Rotor bearing core position calculation method and rotor alignment measurement evaluation method

The method uses a three-dimensional measuring device to calculate bearing center positions in steam turbine units without reference lines, ensuring accurate rotor alignment measurements and reducing adjustment workload.

JP2024155077AActive Publication Date: 2024-10-31KK TOSHIBA
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023069483
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-20
Publication Date
2024-10-31
Estimated Expiration
2043-04-20

AI Technical Summary

Technical Problem

Existing methods for measuring rotor alignment in steam turbine units are prone to inaccuracies due to environmental factors affecting reference lines set by laser beams or piano wires, leading to variations in bearing center position measurements.

Method used

A method using a three-dimensional measuring device to calculate the core position of bearings without attaching the rotor, measuring multiple points, and calculating three-dimensional coordinates to determine the bearing's center position accurately, eliminating the need for reference lines.

Benefits of technology

Enables high-accuracy calculation of bearing center positions, reducing the workload for rotor alignment adjustments by allowing precise evaluation and adjustment of center differences and surface openings before rotor installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024155077000001_ABST
    Figure 2024155077000001_ABST
Patent Text Reader

Abstract

To accurately calculate a core position of a bearing.SOLUTION: A rotor bearing core position calculation method is a method for calculating a core position of a bearing that supports a rotor of a steam turbine unit that is configured such that the multiple rotors are connected via a coupling. The rotor bearing core position calculation method includes: a measurement point position acquisition step in which multiple measurement points on the bearing are each measured using a three-dimensional measurement device to obtain the position coordinates on the three-dimensional coordinates of each measurement point in a state where the rotors are not attached to the steam turbine unit; and a bearing core position calculation step in which the position coordinates on the three-dimensional coordinates of the core position of the bearing are calculated on the basis of the position coordinates of each measurement point acquired in the measurement point position acquisition step.SELECTED DRAWING: Figure 7
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] An embodiment of the present invention relates to a rotor bearing center position calculation method and a rotor alignment measurement and evaluation method. [Background technology]

[0002] A steam turbine unit is a piece of equipment consisting of multiple rotors connected via couplings. The relative positions of the rotors are called rotor alignment, and to keep the rotor alignment in the planned state, the positions of the bearings that support the rotors are adjusted. This is to keep the load distribution of the bearings at the planned value, and is one of the important adjustment items for stable operation of the equipment.

[0003] In a typical rotor alignment measurement method, in order to set the centering error and the face gap between adjacent couplings in the left-right and up-down directions to the planned values, a centering measurement is performed in which the centering error and the face gap are directly measured while the rotor is rotated. If the centering measurement does not meet the planned values, the rotor is lifted out and the bearing is disassembled to adjust the shims on the bearing adjustment block. After the adjustment, the contact between the bearing adjustment block and the bearing pedestal is checked and adjusted, the bearing is assembled, the rotor is lifted out, and the centering measurement is performed again.

[0004] To reduce such workload, a measurement evaluation method is known that evaluates rotor alignment before rotor installation. In this measurement evaluation method, first, with the rotor not installed on the equipment, the center position of the bearings installed on each bearing pedestal is measured using the center line set with laser light or piano wire as a reference line. Next, the deviation of the center position of the bearing from the planned value is calculated. Then, from the estimated data, the center difference in the left-right and up-down directions and the surface opening amount between the couplings are calculated.

[0005] However, in this measurement evaluation method, the bearing center position is measured using the center line set by the laser light or piano wire as a reference line, and it is necessary to set the reference line to obtain the bearing center position. The laser light or piano wire that sets this reference line is easily affected by external environments such as dust and wind, and since the measurement is performed based on the relative position between the reference line and the bearing, the measurement value may vary depending on the installation method of the measurement device, etc. For this reason, there was a problem in ensuring the measurement accuracy of the bearing center position. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] Patent No. 6871092 Summary of the Invention [Problem to be solved by the invention]

[0007] The present invention has been made in consideration of the above points, and has an object to provide a rotor bearing center position calculation method and a rotor alignment measurement and evaluation method that can calculate the center position of a bearing with high accuracy. [Means for solving the problem]

[0008] A rotor bearing center position calculation method according to an embodiment is a method for calculating the center position of a bearing supporting a rotor of a steam turbine unit configured by connecting multiple rotors via couplings. The rotor bearing center position calculation method includes a measurement point position acquisition step of measuring multiple measurement points on the bearing with a three-dimensional measurement device and acquiring three-dimensional position coordinates of each of the measurement points in a state in which the rotor is not attached to the steam turbine unit, and a bearing center position calculation step of calculating the three-dimensional position coordinates of the bearing center position based on the position coordinates of each of the measurement points acquired in the measurement point position acquisition step.

[0009] In addition, the rotor alignment measurement evaluation method according to the embodiment includes a rotor bearing center position calculation process that calculates the position coordinates of each center position of the bearing using the rotor bearing center position calculation method described above, and a coupling center difference calculation process that calculates the center difference in the left-right and up-down directions when viewed along the axial direction between adjacent couplings based on the position coordinates calculated in the rotor bearing center position calculation process.

[0010] In addition, the rotor alignment measurement evaluation method according to the embodiment includes a rotor bearing center position calculation process that calculates the position coordinates of each core position of the bearing using the rotor bearing center position calculation method described above, and a coupling face opening amount calculation process that calculates the face opening amount in the left-right and up-down directions when viewed along the axial direction between adjacent couplings based on the position coordinates calculated in the rotor bearing center position calculation process. Effect of the Invention

[0011] According to the present invention, the center position of the bearing can be calculated with high accuracy. [Brief description of the drawings]

[0012] [Figure 1] FIG. 1 is a schematic diagram showing a schematic configuration of a steam turbine unit, illustrating the relative positional relationship of each rotor in the up-down direction. [Diagram 2] FIG. 2 is a schematic diagram showing a schematic configuration of a steam turbine unit, illustrating the relative positional relationship of each rotor in the left-right direction. [Diagram 3] FIG. 3 is a schematic diagram showing the center misalignment and the surface opening amount in the up-down direction between adjacent couplings. [Figure 4] FIG. 4 is a diagram for explaining the measurement point position acquiring step according to the first embodiment, and is a perspective view showing the lower half of the bearing. [Diagram 5] FIG. 5 is an enlarged schematic view showing measurement points located on one side in the axial direction of the bearing shown in FIG. [Figure 6]FIG. 6 is an enlarged schematic view showing measurement points located on the other side in the axial direction of the bearing shown in FIG. [Figure 7] FIG. 7 is a diagram for explaining the shaft center position calculation step according to the first embodiment, and is a perspective view showing the lower half of the bearing. [Figure 8] FIG. 8 is a perspective view showing a plurality of bearings of the steam turbine unit according to the first embodiment. [Figure 9] FIG. 9 is a diagram for explaining the coupling center difference calculation step and the coupling surface opening amount calculation step, and is a schematic diagram showing a schematic configuration of a steam turbine unit. [Figure 10] FIG. 10 is a schematic diagram showing the position coordinates of the planned state and the current state of each bearing shown in FIG. [Figure 11] FIG. 11 is a schematic diagram showing a state in which the position coordinates of each bearing shown in FIG. 10 are converted into relative coordinates based on the two rear bearings. [Figure 12] FIG. 12 is a perspective view showing a bearing, illustrating the measurement point position acquiring step according to the second embodiment. [Figure 13] FIG. 13 is a schematic diagram showing measurement points located on one side in the axial direction of the bearing shown in FIG. [Figure 14] FIG. 14 is a schematic diagram showing measurement points located on the other axial side of the bearing shown in FIG. [Figure 15] FIG. 15 is a perspective view showing a bearing, illustrating the shaft center position calculation step according to the second embodiment. In FIG. [Figure 16] FIG. 16 is a perspective view showing a plurality of bearings of a steam turbine unit according to the second embodiment. [Figure 17] FIG. 17 is a diagram for explaining the shaft center position calculation process according to the third embodiment, and is a schematic diagram of the bearing and the turbine as viewed in the axial direction. [Figure 18] FIG. 18 is a diagram for explaining the shaft center position calculation step according to the fourth embodiment, and is a schematic diagram of the bearing as viewed along the axial direction. [Figure 19]FIG. 19 is a diagram for explaining the shaft center position calculation step according to the fifth embodiment, and is a schematic diagram showing a state in which subsidence of the bearing occurs. [Figure 20] FIG. 20 is an enlarged schematic view showing a state in which the bearing shown in FIG. 19 has sunk. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a rotor bearing center position calculation method and a rotor alignment measurement and evaluation method according to embodiments of the present invention will be described with reference to the drawings.

[0014] (First embodiment) A rotor bearing center position calculation method and a rotor alignment measurement and evaluation method according to a first embodiment will be described with reference to FIGS. 1 to 11.

[0015] First, the steam turbine unit will be described with reference to FIGS. 1 to 3. FIG.

[0016] 1 and 2, a steam turbine unit 1 is configured by connecting a plurality of rotors 2 via couplings 3. The steam turbine unit 1 includes a plurality of rotors 2, the couplings 3, and a plurality of bearings 10. The rotors 2 are turbine rotors of steam turbines used in, for example, thermal power plants and nuclear power plants.

[0017] In the example shown in Fig. 1 and Fig. 2, the steam turbine unit 1 includes two rotors 2. A coupling 3 is provided on both sides of each rotor 2. The two rotors 2 are connected via the coupling 3. Bearings 10 support the rotors 2. Each rotor 2 is rotatably supported by two bearings 10. Therefore, the steam turbine unit 1 includes four bearings 10. The bearings 10 are supported by bearing stands (not shown).

[0018] Fig. 1 shows the relative positional relationship of each rotor 2 in the up-down direction (vertical direction). Fig. 2 shows the relative positional relationship of each rotor 2 in the left-right direction (horizontal direction). The positional relationship of each rotor 2 is called rotor alignment. As shown in Figs. 1 and 2, each rotor 2 may be positioned tilted in the up-down and left-right directions with respect to a reference line 5 due to the influence of uneven settlement of the foundation, etc. Here, the reference line 5 is an imaginary line parallel to the horizontal plane.

[0019] Fig. 3 shows the center difference 7 and the surface opening amount 8 in the vertical direction between adjacent couplings 3. As shown in Fig. 3, the center difference 7 is the amount of deviation between the centers (center points on the outermost surfaces) of adjacent couplings 3. The surface opening amount 8 is the maximum amount of opening between the outer surfaces of adjacent couplings 3.

[0020] When mounting the rotor 2 to the steam turbine unit 1, it is required that the center difference 7 and the face opening amount 8 in the left-right and up-down directions between adjacent couplings 3 be set to planned values. The rotor bearing center position calculation method according to this embodiment makes it possible to evaluate the center difference 7 and the face opening amount 8 by accurately calculating the center positions of the bearings 10 that support each rotor 2.

[0021] Next, the rotor bearing center position calculation method according to this embodiment will be described with reference to FIGS.

[0022] The rotor bearing center position calculation method according to this embodiment includes a measurement point position acquisition step and a bearing center position calculation step.

[0023] First, a measurement point position acquisition step is performed. In the measurement point position acquisition step, a plurality of measurement points on the bearing 10 are measured by a three-dimensional measuring device in a state where the rotor 2 is not attached to the steam turbine unit 1, and the position coordinates of each of the measurement points on the three-dimensional coordinate system are acquired. The three-dimensional measuring device is, for example, a laser tracker.

[0024] In this embodiment, the bearing 10 is a pad bearing divided into a lower half 11 and an upper half. That is, the bearing 10 includes the lower half 11 and an upper half (not shown) located above the lower half 11. As shown in Fig. 4, the lower half 11 of the bearing 10 includes a first horizontal joint surface 12, a second horizontal joint surface 13, an inner circumferential surface 14, a first edge portion 15, and a second edge portion 16.

[0025] The first horizontal joint surface 12 is located on one side in the left-right direction (the left side in FIG. 4). The second horizontal joint surface 13 is located on the other side in the left-right direction (the right side in FIG. 4). The first horizontal joint surface 12 and the second horizontal joint surface 13 are flat surfaces that face the upper half.

[0026] In this specification, the left-right direction means the left-right direction when viewed along the axial direction. The up-down direction means the vertical direction (the direction of gravity). The axial direction is the direction along the rotation axis of the rotor 2, but as described above, the rotor 2 can be disposed at an inclination with respect to the reference line 5, so strictly speaking, the axial direction can be in a different direction depending on the inclination of the rotor 2. However, in this specification, the axial direction does not have to be the axial direction in the strict sense, and is used as a concept indicating a direction generally along the rotation axis of the rotor 2.

[0027] The inner circumferential surface 14 is located between the first horizontal joint surface 12 and the second horizontal joint surface 13 in the left-right direction. The inner circumferential surface 14 has a semicircular shape (lower half) when viewed along the axial direction.

[0028] The first edge portion 15 is located between the first horizontal joint surface 12 and the inner circumferential surface 14. That is, the first edge portion 15 is formed by an edge portion on the other side in the left-right direction of the first horizontal joint surface 12 (the right side in FIG. 4) and an edge portion on one side in the left-right direction of the inner circumferential surface 14 (the left side in FIG. 4).

[0029] The second edge portion 16 is located between the second horizontal joint surface 13 and the inner circumferential surface 14. That is, the second edge portion 16 is formed by an edge portion on one side in the left-right direction of the second horizontal joint surface 13 (the left side in FIG. 4) and an edge portion on the other side in the left-right direction of the inner circumferential surface 14 (the right side in FIG. 4).

[0030] In the measurement point position acquisition process according to this embodiment, measurements are performed using a three-dimensional measuring device in a state in which the rotor 2 is not attached to the steam turbine unit 1 and the upper half is not attached to the bearing 10.

[0031] 4, eight measurement points are measured, and the position coordinates of each measurement point are obtained. For example, when a laser tracker is used as the three-dimensional measurement device, the reflector 18 of the laser tracker may be placed on each measurement point, and measurements may be performed to obtain the three-dimensional coordinates of the installation position of each reflector 18 (contact position between the bearing 10 and the reflector 18).

[0032] In the example shown in Fig. 4, four measurement points are located on each of one side (the front side in Fig. 4) and the other side (the rear side in Fig. 4) in the axial direction of the bearing 10. More specifically, four measurement points, measurement point P1, measurement point P2, measurement point P3, and measurement point P4, are located on one side in the axial direction of the bearing 10. In addition, four measurement points, measurement point P5, measurement point P6, measurement point P7, and measurement point P8, are located on the other side in the axial direction of the bearing 10.

[0033] The measurement points P1 and P5 are located on the first horizontal joint surface 12. The measurement points P1 and P5 may be located on the inner circumferential surface 14 side. That is, the measurement points P1 and P5 may be located on the other side in the left-right direction (the right side in FIG. 4) on the first horizontal joint surface 12. In other words, the measurement points P1 and P5 may be located near the inner circumferential surface 14.

[0034] The measurement points P2 and P6 are located on the side of the first horizontal joint surface 12 on the inner circumferential surface 14. That is, the measurement points P2 and P6 are located on one side in the left-right direction (the left side in FIG. 4) on the inner circumferential surface 14. In other words, the measurement points P2 and P6 are located near the first horizontal joint surface 12.

[0035] The measurement points P3 and P7 are located on the second horizontal joint surface 13. The measurement points P3 and P7 may be located on the inner circumferential surface 14 side. That is, the measurement points P3 and P7 may be located on one side in the left-right direction (the left side in FIG. 4) on the second horizontal joint surface 13. In other words, the measurement points P3 and P7 may be located near the inner circumferential surface 14.

[0036] The measurement points P4 and P8 are located on the inner circumferential surface 14 on the side of the second horizontal joint surface 13. That is, the measurement points P4 and P8 are located on the other side in the left-right direction (the right side in FIG. 4) on the inner circumferential surface 14. In other words, the measurement points P4 and P8 are located near the second horizontal joint surface 13.

[0037] When acquiring three-dimensional coordinates, a three-dimensional coordinate system is first set. That is, the X-axis, Y-axis, Z-axis, and origin are defined. The direction along the line connecting the center position between the first edge portion 15 and the second edge portion 16 on one side in the axial direction of the bearing 10 and the center position between the first edge portion 15 and the second edge portion 16 on the other side in the axial direction of the bearing 10 is defined as the X-axis. The direction perpendicular to the reference plane defined as absolute horizontal by the three-dimensional measuring device is defined as the Z-axis. The direction perpendicular to both the X-axis and the Z-axis is defined as the Y-axis. In addition, the center position between the first edge portion 15 and the second edge portion 16 on one side in the axial direction of the bearing 10 is defined as the origin.

[0038] In the measurement point position acquisition process according to this embodiment, first, as shown in Figures 4 and 5, a three-dimensional measuring device is used to measure measurement points P1, P2, P3, and P4 located on one side of the bearing 10 in the axial direction, and the three-dimensional position coordinates of each measurement point are acquired. As shown in Figure 5, the X-coordinate, Y-coordinate, and Z-coordinate of the acquired measurement point P1 are represented as P1 (X1, Y1, Z1), respectively. Similarly, measurement points P2, P3, and P4 are represented as P2 (X2, Y2, Z2), P3 (X3, Y3, Z3), and P4 (X4, Y4, Z4), respectively.

[0039] 4 and 6, measurement points P5, P6, P7, and P8 located on the other axial side of bearing 10 are measured using a three-dimensional measuring device to obtain the three-dimensional position coordinates of each measurement point. As shown in Fig. 6, the obtained X, Y, and Z coordinates of measurement point P5 are represented as P5 (X5, Y5, Z5), respectively. Similarly, measurement points P6, P7, and P8 are represented as P6 (X6, Y6, Z6), P7 (X7, Y7, Z7), and P8 (X8, Y8, Z8), respectively.

[0040] After the measurement point position acquisition step, a bearing center position calculation step is performed. In the bearing center position calculation step, the position coordinates of the center position of the bearing 10 in the three-dimensional coordinate system are calculated based on the position coordinates of each of the measurement points acquired in the measurement point position acquisition step.

[0041] In the bearing center position calculation process according to this embodiment, first, the three-dimensional position coordinates of the first edge portion 15 and the second edge portion 16 are calculated on one and the other axial sides of the bearing 10 based on the position coordinates of each of the measurement points P1 to P8 acquired in the measurement point position acquisition process.

[0042] As shown in Fig. 5, the position coordinates in the three-dimensional coordinate system of the first edge portion 15 on one side in the axial direction of the bearing 10 are represented as P9 (X9, Y9, Z9). In this case, X9 can be calculated as the average value of X1 and X2, that is, X9 = (X1 + X2) / 2. Y9 can also be calculated as Y2. Z9 can also be calculated as Z1. In this way, the position coordinates P9 (X9, Y9, Z9) of the first edge portion 15 on one side in the axial direction of the bearing 10 can be calculated based on the position coordinates P1 (X1, Y1, Z1) and P2 (X2, Y2, Z2) of the measurement points P1 and P2.

[0043] 5, the position coordinates of the second edge portion 16 on one side in the axial direction of the bearing 10 in the three-dimensional coordinate system are represented as P10 (X10, Y10, Z10). In this case, X10 can be calculated as the average value of X3 and X4, that is, X10 = (X3 + X4) / 2. Y10 can also be calculated as Y4. Z10 can also be calculated as Z3. In this way, the position coordinates P10 (X10, Y10, Z10) of the second edge portion 16 on one side in the axial direction of the bearing 10 can be calculated based on the position coordinates P3 (X3, Y3, Z3) and P4 (X4, Y4, Z4) of the measurement points P3 and P4.

[0044] 6, the position coordinates of the first edge portion 15 on the other side in the axial direction of the bearing 10 in the three-dimensional coordinate system are represented as P11 (X11, Y11, Z11). In this case, X11 can be calculated as the average value of X5 and X6, that is, X11 = (X5 + X6) / 2. Y11 can also be calculated as Y6. Z11 can also be calculated as Z5. In this way, the position coordinates P11 (X11, Y11, Z11) of the first edge portion 15 on the other side in the axial direction of the bearing 10 can be calculated based on the position coordinates P5 (X5, Y5, Z5) and P6 (X6, Y6, Z6) of the measurement points P5 and P6.

[0045] 6, the position coordinates of the second edge portion 16 on the other side in the axial direction of the bearing 10 in the three-dimensional coordinate system are represented as P12 (X12, Y12, Z12). In this case, X12 can be calculated as the average value of X7 and X8, that is, X12 = (X7 + X8) / 2. Y12 can also be calculated as Y8. Z12 can also be calculated as Z7. In this way, the position coordinates P12 (X12, Y12, Z12) of the second edge portion 16 on the other side in the axial direction of the bearing 10 can be calculated based on the position coordinates P7 (X7, Y7, Z7) and P8 (X8, Y8, Z8) of the measurement points P7 and P8.

[0046] Next, the position coordinates of the center position P15 of the bearing 10 are calculated from the average value of the calculated position coordinates of each of the first edge portion 15 and the second edge portion 16.

[0047] As shown in Fig. 7, the position coordinates of the center position P13 between the first edge portion 15 and the second edge portion 16 on one side in the axial direction of the bearing 10 in three-dimensional coordinates are expressed as P13 (X13, Y13, Z13). This center position P13 can also be said to be the center position on one side in the axial direction of the bearing 10. The position coordinates P13 (X13, Y13, Z13) of this center position P13 can be calculated from the average value of the position coordinates P9 (X9, Y9, Z9) of the first edge portion 15 and the position coordinates P10 (X10, Y10, Z10) of the second edge portion 16. That is, they can be calculated as X13 = (X9 + X10) / 2, Y13 = (Y9 + Y10) / 2, and Z13 = (Z9 + Z10) / 2, respectively.

[0048] 7, the position coordinates of a center position P14 between the first edge portion 15 and the second edge portion 16 on the other side in the axial direction of the bearing 10 in three-dimensional coordinates are expressed as P14 (X14, Y14, Z14). This center position P14 can also be said to be the center position on the other side in the axial direction of the bearing 10. The position coordinates P14 (X14, Y14, Z14) of this center position P14 can be calculated from the average value of the position coordinates P11 (X11, Y11, Z11) of the first edge portion 15 and the position coordinates P12 (X12, Y12, Z12) of the second edge portion 16. That is, they can be calculated as X14 = (X11 + X12) / 2, Y14 = (Y11 + Y12) / 2, and Z14 = (Z11 + Z12) / 2, respectively.

[0049] 7, center position P15 of bearing 10 can be expressed as the center position between center position P13 on one axial side of bearing 10 and center position P14 on the other axial side of bearing 10. This makes it possible to determine center position P15 of bearing 10 while minimizing the effects of tilt, even if bearing 10 is tilted with respect to each of the X-axis, Y-axis, and Z-axis.

[0050] 7, the position coordinates of the center position P15 of the bearing 10 on the three-dimensional coordinate system are represented as P15 (X15, Y15, Z15). In this case, the position coordinates P15 (X15, Y15, Z15) of the center position P15 of the bearing 10 can be calculated from the average value of the position coordinates P13 (X13, Y13, Z13) of the central position P13 and P14 (X14, Y14, Z14) of the central position P14. In other words, they can be calculated as X15 = (X13 + X14) / 2, Y15 = (Y13 + Y14) / 2, and Z15 = (Z13 + Z14) / 2, respectively.

[0051] From the above formulas, it is possible to calculate that X15 = (X9 + X10 + X11 + X12) / 4, Y15 = (Y9 + Y10 + Y11 + Y12) / 4, and Z15 = (Z9 + Z10 + Z11 + Z12) / 4. In other words, the position coordinates P15 (X15, Y15, Z15) of the center position P15 of the bearing 10 can be calculated from the average value of the position coordinates P9 (X9, Y9, Z9), P10 (X10, Y10, Z10), P11 (X11, Y11, Z11), and P12 (X12, Y12, Z12) of the first edge portion 15 and the second edge portion 16, respectively.

[0052] As described above, the steam turbine unit 1 includes a plurality of bearings 10. In the example shown in FIG. 8, the steam turbine unit 1 includes four bearings 10a, 10b, 10c, and 10d. The measurement point position acquisition process and the bearing center position calculation process described above are performed for each of these bearings 10a, 10b, 10c, and 10d. Here, the same three-dimensional coordinate system is set for each of the bearings 10a, 10b, 10c, and 10d. The origin may be set, for example, at a central position between the first edge portion 15 and the second edge portion 16 on one side in the axial direction of the bearing 10 located at the most forward side (the near side in FIG. 8).

[0053] As a result, as shown in Fig. 8, it is possible to calculate the three-dimensional coordinates of the center positions P15a, P15b, P15c, and P15d of the bearings 10a, 10b, 10c, and 10d. This makes it possible to evaluate the distribution of the center positions P15a, P15b, P15c, and P15d of the multiple bearings 10a, 10b, 10c, and 10d. In other words, it becomes possible to evaluate the rotor alignment.

[0054] Next, the rotor alignment measurement and evaluation method according to this embodiment will be described with reference to FIGS.

[0055] The rotor alignment measurement and evaluation method according to this embodiment includes a rotor bearing center position calculation step, a coupling center difference calculation step, and a coupling surface opening amount calculation step.

[0056] First, a rotor bearing center position calculation step is performed. In the rotor bearing center position calculation step, the position coordinates of each center position P15 of the bearings 10 of the steam turbine unit 1 on a three-dimensional coordinate system are calculated using the rotor bearing center position calculation method described above.

[0057] After the rotor bearing center position calculation step, a coupling center offset calculation step is carried out. In the coupling center offset calculation step, center offsets in the left-right and up-down directions between adjacent couplings 3 are calculated based on the position coordinates calculated in the rotor bearing center position calculation step.

[0058] 9 to 11, the steam turbine unit 1 includes four bearings 10a, 10b, 10c, and 10d. As shown in Fig. 10, the position coordinates of the center positions of the bearings 10a, 10b, 10c, and 10d in the planned offset state (planned state) are represented as 10a (a1, a2, a3), 10b (b1, b2, b3), 10c (c1, c2, c3), and 10d (d1, d2, d3), respectively.

[0059] The position coordinates of the center positions of the bearings 10a, 10b, 10c, and 10d calculated using the rotor bearing center position calculation method described above are represented as 10a (e1, e2, e3), 10b (f1, f2, f3), 10c (g1, g2, g3), and 10d (h1, h2, h3), respectively. Here, the position coordinates of these center positions are in a current offset state (current state) where the position has changed over time and deviated from the planned value.

[0060] 9, the distance between bearing 10a and bearing 10b in the X-axis direction is represented as distance dx1. The distance between bearing 10b and coupling 3 in the X-axis direction is represented as distance dx2. The distance between coupling 3 and bearing 10c in the X-axis direction is represented as distance dx3. The distance between bearing 10c and bearing 10d in the X-axis direction is represented as distance dx4.

[0061] First, a method for calculating the center difference in the vertical direction between adjacent couplings 3 will be described. In order to evaluate the position coordinates of the planned state and the position coordinates of the current state under the same conditions, the relative coordinates are calculated for both coordinates with the position coordinates of any two center positions as the reference height position. Here, both the position coordinates of the planned state and the position coordinates of the current state are converted into relative coordinates with the rear bearings 10c, 10d as the reference height position (zero), and the center difference between the couplings 3 is calculated.

[0062] In this case, as shown in Fig. 11, the position coordinates of the planned state after the coordinate transformation of the bearings 10a, 10b, 10c, and 10d are respectively represented as 10a (a1', a2', a3'), 10b (b1', b2', b3'), 10c (0, 0, 0), and 10d (0, 0, 0). Similarly, the position coordinates of the current state after the coordinate transformation of the bearings 10a, 10b, 10c, and 10d are respectively represented as 10a (e1', e2', e3'), 10b (f1', f2', f3'), 10c (0, 0, 0), and 10d (0, 0, 0).

[0063] Here, the deviation amount in the vertical direction (Z-axis direction) between the planned state and the current state of the bearing 10a can be calculated as a3'-e3', and the deviation amount in the vertical direction (Z-axis direction) between the planned state and the current state of the bearing 10b can be calculated as b3'-f3'.

[0064] By calculating the deviation from the planned value at the position of the coupling 3 from this deviation and the distances dx1, dx2, dx3, and dx4, it is possible to calculate the center misalignment in the vertical direction between adjacent couplings 3. More specifically, by finding the gradient of the deviation from the planned value between the bearing 10a and the bearing 10b, it is possible to calculate the deviation from the planned value at the position of the coupling 3 by proportional calculation. The calculation formula can be expressed as center misalignment = (dx1 + dx2) × (b3'-f3'-a3'+e3') / dx1+a3'-e3'+planned value.

[0065] Next, a method for calculating the center misalignment in the left-right direction between adjacent couplings 3 will be described. In order to evaluate the position coordinates of the planned state and the position coordinates of the current state under the same conditions, the relative coordinates are calculated for both coordinates with the position coordinates of any two center positions as the reference left-right direction positions. Here, both the position coordinates of the planned state and the position coordinates of the current state are converted into relative coordinates with the rear bearings 10c, 10d as the reference left-right position (zero), and the center misalignment between the couplings 3 is calculated.

[0066] 11, the position coordinates of the planned state after the coordinate transformation of the bearings 10a, 10b, 10c, and 10d are respectively represented by 10a (a1', a2', a3'), 10b (b1', b2', b3'), 10c (0, 0, 0), and 10d (0, 0, 0). Similarly, the position coordinates of the current state after the coordinate transformation of the bearings 10a, 10b, 10c, and 10d are respectively represented by 10a (e1', e2', e3'), 10b (f1', f2', f3'), 10c (0, 0, 0), and 10d (0, 0, 0).

[0067] Here, the deviation amount in the left-right direction (Y-axis direction) between the planned state and the current state of the bearing 10a can be calculated as a2'-e2', and the deviation amount in the left-right direction (Y-axis direction) between the planned state and the current state of the bearing 10b can be calculated as b2'-f2'.

[0068] By calculating the amount of deviation from the planned value at the position of the coupling 3 from this deviation and the distances dx1, dx2, dx3, and dx4, it is possible to calculate the center misalignment in the left-right direction between adjacent couplings 3. More specifically, by finding the gradient of the amount of deviation from the planned value between the bearing 10a and the bearing 10b, it is possible to calculate the amount of deviation from the planned value at the position of the coupling 3 by proportional calculation. The calculation formula can be expressed as center misalignment = (dx1 + dx2) × (b2'-f2'-a2'+e2') / dx1+a2'-e2'+planned value.

[0069] In this manner, in the coupling center difference calculation step, the center differences in the left-right and up-down directions between adjacent couplings 3 can be calculated based on the position coordinates calculated in the rotor bearing center position calculation step.

[0070] In addition, after the rotor bearing center position calculation step, a coupling surface opening amount calculation step is performed. In the coupling surface opening amount calculation step, the surface opening amounts in the left-right and up-down directions between adjacent couplings 3 are calculated based on the position coordinates calculated in the rotor bearing center position calculation step.

[0071] Similar to the rotor bearing center position calculation process described above, the position coordinates of the center positions of each bearing 10a, 10b, 10c, and 10d in the planned offset state (planned state) are represented as 10a (a1, a2, a3), 10b (b1, b2, b3), 10c (c1, c2, c3), and 10d (d1, d2, d3), respectively.

[0072] The position coordinates of the center positions of the bearings calculated using the rotor bearing center position calculation method described above are represented as 10a (e1, e2, e3), 10b (f1, f2, f3), 10c (g1, g2, g3), and 10d (h1, h2, h3). These center position coordinates are the current offset state (current state) where the position change progresses over time and deviates from the planned value.

[0073] 9, the distance between bearing 10a and bearing 10b in the X-axis direction is represented as distance dx1. The distance between bearing 10b and coupling 3 in the X-axis direction is represented as distance dx2. The distance between coupling 3 and bearing 10c in the X-axis direction is represented as distance dx3. The distance between bearing 10c and bearing 10d in the X-axis direction is represented as distance dx4.

[0074] First, a method for calculating the amount of surface opening in the vertical direction between adjacent couplings 3 will be described. In order to evaluate the position coordinates of the planned state and the position coordinates of the current state under the same conditions, the relative coordinates are calculated for both coordinates with the position coordinates of any two core positions as the reference height position. Here, both the position coordinates of the planned state and the position coordinates of the current state are converted into relative coordinates with the rear bearings 10c, 10d as the reference height position (zero), and the amount of surface opening between the couplings 3 is calculated.

[0075] In this case, as shown in Fig. 11, the position coordinates of the planned state after the coordinate transformation of the bearings 10a, 10b, 10c, and 10d are respectively represented as 10a (a1', a2', a3'), 10b (b1', b2', b3'), 10c (0, 0, 0), and 10d (0, 0, 0). Similarly, the position coordinates of the current state after the coordinate transformation of the bearings 10a, 10b, 10c, and 10d are respectively represented as 10a (e1', e2', e3'), 10b (f1', f2', f3'), 10c (0, 0, 0), and 10d (0, 0, 0).

[0076] Here, the deviation amount in the vertical direction (Z-axis direction) between the planned state and the current state of the bearing 10a can be calculated as a3'-e3', and the deviation amount in the vertical direction (Z-axis direction) between the planned state and the current state of the bearing 10b can be calculated as b3'-f3'.

[0077] From this deviation amount, the distances dx1, dx2, dx3, and dx4, and the outer diameter of the coupling 3, the amount of surface opening in the vertical direction between adjacent couplings 3 can be calculated. More specifically, by obtaining the inclination of the deviation amount from the planned value between the bearing 10a and the bearing 10b, the amount of deviation from the planned value at the position of the coupling 3 can be calculated by proportional calculation. Then, from the inclination of the coupling 3 at the position of the coupling 3 and the outer diameter of the coupling 3, the position coordinates of the outer periphery of the coupling 3 can be calculated. From the difference between the position coordinates of the outer periphery of the coupling 3 and the position coordinates of the adjacent coupling 3, the amount of surface opening in the vertical direction between adjacent couplings 3 can be calculated.

[0078] Next, a method for calculating the amount of surface opening in the left-right direction between adjacent couplings 3 will be described. In order to evaluate the position coordinates of the planned state and the position coordinates of the current state under the same conditions, the relative coordinates are calculated for both coordinates with the position coordinates of any two core positions as the reference left-right direction positions. Here, both the position coordinates of the planned state and the position coordinates of the current state are converted into relative coordinates with the rear bearings 10c, 10d as the reference left-right position (zero), and the amount of surface opening between the couplings 3 is calculated.

[0079] 11, the position coordinates of the planned state after the coordinate transformation of the bearings 10a, 10b, 10c, and 10d are respectively represented by 10a (a1', a2', a3'), 10b (b1', b2', b3'), 10c (0, 0, 0), and 10d (0, 0, 0). Similarly, the position coordinates of the current state after the coordinate transformation of the bearings 10a, 10b, 10c, and 10d are respectively represented by 10a (e1', e2', e3'), 10b (f1', f2', f3'), 10c (0, 0, 0), and 10d (0, 0, 0).

[0080] Here, the deviation amount in the left-right direction (Y-axis direction) between the planned state and the current state of the bearing 10a can be calculated as a2'-e2', and the deviation amount in the left-right direction (Y-axis direction) between the planned state and the current state of the bearing 10b can be calculated as b2'-f2'.

[0081] From this deviation amount, the distances dx1, dx2, dx3, and dx4, and the outer diameter of the coupling 3, the amount of surface opening in the left-right direction between adjacent couplings 3 can be calculated. More specifically, by obtaining the inclination of the deviation amount from the planned value between the bearing 10a and the bearing 10b, the amount of deviation from the planned value at the position of the coupling 3 can be calculated by proportional calculation. Then, from the inclination of the coupling 3 at the position of the coupling 3 and the outer diameter of the coupling 3, the position coordinates of the outer periphery of the coupling 3 can be calculated. From the difference between the position coordinates of the outer periphery of the coupling 3 and the position coordinates of the adjacent coupling 3, the amount of surface opening in the left-right direction between adjacent couplings 3 can be calculated.

[0082] In this manner, in the coupling surface opening amount calculation process, the surface opening amounts in the left-right and up-down directions between adjacent couplings 3 can be calculated based on the position coordinates calculated in the rotor bearing center position calculation process.

[0083] Thus, according to this embodiment, the rotor bearing center position calculation method includes a measurement point position acquisition step of measuring a plurality of measurement points on the bearing 10 by a three-dimensional measuring device and acquiring the position coordinates of each measurement point on the three-dimensional coordinate system, and a bearing center position calculation step of calculating the position coordinates of the center position P15 of the bearing 10 on the three-dimensional coordinate system based on the position coordinates of each measurement point. According to the rotor bearing center position calculation method of this embodiment, it is possible to eliminate the need to set a reference line using a laser beam or a piano wire, which is thought to affect the measurement accuracy, when calculating the center position P15 of the bearing 10 to evaluate the rotor alignment before mounting the rotor. Therefore, the center position P15 of the bearing 10 can be calculated with high accuracy. In addition, since the measurement and calculation method uses a versatile three-dimensional measuring device, the center position P15 of the bearing 10 can be easily calculated without requiring a specialized engineer.

[0084] According to this embodiment, in the measurement point position acquisition step, the three-dimensional measuring device measures the measurement points P1 and P5 located on the first horizontal joint surface 12, the measurement points P2 and P6 located on the first horizontal joint surface 12 side on the inner circumferential surface 14, the measurement points P3 and P7 located on the second horizontal joint surface 13, and the measurement points P4 and P8 located on the second horizontal joint surface 13 side on the inner circumferential surface 14, on one and the other sides in the axial direction of the bearing 10, respectively, to acquire the position coordinates of the measurement points P1 to P8. Then, in the bearing center position calculation step, the position coordinates P13 and P14 of the first edge portion 15 and the second edge portion 16 on the three-dimensional coordinate system are calculated on one and the other sides in the axial direction of the bearing 10 based on the position coordinates of the measurement points P1 to P8, respectively, and the position coordinate of the center position P15 of the bearing 10 is calculated from the average value of the position coordinates P13 and P14 of the first edge portion 15 and the second edge portion 16. By employing such a measurement and calculation method, when the bearing 10 is a pad bearing divided into a lower half 11 and an upper half, the center position P15 of the bearing 10 can be calculated with high accuracy.

[0085] According to this embodiment, the measurement point position acquisition step and the bearing center position calculation step are performed for each of the bearings 10a, 10b, 10c, and 10d to calculate the position coordinates of the center positions P15a, P15b, P15c, and P15d of the bearings 10a, 10b, 10c, and 10d. This makes it possible to evaluate the distribution of the center positions P15a, P15b, P15c, and P15d of the multiple bearings 10a, 10b, 10c, and 10d. In other words, it makes it possible to evaluate the rotor alignment.

[0086] Furthermore, according to this embodiment, the rotor bearing center position calculation method includes a coupling center position calculation step of calculating center positions in the left-right and up-down directions between adjacent couplings 3 based on the position coordinates calculated in the rotor bearing center position calculation step. This makes it possible to evaluate and adjust center positions in the left-right and up-down directions between adjacent couplings 3 before attaching the rotor 2. This reduces the workload for rotor alignment adjustment.

[0087] Furthermore, according to this embodiment, the rotor bearing center position calculation method includes a coupling surface opening amount calculation step of calculating the surface opening amount in the left-right and up-down directions between adjacent couplings 3 based on the position coordinates calculated in the rotor bearing center position calculation step. This makes it possible to evaluate and adjust the surface opening amount in the left-right and up-down directions between adjacent couplings 3 before attaching the rotor 2. This reduces the workload for rotor alignment adjustment.

[0088] (Second embodiment) Next, a rotor bearing center position calculation method and a rotor alignment measurement and evaluation method according to a second embodiment will be described with reference to FIGS.

[0089] 12 to 16, the second embodiment differs mainly in that in the measurement point position acquisition step, at least three measurement points located on the inner peripheral surface on one side and the other side in the axial direction of the bearing are measured by a three-dimensional measuring device to acquire the position coordinates of each of the measurement points, and in the bearing center position calculation step, the center coordinates of the inner peripheral surface on one side and the other side in the axial direction of the bearing are calculated based on the position coordinates of each of the measurement points acquired in the measurement point position acquisition step, and the position coordinates of the bearing center position are calculated from the average value of the center coordinates. The other configurations are substantially the same as those of the first embodiment shown in Figs. 1 to 11.

[0090] In this embodiment, as shown in Fig. 12, the bearing 20 includes an inner peripheral surface 24 having a circular shape when viewed along the axial direction. The bearing 20 may be an elliptical bearing including an inner peripheral surface 24 having an elliptical shape when viewed along the axial direction. The bearing 20 may include a bearing outer ring 21 and an inner bearing ring (not shown) located inside the bearing outer ring 21. The inner peripheral surface 24 may be the inner peripheral surface of the bearing outer ring 21. The bearing outer ring 21 may include a lower half 22 and an upper half 23 located on the lower half 22.

[0091] In the measurement point position acquisition process according to this embodiment, measurement is performed using a three-dimensional measuring device with the rotor 2 not attached to the steam turbine unit 1. As shown in Fig. 12, measurement may be performed using a three-dimensional measuring device with the bearing inner ring (not shown) not attached to the bearing 20. Note that, as shown in Fig. 12, measurement may be performed with both the lower half 22 and the upper half 23 of the bearing outer ring 21 attached, but measurement may also be performed with either the lower half 22 or the upper half 23 of the bearing outer ring 21 not attached.

[0092] In the measurement point position acquisition process according to this embodiment, a three-dimensional measuring device is used to measure at least three measurement points located on the inner surface 24 on one and the other axial sides of the bearing 20, and the position coordinates of each of the measurement points are obtained.

[0093] 12, twelve measurement points are measured, and the position coordinates of each measurement point are obtained. For example, when a laser tracker is used as the three-dimensional measurement device, reflectors 18 of the laser tracker may be placed on each measurement point, measurements may be performed, and the three-dimensional coordinates of the center positions of the reflectors 18 may be obtained.

[0094] 12, six measurement points are located on each of one side (the front side in FIG. 12) and the other side (the rear side in FIG. 12) in the axial direction of the bearing 20. More specifically, six measurement points, namely, measurement point P21, measurement point P22, measurement point P23, measurement point P24, measurement point P25, and measurement point P26, are located on one side in the axial direction of the bearing 20. In addition, six measurement points, namely, measurement point P27, measurement point P28, measurement point P29, measurement point P30, measurement point P31, and measurement point P32, are located on the other side in the axial direction of the bearing 20.

[0095] Measurement points P21, P22, P23, P24, P25, and P26 are located on the inner circumferential surface 24 on one side in the axial direction of the bearing 20. As shown in Fig. 12, the measurement points P21, P22, P23, P24, P25, and P26 may be located on the inner circumferential surface 24 of the upper half 23 of the bearing 20. Furthermore, the measurement points P21, P22, P23, P24, P25, and P26 may be arranged at equal intervals on the inner circumferential surface 24 of the upper half 23.

[0096] The measurement points P27, P28, P29, P30, P31, and P32 are located on the inner peripheral surface 24 on the other side in the axial direction of the bearing 20. As shown in FIG. 12, the measurement points P27, P28, P29, P30, P31, and P32 may be located on the inner peripheral surface 24 of the upper half 23 of the bearing 20. Also, the measurement points P27, P28, P29, P30, P31, and P32 may be arranged at equal intervals on the inner peripheral surface 24 of the upper half 23. Also, when viewed along the axial direction, the measurement points P27, P28, P29, P30, P31, and P32 may be located at the same positions as the measurement points P21, P22, P23, P24, P25, and P26, respectively.

[0097] When acquiring three-dimensional coordinates, a three-dimensional coordinate system is first set. That is, the X-axis, Y-axis, Z-axis, and origin are defined. The direction along the line connecting the center position of the inner circumferential surface 24 on one side of the bearing 20 in the axial direction and the center position of the inner circumferential surface 24 on the other side of the bearing 20 in the axial direction is defined as the X-axis. The direction perpendicular to the reference plane defined as absolute horizontal by the three-dimensional measuring device is defined as the Z-axis. The direction perpendicular to both the X-axis and the Z-axis is defined as the Y-axis. In addition, the center position of the inner circumferential surface 24 on one side of the bearing 20 in the axial direction is defined as the origin.

[0098] In the measurement point position acquisition process according to this embodiment, first, as shown in Fig. 12 and Fig. 13, measurement points P21, P22, P23, P24, P25, and P26 located on one side of the bearing 20 in the axial direction are measured by a three-dimensional measuring device, and the position coordinates of each measurement point on the three-dimensional coordinate system are acquired. As shown in Fig. 13, the X-coordinate, Y-coordinate, and Z-coordinate of the acquired measurement point P21 are represented as P21 (X21, Y21, Z21), respectively. Similarly, measurement points P22, P23, P24, P25, and P26 are represented as P22 (X22, Y22, Z22), P23 (X23, Y23, Z23), P24 (X24, Y24, Z24), P25 (X25, Y25, Z25), and P26 (X26, Y26, Z26), respectively.

[0099] Similarly, as shown in Figures 12 and 14, measurement points P27, P28, P29, P30, P31, and P32 located on the other side of the bearing 20 in the axial direction are measured by a three-dimensional measuring device, and the position coordinates of each measurement point on the three-dimensional coordinate system are obtained. As shown in Figure 14, the acquired X-coordinate, Y-coordinate, and Z-coordinate of measurement point P27 are represented as P27 (X27, Y27, Z27), respectively. Similarly, measurement points P28, P29, P30, P31, and P32 are represented as P28 (X28, Y28, Z28), P29 (X29, Y29, Z29), P30 (X30, Y30, Z30), P31 (X31, Y31, Z31), and P32 (X32, Y32, Z32), respectively.

[0100] After the measurement point position acquisition step, a bearing center position calculation step is performed. In the measurement point position acquisition step according to the present embodiment, first, the center coordinates of the inner peripheral surface 24 are calculated on one side and the other side of the bearing 20 in the axial direction based on the position coordinates of each of the measurement points P21 to P32 acquired in the measurement point position acquisition step.

[0101] 13, the central coordinates of inner circumferential surface 24 on one side in the axial direction of bearing 20 are expressed as P33 (X33, Y33, Z33). In this case, a perfect circle 25 that passes through measurement points P21, P22, P23, P24, P25, and P26 is created, and the central coordinates of this perfect circle 25 are calculated, thereby making it possible to calculate the central coordinates P33 (X33, Y33, Z33) of inner circumferential surface 24 on one side in the axial direction of bearing 20.

[0102] 14, the central coordinates of inner circumferential surface 24 on the other side in the axial direction of bearing 20 are represented as P34 (X34, Y34, Z34). In this case, a perfect circle 26 that passes through measurement points P27, P28, P29, P30, P31, and P32 is created, and the central coordinates of this perfect circle 26 are calculated, thereby making it possible to calculate the central coordinates P34 (X34, Y34, Z34) of inner circumferential surface 24 on the other side in the axial direction of bearing 20.

[0103] Next, the position coordinates of the center position P25 of the bearing 20 on the three-dimensional coordinate system are calculated from the average value of the calculated center coordinates P33, P34.

[0104] 15, the position coordinates of the center position P35 of the bearing 20 on the three-dimensional coordinate system are represented as P35 (X35, Y35, Z35). In this case, the position coordinates P35 (X35, Y35, Z35) of the center position P35 of the bearing 20 can be calculated from the average value of the center coordinates P33 (X33, Y33, Z33) of the inner circumferential surface 24 on one side in the axial direction of the bearing 20 and the center coordinates P34 (X34, Y34, Z34) of the inner circumferential surface 24 on the other side in the axial direction of the bearing 20. That is, they can be calculated as X35 = (X33 + X34) / 2, Y35 = (Y33 + Y34) / 2, and Z35 = (Z33 + Z34) / 2, respectively.

[0105] In the example shown in Fig. 12 to Fig. 15, twelve measurement points are measured, but the number of measurement points is not limited to this and is arbitrary. That is, in this embodiment, perfect circles 25, 26 passing through the measurement points on one side and the other side of the bearing 20 in the axial direction are created to calculate the center coordinates P33, P34 of the inner peripheral surface 24. Therefore, it is sufficient that at least three measurement points are located on the inner peripheral surface 24 so that the perfect circles 25, 26 can be created on one side and the other side of the bearing 20 in the axial direction. However, since the accuracy of the perfect circles 25, 26 improves as the number of measurement points increases, it is preferable to measure as many measurement points as possible from the viewpoint of improving the calculation accuracy of the center position P35 of the bearing 20.

[0106] In the example shown in Fig. 16, the steam turbine unit 1 includes four bearings 20a, 20b, 20c, and 20d. The measurement point position acquisition process and bearing center position calculation process described above are performed for each of these bearings 20a, 20b, 20c, and 20d. Here, the same three-dimensional coordinate system is set for each of the bearings 20a, 20b, 20c, and 20d. The origin is set, for example, at the center position of the inner circumferential surface 24 on one side in the axial direction of the bearing 20 located at the frontmost side (the near side in Fig. 16).

[0107] As a result, as shown in Fig. 16, the position coordinates of the center positions P25a, P25b, P25c, and P25d of the bearings 20a, 20b, 20c, and 20d can be calculated. This makes it possible to evaluate the distribution of the center positions P25a, P25b, P25c, and P25d of the multiple bearings 20a, 20b, 20c, and 20d. In other words, it becomes possible to evaluate the rotor alignment.

[0108] In this embodiment as well, it is possible to eliminate the need to set a reference line using a laser beam or piano wire, which is thought to affect measurement accuracy, when calculating the center position P35 of the bearing 10 to evaluate the rotor alignment before mounting the rotor. This makes it possible to calculate the center position P35 of the bearing 10 with high accuracy. Furthermore, because the measurement and calculation method uses a versatile three-dimensional measuring device, the center position P35 of the bearing 10 can be easily calculated without the need for a specialized engineer.

[0109] Also, according to this embodiment, in a measurement point position acquisition step, at least three measurement points P21 to P32 located on the inner circumferential surface 24 on one side and the other side in the axial direction of the bearing 20 are measured by a three-dimensional measuring device, and the position coordinates of each measurement point are acquired. Then, in a bearing center position calculation step, the center coordinates of the inner circumferential surface 24 on one side and the other side in the axial direction of the bearing 20 are calculated based on the position coordinates of each measurement point P21 to P32, and the position coordinate of the center position P35 of the bearing 20 is calculated from the average value of the center coordinates. By employing such a measurement and calculation method, when the bearing 20 includes an inner circumferential surface 24 that has a circular shape when viewed along the axial direction, it is possible to accurately calculate the center position P35 of the bearing 20.

[0110] (Third embodiment) Next, a rotor bearing center position calculation method and a rotor alignment measurement and evaluation method according to a third embodiment will be described with reference to FIG.

[0111] The third embodiment shown in Fig. 17 differs mainly in that the position coordinates of the center position in the vertical direction are corrected by a distance equivalent to half the difference between the inner diameter of the bearing and the outer diameter of the rotor in the vertical direction in the bearing center position calculation process. The other configurations are substantially the same as those of the first embodiment shown in Figs. 1 to 11.

[0112] 17, when comparing the outer diameter of the rotor 2 and the inner diameter of the bearing 10, lubricating oil for cooling the rotor journal portion is supplied between the rotor 2 and the bearing 10, so that a vertical bearing gap U is provided between the rotor 2 and the bearing 10 at the time of planning. Therefore, a vertical deviation occurs between the center position 2c of the rotor 2 and the center position P15 of the bearing 10. More specifically, a vertical deviation occurs by a distance equivalent to half the difference between the inner diameter of the bearing 10 and the outer diameter of the rotor 2 in the vertical direction.

[0113] Therefore, in this embodiment, in the bearing center position calculation step, the position coordinate of center position P15 in the vertical direction is corrected by a distance equivalent to half the difference in the vertical direction between the inner diameter of the bearing 10 and the outer diameter of the rotor 2. More specifically, in the bearing center position calculation step described above, after the position coordinate of center position P15 of the bearing 10 is calculated, a distance equivalent to half the shaft gap U in the vertical direction is subtracted from the Z-axis component of the position coordinate of center position P15. In other words, when the position coordinate of center position P15 after correction is P15' (X15', Y15', Z15'), the correction is made as Z15'=Z15-U / 2.

[0114] Thus, according to this embodiment, in the bearing center position calculation process, the position coordinates of center position P15 in the vertical direction are corrected by a distance equivalent to half the difference in the vertical direction between the inner diameter of the bearing 10 and the outer diameter of the rotor 2. This makes it possible to bring the position coordinates of center position P15 of the bearing 10 closer to the position coordinates of center position 2c of the rotor 2. This makes it possible to more accurately evaluate and adjust the rotor alignment before mounting the rotor.

[0115] (Fourth embodiment) Next, a rotor bearing center position calculation method and a rotor alignment measurement and evaluation method according to a fourth embodiment will be described with reference to FIG.

[0116] The fourth embodiment shown in Fig. 18 differs mainly in that the position coordinates of the center position in the vertical direction are corrected by a distance equivalent to half the difference between the inner diameter of the bearing outer ring and the outer diameter of the bearing inner ring in the vertical direction in the bearing center position calculation process. The other configurations are substantially the same as those of the first embodiment shown in Figs. 1 to 11.

[0117] In this embodiment, bearing 40 has a split structure divided into a bearing outer ring 41 and a bearing inner ring 42. That is, as shown in Fig. 18, bearing 40 includes bearing outer ring 41 and bearing inner ring 42 located inside bearing outer ring 41.

[0118] As shown in FIG. 18, a vertical spherical gap V is provided between the outer bearing ring 41 and the inner bearing ring 42. Therefore, a vertical deviation occurs between the center position P41 of the outer bearing ring 41 and the center position P42 of the inner bearing ring 42. The position coordinates of the center position 2c of the rotor 2 are closer to the position coordinates of the center position P42 of the inner bearing ring 42 than the center position P41 of the outer bearing ring 41. However, for example, as in the above-mentioned second embodiment, when the position coordinates of the center position P40 of the bearing 40 are calculated as the position coordinates of the center position P41 of the outer bearing ring 41, a vertical deviation occurs between the center position 2c of the rotor 2 and the center position P40 of the bearing 40. More specifically, a vertical deviation occurs by a distance equivalent to half the difference between the inner diameter of the outer bearing ring 41 and the outer diameter of the inner bearing ring 42 in the vertical direction.

[0119] Therefore, in this embodiment, in the bearing center position calculation step, the position coordinate of the center position P40 in the vertical direction is corrected by a distance equivalent to half the difference in the vertical direction between the inner diameter of the bearing outer ring 41 and the outer diameter of the bearing inner ring 42. More specifically, in the bearing center position calculation step described above, after the position coordinate of the center position P40 of the bearing 40 (center position P41 of the bearing outer ring 41) is calculated, a distance equivalent to half the spherical gap V in the vertical direction is subtracted from the Z-axis component of the position coordinate of the center position P40. In other words, when the position coordinate of the center position P40 before correction is P40(X40, Y40, Z40) and the position coordinate of the center position P40' after correction is P40'(X40', Y40', Z40'), the correction is made as Z40'=Z40-V / 2.

[0120] As described above, according to this embodiment, in the bearing center position calculation step, the position coordinates of center position P40 in the vertical direction are corrected by a distance equivalent to half the difference in the vertical direction between the inner diameter of bearing outer ring 41 and the outer diameter of bearing inner ring 42. This makes it possible to bring the position coordinates of center position P40 of bearing 40 closer to the position coordinates of center position 2c of rotor 2. This makes it possible to more accurately evaluate and adjust rotor alignment before rotor installation.

[0121] (Fifth embodiment) Next, a rotor bearing center position calculation method and a rotor alignment measurement and evaluation method according to a fifth embodiment will be described with reference to FIGS.

[0122] 19 and 20, the fifth embodiment is different from the first embodiment in that the position coordinates of the center position in the vertical direction are corrected by a distance corresponding to the sinking amount of the bearing when the rotor is attached to the steam turbine unit in the bearing center position calculation process. The other configurations are substantially the same as those of the first embodiment shown in FIGS. 1 to 11.

[0123] 19 and 20, in a configuration in which a bearing 10 is supported by a bearing pedestal 52 (bearing cone portion) of a welded structure turbine 51, when a rotor 2 is attached to a steam turbine unit 1, the bearing pedestal 52 may be deformed by the load of the rotor 2, which may cause the bearing 10 to sink. The center position P15 of the bearing 10 is calculated from a measurement result in a state in which the rotor 2 is not attached to the steam turbine unit 1, i.e., in a state in which the load of the rotor 2 is not acting. For this reason, a vertical deviation occurs between the calculated center position P15 of the bearing 10 and the actual center position 2c of the rotor 2. More specifically, a vertical deviation occurs by a distance equivalent to the amount of sinking W of the bearing 10 when the rotor 2 is attached to the steam turbine unit 1.

[0124] Therefore, in this embodiment, in the bearing center position calculation step, the position coordinate of the center position P15 in the up-down direction is corrected by a distance equivalent to the subsidence amount W of the bearing 10 when the rotor 2 is attached to the steam turbine unit 1. More specifically, in the bearing center position calculation step described above, after the position coordinate of the center position P15 of the bearing 10 is calculated, the distance equivalent to the subsidence amount W of the bearing 10 is subtracted from the Z-axis component of the position coordinate of the center position P15. In other words, when the position coordinate of the corrected center position P15 is P15' (X15', Y15', Z15'), the correction is made as Z15'=Z15-W.

[0125] The subsidence amount W of the bearing 10 can be obtained from the track record of bearing subsidence amounts in similar machines, or by measuring the subsidence amount of the bearing 10 that occurs when the rotor 2 is actually installed in the steam turbine unit 1.

[0126] As described above, according to this embodiment, in the bearing center position calculation process, the position coordinates of the center position P15 in the up-down direction are corrected by a distance equivalent to the sinking amount W of the bearing 10 when the rotor 2 is attached to the steam turbine unit 1. This makes it possible to bring the position coordinates of the center position P15 of the bearing 10 closer to the position coordinates of the center position 2c of the rotor 2. This makes it possible to more accurately evaluate and adjust the rotor alignment before attaching the rotor.

[0127] The above-described embodiments may be combined as appropriate.

[0128] According to the embodiment described above, the center position of the bearing can be calculated with high accuracy.

[0129] Although several embodiments of the present invention have been described above, these embodiments are presented as examples and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the gist of the invention. These embodiments and their modifications are included in the scope and gist of the invention, and are included in the scope of the invention and its equivalents described in the claims. [Explanation of symbols]

[0130] 1: steam turbine unit, 2: rotor, 3: coupling, 10, 10a, 10b, 10c, 10d: bearing, 11: lower half, 12: first horizontal joint surface, 13: second horizontal joint surface, 14: inner peripheral surface, 15: first edge portion, 16: second edge portion, 20: bearing, 24: inner peripheral surface, 40: bearing, 41: bearing outer ring, 42: bearing inner ring, P1-P8: measurement points, P15, P15a, P15b, P15c, P15d: center position, P21-P32: measurement points, P35, P35a, P35b, P35c, P35d: center position, P40: center position, U: bearing clearance, V: spherical clearance, W: settlement amount

Claims

1. A rotor bearing center position calculation method for calculating a center position of a bearing supporting a rotor of a steam turbine unit configured by connecting a plurality of rotors via a coupling, comprising: a measurement point position acquisition step of measuring a plurality of measurement points on the bearing by a three-dimensional measurement device while the rotor is not attached to the steam turbine unit, and acquiring position coordinates of each of the measurement points on a three-dimensional coordinate system; a bearing center position calculation process for calculating the position coordinates of the center position of the bearing on a three-dimensional coordinate system based on the position coordinates of each of the measurement points acquired in the measurement point position acquisition process.

2. The bearing includes a lower half and an upper half located on the lower half, The lower half portion includes a first horizontal joint surface located on one side in the left-right direction when viewed along the axial direction, a second horizontal joint surface located on the other side in the left-right direction, an inner circumferential surface located between the first horizontal joint surface and the second horizontal joint surface in the left-right direction, a first edge portion located between the first horizontal joint surface and the inner circumferential surface, and a second edge portion located between the second horizontal joint surface and the inner circumferential surface, in the measurement point position acquisition step, with the rotor not attached to the steam turbine unit and the upper half not attached to the bearing, using the three-dimensional measuring device to measure a measurement point located on the first horizontal joint surface, a measurement point located on the inner circumferential surface on the side of the first horizontal joint surface, a measurement point located on the second horizontal joint surface, and a measurement point located on the inner circumferential surface on the side of the second horizontal joint surface, on one side and the other side of the bearing in the axial direction, to acquire the position coordinates of each of the measurement points; 2. The rotor bearing center position calculation method of claim 1, wherein, in the bearing center position calculation process, the position coordinates on a three-dimensional coordinate system of the first edge portion and the second edge portion on one side and the other side of the bearing in the axial direction are calculated based on the position coordinates of each of the measurement points acquired in the measurement point position acquisition process, and the position coordinates of the center position of the bearing are calculated from an average value of the position coordinates of each of the first edge portion and the second edge portion.

3. the bearing includes an inner circumferential surface having a circular shape when viewed axially; In the measurement point position acquisition step, at least three measurement points located on the inner peripheral surface are measured on one side and the other side of the bearing in the axial direction by the three-dimensional measuring device, and the position coordinates of each of the measurement points are acquired; 2. The rotor bearing center position calculation method of claim 1, wherein, in the bearing center position calculation process, center coordinates of the inner surface on one side and the other side in the axial direction of the bearing are calculated based on the position coordinates of each of the measurement points acquired in the measurement point position acquisition process, and the position coordinates of the center position of the bearing are calculated from an average value of the center coordinates.

4. 2. The rotor bearing center position calculation method according to claim 1, wherein in the bearing center position calculation process, the position coordinates of the center position in the vertical direction are corrected by a distance equivalent to half the difference between the inner diameter of the bearing and the outer diameter of the rotor in the vertical direction.

5. The bearing includes a bearing outer ring and a bearing inner ring located inside the bearing outer ring, 2. The rotor bearing center position calculation method according to claim 1, wherein in the bearing center position calculation process, the position coordinates of the center position in the vertical direction are corrected by a distance equivalent to half the difference between the inner diameter of the bearing outer ring and the outer diameter of the bearing inner ring in the vertical direction.

6. 2. The rotor bearing center position calculation method according to claim 1, wherein in the bearing center position calculation step, the position coordinates of the center position in the vertical direction are corrected by a distance corresponding to the amount of sinking of the bearing when the rotor is attached to the steam turbine unit.

7. The steam turbine unit includes a plurality of the bearings, A rotor bearing center position calculation method according to any one of claims 1 to 6, wherein the position coordinates of the center position of each of the bearings are calculated by performing the measurement point position acquisition process and the bearing center position calculation process for each of the bearings.

8. a rotor bearing center position calculation step of calculating the position coordinates of the center position of each of the bearings by using the rotor bearing center position calculation method according to claim 7; and a coupling center difference calculation step of calculating center differences in the left-right and up-down directions when viewed along the axial direction between adjacent couplings, based on the position coordinates calculated in the rotor bearing center position calculation step.

9. 9. The rotor alignment measurement and evaluation method according to claim 8, further comprising a coupling surface opening amount calculation step of calculating a surface opening amount between adjacent couplings in the left-right direction and the up-down direction based on the position coordinates calculated in the rotor bearing center position calculation step.

10. a rotor bearing center position calculation step of calculating the position coordinates of the center position of each of the bearings by using the rotor bearing center position calculation method according to claim 7; a coupling surface opening amount calculation process for calculating a surface opening amount in the left-right and up-down directions when viewed along the axial direction between adjacent couplings, based on the position coordinates calculated in the rotor bearing center position calculation process.

Citation Information

Patent Citations

  • Alignment evaluation system, alignment evaluation method, and rotating body system

    JP2020180802A

  • Design method for center guide pin, manufacturing method for center guide pin, and assembling method for rotary machine

    JP2022191685A

  • Method for measuring and aligning a rotary cylindrical apparatus

    US20120290258A1

  • Triple laser rotary kiln alignment system

    US5491553A

  • Rotor alignment measurement and evaluation method and calculation device

    JP6871092B2