the deck erection machine in a direction perpendicular to the bridge axis using a rail. [Figure 4] 11(a) to 11(c) are front views showing an example of the procedure for moving the deck erection machine in a direction perpendicular to the bridge axis using a rail. [Diagram 5] 11(a) to 11(c) are front views showing an example of the procedure for moving the deck erection machine in a direction perpendicular to the bridge axis using a rail. [Figure 6] (a) to (d) are side views corresponding to Figs. 3(a) to (d). [Figure 7] (a) to (c) are side views corresponding to Figs. 4(a) to (c). [Figure 8] (a) to (c) are side views corresponding to Figs. 5(a) to (c). [Figure 9] 13(a) to 13(d) are front views showing an example of the procedure for moving a deck erection machine in a direction perpendicular to the bridge axis using a cart. [Figure 10] 13(a) to 13(c) are front views showing an example of the procedure for moving a deck erection machine in a direction perpendicular to the bridge axis using a cart. [Figure 11] 13(a) to 13(c) are front views showing an example of the procedure for moving a deck erection machine in a direction perpendicular to the bridge axis using a cart. [Figure 12] (a) to (d) are side views corresponding to Figs. 9(a) to (d). [Figure 13] (a) to (c) are side views corresponding to Figs. 10(a) to (c). [Figure 14] (a) to (c) are side views corresponding to Figures 11(a) to (c). DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0015] (Embodiment) An example of an embodiment of the present invention will be described with reference to the drawings. As shown in Fig. 1(a) and (b), the method of moving a deck erection machine of the present invention is a method of moving a deck erection machine 10 in a direction perpendicular to the bridge axis without dismantling it. For convenience of explanation, prior to the explanation of the deck erection machine moving method, an example of the deck erection machine 10 moved by the deck erection machine moving method will be described.

[0016] [Slab erection machine] As an example, a deck erection machine 10 shown in Fig. 2(a) is equipped with a plurality of support structures 11 arranged at intervals in the bridge axis direction, and an erection beam 12 erected across the plurality of support structures 11. Fig. 2(a) shows an example in which there are four support structures 11, but the number of support structures 11 may be more or less than four.

[0017] Each support structure 11 has two pillars 11a, 11b spaced apart in the direction perpendicular to the bridge axis. The two pillars 11a, 11b are connected by a tie beam 11c installed horizontally between them. Between the two pillars 11a, 11b and below the tie beam 11c, a passage A is provided through which trucks, cranes, etc. can pass. The pillars 11a, 11b and the tie beam 11c can be made of H-shaped steel or the like.

[0018] The erection beam 12 is a member that is long in the bridge axis direction. The erection beam 12 can be composed of an H-shaped steel or the like. In this embodiment, two H-shaped steel pieces arranged in parallel with a gap between them are used as the erection beam 12. The erection beam 12 is placed below the connecting beams 11c of multiple (four in this embodiment) supporting structures 11, and is fixed to the connecting beams 11c of each supporting structure 11.

[0019] The configuration of the deck construction machine 10 described here is just one example, and the deck construction machine 10 may have a different configuration.

[0020] [How to move the floor slab erection machine] Next, an example of a method for moving the deck erection machine will be described. Here, a method for moving the deck erection machine 10 using a rail R and a method for moving the deck erection machine 10 using a carriage T will be described.

[0021] -Example of using rails- When the rail R is used, for example, the deck erection machine 10 can be moved in a direction perpendicular to the bridge axis in the following procedure. (1) The lifting and lowering device 20 for lifting and lowering the deck erection machine 10 is installed in a position capable of supporting the deck erection machine 10 (FIGS. 3(a) and 6(a)). (2) The deck erection machine 10 is lifted by the installed lifting and lowering device 20 (FIGS. 3(b) and 6(b)). (3) The required number of rails R are installed at a position lower than the raised deck erection machine 10 (FIGS. 3(c) and 6(c)). (4) The lifted deck erection machine 10 is lowered and the load of the deck erection machine 10 is placed on the rails R (FIGS. 3(d) and 6(d)). (5) Using the rail R, the deck erection machine 10 placed on the rail R is moved in a direction perpendicular to the bridge axis (FIGS. 4(a) and 7(a)). (6) The lifting and lowering device 20 is installed in a position capable of supporting the deck erection machine 10 after it has been moved (FIGS. 4(b) and 7(b)). (7) The deck erection machine 10 is lifted by the installed lifting and lowering device 20 (FIGS. 4(c) and 7(c)). (8) Remove the rail R installed in (3) above (Figures 5(a) and 8(a)). (9) The lifted deck erection machine 10 is lowered and the pillars 11a, 11b are placed on the ground (FIGS. 5(a) and 8(a)). (10) Through the above steps (1) to (9), the movement of the deck erection machine 10 in the direction perpendicular to the bridge axis is completed (FIG. 5(c) and FIG. 8(c)).

[0022] The lifting and lowering device 20 installed in the step (1) above may be, for example, a gate structure equipped with a jack as shown in Fig. 2(b). The lifting and lowering device 20 may have any configuration as long as it can lift and lower the deck erection machine 10, and may be, for example, an existing jack.

[0023] When an existing jack is used as the lifting and lowering device 20, for example, as shown in Figure 2 (c), brackets 30 can be provided on the pillars 11a, 11b, a jack can be placed under the brackets 30, and the stroke of the jack can be extended so that it is supported by the brackets 30, thereby enabling the deck erection machine 10 to be lifted and lowered.

[0024] The brackets 30 can be attached to the posts 11a and 11b when lifting and lowering, or can be attached to the posts 11a and 11b in advance (constituted as part of the posts 11a and 11b). In either case, there is no particular limit to the number of lifting and lowering devices 20 that can be installed.

[0025] The lifting and lowering device 20 may be installed in any position capable of supporting the deck erection machine 10, such as below the erection beam 12. Specifically, it may be installed between adjacent support structures 11 in the bridge axis direction, between the columns of each support structure 11, etc.

[0026] In this embodiment, one lifting and lowering device 20 is installed on the underside of each erection beam 12 between adjacent support structures 11 in the bridge axis direction, but if brackets 30 are provided on the pillars 11a, 11b as shown in Figure 2(c), a jack can be installed on the underside of each bracket 30 (for each bracket 30).

[0027] In the step (2) above, the lifting and lowering device 20 installed under the erection beam 12 is operated to lift the deck erection machine 10 to a position where the columns 11a and 11b are separated from the installation surface. As a result, the load of the deck erection machine 10 is transferred to the lifting and lowering device 20, and the deck erection machine 10 is supported at that position (lifting position).

[0028] In the step (3) above, one or more rails R are installed from the underside of the lifted deck slab erection machine 10, specifically, from the underside of each support structure 11 toward the destination (e.g., the adjacent lane). For example, one row of rails R is installed for each support structure 11. The length and number of rails R may be appropriately set according to the travel distance. The structure of the rails R may be an H-shaped steel or a rail used for a railway track.

[0029] In the step (4) above, the deck erection machine 10 lifted by the lifting and lowering device 20 is lowered onto the rail R, and the load of the deck erection machine 10 is placed on the rail R.

[0030] In the above step (5), the deck erection machine 10 placed on the rail R is moved perpendicular to the bridge axis along the rail R. Examples of the moving method include a method in which a horizontal jack is attached to the deck erection machine 10 and the horizontal jack is used to move it by applying a reaction force to the rail R, a method in which a cart is placed on the rail R, or a method in which a plate with a small coefficient of friction is placed on the deck erection machine 10 and a wire is attached to the deck erection machine 10 and the machine is moved by pulling the wire with a jack, a chill hole, a winch or a lever block (registered trademark). The deck erection machine 10 can also be moved by methods other than these.

[0031] In the step (6) above, in order to support the deck slab erection machine 10 after it has been moved, the lifting and lowering device 20 is installed in a position capable of supporting the deck slab erection machine 10 after it has been moved, for example, below the erection beam 12.

[0032] As in the step (2) above, in this embodiment, the lifting and lowering device 20 is installed under the erection beam 12. Note that the lifting and lowering device 20 may be the same as that used in the step (2) above.

[0033] In the step (7) above, the deck erection machine 10 is lifted to a position away from the installation surface by the lifting and lowering device 20 installed on the underside of the erection beam 12. As a result, the load of the deck erection machine 10 is transferred to the lifting and lowering device 20, and the deck erection machine 10 is supported at the lifted position.

[0034] In the above-mentioned step (8), the installed rail R is removed. Specifically, the rail R is taken out from under the pillars 11a and 11b of the support frame 11, and the taken-out rail R is moved to a position where it does not interfere with the support frame 11.

[0035] In the step (9) above, the deck erection machine 10 lifted by the lifting and lowering device 20 is lowered. Specifically, the gate structure is jacked down, and the deck erection machine 10 is set at the destination.

[0036] -Example of using a dolly- Next, a description will be given of a case where the deck slab erection machine 10 is moved in a direction perpendicular to the bridge axis by using the carriage T. When the carriage T is used, for example, the deck slab erection machine 10 can be moved in a direction perpendicular to the bridge axis by the following procedure. (1) The lifting and lowering device 20 for lifting and lowering the deck erection machine 10 is installed in a position capable of supporting the deck erection machine 10 (FIGS. 9(a) and 12(a)). (2) The deck erection machine 10 is lifted by the installed lifting and lowering device 20 (FIGS. 9(b) and 12(b)). (3) A cart T is placed at a position lower than the raised deck erection machine 10 (FIGS. 9(c) and 12(c)). (4) The lifted deck erection machine 10 is lowered, and the load of the deck erection machine 10 is placed on the trolley T (FIGS. 9(d) and 12(d)). (5) Using the bogie T, the deck erection machine 10 placed on the bogie T is moved in a direction perpendicular to the bridge axis (FIGS. 10(a) and 13(a)). (6) The lifting and lowering device 20 is installed in a position capable of supporting the deck erection machine 10 after it has been moved (FIGS. 10(b) and 13(b)). (7) The deck erection machine 10 is lifted by the installed lifting and lowering device 20 (FIGS. 10(c) and 13(c)). (8) Remove the trolley T (Figure 11(a) and Figure 14(a)). (9) The lifted deck erection machine 10 is lowered to the designated position, and the pillars 11a, 11b are placed on the ground (FIGS. 11(b) and 14(b)). (10) Through the above steps (1) to (9), the movement of the deck erection machine 10 in the direction perpendicular to the bridge axis is completed (FIG. 11(c) and FIG. 14(c)).

[0037] The lifting and lowering device 20 installed in the step (1) above can be, for example, a gate structure equipped with a jack as shown in Fig. 2(b). The lifting and lowering device 20 can be of any configuration as long as it can lift and lower the deck erection machine 10, and for example, an existing jack can be used.

[0038] When an existing jack is used as the lifting and lowering device 20, for example, as shown in Figure 2 (c), brackets 30 can be provided on the pillars 11a, 11b, a jack can be placed under the brackets 30, and the stroke of the jack can be extended so that it is supported by the brackets 30, thereby enabling the deck erection machine 10 to be lifted and lowered.

[0039] The brackets 30 can be attached to the posts 11a and 11b when lifting and lowering, or can be attached to the posts 11a and 11b in advance (constituted as part of the posts 11a and 11b). In either case, there is no particular limit to the number of lifting and lowering devices 20 that can be installed.

[0040] The lifting and lowering device 20 may be installed in any position capable of supporting the deck erection machine 10, such as below the erection beam 12. Specifically, it may be installed between adjacent support structures 11 in the bridge axis direction, between the columns 11a, 11b of each support structure 11, etc.

[0041] In this embodiment, one lifting and lowering device 20 is installed on the underside of each erection beam 12 between adjacent support structures 11 in the bridge axis direction, but if brackets 30 are provided on the pillars 11a, 11b as shown in Figure 2(c), a jack can be installed on the underside of each bracket 30 (for each bracket 30).

[0042] In the step (2) above, the lifting and lowering device 20 installed under the erection beam 12 is operated to lift the deck erection machine 10 to a position where the columns 11a and 11b are separated from the installation surface. As a result, the load of the deck erection machine 10 is transferred to the lifting and lowering device 20, and the deck erection machine 10 is supported at that position (lifting position).

[0043] In the step (3) above, a trolley T is placed under the lifted deck erection machine 10, specifically, under each support frame 11. The trolley T may be provided for each of the pillars 11a, 11b constituting the support frame 11, or one trolley T may be provided for both pillars 11a, 11b.

[0044] The bogie T installed here may be, for example, a multi-axle bogie equipped with wheels that can move in a direction perpendicular to the bridge axis, or a caterpillar-type bogie equipped with crawlers.

[0045] In the step (4) above, the deck slab erection machine 10 lifted by the lifting and lowering device 20 is lowered onto the bogie T, and the load of the deck slab erection machine 10 is placed on the bogie T.

[0046] In the step (5) above, the deck erection machine 10 mounted on the cart T is moved in a direction perpendicular to the bridge axis. If the cart T is self-propelled, it can be moved by its self-propelling function, and if the cart T is not self-propelled, it can be moved by a horizontal jack, a jack using a wire, or a tiller, or a lever block.

[0047] In the step (6) above, in order to support the deck slab erection machine 10 after it has been moved, the lifting and lowering device 20 is installed in a position capable of supporting the deck slab erection machine 10 after it has been moved, for example, below the erection beam 12.

[0048] As in the step (2) above, in this embodiment, the lifting and lowering device 20 is installed under the erection beam 12. Note that the lifting and lowering device 20 may be the same as that used in the step (2) above.

[0049] In the step (7) above, the deck erection machine 10 is lifted to a position away from the installation surface by the lifting and lowering device 20 installed on the underside of each erection beam 12. As a result, the load of the deck erection machine 10 is transferred to the lifting and lowering device 20, and the deck erection machine 10 is supported at the lifted position.

[0050] In the step (8) above, the installed cart T is removed. Specifically, the cart T is taken out from under the pillars 11a and 11b of the support frame 11, and the taken out cart T is moved to a position where it does not interfere with the support frame 11.

[0051] In the step (9) above, the deck erection machine 10 lifted by the lifting and lowering device 20 is lowered. Specifically, the gate structure is jacked down, and the deck erection machine 10 is set at the destination.

[0052] -Variations- In the above-mentioned method for moving the deck erection machine, an example is given in which a gate structure equipped with a jack is used as the lifting and lowering device 20, but the lifting and lowering device 20 can be configured in other ways as long as it is capable of lifting and supporting the deck erection machine 10.

[0053] In the method using the trolley T, an example is given in which the trolley T is placed under the pillars 11a, 11b of the deck erection machine 10 and the weight of the deck erection machine 10 is placed on the trolley T. However, instead of doing this, moving wheels (not shown) that function in the same way as the trolley T can be attached to the lower ends of the pillars 11a, 11b, and the deck erection machine 10 can be moved in a direction perpendicular to the bridge axis by using the moving wheels.

[0054] Various types of moving wheels can be used, but in any case, it is preferable to use ones that have the strength to withstand the load of the deck erection machine 10. A moving wheel may be provided for each of the supports 11a, 11b, or one for each support structure 11.

[0055] The embodiment of the deck erection machine moving method of the present invention is an example, and is not limited to this configuration. The deck erection machine moving method of the present invention can be modified, such as by adding, omitting, or replacing components, to the extent that the intended purpose can be achieved.

[0056] When using a conventional lifting device, it takes about one day each to dismantle and assemble the lifting device (two days in total), depending on its size and structure. In contrast, according to the deck erection machine moving method of each of the above-mentioned embodiments, it takes one or half a day to move the deck erection machine to another section, thereby shortening the construction period accordingly. This difference has a significant impact on users. Also, in terms of cost, when all components are assembled within a limited construction area as in the conventional construction method, taking into account the vehicles required to transport the components and the cranes required for assembly, this construction method is often superior. [Industrial Applicability]

[0057] The method for moving a deck erection machine of the present invention can be used in the construction of various bridges, and can be particularly suitably used as a method for moving a deck erection machine when carrying out deck renewal work on road bridges. [Explanation of symbols]

[0058] 10 Floor slab erection machine 11 Support frame 11a, 11b struts 11c Connecting beam 12 Erection beam 20 Lifting and lowering device 30 Bracket A aisle R rail T dolly

Claims

1. A method for moving a deck erection machine in a direction perpendicular to the bridge axis, comprising: A step of installing a lifting and lowering device for lifting and lowering the deck erection machine at a position capable of supporting the deck erection machine; A step of lifting the deck erection machine by the lifting and lowering device; A step of installing a rail at a position lower than the raised deck erection machine; A step of lowering the lifted deck erection machine and placing the load of the deck erection machine on the rail; A step of moving the deck erection machine on the rail in a direction perpendicular to the bridge axis; A step of installing the lifting and lowering device at a position capable of supporting the deck erection machine after the movement; A step of lifting the deck erection machine by the lifting and lowering device; removing the rail; A step of lowering the lifted deck erection machine to a predetermined position is also provided. A method for moving a deck erection machine.

2. A method for moving a deck erection machine in a direction perpendicular to the bridge axis, comprising: A step of installing a lifting and lowering device for lifting and lowering the deck erection machine at a position capable of supporting the deck erection machine; A step of lifting the deck erection machine by the lifting and lowering device; A step of placing a cart at a position lower than the lifted deck erection machine; A step of lowering the lifted deck erection machine and transferring the load of the deck erection machine to the cart; A step of moving the deck erection machine on the carriage in a direction perpendicular to the bridge axis; A step of installing the lifting and lowering device at a position capable of supporting the deck erection machine after the movement; A step of lifting the deck erection machine by the lifting and lowering device; removing the dolly; A step of lowering the lifted deck erection machine to a predetermined position is also provided. A method for moving a deck erection machine.

3. A method for moving a deck erection machine in a direction perpendicular to the bridge axis, comprising: A step of installing a lifting and lowering device for lifting and lowering the deck erection machine at a position capable of supporting the deck erection machine; A step of lifting the deck erection machine by the lifting and lowering device; A step of attaching moving wheels to the lifted deck erection machine; A process of lowering the lifted deck erection machine and grounding the moving wheels attached to the deck erection machine; A step of moving the deck erection machine to which the moving wheels are attached in a direction perpendicular to the bridge axis; A step of installing the lifting and lowering device at a position capable of supporting the deck erection machine after the movement; A step of lifting the deck erection machine by the lifting and lowering device; Removing the moving wheels from the deck erection machine; A step of lowering the lifted deck erection machine to a predetermined position is also provided. A method for moving a deck erection machine.

Citation Information