Method for predicting amount of subsidence, method for reinforcing building, and display control system

By identifying subsidence layer end points and constructing a virtual ground model to estimate pile settlement, the method addresses costly and inaccurate pile sinking prevention, ensuring accurate subsidence prediction and reduced costs through optimized pile reinforcement.

JP2024164546AActive Publication Date: 2024-11-27NIPPON STEEL & SUMIKIN ENGINEERING CO LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
JP2023080109
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-15
Publication Date
2024-11-27
Estimated Expiration
2043-05-15

AI Technical Summary

Technical Problem

Existing methods for preventing pile sinking in soft ground foundations are costly and time-consuming, and conventional subsidence estimation can lead to unexpected subsidence in non-representative areas, increasing costs due to excessive pile reinforcement.

Method used

A method involving the identification of lower and upper end points of expected subsidence layers at multiple positions, constructing a virtual ground model, and calculating settlement amounts at assumed pile driving positions, allowing for accurate estimation and reducing the need for excessive pile reinforcement.

Benefits of technology

Accurately predicts subsidence, reduces design costs by minimizing the number of piles required, and provides a visual display system for confirming subsidence amounts, thereby enhancing foundation stability and cost-effectiveness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024164546000001_ABST
    Figure 2024164546000001_ABST
Patent Text Reader

Abstract

To provide a method for predicting the amount of subsidence, a method for reinforcing a building, and a display control system, which are capable of suppressing unexpected subsidence of a pile and reducing costs.SOLUTION: A method for predicting the amount of subsidence includes the steps of identifying lower and upper end points of an expected subsidence layer at multiple set positions BP, constructing a virtual ground model including the expected subsidence layer, and calculating the expected amount of subsidence at multiple expected pile driving positions PP from the virtual ground model.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a subsidence amount estimation method, a building reinforcement method, and a display control system. [Background technology]

[0002] Piles are sometimes driven into the ground as part of the foundation structure of a building. If the ground into which the piles are driven contains soft ground, the piles may sink after being driven. When constructing a building, measures are taken to prevent the piles from sinking by increasing the number of piles (using multiple piles), or the piles are allowed to sink and the amount of pile settlement is estimated before designing the foundation structure. Patent Document 1, an example of prior art, discloses a technology in which actual load test results are compiled for each geology and in relation to the characteristics of the ground, particularly the N-value, and then the relationship between the load and the amount of settlement is compiled from a small number of actual measurements, making it possible to rationally estimate the amount of settlement of embedded piles using the load transfer method. Furthermore, Patent Document 2, an example of conventional technology, discloses technology that can predict the amount of subsidence of ground and structures following liquefaction caused by an earthquake, targeting the ground on which a structure stands. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Japanese Patent Application Publication No. 11-13047 [Patent Document 2] JP 2007-9558 A Summary of the Invention [Problem to be solved by the invention]

[0004] When measures are taken to prevent the piles from sinking by increasing the number of piles, there is a problem that costs increase. On the other hand, there is a problem that estimating the amount of settlement of a pile by allowing for settlement using conventional techniques is time-consuming and costly. Furthermore, in the conventional technology, the amount of subsidence is estimated only at a representative position of the ground, and therefore there is a problem that unexpected subsidence may occur in parts other than the representative position.

[0005] The present invention has been made in consideration of the above-mentioned circumstances, and aims to provide a method for estimating the amount of subsidence, a method for reinforcing a building, and a display control system that prevent unexpected subsidence of piles while reducing costs. [Means for solving the problem]

[0006] <1> The subsidence estimation method according to aspect 1 of the present invention includes the steps of identifying the lower and upper end points of an expected subsidence layer at multiple set positions, constructing a virtual ground model including the expected subsidence layer, and calculating the expected subsidence at multiple expected pile driving positions from the virtual ground model.

[0007] According to the first aspect, first, the lower end point and the upper end point of the assumed subsidence layer at a plurality of set positions are specified. Next, a virtual ground model including the assumed subsidence layer is constructed based on information on the lower end point and the upper end point of the assumed subsidence layer at the specified multiple set positions. Then, the estimated amount of subsidence at a plurality of estimated pile driving positions is calculated from the virtual ground model. In this way, by constructing a virtual ground model in advance and then calculating the estimated amount of subsidence of the pile, the estimated amount of subsidence at the estimated pile driving position can be accurately calculated. Therefore, it is possible to prevent unexpected settlement of the piles that may occur when estimating the amount of settlement only at representative positions in the ground. This makes it easier to design a structure that allows for the settlement of piles, thereby reducing design costs. In addition, the design does not allow for settlement, which helps prevent increases in costs due to increasing the number of piles.

[0008] <2> The subsidence amount estimation method according to aspect 2 of the present invention includes the steps of identifying a lower end point and an upper end point of an expected subsidence layer at a plurality of set positions, generating a virtual lower surface of the expected subsidence layer by interpolating between the lower end points at the plurality of set positions and generating a virtual upper surface of the expected subsidence layer by interpolating between the upper end points at the plurality of set positions, thereby constructing a virtual ground model including the expected subsidence layer, and calculating the expected subsidence amount at a plurality of expected pile driving positions from the virtual ground model.

[0009] According to the second aspect, first, the lower end point and the upper end point of the assumed subsidence layer at a plurality of set positions are specified. Next, a virtual lower surface of the subsidence expected layer is generated by complementing the intervals between the lower end points of the subsidence expected layer at the multiple set positions, and a virtual upper surface of the subsidence expected layer is generated by complementing the intervals between the upper end points of the subsidence expected layer at the multiple set positions, thereby constructing a virtual ground model including the subsidence expected layer. Then, the estimated amount of subsidence at a plurality of estimated pile driving positions is calculated from the virtual ground model. In this way, a virtual ground model can be constructed by generating a virtual bottom surface and a virtual top surface. By calculating the expected subsidence of the piles based on the virtual ground model, the expected subsidence of the piles at the expected pile driving positions can be calculated more accurately. Therefore, it is possible to more reliably prevent unexpected settlement of the piles that may occur when estimating the amount of settlement only at representative positions in the ground. This makes it easier to design a structure that allows for the settlement of piles, thereby reducing design costs. In addition, the design does not allow for settlement, which helps prevent increases in costs due to increasing the number of piles.

[0010] <3> A subsidence estimation method according to aspect 3 of the present invention is a subsidence estimation method according to aspect 1 or aspect 2, in which some of the multiple set positions coincide with the multiple assumed pile driving positions, or some of the multiple assumed pile driving positions coincide with the multiple set positions.

[0011] According to the third aspect, some of the set positions coincide with the plurality of assumed pile driving positions. Alternatively, some of the plurality of assumed pile driving positions coincide with the plurality of set positions. In other words, some or all of the multiple piles are driven into the ground at set positions where the lower and upper end points of the expected subsidence layer are specified. This makes it possible to more reliably and accurately calculate the expected amount of settlement of the pile to be driven into the set position.

[0012] <4> A subsidence amount estimation method according to a fourth aspect of the present invention is the subsidence amount estimation method according to the second or third aspect, wherein the interpolation between the points is a curved surface interpolation in which the surfaces between the points are curved.

[0013] According to the fourth aspect, the interpolation between the lower end points or the upper end points at the multiple set positions is a curved surface interpolation in which the areas between the points are curved surfaces. This allows the virtual lower surface and virtual upper surface of the assumed subsidence layer to be generated more accurately, and a more accurate virtual ground model can be constructed. Therefore, the expected subsidence of the pile at the expected pile driving position can be calculated more accurately.

[0014] <5> A subsidence amount estimation method according to a fifth aspect of the present invention is the subsidence amount estimation method according to any one of the first to fourth aspects, wherein the subsidence expected layer includes at least one of a clay layer and a silt layer.

[0015] According to the fifth aspect, the subsidence-expected layer includes at least one of a clay layer and a silt layer. This makes it possible to calculate the expected amount of settlement of the pile due to the clay or silt layer at the expected pile driving position.

[0016] <6> A subsidence amount estimation method according to aspect 6 of the present invention is a subsidence amount estimation method according to any one of aspects 1 to 5, in which the lower end point and the upper end point of the expected subsidence layer at the multiple set positions are identified based on a boring log diagram.

[0017] According to the sixth aspect, the lower end point and the upper end point of the assumed subsidence layer at a plurality of set positions are identified based on a boring log. In this way, by repurposing existing boring log diagrams to identify the layer expected to subside, the lower and upper end points of the layer expected to subside can be identified without performing any special work. Therefore, it is possible to prevent increases in costs due to ground surveys, etc.

[0018] <7> A subsidence amount estimation method according to aspect 7 of the present invention is a subsidence amount estimation method according to any one of aspects 1 to 6, in which the vertical length of the subsidence expected layer is divided into a plurality of reference lengths and one fractional length shorter than the reference length.

[0019] According to the seventh aspect, at a plurality of set positions, the vertical length of the assumed subsidence layer is divided into a plurality of reference lengths and one fractional length that is shorter than the reference length. In this way, by using the reference length, it is possible to easily compare the vertical length of the assumed subsidence layer between multiple set positions.

[0020] <8> The building reinforcement method of aspect 8 of the present invention includes the steps of calculating an estimated settlement differential value from estimated subsidence amounts at multiple estimated pile driving positions, calculating additional stress generated in the foundation beam from the estimated settlement differential value, and determining the placement of reinforcing bars in accordance with the additional stress.

[0021] According to the eighth aspect, first, a relative settlement difference value is calculated from the estimated settlement amounts at a plurality of estimated pile driving positions. Next, the additional stress generated in the foundation beam is calculated from the estimated differential settlement values ​​at multiple estimated pile driving positions. Then, the placement of reinforcing bars is determined according to the added stress. In other words, the arrangement of the reinforcing bars, such as their density and number, is determined according to the additional stress of the foundation beams estimated from the estimated amount of settlement at multiple estimated pile driving positions. This allows the foundation beam to better resist additional stresses caused by the settlement of multiple piles. In addition, by reinforcing the foundation beams more precisely, it is possible to prevent increases in costs due to excessive reinforcement of buildings.

[0022] <9> A building reinforcement method according to a ninth aspect of the present invention is the building reinforcement method according to the eighth aspect, in which the expected amount of subsidence is estimated by the subsidence estimation method according to any one of the first to seventh aspects.

[0023] According to aspect 9, the expected settlement of the pile is estimated by the settlement estimation method according to any one of the above aspects. In other words, the arrangement of the reinforcing bars, such as their density and number, is determined according to the additional stress of the foundation beam calculated from the amount of pile settlement estimated by any of the methods described above. This allows the additional stress generated in the foundation beam to be accurately grasped, and the foundation beam can be appropriately reinforced. This makes the foundation beam more resistant to additional stresses caused by the settlement of multiple piles.

[0024] <10> A display control system according to aspect 10 of the present invention identifies the lower and upper end points of an expected subsidence layer at multiple set positions, constructs a virtual ground model including the expected subsidence layer, and displays on a display unit the expected amount of subsidence from the virtual ground model at multiple expected pile driving positions.

[0025] According to aspect 10, the display control system first identifies the lower end point and the upper end point of the assumed subsidence layer at a plurality of set positions, and constructs a virtual ground model including the assumed subsidence layer. The display control system then causes the display unit to display the estimated amounts of subsidence at a plurality of estimated pile driving positions based on the constructed virtual ground model. This allows the user to easily visually confirm the estimated amount of subsidence of the pile at multiple set positions.

[0026] <11> The display control system of aspect 11 of the present invention identifies the lower end point and the upper end point of the expected subsidence layer at a plurality of set positions, generates a virtual lower surface of the expected subsidence layer by interpolating between the lower end points at the plurality of set positions, and generates a virtual upper surface of the expected subsidence layer by interpolating between the upper end points at the plurality of set positions, thereby constructing a virtual ground model including the expected subsidence layer, and displays the expected amount of subsidence at a plurality of expected pile driving positions from the virtual ground model on a display unit.

[0027] According to the eleventh aspect, the display control system first identifies the lower end point and the upper end point of the assumed subsidence layer at a plurality of set positions. Next, a virtual lower surface of the expected subsidence layer is generated by complementing the lower end points at the multiple set positions, and a virtual upper surface of the expected subsidence layer is generated by complementing the upper end points at the multiple set positions, thereby constructing a virtual ground model including the expected subsidence layer. By generating a virtual bottom surface and a virtual top surface in this manner, a more accurate virtual ground model can be constructed. The display control system then causes the display unit to display the estimated amounts of subsidence at a plurality of estimated pile driving positions based on the constructed virtual ground model. This allows the user to easily visually confirm the estimated amount of subsidence of the pile at multiple set positions.

[0028] <12> A display control system according to a twelfth aspect of the present invention is the display control system according to the tenth or eleventh aspect, in which a color shade is set according to the estimated amount of subsidence and displayed.

[0029] According to aspect 12, the display control system sets the shade of color according to the estimated amount of subsidence of the pile and displays it on the display unit. This makes it easier for the user to visually and intuitively grasp the expected amount of settlement of the pile.

[0030] <13> A display control system according to aspect 13 of the present invention is a display control system according to any one of aspects 10 to 13, which calculates an estimated subsidence differential value from the estimated subsidence at the multiple estimated pile driving positions, calculates a deformation angle of the foundation beam from the estimated subsidence differential value, and displays the deformation angle in correspondence with the estimated subsidence.

[0031] According to the thirteenth aspect, the display control system displays the deformation angle of the foundation beam in association with the estimated amount of settlement of the pile. This makes it easier for the user to understand whether the deformation angle expected for the foundation beam is within the allowable range. Effect of the Invention

[0032] According to the present invention, it is possible to provide a method for estimating the amount of subsidence, a method for reinforcing a building, and a display control system that can prevent unexpected subsidence of piles while reducing costs. [Brief description of the drawings]

[0033] [Figure 1] FIG. 2 is a plan view of the ground in the embodiment. [Diagram 2] 4 is a flowchart of a subsidence amount estimation method according to an embodiment. [Diagram 3] FIG. 1 is a schematic diagram of a boring log at multiple set positions in an embodiment. [Figure 4] FIG. 2 is a schematic diagram of a virtual ground model in the embodiment. [Diagram 5] 1 is a flowchart of a building reinforcement method according to an embodiment. [Figure 6] 1 is a block diagram of a display control system according to an embodiment. [Figure 7] 4 is a first example of information displayed by a display unit in the embodiment. [Figure 8] 11 is a second example of information displayed by the display unit in the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0034] Hereinafter, a subsidence amount estimation method, a building reinforcement method, and a display control system according to an embodiment of the present invention will be described with reference to the drawings.

[0035] (Method of estimating the amount of settlement) FIG. 1 is a plan view of the ground G in this embodiment. The settlement amount estimation method according to this embodiment is a method for estimating the settlement amount of piles P that are driven into the ground G and become part of the foundation of a building, as shown in Fig. 1. By using this method, for example, the additional stress generated in a foundation beam B provided between the multiple piles P and the deformation angle of the foundation beam B due to the additional stress can be calculated.

[0036] FIG. 2 is a flowchart of the subsidence amount estimation method according to this embodiment. The subsidence amount estimation method according to this embodiment includes the following first to third steps. The first step SA1 of estimating the amount of subsidence shown in FIG. 2 is a step of identifying the lower end point and the upper end point of the assumed subsidence layer at the multiple set positions BP shown in FIG. The subsidence expected layer refers to a layer in which the driven pile P is expected to subside among a plurality of layers included in the ground G shown in Fig. 1. The subsidence expected layer includes a soft ground. In this embodiment, the subsidence expected layer includes at least one of a clay layer and a silt layer. The clay layer is a layer made up of soil particles with a diameter of 0.005 mm or less, and the silt layer is a layer made up of soil particles with a diameter of 0.075 to 0.005 mm.

[0037] FIG. 3 is a schematic diagram of boring logs Bc at a plurality of set positions BP in this embodiment. In the first step SA1 of estimating the amount of subsidence, first, as shown in Figures 1 and 3, a plurality of set positions BP are determined for identifying the lower end point BPb and the upper end point BPt of the assumed subsidence layer SL in the ground G. The set positions BP are, for example, positions in the ground G where a boring survey is carried out before the construction of a building. It is preferable to specify the lower end point BPb and the upper end point BPt of the assumed subsidence layer SL at the multiple set positions BP based on the boring log Bc. That is, by performing boring surveys at the multiple set positions BP, the positions of the lower end point BPb and the upper end point BPt of the assumed subsidence layer SL at the multiple set positions BP are extracted as shown in FIG.

[0038] In this embodiment, the vertical length of the subsidence assumed layer SL is divided into a plurality of reference lengths X and one fractional length Y shorter than the reference length X, as shown in Fig. 3. That is, for example, the vertical length Z of the subsidence assumed layer SL is expressed by the following formula, where a is an arbitrary integer. Z=aX+Y That is, the vertical length Z of the assumed subsidence layer SL may be expressed by adding a fractional length Y to the reference length X multiplied by a. For example, as shown in Fig. 3, if the vertical lengths Z of the assumed subsidence layer SL at the multiple setting positions BP are Z1, Z2, and Z3, respectively, then Z1, Z2, and Z3 are expressed by the following equations, respectively. Z1=aX+Y1 Z2=bX+Y2 Z3=cX+Y3 In the above formula, a, b, and c are natural numbers. In this way, by managing the multiple vertical lengths Z of the subsidence expected layer SL at multiple setting positions BP based on a single reference length X, it is possible to easily compare the vertical lengths Z of the subsidence expected layer SL at multiple setting positions BP.

[0039] The second step SA2 of estimating the amount of subsidence shown in FIG. 2 is a step of constructing a virtual ground model VG including a subsidence expected layer SL. FIG. 4 is a schematic diagram of the virtual ground model VG in this embodiment. That is, first, the lower end points BPb of the subsidence assumed layer SL at the multiple set positions BP are interpolated to generate a virtual lower surface SLb of the subsidence assumed layer SL. At the same time, the upper end points BPt of the subsidence assumed layer SL at the multiple set positions BP are interpolated to generate a virtual upper surface SLt of the subsidence assumed layer SL. This results in the construction of a virtual ground model VG of the ground G at the site where the building is to be constructed, as shown in FIG. In this embodiment, the interpolation between the points is preferably a curved surface interpolation in which the areas between the points are curved surfaces, which is performed, for example, by using a known three-dimensional modeling tool.

[0040] The third step SA3 of estimating the amount of subsidence shown in FIG. 2 is a step of calculating the assumed amount of subsidence at a plurality of assumed pile driving positions PP from the virtual ground model VG constructed in the second step SA2. That is, first, the positions where the piles P are to be driven in the building, i.e., the pile driving positions PP are set. Next, the positions of the expected subsidence layer SL corresponding to the positions where the piles P are to be installed are specified in the virtual ground model VG of the site where the building is to be constructed. Then, the amount of settlement of pile P at each of the multiple assumed pile driving positions PP is calculated using the one-dimensional settlement calculation method described on page 44 of the "Guidelines for Design of Building Foundation Structures (Architectural Institute of Japan, 3rd Edition, published November 2019)". The amount of settlement can be calculated as the amount of consolidation settlement S (m) by the compression curve method (e~log σ method) of the following equation 1.

[0041]

number

[0042] Here, Δe i is the increment in effective vertical stress Δσ due to embankment and building construction at the center of layer i z ´(kN / m 2 ) is the change in void ratio caused by In addition, Δe i is the value read from the e~logσ curve. Also, e 0i is the vertical effective stress σ at the center of layer i before construction 1zi ´ is the void ratio. H i is the thickness of layer i (m).

[0043] In this embodiment, some of the plurality of set positions BP coincide with the plurality of assumed pile driving positions PP, or some of the plurality of assumed pile driving positions PP coincide with the plurality of set positions BP. In other words, a part or the whole of the pile P is driven into the set position BP where the lower end point BPb and the upper end point BPt of the assumed subsidence layer SL are specified in the ground G. This makes it possible to more reliably and accurately calculate the assumed subsidence amount of the pile P driven into the set position BP. In addition, the expected deformation angle of the foundation beam B may be calculated from the expected amount of settlement.

[0044] (Building reinforcement method) Next, a method for reinforcing a building according to this embodiment will be described. As shown in Fig. 1, the method for reinforcing a building according to this embodiment is a method for reinforcing a foundation beam B that is provided to connect a plurality of driven piles P in a building. The foundation beam B is reinforced, for example, by changing the cross-sectional shape of the foundation beam B to improve the moment of inertia, or by arranging reinforcing bars around the foundation beam B. In the building reinforcement method according to this embodiment, whether or not to reinforce the foundation beams B of a building is determined by the following steps. FIG. 5 is a flowchart of the building reinforcing method according to this embodiment. That is, the building reinforcement method according to this embodiment includes the following first to third steps.

[0045] The first step SB1 of building reinforcement is a step of calculating an assumed subsidence difference value from the assumed subsidence amounts at a plurality of assumed pile driving positions PP. The expected subsidence difference value is the difference in the expected subsidence amount between adjacent piles P among multiple piles P driven into a building. In this embodiment, the expected subsidence difference value is calculated for each combination of piles P connected by a foundation beam B. In the first step SB1 of building reinforcement, the expected amount of settlement is estimated by the above-mentioned method for estimating the amount of settlement.

[0046] The second step SB2 of building reinforcement is a step of calculating the additional stress generated in the foundation beam B from the expected settlement difference value. The additional stress in the foundation beam B is a stress caused by a force applied that deforms the foundation beam B due to the relative displacement of the positions of both ends of the foundation beam B due to the different amounts of settlement of the piles P connected by the foundation beam B. In this embodiment, the additional stress of the foundation beam B is calculated for some or all of the multiple foundation beams B provided in the building.

[0047] The third step SB3 of building reinforcement is a step for determining the arrangement of reinforcing steel bars according to the added stress. That is, for example, if the added stress of the foundation beam B calculated in the above-mentioned second step SB2 is within the allowable range, the placement of reinforcing steel bars is not necessary. If the added stress of the foundation beam B calculated in the second step SB2 exceeds the allowable range, the density of the reinforcing steel bars is calculated according to the magnitude of the added stress, and the placement of reinforcing steel bars around the foundation beam B is considered. In addition, if the additional stress of the foundation beam B is large and the foundation beam B cannot be sufficiently reinforced by reinforcing bars, the second moment of area of ​​the foundation beam B may be improved by changing the shape of the foundation beam B.

[0048] (Display Control System) Next, a description will be given of the display control system 100 according to this embodiment. The display control system 100 performs calculations in the subsidence amount estimation method and building reinforcement method described above, and visually displays various information to the user. FIG. 6 is a block diagram of a display control system 100 according to this embodiment. The display control system 100 according to the present embodiment includes a processor 10, such as a CPU (Central Processing Unit), and a memory 20, which are connected via a bus, and executes a program. The display control system 100 displays various types of information on a display unit 30 by executing the program. The display unit 30 includes a display device such as a CRT (Cathode Ray Tube) display, a liquid crystal display, or an organic EL (Electro-Luminescence) display. Although the display unit 30 shown in FIG. 6 is provided within the display control system 100, the present invention is not limited to this, and the display unit 30 may be provided outside the display control system 100.

[0049] The display control system 100 identifies the lower end point BPb and the upper end point BPt of the expected subsidence layer SL at multiple set positions BP as shown in Figure 3, constructs a virtual ground model VG including the expected subsidence layer SL as shown in Figure 4, and displays the expected subsidence amounts at multiple expected pile driving positions PP from the virtual ground model VG on the display unit 30. In the display control system 100, the virtual ground model VG is constructed by complementing the identified lower end points BPb to generate a virtual lower surface SLb of the subsidence expected layer SL, and by complementing the identified upper end points BPt to generate a virtual upper surface SLt of the subsidence expected layer SL. The processor 10 in the display control system 100 also calculates an assumed subsidence difference value from the assumed subsidence amounts at the multiple assumed pile driving positions PP. Furthermore, the processor 10 in the display control system 100 calculates the deformation angle of the foundation beam B from the calculated subsidence difference value.

[0050] FIG. 7 shows a first example of information displayed by the display unit 30 in this embodiment. In this embodiment, the display control system 100 may set and display a color shade according to the expected amount of subsidence. That is, for example, as shown in FIG. 7, the display unit 30 displays the estimated subsidence amounts of a plurality of piles P in a table. At this time, the shade of the color is set according to the magnitude of the estimated subsidence amount. For example, a relatively small estimated subsidence amount is displayed in a light color, and a relatively large estimated subsidence amount is displayed in a dark color. This allows the user to visually and intuitively grasp the magnitude or difference in the expected subsidence amounts of multiple piles P.

[0051] FIG. 8 shows a second example of information displayed by the display unit 30 in this embodiment. In this embodiment, the display control system 100 may display the estimated settlement amount of each of the multiple piles P in association with the deformation angle of the foundation beam B. That is, for example, as shown in FIG. 8, the display unit 30 displays the deformation angles of a plurality of foundation beams B in a table. At this time, the color shade is set according to the magnitude of the deformation angle of the foundation beam B. For example, a relatively small deformation angle is displayed in a light color, and a relatively large deformation angle is displayed in a dark color. This allows the user to intuitively grasp the magnitude of the deformation angle of the foundation beam B visually.

[0052] As described above, according to the subsidence amount estimation method of this embodiment, first, the lower end point BPb and the upper end point BPt of the assumed subsidence layer SL at the multiple set positions BP are identified. Next, a virtual ground model VG including the assumed subsidence layer SL is constructed based on information on the lower end points BPb and upper end points BPt of the assumed subsidence layer SL at the identified multiple set positions BP. Then, the expected subsidence amounts at multiple assumed pile driving positions PP are calculated from the virtual ground model VG. In this way, by constructing the virtual ground model VG in advance and then calculating the estimated amount of settlement of the pile P, the estimated amount of settlement at the estimated pile driving position PP can be accurately calculated. Therefore, it is possible to prevent unexpected subsidence of the pile P that may occur when estimating the amount of subsidence only at representative positions in the ground G. Therefore, it is easier to design the pile P to allow for settlement, and design costs can be reduced. In addition, the design does not allow for subsidence, making it possible to suppress increases in costs due to an increase in the number of piles P.

[0053] According to another example of the subsidence amount estimation method according to the present embodiment, first, the lower end point BPb and the upper end point BPt of the assumed subsidence layer SL at the multiple set positions BP are identified. Next, a virtual lower surface SLb of the subsidence expected layer SL is generated by complementing the lower end points BPb of the subsidence expected layer SL at the multiple set positions BP, and a virtual upper surface SLt of the subsidence expected layer SL is generated by complementing the upper end points BPt of the subsidence expected layer SL at the multiple set positions BP, thereby constructing a virtual ground model VG including the subsidence expected layer SL. Then, the expected subsidence amounts at a plurality of assumed pile driving positions PP are calculated from the virtual ground model VG. In this way, by generating the virtual bottom surface SLb and the virtual top surface SLt, the virtual ground model VG can be constructed. Then, by calculating the expected subsidence of the pile P, the expected subsidence at the pile driving position PP can be calculated more accurately. Therefore, it is possible to more reliably prevent unexpected subsidence of the pile P that may occur when estimating the amount of subsidence only at representative positions in the ground G. Therefore, it is easier to design the pile P to allow for settlement, and design costs can be reduced. In addition, the design does not allow for subsidence, making it possible to suppress increases in costs due to an increase in the number of piles P.

[0054] In addition, a part of the plurality of set positions BP may coincide with a plurality of assumed pile driving positions PP. Alternatively, a part of the plurality of assumed pile driving positions PP may coincide with a plurality of set positions BP. In other words, some or all of the piles P are driven into the ground G at set positions BP where the lower end point BPb and the upper end point BPt of the assumed subsidence layer SL are specified. This makes it possible to more reliably and accurately calculate the expected amount of settlement of the pile P to be driven into the set position BP.

[0055] Furthermore, the interpolation between the lower end points BPb or the upper end points BPt at the multiple set positions BP is a curved surface interpolation in which the areas between the points are curved surfaces. This allows the virtual lower surface SLb and the virtual upper surface SLt of the assumed subsidence layer SL to be generated more accurately, and a more accurate virtual ground model VG to be constructed. Therefore, the expected subsidence amount of the pile P at the expected pile driving position PP can be calculated more accurately.

[0056] Note that the surface in the surface interpolation can be generated, for example, by the Patch command of Grasshopper (Applicraft Co., Ltd.). The Patch command creates an approximate patch surface from input curves and / or points. You can also adjust the accuracy of the surface by adjusting Spans and Flexibility. In this embodiment, a plurality of lower end points BPb and a plurality of upper end points BPt of the assumed subsidence layer SL are input as the point group (Points), and the softness of the curved surface is adjusted by the intervals (Spans) and flexibility (Flexibility). By adjusting the softness of the surface, the shape of the surface can be adjusted so that it passes through each of the input points.

[0057] The subsidence expected layer SL is expected to include at least one of a clay layer and a silt layer. This makes it possible to calculate the expected amount of subsidence of the pile P due to the clay or silt layer at the expected pile driving position PP.

[0058] In addition, the lower end point BPb and the upper end point BPt of the assumed subsidence layer SL at the multiple set positions BP may be specified based on the boring log Bc. In this way, by repurposing the existing boring log Bc to identify the subsidence-prone layer SL, the lower end point BPb and the upper end point BPt of the subsidence-prone layer SL can be identified without performing any special work. Therefore, it is possible to prevent increases in costs due to investigations of the ground G, etc.

[0059] In addition, at the plurality of set positions BP, the vertical length Z of the assumed subsidence layer SL may be divided into a plurality of reference lengths X and one fractional length Y shorter than the reference length X. In this way, by using the reference length, it is possible to easily compare the vertical length Z of the assumed subsidence layer SL between multiple set positions BP.

[0060] Moreover, according to the building reinforcement method of this embodiment, first, a relative subsidence difference value is calculated from the assumed subsidence amounts at a plurality of assumed pile driving positions PP. Next, the additional stress generated in the foundation beam B is calculated from the expected differential settlement values ​​at multiple assumed pile driving positions PP. Then, the placement of reinforcing bars is determined according to the added stress. In other words, the arrangement of the reinforcing bars, such as their density and number, is determined according to the additional stress of the foundation beam B estimated from the estimated settlement at multiple estimated pile driving positions PP. This makes it easier for the foundation beam B to resist additional stress caused by the settlement of multiple piles P. In addition, by reinforcing the foundation beam B more accurately, it is possible to prevent increases in costs due to excessive reinforcement of the building.

[0061] In addition, the expected subsidence amount of the pile P may be estimated by a subsidence amount estimation method according to any one of the above aspects. In other words, the arrangement of the reinforcing bars, such as their density and number, is determined according to the additional stress of the foundation beam B calculated from the amount of settlement of the pile P estimated by any of the methods described above. This allows the additional stress generated in the foundation beam B to be accurately grasped, and the foundation beam B can be reinforced appropriately. Therefore, the foundation beam B can be made more resistant to additional stress caused by the settlement of multiple piles P.

[0062] Furthermore, according to the display control system 100 of this embodiment, first, the lower end point BPb and the upper end point BPt of the subsidence assumed layer SL at the multiple set positions BP are identified, and a virtual ground model VG including the subsidence assumed layer SL is constructed. Then, the display control system 100 causes the display unit 30 to display the estimated subsidence amounts at a plurality of estimated pile driving positions PP from the constructed virtual ground model VG. This allows the user to easily visually recognize the expected subsidence amount of the pile P at multiple set positions BP.

[0063] Moreover, the display control system 100 first identifies the lower end point BPb and the upper end point BPt of the assumed subsidence layer SL at the multiple setting positions BP. Next, a virtual lower surface SLb of the subsidence expected layer SL is generated by complementing the lower end points BPb at the multiple set positions BP, and a virtual upper surface SLt of the subsidence expected layer SL is generated by complementing the upper end points BPt at the multiple set positions BP, thereby constructing a virtual ground model VG including the subsidence expected layer SL. In this way, by generating the virtual bottom surface SLb and the virtual top surface SLt, a more accurate virtual ground model VG can be constructed. Then, the display control system 100 causes the display unit 30 to display the estimated subsidence amounts at a plurality of estimated pile driving positions PP based on the constructed virtual ground model VG. This allows the user to easily visually recognize the expected subsidence amount of the pile P at multiple set positions BP.

[0064] In addition, the display control system 100 may set the shade of color according to the estimated amount of settlement of the pile P and cause the display unit 30 to display the color. This makes it easier for the user to visually and intuitively grasp the expected amount of subsidence of the pile P.

[0065] In addition, the display control system 100 may display the estimated amount of settlement of the pile P in association with the deformation angle of the foundation beam B. This makes it easier for the user to understand whether the deformation angle expected for the foundation beam B is within the allowable range.

[0066] The technical scope of the present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the spirit of the present invention. For example, in the above description, the display unit 30 sets the shade of the color according to the estimated settlement amount of the pile P and the deformation angle of the foundation beam B, but the brightness of the color may be set. That is, for example, if the estimated settlement amount or the deformation angle of the foundation beam B has a relatively large value, it is displayed in a bright color, and if the estimated settlement amount or the deformation angle of the foundation beam B has a relatively small value, it is displayed in a dark color. Alternatively, the color itself may be changed. That is, for example, if the estimated settlement amount or the deformation angle of the foundation beam B is relatively large, it is displayed in red, and if the estimated settlement amount or the deformation angle of the foundation beam B is relatively small, it is displayed in blue. Also, for example, a virtual ground model VG may be displayed on the display unit 30, and the numerical values ​​of the estimated subsidence of each pile P and the deformation angle of the foundation beam B may be displayed in the areas corresponding to the positions where multiple piles P and foundation beams B are to be installed.

[0067] In addition, within the scope of the invention, the components in the above-described embodiments may be replaced with well-known components, and the above-described modified examples may be combined as appropriate. [Explanation of symbols]

[0068] 10 Processors 20 Memory 30 Display section 100 Display Control System B Foundation beam Bc Boring log BP setting position BPb lower end point BPt upper end point G. Ground P pile PP Expected position SL Expected subsidence layer SLb virtual bottom surface SLt Virtual top surface VG Virtual Ground Model X standard length Y fraction length Z: Vertical length of expected subsidence layer

Claims

1. Identifying the lower end point and the upper end point of the assumed subsidence layer at a plurality of set positions; constructing a virtual ground model including the assumed subsidence layer; Calculating an estimated subsidence amount at a plurality of estimated pile driving positions from the virtual ground model; A method for estimating the amount of subsidence, including:

2. Identifying the lower end point and the upper end point of the assumed subsidence layer at a plurality of set positions; A step of constructing a virtual ground model including the subsidence assumed layer by generating a virtual lower surface of the subsidence assumed layer by complementing the points between the lower end points at the plurality of set positions and generating a virtual upper surface of the subsidence assumed layer by complementing the points between the upper end points at the plurality of set positions; Calculating an estimated subsidence amount at a plurality of estimated pile driving positions from the virtual ground model; A method for estimating the amount of subsidence, including:

3. A part of the plurality of set positions coincides with the plurality of assumed pile driving positions, Or, some of the plurality of assumed pile driving positions coincide with the plurality of set positions. The method for estimating subsidence amount according to claim 1.

4. The point-to-point interpolation is a surface interpolation in which the points are connected to each other by a curved surface. The method for estimating subsidence amount according to claim 2.

5. The subsidence assumed layer includes at least one of a clay layer and a silt layer; The method for estimating subsidence amount according to claim 1.

6. The lower end point and the upper end point of the assumed subsidence layer at the plurality of set positions are specified based on a boring log. The method for estimating subsidence amount according to claim 1.

7. The vertical length of the assumed subsidence layer is divided into a plurality of reference lengths and one fractional length shorter than the reference length; The method for estimating subsidence amount according to claim 1.

8. A step of calculating an estimated subsidence difference value from the estimated subsidence amounts at a plurality of estimated pile driving positions; A step of calculating an additional stress generated in the foundation beam from the estimated settlement difference value; determining the arrangement of reinforcing bars according to the added stress; A method for reinforcing a building, comprising:

9. The estimated subsidence amount is estimated by a subsidence amount estimation method according to any one of claims 1 to 7. The method for reinforcing a building according to claim 8.

10. Identifying the lower end point and the upper end point of the assumed subsidence layer at a plurality of set positions, and constructing a virtual ground model including the assumed subsidence layer; displaying on a display unit estimated subsidence amounts at a plurality of estimated pile driving positions based on the virtual ground model; Display control system.

11. A virtual ground model including the subsidence assumed layer is constructed by identifying a lower end point and an upper end point of the subsidence assumed layer at a plurality of set positions, generating a virtual lower surface of the subsidence assumed layer by complementing the points between the lower end points at the plurality of set positions, and generating a virtual upper surface of the subsidence assumed layer by complementing the points between the upper end points at the plurality of set positions; displaying on a display unit estimated subsidence amounts at a plurality of estimated pile driving positions based on the virtual ground model; Display control system.

12. A color shade is set and displayed according to the estimated subsidence amount. The display control system according to claim 10 or 11.

13. Calculating an estimated subsidence difference value from the estimated subsidence amounts at the plurality of estimated pile driving positions; Calculate the deformation angle of the foundation beam from the estimated settlement difference value, The deformation angle is displayed in association with the estimated subsidence amount. The display control system according to claim 10 or 11.

Citation Information

Patent Citations

  • Ground settlement test system and method adopted with sensitive-gratings with numerical value of resistance

    CN108166547A

  • Ground analyzing apparatus for building plot

    JP2002054128A

  • Building inclination measuring and management system

    JP2002133571A

  • Ground investigation method, construction method for base isolation building, and design method for building

    JP2002250027A

  • Support layer selection program

    JP2004211399A