Construction method of multi-story building, and lifting device
A crane and lifting device system enables efficient construction of multi-story buildings by allowing relocation within the structure, reducing space requirements and construction costs, addressing the limitations of conventional cranes.
Patent Information
- Application Number
- JP2024069217
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-04-24
- Filing Date
- 2024-04-22
- Publication Date
- 2024-11-06
AI Technical Summary
Constructing multi-story buildings with conventional cranes requires large self-propelled cranes that occupy significant space, limiting installation options and increasing construction costs and time, especially in narrow areas, and climbing cranes necessitate on-site assembly and disassembly, further complicating the process.
A method using a crane that can be moved without disassembly, combined with a lifting device installed in stages, allowing the crane to be relocated within the building structure, reducing space requirements and construction time, and enabling construction beyond the crane's ground lift capacity.
Facilitates construction of multi-story buildings with reduced space constraints and lower costs by allowing the crane to be installed and relocated within the building, minimizing the impact of crane performance on building height and construction duration.
Smart Images

Figure 2024156627000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for constructing a multi-storey building and to a lifting device used in said method. [Background technology]
[0002] Conventionally, self-propelled cranes and climbing cranes have been used when constructing multi-story buildings. The type of crane is selected based on the size of the building, and as the building gets taller, larger cranes are used to ensure a high lift height above the ground. Self-propelled cranes ensure their lifting height above ground by extending a telescopic boom, while climbing cranes can move the superstructure by mast climbing or floor climbing, allowing the crane to move to the top of a building and ensure their lifting height above ground. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent Publication No. 2019-112214 Summary of the Invention [Problem to be solved by the invention]
[0004] However, when constructing a multi-story building, it is necessary to ensure a high lift height from the ground according to the number of floors, so a large self-propelled crane must be used, and securing space to install the self-propelled crane becomes an issue, especially in narrow areas or areas where buildings are densely packed. Therefore, when constructing a building on a narrow site, a relatively small self-propelled crane that can secure the installation space must be used, and there is a problem that the height of the building is limited by the lift height from the ground of the crane used. In addition, when using a climbing crane, structures such as the crane equipment and mast, which are not self-propelled, must be transported to the site and assembled and disassembled on-site, which increases the construction period and costs.
[0005] Therefore, for example, in construction work on narrow ground, it is conceivable to use a crane that can be moved to a different installation location without disassembly, as described in the above Patent Document 1. The crane described in the above Patent Document 1 is equipped with a hoisting boom and a folding boom, and by lowering the hoisting boom and the folding boom and storing the outrigger device, it can assume a traveling posture that is wide, long, and high enough to enter a typical building, making it possible to carry the crane into the building. In addition, work can be performed in a working posture in which the hoisting boom is raised and the folding boom is raised to an angle higher than horizontal. However, in order to install elevators to raise and lower the above-mentioned cranes, the building must be constructed up to the top floor, so the height of the building is limited by the performance of the crane. Also, if elevators are to be installed in stages up to the floors that can be constructed, this will increase the construction costs.
[0006] In consideration of the above-mentioned circumstances, the present invention aims to provide a construction method for multi-story buildings and a lifting device used in said construction method, which makes it easier to secure installation space for the crane by using a crane that can be moved to an installation location without being disassembled and can be moved to an upper floor without using any other climbing crane or self-propelled crane, making the possible building height less affected by the crane's ground lifting capacity, and which does not increase the construction period and construction costs associated with bringing in and taking out the crane compared to using a crane that does not have self-propelling capacity. [Means for solving the problem]
[0007] The first invention includes a basic process of constructing a framework using a crane that can be moved to a different installation location without disassembly, from the floor where the crane is installed to a floor that is lower than the maximum lift height of the crane from above ground; a lifting device installation process for installing a lifting device for lifting and lowering the crane on a floor higher than the floor on which the crane is installed, using the crane; a crane installation process for installing the crane by using the lifting device on a floor above the floor on which the crane is installed and below the floor on which the lifting device is installed after the lifting device is installed; and This is a method for constructing a multi-story building, characterized by repeating the above basic steps.
[0008] A second invention is a method for constructing a multi-story building, characterized in that the lifting device installation process described in the first invention includes a process of moving the lifting device in a disassembled state and assembling it on the floor on which the lifting device is to be installed.
[0009] A third invention is a method for constructing a multi-story building, characterized in that, in the basic steps described in the first invention, the crane is installed within an area where the structure is to be constructed.
[0010] A fourth invention is a method for constructing a multi-story building, characterized in that the construction steps described in the first invention are repeated a number of times.
[0011] A fifth aspect of the present invention is a crane according to any one of the first to fourth aspects of the present invention, comprising a hoisting boom capable of rotating and extending and contracting, and a folding boom the base end of which is supported at the tip of the hoisting boom so as to be capable of being raised and lowered; The method for constructing a multi-story building is characterized in that the hoisting boom and the folding boom can be contracted and placed in a lying down storage position.
[0012] A sixth invention is a method for constructing a multi-story building, characterized in that the basic steps described in the fifth invention include a step of forming an atrium shaped to allow the crane and the lifting device to pass through.
[0013] A seventh invention is a method for constructing a multi-story building, characterized in that movement for installing the crane and the lifting device described in the sixth invention is carried out through the atrium.
[0014] The eighth invention is a method for installing the crane according to the seventh invention, comprising the steps of: using a temporary floor plate that is fixed to cover the floor portion in which the atrium is formed and has an opening through which the crane can pass and a door that covers the opening; The temporary floor plate is installed on the next floor on which the crane will be installed; The door is kept open until the crane is moved to a position higher than the temporary floor plate by the lifting device, and the door is kept closed after the crane is moved to a position higher than the temporary floor plate; This is a method for constructing a multi-story building, characterized in that after the door is closed, the crane is landed on the temporary floor plate.
[0015] A ninth aspect of the present invention is a lifting device that is installed on an upper floor of a building using a crane that can be moved to an installation location without being disassembled, in order to build a building to a height equal to or higher than the maximum ground lift height of the crane, and that lifts and lowers the crane, An installation unit that is installed on a skeleton of the building; a lifting section supported by the installation section for lifting and lowering the crane, The lifting device is characterized in that it can be disassembled into the installation section and the lifting section.
[0016] The tenth invention is the installation section according to the ninth invention, which is configured by combining a plurality of beam-like members including a reference member that is a beam-like member having a length equal to or greater than the length between adjacent columns in the framework of the building, The reference member includes a fixing portion which is a portion fixed to the framework of the building, and a holding portion which detachably holds an end portion of another beam member constituting the installation portion, Furthermore, the lifting device is characterized in that the installation section can be disassembled into the reference member and another beam-like member.
[0017] An eleventh invention is a lifting device, characterized in that the installation section described in the ninth or tenth invention is configured in a frame shape large enough that the boom of the crane can pass through the inside.
[0018] A twelfth invention is a lifting device characterized in that the lifting section described in the eleventh invention is a pair of beam-like members, and these beam-like members are hung across the installation section with a gap between them that allows the boom of the crane to pass through.
[0019] A thirteenth aspect of the present invention is a lifting unit according to the ninth aspect of the present invention, the lifting unit having at least two lifting winches, The lifting device further comprises a synchronizing unit for matching the winding amounts of the lifting winches.
[0020] A fourteenth invention is a lifting device described in the ninth invention, characterized in that it is equipped with a battery and a power receiving unit for receiving power from an external source, and is capable of switching between the battery and the power receiving unit as a power source for the lifting unit. Effect of the Invention
[0021] The construction method of the present invention makes it easy to secure installation space for a crane, the height at which a building can be constructed is less affected by the crane's ground lifting capacity, and a method for constructing a multi-story building can be provided that does not increase construction time or construction costs associated with bringing in and taking out a crane, compared to using a crane that cannot be moved without being disassembled. [Brief description of the drawings]
[0022] [Figure 1] FIG. 2 is a front view of the crane used in the present embodiment when it is in a traveling position. [Diagram 2] FIG. 2 is a front view of the crane used in the present embodiment when it is in a working position. [Diagram 3] FIG. 2 is a plan view of the crane used in the present embodiment when it is in a traveling position. [Figure 4]FIG. 2 is a front view of one of the outrigger devices provided on the crane used in this embodiment when in a stored state. [Diagram 5] FIG. 4A is a plan view of the lifting device, and FIG. [Figure 6] FIG. 2 is a block diagram showing a configuration of a lifting device. [Figure 7] 1A is a plan view of the temporary floor panel, and FIG. 1B is a front view of the temporary floor panel. [Figure 8] 1 is a flowchart showing an overview of a construction method according to the present invention. [Figure 9] FIG. 2 is a diagram showing the steps of a construction method according to the present invention. [Figure 10] FIG. 2 is a diagram showing the steps of a construction method according to the present invention. [Figure 11] 1A is a plan view of a crane and a building, and FIG. 1B is a diagram showing the steps of a construction method according to the present invention. [Figure 12] 1A is a plan view of a crane and a building, and FIG. 1B is a diagram showing the steps of a construction method according to the present invention. [Figure 13] 1A is a plan view of a crane and a building, and FIG. 1B is a diagram showing the steps of a construction method according to the present invention. [Figure 14] 1A is a plan view of a crane and a building, and FIG. 1B is a diagram showing the steps of a construction method according to the present invention. [Figure 15] FIG. 2 is a plan view of the crane when the hooks of the lifting device are engaged. [Figure 16] FIG. 13 is a front view of one of the outrigger units when the lifting device hooks are engaged. [Figure 17] 1A is a plan view of a crane and a building, and FIG. 1B is a diagram showing the steps of a construction method according to the present invention. [Figure 18] 1A is a plan view of a crane and a building, and FIG. 1B is a diagram showing the steps of a construction method according to the present invention. [Figure 19] 1A is a plan view of a crane and a building, and FIG. 1B is a diagram showing the steps of a construction method according to the present invention. [Figure 20] 1A is a plan view of a crane and a building, and FIG. 1B is a diagram showing the steps of a construction method according to the present invention. [Figure 21] 1A is a plan view of a crane and a building, and FIG. 1B is a diagram showing the steps of a construction method according to the present invention. [Figure 22] 1A is a plan view of a crane and a building, and FIG. 1B is a diagram showing the steps of a construction method according to the present invention. [Diagram 23] 1A is a plan view of a crane and a building, and FIG. 1B is a diagram showing the steps of a construction method according to the present invention. [Figure 24] 1A is a plan view of a crane and a building, and FIG. 1B is a diagram showing the steps of a construction method according to the present invention. [Diagram 25] 1A is a plan view of a crane and a building, and FIG. 1B is a diagram showing the steps of a construction method according to the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0023] Hereinafter, an embodiment of the present invention will be described with reference to the accompanying drawings, taking as an example a case where a self-propelled crane is used as a crane that can be moved to an installation location without being disassembled. In the following, the drawings are schematic. Therefore, it should be noted that the relationship, ratio, etc. between the thickness and the planar dimensions may differ from the actual ones, and the drawings may include parts with different dimensional relationships and ratios. In addition, the embodiments shown below are examples of devices and methods for embodying the technical idea of the present invention, and the technical idea of the present invention does not specify the materials, shapes, structures, arrangements, etc. of the components to the embodiments described below.
[0024] In the following explanations and drawings relating to the configuration of the self-propelled crane, the direction in which the self-propelled crane moves forward (the direction in which the crane travels with the control lever tilted to the forward direction) may be referred to as "forward." Similarly, in the following explanations and drawings, the direction in which the self-propelled crane moves backward (the direction in which the crane travels with the control lever tilted to the backward direction) may be referred to as "rearward." In addition, in the following explanations and drawings relating to the construction method, the direction of gravity may be described as "down" and the opposite direction as "up." First, the self-propelled crane, the lifting device, and the temporary floor plate used in the construction method according to the present invention will be described.
[0025] <Self-propelled crane> As shown in Figs. 1 to 4, a self-propelled crane 1 according to this embodiment includes a crane device 10, a traveling device 20, an outrigger device 30, a motor unit G, and a driver's seat OS. The crane apparatus 10 has a hoisting boom 11 and a folding boom 12. The base end of the hoisting boom 11 is supported by a chassis frame F via a swivel device, and can be changed in position between a position lowered to an angle close to horizontal (Figure 1) and a position erected to an angle close to vertical (Figure 2) by performing a hoisting operation. The base end of the folding boom 12 is supported by the tip of the hoisting boom 11, and can be raised and lowered around an axis parallel to the hoisting boom 11. In addition, the hoisting boom 11 and the folding boom 12 are configured as nested box-shaped booms, and are therefore capable of telescopic operation.
[0026] The self-propelled crane 1 is provided with a traveling device 20 at its bottom. In addition, outrigger devices 30 are provided at the front and rear of both sides of the chassis frame F. The outrigger device 30 includes an outrigger hoisting cylinder 30S, a base end arm 31, and a tip end arm 32. The tip end arm 32 includes an inner arm 32B nested inside an outer arm 32A. A lateral outrigger cylinder (not shown) is provided inside the inner arm 32B to extend the inner arm 32B from the outer arm 32A. The outrigger unit 30 can be in a stored state and an expanded state. To change the outrigger unit 30 from the stored state to the expanded state, an operator first manually expands and fixes the outrigger unit 30 in the horizontal direction. When the self-propelled crane 1 is viewed from above, the outrigger unit 30 is expanded so that it is at an angle radially disposed with respect to the chassis frame F. Next, the outrigger pin 33 is pulled out from the fixed position hole 34. Then, the tip side arm 32 is raised to the expanded position using the power of the lateral outrigger cylinder (not shown). After that, the outrigger pin 33 is inserted into the expanded position hole 35 and fixed. After that, the telescopic fixed pin 36 of the outer arm 32A is pulled out, and the lateral outrigger cylinder (not shown) is extended to pull out the inner arm 32B. After the inner arm 32B is pulled out to a predetermined length, the telescopic fixed pin 36 is inserted to fix the inner arm 32B to the predetermined length. Then, by extending the outrigger hoisting cylinder 30S, the base end arm 31 is operated in the lowering direction, the tip of the outer arm 32A is grounded, and the bottom surface of the traveling device 20 is raised a predetermined height above the ground surface. Through the above operations, the outrigger device 30 is deployed (FIG. 2), and the stability of the mobile crane 1 is ensured. To change the outrigger unit 30 from the deployed state to the stowed state, first the outrigger hoist cylinder 30S is contracted and the outer arm 32A is released from the installed state, thereby allowing the bottom surface of the traveling unit 20 to touch the ground. After that, the outrigger hoist cylinder 30S is further contracted and the base end arm 31 is raised to a nearly vertical angle. Then, the inner arm 32B is contracted and the outer arm 32A is pushed down to a nearly vertical angle and fixed in place, and the outrigger unit 30 is rotated toward the center of the vehicle of the mobile crane 1 and fixed in the state shown in FIG. The outrigger pin 33 in this embodiment, when inserted into the fixing position hole 34 and fixed, protrudes to the outside of the self-propelled crane 1 (Figure 3), and a ring 33A for hanging a lifting hook is provided on the protruding portion. The outrigger device 30 does not necessarily have to include a lateral outrigger cylinder (not shown), and may be configured so that an operator manually performs the operation of raising the tip arm 32 and the operation of drawing out the inner arm 32B. When installing the outrigger device 30, the angle between the base arm 31 and the tip arm 32 can also be fixed by using an outrigger pin (not shown) having no protrusion or ring 33A in addition to the outrigger pin 33 having the protrusion and ring 33A.
[0027] The self-propelled crane 1 is operated by an operator seated in a driver's seat OS, and the crane device 10 is operated by the operator using an operating unit CN or a radio-controlled operation device (not shown). When in the traveling posture (FIG. 1), the self-propelled crane 1 can move by the traveling device 20, and when performing crane work, the state is changed to the working posture (FIG. 2). In order to change the self-propelled crane 1 from a traveling posture to a working posture, the outrigger device 30 is deployed, the hoisting boom 11 is raised to a prescribed angle close to vertical, and the folding boom 12 is raised to an angle higher than horizontal. To change the self-propelled crane 1 from the working posture to the traveling posture, the hoisting boom 11 and the folding boom 12 are contracted to their minimum lengths. At this time, the tip of the hoisting boom 11 is positioned on the side of the driver's seat OS, and the hoisting boom 11 is rotated so that it forms an angle parallel to a line along the fore-and-aft direction of the self-propelled crane 1. The folding boom 12 is then lowered to a predetermined angle close to horizontal. After that, the outrigger unit 30 is put into the stored state.
[0028] <Lifting device> The lifting device will be described with reference to FIGS. The lifting device 2 has a frame 50 as an installation section, and a pair of beams 53A, 53B as a lifting section. The beams 53A, 53B are fixed across the upper part of the frame 50 with a gap therebetween so that the hoisting boom 11 and the folding boom 12 can pass through. The frame 50 has an H-shaped cross section and is assembled into a rectangular frame shape by combining two first frame members 51, which are beam-like members whose length is approximately equal to the distance between adjacent columns in the skeleton (hereinafter referred to as the column span), and two second frame members 52, which are shorter than the first frame members 51. The first frame member 51 and the second frame member 52 differ in the presence or absence of a fixing portion and a holding portion, which will be described next. The first frame member 51 is a reference member as defined in the claims.
[0029] At both ends of the back surface of the first frame member 51, U-shaped fitting portions 54 are provided as holding portions. The fitting portions 54 fit the ends of the second frame member 52 and detachably hold them. Also, at the undersides of both ends of the first frame member 51, lifting device fixing portions 55 for fitting parts of the building frame to fix the lifting device 2 are provided. Also, the first frame member 51, the second frame member 52, the fitting portions 54, and the beams 53A and 53B have through holes formed therein for fixing them with bolts.
[0030] The upper surfaces of the first frame member 51 and the second frame member 52 are provided with clamping portions 56 for clamping and holding both ends of the beams 53A and 53B and restricting the movement of the beams 53A and 53B in the short-side direction. The clamping portions 56 are clamping plates 56A provided facing each other at positions approximately one-third of the way from the ends of the first frame member 51 and the second frame member 52, and are provided at an angle such that the beams 53A and 53B are held parallel to the diagonal line of the frame 50. The clamping portions 56 of the second frame member 52 are provided at positions approximately one-third of the way from both ends of the second frame member 52.
[0031] A restricting member 57 is provided on the lower surface of the beams 53A, 53B to restrict movement of the beams 53A, 53B in the longitudinal direction when the beams 53A, 53B are spanned across the frame 50. Two lifting winches 58 are provided on each side of beams 53A and 53B as lifting devices, and hooks 59 are suspended by wire ropes. Hereinafter, reference numerals 58A to 58D will be used to indicate each of lifting winches 58. The mounting position of the lifting winch 58 can be changed according to the position on the self-propelled crane 1 where the hook 59 is attached.
[0032] An auxiliary winch 60 is provided at the end of the first frame member 51 on the side where the clamping portion 56 is provided. The auxiliary winch 60 is fixed to the central side surface of the first frame member 51 at the fitting portion 54, and an auxiliary hook 61 is suspended by a wire rope.
[0033] A control unit CU for operating the lifting winch 58 and the auxiliary winch 60 is provided on the side of the beam 53A. As shown in FIG. 6, the control unit CU is equipped with a receiving unit 65 that receives an operation signal from the remote controller RC, a synchronizing unit 66 that receives information from the tachometers C1 to C4 and generates correction information for synchronizing the winding amounts of the first lifting winch 58A to the fourth lifting winch 58D so that the self-propelled crane 1 rises and falls while maintaining the horizontality and appropriately changing the rotation speed of each, a control unit 67 that generates operation signals for the first lifting winch 58A to the fourth lifting winch 58D based on the information from the receiving unit 65 and the synchronizing unit 66, a power receiving unit 68 for receiving power from an external source, and an on-board battery B. The power receiving unit 68 and the battery B can be used as a power source for the lifting device 2 by being arbitrarily switched by the operator.
[0034] <Temporary floor plate> 7(a) and (b) show one of a pair of temporary floor panels that are used with their bases facing each other. The temporary floor panel 3 is a plate material in the shape of an approximately isosceles triangle, and is equipped with a floor panel fixing part 70 in the shape of an approximately isosceles triangle, which is divided about one-third from the base by a straight line parallel to the base, and a door 71 that is approximately trapezoidal. The floor panel fixing part 70 and the door 71 are connected via a hinge 72 so that they can swing. An L-shaped swing angle regulating member 73 is provided on the bottom side of the bottom surface of the door 71 so as to prevent the door 71 from swinging downward from a state parallel to the floor board fixing portion 70.
[0035] The door 71 is provided on its long side with an engagement portion 74 having teeth arranged at equal intervals. The pair of temporary floor boards 3 are arranged so that the interlocking portions 74 interlock with each other when the long sides of the doors 71 face each other and the doors 71 are at an angle parallel to the floor board fixing portions 70.
[0036] Through holes 75 for fixing the temporary floor panel 3 to the building frame with bolts are formed in a row at regular intervals on the outer extension of the hypotenuse side of the floor panel fixing portion 70 and the door 71. Further, a hanging portion 76 for hanging the auxiliary hook 61 is provided at one end of the lower base side of the door 71.
[0037] <Construction method> Next, a construction method using the self-propelled crane 1 will be described with reference to Figs. 8 to 24. In this embodiment, an example will be described in which the self-propelled crane is installed on the fifth floor 102 to construct a building having eight floors. Note that the framework in this embodiment includes the columns, beams, and floors that support the building. Note that Figs. 10 to 14 and Figs. 16 to 25 show the self-propelled crane 1 in a simplified form. Also, in the subsequent figures, the lifting device 2 and temporary floor plate 3 are also shown in a simplified form.
[0038] (Outline of procedure) As shown in Fig. 8, the construction method according to this embodiment includes the following construction steps: First, the mobile crane 1 is brought into the area of the foundation of the building (step S1), and after it is placed in a working position (step S2), the basic step of constructing the building up to the sixth floor, which is the floor below the ground lift height of the mobile crane 1, is carried out (step S3). Then, in order to carry out construction work up to the 8th floor, which is higher than the ground lift height of the self-propelled crane 1, the lifting device installation process is first carried out to install the lifting device 2 on the 6th floor (step S4). Next, the self-propelled crane 1 is put into a traveling position (step S5), and the self-propelled crane 1 is raised by the lifting device 2 and installed on the 5th floor (steps S6, S7), in the crane installation process. This allows the self-propelled crane 1 to move to the upper floors of the building, making it possible to construct higher floors. After the ceiling of the eighth floor, which is the top floor, is constructed (step S8), the self-propelled crane 1 and the lifting device 2 are moved to the first floor and removed (steps S9 to S15).
[0039] (Self-propelled crane delivery) As shown in Fig. 9, when constructing the skeleton 100 of a building, the self-propelled crane 1 is first moved to the first floor 101 by self-propelling (step S1). After the self-propelled crane 1 arrives at the installation site, the self-propelled crane 1 is put into a working position (step S2).
[0040] (1st basic process) Next, as shown in Fig. 10, the self-propelled crane 1 is used to construct the skeleton 100 (step S3). At this time, an atrium 110 is formed in the skeleton 100, the atrium 110 having a width and length greater than those of the self-propelled crane 1 when it is in the stored position. Therefore, the self-propelled crane 1 is used for construction work with the hoisting boom 11 penetrating the atrium 110. When construction is carried out, the skeleton 100 is constructed from the outside in order to make it easier to ensure the range of motion of the folding boom 12. Although not shown in the drawings, in this process, the temporary floor 3 is moved to the fifth floor 102, and the non-movable temporary floor TF is moved to temporary storage areas for materials and the like provided on each of the second to fourth floors. The non-movable temporary floor TF is, for example, construction scaffolding that can be carried by workers.
[0041] (Lifting device installation process) 11(a) and (b), the framework 100 is constructed up to the sixth floor 103, which is a floor below the ground lift height when the hoisting boom 11 of the self-propelled crane 1 is fully extended (step S3). At this time, the sixth floor 103 is the floor where the lifting device is installed, and the fifth floor 102 is the next floor where the crane is installed. Then, in order to construct the seventh floor and above, the self-propelled crane 1 is used to move the disassembled lifting device 2 to the sixth floor 103 through the atrium 110.
[0042] 12(a) and 12(b), the lifting device 2 is assembled using the self-propelled crane 1 and installed on the skeleton 100 (step S4). The lifting device 2 is fixed by fitting the pillars of the skeleton 100 into the lifting device fixing parts 55. The temporary floor panels 3 are installed with their bottom sides facing each other so as to cover the void 110 on the fifth floor 102. At this time, the distance is adjusted so that the interlocking parts 74 interlock with each other. When installing the temporary floor board 3, the hoisting boom 11 of the self-propelled crane 1 penetrates the atrium 110, so it is necessary to open the door 71 of the temporary floor board 3. Therefore, the auxiliary hook 61 connected to the auxiliary winch 60 of the lifting device 2 is lowered and hooked onto the hanging part 76. The auxiliary winch 60 is then wound up to lift the door 71 while holding it in the open position. After the temporary floor plate 3 is installed, floor plates 77A and 77B are installed at the ground contact position of the outrigger unit 30 to reinforce the floor surface. After the lifting device 2 and the temporary floor plate 3 are installed, the folding boom 12 of the self-propelled crane 1 is contracted to its minimum state and then raised to a nearly vertical state. After that, the hoisting boom 11 is contracted to its minimum state.
[0043] 13(a) and 13(b), the hoisting boom 11 is contracted, and then the crane apparatus 10 is stowed. At this time, by simultaneously lowering the hoisting boom 11 and the folding boom 12, the tip of the folding boom 12 descends along a straight line at an angle close to vertical within the space of the atrium 110 on each floor, so that the crane apparatus 10 can be stowed without coming into contact with the building frame 100. After the crane apparatus 10 has been stowed, the outrigger apparatus 30 is put into the stowed state, and the self-propelled crane 1 assumes a traveling position (step S5).
[0044] (Self-propelled crane installation process) As shown in Figures 14(a) and 14(b), after the self-propelled crane 1 is put into a traveling position, the opening formed by opening the door 71 of the temporary floor plate 3 is rotated so that the self-propelled crane 1 can pass through. Next, the wire rope is paid out from the lifting winch 58 of the lifting device 2, and the hook 59 is lowered to the vicinity of the self-propelled crane 1. Then, as shown in Figures 15 and 16, the hook 59 is hooked onto the ring 33A of the outrigger pin 33.
[0045] As shown in Figures 17(a) and 17(b), all of the lifting winches 58 are wound up equally at the same time to raise the self-propelled crane 1 to the fifth floor 102. At this time, the self-propelled crane 1 is first raised to a height where it will not come into contact with the door 71 of the temporary floor panel 3 when it is closed. Then, the auxiliary winch 60 is wound down, the door 71 is closed, and the stairwell 110 is blocked, making it possible for the self-propelled crane 1 to land. After closing the door 71, land the self-propelled crane 1 on the temporary floor 3 as shown in Figure 17, rotate the self-propelled crane 1 so that the traveling device 20 touches the floor fixing portion 70, check whether the crane device 10 can be deployed, and adjust the installation position (Figure 18). Workers install non-movable temporary floor panels TF in the atrium 110 from the second to fourth floors.
[0046] As shown in Fig. 19(a)(b), after the installation position of the self-propelled crane 1 is determined, the outrigger unit 30 is adjusted so as to be installed on the floor plates 77A and 77B, and is deployed. Then, the hoisting boom 11 and the folding boom 12 are operated in the direction of raising, so that the self-propelled crane 1 is in a working position (steps S6 and S7). At this time, in order to prevent the crane apparatus 10 from contacting the beams 53A and 53B of the lifting device 2, a rotation operation is also performed in addition to the raising operation. When the crane apparatus 10 is deployed, the hoisting boom 11 and the folding boom 12 are operated simultaneously, as in the case of storing. Therefore, the tip of the folding boom 12 rises along a straight line close to vertical within the space of the atrium 110. When the self-propelled crane 1 is put into the working posture, the hoisting boom 11 and the folding boom 12 may be operated before the outrigger devices 30 are installed on the floor plates 77A and 77B. At this time, the self-propelled crane 1 may be traveled in order to adjust the positions of the hoisting boom 11 and the folding boom 12.
[0047] (2nd basic process) 20(a)(b), after the self-propelled crane 1 is put into a working position, it is used for construction of the seventh to eighth floors 104 (step S8). At this time, the lifting device 2 is removed from the framework 100 using the self-propelled crane 1 and disassembled. After disassembly, the lifting device is stored in a movable position using the self-propelled crane 1.
[0048] (Export process) As shown in FIGS. 21(a) and 21(b), after construction is completed up to the ceiling RO of the eighth floor 104, which is the top floor, using the mobile crane 1, the mobile crane 1 is removed. To transport the self-propelled crane 1, first, the beams 53A, 53B of the lifting device 2 are moved to the eighth floor 104 using the self-propelled crane 1 and are secured across the void 110 on the eighth floor 104 (step S9). When the ceiling RO of the skeleton 100 is constructed, the hoisting boom 11 and the folding boom 12 protrude upward from the ceiling RO of the skeleton 100. After the ceiling RO is constructed, the hoisting boom 11 and the folding boom 12 are contracted, the crane device 10 is stored, and the outriggers are stored to place the self-propelled crane 1 in a traveling position (step S10).
[0049] As shown in Figures 22(a)(b), 23(a)(b), and 24(a)(b), after the self-propelled crane 1 is put into a traveling position, the traveling device 20 of the self-propelled crane 1 is rotated so that it touches only the door 71, and the hook 59 is lowered to the fifth floor 102 and engaged with the outrigger pin 33 of the self-propelled crane 1. In addition, the auxiliary hook 61 is hooked onto the hanging portion 76 of the door 71. After that, all the lifting winches 58 are simultaneously and equally wound up to raise the self-propelled crane 1, and the door 71 of the temporary floor plate 3 is opened by winding up the auxiliary winch 60. In addition, the workers remove the non-movable temporary floor plates TF from the second to fourth floors. Thereafter, the self-propelled crane 1 is lowered onto the first floor 101 through the atrium 110 (step S11).
[0050] As shown in Fig. 25, the self-propelled crane 1 is put into a working position on the first floor 101 (step S12). Then, the lifting device 2 and the temporary floor plate 3 are lowered to the first floor 101 using the self-propelled crane 1, and removed from the building (step S13). Next, the self-propelled crane 1 is put into a traveling position (step S14). After that, the self-propelled crane 1 is self-propelled by the traveling device 20 and removed from the structure 100 (step S15). After the lifting equipment and temporary floor plate 3 are lowered to the first floor 101, the void 110 is filled with a regular ceiling and floor.
[0051] After the self-propelled crane 1 is removed, an elevator or the like is used as necessary to bring in a smaller crane device or the like to carry out finishing work on the building.
[0052] <Effects of the Invention> By using the method according to the present invention, the crane device 10 can be located in the center of the building, which makes it easier to uniform the load that can be lifted around the entire periphery of the building and makes it easier to select the direction when lifting the load.
[0053] In the present invention, the self-propelled crane 1 is installed inside the framework 100, and can be moved to a higher floor as the construction work progresses and used for construction work, making it easier to secure installation space for the crane compared to installing the self-propelled crane outside the building. Furthermore, when using a self-propelled crane installed outside the building, the height of the building that can be constructed is limited by the performance of the self-propelled crane, but in the method according to the present invention, the floor on which the self-propelled crane 1 is installed is higher according to the height of the building, so construction work can be carried out without being affected by the performance of the crane. In other words, by using the construction method of the present invention, it becomes easy to construct multi-story buildings even in places where it is difficult to secure space to install a self-propelled crane for construction work, such as along a busy road or in a place surrounded by a large number of buildings.
[0054] In addition, compared to using a climbing crane, which must be delivered and assembled before construction work begins and then dismantled and removed after construction work is completed, the present invention allows the self-propelled crane 1 to be delivered and removed by self-propelling, thereby reducing the work required to set up the crane and shortening work time. This also reduces the burden on the worker.
[0055] The lifting device 2 according to the present invention can disassemble the frame 50, which is the installation part, and the beams 53A and 53B, which are the lifting parts, and can disassemble the first frame member 51 and the second frame member 52, which have a length equivalent to the column span of the building, so that it can be carried in, carried out, and lifted and lowered through the inside of the building. Therefore, the period for carrying in and carrying out the crane can be shortened compared to the case of construction using a tower crane, and the cost can also be reduced. In addition, it is possible to build up to a high floor without securing the land required for construction using a rough terrain crane. Although the explanation is omitted in the embodiment, depending on the relationship with the size of the atrium 110, the frame 50 may be raised and lowered without being disassembled into the first frame member 51 and the second frame member 52.
[0056] The lifting device 2 according to the present invention is constructed by combining a first frame member 51, a second frame member 52, and beams 53A and 53B, which are beam members. In particular, the beam members are fixed to each other by fitting their ends together, so that fixing is possible without using any other fasteners such as bolts, and the man-hours required for assembling the lifting device 2 can be reduced. However, since the strength of the structure can be improved by using fasteners such as bolts, it is also possible to use different fixing methods depending on the weight of the self-propelled crane 1, etc.
[0057] The lifting device 2 according to the present invention includes two types of beam members: a first frame member 51 having a fitting portion 54 that is a retaining portion, and a second frame member 52 having no retaining portion. Therefore, it is not necessary to assemble the lifting device 2 while simultaneously adjusting the positions of all the beam members. In other words, after the first frame member 51 is grounded, assembly can be performed while adjusting the position of the second frame member 52, making assembly easier than, for example, a beam member having a retaining portion only at one end.
[0058] The lifting device 2 according to the present invention is equipped with a power receiving unit 68 and a battery B as means for supplying power to the lifting winch. Therefore, even if the supply of power from an external source is not available, the self-propelled crane 1 can be raised and lowered using the battery B. After the battery B has been used, it can be charged from the power receiving unit 68 when the supply of external power becomes available, and it can be charged even while it is disassembled and placed in a material storage area.
[0059] The lifting device 2 according to the present invention is equipped with at least two lifting winches, so when the self-propelled crane 1 is lifted, rotation due to twisting of the wire rope is unlikely to occur. Therefore, even in a narrow space such as the atrium 110, the risk of the self-propelled crane 1 coming into contact with a wall surface or the like can be reduced.
[0060] <Modification> In this embodiment, the eight-story skeleton 100 has been described, but this embodiment can also be applied to buildings with nine or more stories. In that case, after the second basic process, the third basic process is carried out by carrying out the second lifting device installation process and the second mobile crane installation process. When building a story that is taller than can be built by the third basic process, the lifting device installation process, mobile crane installation process, and basic process are repeated multiple times until the top floor is built, thereby building a multi-story building.
[0061] In this embodiment, the method for constructing the skeleton 100 of a building has been described, but the present invention can also be used for construction work on the exterior walls of a building, and for transporting materials for interior construction work.
[0062] In this embodiment, only one self-propelled crane 1 is shown and an example of construction work on the skeleton 100 is described, but multiple self-propelled cranes 1 may be used to construct the skeleton 100 depending on the scale of the building. When multiple self-propelled cranes 1 are used to construct the skeleton 100, one lifting device 2 may be shared by multiple self-propelled cranes 1, or a separate lifting device 2 may be used for each self-propelled crane 1. Even in such a case, it is not necessary to use another crane to set up and transport the self-propelled crane 1.
[0063] In this embodiment, a self-propelled crane 1 equipped with a track-type traveling device has been described as an example of a crane that can be moved to an installation location without disassembly, but the crane used in the present invention is not limited to this type of crane. For example, a crane that does not have the ability to move by itself may be moved by human power or the power of a winch.
[0064] In the lifting device 2 shown in the embodiment, four lifting winches 58 are provided, but in the practice of the present invention, four lifting winches are not necessarily provided. In addition, it is not necessarily required to hang the hook 59 on the self-propelled crane 1 to lift it. For example, a hoisting device in which four hooks that can be hung on the ring 33A of the outrigger pin 33 are connected by a chain or the like, or an elevator car may be connected to the two lifting winches 58. In other words, the specific method of lifting and lowering the self-propelled crane 1 using the lifting winches 58 can be arbitrarily selected by the designer or constructor of the building depending on the shape and structure of the skeleton 100 and the self-propelled crane 1.
[0065] In addition, the lifting device 2 shown in the embodiment has two beams 53A, 53B suspended across the frame 50 as a lifting section, but the lifting section in the present invention does not necessarily have to be configured with two beams suspended across the frame 50. For example, only one beam equipped with two lifting winches 58 may be suspended across the frame.
[0066] The lifting device 2 shown in the embodiment can be switched between the power receiving unit 68 and the battery B as the power source for the lifting winch 58, but in implementing the present invention, the power source does not necessarily need to be switchable, and it may be configured to include only the power receiving unit 68 or only the battery B. When only one power source is provided, the lifting device 2 can be easily made lighter in weight, and therefore the labor required for transporting the lifting device 2 can be reduced.
[0067] In the embodiment, the lower surface of the end of the first frame member 51 is provided with a lifting device fixing part 55 for fitting a pillar of the body 100 to fix the lifting device 2, but the lifting device in the present invention does not necessarily have to be provided with a lifting device fixing part 55. For example, the frame 50 may be fixed to the floor instead of to a pillar, in which case the frame 50 may be fixed directly to the floor with bolts.
[0068] In the embodiment, the frame 50, which is the installation part, is configured by combining multiple beam members (first frame member 51, second frame member 52, beams 53A, 53B), but in the practice of the present invention, the installation part does not necessarily have to be the frame 50. In other words, the shape of the installation part can be selected arbitrarily by the designer or builder depending on the shape of the atrium and the internal structure of the building. Therefore, the shape of the fitting part 54 can also be changed. [Explanation of symbols]
[0069] 1...self-propelled crane, 2...lifting device, 3...temporary floor plate, 10...crane device, 11...hoisting boom, 12...folding boom, 20...traveling device, 30...outrigger device, 30S...outrigger hoisting cylinder, 31...base end arm, 32A...outer arm, 32B...inner arm, 33...outrigger pin, 34...fixed position hole, 35...deployed position hole, 33A...ring, 50...frame, 51...first frame member, 52...second frame member, 53A...beam, 53B...beam, 54...insertion portion, 55...lifting device fixing portion, 56...clamping portion, 57...regulating member, 58...lifting winch Chi, 59...hook, 60...auxiliary winch, 61...auxiliary hook, 65...receiving unit, 66...synchronizing unit, 67...control unit, 70...floor board fixing unit, 70A, 70B...flooring board, 71...door, 72...hinge, 73...swing angle regulating member, 74...engagement unit, 75...through hole, 76...suspension unit, 100...structure, 101...first floor, 102...fifth floor, 103...sixth floor, 104...eighth floor, 110...atrium, B...battery, CN...operating unit, CU...control unit, F...chassis frame, G...motor unit, OS...driver's seat, RC...remote control device, RO...ceiling, TF...non-movable temporary floor board
Claims
1. A basic process of constructing a structure using a crane that can be moved to a different location without disassembly, from the floor on which the crane is installed to a floor that is lower than the maximum ground lift height of the crane; a lifting device installation process for installing a lifting device for lifting and lowering the crane on a floor higher than the floor on which the crane is installed, using the crane; a crane installation process for installing the crane by using the lifting device on a floor above the floor on which the crane is installed and below the floor on which the lifting device is installed after the lifting device is installed; and A method for constructing a multi-story building, comprising repeating the above basic steps.
2. 2. The method for constructing a multi-story building according to claim 1, wherein the step of installing the lifting device includes a step of moving the lifting device in a disassembled state and assembling it on the floor on which the lifting device is to be installed.
3. 2. The method for constructing a multi-story building according to claim 1, wherein in the basic step, the crane is set up within an area where the structure is to be constructed.
4. 2. The method for constructing a multi-story building according to claim 1, wherein the construction steps are repeated a number of times.
5. The crane includes a hoisting boom that can be rotated and extended, and a folding boom whose base end is supported at the tip of the hoisting boom so as to be able to be hoisted, 5. The method for constructing a multi-story building according to claim 1, wherein the hoisting boom and the folding boom can be contracted and placed in a lying-down storage position.
6. 6. The method for constructing a multi-story building according to claim 5, wherein the basic steps include a step of forming an atrium having a shape that allows the crane and the lifting device to pass through.
7. 7. The method for constructing a multi-story building according to claim 6, wherein movement for installing the crane and the lifting device is performed through the atrium.
8. In the crane installation step, a temporary floor plate is used, which is fixed so as to cover the floor portion in which the atrium is formed, and which has an opening through which the crane can pass and a door to cover the opening, The temporary floor plate is installed on the next floor on which the crane will be installed; The door is kept open until the crane is moved to a position higher than the temporary floor plate by the lifting device, and the door is kept closed after the crane is moved to a position higher than the temporary floor plate; 8. The method for constructing a multi-story building according to claim 7, further comprising the step of: after closing the door, landing the crane on the temporary floor plate.
9. A lifting device that is installed on an upper floor of a building using a crane that can be moved to an installation location without being disassembled, in order to build the building to a height equal to or higher than the maximum ground lift height of the crane, and that lifts and lowers the crane, An installation unit that is installed on a skeleton of the building; a lifting section supported by the installation section for lifting and lowering the crane, A lifting device capable of being disassembled into the installation section and the lifting section.
10. The installation section is configured by combining a plurality of beam-like members including a reference member that is a beam-like member having a length equal to or greater than the length between adjacent columns in the skeleton of the building, The reference member includes a fixing portion which is a portion fixed to the framework of the building, and a holding portion which detachably holds an end portion of another beam member constituting the installation portion, The lifting device according to claim 9, wherein the installation portion is further separable into the reference member and another beam-like member.
11. 11. The lifting device according to claim 9 or 10, wherein the installation section is configured in a frame shape having a size that allows the boom of the crane to pass through the inside thereof.
12. The lifting device according to claim 11, characterized in that the lifting section is a pair of beam-like members that are hung across the installation section with a gap between them that allows the boom of the crane to pass through.
13. The lifting unit includes at least two lifting winches, The lifting device according to claim 9, further comprising a synchronizing unit for matching the winding amounts of the lifting winches.
14. 10. The lifting device according to claim 9, further comprising a battery and a power receiving unit for receiving power from an external source, the power source for the lifting unit being switchable between the battery and the power receiving unit.