Fixture

The fitting system integrates frames with different configurations using common shoji-side frames and adaptable frame-side frames, reducing installation costs and preventing rattling.

JP2024162520APending Publication Date: 2024-11-21LIXIL CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023078085
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-10
Publication Date
2024-11-21

AI Technical Summary

Technical Problem

The installation of shoji screens in openings with different fitting configurations requires separate frames for each configuration, leading to increased costs.

Method used

A fitting system comprising a frame body and a shoji screen that includes a frame-side joint and a shoji-side joint, allowing integration of frames with different configurations using common shoji-side frames and adaptable frame-side frames.

Benefits of technology

This system reduces costs by allowing a common shoji screen to be installed in frames with varying configurations, while suppressing rattling through directional restrictions and secure connections.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024162520000001_ABST
    Figure 2024162520000001_ABST
Patent Text Reader

Abstract

To provide a fixture capable of reducing a cost when placing a common shoji screen in the opening of multiple building frames that include different fitting configurations.SOLUTION: A fixture 1 includes: a frame that is fixed to an opening 7 of a building frame according to an arbitrary shape of the opening 7; and a sash (door body 4) placed inside the frame. The frame includes: building frame side frames (building frame side top frames 70, 77, and building frame side bottom frames 74, 78) that are fixed to the opening 7 according to the arbitrary shape of the opening 7; and sash side frames (sash side top frame 80, sash side bottom frame 84) that are attached to the building frame side frame placed at the sash side. The building frame side frame has a building frame side joint, and the sash side frame is attached to the building frame side joint. The frame also has a sash side joint that unifies the building frame side frame and the sash side frame in this combined state.SELECTED DRAWING: Figure 6
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to building materials. [Background technology]

[0002] Conventionally, there is known a fitting that includes a frame body that is placed in an opening of a building frame and a paper screen that is placed inside the frame body. The frame body is generally framed in a rectangular shape by upper and lower frames that are arranged vertically and extend in the width direction, and a pair of vertical frames that are arranged on the left and right and extend in the up and down direction, and each frame member is generally made of a single shaped material (for example, see Patent Document 1). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2023-31758 A Summary of the Invention [Problem to be solved by the invention]

[0004] When installing multiple shoji screens with a common structure at multiple openings in a building frame, if the openings have different fitting structures (such as the shape and number of components that make up the fitting structure), it is necessary to prepare a frame body that corresponds to the fitting structure of each different opening, which leads to a rise in costs. Therefore, the purpose of this disclosure is to provide a fitting that can reduce costs when arranging a common shoji screen at multiple openings in a building frame that have different fitting structures. [Means for solving the problem]

[0005] The present disclosure relates to a fitting comprising a frame body fixed to an opening in a main body in correspondence with any shape of the opening, and a shoji screen arranged inside the frame body, wherein the frame body includes a main body side frame body fixed to an opening in correspondence with any shape of the opening, and a shoji screen side frame body attached to the main body side frame body and arranged on the shoji screen side, the main body side frame body having a main body side joint, and the shoji screen side frame body having a shoji screen side joint that is joined to the main body side joint and that makes the main body side frame body and the shoji screen side frame body one unit in the joined state. [Brief description of the drawings]

[0006] [Figure 1] FIG. 2 is a diagram showing the fitting according to the embodiment as seen from the outside of the room. [Diagram 2] FIG. 2 is a diagram showing the fitting according to the embodiment as seen from the inside of the room. [Diagram 3] This is an oblique view of a fitting according to an embodiment, showing the upper and lower shoji screens of the fitting in the open state. [Figure 4] 4 is a partially cutaway cross-sectional view corresponding to line IV-IV in FIG. 2. [Diagram 5] FIG. 5 is an enlarged view of part V in FIG. [Figure 6] FIG. 5 is an enlarged view of a portion VI in FIG. [Figure 7] 5 is a cross-sectional view showing another upper frame of an embodiment that is placed on a body having a different fitting shape from the fitting shape of the body shown in FIG. [Figure 8] 5 is a cross-sectional view showing another lower frame of an embodiment that is placed on a body having a different fitting shape from the fitting shape of the body shown in FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0007] Hereinafter, the embodiments will be described with reference to the drawings. In this specification, the term "appearance direction" refers to the face direction of a shoji screen in a fitting placed in an opening formed in a building, and the term "projection direction" refers to the thickness direction (depth direction) of the shoji screen. Furthermore, the term "width direction" refers to the left-right direction when the shoji screen is viewed from the front, and the term "up-down direction" refers to the up-down direction when the shoji screen is viewed from the front. Furthermore, "parallel" includes not only perfect parallelism but also substantial parallelism within a certain margin of error. Furthermore, "vertical" includes not only perfect verticality but also substantial verticality within a certain margin of error.

[0008] Fig. 1 is a view of the fitting 1 of the embodiment as seen from the outside of the room. Fig. 2 is a view of the fitting 1 as seen from the inside of the room. Fig. 3 is a perspective view showing the upper and lower shoji screens 5 and 6 of the fitting 1 in an open state.

[0009] First, the basic configuration of the fitting 1 will be described with reference to Figs. 1 to 3. The fitting 1 of the embodiment is a door such as a back door. The fitting 1 is placed in a vertically long rectangular opening 7 formed in a building. The fitting 1 comprises a frame body 20 attached to the opening 7 of the building, and a door body 4 serving as a shoji screen that is arranged inside the frame body 20 so as to be able to be opened and closed. The door body 4 is a so-called swing door, one side of which is hinged to the frame body 20.

[0010] The frame body 20 is framed in a rectangle by an upper frame 21A and a lower frame 22A arranged above and below, respectively, a vertical frame 23 on the hanging side, and a vertical frame 24 on the door end side. The upper frame 21A and the lower frame 22A are an example of a frame body according to the present disclosure, and extend in the width direction (left and right direction). Each of the vertical frames 23, 24 extends in the up and down direction. The door body 4 comprises a swing frame 40, and an upper shoji screen 5 and a lower shoji screen 6 that are fitted into the swing frame 40.

[0011] The swing frame 40 is framed in a rectangle by an upper swing frame 41, a lower swing frame 42, a swing vertical frame 43 on the hanging side, and a swing vertical frame 44 on the door end side. The swing vertical frame 44 on the door end side has a doorknob 8a at approximately the center in the height direction. Locks (not shown) are placed above and below the doorknob 8a on the indoor side. As shown in FIG. 2, the swing vertical frame 44 on the door end side has thumb turns 8b, 8c that open and close the locks. By rotating the thumb turns 8b, 8c, a deadbolt (not shown) can be operated to lock the door body 4.

[0012] The upper shoji 5 comprises a frame 50 and glass 55 fitted and fixed into the frame 50. The frame 50 is assembled into a rectangle by an upper frame 51, a lower frame 52, a vertical frame 53 on the hanging side, and a vertical frame 54 on the door end side. The lower shoji 6 comprises a frame 60 and glass 65 fitted and fixed into the frame 60. The frame 60 is assembled into a rectangle by an upper frame 61, a lower frame 62, a vertical frame 63 on the hanging side, and a vertical frame 64 on the door end side.

[0013] The upper and lower screens 5 and 6 have a ventilation window structure. Specifically, the lower screen 6 is provided so as to be movable in the forward and vertical directions within the swing frame 40, or in the forward direction. That is, when the lower screen 6 is pulled up while being pulled toward the room, the lower screen 6 moves in the forward direction (toward the room) and in the forward direction (upward), and when the lower screen 6 is subsequently pulled up, the lower screen 6 moves only in the vertical direction. The upper and lower screens 5 and 6 have a so-called flat slide structure. That is, when the ventilation window formed by the upper screen 5 and the lower screen 6 is closed, the lower screen 6 is disposed in the same plane below the upper screen 5.

[0014] The fitting 1 can communicate between the outside and the inside of the room and let in air by moving the upper door 5 downward and the lower door 6 upward along the vertically extending swing vertical frames 43 and 44. The upper frame 61 of the frame body 60 has a pair of slide locks 8d for fixing the lower door 6 in the closed state. The pair of slide locks 8d are located at both ends of the upper frame 61, on the door end side and the hanging side, respectively.

[0015] The door body 4 can be opened by grasping the doorknob 8a from inside the room and rotating it counterclockwise, operating the deadbolt (not shown), pushing the swing vertical frame 44 on the door end side to the outside of the room, and rotating the door body 4 via a hinge (not shown).

[0016] The glass 55 of the upper shoji screen 5 and the glass 65 of the lower shoji screen 6 are, for example, double-glazed glass having a plurality of (eg, three) glass sheets and excellent heat insulation properties, but are not limited to this.

[0017] The above is the basic configuration of the fitting 1 of the embodiment. Next, the upper frame 21A and the lower frame 22A according to the embodiment of the present disclosure will be described in detail with reference to Figs. 4 to 8. Fig. 4 is a vertical cross-sectional view of the fitting 1, and is a cross-sectional view corresponding to the line IV-IV in Fig. 2. Note that Fig. 4 omits the illustration of the upper and lower shoji screens 5 and 6. Fig. 5 is an enlarged view of a portion V in Fig. 4. Fig. 6 is an enlarged view of a portion VI in Fig. 4. Figs. 7 and 8 are cross-sectional views showing an upper frame and a lower frame that can be applied to a frame having a different fitting configuration with the door body 4, and Fig. 7 corresponds to Fig. 5, and Fig. 8 corresponds to Fig. 6.

[0018] FIG. 4 shows the upper body 2A and the lower body 3A, which are not shown in FIG. 2. The upper body 2A includes an upper body frame 210A arranged above the upper frame 21A, an indoor body frame 220A arranged on the indoor side of the upper frame 21A, and a wall material 230A. The upper frame 21A is fixed to the upper body frame 210A, the indoor body frame 220A, and the wall material 230A. The lower body 3A includes a lower body frame 310A arranged below the lower frame 22A, and a floor material 320A. The lower frame 22A is fixed to the lower body frame 310A and the floor material 320A. Similarly, FIG. 5 and FIG. 6 show the upper body 2A and the lower body 3A, respectively.

[0019] (Top frame 21A) As shown in Figures 4 and 5, the upper frame 21A is composed of two members, a body-side upper frame 70 and a shoji-side upper frame 80. The body-side upper frame 70 is disposed on the upper body frame 210A side of the upper body 2A and is fixed to this upper body frame 210A. The shoji-side upper frame 80 is disposed on the door body 4 side, inside the body-side upper frame 70 in the viewing direction.

[0020] (Upper frame 70 on the body side of upper frame 21A) As shown in Fig. 5, the main body side upper frame 70 is fixed to the upper main body frame 210A with screws 101. The main body side upper frame 70 is a shaped member made of aluminum or the like, and includes a flat base portion 710 parallel to the projection direction, an outer end portion 720 on the outdoor side of the base portion 710, and an inner end portion 730 on the indoor side of the base portion 710. Tapping holes 711, 712 are formed between the base portion 710 and the outer end portion 720, and between the base portion 710 and the inner end portion 730, respectively.

[0021] The outer end portion 720 includes a pair of upper and lower plates 721 and 722 that are parallel to the forward direction, and a connecting plate portion 723 that connects the upper plate portion 721 and the lower plate portion 722 and is parallel to the forward direction. A pair of upper and lower positioning pieces 723a, 723b extend from the upper end and center of the connecting plate portion 723 toward the indoor side. A first engagement groove 724 that opens toward the indoor side is formed at the lower end of the connecting plate portion 723. The screw 101 is passed between the positioning pieces 723a, 723b of the connecting plate portion 723 from the outside of the room and screwed into the upper body frame 210A.

[0022] The inner end portion 730 includes a connecting plate portion 731 parallel to the projection direction, and a hanging portion 732 hanging down from the lower end of the connecting plate portion 731 on the indoor side. The connecting plate portion 731 is formed below the base portion 710. A second engagement groove 733 opening to the indoor side is formed on the outdoor side of the connecting plate portion 731, which corresponds to the lower end of the tapping hole portion 712. A first engagement piece 734 protruding to the outdoor side is formed at the lower end of the hanging portion 732. The connecting plate portion 731, the first engagement groove 724, and the second engagement groove 733 are an example of a body side connecting portion of the present disclosure.

[0023] (Upper frame 21A, upper frame 80 on the shoji side) As shown in Fig. 5, the shoji-side upper frame 80 is fixed to the indoor-side main body frame 220A via a mounting frame material 90 with screws 102. The shoji-side upper frame 80 is a shaped member made of aluminum or the like with a roughly L-shaped cross section, and includes a base portion 810 parallel to the projection direction, a hanging portion 811 hanging downward from the indoor-side end of the base portion 810, and a connecting plate portion 813 located above the hanging portion 811 and on the indoor side.

[0024] The base portion 810 has a tip fitting portion 814 formed at its outdoor end to fit into the first engagement groove 724 of the upper frame 70 on the main body side. The upper end of the hanging portion 811 has a rib-shaped protrusion 815 protruding toward the indoor side. The hanging portion 811 has an airtight material mounting portion 816 formed at its outdoor end at its lower end, to which an airtight material 817 is mounted. The airtight material 817 abuts against the indoor side surface of the swing upper frame 41 in the closed state of the door body 4. The connecting plate portion 813 has a protrusion 818 formed at its outdoor end to protrude toward the outdoor side and fit into the second engagement groove 733 of the upper frame 70 on the main body side. The connecting plate portion 813, the tip fitting portion 814, and the protrusion 818 are examples of the shoji side connecting portion of the present disclosure.

[0025] (Mounting frame material 90) The mounting frame material 90 is, for example, a resin shaped material, and is fixed to the indoor body frame 220A and the wall material 230A. The mounting frame material 90 includes a first fixing part 910 arranged parallel to the hanging part 811 of the shoji-side upper frame 80 facing the indoor side, and a second fixing part 920 extending vertically from the upper end of the first fixing part 910 to the indoor side. The second fixing part 920 has a pair of front and rear elastic pieces 921, 922 extending upward. Of these elastic pieces 921, 922, the upper end of the outdoor elastic piece 921 is formed with a first engagement end 921a that elastically engages with the protrusion 815 of the hanging part 811 of the shoji-side upper frame 80. A second engagement end 922a that elastically engages with the first engagement piece 734 of the hanging portion 732 of the upper frame 70 on the main body side is formed at the upper end of the elastic piece 922 on the indoor side.

[0026] The first fixing portion 910 is fixed to the indoor side body frame 220A by a screw 102 passing through the indoor side body frame 220A from the indoor side and screwing the screw 102 into the hanging portion 811 of the shoji side upper frame 80. In this way, the shoji side upper frame 80 is fixed to the indoor side body frame 220A via the mounting frame material 90. The second fixing portion 920 is fixed to the wall material 230A by a screw 103 passing through the indoor side end of the second fixing portion 920 from the inside in the front direction and screwing the screw 103 into the wall material 230A via the mounting member 103a.

[0027] (Assembly and construction of upper frame 21A) The leading end insertion portion 814 of the shoji-side upper frame 80 is fitted into and engaged with the first engagement groove 724 of the frame body-side upper frame 70, and the protrusion 818 of the shoji-side upper frame 80 is fitted into and engaged with the second engagement groove 733 of the frame body-side upper frame 70. Then, the joining plate portion 731 of the frame body-side upper frame 70 and the joining plate portion 813 of the shoji-side upper frame 80 are crimped together. In other words, the upper frame 21A has a crimped joining portion 400 at which the frame body-side upper frame 70 and the shoji-side upper frame 80 are joined by crimping. In this way, the upper frame 21A is assembled. Next, the first engagement end 921a of the mounting frame material 90 engages with the protrusion 815 of the shoji-side upper frame 80, and the second engagement end 922a of the mounting frame material 90 engages with the first engagement piece 734 of the framework-side upper frame 70, and the mounting frame material 90 is assembled into the upper frame 21A. The framework-side upper frame 70, the shoji-side upper frame 80 and the mounting frame material 90 are assembled in this manner in advance in a factory or the like, and are transported to the construction site and constructed as necessary.

[0028] During construction, positioning pieces 723a, 723b of outer end 720 of main body side upper frame 70 are abutted against the corresponding exterior surface of upper main body frame 210A to position it, and outer end 720 is fastened to upper main body frame 210A with screws 101. In addition, first fixing portion 910 of mounting frame material 90 and hanging portion 811 of shoji side upper frame 80 are fastened to interior main body frame 220A with screws 102, and the indoor end of mounting frame material 90 is fastened to wall material 230A with screws 103 via mounting member 103a.

[0029] The tip fitting portion 814 of the shoji-side upper frame 80 is fitted into and engaged with the first engagement groove 724 of the frame 70 on the main body side, and the protruding portion 818 of the shoji-side upper frame 80 is fitted into and engaged with the second engagement groove 733 of the frame 70 on the main body side, thereby restricting the vertical movement of the shoji-side upper frame 80 and the frame 70 on the main body side. In addition, the upper frame 21A is crimped to the connecting plate portion 731 of the frame 70 on the main body side and the connecting plate portion 813 of the shoji-side upper frame 80, so that the movement of the shoji-side upper frame 80 and the frame 70 on the main body side in the projection direction and the width direction (the direction intersecting the crimping direction) is also restricted. This makes it possible to suppress rattling between the shoji-side upper frame 80 and the frame 70 on the main body side.

[0030] (Bottom frame 22A) Next, the bottom frame 22A will be described with reference to Figures 4 and 6. The bottom frame 22A is composed of two members, a main body side bottom frame 74 and a shoji side bottom frame 84. The main body side bottom frame 74 is disposed on the lower main body frame 310A side and fixed to this lower main body frame 310A. The shoji side bottom frame 84 is disposed on the door body 4 side, inside the main body side bottom frame 74 in the view direction.

[0031] (Bottom frame 74 on the body side of bottom frame 22A) 6, the main body side lower frame 74 is fixed to the lower main body frame 310A with screws 104. The main body side lower frame 74 is a shaped member made of aluminum or the like, and includes a flat base portion 740 parallel to the projection direction, an outer end portion 750 disposed on the outdoor side of the base portion 740, and an inner end portion 760 disposed on the indoor side of the base portion 740.

[0032] The outer end 750 includes an inclined portion 751 that inclines downward from the outer end of the base portion 740, a hanging portion 752 that hangs down from the lower end of the inclined portion 751, a pair of upper and lower plate portions 753 and 754 that extend from the upper and lower ends of the hanging portion 752 to the outer side of the room, a pair of upper and lower positioning pieces 755 that extend from the hanging portion 752 to the indoor side, and a tapping hole portion 756 provided in the inclined portion 751. A protruding portion 757 that protrudes to the outer side of the room is formed on the outer side of the tapping hole portion 756. A communication hole 758 is provided between the tapping hole portion 756 and the upper end of the inclined portion 751. A plurality of communication holes 758 are arranged at intervals in the width direction of the fitting 1 (the front and back direction of the paper in FIG. 5). The screw 104 is passed between the upper and lower positioning pieces 755 of the hanging portion 752 from the outer side of the room and screwed into the lower body frame 310A.

[0033] The inner end portion 760 includes an inclined portion 761 inclined upward from the end portion on the indoor side of the base portion 740, a connecting plate portion 762 extending from the upper end of the inclined portion 761 to the indoor side in parallel with the projection direction, and an inner end plate portion 763 extending vertically from the end portion on the indoor side of the connecting plate portion 762 in parallel with the projection direction. Tapping holes 764 and 765 are provided at both ends of the inclined portion 761. A positioning piece 764a is formed at the lower portion of the tapping hole portion 764, which abuts against the lower body frame 310A to determine the vertical position of the body side lower frame 74. A second engagement piece 766 having an L-shaped cross section that protrudes to the outdoor side is formed at the vertical center of the inner end plate portion 763. A third engagement piece 767 that protrudes to the outdoor side is formed at the upper portion of the inner end plate portion 763. The lower end of the inner end plate portion 763 abuts against the upper surface of the floor material 320A, thereby determining the vertical position of the body-side lower frame 74. The protrusion portion 757, the connecting plate portion 762, and the second engagement piece 766 are an example of a body-side connecting portion of the present disclosure.

[0034] (Bottom frame 22A, Shoji side bottom frame 84) The shoji-side bottom frame 84 is a shaped member made of aluminum or the like with a generally L-shaped cross section, and includes a base portion 840 parallel to the projection direction, and an inside end portion 842 on the indoor side of the base portion 840. An outdoor end engaging groove 841 is formed at the outdoor end of the base portion 840, into which the protruding portion 757 of the frame-side bottom frame 74 fits.

[0035] The inner end 842 has a generally L-shaped cross section and includes a first connecting plate portion 843 parallel to the projection direction and a second connecting plate portion 846 rising upward from the outdoor end of the first connecting plate portion 843. An indoor end of the first connecting plate portion 843 is formed with an indoor end engaging piece 844 that engages with the second engaging piece 766 of the frame-side lower frame 74. A third engaging groove 847 that opens to the outdoor side is formed at the lower end of the second connecting plate portion 846. The outdoor end engaging groove 841, the first connecting plate portion 843, and the indoor end engaging piece 844 are an example of a shoji side connecting portion of the present disclosure.

[0036] A mounting frame material 94 is attached to the shoji-side lower frame 84. The mounting frame material 94 is, for example, a resin shaped material, and includes an upper plate portion 941 parallel to the projection direction, an exterior hanging portion 942 hanging from the exterior end of the upper plate portion 941, and an interior hanging portion 943 hanging from the interior end of the upper plate portion 941. An airtight material mounting portion 944 is formed at the exterior upper end of the mounting frame material 94, and an airtight material 945 is mounted on this airtight material mounting portion 944. The airtight material 945 abuts against the interior surface of the swing lower frame 42 of the door body 4 in the closed state. An engagement protrusion 946 that engages with the third engagement groove 847 of the shoji-side lower frame 84 is formed at the lower end of the exterior hanging portion 942. A fourth engagement piece 947 that engages with the third engagement piece 767 of the body side lower frame 74 is formed on the indoor side of the vertical center of the indoor side hanging portion 943.

[0037] (Assembly and construction of lower frame 22A) The protrusion 757 of the frame-side sill 74 engages with the outside-facing tip engagement groove 841 of the frame-side sill 84, and the inside-facing tip engagement piece 844 of the frame-side sill 84 engages with the second engagement piece 766 of the frame-side sill 74. Then, the connecting plate portion 762 of the frame-side sill 74 and the first connecting plate portion 843 of the frame-side sill 84 are crimped together. In other words, the frame 22A has a crimped connection portion 410 at which the frame-side sill 74 and the frame-side sill 84 are crimped together. In this way, the frame 22A is assembled. Furthermore, the engaging protrusion 946 of the mounting frame material 94 engages with the third engaging groove 847 of the shoji-side bottom frame 84, and the fourth engaging piece 947 of the mounting frame material 94 engages with the third engaging piece 767 of the shoji-side bottom frame 84, so that the mounting frame material 94 is incorporated into the bottom frame 22A. The body-side bottom frame 74, the shoji-side bottom frame 84 and the mounting frame material 94 are assembled in this manner in advance at a factory or the like, and, if necessary, transported to the construction site for construction.

[0038] In construction, the positioning pieces 764a and the lower end of the inner end plate portion 763 of the skeleton-side lower frame 74 are abutted against the upper surfaces of the lower skeleton frame 310A and the floor material 320A, respectively, and in this state, the outer end portion 750 of the skeleton-side lower frame 74 is fastened to the lower skeleton frame 310A by the screws 104. In addition, the fixing plate material 110 fitted from above into the skeleton-side lower frame 74 and the mounting frame material 94 is fixed to the floor material 320A by the screws 105 via the mounting members 105a.

[0039] The protrusion 757 of the frame-side bottom frame 74 is fitted into and engaged with the outer end engagement groove 841 of the shoji-side bottom frame 84, and the inner end engagement piece 844 of the shoji-side bottom frame 84 is engaged with the second engagement piece 766 of the frame-side bottom frame 74, thereby restricting the vertical movement of the shoji-side bottom frame 84 and the frame-side bottom frame 74. In addition, the joint plate portion 762 of the frame-side bottom frame 74 and the first joint plate portion 843 of the shoji-side bottom frame 84 are crimped together, so that the movement of the shoji-side bottom frame 84 and the frame-side bottom frame 74 in the projection direction and width direction (direction intersecting the direction of the crimping joint) is also restricted. This makes it possible to suppress rattling between the shoji-side bottom frame 84 and the frame-side bottom frame 74.

[0040] (Upper frame 21B and lower frame 22B applied to different structures) Next, referring to Figures 7 and 8, we will explain the upper frame 21B and the lower frame 22B that are attached to a skeleton having a different configuration from the skeleton shown in Figures 4 to 6. As shown in Figure 7, the upper frame 21B is attached to the upper skeleton 2B. As shown in Figure 8, the lower frame 22B is attached to the lower skeleton 3B.

[0041] The upper structure 2B includes an upper structure frame 210B arranged above the upper frame 21B, an indoor structure frame 220B arranged on the indoor side of the upper frame 21B, and a wall material 230B. The upper frame 21B is fixed to the upper structure frame 210B, the indoor structure frame 220B, and the wall material 230B. The lower structure 3B includes a floor material 310B arranged below the lower frame 22B, and a floor material 320B arranged on the indoor side of the lower frame 22B. The lower frame 22B is fixed to the floor materials 310B and 320B.

[0042] (Top frame 21B) The upper frame 21B is composed of two components, the frame body-side upper frame 77 and the above-mentioned shoji-side upper frame 80. That is, the shoji-side upper frame of the upper frame 21B is common to the upper frame 21A. The mounting frame material 90 is also a common component. Therefore, we will explain the frame body-side upper frame 77, which has a different configuration from the above-mentioned frame body-side upper frame 70, and will omit or simplify the explanation of the other common components.

[0043] (Upper frame 77 on the body side of upper frame 21B) 7, the main body side upper frame 77 is disposed on the upper main body frame 210B side of the upper main body 2B, and is fixed to this upper main body frame 210B with screws 106. The main body side upper frame 77 is a shaped member made of aluminum or the like, and includes a flat base portion 770 parallel to the projection direction, an outer end portion 771 on the outdoor side of the base portion 770, and an inner end portion 775 on the indoor side of the base portion 770.

[0044] The outer end portion 771 includes a cylindrical portion 772 having a generally trapezoidal cross section, and a fixing portion 773 above the cylindrical portion 772. A fourth engagement groove 772a is formed at the lower end of the cylindrical portion 772 into which the tip insertion portion 814 of the shoji-side upper frame 80 fits and engages. A tapping hole portion 774 is formed between the cylindrical portion 772 and the fixing portion 773. The fixing portion 773 abuts against a mounting member 240B arranged on the outdoor side of the upper body frame 210B.

[0045] The inner end 775 is a portion that hangs down from the room-side end of the base portion 770, and has a tapping hole portion 776. A fifth engagement groove 777 into which the protrusion 818 of the shoji-side upper frame 80 fits and engages is formed at the lower end of the inner end 775. The fourth engagement groove 772a and the fifth engagement groove 777 are an example of a body-side joint of the present disclosure.

[0046] (Assembly and construction of upper frame 21B) The leading end insertion portion 814 of the shoji-side upper frame 80 is fitted into and engaged with the fourth engagement groove 772a of the frame body-side upper frame 77, and the protrusion 818 of the shoji-side upper frame 80 is fitted into and engaged with the fifth engagement groove 777 of the frame body-side upper frame 77. Then, the connecting plate portion 731 of the frame body-side upper frame 77 and the connecting plate portion 813 of the shoji-side upper frame 80 are crimped together. In other words, the upper frame 21B has a crimped connecting portion 420 at which the frame body-side upper frame 77 and the shoji-side upper frame 80 are crimped together. In this way, the upper frame 21B is assembled.

[0047] The fixing portion 773 of the main body side upper frame 77 is fastened to the upper main body frame 210B via the mounting member 240B with a screw 106 passed through from the inside of the room. The connecting plate portion 813 of the shoji side upper frame 80 is fastened to the upper main body frame 210B with a screw 107 passed through from the inside of the front view. The hanging portion 811 of the shoji side upper frame 80 is fastened to the inside main body frame 220B together with the mounting frame material 90 with a screw 102 passed through from the inside of the room. In addition, the second fixing portion 920 of the mounting frame material 90 is fixed to the wall material 230B via the mounting member 103a with a screw 103.

[0048] The leading end insertion portion 814 of the shoji-side upper frame 80 is fitted and engaged with the fourth engagement groove 772a of the frame body-side upper frame 77, and the protrusion 818 of the shoji-side upper frame 80 is fitted and engaged with the fifth engagement groove 777 of the frame body-side upper frame 77, thereby restricting the vertical movement of the shoji-side upper frame 80 and the frame body-side upper frame 77. In addition, the joint plate portion 731 of the frame body-side upper frame 77 and the joint plate portion 813 of the shoji-side upper frame 80 are crimped together, so that the movement of the shoji-side upper frame 80 and the frame body-side upper frame 77 in the projection direction and width direction (direction intersecting the crimping direction) is also restricted. This makes it possible to suppress rattling between the shoji-side upper frame 80 and the frame body-side upper frame 77.

[0049] (Bottom frame 22B) The bottom frame 22B is composed of two components, the frame body side bottom frame 78 and the above-mentioned shoji side bottom frame 84. That is, the shoji side bottom frame of the bottom frame 22B is common to the frame body side bottom frame 22A. The mounting frame material 94 is also a common component. Therefore, we will explain the frame body side bottom frame 78, which has a different configuration from the above-mentioned frame body side bottom frame 74, and will omit or simplify the explanation of the other common components.

[0050] (Bottom frame 78 on the body side of bottom frame 22B) 8, the skeleton-side lower frame 78 is fixed to the floor material 310B of the lower skeleton 3B with screws 108. The skeleton-side lower frame 78 is a shaped member made of aluminum or the like, and includes a flat base portion 780 parallel to the projection direction, an outer end portion 781 disposed on the outdoor side of the base portion 780, and an inner end portion 785 disposed on the indoor side of the base portion 780.

[0051] The outer end 781 includes a cylindrical portion 782 located below the base portion 780 and continuing to the base portion 780, a fixing portion 783 extending downward from the lower end of the cylindrical portion 782 on the indoor side, and an engagement piece portion 784 extending upward from the upper end of the cylindrical portion 782 on the indoor side. A sixth engagement groove 784a is formed at the upper end of the engagement piece portion 784 into which the outdoor side tip engagement groove 841 of the shoji side lower frame 84 fits and engages. A tapping hole portion 782a is formed at the upper end of the cylindrical portion 782 on the indoor side.

[0052] The inner end portion 785 includes an inclined portion 786 inclined upward from the end portion on the indoor side of the base portion 780, a connecting plate portion 787 extending from the upper end of the inclined portion to the indoor side and parallel to the projection direction, and an inner end plate portion 788 extending vertically from the end portion on the indoor side of the connecting plate portion 787 and parallel to the projection direction. Tapping holes 786a and 786b are provided at both ends of the inclined portion 786. An eighth engagement piece 788a having an L-shaped cross section and protruding to the outdoor side is formed at the center of the vertical direction of the inner end plate portion 788. A ninth engagement piece 788b protruding to the outdoor side is formed at the upper portion of the inner end plate portion 788. The sixth engagement groove 784a, the connecting plate portion 787, and the eighth engagement piece 788a are examples of the body side connecting portion of the present disclosure.

[0053] The frame 78 has a plurality of positioning pieces 78a, 78b, 78c, and 78d that correspond to the floor material 310B and allow the frame 78 to be positioned on the floor material 310 from the outside of the room. The positioning pieces 78a and 78b are provided in pairs on the inside of the fixing portion 783, one above the other, and abut against the surface of the outside of the room of the floor material 310B. The positioning piece 78c extends downward from the tapping hole portion 786a and abuts against the upper surface of the floor material 310B. The positioning piece 78d constitutes the lower end of the inner end plate portion 788 and abuts against the upper surface of the floor material 310B. The frame 78 is positioned relative to the lower frame 3B when the tips of the positioning pieces 78a, 78b, 78c, and 78d abut against the floor material 310B. The body side lower frame 78 is fastened to the floor material 310B by passing the screws 108 through the fixing parts 783 from the outside of the room and screwing them into the floor material 310B.

[0054] (Assembly and construction of lower frame 22B) The outside leading end engagement groove 841 of the shoji side sill 84 engages with the sixth engagement groove 784a of the frame-side sill 78, and the inside leading end engagement piece 844 of the shoji side sill 84 engages with the eighth engagement piece 788a of the frame-side sill 78. Then, the connecting plate portion 787 of the frame-side sill 78 and the first connecting plate portion 843 of the shoji side sill 84 are crimped together. In other words, the sill 22B has a crimped connection portion 430 at which the frame-side sill 78 and the shoji side sill 84 are crimped together. In this way, the sill 22B is assembled. Furthermore, the engaging protrusion 946 of the mounting frame material 94 engages with the third engaging groove 847 of the shoji-side bottom frame 84, and the fourth engaging piece 947 of the mounting frame material 94 engages with the ninth engaging piece 788b of the shoji-side bottom frame 84, so that the mounting frame material 94 is incorporated into the bottom frame 22B. The body-side bottom frame 78, the shoji-side bottom frame 84 and the mounting frame material 94 are assembled in this manner in advance at a factory or the like, and are transported to the construction site and constructed as necessary.

[0055] During construction, the outer end 781 of the main body side lower frame 78 is fastened to the floor material 310B by screws 108, and the fixing plate material 110 fitted from above into the main body side lower frame 78 and the mounting frame material 94 is fixed to the floor material 320B via the mounting member 105a by screws 105.

[0056] The sixth engagement groove 784a of the frame-side sill 78 engages with the outer end engagement groove 841 of the shoji-side sill 84, and the eighth engagement piece 788a of the frame-side sill 78 engages with the inner end engagement piece 844 of the shoji-side sill 84, restricting the vertical movement of the shoji-side sill 84 and the frame-side sill 78. In addition, the joint plate 787 of the frame-side sill 78 and the first joint plate 843 of the shoji-side sill 84 are crimped together, restricting the movement of the shoji-side sill 84 and the frame-side sill 78 in the projection direction and width direction (direction intersecting the crimping direction). This makes it possible to suppress rattling between the shoji-side sill 84 and the frame-side sill 78.

[0057] The above is an embodiment. In this embodiment, the upper frame is attached to the upper frame 2A (Fig. 5) and the upper frame 21B is attached to the upper frame 2B (Fig. 7) for the upper frame 2A and the upper frame 21B, which have different fitting configurations for the door body 4. The upper frame 21A is configured by combining two members, a frame-side upper frame 70 corresponding to the upper frame 2A and a shoji-side upper frame 80 corresponding to the door body 4. On the other hand, the upper frame 21B is configured by combining the frame-side upper frame 77 corresponding to the upper frame 2B and the shoji-side upper frame 80, with the frame-side upper frame 77 and the shoji-side upper frame 80 being a common member. In this way, by making the screen-side upper frame 80 on the door body 4 common and the frame on the main body corresponding to each upper main body, manufacturing efficiency is better than when the entire frame is made from a single shaped material. In other words, the screen-side upper frame 80 on the door body 4 is mass-produced, and the main body-side upper frame can be assembled into the screen-side upper frame 80 and manufactured individually to the required shape to correspond to any upper main body. This helps to prevent costs from rising.

[0058] The same is true for the bottom frame. That is, for the lower body 3A and the lower body 3B, which have different fitting configurations for the door body 4, a bottom frame 22A is attached to the lower body 3A (Fig. 6), and a bottom frame 22B is attached to the lower body 3B (Fig. 8). The bottom frame 22B is configured by combining two members: a body-side bottom frame 78 corresponding to the lower body 3B, and a shoji-side bottom frame 84 corresponding to the door body 4. On the other hand, the body-side bottom frame 78 corresponding to the lower body 3B has a different configuration from the body-side bottom frame 74 of the bottom frame 22A, but the shoji-side bottom frame 84 is a common member, and the body-side bottom frame 78 and the shoji-side bottom frame 84 are combined. In this way, by making the shoji-side bottom frame 84 on the door body 4 common and the frame on the main body corresponding to each lower main body, manufacturing efficiency is improved compared to when the entire frame is made of a single shaped material. Therefore, as mentioned above, it is possible to suppress the increase in costs.

[0059] The fitting 1 according to the embodiment is a fitting 1 comprising a frame body fixed to an opening 7 of a structural body in accordance with the arbitrary shape of the opening 7, and a shoji (door body 4) arranged inside the frame body, the frame body including a structural body side frame body (structural body side upper frame 70, 77, structural body side lower frame 74, 78) fixed to the opening 7 in accordance with the arbitrary shape of the opening 7, and a shoji side frame body (shoji side upper frame 80, shoji side lower frame 84) attached to the structural body side frame body and arranged on the shoji side, the structural body side frame body having a structural body side joint part, the shoji side frame body having a shoji side joint part that is joined to the structural body side joint part and that makes the structural body side frame body and the shoji side frame body in a state of being integrated in the joined state. This makes it possible to reduce costs when arranging a common shoji in openings of a plurality of structural bodies having different fitting configurations.

[0060] In the fitting 1 according to the embodiment, it is preferable that the movement of the shoji-side frame body relative to the frame body in at least one of the following directions, namely, the projection direction, the vertical direction, and the width direction, is restricted when the frame body on the structural body side is connected to the shoji-side joint part. This makes it possible to suppress rattling of the shoji-side frame body.

[0061] The present disclosure is not limited to the above-described embodiments, and modifications and improvements within the scope of achieving the object of the present disclosure are included in the present disclosure.

[0062] For example, in connecting the main body side frame body and the shoji side frame body, the crimped connection portion in the above embodiment (such as the portion in FIG. 5 where the connecting plate portion 731 of the main body side upper frame 70 and the connecting plate portion 813 of the shoji side upper frame 80 are crimped) is not limited to crimping, and may be connected by a hook and loop fastening. Other connecting means such as screw fastening or riveting may also be used. In any case, by connecting the shoji side frame body to the main body side frame body in this way, rattling of the shoji side frame body can be suppressed.

[0063] For example, in the above embodiment, two examples of upper and lower skeletons are given as examples of skeletons with different fittings, but the types of fittings of the skeletons are not limited to two, and for fittings of three or more multiple skeletons, a skeleton-side upper frame and a skeleton-side lower frame corresponding to each of the skeletons are prepared, and a common shoji-side upper frame and a shoji-side lower frame are combined, which is a feature of the present disclosure. Also, the configuration of the present disclosure is applied to the upper frame and the lower frame, but it may also be applied to the vertical frame.

[0064] In the above embodiment, the direction in which the movement of the shoji-side upper frame 80 and the frame-side upper frame 70, 77 is restricted by the engagement, and the direction in which the movement of the shoji-side lower frame 84 and the frame-side lower frame 74, 78 is restricted by the engagement is the up-down direction, and the direction of the crimped joint is also up-down in response to this, but this is not limited to the above example. If the direction in which the movement is restricted by the engagement changes, the direction of the crimped joint may be changed accordingly. Furthermore, the direction in which the movement is restricted and the direction of the crimped joint do not have to correspond to each other. Furthermore, the two members on the frame side and the shoji side may not be engaged and may be connected only by crimping.

[0065] In the above embodiment, the fitting 1 is configured as a door with a ventilation window, but is not limited to this configuration. For example, the fitting can be applied to any type of shoji, including swing doors, sliding doors, and various types of windows. [Explanation of symbols]

[0066] 1. Doors and windows 2A, 2B Upper body (body) 3A, 3B Lower body (frame) 4 Door body (shoji) 7 Openings 21A, 21B Upper frame (frame body) 22A, 22B Lower frame (frame body) 70, 77 Upper frame on the main body side (frame on the main body side) 74, 78 Body side lower frame (body side frame) 80 Shoji side upper frame (Shoji side frame body) 84 Shoji side bottom frame (Shoji side frame body) 724 1st engagement groove (body side connection part) 733 2nd engagement groove (body side connection part) 731 Joint plate part (frame side joint part) 757 Projection (body side joint) 762 Joint plate part (frame side joint part) 766 Second engagement piece (body side joint) 772a 4th engagement groove (body side connection part) 777 5th engagement groove (body side connection part) 784a 6th engagement groove (body side connection part) 787 Joint plate part (frame side joint part) 788a 8th engagement piece (body side joint) 813 Joint plate part (Shoji side joint part) 814 Tip insertion part (shoji side joint part) 818 Protruding part (Shoji side joint) 841 Outside end engagement groove (Shoji side joint) 843 First joint plate part (Shoji side joint part) 844 Indoor end engagement piece (Shoji side joint)

Claims

1. A frame body that is fixed to an opening of a body in accordance with an arbitrary shape of the opening; A door that is placed inside the frame body, The frame body includes a frame body on a main body side that is fixed to the opening in accordance with an arbitrary shape of the opening, and a frame body on a shoji side that is attached to the frame body on the main body side and disposed on the shoji side, The body-side frame has a body-side joint portion, The shoji side frame body is connected to the main body side joint part, and in this connected state, the main body side frame body and the shoji side frame body are integrated into one piece, making this a fitting.

2. The fixture described in claim 1, wherein when the main body side joint is connected to the shoji side joint, movement of the shoji side frame body relative to the main body side frame body in at least one of the forward and backward directions is restricted.

3. The fixture according to claim 1 or 2, wherein the main body side joint portion is joined to the shoji side joint portion by caulking.

4. The fixture according to claim 1 or 2, wherein the main body side joint portion is joined to the shoji side joint portion by fitting.