All solid battery system and vehicle

The all-solid-state battery system addresses variations in stored electricity between cells by using a control device for equalization processes, enhancing the consistency and stability of the battery pack.

JP2024155004AActive Publication Date: 2024-10-31TOYOTA JIDOSHA KK
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2023069326
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-20
Publication Date
2024-10-31
Estimated Expiration
2043-04-20

AI Technical Summary

Technical Problem

When multiple all-solid-state batteries are connected and used as a battery pack, variations in the amount of stored electricity between cells can occur.

Method used

An all-solid-state battery system with a control device that performs charging and discharging control, including an equalization process to equalize the amount of electricity stored between cells, particularly in plateau regions of the voltage-charge relationship.

Benefits of technology

Suppresses variations in the amount of electricity stored between cells, ensuring consistent performance and stability of the battery pack.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024155004000001_ABST
    Figure 2024155004000001_ABST
Patent Text Reader

Abstract

To suppress variations in the power storage amount between cells when a plurality of all solid batteries (cells) are connected and used as a battery assembly.SOLUTION: An all solid battery system has a battery assembly consisting of a plurality of cells connected together, and a control unit that executes charge control and discharge control of the battery assembly. Each of a plurality of cells is an all solid battery. The control unit is configured to execute an equalization process to bring power storage amount between cells closer to equality in the plateau region in the relationship between the voltage and power storage amount of the battery assembly in the charge or discharge control of the battery assembly.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to an all-solid-state battery system and a vehicle including an all-solid-state battery system. [Background technology]

[0002] In recent years, research and development of all-solid-state batteries has been progressing. For example, JP 2022-133689 A (Patent Document 1) discloses a technology for calculating the remaining battery capacity based on the Li occupancy state in the thickness direction of the electrode layer of an all-solid-state battery. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2022-133689 A Summary of the Invention [Problem to be solved by the invention]

[0004] According to the technology described in Patent Document 1, it is possible to calculate the amount of stored electricity (remaining battery capacity) of an all-solid-state battery. However, when multiple all-solid-state batteries (cells) are connected to be used as a battery pack, there is a possibility that the amount of stored electricity may vary between the cells.

[0005] The present disclosure has been made to solve the above problems, and its purpose is to suppress variation in the amount of stored electricity between cells when a plurality of all-solid-state batteries (cells) are connected and used as a battery pack. [Means for solving the problem]

[0006] An all-solid-state battery system according to an embodiment of the present disclosure includes a battery pack including a plurality of cells connected together, and a control device configured to execute charge control and discharge control of the battery pack. Each of the plurality of cells is a solid-state battery. The control device is configured to execute an equalization process for equalizing the amounts of charge stored in the cells in a plateau region in the relationship between the voltage and the amount of charge stored in the battery pack during charge control or discharge control of the battery pack. Effect of the Invention

[0007] According to the present disclosure, when a plurality of all-solid-state batteries (cells) are connected and used as a battery pack, it is possible to suppress variation in the amount of stored electricity between the cells. [Brief description of the drawings]

[0008] [Figure 1] 1 is a diagram showing a schematic configuration of a vehicle according to an embodiment of the present disclosure. [Diagram 2] 2 is a diagram showing components included in the battery pack shown in FIG. 1. [Diagram 3] 4 is a flowchart showing a process related to charging control executed by a control device according to an embodiment of the present disclosure. [Figure 4] 4 is a flowchart showing a process related to discharge control executed by a control device according to an embodiment of the present disclosure. [Diagram 5] 4 is a flowchart showing a modification of the charging control shown in FIG. 3. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the drawings. In the drawings, the same or corresponding parts are designated by the same reference characters and their description will not be repeated.

[0010] FIG. 1 is a diagram showing a schematic configuration of a vehicle according to this embodiment. Referring to FIG. 1, vehicle 1 is configured to be capable of performing charging (hereinafter also referred to as "external charging") using power supplied from outside the vehicle (external power source). Vehicle 1 is a four-wheeled BEV (electric vehicle). External charging performed by vehicle 1 is contact charging (plug-in charging) using power supplied from EVSE (Electric Vehicle Supply Equipment). However, vehicle 1 may also be another xEV (electric vehicle) such as a plug-in hybrid vehicle. The number of wheels is also arbitrary, and may be three wheels or five or more wheels. External charging may be non-contact charging.

[0011] The vehicle 1 includes a charging unit 10, a battery pack 20, a driving unit 30, driving wheels 40, a power conversion circuit 50, an in-vehicle device 60, and an ECU (Electronic Control Unit) 100. The charging unit 10 includes an inlet 11, a power conversion circuit 12, and a CHR (Charging Relay) 13. The power conversion circuit 12 includes, for example, at least one of a DC / DC converter and an inverter. The battery pack 20 includes a battery 21 and a thermal management device 22 that adjusts the temperature of the battery 21. The thermal management device 22 includes, for example, at least one of an electric heater and a cooling device. The driving unit 30 includes a PCU (Power Control Unit) 31 and a MG (Motor Generator) 32. The PCU 31 drives the MG 32 using power supplied from the battery 21. The MG 32 rotates the driving wheels 40. In this way, the vehicle 1 is configured to be capable of electric running. The battery 21 also supplies power to the in-vehicle device 60. The in-vehicle equipment 60 includes an air conditioner that conditions the air inside the vehicle 1. Power from the battery 21 is supplied to the in-vehicle equipment 60 via a power conversion circuit 50. The power conversion circuit 50 includes, for example, at least one of a DC / DC converter and an inverter. The ECU 100 controls the charging unit 10, the battery pack 20, the drive unit 30, and the power conversion circuit 50.

[0012] The ECU 100 includes a processor 101, a RAM (Random Access Memory) 102, and a storage device 103. For example, a CPU (Central Processing Unit) can be used as the processor 101. The storage device 103 is configured to be able to save stored information. In addition to programs, the storage device 103 stores information used by the programs (for example, maps, formulas, and various parameters). In this embodiment, the processor 101 executes the programs stored in the storage device 103, thereby executing various types of control in the ECU 100 (for example, controls shown in Figs. 3 and 4, which will be described later). However, the various types of control in the ECU 100 may be executed by hardware (electronic circuits) instead of software. The number of processors included in the ECU 100 is arbitrary, and may be more than one.

[0013] The ECU 100 is configured to be able to communicate with an HMI (Human Machine Interface) 80 located inside or outside the vehicle 1. The HMI 80 includes an input device and an alarm device (e.g., a display device and a speaker). The HMI 80 may be a terminal (e.g., a navigation system) mounted on the vehicle 1, or may be a mobile terminal (e.g., a smartphone or a wearable device) that can be carried by a user.

[0014] The storage device 103 stores battery information related to the battery 21. The battery information includes data indicating the transition of the voltage of the battery 21 with an increase in the amount of stored power in the battery 21 during charging (hereinafter referred to as a "charging curve"), and data indicating the transition of the voltage of the battery 21 with a decrease in the amount of stored power in the battery 21 during discharging (hereinafter referred to as a "discharging curve"). The charging curve and the discharging curve are measured in advance and stored in the storage device 103. Each of the charging curve and the discharging curve indicates the relationship between the voltage and the amount of stored power of the battery 21. The "voltage" in each curve is, for example, OCV (open circuit voltage). The amount of stored power in the battery 21 is represented, for example, by SOC (State Of Charge). The SOC is a ratio of the current amount of stored power to the amount of stored power in a fully charged state, expressed, for example, as 0 to 100%. The ECU 100 may successively update the charge curve and the discharge curve in the storage device 103 using data (eg, voltage and SOC) actually measured in the control of the battery 21 (FIGS. 3 and 4) described later.

[0015] Although not shown in Fig. 1, the battery pack 20 is also equipped with a BMS (Battery Management System) that monitors the state of the battery 21. The BMS includes various sensors for detecting the state of the battery 21. The internal configuration of the battery pack 20 will be described below with reference to Fig. 2.

[0016] FIG. 2 is a diagram showing components included in a battery pack 20. Referring to FIG. 2, a battery 21 is an assembled battery configured by connecting N cells 2-1 to 2-N. N is a natural number of 2 or more, and may be 2 or more and less than 100, or 100 or more. The cells 2-1 to 2-N are connected in series. However, the connection mode of the cells in the assembled battery is not limited to series and may include parallel connection. In this embodiment, the cells 2-1 to 2-N shown in FIG. 2 have the same configuration, and therefore, hereinafter, they will be referred to as "cell 2" when there is no need to distinguish between them. The cells 2 are all-solid-state secondary batteries that constitute the assembled battery.

[0017] The cell 2 includes a positive electrode current collector 201, a positive electrode layer 202, an electrolyte layer 203, a negative electrode layer 204, and a negative electrode current collector 205. The positive electrode current collector 201 is configured to collect current from the positive electrode layer 202. Examples of materials for the positive electrode current collector 201 include SUS (Steel Use Stainless), aluminum, nickel, iron, titanium, and carbon. The negative electrode current collector 205 is configured to collect current from the negative electrode layer 204. Examples of materials for the negative electrode current collector 205 include SUS, copper, nickel, and carbon. The shape of the cell 2 may be, for example, a rectangular parallelepiped (angled), laminated, cylindrical, button, coin, or flat type.

[0018] In the cell 2, which is an all-solid-state battery, the electrolyte layer 203 includes a solid electrolyte. The electrolyte layer 203 is located between the positive electrode layer 202 and the negative electrode layer 204. The thickness of the electrolyte layer 203 is, for example, 0.1 μm or more and 1000 μm or less. Examples of the solid electrolyte include inorganic solid electrolytes (sulfide solid electrolytes, oxide solid electrolytes, nitride solid electrolytes, halide solid electrolytes, etc.) and organic polymer electrolytes (polymer electrolytes, etc.). Examples of the sulfide solid electrolyte include solid electrolytes containing Li element, X element (X is at least one of P, As, Sb, Si, Ge, Sn, B, Al, Ga, and In), and S element. The sulfide solid electrolyte may further contain at least one of O element and halogen element. The sulfide solid electrolyte may be glass (amorphous) or glass ceramics. Examples of sulfide solid electrolytes include Li2S-P2S5, LiI-Li2S-P2S5, LiI-LiBr-Li2S-P2S5, Li2S-SiS2, Li2S-GeS2, and Li2S-P2S5-GeS2.

[0019] The positive electrode layer 202 is a layer containing at least a positive electrode active material. The thickness of the positive electrode layer 202 is, for example, 0.1 μm or more and 1000 μm or less. The positive electrode layer 202 may also contain at least one of an electrolyte, a conductive material (such as a carbon material, metal particles, or a conductive polymer), and a binder, as necessary.

[0020] The positive electrode active material is, for example, an oxide active material. Examples of oxide active materials include rock salt layered active materials (LiCoO2, LiMnO2, LiNiO2, LiVO2, LiNi 1 / 3 Co 1 / 3 Mn 1 / 3 O2, etc.), spinel-type active materials (LiMn2O4, Li4Ti5O 12 , Li(Ni 0.5 Mn 1.5 )O4, etc.), and olivine-type active materials (LiFePO4, LiMnPO4, LiNiPO4, LiCoPO4, etc.). A coating layer containing a Li-ion conductive oxide may be formed on the surface of the oxide active material. This coating layer can suppress the reaction between the oxide active material and the solid electrolyte (particularly, a sulfide solid electrolyte). An example of the Li-ion conductive oxide is LiNbO3. The thickness of the coating layer is, for example, 1 nm or more and 30 nm or less. However, the positive electrode active material is not limited to the above oxide active materials. For example, Li2S may be used as the positive electrode active material.

[0021] The negative electrode layer 204 is a layer containing at least a negative electrode active material. The thickness of the negative electrode layer 204 is, for example, 0.1 μm or more and 1000 μm or less. The ratio of the negative electrode active material in the negative electrode layer 204 is, for example, 20% by weight or more and 80% by weight or less. The negative electrode layer 204 may contain at least one of an electrolyte, a conductive material (carbon material, metal particles, conductive polymer, etc.), and a binder, as necessary.

[0022] In this embodiment, the negative electrode active material has a silicon clathrate II type crystal phase. For example, a Na source (e.g., metal Na, NaH, or a metal Na dispersion in which metal Na particles are dispersed in oil) and a Si source (e.g., porous Si having voids inside the primary particles) are reacted to obtain a Na-Si alloy, and then the Na-Si alloy is heated to reduce the amount of Na in the Na-Si alloy, thereby generating a silicon clathrate II type crystal phase. In the silicon clathrate II type crystal phase, a polyhedron (cage) including a pentagon or hexagon is formed by a plurality of Si elements. This polyhedron has a space inside that can contain a metal ion such as Li ion. The negative electrode active material may have a minute void with a pore diameter of 100 nm or less. The porosity may be, for example, 4% or more and 40% or less. By inserting a metal ion into this space, the volume change due to charging and discharging can be suppressed. In addition, general Si has a diamond type crystal phase.

[0023] The structure and materials of the cells 2 are not limited to those described above and can be modified as appropriate. The battery pack 20 may further include a restraining tool that applies a restraining pressure along the stacking direction of the cells 2-1 to 2-N. A restraining pressure (for example, a restraining pressure of 0.1 MPa or more and 100 MPa or less) may be applied to form good ion conductive paths and electron conductive paths.

[0024] The battery pack 20 further includes a current sensor 25 that detects a current flowing through the battery 21 (battery pack), and voltage sensors 23-1 to 23-N and temperature sensors 24-1 to 24-N corresponding to the cells 2-1 to 2-N, respectively. The detection results of each sensor are input to the ECU 100. Each sensor functions as a BMS. The ECU 100 can acquire the current of the battery 21 and the voltage and temperature of each cell of the battery 21 based on the signals from each sensor. The ECU 100 can also calculate the SOC of each cell from the detection results of each sensor. With regard to parameters (e.g., voltage, temperature, and SOC) detected for each cell in the battery 21, a representative value (e.g., average value or median value) of the values ​​detected for each cell may be regarded as the detection value of the battery 21. The configuration of the BMS can be appropriately changed. For example, the number of each of the current sensor and the temperature sensor may not be one for one cell, but may be one for a plurality of cells.

[0025] However, when a plurality of solid-state batteries (cells) are connected to be used as a battery pack, the amount of charge stored in the cells tends to vary. Therefore, the ECU 100 according to this embodiment suppresses the variation in the amount of charge stored in the cells by executing the charging control shown in Fig. 3 and the discharging control shown in Fig. 4 as described below.

[0026] 3 is a flowchart showing the process related to charging control executed by ECU 100. Each step in the flowchart is simply denoted by "S". The process shown in this flowchart is started, for example, when a condition for starting plug-in charging is satisfied. Specifically, when a connector of a charging cable of an EVSE (external power source) is connected to inlet 11 of vehicle 1, the condition for starting plug-in charging is satisfied and the process flow shown below (S11, S12, and S21 to S24) may be started.

[0027] 3, in S11, ECU 100 obtains the current SOC of battery 21 and determines whether the obtained SOC belongs to the plateau region of charging curve L1. In detail, ECU 100 reads charging curve L1 from storage device 103 and recognizes the plateau region of charging curve L1. The plateau region is a region where a charging curve or a discharging curve becomes flat. In the plateau region, the amount of change in voltage relative to the amount of change in the amount of stored electricity (the slope of the curve) becomes smaller than a reference amount of change. The plateau voltage is the battery voltage in the plateau region.

[0028] In the charging curve L1 shown in FIG. 3, the first SOC range (plateau region A) from 0% to value P11 and the second SOC range (plateau region B) from value P12 to value P13 each correspond to a plateau region. In this embodiment, the values ​​P11, P12, and P13 are 30%, 60%, and 80%, respectively, and the widths of the first SOC range and the second SOC range are 30% and 20%, respectively. However, each of the values ​​P11, P12, and P13 is not limited to the above and may vary depending on the characteristics of the cell (all-solid-state battery) used. The width of the first SOC range is preferably 5% or more, and more preferably 15% or more. Each of the cells 2-1 to 2-N constituting the battery 21 according to this embodiment is an all-solid-state battery having an electrode layer (specifically, a negative electrode layer) containing silicon clathrate. Such an all-solid-state battery is likely to have a clear plateau region in the low SOC region in each of its charge and discharge curves, and more specifically, is likely to have a plateau region in at least a portion of the SOC range of 0% or more and 30% or less.

[0029] In this embodiment, if the SOC of battery 21 when the plug-in charging start condition is satisfied falls within either the first SOC range (0-30%) or the second SOC range (60-80%), a YES determination is made in S11, and if the SOC does not fall within either the first or second SOC range, a NO determination is made in S11. A known method such as a current integration method can be used to measure the SOC.

[0030] If the determination in S11 is YES, the ECU 100 executes an equalization process for the battery 21 in the following S12. The equalization process is a process for making the amount of charge between the cells closer to equal. In this embodiment, the ECU 100 controls the charging unit 10 in S12 so as to make the SOCs of the cells 2-1 to 2-N (FIG. 2) equal to each other. Specifically, the ECU 100 performs charging control (external charging) of the battery 21 in the plateau region at a voltage (hereinafter referred to as a "first equalization voltage") lower than a normal charging (S21) described later. The first equalization voltage is a voltage lower than a reference voltage (S21) described later, and may be equal to or lower than half the reference voltage. The ECU 100 may adjust (step down) the voltage by the power conversion circuit 12. The equalization process reduces the voltage variation between the cells and the potential variation inside the cells (for example, the potential variation caused by reaction unevenness) for the battery 21. In all-solid-state batteries that do not contain an electrolytic solution, it is difficult for ion conduction paths to be formed between solid electrolytes in the thickness direction, and the resistance associated with the movement of ions in the thickness direction is high, making it easy for reaction to become uneven.

[0031] When the equalization process is completed, the process proceeds to S21. The ECU 100 may determine whether the equalization process is completed based on the state (e.g., SOC) of each cell of the battery 21. Alternatively, the ECU 100 may determine that the equalization process is completed when a predetermined time has elapsed since the start of the equalization process. Furthermore, if the SOC of the battery 21 leaves the plateau region during the equalization process, the ECU 100 may stop the equalization process and proceed to S21. Furthermore, the process also proceeds to S21 if NO is determined in S11.

[0032] In S21, the ECU 100 performs external charging (plug-in charging) of the battery 21 at a predetermined reference voltage. The reference voltage may be determined according to the specifications (e.g., rated voltage) of the EVSE connected to the vehicle 1. The ECU 100 controls the charging unit 10 so that the battery 21 is charged by power supplied from the EVSE.

[0033] Next, in S22, the ECU 100 determines whether to terminate charging based on whether a charging termination condition is satisfied. The charging termination condition is satisfied, for example, when the SOC of the battery 21 reaches a target value. The target value may be set automatically by the ECU 100 or the EVSE, or may be set by the user. The target value may be 100% (SOC value indicating full charge). The charging termination condition is also satisfied when the charging cable is removed from the inlet 11. Note that the charging termination condition can be changed as appropriate. For example, the charging termination condition may be satisfied when a predetermined time has elapsed since the start of external charging (S21). The charging termination condition may also be satisfied in response to an instruction from the user to stop charging.

[0034] If the charging end condition is not satisfied (NO in S22), the process proceeds to S23. In S23, the ECU 100 judges whether or not the SOC of the battery 21 has entered the plateau region of the charging curve L1 as a result of the charging (S21). In this embodiment, if the SOC of the battery 21 increases and reaches a value P12 as a result of the charging, the result is judged as YES in S23, and the process proceeds to S24. In S24, the ECU 100 executes an equalization process (for example, the above-mentioned low-voltage charging) for the battery 21. The equalization process in S24 may be the same as or different from the equalization process in S12. When the equalization process in S24 is completed, the process returns to S21. Also, when the result is NO in S23, the process returns to S21. When the equalization process in S24 is completed, the result is judged as NO in S23.

[0035] While the determinations in both S22 and S23 are NO, external charging of the battery 21 at the reference voltage (S21) is continuously performed. Then, when the charging end condition is met (YES in S22), the process flow shown in FIG. 3 ends.

[0036] The equalization process is not limited to the low-voltage charging described above. The equalization process in each of S12 and S24 may be, for example, a process of stopping charging of the battery 21. In the plateau region, the voltage of each cell constituting the battery 21 approaches the plateau voltage due to the stopping of charging. For example, after the vehicle 1 has finished traveling using the power of the battery 21 (electric traveling), if the start condition for plug-in charging is satisfied in a state in which the SOC of the battery 21 belongs to the plateau region (YES in S11), the ECU 100 may wait in the plateau region without charging or discharging the battery 21 in S12, and then start plug-in charging (S21) of the battery 21. In addition, in the charging control of the battery 21, when the amount of stored power of the battery 21 belongs to the plateau region, the ECU 100 may stop charging the battery 21 as an equalization process, and perform charging of the battery 21 after the equalization process is completed. Specifically, when the SOC of battery 21 does not belong to the plateau region (NO in S11) at the time when charging control is started, but the SOC of battery 21 increases due to plug-in charging (S21) and belongs to the plateau region (YES in S23), ECU 100 may stop charging battery 21 in S24. Then, after the equalization process is completed, ECU 100 may resume plug-in charging (S21) of battery 21. The equalization process may be discharging (see S121 in FIG. 5), which will be described later.

[0037] 4 is a flowchart showing a process related to the discharge control executed by the ECU 100. The process shown in this flowchart is started, for example, when a discharge start condition of the battery 21 is satisfied in the vehicle 1 that is stopped. Specifically, in the vehicle 1 that is stopped, when the SOC of the battery 21 is higher than a lower limit value (for example, a value P21 described later) and the user performs an ON operation (operation request) of the in-vehicle device 60 (for example, an air conditioner), the discharge start condition of the battery 21 is satisfied and the process flow (S31 to S33 and S341, S342) shown below may be started.

[0038] 4, in S31, ECU 100 executes discharging of battery 21. Specifically, ECU 100 controls power conversion circuit 50 so that power for operating in-vehicle device 60 is supplied from battery 21 to in-vehicle device 60. That is, in S31, ECU 100 executes discharge control of battery 21 with a drive voltage of in-vehicle device 60. Hereinafter, in-vehicle device 60 receiving power supply from battery 21 is referred to as "target device."

[0039] Next, in S32, the ECU 100 determines whether to end the discharge based on whether a discharge end condition is satisfied. The discharge end condition is satisfied, for example, when a user turns off the target device (requests to stop the device). The discharge end condition is also satisfied when the vehicle 1 starts traveling. The discharge end condition can be changed as appropriate.

[0040] If the discharge end condition is not satisfied (NO in S32), the process proceeds to S33. In S33, the ECU 100 determines whether the SOC of the battery 21 has entered a plateau region (plateau region C shown below in this embodiment) located on the lowest SOC side of the plateau region of the discharge curve L2 as a result of the above discharge (S31).

[0041] In detail, the ECU 100 reads out the discharge curve L2 from the storage device 103 and recognizes the plateau region of the discharge curve L2. In the discharge curve L2 shown in FIG. 4, the third SOC range (plateau region C) from 0% to value P21 and the fourth SOC range (plateau region D) from value P22 to value P23 each correspond to the plateau region. In this embodiment, the values ​​P21, P22, and P23 are 30%, 55%, and 75%, respectively, and the widths of the third SOC range and the fourth SOC range are 30% and 20%, respectively. However, each of the values ​​P21, P22, and P23 is not limited to the above and may vary depending on the characteristics of the cell (all-solid-state battery) employed. The width of the third SOC range is preferably 5% or more, and more preferably 15% or more.

[0042] If the SOC of the battery 21 is higher than the value P21, a NO determination is made in S33. In this embodiment, while both S32 and S33 are NO, power supply (S31) from the battery 21 to the target device is continuously executed. Then, when the SOC of the battery 21 decreases due to this discharge (S31) and reaches the value P21, a YES determination is made in S33 and the process proceeds to S341.

[0043] In S341, the ECU 100 notifies the user of the stop of discharging. Specifically, the ECU 100 controls the HMI 80 to notify the user of the stop of the target device, for example. The HMI 80 may notify the user by display or sound. Subsequently, the ECU 100 executes equalization processing of the battery 21 in S342. Specifically, the ECU 100 controls the discharge of the battery 21 at a voltage (hereinafter referred to as "second equalization voltage") lower than the drive voltage (S31) of the in-vehicle device 60 in the plateau region C. As a result, the power supply from the battery 21 to the target device is stopped. The second equalization voltage is a voltage lower than the discharge voltage of S31. In S342, low-voltage discharge of the battery 21 is executed. The ECU 100 may adjust (step down) the voltage by, for example, the power conversion circuit 50. The discharged power may be consumed by a power load (not shown) included in the in-vehicle device 60, or may be stored in an auxiliary battery (not shown). The equalization process of S342 reduces the voltage variation between cells and the potential variation within the cells of the battery 21. In the low SOC plateau region (plateau region close to over-discharge), the mitigation (equalization) of these variations is particularly promoted.

[0044] When the equalization process of S342 is completed, the process flow shown in Fig. 4 ends. Also, when the discharge end condition is satisfied (YES in S32), the process flow shown in Fig. 4 ends. In the discharge control shown in Fig. 4, the equalization process of the battery 21 is not executed in the plateau region D so as not to excessively reduce the convenience of the user. However, this is not limited to this, and the ECU 100 may execute the equalization process of the battery 21 not only in the plateau region C but also in the plateau region D. Also, the discharge control of the battery 21 is not limited to the discharge control for operating the in-vehicle device 60, and may be the discharge control for supplying power to the outside of the vehicle.

[0045] As described above, the vehicle 1 according to this embodiment includes an all-solid-state battery system. The all-solid-state battery system includes the battery 21 and the ECU 100 (control device) that executes charge control and discharge control of the battery 21. The battery 21 is an assembled battery configured by connecting a plurality of cells. Each of the plurality of cells is an all-solid-state battery. The ECU 100 is configured to execute an equalization process (S12, S24 in FIG. 3 and S342 in FIG. 4) in charge control or discharge control of the battery 21, which makes the amount of charge between the cells closer to equal in a plateau region (flat region) in the relationship between the voltage and the amount of charge of the battery 21. In the plateau region, the voltage of each cell (all-solid-state battery) that constitutes the assembled battery is likely to approach the plateau voltage. Therefore, in the plateau region, the equalization of the amount of charge between the cells is promoted. According to the above configuration, when a plurality of all-solid-state batteries (cells) are connected and used as an assembled battery, the variation in the amount of charge between the cells is suppressed.

[0046] Each of the charge curve and discharge curve of the battery 21 according to the above embodiment has a plurality of plateau regions spaced apart from each other. However, the present invention is not limited to this, and each of the charge curve and discharge curve may have only one plateau region. For example, the charge curve of the battery 21 may have the plateau region A shown in FIG. 3 as the only plateau region. For such a battery 21, the variation in the amount of charge between the cells can be suppressed by the charge control shown in FIG. 3. Furthermore, the discharge curve of the battery 21 may have the plateau region C shown in FIG. 4 as the only plateau region. For such a battery 21, the variation in the amount of charge between the cells can be suppressed by the discharge control shown in FIG. 4.

[0047] The process flows shown in Figures 3 and 4 can be modified as appropriate. For example, the order of the processes may be changed or unnecessary steps may be omitted depending on the purpose. Furthermore, the content of any of the processes may be changed. For example, the ECU 100 may execute the charging control shown in Figure 5, which will be described below, instead of the charging control shown in Figure 3.

[0048] FIG. 5 is a flowchart showing a modified example of the charge control shown in FIG. 3. The battery 21 (all-solid-state battery) according to this modified example has the characteristics shown by the charge curve L1A. The charge curve L1A has a plateau region A as the only plateau region. The plateau region A in FIG. 5 is the same as the plateau region A shown in FIG. 3. However, the ECU 100 recognizes the plateau region A by dividing it into a plurality of sections (specifically, sections A1 and A2). The plateau region A of the charge curve L1A shown in FIG. 5 includes a first section (section A1) from 0% to a value P10, and a second section (section A2) from a value P10 to a value P11. The values ​​P10 and P11 are stored in advance in the storage device 103 together with the charge curve L1A. The value P10 is smaller than the value P11. The value P10 is an SOC value near 0%, for example, an SOC value selected from a range of more than 0% and not more than 15%.

[0049] 5, in S111, ECU 100 obtains the current SOC of battery 21 and determines whether or not the obtained SOC belongs to plateau region A (0% to value P11) of charging curve L1A. If the SOC of battery 21 belongs to plateau region A of charging curve L1A (YES in S111), ECU 100 determines whether or not the SOC of battery 21 belongs to section A1 (0% to value P10) in the following S112. If the SOC of battery 21 belongs to section A1 (YES in S112), ECU 100 executes a first equalization process for battery 21 in S121. If the SOC of battery 21 belongs to a section other than section A1 (section A2) (NO in S112), ECU 100 executes a second equalization process for battery 21 in S122.

[0050] The first equalization process is discharging the battery 21. Specifically, in S121, the ECU 100 controls the power conversion circuit 50 so that the battery 21 is discharged until the SOC of the battery 21 becomes 0% or less. The discharged power may be consumed by a power load (not shown) included in the in-vehicle device 60, or may be stored in an auxiliary battery (not shown).

[0051] The second equalization process is the above-mentioned low voltage charging, that is, external charging of the battery 21 at the first equalization voltage (see S12 in FIG. 3). That is, in S122, charging control of the battery 21 is executed at a voltage lower than that in normal charging (S21).

[0052] When the equalization process is completed in either S121 or S122, the process proceeds to S21. Also, when the determination in S111 is NO, the process proceeds to S21. In S21, the ECU 100 performs external charging (plug-in charging) of the battery 21. Next, in S22, the ECU 100 determines whether or not to end the charging based on whether or not a charging end condition is satisfied. Since S21 and S22 in FIG. 5 are the same as S21 and S22 in FIG. 3, the description will not be repeated. While the charging end condition is not satisfied (NO in S22), the plug-in charging in S21 is continuously performed. Then, when the charging end condition is satisfied (YES in S22), the process flow shown in FIG. 5 ends.

[0053] In the above modification, different equalization processes are performed for each section of the plateau region classified according to the amount of charge stored. This makes it possible to more appropriately suppress the variation in the amount of charge stored between the cells. Although FIG. 5 illustrates the charge control, different equalization processes may be performed for each section of the plateau region in the discharge control.

[0054] During execution of the equalization process (S12, S24 in FIG. 3, S342 in FIG. 4, S121, S122 in FIG. 5), the ECU 100 may adjust the temperature of the battery 21 by the thermal management device 22. The ECU 100 may adjust the battery temperature to within a temperature range in which equalization is promoted.

[0055] In the above embodiment and modified example, the ECU 100 judges whether the state of charge or the state of discharge of the battery 21 corresponds to the plateau region based on the SOC of the battery 21 (S11, S23 in FIG. 3, S33 in FIG. 4, S111 in FIG. 5). However, the present invention is not limited to this, and the ECU 100 may judge whether the state of charge or the state of discharge of the battery 21 corresponds to the plateau region using the OCV of the battery 21 in addition to or instead of the SOC of the battery 21. The ECU 100 may estimate the OCV of the battery 21 based on the terminal voltage, current, and internal resistance of the battery 21 while continuing to charge the battery 21. Alternatively, the ECU 100 may temporarily stop charging the battery 21 and actually measure the voltage (OCV) of the battery 21 when no current is flowing. The ECU 100 may also regard the voltage of the battery 21 when a small current is flowing as the OCV of the battery 21.

[0056] The applications of the all-solid-state battery system are not limited to vehicles. The all-solid-state battery system may be used for applications other than vehicles (for example, stationary applications).

[0057] The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The technical scope of the present disclosure is defined by the claims, not by the description of the embodiments described above, and is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]

[0058] 1 vehicle, 2 cells, 10 charging unit, 11 inlet, 12 power conversion circuit, 20 battery pack, 21 battery, 50 power conversion circuit, 60 on-board equipment, 100 ECU.

Claims

1. A battery pack formed by connecting a plurality of cells; a control device that executes charge control and discharge control of the battery pack, each of the plurality of cells is an all-solid-state battery; the control device is configured to execute, in the charging control or the discharging control, an equalization process for making the amounts of stored electricity among the cells closer to equal in a plateau region of a relationship between a voltage and a stored electricity amount of the assembled battery.

2. Each of the plurality of cells comprises an electrode layer including a silicon clathrate; 2. The all-solid-state battery system according to claim 1, wherein the assembled battery has the plateau region in at least a part of a range in which a State Of Charge (SOC) indicating a ratio of a current amount of stored electricity to an amount of stored electricity in a fully charged state is equal to or greater than 0% and equal to or less than 30%.

3. 2. The all-solid-state battery system according to claim 1, wherein the control device performs the charging control of the assembled battery at a voltage lower than a reference voltage in the plateau region as the equalization process, and performs the charging control of the assembled battery at the reference voltage after the equalization process is completed.

4. 2. The all-solid-state battery system according to claim 1, wherein, in the charging control, when an amount of charge stored in the battery pack belongs to the plateau region, the control device stops charging the battery pack as the equalization process, and performs charging of the battery pack after the equalization process is completed.

5. A vehicle comprising the all-solid-state battery system according to any one of claims 1 to 4.

Citation Information

Patent Citations

  • State management device, equalization method for storage elements

    JP2013070599A

  • A method for balancing the charge and discharge levels of a battery by switching the battery cell blocks.

    JP2014535255A

  • Equalization discharger

    JP2015201939A

  • Cell balancing system and control method

    JP2019503640A

  • Active material and battery

    JP2020017513A