Thermoelectric control system and thermoelectric control simulation program

The thermoelectric control system addresses the challenge of load fluctuations and diverse equipment configurations by automating load distribution and simulation, enhancing efficiency and reducing costs.

JP2024161736APending Publication Date: 2024-11-20HITACHI LTD

Patent Information

Application Number
JP2023076715
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-08
Publication Date
2024-11-20

AI Technical Summary

Technical Problem

Conventional control methods for thermoelectric systems fail to compensate for the magnitude of load fluctuations and require manual construction of control logic for diverse equipment configurations, leading to increased costs and longer delivery times.

Method used

A thermoelectric control system with a control section, load following priority setting, and control modules that automatically adjust load distribution across multiple facilities with different characteristics, using a simulation program to simulate and optimize operations.

Benefits of technology

The system enables automatic construction of control logic for load following, reducing engineering costs and delivery times while effectively managing load fluctuations in diverse thermoelectric equipment configurations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024161736000001_ABST
    Figure 2024161736000001_ABST
Patent Text Reader

Abstract

To provide a system capable of automatically constructing control logic of entire facilities for performing load following relative to a plurality of kinds of thermoelectric facilities having different control characteristics.SOLUTION: A thermoelectric control system includes: a control unit 1 having a plurality of control modules 121 to 123 for controlling a plurality of thermoelectric facilities 31 to 33; and a load following priority setting unit 6 for storing a load following priority of the facilities 31 to 33. The control module 122 inputs a value of a planned load of the facilities 32, inputs a load correction value from the control module 121 of the facilities 31 of a higher priority, corrects the value of the planned load by using the load correction value to obtain an adjusted load, executes range limiter processing for matching an adjusted load with a load range of the facilities 32, outputs an adjusted load after the range limiter processing as a load request value of the facilities 32, and outputs a value at which the adjusted load exceeds a load range as a load correction value to the control module 123 of the facilities 33 of a lower priority.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a control system that supplies electric power and heat using a plurality of electric power facilities and heat supply facilities, and a simulation program for simulating the operation of this control system. [Background technology]

[0002] With the recent trend towards decarbonization, the equipment used to supply thermoelectricity is becoming more diverse. Examples of such equipment include conventional thermoelectric equipment such as gas engines and boilers, renewable energy equipment such as solar power generation equipment and wind power generation equipment, storage batteries that are often used in combination to absorb fluctuations in renewable energy, hydrogen co-firing engines that use hydrogen as fuel, hydrogen boilers and fuel cells that do not emit carbon dioxide, and hydrogen production equipment such as water electrolysis devices. As the equipment used becomes more diverse in response to customer demands, the systems for controlling the equipment also become more complex. In the following, renewable energy is also referred to as "renewable energy."

[0003] When controlling heat and power supply, it is necessary to change the load of the equipment (for example, the amount of electricity supplied or heat supplied) in response to demand, which changes in real time. In the case of heat supply, there is some leeway in the event of a mismatch between supply and demand, as heat can be stored in the header. In contrast, in the case of electricity supply, if a mismatch occurs between supply and demand, the power supply equipment may cut off the power, which could result in a blackout. For this reason, load following in electricity supply (operating the equipment load to follow demand so that the power supply matches the demand) is more important than in heat supply.

[0004] Load response characteristics differ depending on the heat and power equipment. For example, storage batteries have a faster response than gas engines and can handle high frequency fluctuations in power demand. However, storage batteries have a limit to the amount of electricity they can store, so they cannot be used for load following all the time. In addition, since the power generation and heat supply capacities differ depending on the equipment, the range in which they can handle load following also differs from equipment to equipment. For this reason, the control logic that determines the load distribution must be built taking into account the characteristics of each equipment.

[0005] As mentioned above, in recent years, facilities have become more diverse and the facility configurations vary greatly depending on the customer, so the control logic for heat and power facilities is often created each time the facility is configured. This has resulted in higher costs and longer delivery times due to the increased engineering work.

[0006] To address these issues, there is a need for technology that can generalize control methods for load following while taking into account the characteristics of each piece of equipment, and that can automatically construct control logic.

[0007] An example of a conventional control method for supplying electric power using multiple types of power generation facilities is described in Patent Document 1. In the control method described in Patent Document 1, the load fluctuation to be compensated for is divided into multiple frequency bands by frequency analysis, and the load fluctuation in each frequency band is assigned to one of the distributed power sources (e.g., a gas engine, a micro gas turbine, and a secondary battery) for compensation. With this method, it is possible to compensate for the load fluctuation by comprehensively controlling multiple types of power generation facilities that have different follow-up capabilities for the load fluctuation.

[0008] Furthermore, conventional technology includes an operation method that determines load distribution to multiple power generation facilities through optimization. This is a method that determines the load that minimizes costs and CO2 emissions through optimization, using predicted values ​​of power demand and power generation of renewable energy facilities as conditions, and operates the power generation facilities based on this load (planned load). [Prior art documents] [Patent documents]

[0009] [Patent Document 1] JP 2006-246584 A Summary of the Invention [Problem to be solved by the invention]

[0010] In conventional technologies such as the control method described in Patent Document 1, the load fluctuation to be compensated for can be shared among the power generation facilities according to the frequency of the load fluctuation, but the magnitude of the load fluctuation is not compensated for. For example, renewable energy facilities such as solar power generation facilities and wind power generation facilities vary greatly in power generation depending on weather conditions, so other power generation facilities need to adjust their power generation to compensate for this fluctuation. However, conventional technologies do not take into account compensation for the magnitude of such load fluctuations.

[0011] In addition, the operational method of optimizing load distribution to multiple power generation facilities sets predicted values ​​for electricity demand and power generation from renewable energy facilities as conditions, so there is an issue that if fluctuations occur in which these predicted values ​​deviate significantly from the actual values, it becomes necessary to readjust the planned load.

[0012] As described above, in control using multiple power generation facilities, a control method must be adopted that can compensate not only for the frequency included in the load fluctuation, but also for the magnitude of the load fluctuation (fluctuations in power demand and fluctuations in the amount of power generated by renewable energy facilities). Furthermore, as mentioned above, such load following technology requires generalized control methods and the ability to automatically construct control logic that can handle a variety of facility configurations.

[0013] An object of the present invention is to provide a system that can automatically construct control logic for the entire facility to perform load following for multiple types of heat and power generation facilities with different control characteristics, and a simulation program for this system. [Means for solving the problem]

[0014] The thermoelectric control system according to the present invention includes a control unit that controls a plurality of facilities including at least one of a power generation facility and a heat supply facility, and a load following priority setting unit that stores a priority for load following for each of the facilities. The control unit includes a plurality of control modules that control each of the facilities. The control module inputs a planned load value that is a planned load of the facility, and inputs a load correction value that is a value for correcting the load from the control module that controls the facility with the higher priority, and obtains an adjusted load by correcting the planned load value using the load correction value, executes range limiter processing to match the adjusted load to a load range of the facility controlled by the control module, outputs the adjusted load after the range limiter processing as a load request value of the facility, and outputs a value at which the adjusted load exceeds the load range as the load correction value to the control module that controls the facility with the lower priority.

[0015] The thermoelectric control simulation program according to the present invention causes a computer to realize the functions of the control unit, the load following priority setting unit, and the control module of the thermoelectric control system according to the present invention. Effect of the Invention

[0016] According to the present invention, it is possible to provide a system that can automatically construct control logic for the entire facility to perform load following for multiple types of heat and power supply facilities with different control characteristics, and a simulation program for this system. [Brief description of the drawings]

[0017] [Figure 1] FIG. 1 is a diagram showing the configuration of a thermoelectric control system according to a first embodiment of the present invention. [Diagram 2] FIG. 2 is a diagram showing the internal configuration of a power generation facility control unit and the relationship between the power generation facility control unit and devices that directly exchange data with each other. [Diagram 3] FIG. 4 is a diagram showing an example of the configuration of planned load data acquired by a data acquisition unit. [Figure 4] 13 is a diagram showing an example of the configuration of load following priority data stored in a load following priority setting unit; FIG. [Diagram 5] FIG. 2 is a diagram showing the internal configuration of a control module of the power generation facility. [Figure 6] 5A to 5C are diagrams for explaining the partitioning process of load correction values ​​executed by a partitioning processor; [Figure 7] FIG. 2 is a diagram illustrating an example of the operation of a power generation facility under load distribution control. [Figure 8] FIG. 4 is a diagram showing an example of a screen displayed on a display device by the thermoelectric control system. [Figure 9] FIG. 11 is a diagram showing the configuration of a thermoelectric control system according to a second embodiment of the present invention. [Figure 10] 11 is a diagram for explaining an example of a process in which a load following priority setting unit determines a load following priority; [Figure 11] 11 is a diagram for explaining an example of a process in which a load following priority setting unit changes a load following priority depending on a stored amount of electricity in a storage battery; [Figure 12] FIG. 11 is a diagram showing an example of a screen displayed on a display device by the thermoelectric control system according to the second embodiment. [Figure 13] 13 is a diagram for explaining another example of a process in which the load following priority setting unit determines a load following priority; [Figure 14] FIG. 11 is a diagram showing an example of a screen displayed on a display device by the thermoelectric control system according to the second embodiment. [Figure 15] 11 is a diagram for explaining an example of a process in which a load following priority setting unit determines a load following priority according to an accumulated time during which a power generation facility has performed load following operation; FIG. [Figure 16] FIG. 11 is a diagram showing an example of a screen displayed on a display device by the thermoelectric control system according to the second embodiment. [Figure 17] FIG. 11 is a diagram showing a configuration realized by a thermoelectric control simulation program according to a third embodiment of the present invention. [Figure 18] FIG. 11 is a diagram showing an example of a screen displayed on a display device by a thermoelectric control simulation program according to a third embodiment. [Figure 19] FIG. 11 is a diagram showing the configuration of a thermoelectric control system according to a fourth embodiment of the present invention. [Figure 20]FIG. 4 is a diagram showing an example of the configuration of planned load data output by a heat and power planning unit. [Figure 21] 13 is a diagram showing an example of the configuration of load following priority data output by a load following priority setting unit to a power generation facility control unit and a heat supply facility control unit. FIG. BEST MODE FOR CARRYING OUT THEINVENTION

[0018] The thermoelectric control system of the present invention is a system that controls multiple thermoelectric equipment (e.g., power generation equipment, heat supply equipment, and combined heat and power supply equipment) that supplies at least one of electricity and heat, and can automatically construct a control logic for the entire equipment to perform load following for multiple types of thermoelectric equipment with different control characteristics, and can compensate for the magnitude of load fluctuations.

[0019] The heat and power supply control system according to the present invention includes a load following priority setting unit that sets a priority for load following for each of heat and power supply equipment, and a control module that controls each of the heat and power supply equipment. The control module inputs a planned load of the equipment and a load correction value from a control module that controls equipment with a higher priority, corrects the planned load to obtain an adjusted load, executes range limiter processing to match the adjusted load to a load range of the equipment, outputs the adjusted load after range limiter processing as a load request value, and outputs a value where the adjusted load exceeds the load range of the equipment as a load correction value to a control module that controls equipment with a lower priority.

[0020] The thermoelectric control simulation program according to the present invention is a computer program for simulating the operation of the thermoelectric control system according to the present invention, and can cause a computer to execute the control processing performed by the thermoelectric control system according to the present invention.

[0021] Hereinafter, a thermoelectric control system and a thermoelectric control simulation program according to an embodiment of the present invention will be described with reference to the drawings. In the following embodiments, renewable energy is also called "renewable energy." In addition, in the drawings used in this specification, the same or corresponding components are given the same reference numerals, and repeated explanations of these components may be omitted. Example 1

[0022] A thermoelectric control system according to a first embodiment of the present invention will be described.

[0023] 1 is a diagram showing the configuration of a thermoelectric control system according to this embodiment. The thermoelectric control system according to this embodiment includes a power generation facility control unit 1, a load following priority setting unit 6, and a display device 7, and is connectable to a power generation planning unit 2, local control devices 41-43, a local control device 44, and a power measurement facility 5, and controls a plurality of power generation facilities 31-33 and a renewable energy facility 34.

[0024] The power generation facilities 31 to 33 are, for example, gas engines and storage batteries. The renewable energy facility 34 is, for example, a renewable energy facility such as a solar power generation facility or a wind power generation facility. Fig. 1 shows three power generation facilities (A) 31, (B) 32, and (C) 33 as an example. Note that the renewable energy facility 34 can be included in the power generation facilities, but is depicted separately from the power generation facilities 31 to 33 in Fig. 1 (and Fig. 2).

[0025] The power generation equipment control unit 1 is a main component of the thermoelectric control system, and controls a plurality of power generation equipment 31-33 and a renewable energy equipment 34. The power generation equipment control unit 1 is connected to a load following priority setting unit 6, a display device 7, a power generation planning unit 2, local control devices 41-43, a local control device 44, and a power measurement facility 5.

[0026] The load following priority setting unit 6 stores data on the priority (load following priority) for load following that is set in advance for each of the power generation facilities 31 to 33, and outputs this data to the power generation facility control unit 1. The load following priority is a priority for performing load following operation, and power generation facilities with high load following priority are given priority in performing load following operation.

[0027] The display device 7 displays the operating states of the power generation equipment 31-33 and the renewable energy equipment 34 controlled by the power generation equipment control unit 1, and information related to the control by the power generation equipment control unit 1. For example, the display device 7 can display the current load following priority for each of the power generation equipment 31-33.

[0028] The power generation planning unit 2 obtains, by optimization, the loads of the power generation equipment 31-33 that minimize the operating costs and CO2 emissions, and outputs the obtained loads (planned loads) to the power generation equipment control unit 1. The planned loads are loads that are planned so that the operation of the power generation equipment 31-33 is optimal, and are obtained for each of the power generation equipment 31-33.

[0029] The local control devices 41-44 control the power generation facilities 31-33 and the renewable energy facility 34, respectively. FIG. 1 shows four local control devices 41-44 as an example. The local control devices 41-44 control only the power generation facilities connected to them. In the example shown in FIG. 1, the local control device 41 controls the power generation facility (A) 31, the local control device 42 controls the power generation facility (B) 32, the local control device 43 controls the power generation facility (C) 33, and the local control device 44 controls the renewable energy facility 34. The local control device 44 outputs a measurement value of the amount of power generated by the renewable energy facility 34 to the power generation facility control unit 1.

[0030] The power metering equipment 5 measures the power consumption, which is the power demand.

[0031] The power generation equipment control unit 1 is positioned above the local control devices 41-43 and local control device 44, and performs control such as load distribution that integrates the power generation equipment 31-33 and the renewable energy equipment 34. The power generation equipment control unit 1 controls each of the equipment 31-34 so that the total amount of power generated by the power generation equipment 31-33 and the renewable energy equipment 34 tracks the amount of power consumption input from the power measurement equipment 5.

[0032] FIG. 2 is a diagram showing the internal configuration of the power generation facility control unit 1 and the relationship between the power generation facility control unit 1 and devices that directly exchange data with each other.

[0033] The power generation facility control unit 1 includes a data acquisition unit 11, a control logic unit 12, and a control module priority setting unit 13.

[0034] The data acquisition unit 11 acquires data on the planned loads of the power generation facilities 31 to 33 and the renewable energy facility from the power generation planning unit 2, and also acquires data on the power consumption of the facilities 31 to from the power measurement facility 5.

[0035] Here, the processing of the data acquisition unit 11 will be described with reference to FIG.

[0036] Fig. 3 is a diagram showing an example of the configuration of planned load data acquired by the data acquisition unit 11 from the power generation planning unit 2. Fig. 3 shows, as an example, planned load data for power generation facilities 31 to 33. In this embodiment, the power generation facilities 31 to 33 are also referred to as power generation facility A, power generation facility B, and power generation facility C, respectively.

[0037] As shown in Fig. 3, the planned load data shows the planned loads of power generation facilities A to C in a time series. In the example of the planned load data shown in Fig. 3, the planned loads of power generation facilities A to C are shown as one-day time-series data at 30-minute intervals.

[0038] The power generation planning unit 2 determines the load of each of the power generation facilities A to C by optimization, and outputs the planned load as shown in Fig. 3 to the power generation facility control unit 1. Since an existing method can be used for this optimization process, a detailed description will be omitted, but a general process will be described below.

[0039] The power generation planning unit 2 stores the operating characteristics of each power generation facility in advance. The operating characteristics of the power generation facility include power generation efficiency, the unit price of the fuel used, CO2 emissions per unit fuel, and the load range in which the facility can be operated (rated load and minimum load in which the facility can be operated). Power generation efficiency is the amount of fuel consumed per kW of unit load. In most power generation facilities, the power generation efficiency varies according to the load, and increases as the facility approaches the rated load. For this reason, it is preferable to store the power generation efficiency as an efficiency curve against the load. Furthermore, when the power generation facility is a storage battery, the load range is the upper limit of the charge amount and the upper limit of the discharge amount. Furthermore, in the case of a storage battery, the upper and lower limits of the amount of stored electricity are also included in the operating characteristics.

[0040] The power generation planning unit 2 determines the load for each power generation facility for one day through optimization using 48 predicted power demand values ​​and predicted photovoltaic power generation values ​​for one day, i.e., at 30-minute intervals. The target functions in the optimization process are the operating cost and CO2 emissions (the target function is often defined as the sum of the two using a weighting coefficient). In other words, the power generation planning unit 2 determines the planned load so that the system is operated in such a way that both the operating cost and the CO2 emissions are minimized. As mentioned above, power generation efficiency varies depending on the load, so operating costs can be reduced by operating the system as close to the rated load as possible.

[0041] Considering the characteristics of storage batteries, it is preferable to calculate the planned load using one day's worth of time-series data. Storage batteries are operated so that they charge during times when there is a surplus in the power supply, and discharge during times when there is a surplus to make up for the amount of power generated. Optimization that includes this type of operation is difficult to achieve by calculating only instantaneous values, and optimization must be performed over at least the entire day.

[0042] As mentioned above, the input conditions for optimization are the predicted values ​​of power demand and solar power generation for one day. The constraint condition for optimization is that the sum of the loads of each power generation facility must match the power demand. However, the load of each power generation facility is calculated so that it falls within the load range, which is one of the operating characteristics of the power generation facility mentioned above.

[0043] Furthermore, in the case of renewable energy facilities such as photovoltaic power generation facilities, the amount of power generated cannot be controlled. For this reason, when determining the planned load, the power generation planning unit 2 inputs the amount of photovoltaic power generation for one day and plans operation so that the shortfall in power demand is supplemented by other power generation facilities. At this time, if the amount of photovoltaic power generation exceeds the power demand, the surplus power generation is charged into a storage battery, and the storage battery is discharged during other time periods, thereby planning operation that minimizes operating costs while also taking into account CO2 emissions.

[0044] The power generation planning unit 2 performs the above-mentioned processing, determines one-day planned load data as shown in FIG. 3 as a power generation plan, and outputs it to the data acquisition unit 11 of the power generation facility control unit 1.

[0045] Returning to the explanation of Figure 2.

[0046] The data acquisition unit 11 of the power generation equipment control unit 1 inputs a measurement value of the current power consumption (power measurement value) from the power measurement equipment 5. This power measurement value is the current power demand. The data acquisition unit 11 also acquires a measurement value of the power generation amount of the renewable energy equipment 34 (renewable energy equipment power generation amount measurement value) from the local control device 44. The renewable energy equipment 34 is also one of the power generation equipment, but is distinguished from the other power generation equipment 31 to 33 in the processing by the power generation equipment control unit 1. This is because the renewable energy equipment 34, such as a solar power generation equipment, cannot adjust the amount of power generation. The local control device 44 that controls the renewable energy equipment 34 can only execute limited measures for the renewable energy equipment 34, such as cutting off the power in an emergency.

[0047] Here, a description will be given of the processing of the load following priority setting unit 6. As described above, the load following priority setting unit 6 stores data on the load following priority set for each of the power generation facilities 31-33.

[0048] First, the concept of priority for load following, which is important in this embodiment, will be explained. Load following is a control that adjusts the amount of power generation and supply so that it matches the power demand (power consumption) that changes in real time. When a mismatch between power supply and demand (a supply-demand gap) occurs, the power supply facility cuts off the power, resulting in a power outage. The allowable time for a power supply-demand gap is less than one second, and the stability of load following is important in terms of control.

[0049] When multiple power generation facilities are used for load following, in most cases, one power generation facility is responsible for the load following function. In other words, only one power generation facility monitors power consumption and adjusts power generation in real time to match the power consumption. This is because if multiple power generation facilities control load following, there is a possibility that interference may occur between the power generation facilities. One of the multiple power generation facilities changes its power generation amount in real time by performing load following, while the other power generation facilities change their power generation amount at long time intervals. In other words, the roles of multiple power generation facilities are divided so that one power generation facility set for load following operation responds to small fluctuations in power demand, and the other power generation facilities respond to large changes in power demand.

[0050] In this embodiment, in order to control such load following, a priority (load following priority) for load following operation is set in advance for the power generation facilities 31 to 33, and the load of each of the power generation facilities 31 to 33 is determined based on this priority.

[0051] 4 is a diagram showing an example of the configuration of load following priority data stored in the load following priority setting unit 6. The load following priority setting unit 6 outputs the load following priority data to the power generation facility control unit 1.

[0052] In the load following priority data, a load following priority (the order in which load following operation is performed) is set in advance for each of power generation facilities A to C. In the example shown in FIG. 4, load following priorities are set as 1, 2, and 3 for power generation facilities A, B, and C, respectively. The load following priorities are assumed to be 1, 2, and 3 in descending order. A power generation facility with a load following priority set to 1 performs load following. A power generation facility with a load following priority of 2 or higher basically does not perform load following operation, but when it becomes difficult for a power generation facility with a load following priority of 1 to perform load following operation, the power generation facility performs load following operation as a backup.

[0053] Such backup-like load following operation is performed in the order of load following priority, from highest to lowest. That is, the load following operation is performed by the power generation equipment with priority 1, and if the power generation equipment with priority 1 has difficulty in operating, the power generation equipment with priority 2 operates, and if the power generation equipment with priority 2 has difficulty in operating, the power generation equipment with priority 3 operates, and so on. The details of this process will be described later.

[0054] Returning to the explanation of Figure 2.

[0055] The load following priority setting unit 6 outputs load following priority data ( FIG. 4 ) to the control module priority setting unit 13 of the power generation facility control unit 1.

[0056] The control module priority setting unit 13 acquires data on the load following priority from the load following priority setting unit 6 , and outputs information on the load following priority to the control logic unit 12 .

[0057] The control logic unit 12 includes control modules 121-123 that respectively control the power generation facilities A-C, and performs control processing that integrates the control modules 121-123. In this embodiment, the control logic unit 12 includes individual control modules 121-123 that respectively correspond to the power generation facilities A-C (power generation facilities 31-33), and a control logic for the entire power generation facilities is configured by combining these control modules 121-123. The load following priority data is used in processing that uses the control modules 121-123.

[0058] The power generation equipment control modules 121-123 control the power generation equipment A-C by transmitting control signals to the local control devices 41-43, respectively. The control modules 121-123 have the same configuration, but can change the control they execute depending on parameters set inside the modules.

[0059] The control modules 121 to 123 control the power generation facilities A to C, respectively. The control module 121 is a control module corresponding to the power generation facility (A) 31. The control module 122 is a control module corresponding to the power generation facility (B) 32. The control module 123 is a control module corresponding to the power generation facility (C) 33. Note that the power generation facility A has a load following priority of 1 as shown in FIG. 4, and is a power generation facility that performs load following. As described above, the control modules 121 to 123 have the same configuration, but can handle the control of each power generation facility by parameters for each power generation facility set inside the module. The control modules 121 to 123 will be described later.

[0060] Here, an overview of the control method that the control logic unit 12 performs on the plurality of power generation facilities A to C (power generation facilities 31 to 33) will be described.

[0061] Power generation equipment A has a load following priority of 1 (Figure 4). Therefore, the control method of power generation equipment A is different from the other power generation equipment B and C.

[0062] The control logic unit 12 outputs a control signal (a control signal with load following mode ON) to the local control device 41 of the power generation facility A to perform load following operation. The local control device 41 of the power generation facility A receives this control signal and performs control in load following operation. The power generation facility A performs load following operation without following the planned load (power generation plan) determined by the power generation plan unit 2.

[0063] That is, the local control device 41 inputs the measurement value of the current power consumption (power measurement value) from the power metering facility 5, and adjusts the amount of power generated by the power generation facility A so that the supply of power matches the power measurement value, which is the demand. The power supply and demand gap appears in the power frequency. When the supply is insufficient relative to the demand, the frequency drops below a predetermined value, and when there is an excess supply, the frequency increases above this predetermined value. The local control device 41 of the power generation facility A performs load following operation by adjusting the amount of power generated by the power generation facility A based on such power frequency characteristics.

[0064] On the other hand, power generation equipment B and C, which are power generation equipment with a priority of 2 or higher, do not perform load following operation as power generation equipment A, which has a priority of 1, but operate according to the planned load (power generation plan) determined by the power generation planning unit 2. The control logic unit 12 outputs the planned load value (load request value) as a control signal to the local control devices 42 and 43 of the power generation equipment B and C. The local control devices 42 and 43 input the load request value and adjust the power generation amount of the power generation equipment B and C, respectively, so that it matches the load request value. Unlike the load value of the power generation equipment A, which performs load following operation, the load request value of the power generation equipment B and C does not change frequently.

[0065] The above is the flow of the process in which the control logic unit 12 transmits control signals to the local control devices 41-43 of the power generation facilities A-C and controls the power generation facilities A-C.

[0066] Next, the process in which the control logic unit 12 creates a control signal will be described in detail.

[0067] As described above, the power generation equipment A with a priority of 1 (power generation equipment performing load following operation) has a different operating method from the power generation equipment B and C with a priority of 2 or higher. As described above, the control modules 121-123 corresponding to the power generation equipment A-C respectively have the same configuration and can handle the control of each power generation equipment by parameters for each power generation equipment set inside the module.

[0068] 5 is a diagram showing the internal configuration of the power generation facility control modules 121 to 123. Each of the control modules 121 to 123 includes a load following mode setting unit 21, a load estimation unit 22, a range deviation amount calculation unit 24, a load correction value addition unit 23, a range setting unit 26, a division processing unit 25, and a start / stop determination unit 27.

[0069] The load following mode setting unit 21 inputs information on the load following priority of the power generation equipment to be controlled from the control module priority setting unit 13 (FIG. 2). As described above, the processing of the control modules 121 to 123 is different between the power generation equipment A (power generation equipment performing load following operation) with a priority of 1 and the power generation equipment B and C with a priority of 2 or higher. When the priority of the power generation equipment to be controlled is 1, the load following mode setting unit 21 transmits a control signal for performing load following operation (a control signal indicating that the load following mode is ON) to the local control device 41 and operates the load estimation unit 22. On the other hand, when the priority of the power generation equipment to be controlled is 2 or higher, the load following mode setting unit 21 operates the load correction value adding unit 23 assuming that the load following mode is OFF. The load correction value adding unit 23 will be described later.

[0070] First, a description will be given of the process in the load following operation of the power generation equipment having the priority level of 1. Note that the control modules 121 to 123 do not output a control signal of the planned load value (load request value) to the power generation equipment performing the load following operation.

[0071] The local control device 41 receives a power measurement value from the power measurement facility 5 and adjusts the amount of power generated by the power generation facility so that the amount of power generated matches the power measurement value (i.e., so that the power frequency becomes constant), thereby performing load following operation. This control is a feedback control that is performed outside the control modules 121-123.

[0072] The load estimation unit 22 estimates the power generation amount (load) of the power generation facility performing the load following operation by the following formula (1). Load estimate for power generation facility A = Measured power value - Total planned load of power generation facilities excluding power generation facility A = Power measurement value - (Total value of all planned loads - Planned load value of power generation equipment A) (1) However, in equation (1), it is assumed that power generation equipment A is performing load following operation.

[0073] As shown in formula (1), the estimated value of the power generation amount (load estimated value) of power generation equipment A is a value obtained by subtracting the total planned load of the other power generation equipments excluding power generation equipment A from the power measurement value, which is the power value actually used. In other words, the load estimation unit 22 can calculate the load estimation value of power generation equipment A from three pieces of data: the power measurement value, the total planned load of all power generation equipments, and the planned load value of power generation equipment A. The load estimation unit 22 inputs these three pieces of data from the data acquisition unit 11 as shown in FIG. 2. The data acquisition unit 11 inputs the power measurement value from the power measurement equipment 5 and inputs the planned load of each power generation equipment from the power generation planning unit 2.

[0074] Next, the range deviation calculation unit 24 inputs a load estimation value of a power generation facility (e.g., power generation facility A) performing load following operation from the load estimation unit 22. Then, the range deviation calculation unit 24 compares the input load estimation value with a load range (power generation range) set as an operating characteristic of each power generation facility (e.g., power generation facility A), and calculates the deviation amount (range deviation amount) of the load estimation value from the load range. In general, the upper limit of the load range is set to the rated load, and the lower limit is set to the minimum load at which operation is possible (because some power generation facilities cannot operate at a load near zero).

[0075] The range deviation is zero when the load estimate is within the load range, a positive value when the load estimate is above the upper limit of the load range, and a negative value when the load estimate is below the lower limit of the load range. It is calculated by the following formula (2). Range deviation amount =MAX(load estimate - upper limit of load range, 0) +MIN(load estimate - lower limit of load range, 0) (2) Here, the function MAX gives the maximum value among the arguments, and the function MIN gives the minimum value among the arguments.

[0076] A positive range deviation calculated by the range deviation calculation unit 24 means that the power generation facility that is supposed to perform load following operation cannot handle the load following. In other words, this power generation facility has a large shortage of power generation relative to the power demand (power measurement value), and even if the power generation amount is increased to the upper limit of the load range, it cannot keep up with the power demand, i.e., the power supply is insufficient.

[0077] Such a situation occurs when the predicted value of the power demand or the predicted value of the amount of solar power generation deviates significantly from the actual value. For example, as described above, the power generation planning unit 2 determines the load of each power generation facility so as to match the given predicted value of the power demand. Therefore, when the actual power demand greatly exceeds the predicted value, a power supply shortage occurs. When determining the load of the power generation facility, the load is determined after taking into consideration a margin for such fluctuations. In other words, when the power demand fluctuates to the extent that it exceeds this margin, it becomes difficult for the power generation facility to operate at the planned load determined by the power generation planning unit 2. The same applies to the amount of solar power generation. The power generation planning unit 2 determines the load of the power generation facility based on the predicted value of the amount of solar power generation estimated using meteorological information, etc., but when the actual value of the amount of solar power generation falls significantly below the predicted value, a power supply shortage occurs.

[0078] On the other hand, if the range deviation amount calculated by the range deviation amount calculation unit 24 is a negative value, the power supply is excessive. This situation occurs when the actual value of the power demand is less than the predicted value, or the actual value of the solar power generation is greater than the predicted value.

[0079] The range deviation calculation unit 24 calculates the range deviation (i.e., the shortage or excess of the load of the power generation equipment) using formula (2) and outputs the range deviation as a load correction value to the control module of the power generation equipment with a lower load following priority. The load correction value is the shortage or excess of the load of the power generation equipment, and is a value for correcting the load of the power generation equipment.

[0080] The above is the process performed by the control module of the power generation facility (for example, power generation facility A) that performs the load following operation.

[0081] Next, a process for power generation facilities other than the power generation facilities performing the load following operation, that is, power generation facilities having a load following priority of 2 or higher will be described. In these power generation facilities, the load correction value adding unit 23 shown in FIG. 5 operates.

[0082] The load correction value adding unit 23 inputs the planned load value from the data acquiring unit 11, and also inputs the load correction value from the control module that controls the power generation equipment with the higher load following priority through the partitioning processing unit 25 (details will be described later). As described above, the load correction value is the range deviation amount, that is, the shortage or excess amount of power supply that deviates from the load range of the higher-ranked power generation equipment.

[0083] Then, the load correction value adding unit 23 obtains the adjusted load by correcting the value of the planned load using the load correction value, and outputs the obtained adjusted load to the range setting unit 26. The load correction value adding unit 23 obtains the adjusted load by adding the load correction value to the value of the planned load.

[0084] When the load correction value is zero, the load correction value adding unit 23 outputs the input planned load value as is to the range setting unit 26. The power generation facility controlled by the control module performing such processing operates according to the plan determined by the power generation planning unit 2.

[0085] When the load correction value is a value other than zero, the load correction value addition unit 23 performs unplanned load adjustment. When the power supply is insufficient, the load correction value (range deviation amount) is a positive value, and the planned load value increases by the load correction value. In other words, the load of the power generation equipment to be controlled is increased above the plan. On the other hand, when the power supply is excessive, the load correction value is a negative value, and the planned load value decreases by the load correction value. In other words, the load of the power generation equipment to be controlled is decreased below the plan. The load correction value addition unit 23 performs this processing to determine the adjusted load from the planned load value and the load correction value.

[0086] Such processing by the load correction value adding unit 23 makes it possible to eliminate an operating state in which the power supply from the power generation facilities A to C is insufficient or an operating state in which the power supply is excessive. The load correction value adding unit 23 outputs the calculated adjusted load to the range setting unit 26.

[0087] The range setting unit 26 inputs the adjusted load calculated by the load correction value adding unit 23, and executes range limiter processing to match the range of the adjusted load to the load range of the power generation equipment (the power generation equipment) controlled by the control module including the range setting unit 26. That is, the range setting unit 26 executes range limiter processing to match the upper and lower limits of the range of the adjusted load to the upper and lower limits of the load range of the power generation equipment so that the adjusted load does not exceed the load range of the power generation equipment. The range setting unit 26 outputs the adjusted load value after range limiter processing to the local control device as a load request value.

[0088] In the range limiter processing of the range setting unit 26, the adjusted load output by the load correction value adding unit 23 may exceed the load range of the power generation equipment. This means that the load correction value input from the control module of the power generation equipment with a higher load following priority is too large, and the power supply cannot be adjusted by matching the adjusted load range to the load range of the power generation equipment.

[0089] In such a case, similar to the processing in the load following operation described above, the range deviation calculation unit 24 calculates the value (range deviation) at which the adjusted load exceeds the load range of the power generation equipment, and outputs this range deviation as a load correction value to the control module of the power generation equipment with the lower load following priority.

[0090] In this embodiment, the power generation equipment 31-33 can perform load following operation in a backup manner in accordance with the preset load following priority through the processing of the multiple control modules 121-123. That is, when the power generation equipment with load following priority 1 cannot adjust the power supply (when load following becomes difficult), the power generation equipment with load following priority 2 backs up and adjusts the power supply, and when the power generation equipment with load following priority 2 cannot adjust the power supply either, the power generation equipment with load following priority 3 backs up and adjusts the power supply.

[0091] As described above, the load correction value adding unit 23 adds the load correction value input from the control module of the power generation equipment with the higher load following priority to the planned load value to obtain the adjusted load. This load correction value is preferably added to the planned load value after a numerical value classification process is performed. This classification process is a process of classifying (converting) the load correction value into one of a plurality of discrete values, and is executed by the classification processing unit 25 shown in FIG. 5.

[0092] The details and purpose of the segmentation process performed by the segmentation processor 25 are explained below.

[0093] Fig. 6 is a diagram for explaining the partitioning process of the load correction value executed by the partitioning process unit 25. In the example shown in Fig. 6, the partitioning process unit 25 partitions the load correction value in units of 10. For example, when the load correction value is 0, the partitioned load correction value is set to 0, when the load correction value is greater than 0 and equal to or less than 10, the partitioned load correction value is set to 10, and when the load correction value is greater than 10 and equal to or less than 20, the partitioned load correction value is set to 20. By this partitioning process, the load correction value takes on discretized values ​​such as -20, -10, 0, +10, +20, for example.

[0094] The purpose of such a classification process is to reduce the frequency of power generation adjustment for power generation equipment with a load following priority of 2 or higher. As described above, there is only one power generation equipment that performs load following operation, which changes the power generation amount in real time according to the power demand. By performing classification process by the classification processing unit 25, the frequency of power generation adjustment can be reduced for power generation equipment with a load following priority of 2 or higher. In other words, the power generation equipment that performs load following operation can be fixed to power generation equipment with a load following priority of 1 as much as possible. Furthermore, when performing such classification process, it is preferable to provide a hysteresis function for the classification threshold value and change the threshold value according to the value of the load correction value. By providing a hysteresis function for the classification threshold value, the frequency of power generation adjustment of the power generation equipment can be reduced even when the load correction value fluctuates across the threshold value.

[0095] So far, the process related to the control for adjusting the load (power generation amount) of the power generation facility has been described.

[0096] It may be preferable to control the power generation equipment to start or stop depending on the planned load calculated by the power generation planning unit 2 and output to the power generation equipment control unit 1. This control to start or stop the power generation equipment is executed by a start / stop determination unit 27 shown in FIG.

[0097] The start / stop determination unit 27 refers to the time series data of the planned load (FIG. 3), and when the value of the planned load changes from 0 to a positive value, outputs a start signal to the local control device to start the power generation equipment at the time when this change occurs. Also, when the value of the planned load changes from a positive value to 0, the start / stop determination unit 27 outputs a stop signal to the local control device to stop the power generation equipment at the time when this change occurs.

[0098] The above is the control of load distribution to a plurality of power generation facilities in this embodiment. As described above, the heat and power control system according to this embodiment can automatically construct a control logic for performing load following.

[0099] Fig. 7 is a diagram showing an example of the operation of power generation facilities under the load distribution control in this embodiment. Fig. 7 shows an example of the operation of three power generation facilities A to C. Power generation facility A has a load following priority of 1 and is performing load following operation.

[0100] For example, at time t1, when the load (power generation amount) of power generation equipment A reaches the upper limit of the load range, the load of power generation equipment B, which has a load following priority of 2, is corrected from the planned load and increases. The load correction value, which is the correction amount at this time, is changed to a rectangular wave-like shape by the segmentation processing of the segmentation processing unit 25. Power generation equipment A, which has a load following priority of 1, is always performing load following operation. Note that the load of power generation equipment C always follows the planned load.

[0101] Fig. 8 is a diagram showing an example of a screen displayed on the display device 7 by the thermoelectric control system according to this embodiment. In the example shown in Fig. 8, the trends (time changes) of the actual value (measured value) of the power demand and the planned value (planned load value) are shown in comparison with each other at the top of the screen. Below this trend of power demand, the trend of the actual value of the power generation amount of each power generation facility when load distribution control is performed on multiple power generation facilities so that it matches the actual value of the power demand is shown.

[0102] 8, as an example, the power generation equipment with a load following priority of 1 is a gas engine A, the power generation equipment with a load following priority of 2 is a storage battery, and the power generation equipment with a load following priority of 3 is a gas engine B. Note that, since the amount of power generation cannot be adjusted for a renewable energy equipment 34 such as a solar power generation equipment, no load following priority is set.

[0103] In the trend of power demand, there are time periods when the actual power demand value significantly exceeds the planned value. During these time periods, the power generation amount of gas engine A, which has a load following priority of 1, reaches its upper limit, so the storage battery, which has a load following priority of 2, corrects the planned load and increases the power generation amount (discharge amount) from the planned load (planned discharge amount) to supply power. In Figure 8, in the trend of the power generation amount (charge / discharge amount) of the storage battery, the unplanned change in power generation amount (increase in discharge amount) due to the correction of the planned load (addition of the load correction value) is shown by shading.

[0104] As described above, the thermoelectric control system according to this embodiment includes control modules 121-123 that have the same configuration and can execute common processing, and can automatically configure a control logic for the entire facility to perform load following for multiple types of power generation facilities 31-33 with different control characteristics by using the load ranges of the power generation facilities 31-33 controlled by the control modules 121-123 and the load following priorities set for the power generation facilities 31-33. This makes it easy to configure a control logic for the power generation facilities even for a power generation system that combines a variety of power generation facilities, thereby reducing engineering man-hours, reducing development costs, and shortening delivery times.

[0105] Furthermore, in the thermoelectric control system according to this embodiment, multiple power generation facilities can perform load following operation according to the load following priority, and can perform load following operation in a backup manner to adjust the power supply, thereby making it possible to compensate for the magnitude of load fluctuations. Example 2

[0106] A thermoelectric control system according to a second embodiment of the present invention will be described. The thermoelectric control system according to this embodiment differs from the thermoelectric control system according to the first embodiment in the processing of the load following priority setting unit 6. The following mainly describes the differences between this embodiment and the first embodiment.

[0107] 9 is a diagram showing the configuration of a heat and power control system according to this embodiment. The load following priority setting unit 6 can acquire the operating states of the power generation facilities 31 to 33 via the local control devices 41 to 43, respectively. The load following priority setting unit 6 can also acquire the planned load from the power generation planning unit 2.

[0108] In the first embodiment, the load following priority setting unit 6 stores data of the load following priority that is set in advance for each of the power generation facilities 31 to 33. That is, in the first embodiment, the load following priority is fixed.

[0109] In this embodiment, the load following priority setting unit 6 can dynamically change the load following priority depending on the operating state of the power generation facilities 31-33.

[0110] Fig. 10 is a diagram for explaining an example of a process in which the load following priority setting unit 6 determines the load following priority. The load following priority setting unit 6 can change the load following priority according to the operation modes (1) to (3) of the power generation facilities (including renewable energy facilities). In the example shown in Fig. 10, the power generation facilities are a small gas engine A, a large gas engine B, and a storage battery.

[0111] Operation mode (1) is a normal mode, that is, a mode in which the power generation equipment is operating normally. In operation mode (1), the load following priority setting unit 6 sets the load following priority of the small gas engine A to 1, the load following priority of the storage battery to 2, and the load following priority of the large gas engine B to 3.

[0112] Operation mode (2) is a power supply shortage mode, i.e., a mode when power supply is insufficient. In operation mode (2), the load following priority setting unit 6 switches the load following priority of gas engine A (small) and gas engine B (large), setting the load following priority of gas engine B to 1 and the load following priority of gas engine A to 3. The load following priority setting unit 6 determines that the operation mode is (i.e., power supply is insufficient) when the difference obtained by subtracting the total value of the planned load of each power generation facility (planned value of power demand) from the power measurement value (actual value of power demand) exceeds a predetermined threshold value.

[0113] The setting of the load following priority in operation mode (2) is based on, for example, the following idea. Because parts of a gas engine that performs load following operation wear out quickly, an inexpensive gas engine (small gas engine A) is usually used. However, when the power supply shortage exceeds a predetermined threshold, the load following priority is changed so that a larger gas engine B, which generates more power, can perform load following operation.

[0114] Operation mode (3) is an excess solar power generation mode, i.e., a mode when the amount of solar power generation is excessive. In operation mode (3), the load following priority setting unit 6 sets the load following priority of the storage battery to 1. When the difference obtained by subtracting the power measurement value (actual value of power demand) from the amount of solar power generation exceeds a predetermined threshold, the load following priority setting unit 6 determines that the operation mode is (3) (i.e., the amount of solar power generation is excessive).

[0115] The load following priority setting in operation mode (3) has the purpose of operating in such a way that when the amount of photovoltaic power generation exceeds the actual power demand, the excess power generation is preferentially charged to the storage battery. The power supply equipment also cuts off the power supply when there is an excess of power. For this reason, when there is excess photovoltaic power generation, charging the photovoltaic power generation to the storage battery can reduce operating costs, rather than forcibly stopping power generation by disconnecting the photovoltaic power generation from the power line.

[0116] 11 is a diagram for explaining an example of a process in which the load following priority setting unit 6 changes the load following priority according to the amount of stored power in the storage battery. The load following priority setting unit 6 can change the load following priority according to the operation modes (4) to (6).

[0117] Operation mode (4) is a power supply shortage mode and a low storage mode, i.e., an operation mode in which the power supply is insufficient and the storage amount of the storage battery is low. In operation mode (4), the load following priority setting unit 6 sets the load following priority of the storage battery to the lowest in order to suppress an increase in the unplanned discharge amount of the storage battery and ensure the storage amount. The load following priority setting unit 6 determines whether the power supply is insufficient in the same manner as operation mode (2). Furthermore, the load following priority setting unit 6 determines that the storage amount of the storage battery is low when the storage amount of the storage battery is below a predetermined threshold.

[0118] The operation mode (5) is an excess power supply mode and a high power storage mode, i.e., an operation mode in which the power supply is excessive and the storage amount of the storage battery is large. In the operation mode (5), the load following priority setting unit 6 sets the load following priority of the storage battery to the lowest in order to prevent overcharging by suppressing an increase in the unplanned charge amount of the storage battery. The load following priority setting unit 6 determines that the power supply is excessive when the difference obtained by subtracting the total value of the planned load of each power generation facility (planned value of power demand) from the power measurement value (actual value of power demand) falls below a predetermined threshold. In addition, the load following priority setting unit 6 determines that the storage amount of the storage battery is large when the storage amount of the storage battery exceeds a predetermined threshold.

[0119] The operation mode (6) is a night mode, that is, a mode in which the power generation equipment operates during the nighttime hours. The load following priority can also be changed depending on the time period in which the power generation equipment operates. In the operation mode (6), the load following priority setting unit 6 sets the load following priority of the storage battery to the lowest. This is for the purpose of suppressing unplanned charging and discharging operations of the storage battery during the nighttime hours when solar power generation stops when the storage battery is operated to absorb fluctuations in the amount of solar power generation. The nighttime hours can be determined arbitrarily in advance.

[0120] FIG. 12 is a diagram showing an example of a screen displayed on the display device 7 by the thermoelectric control system according to this embodiment. In FIG. 12, as an example, data showing the operating state used to determine the load following priority is displayed in the upper part of the screen. Also, as an example, information on the current load following priority is displayed in the lower part of the screen. The data showing the operating state is, for example, the difference between the measured value and the planned value of the power consumption, the difference between the measured value and the predicted value of the photovoltaic power generation, the measured value of the amount of electricity stored in the storage battery, and the set night time period. The information on the load following priority is, for example, the operating mode and the equipment for which the load following priority is set to 1 to 3.

[0121] 12, the power generation facility is operating in operation mode (4), i.e., power supply shortage mode and low power storage mode. Therefore, the load following priority setting unit 6 sets the load following priority of the storage battery to the lowest in the power supply shortage mode, i.e., sets the load following priority of the large gas engine B to 1, the load following priority of the small gas engine A to 2, and the load following priority of the storage battery to 3.

[0122] Next, an example of a process for determining the load following priority, which is different from the processes described above, will be described.

[0123] 13 is a diagram for explaining another example of the process in which the load following priority setting unit 6 determines the load following priority. The load following priority setting unit 6 can dynamically change the load following priority according to the power generation efficiency of the power generation facility. In the following, as an example, a power generation facility is composed of a gas engine A that performs load following operation, a gas engine B that has high power generation efficiency, and a gas engine C that has a power generation efficiency lower than that of gas engine B, and the load following priority of gas engine B and gas engine C is changed.

[0124] 13 shows an example in which the load following priority setting unit 6 changes the load following priority between a power shortage mode and an excess power mode. As described above, the power shortage mode is a mode in which the difference obtained by subtracting the total planned load of each power generation facility (planned power demand) from the measured power value (actual power demand) exceeds a predetermined threshold. The excess power mode is a mode in which the difference is equal to or less than this predetermined threshold.

[0125] In the power supply shortage mode, when a correction is applied to the planned load for a power generation facility with a load following priority of 2 or higher (i.e., when the load correction value is other than 0), the above difference is always a positive value, so the power generation amount is increased. For this reason, the load following priority setting unit 6 sets the load following priority of the highly efficient gas engine B higher than the load following priority of the low-efficiency gas engine C. This is because increasing the power generation amount of the highly efficient gas engine B can keep the increase in operating costs to a minimum.

[0126] In the power excess supply mode, the opposite operation to the power shortage supply mode is performed. That is, the load following priority setting unit 6 sets the load following priority of the low-efficiency gas engine C higher than the load following priority of the high-efficiency gas engine B. This is to reduce the amount of power generation by preferentially using the low-efficiency gas engine C, thereby further reducing the operating cost.

[0127] FIG. 14 is a diagram showing an example of a screen displayed on the display device 7 by the thermoelectric control system according to this embodiment. In FIG. 14, as an example, data representing the operating state used to determine the load following priority is displayed in the upper part of the screen. Also, as an example, information on the load following priority is displayed in the lower part of the screen. The data representing the operating state is, for example, the difference between the measured value and the planned value of the power consumption. The information on the load following priority is, for example, the operating mode and the equipment for which the load following priority is set to 1 to 3.

[0128] 14, the power generation facility is operated in a power supply shortage mode. Therefore, the load following priority setting unit 6 sets the load following priority of the gas engine A performing load following operation to 1, the load following priority of the highly efficient gas engine B to 2, and the load following priority of the less efficient gas engine C to 3.

[0129] Next, an example of a process for determining the load following priority, which is different from the process described above, will be described. The load following priority setting unit 6 sets the accumulated time during which each power generation facility has performed load following operation as an operating state, and can dynamically change the load following priority according to this accumulated time.

[0130] In load following operation, the load changes frequently, and in a combustion engine such as a gas engine, for example, thermal stress causes parts to wear out quickly. For this reason, when there are multiple power generation equipment of the same model, instead of performing load following operation on only one piece of equipment, the multiple pieces of equipment are operated equally in load following operation, so that the parts of the multiple pieces of equipment wear out to the same extent. The load following priority setting unit 6 changes the load following priority according to the accumulated time that each piece of power generation equipment has performed load following operation, and by performing load following operation equally on the multiple pieces of equipment, the life of the entire power generation equipment can be extended.

[0131] Fig. 15 is a diagram for explaining an example of a process in which the load following priority setting unit 6 determines the load following priority according to the accumulated time during which the power generation equipment has been operated in the load following mode. Fig. 15 shows, as an example, the accumulated operation time in the load following mode and the set load following priority for three gas engines A to C.

[0132] The load following priority setting unit 6 acquires data on the accumulated operation time in load following from the control logic unit 12 (FIG. 2) and stores it. In the example shown in FIG. 15, the accumulated operation time in load following is 2000 hours for gas engines A and B, and 1000 hours for gas engine C. For this reason, the load following priority setting unit 6 sets the load following priority of gas engine C, which has a shorter accumulated operation time, higher than gas engines A and B, which have longer accumulated operation times, and sets the load following priority of gas engine C to 1.

[0133] FIG. 16 is a diagram showing an example of a screen displayed on the display device 7 by the thermoelectric control system according to this embodiment. In FIG. 16, as an example, data showing the operating state used to determine the load following priority is displayed in the upper part of the screen. Also, as an example, information on the load following priority is displayed in the lower part of the screen. The data showing the operating state is, for example, the accumulated operating time in load following. The information on the load following priority is, for example, equipment for which a load following priority of 1 to 3 is set. In the example shown in FIG. 16, the gas engine C has the shortest accumulated operating time in load following and its load following priority is set to 1, which is the highest priority.

[0134] In this embodiment, the display device 7 can display values ​​and information (operating state of the power generation equipment) used by the load following priority setting unit 6 to change the load following priority of the power generation equipment. The display device 7 can also display the current load following priority for each of the power generation equipment. Furthermore, the display device 7 can display the operating mode of the power generation equipment. The operating mode of the power generation equipment can be determined from the operating state of the power generation equipment, i.e., the values ​​and information used by the load following priority setting unit 6 to change the load following priority of the power generation equipment.

[0135] As described above, in the thermoelectric control system according to this embodiment, the load following priority setting unit 6 can dynamically and appropriately set the load following priority of the power generation equipment according to the operating state of the power generation equipment. As a result, in the thermoelectric control system according to this embodiment, even if the power supply becomes insufficient or excessive with respect to the plan, the load can be appropriately distributed according to the operating state of the power generation equipment, thereby improving the reliability of operation. Example 3

[0136] A thermoelectric control simulation program according to a third embodiment of the present invention will be described. In the first and second embodiments, a thermoelectric control system for actually controlling a power generation facility has been described. In this embodiment, a program for performing a simulation aimed at verifying the operation of this thermoelectric control system will be described. The thermoelectric control simulation program according to this embodiment is a program for verifying the operation of a thermoelectric control system, and therefore can cause a computer to execute the control processing performed by an actual thermoelectric control system (for example, the thermoelectric control system according to the first or second embodiment). In the following, the simulation program will also be referred to as a "simulator."

[0137] Fig. 17 is a diagram showing a configuration realized by a thermoelectric control simulation program according to this embodiment. The thermoelectric control simulation program according to this embodiment is executed by a computer, and realizes the configuration of the actual thermoelectric control system in the first and second embodiments by software. That is, the simulator according to this embodiment is a computer program for making a computer realize the functions of the thermoelectric control system according to the first or second embodiment. The configuration realized by the simulator according to this embodiment is almost the same as the configuration shown in Fig. 1 (first embodiment) and Fig. 9 (second embodiment), but differs in that it uses control response models 51-53 that output control responses instead of hardware such as the power generation facilities 31-33 and the local control devices 41-43.

[0138] The control response models 51-53 output, as a control response, the response of the power generation facilities 31-33 to inputs such as a load request value (or a planned load value) and a control signal for the power generation facilities 31-33 (for example, a control signal for starting and stopping). The control response models 51-53 output a response to a load request value for a change in load by using a first-order lag or dead time. Furthermore, the control response models 51-53 store data in advance on start-up times (start-up preparation times and load increase times) and stop times (load decrease times) for starting and stopping the power generation facilities 31-33, and output a response based on this data.

[0139] In this embodiment, the renewable energy facility 34 (for example, solar power generation facility) in the first and second embodiments (FIGS. 1 and 9) uses, instead of hardware, a solar power generation condition setting unit 54 which is a module that outputs a solar power generation amount set as a condition in advance. And, the power measurement facility 5 (FIGS. 1 and 9) uses, instead of hardware, a power consumption condition setting unit 55 which is a module that outputs a power consumption amount set as a condition in advance.

[0140] The simulator according to this embodiment is a computer program that uses the responses output by the control response models 51 to 53, the solar power generation amount output by the solar power generation amount condition setting unit 54, and the power consumption output by the power consumption amount condition setting unit 55 as input values.

[0141] As described above, the simulator according to this embodiment performs a simulation by executing all the operations of an actual thermoelectric control system by software, and verifies the control operation of the thermoelectric control system. Then, the simulation results of the amount of power generated in each power generation facility are stored in the result storage unit 56, which is a module that stores the results of calculations. The simulation results of the amount of power generated include, for example, the trend of the amount of power generated in each power generation facility.

[0142] The simulator according to this embodiment can display the results of the executed simulation on the display device 7. A user of the simulator can refer to the simulation results on the display device 7.

[0143] Fig. 18 is a diagram showing an example of a screen displayed by the thermoelectric control simulation program according to this embodiment on the display device 7. In the example shown in Fig. 18, the power demand trend (power demand given as a simulation condition) is shown at the top of the screen, and below this power demand trend, the power generation amount trend of each power generation facility is shown as a simulation result executed by the simulator according to this embodiment.

[0144] In this simulation, data corresponding to the actual value of the power demand and data corresponding to the actual value of the solar power generation are input conditions. These data are set by the power consumption condition setting unit 55 and the solar power generation condition setting unit 54 shown in FIG.

[0145] In this heat and power control simulation, it is checked whether power supply is possible when the power demand and solar power generation amount deviate from the planned values ​​(predicted values). Fig. 18 shows an example of a simulation under the condition that the power demand value is greater than the planned value and the solar power generation amount is less than the planned value. This simulation checks whether power supply is possible under the condition that the power supply is insufficient.

[0146] As a result of the simulation, gas engine A, whose load following priority was set to 1, generated power up to the upper load limit. As a result, the load of the storage battery, whose load following priority was set to 2, was corrected, and the amount of discharge increased more than planned. However, as the amount of stored power in the storage battery decreased over time, the increase in the amount of discharge stopped (note that the amount of stored power in the storage battery is not shown in Figure 18). As a result, gas engine B, whose load following priority was set to 3, had its load corrected, and the amount of power generated increased more than planned. However, the amount of power generated by gas engine B also reached the upper load limit, and these power generation facilities were no longer able to supply power that was commensurate with the power demand that was set as a condition, and became unable to operate.

[0147] From the results of such a simulation, the user can determine that measures are needed to increase the power generation capacity of gas engines A and B or to increase the capacity of the storage battery.

[0148] As described above, by using the thermoelectric control simulation program according to this embodiment, it is possible to check whether power supply is possible for a power generation facility under the current conditions. In addition, the simulator according to this embodiment can check not only the operation verification under the condition that a deviation occurs between the predicted value and the actual value of the power demand or the amount of photovoltaic power generation as described in this embodiment, but also whether power supply is possible using other operable facilities under the condition that a facility that has broken down and is inoperable exists. Example 4

[0149] A thermoelectric control system according to a fourth embodiment of the present invention will be described. The thermoelectric control system according to this embodiment has a different controlled object from the thermoelectric control system according to the second embodiment (FIG. 9). The controlled object of the thermoelectric control system according to this embodiment is not only the power generation facility, but also the power generation facility and the heat supply facility. The following mainly describes the differences between this embodiment and the second embodiment.

[0150] 19 is a diagram showing the configuration of a thermoelectric control system according to this embodiment. The thermoelectric control system according to this embodiment includes a power generation equipment control unit 1, a heat supply equipment control unit 4, a load following priority setting unit 6, and a display device 7, and is connectable to a thermoelectric planning unit 3, local control devices 71-72, local control devices 74-75, and a power / heat metering equipment 8, and controls a plurality of cogeneration equipment 61-62 and heat supply equipment 64-65.

[0151] The objects to be controlled by the heat and power control system according to this embodiment are cogeneration facilities 61-62 and heat supply facilities 64-65. The cogeneration facilities 61-62 are combined heat and power facilities capable of supplying both heat and electricity, and are also referred to as cogeneration facilities 61-62 below. A representative example of the cogeneration facilities 61-62 is a combined heat and power facility including a gas engine for power generation, which is the object to be controlled in the first and second embodiments, and a device for generating steam in a heat exchanger using high-temperature exhaust gas. A representative example of the heat supply facilities 64-65 is a boiler.

[0152] The power generation facility control unit 1 is connected to local control devices 71-72 and controls the cogeneration facilities 61-62. The local control devices 71-72 respectively control the cogeneration facilities 61-62. The local control device 71 controls the cogeneration facility (A) 61, and the local control device 72 controls the cogeneration facility (B) 62.

[0153] The heat supply equipment control unit 4 is connected to local control devices 74-75 and controls the heat supply equipment 64-65. The local control devices 74-75 respectively control the heat supply equipment 64-65. The local control device 74 controls the heat supply equipment (A) 64, and the local control device 75 controls the heat supply equipment (B) 65.

[0154] The thermoelectric planning unit 3 corresponds to the power generation planning unit 2 in the second embodiment, and determines through optimization the loads (power generation amount and heat supply amount) of the cogeneration equipment 61-62 and the loads (heat supply amount) of the heat supply equipment 64-65 that minimize operating costs and CO2 emissions, and outputs the determined loads (planned loads) to the power generation equipment control unit 1 and the heat supply equipment control unit 4, respectively.

[0155] The electric power / heat measuring equipment 8 corresponds to the electric power measuring equipment 5 in the second embodiment, and measures the amount of electric power consumption, which is the electric power demand, and the amount of heat consumption, which is the heat demand.

[0156] Fig. 20 is a diagram showing an example of the configuration of planned load data output by the heat and power planning unit 3. The planned load data in this embodiment differs from the planned load data (Fig. 3) in embodiments 1 and 2 in that both power and heat data are included in the planned load.

[0157] In this embodiment, the heat and power planning unit 3 determines the load of each piece of equipment through optimization, using the predicted value of heat demand as a condition in addition to the predicted value of power demand.

[0158] Fig. 21 is a diagram showing an example of the configuration of load following priority data that the load following priority setting unit 6 outputs to the power generation equipment control unit 1 and the heat supply equipment control unit 4. The load following priority data in this embodiment differs from the load following priority data (Fig. 4) in embodiments 1 and 2 in that it includes load following priorities for each of the cogeneration equipment 61-62 (cogeneration equipment A-B) and the heat supply equipment 64-65 (heat supply equipment A-B).

[0159] In this embodiment, the cogeneration facilities 61-62 control the amount of power generation to match the load requirement value, but do not control the amount of heat generated. Heat is considered to be generated additionally by exhaust heat after power generation. This control method is called power-driven control. For this reason, among the facilities that supply heat, it is the heat supply facilities 64-65 such as boilers that perform load-following operation, rather than the cogeneration facilities 61-62.

[0160] The power generation equipment control unit 1 and the heat supply equipment control unit 4 respectively input the planned loads and load following priorities for power and heat, as well as the measured values ​​of power consumption and heat consumption from the power / heat measurement equipment 8, and generate control signals for the cogeneration equipment 61-62 and the heat supply equipment 64-65. The heat supply equipment control unit 4 performs the same processing as the power generation equipment control unit 1 described in the first and second embodiments, and controls the entire heat supply equipment 64-65 by using a combination of control modules set for each of the heat supply equipment 64-65.

[0161] As described above, in the thermoelectric control system of this embodiment, both the power generation equipment (cogeneration equipment 61-62) and the heat supply equipment 64-65 are controlled, and even if the power supply or heat supply becomes insufficient or excessive compared to the plan, the load can be appropriately distributed according to the operating status of the power generation equipment and the heat supply equipment, thereby improving the reliability of operation.

[0162] Furthermore, the thermoelectric control system according to this embodiment can control only the heat supply facilities 64 to 65. That is, the thermoelectric control system according to this embodiment includes the heat supply facility control unit 4 but does not include the power generation facility control unit 1, and controls only the heat supply facilities 64 to 65, so that even if the heat supply becomes insufficient or excessive relative to the plan, the load can be appropriately distributed according to the operating state of the heat supply facilities.

[0163] The present invention is not limited to the above-described embodiments, and various modifications are possible. For example, the above-described embodiments have been described in detail to clearly explain the present invention, and the present invention is not necessarily limited to an embodiment having all of the configurations described. It is also possible to replace a part of the configuration of one embodiment with the configuration of another embodiment. It is also possible to add the configuration of another embodiment to the configuration of one embodiment. It is also possible to delete a part of the configuration of each embodiment, or to add or replace another configuration. [Explanation of symbols]

[0164] 1...power generation equipment control unit, 2...power generation planning unit, 3...thermoelectricity planning unit, 4...heat supply equipment control unit, 5...power measurement equipment, 6...load following priority setting unit, 7...display device, 8...power / heat measurement equipment, 11...data acquisition unit, 12...control logic unit, 13...control module priority setting unit, 21...load following mode setting unit, 22...load estimation unit, 23...load correction value addition unit, 24...range deviation calculation unit, 25...division processing unit, 26...range setting unit, 27 ...start / stop judgment unit, 31-33...power generation equipment, 34...renewable energy equipment, 41-43...local control device, 44...local control device, 51-53...control response model, 54...solar power generation condition setting unit, 55...power consumption condition setting unit, 56...result storage unit, 61-62...cogeneration equipment, 64-65...heat supply equipment, 71-72...local control device, 74-75...local control device, 121-123...control module.

Claims

1. A control unit that controls a plurality of facilities including at least one of a power generation facility and a heat supply facility; a load following priority setting unit that stores a priority for load following for each of the facilities; Equipped with The control unit includes a plurality of control modules that control each of the facilities, The control module includes: A planned load value, which is a planned load of the equipment, is input, and a load correction value, which is a value for correcting the load, is input from the control module that controls the equipment with the higher priority; The load correction value is used to correct the value of the planned load to obtain an adjusted load; Executing a range limiter process to match the adjusted load to a load range of the equipment controlled by the control module; The adjusted load after the range limiter processing is output as a load requirement value of the equipment, and a value at which the adjusted load exceeds the load range is output as the load correction value to the control module that controls the equipment having a lower priority. A thermoelectric control system comprising:

2. The load following priority setting unit, A difference between the actual value of the load demand and the value of the planned load; A difference between the amount of power generated by the facility and the actual value of the load demand when the facility is a renewable energy facility; and The amount of stored electricity in the facility when the facility is a storage battery; and The time period during which the facility operates; and When the facility is a power generation facility, the power generation efficiency of the facility; and The cumulative time during which the load following operation of the equipment has been performed; and changing the priority in response to at least one of the pieces of information. The thermoelectric control system of claim 1 .

3. A display device is provided, The display device displays the current priority for each of the facilities. The thermoelectric control system of claim 1 .

4. A display device is provided, The display device includes: Among the information, a value used by the load following priority setting unit to change the priority is displayed, and displaying an operation mode of the equipment determined from at least one of the information; The thermoelectric control system of claim 2 .

5. A thermoelectric control simulation program for causing a computer to realize the functions of the control unit, the load following priority setting unit, and the control module of the thermoelectric control system according to claim 1.

6. a control response model outputs a response of the equipment to the load demand value and a control signal for the equipment; The response output by the control response model is used as an input value. The thermoelectric control simulation program according to claim 5 .

Citation Information

Patent Citations

  • Control method for distributed power supply