Distribution device, power control system, distribution method, and distribution program

The distribution device optimizes power allocation by considering cost and emissions for generators and storage batteries, addressing prediction errors in electricity demand and solar power, ensuring balanced supply and demand.

JP2024164588AActive Publication Date: 2024-11-27TOYOTA JIDOSHA KK
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2023080185
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-15
Publication Date
2024-11-27
Estimated Expiration
2043-05-15

AI Technical Summary

Technical Problem

Retail electricity utilities and registered specified electricity transmission and distribution utilities face challenges in ensuring the ability to adjust to prediction errors in electricity demand and solar power generation under the planned value simultaneous consumption system, necessitating the allocation of necessary adjustment power to maintain local electricity supply and demand balance.

Method used

A distribution device and method that allocates adjustment power by considering cost and carbon dioxide emissions for each type of power source across multiple time zones, setting distribution rates to optimize power usage among generators and storage batteries, ensuring sufficient adjustment power is secured during the planning period.

Benefits of technology

The solution effectively apportions necessary adjustment power, allowing utilities to manage prediction errors and maintain supply-demand balance while minimizing costs and carbon emissions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024164588000001_ABST
    Figure 2024164588000001_ABST
Patent Text Reader

Abstract

To proportionally divide necessary adjustment force which should be secured in a planning period.SOLUTION: A distribution device 20 comprises a control unit 21 which acquires information regarding either of costs by every time zone or carbon dioxide emission by every time zone for each of a plurality of kinds of power sources 11 used for providing adjustment force in a plurality of time zones, sets ratio at which each of the plurality of kinds of power sources 11 is used to provide the adjustment force as distribution ratio by referring to the acquired information for each time zone included in the plurality of time zones, and outputs a setting value of the distribution ratio by every time zone.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a distribution device, a power control system, a distribution method, and a distribution program. [Background technology]

[0002] Patent Document 1 discloses an operation planning device for a power plant having a power generation facility and an energy storage facility.

[0003] Patent Document 2 discloses an energy management system that controls buying and selling of grid power accompanying charging and discharging of a power storage device that can store system power from a power grid and power generated by a power generation device.

[0004] Patent Document 3 discloses a power control device that selects, for each operation period, either a charging priority operation that prioritizes a charging operation in which surplus power generated by a distributed power source, excluding demand power, is output to a power grid as power to be sold, and a power selling priority operation that prioritizes a power selling operation over a charging operation, and performs the selected operation. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] Patent Publication No. 2021-035277 [Patent Document 2] JP 2022-142957 A [Patent Document 3] International Publication No. 2017 / 094223 Summary of the Invention [Problem to be solved by the invention]

[0006] Electricity retailers and registered specified electricity transmission and distribution businesses must comply with the Planned Value Simultaneous Balancing System to avoid disrupting the electricity supply and demand in the region. The Planned Value Simultaneous Balancing System requires the submission of facility operation plans within the jurisdiction to OCCTO, or to the representative contractor if joining a balancing group. "OCCTO" is the abbreviation for Organization for Cross-regional Coordination of Transmission Operators. Facility operation plans are created in the following steps: (i) forecasting electricity demand and solar power generation, and (ii) creating a facility operation plan that can cover the shortage in (i) and minimize costs.

[0007] In facility operation planning, it is necessary to secure the adjustment capacity to absorb the forecast error that occurs in (i). The adjustment capacity required to absorb the forecast error during the planning period plus the adjustment capacity required for DR at the DR target time is the adjustment capacity required to be secured during the planning period. "DR" is an abbreviation for demand response.

[0008] The purpose of this disclosure is to apportion the necessary adjustment capacity to be secured during the planning period. [Means for solving the problem]

[0009] The allocation device according to the present disclosure comprises: The system includes a control unit that acquires information regarding either the cost by time period or the carbon dioxide emissions by time period for each of multiple types of power sources used to provide adjustment power in multiple time periods, and for each time period included in the multiple time periods, refers to the acquired information, sets the ratio at which each of the multiple types of power sources is used to provide adjustment power as an allocation rate, and outputs a setting value of the allocation rate by time period.

[0010] The allocation method according to the present disclosure is: Acquiring, by a distribution device, information regarding either a time-slot cost or a time-slot carbon dioxide emission amount for each of a plurality of types of power sources used to provide adjustment power in a plurality of time slots; With respect to each of the time periods included in the plurality of time periods, by referring to the acquired information, a ratio at which each of the plurality of types of power sources is used to provide adjustment power is set as an allocation rate by the allocation device; outputting a set value of the allocation rate for each time period from the allocation device; Includes.

[0011] The allocation program according to the present disclosure is Acquiring information regarding either a time-slot cost or a time-slot carbon dioxide emission for each of a plurality of types of power sources used to provide adjustment capability in a plurality of time slots; With respect to each of the time periods included in the plurality of time periods, by referring to the acquired information, a ratio at which each of the plurality of types of power sources is used to provide adjustment power is set as an allocation rate; Output the set value of the allocation rate by time period The method causes a computer to perform operations including: Effect of the Invention

[0012] According to the present disclosure, it is possible to apportion the necessary adjustment capacity to be secured during the planning period. [Brief description of the drawings]

[0013] [Figure 1] 1 is a diagram illustrating a configuration of a power control system according to an embodiment of the present disclosure. [Diagram 2] 1 is a graph showing an example of the necessary adjustment capacity to be secured during a planning period. [Diagram 3] 10 is a flowchart illustrating the operation of an allocation device according to an embodiment of the present disclosure. [Figure 4] 4 is a flowchart showing a specific procedure of the process in step S9 of FIG. 3. [Diagram 5]13A and 13B are diagrams illustrating an example of an allocation result and its influence on a subsequent process according to an embodiment of the present disclosure. [Figure 6] 10 is a flowchart showing a modified example of the specific procedure of the process in step S9 of FIG. 3. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] Hereinafter, an embodiment of the present disclosure will be described with reference to the drawings.

[0015] In each drawing, the same or corresponding parts are denoted by the same reference numerals. In the description of this embodiment, the description of the same or corresponding parts will be omitted or simplified as appropriate.

[0016] The configuration of a power control system 10 according to this embodiment will be described with reference to FIG.

[0017] The power control system 10 includes a distribution device 20 and a power control device 30. The distribution device 20 is capable of communicating with the power control device 30 via a network 40.

[0018] The distribution device 20 and the power control device 30 are computers installed in facilities such as a substation or a data center. The distribution device 20 and the power control device 30 are operated by an electric utility such as a retail electricity supplier or a registered specified electricity transmission and distribution supplier.

[0019] Network 40 includes the Internet, at least one WAN, at least one MAN, or any combination thereof. "WAN" is an abbreviation for wide area network. "MAN" is an abbreviation for metropolitan area network. Network 40 may include at least one wireless network, at least one optical network, or any combination thereof. A wireless network may be, for example, an ad-hoc network, a cellular network, a wireless LAN, a satellite communication network, or a terrestrial microwave network. "LAN" is an abbreviation for local area network.

[0020] The outline of this embodiment will be described.

[0021] The distribution device 20 acquires information on either the cost Ci by time zone or the carbon dioxide emission amount Ei by time zone for each of the multiple types of power sources 11 used to provide the adjustment power in the multiple time zones P. The "adjustment power" refers to the capacity of power generation facilities (including pumped storage power generation facilities), power storage facilities, DR and other systems for controlling power supply and demand, and other equivalents (excluding distribution facilities) required for frequency control, supply and demand balance adjustment, and other system stabilization operations in the supply area. The multiple time zones P correspond to a planning period. The length of the planning period is, for example, 24 hours or 72 hours. The multiple types of power sources 11 may include any power source, but in this embodiment, they include a generator 12 and a storage battery 13. The information on the cost Ci by time zone may include information on any cost required for using the multiple types of power sources 11, but in this embodiment, it includes information on the fuel price 24 by time zone, information on the power purchase price 25 by time zone, and information on the power sale price 26 by time zone.

[0022] The distribution device 20 refers to the acquired information for each time slot Ti included in the multiple time slots P, and sets the ratio at which each of the multiple types of power sources 11 is used to provide adjustment power as the distribution rate Di. Each time slot Ti corresponds to each frame of the planning period. The length of one frame is, for example, 30 minutes.

[0023] The distribution device 20 outputs a set value of the distribution rate Di for each time period. The power control device 30 controls the multiple types of power sources 11 according to the set value of the distribution rate Di for each time period output from the distribution device 20.

[0024] According to this embodiment, it is possible to apportion the necessary adjustment capacity 50 to be secured during the planning period as shown in Fig. 2. Specifically, in the method of apportioning the necessary adjustment capacity 50 to be secured during the planning period, it is possible to select the means for securing adjustment capacity in ascending order of unit cost or in descending order of carbon dioxide emissions.

[0025] The required adjustability 50 to be secured during the planning period is the sum of the required adjustability 51 for absorbing forecast errors during the planning period and the required adjustability 52 for DR at the DR target time. The unit is kW. The required adjustability 50 to be secured during the planning period is divided into PA and NA. "PA" is an abbreviation for positive adjustability. "NA" is an abbreviation for negative adjustability.

[0026] PA is an adjustment capability for procuring power shortages caused by prediction errors of power demand and photovoltaic power generation in the planning period, and may also include the necessary adjustment capability 52 for DR at the DR target time. In this embodiment, PA is secured by leaving a power generation surplus in the generator 12, storing electricity in the storage battery 13, or both.

[0027] NA is an adjustment capacity for absorbing surplus power caused by prediction errors of power demand and solar power generation during the planning period. In this embodiment, NA is secured by having the generator 12 generate power, or by leaving a storage capacity in the storage battery 13, or by both.

[0028] The configuration of a distribution device 20 according to this embodiment will be described with reference to FIG.

[0029] The distribution device 20 includes a control unit 21, a storage unit 22, and a communication unit 23.

[0030] The control unit 21 includes at least one processor, at least one programmable circuit, at least one dedicated circuit, or any combination thereof. The processor is a general-purpose processor such as a CPU or GPU, or a dedicated processor specialized for a specific process. "CPU" is an abbreviation for central processing unit. "GPU" is an abbreviation for graphics processing unit. The programmable circuit is, for example, an FPGA. "FPGA" is an abbreviation for field-programmable gate array. The dedicated circuit is, for example, an ASIC. "ASIC" is an abbreviation for application specific integrated circuit. The control unit 21 executes processes related to the operation of the distribution device 20 while controlling each part of the distribution device 20.

[0031] The storage unit 22 includes at least one semiconductor memory, at least one magnetic memory, at least one optical memory, or any combination thereof. The semiconductor memory is, for example, a RAM, a ROM, or a flash memory. "RAM" is an abbreviation for random access memory. "ROM" is an abbreviation for read only memory. The RAM is, for example, an SRAM or a DRAM. "SRAM" is an abbreviation for static random access memory. "DRAM" is an abbreviation for dynamic random access memory. The ROM is, for example, an EEPROM. "EEPROM" is an abbreviation for electrically erasable programmable read only memory. The flash memory is, for example, an SSD. "SSD" is an abbreviation for solid-state drive. The magnetic memory is, for example, an HDD. "HDD" is an abbreviation for hard disk drive. The storage unit 22 functions, for example, as a main storage device, an auxiliary storage device, or a cache memory. The storage unit 22 stores information used for the operation of the allocation device 20 and information obtained by the operation of the allocation device 20. In this embodiment, the storage unit 22 stores at least information regarding either the cost Ci by time slot or the carbon dioxide emission amount Ei by time slot.

[0032] The communication unit 23 includes at least one communication module. The communication module is, for example, a module compatible with a wired LAN communication standard such as Ethernet (registered trademark) or a wireless LAN communication standard such as IEEE802.11. "IEEE" is an abbreviation for Institute of Electrical and Electronics Engineers. The communication unit 23 communicates with devices other than the distribution device 20, such as the power control device 30. The communication unit 23 receives information used in the operation of the distribution device 20, and transmits information obtained by the operation of the distribution device 20. In this embodiment, the communication unit 23 receives information on at least one of the cost Ci by time zone and the carbon dioxide emission amount Ei by time zone.

[0033] The functions of the allocation device 20 are realized by executing an allocation program according to this embodiment on a processor serving as the control unit 21. That is, the functions of the allocation device 20 are realized by software. The allocation program causes a computer to execute the operations of the allocation device 20, thereby causing the computer to function as the allocation device 20. That is, the computer functions as the allocation device 20 by executing the operations of the allocation device 20 in accordance with the allocation program.

[0034] The program may be stored in a non-transitory computer-readable medium. Examples of the non-transitory computer-readable medium include a flash memory, a magnetic recording device, an optical disk, a magneto-optical recording medium, or a ROM. The program may be distributed, for example, by selling, transferring, or lending a portable medium such as an SD card, DVD, or CD-ROM on which the program is stored. "SD" is an abbreviation for Secure Digital. "DVD" is an abbreviation for digital versatile disc. "CD-ROM" is an abbreviation for compact disc read only memory. The program may be distributed by storing the program in the storage of a server and transferring the program from the server to another computer. The program may be provided as a program product.

[0035] A computer temporarily stores in a main storage device, for example, a program stored in a portable medium or a program transferred from a server. Then, the computer reads the program stored in the main storage device with a processor, and executes processing according to the read program with the processor. The computer may read the program directly from a portable medium and execute processing according to the program. The computer may execute processing according to the received program each time a program is transferred from the server to the computer. Processing may be executed by a so-called ASP-type service that realizes functions only by execution instructions and result acquisition without transferring a program from the server to the computer. "ASP" is an abbreviation for application service provider. A program is information used for processing by a computer, and includes those equivalent to a program. For example, data that is not a direct command to a computer but has the property of defining computer processing falls under "those equivalent to a program."

[0036] A part or all of the functions of the distribution device 20 may be realized by a programmable circuit or a dedicated circuit as the control unit 21. In other words, a part or all of the functions of the distribution device 20 may be realized by hardware.

[0037] The operation of the distribution device 20 according to this embodiment will be described with reference to Fig. 3. The operation shown in Fig. 3 corresponds to the distribution method according to this embodiment.

[0038] In step S1, the control unit 21 acquires information on the necessary adjustment capacity 50 to be secured in the planning period and information on the specifications of the multiple types of power sources 11. For example, the control unit 21 receives the information on the necessary adjustment capacity 50 to be secured in the planning period and information on the specifications of the multiple types of power sources 11 from the manager's terminal device or an external server device via the communication unit 23. Alternatively, the control unit 21 may directly receive input of the information on the necessary adjustment capacity 50 to be secured in the planning period and information on the specifications of the multiple types of power sources 11 from the manager. The information on the specifications of the multiple types of power sources 11 includes information on the specifications of the generator 12 and information on the specifications of the storage battery 13. The control unit 21 refers to the acquired information and determines whether the sum of PA and NA in the planning period is greater than the sum of the total power generation amount of the generator 12 and the total capacity of the storage battery 13. In FIG. 2, the total area of ​​PA and NA corresponds to the sum of PA and NA.

[0039] If the sum of PA and NA in the planning period is greater than the sum of the total power generation amount of the generator 12 and the total capacity of the storage battery 13, the process of step S2 is executed. If the sum of PA and NA in the planning period is equal to or less than the sum of the total power generation amount of the generator 12 and the total capacity of the storage battery 13, the process of step S9 is executed.

[0040] In step S2, the control unit 21 acquires information regarding consideration of bidding in the supply and demand adjustment market. For example, the control unit 21 receives the information regarding consideration of bidding in the supply and demand adjustment market from the manager's terminal device or an external server device via the communication unit 23. Alternatively, the control unit 21 may directly accept input of the information regarding consideration of bidding in the supply and demand adjustment market from the manager. The control unit 21 refers to the acquired information and determines whether the PA includes a portion for consideration of bidding in the supply and demand adjustment market.

[0041] If the PA includes a portion for consideration of bidding to the balancing market, the process of step S3 is executed. If the PA does not include a portion for consideration of bidding to the balancing market, the process of step S5 is executed.

[0042] In step S3, the control unit 21 subtracts the amount of the bid to be considered for the supply and demand balancing market from the PA. The control unit 21 may subtract only a part of the amount of the bid to be considered for the supply and demand balancing market from the PA, as long as the sum of the PA and the NA in the planning period can be made equal to the sum of the total power generation amount of the generator 12 and the total capacity of the storage battery 13. The control unit 21 may prompt the manager to cancel or reconsider the consideration of the bid to the supply and demand balancing market. After step S3, the process of step S4 is executed.

[0043] In step S4, the control unit 21 refers to the information acquired in step S1 and determines whether the sum of PA and NA in the planning period is greater than the sum of the total power generation amount of the generator 12 and the total capacity of the storage battery 13. PA here is the PA after the amount for bidding consideration in the supply and demand adjustment market in step S3 is subtracted.

[0044] If the sum of PA and NA in the planning period is greater than the sum of the total power generation amount of the generator 12 and the total capacity of the storage battery 13, the process of step S5 is executed. If the sum of PA and NA in the planning period is equal to or less than the sum of the total power generation amount of the generator 12 and the total capacity of the storage battery 13, the process of step S9 is executed.

[0045] In step S5, the control unit 21 acquires information regarding how to deal with the excess of the contract power. For example, the control unit 21 receives the information regarding how to deal with the excess of the contract power from the manager's terminal device or an external server device via the communication unit 23. Alternatively, the control unit 21 may directly accept input of information regarding how to deal with the excess of the contract power from the manager. A plan for dealing with the excess of the contract power is made when it is likely that the contract power will be exceeded, such as when the reserve margin falls below 5% as a result of power supply and demand forecast. The control unit 21 refers to the acquired information and determines whether the PA includes a portion for dealing with the excess of the contract power.

[0046] If the PA includes a portion for dealing with the excess of the contracted power, the process proceeds to step S6. If the PA does not include a portion for dealing with the excess of the contracted power, the process proceeds to step S8.

[0047] In step S6, the control unit 21 subtracts from PA the amount corresponding to the excess of the contracted power. If the control unit 21 can make the sum of PA and NA in the planning period equal to the sum of the total power generation amount of the generator 12 and the total capacity of the storage battery 13, the control unit 21 may subtract only a part of the amount corresponding to the excess of the contracted power from PA. The control unit 21 may urge the manager to take measures to prevent the excess of the contracted power from occurring by reducing the power demand in the corresponding time period, such as a request for power saving, so that the action to the excess of the contracted power becomes unnecessary. After step S6, the process of step S7 is executed.

[0048] In step S7, the control unit 21 refers to the information acquired in step S1 and determines whether the sum of PA and NA in the planning period is greater than the sum of the total power generation amount of the generator 12 and the total capacity of the storage battery 13. PA here is the value after the portion corresponding to the excess of the contracted power is subtracted in step S6.

[0049] If the sum of PA and NA in the planning period is greater than the sum of the total power generation amount of the generator 12 and the total capacity of the storage battery 13, the process of step S8 is executed. If the sum of PA and NA in the planning period is equal to or less than the sum of the total power generation amount of the generator 12 and the total capacity of the storage battery 13, the process of step S9 is executed.

[0050] In step S8, the control unit 21 prompts the manager to consider strengthening the power source 11, such as introducing a new generator, a new storage battery, or both. After step S8, the operation shown in FIG.

[0051] In step S9, the control unit 21 apportions the necessary adjustment capacity 50 to be secured in the planning period. Specifically, the control unit 21 acquires information on either the cost Ci for each time slot or the carbon dioxide emission amount Ei for each time slot for each of the multiple types of power sources 11. For example, the control unit 21 receives information on either the cost Ci for each time slot or the carbon dioxide emission amount Ei for each time slot from the administrator's terminal device or an external server device via the communication unit 23. Alternatively, the control unit 21 may directly accept input of information on either the cost Ci for each time slot or the carbon dioxide emission amount Ei for each time slot from the administrator. The control unit 21 sets the ratio at which each of the multiple types of power sources 11 is used to provide adjustment capacity as the allocation rate Di by referring to the acquired information for each time slot Ti included in the multiple time slots P. The control unit 21 outputs the set value of the allocation rate Di for each time slot. For example, the control unit 21 transmits the set value of the allocation rate Di for each time slot to the power control device 30 via the communication unit 23. After step S9, the operation shown in FIG. 3 ends.

[0052] The specific procedure of the process in step S9 will be described with reference to FIG.

[0053] The processes from step S901 to step S906 are executed for each time slot Ti included in the multiple time slots P, that is, for each frame of the planning period.

[0054] In steps S901 to S903, the control unit 21 refers to information on the corresponding fuel price 24 and information on the corresponding power purchase price 25 for each time slot Ti, and sets at least the ratio of the generator 12 and the storage battery 13 to be used to provide adjustment capability for power shortage as the allocation rate Di. Specifically, the control unit 21 compares the cost of procuring the power shortage by supplying fuel to the generator 12 and causing the generator 12 to generate power with the cost of procuring the power shortage by supplying the power obtained by purchasing power to the storage battery 13 and discharging the power to the storage battery 13, and sets the ratio of the generator 12 and the storage battery 13 to be used to provide adjustment capability for power shortage for each time slot Ti. For example, if the generator 12 is an FC generator, the fuel is hydrogen. "FC" is an abbreviation for fuel cell.

[0055] More specifically, in step S901, the control unit 21 compares the predicted values ​​of the power procurement cost in the case of consuming fuel to generate power and in the case of purchasing power from an external source to discharge. If it is predicted that the power procurement cost is lower in the case of purchasing power from an external source to discharge than in the case of consuming fuel to generate power, in step S902, the control unit 21 preferentially secures the discharge reserve of the storage battery 13 for PA. If the discharge reserve of the storage battery 13 that can be secured for PA is insufficient after taking into consideration the amount to be secured for NA, the control unit 21 also secures the power generation reserve of the generator 12. For example, if 1 / 2 of the rated capacity of the storage battery 13 is secured for NA, only 1 / 2 of the rated capacity of the storage battery 13 can be secured for PA. If it is predicted that the power procurement cost is lower in the case of consuming fuel to generate power than in the case of purchasing power from an external source to discharge, or that the costs are the same in both cases, in step S903, the control unit 21 preferentially secures the power generation reserve of the generator 12 for PA. If the power generation reserve of the generator 12 that can be secured for PA is insufficient after taking into consideration the portion to be secured for NA, the control unit 21 also secures the discharge reserve of the storage battery 13. For example, if 1 / 2 of the rated output of the generator 12 is secured for NA, only 1 / 2 of the rated output of the generator 12 can be secured for PA as well.

[0056] In steps S904 to S906, the control unit 21 refers to information on the corresponding power selling price 26 and information on the corresponding power purchasing price 25 for each time slot Ti, and sets at least the ratio of each of the generator 12 and the storage battery 13 to be used for providing adjustment power for surplus power as the allocation rate Di. Specifically, the control unit 21 compares the cost of absorbing surplus power by reducing the power obtained by having the generator 12 generate power for power sale with the cost of absorbing surplus power by reducing the power obtained by purchasing power for charging the storage battery 13, and sets the ratio of each of the generator 12 and the storage battery 13 to be used for providing adjustment power for surplus power, for each time slot Ti.

[0057] More specifically, in step S904, the control unit 21 compares predicted values ​​of the power procurement cost in the case of reducing the amount of power generated and reducing the amount of power sold with the case of charging the storage battery 13 with the surplus power and reducing the amount of power purchased. If it is predicted that the power procurement cost of reducing the amount of power generated and reducing the amount of power sold will be lower than the power procurement cost of charging the storage battery 13 with the surplus power and reducing the amount of power purchased, in step S905, the control unit 21 preferentially secures the power generation reduction margin of the generator 12 for the NA. After taking into consideration the amount to be secured for the PA, if the power generation reduction margin of the generator 12 that can be secured for the NA is insufficient, the control unit 21 also secures the charging margin of the storage battery 13. For example, if half of the rated output of the generator 12 is secured for the PA, only half of the rated output of the generator 12 can be secured for the NA. If it is predicted that the cost of procuring electricity is lower by charging the surplus electricity to the storage battery 13 and reducing the amount of electricity purchased than by reducing the amount of electricity generated and reducing the amount of electricity sold, or that both are the same, in step S906, the control unit 21 preferentially secures the charging capacity of the storage battery 13 for the NA. After taking into consideration the amount to be secured for the PA, if the charging capacity of the storage battery 13 that can be secured for the NA is insufficient, the control unit 21 also secures the power generation reduction capacity of the generator 12. For example, if half the rated capacity of the storage battery 13 is secured for the PA, only half the rated capacity of the storage battery 13 can be secured for the NA.

[0058] As shown in FIG. 4, the allocation result obtained by selecting the means for securing the adjustment capacity in ascending order of unit price may affect the next process. For example, as shown in FIG. 5, the allocation result becomes the upper and lower limits of the SOC of the storage battery 13, the upper and lower limits of the output of the generator 12, or both of them. "SOC" is an abbreviation of state of charge. In the example shown in FIG. 5, the sum of PA and NA in the planning period is smaller than the sum of the total power generation amount of the generator 12 and the total capacity of the storage battery 13, so the difference obtained by subtracting the sum of PA and NA from the sum of the total power generation amount of the generator 12 and the total capacity of the storage battery 13 can be used for energy management. "Use for energy management" means "operate the facility according to the objective function." For example, when creating a plan with the objective function of "minimizing the power procurement cost," it is considered that the storage battery 13 stores surplus solar power generation, or purchases and stores electricity when it is possible to purchase electricity cheaply, and discharges it when the unit price of electricity purchase is high. Assuming that the unit price order is "purchased electricity > power generation > discharge," the generator 12 may generate electricity when the purchased electricity price is high and the above-mentioned discharge is insufficient.

[0059] A modified example of the specific procedure of the process in step S9 will be described with reference to FIG.

[0060] The processes from step S911 to step S916 are executed for each time slot Ti included in the multiple time slots P, that is, for each frame of the planning period.

[0061] In steps S911 to S913, the control unit 21 references information on the corresponding carbon dioxide emission amount Ei for each time slot Ti and sets, as the allocation rate Di, at least the ratio at which the generator 12 and the storage battery 13 are used to provide adjustment capability for a power shortage. Specifically, the control unit 21 compares, for each time slot Ti, the amount of carbon dioxide emission in a case where the power shortage is procured by supplying fuel to the generator 12 and causing the generator 12 to generate electricity with the amount of carbon dioxide emission in a case where the power shortage is procured by supplying power obtained by purchasing electricity to the storage battery 13 and discharging the power into the storage battery 13, and sets the ratio at which the generator 12 and the storage battery 13 are used to provide adjustment capability for a power shortage.

[0062] More specifically, in step S911, the control unit 21 compares the predicted values ​​of the amount of carbon dioxide emission in the case of generating electricity by consuming fuel with the case of discharging electricity by purchasing electricity from outside. As a method for calculating the amount of carbon dioxide emission in the case of generating electricity, for example, a method of calculating the amount of carbon dioxide emission per kWh from the amount of carbon dioxide emission when fuel is burned and the power generation efficiency, and further multiplying it by the amount of electricity generated can be used. As a method for calculating the amount of carbon dioxide emission in the case of discharging electricity by purchasing electricity, for example, a method of multiplying the amount of electricity purchased by the amount of carbon dioxide emission per kWh of purchased electricity published by each electricity purchase destination. If it is predicted that the amount of carbon dioxide emission is smaller when discharging electricity by purchasing electricity from outside than when generating electricity by consuming fuel, in step S912, the control unit 21 secures the discharge reserve capacity of the storage battery 13 for PA with priority. The control unit 21 also secures the power generation reserve capacity of the generator 12 if the discharge reserve capacity of the storage battery 13 that can be secured for PA is insufficient, taking into consideration the amount to be secured for NA. If it is predicted that consuming fuel to generate power results in less carbon dioxide emissions than purchasing power from outside and discharging it, or that both are the same, in step S913, the control unit 21 preferentially secures the power generation reserve of the generator 12 for PA. Taking into consideration the amount to be secured for NA, the control unit 21 also secures the discharge reserve of the storage battery 13 if the power generation reserve of the generator 12 that can be secured for PA is insufficient.

[0063] In steps S914 to S916, the control unit 21 references information on the corresponding carbon dioxide emission amount Ei for each time slot Ti and sets, as the allocation rate Di, at least the ratio at which each of the generator 12 and the storage battery 13 is used to provide adjustment capability for surplus power. Specifically, the control unit 21 compares, for each time slot Ti, the amount of carbon dioxide emission in a case where surplus power is absorbed by reducing the power obtained by having the generator 12 generate power for sale with the amount of carbon dioxide emission in a case where surplus power is absorbed by reducing the power obtained by purchasing power for charging the storage battery 13, and sets the ratio at which each of the generator 12 and the storage battery 13 is used to provide adjustment capability for surplus power.

[0064] More specifically, in step S914, the control unit 21 compares predicted values ​​of carbon dioxide emissions in a case where the amount of power generation is reduced to reduce the amount of power sold, and in a case where the amount of power purchased is reduced by charging the storage battery 13 with the surplus power. A method of calculating the amount of carbon dioxide emissions in a case where power is sold can be used, for example, by calculating the amount of carbon dioxide emissions per kWh in a case where power is generated, and further multiplying it by the amount of power sold. If it is predicted that reducing the amount of power generation to reduce the amount of power sold will result in less carbon dioxide emissions than reducing the amount of power purchased by charging the storage battery 13 with the surplus power, in step S915, the control unit 21 preferentially secures the power generation reduction margin of the generator 12 for the NA. In consideration of the amount to be secured for the PA, if the power generation reduction margin of the generator 12 that can be secured for the NA is insufficient, the control unit 21 also secures the charging margin of the storage battery 13. If it is predicted that charging the surplus power to the storage battery 13 and reducing the amount of purchased power will result in less carbon dioxide emissions than reducing the amount of power generated and reducing the amount of power sold, or that both will be the same, in step S916, the control unit 21 prioritizes reserving a charging capacity of the storage battery 13 for NA. Taking into consideration the amount to be reserved for PA, if the charging capacity of the storage battery 13 that can be reserved for NA is insufficient, the control unit 21 also reserves a power generation reduction capacity of the generator 12.

[0065] The present disclosure is not limited to the above-mentioned embodiment. For example, two or more blocks shown in the block diagram may be integrated, or one block may be divided. Instead of executing two or more steps shown in the flowchart in chronological order as described, they may be executed in parallel or in a different order depending on the processing capacity of the device executing each step, or as necessary. Other modifications are possible without departing from the spirit of the present disclosure.

[0066] Some of the embodiments of the present disclosure will be described below as examples. However, it should be noted that the embodiments of the present disclosure are not limited to these examples. [Appendix 1] An allocation device comprising a control unit that acquires information regarding either the cost by time period or the carbon dioxide emissions by time period for each of multiple types of power sources used to provide adjustment power in multiple time periods, and for each time period included in the multiple time periods, refers to the acquired information, sets the ratio at which each of the multiple types of power sources is used to provide adjustment power as an allocation rate, and outputs a setting value of the allocation rate by time period. [Appendix 2] the plurality of types of power sources include a generator and a storage battery; The information on costs by time period includes information on fuel prices by time period and information on electricity purchase prices by time period, The control unit of the distribution device described in Appendix 1 refers to information regarding the corresponding fuel price and information regarding the corresponding power purchase price for each time period, and sets the distribution rate as the ratio at which at least the generator and the storage battery are used to provide adjustment power for power shortages. [Appendix 3] The control unit compares, for each time period, the cost of providing the shortfall in power by supplying fuel to the generator and causing the generator to generate power with the cost of providing the shortfall in power by supplying electricity obtained by purchasing power to the storage battery and discharging the electricity into the storage battery, and sets a ratio at which the generator and the storage battery are each used to provide adjustment power for the shortfall in power. [Appendix 4] the plurality of types of power sources include a generator and a storage battery; The information on the cost by time period includes information on the power selling price by time period and information on the power purchasing price by time period, The control unit refers to information relating to a corresponding electricity selling price and information relating to a corresponding electricity purchasing price for each time period, and sets the allocation rate to at least the ratio at which the generator and the storage battery are used to provide adjustment power for surplus electricity. [Appendix 5] The control unit, for each time period, compares the cost of absorbing the surplus power by reducing the power obtained by having the generator generate power to sell with the cost of absorbing the surplus power by reducing the power obtained by purchasing power to charge the storage battery, and sets the ratio at which the generator and the storage battery are used to provide adjustment power for the surplus power. [Appendix 6] the plurality of types of power sources include a generator and a storage battery; The control unit refers to information regarding corresponding carbon dioxide emission amounts for each time period and sets the allocation rate to at least the ratio at which the generator and the storage battery are utilized to provide adjustment power for power shortages. [Appendix 7] The control unit, for each time period, compares the amount of carbon dioxide emissions when the shortage of power is procured by supplying fuel to the generator and causing the generator to generate electricity with the amount of carbon dioxide emissions when the shortage of power is procured by supplying electricity obtained by purchasing power to the storage battery and discharging it into the storage battery, and sets a ratio at which the generator and the storage battery are each used to provide adjustment power for the shortage of power. [Appendix 8] the plurality of types of power sources include a generator and a storage battery; The control unit refers to information regarding corresponding carbon dioxide emission amounts for each time period and sets the allocation rate to at least the ratio at which each of the generators and the storage batteries is used to provide adjustment power for surplus electricity. [Appendix 9] The control unit, for each time period, compares the amount of carbon dioxide emissions when the surplus power is absorbed by reducing the power obtained by having the generator generate power to sell with the amount of carbon dioxide emissions when the surplus power is absorbed by reducing the power obtained by purchasing power to charge the storage battery, and sets a ratio at which the generator and the storage battery are used to provide adjustment power for the surplus power. [Appendix 10] A distribution device according to any one of claims 1 to 9, a power control device that controls the plurality of types of power sources in accordance with a set value of a distribution rate for each time period output from the distribution device; A power control system comprising: [Appendix 11] Acquiring, by a distribution device, information regarding either a time-slot cost or a time-slot carbon dioxide emission amount for each of a plurality of types of power sources used to provide adjustment power in a plurality of time slots; With respect to each of the time periods included in the plurality of time periods, by referring to the acquired information, a ratio at which each of the plurality of types of power sources is used to provide adjustment power is set as an allocation rate by the allocation device; outputting a set value of the allocation rate for each time period from the allocation device; Allocation methods including: [Appendix 12] Acquiring information regarding either a time-slot cost or a time-slot carbon dioxide emission for each of a plurality of types of power sources used to provide adjustment capability in a plurality of time slots; With respect to each of the time periods included in the plurality of time periods, by referring to the acquired information, a ratio at which each of the plurality of types of power sources is used to provide adjustment power is set as an allocation rate; Output the set value of the allocation rate by time period A distribution program that causes a computer to perform operations including: [Explanation of symbols]

[0067] 10 Power Control System 11 Power supply 12. Generator 13. Storage battery 20 Distribution Device 21 Control section 22 Memory section 23 Communications Department 24 Fuel Prices 25 Power Purchase Price 26 Electricity selling price 30 Power control device 40 Network 50,51,52 Necessary adjustment force

Claims

1. An allocation device comprising a control unit that acquires information regarding either the cost by time period or the carbon dioxide emissions by time period for each of multiple types of power sources used to provide adjustment power in multiple time periods, and for each time period included in the multiple time periods, refers to the acquired information, sets the ratio at which each of the multiple types of power sources is used to provide adjustment power as an allocation rate, and outputs a setting value of the allocation rate by time period.

2. the plurality of types of power sources include a generator and a storage battery; The information on costs by time period includes information on fuel prices by time period and information on electricity purchase prices by time period, The distribution device of claim 1, wherein the control unit, for each time period, refers to information regarding the corresponding fuel price and information regarding the corresponding electricity purchase price, and sets the distribution rate as the ratio at which at least the generator and the storage battery are used to provide adjustment power for power shortages.

3. 3. The distribution device according to claim 2, wherein the control unit, for each time period, compares the cost of providing the shortage of power by supplying fuel to the generator and causing the generator to generate electricity with the cost of providing the shortage of power by supplying electricity obtained by purchasing power to the storage battery and discharging it into the storage battery, and sets a ratio at which the generator and the storage battery are each used to provide adjustment power for the shortage of power.

4. the plurality of types of power sources include a generator and a storage battery; The information on the cost by time period includes information on the power selling price by time period and information on the power purchasing price by time period, The distribution device of claim 1, wherein the control unit, for each time period, refers to information regarding the corresponding electricity selling price and information regarding the corresponding electricity purchasing price, and sets the distribution rate as the ratio at least of the ratio at which the generator and the storage battery are used to provide adjustment power for surplus electricity.

5. The control unit, for each time period, compares the cost of absorbing the surplus power by reducing the power obtained by having the generator generate power to sell with the cost of absorbing the surplus power by reducing the power obtained by purchasing power to charge the storage battery, and sets a ratio at which the generator and the storage battery are used to provide adjustment power for the surplus power.

6. the plurality of types of power sources include a generator and a storage battery; The distribution device according to claim 1, wherein the control unit, for each time period, refers to information regarding corresponding carbon dioxide emission amounts and sets the distribution rate as the ratio at which at least the generator and the storage battery are used to provide adjustment power for power shortages.

7. The control unit, for each time period, compares the amount of carbon dioxide emissions when the shortage of power is procured by supplying fuel to the generator and causing the generator to generate electricity with the amount of carbon dioxide emissions when the shortage of power is procured by supplying electricity obtained by purchasing power to the storage battery and discharging it into the storage battery, and sets a ratio at which the generator and the storage battery are each used to provide adjustment power for the shortage of power.

8. the plurality of types of power sources include a generator and a storage battery; The distribution device according to claim 1, wherein the control unit, for each time period, refers to information regarding corresponding carbon dioxide emission amounts and sets the distribution rate as the ratio at which at least each of the generator and the storage battery is used to provide adjustment power for surplus electricity.

9. The control unit, for each time period, compares the amount of carbon dioxide emissions when the surplus power is absorbed by reducing the amount of power generated by the generator to be sold with the amount of carbon dioxide emissions when the surplus power is absorbed by reducing the amount of power purchased to charge the storage battery, and sets a ratio at which the generator and the storage battery are used to provide adjustment power for the surplus power.

10. An allocation device according to any one of claims 1 to 9; a power control device that controls the plurality of types of power sources in accordance with a set value of a distribution rate for each time period output from the distribution device; A power control system comprising:

11. Acquiring, by a distribution device, information regarding either a time-slot cost or a time-slot carbon dioxide emission amount for each of a plurality of types of power sources used to provide adjustment power in a plurality of time slots; With respect to each of the time periods included in the plurality of time periods, by referring to the acquired information, a ratio at which each of the plurality of types of power sources is used to provide adjustment power is set as an allocation rate by the allocation device; outputting a set value of the allocation rate for each time period from the allocation device; Allocation methods including:

12. Acquiring information regarding either a time-slot cost or a time-slot carbon dioxide emission for each of a plurality of types of power sources used to provide adjustment capability in a plurality of time slots; With respect to each of the time periods included in the plurality of time periods, by referring to the acquired information, a ratio at which each of the plurality of types of power sources is used to provide adjustment power is set as an allocation rate; Output the set value of the allocation rate by time period A distribution program that causes a computer to perform operations including:

Citation Information

Patent Citations

  • Energy management system, energy management method, and computer program

    JP2020184881A

  • Power plant operation planning device and power plant operation planning method

    JP2021035277A

  • Energy management system, integrated management device, and energy management method

    JP2021047598A

  • Dynamic non-linear optimization of a battery energy storage system

    US20220247188A1

  • Energy management system

    JP2022142957A