Double-pipe brace and method for manufacturing the same
By surrounding the core material with a restraining material formed from multiple steel pipes, the joint between the core and end joining materials is protected, addressing the structural weakness and maintaining the brace's seismic energy absorption capacity.
Patent Information
- Application Number
- JP2023082577
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-18
- Publication Date
- 2024-11-28
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The joint between the core material and the end joining material in conventional double pipe braces becomes a structurally weak point due to exposure and changes in rigidity, leading to potential failure during seismic events.
The core material is surrounded by a restraining material formed from multiple steel pipes, with the joints between the core and end joining materials being inserted inside the restraining material to prevent weakness, using various configurations of split and connected steel pipes to enhance structural integrity.
This configuration prevents the joint from becoming a structural weak point, maintaining the brace's seismic energy absorption capacity and ensuring the joint remains protected within the restraining material, thus enhancing the brace's durability during earthquakes.
Smart Images

Figure 2024165956000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a double tube brace and a method for making the same. [Background technology]
[0002] Double-tube braces have traditionally been used as braces that form building frames (column-beam frames, roof frames, etc.). Double-tube braces have a double steel pipe structure with a core material made of steel pipes (circular steel pipes) that absorb earthquake energy and restraining materials (stiffening materials) made of steel pipes with a relatively larger diameter than the core material that surround the core material to prevent the core material from buckling. They are buckling-restrained braces that have excellent earthquake energy absorption properties and are relatively lightweight.
[0003] When incorporating the above-mentioned double-tube brace into a building frame that has a rectangular frame shape when viewed from the front, it is common to have brackets, gusset plates, etc. protrude inward from a pair of diagonal corners of the building frame, attach end connecting materials to both ends of the core material of the double-tube brace, and then bolt together the pair of brackets, gusset plates, etc. and the pair of end connecting materials.
[0004] Incidentally, in order to effectively transmit seismic energy to the core material of the double-tube brace and absorb the seismic energy throughout the entire core material when the building frame is deformed during a major earthquake, it is necessary that the end joint material directly joined to the building frame has sufficient rigidity and does not undergo plastic failure before the core material does, and therefore a highly rigid cross gusset plate or the like may be used as the end joint material. Cross gusset plates are generally welded to end plates attached to the ends of the steel pipes that form the core material, and have a shape and dimensions such that the width (planar width) of the gusset plate gradually increases from the end plate toward the sides, with the planar width of the wide surface being larger than that of the core material.
[0005] Increasing the rigidity of the end joint material in this way makes it possible for the double-tube brace to exhibit its initial seismic energy absorption properties, but on the other hand, when the joint between the core material and the end joint material is located outside the restraining material surrounding the core material and exposed to the outside, the joint, which is the rigidity change point where the rigidity changes from the end joint material to the core material, is likely to become a structurally weak part, and although the end joint material with increased rigidity does not suffer pre-failure, there is a concern that the joint may suffer pre-failure. Therefore, a method is considered in which the joint is inserted into the restraining material to stiffen the joint that may become a structurally weak part with the restraining material, but as mentioned above, the planar width of the end joint material is generally wider than that of the core material, which poses the problem that it is difficult to insert the joint into the restraining material.
[0006] Here, Patent Document 1 proposes a brace material that allows damage such as local buckling and cracks in the steel pipe core material to be directly and visually confirmed. This brace material has a steel pipe core material that bears axial force, a buckling restraint material inserted into the steel pipe core material, and a joint member with a cross-shaped cross section, one end of which is welded to the end of the steel pipe core material and the other end of which is joined to the framework of the building structure. At both ends of the steel pipe core material, a plurality of first notches are formed with a predetermined length in the axial direction, into which one end of the joint member is inserted, and the joint member is formed so that the dimensions of each side of the cross are larger than the outer diameter of the steel pipe core material, and has an insertion portion that is inserted up to the inner end face of the first notch portion and welded, and an extension portion that is formed integrally with the insertion portion, extends from the end face of the insertion portion in the axial direction, and is welded to the outer surface of the steel pipe core material. [Prior art documents] [Patent documents]
[0007] [Patent Document 1] Patent No. 7116008 Summary of the Invention [Problem to be solved by the invention]
[0008] The brace material described in Patent Document 1 is the opposite of the above-mentioned structure in which the core material is surrounded by the restraining material; the core material is formed from a steel pipe with a larger diameter than the restraining material. Therefore, for a double-tube brace in which the core material is surrounded by the restraining material, it does not disclose a means of resolving the above-mentioned problem that the joint between the core material and the end joint material becomes a structural weak point.
[0009] The present invention has been made in consideration of the above-mentioned problems, and relates to a double-tube brace in which a core material is surrounded by a restraining material, and aims to provide a double-tube brace and a method for manufacturing the same, in which the joint between the core material and the end joining material is surrounded by a restraining material, preventing the joint from becoming a structural weak point. [Means for solving the problem]
[0010] In order to achieve the above object, one aspect of the double pipe brace according to the present invention is to A core material formed by a first steel pipe; An end joining material is fixed to both ends of the core material and joined to another member; A restraining member is formed of a second steel pipe having a larger diameter than the first steel pipe and surrounding the core material, The restraint member includes two first restraint members whose total length is greater than the length of the core member; One of the first restraint members is formed by a plurality of first split pipes obtained by splitting the second steel pipe in the circumferential direction, The two first restraining materials are joined together with the joints between the core material and the end joining material wedged inside the respective ends of the two first restraining materials.
[0011] According to this aspect, the restraining member made of the second steel pipe surrounding the core member made of the first steel pipe is formed of two first restraining members whose total length is longer than the length of the core member, and one of the first restraining members is formed of a plurality of (for example, two) first split pipes obtained by dividing the second steel pipe in the circumferential direction, so that a double-tube brace can be formed in which a pair of joints between both ends of the core member and a pair of end joint members are wedged inside the respective ends of the two first restraining members. This allows the joints between the core member and the end joint members to be surrounded by the restraining member, preventing the joints from becoming structurally weak.
[0012] The double-tube brace of this embodiment can be manufactured relatively easily by inserting one of the first restraining members around the core material, exposing both ends of the core material and fixing the end joining members, then moving one of the first restraining members toward one end of the core material and joining multiple (e.g., two) first split tubes around the core material to form the other first restraining member, and joining the two first restraining members to form the restraining member.This manufacturing method allows the double-tube brace to be manufactured relatively easily, with the joints between the core material and the end joining members wedged inside the restraining member.
[0013] Another aspect of the double tube brace according to the present invention is as follows: A core material formed by a first steel pipe; An end joining material is fixed to both ends of the core material and joined to another member; A restraining member is formed of a second steel pipe having a larger diameter than the first steel pipe and surrounding the core material, The restraining material includes two first restraining materials whose total length is shorter than the length of the core material, and a second restraining material connecting the two first restraining materials, The two first restraining materials are connected by the second restraining material with the joint between the core material and the end joining material wedged inside the respective ends of the two first restraining materials.
[0014] According to this aspect, the restraining member made of the second steel pipe surrounding the core member made of the first steel pipe includes two first restraining members whose total length is shorter than the length of the core member, and a second restraining member connecting the two first restraining members. Since the two first restraining members are connected by the second restraining member, a double-tube brace can be formed in which a pair of joints between both ends of the core member and a pair of end joint members are wedged inside the respective ends of the two first restraining members. This prevents the joints between the core member and the end joint members from becoming structurally weak by being surrounded by the restraining member. The second restraining member can be formed by a plurality of second split pipes obtained by dividing the second steel pipe in the circumferential direction, or by a third steel pipe having a larger diameter than the second steel pipe.
[0015] In another aspect of the double tube brace according to the present invention, the second restraint member is formed by a plurality of second split pipes obtained by dividing the second steel pipe in the circumferential direction, The present invention is characterized in that the plurality of second split pipes are interposed between the two first restraining members in a state where they are joined to each other, and are joined to the two first restraining members.
[0016] According to this aspect, the restraint material made of a second steel pipe surrounding a core material made of a first steel pipe comprises two first restraint materials whose total length is shorter than the length of the core material, and a second restraint material connecting the two first restraint materials, and the second restraint material is formed by multiple (e.g., two) second split pipes formed by circumferentially dividing the second steel pipe and is interposed between the two first restraint materials, so that a double-tube brace can be formed in which a pair of joints between both ends of the core material and a pair of end joints are wedged inside the respective ends of the two first restraint materials. The double-tube brace of this embodiment can be manufactured relatively easily by inserting two first restraint members around the core material and moving them toward the center of the core material, exposing both ends of the core material and fixing the end joining members, joining multiple second split tubes to each other between the two first restraint members to form the second restraint member, and joining the second restraint member to the two first restraint members to form the restraint member.This manufacturing method allows the double-tube brace to be manufactured relatively easily, with the joints between the core material and the end joining members wedged inside the restraint members.
[0017] In another aspect of the double tube brace according to the present invention, The second restraint member is formed of a third steel pipe having a larger diameter than the second steel pipe, The end portions of the two first restraint materials are housed inside both ends of the second restraint material and joined to each other.
[0018] According to this aspect, the restraint material made of a second steel pipe surrounding a core material made of a first steel pipe comprises two first restraint materials whose total length is shorter than the length of the core material, and a second restraint material connecting the two first restraint materials, and the second restraint material is formed of a third steel pipe having a larger diameter than the second steel pipe and accommodates the ends of the two first restraint materials, so that a double-tube brace can be formed in which a pair of joints between both ends of the core material and a pair of end joints are wedged inside the respective ends of the two first restraint materials. The double-tube brace of this embodiment can be manufactured relatively easily by inserting two first restraining members around a core material, inserting a second restraining member around the two first restraining members, moving the two first restraining members toward the center of the core material, exposing both ends of the core material and fixing the end joining members, and then joining the two first restraining members to the second restraining members to form a restraining member.This method allows the double-tube brace to be manufactured relatively easily, with the joints between the core material and the end joining members wedged inside the restraining member.
[0019] Another aspect of the double tube brace according to the present invention is as follows: A core material formed by a first steel pipe; An end joining material is fixed to both ends of the core material and joined to another member; A restraining member is formed of a second steel pipe having a larger diameter than the first steel pipe, surrounds the core material, and is longer than the core material. The joints between the core material and the end joint material are wedged inside the two ends of the restraint material, a first slit having a structural slit length for preventing interference with the end joining materials when the core material is deformed during an earthquake is provided at positions corresponding to the end joining materials at both ends of the restraint material, and at least a part of the end joining materials is loosely fitted into the first slit; The first slit at least at one of both ends of the restraint material is characterized in that it is a second slit that is longer than the structural slit length.
[0020] According to this aspect, a first slit having a structural slit length is provided at a position corresponding to the end joining material, for example at one of the end portions of the restraining material, and at least a part of the end joining material is loosely fitted into the first slit, and a second slit longer than the structural slit length is provided at a position corresponding to the end joining material at the other of the end portions of the restraining material, and a part of the end joining material is loosely fitted into the first slit.Therefore, even while using a restraining material longer than the core material, by sliding the end joining material within the second slit during production, a double-tube brace can be formed in which a pair of joints between the two ends of the core material and the pair of end joining materials are wedged inside the respective ends of the two first restraining materials.
[0021] Another aspect of the double tube brace according to the present invention is as follows: The second slit is characterized in that a region of the second slit toward the center of the restraint material, which is longer than the structural slit length, is closed by a steel filler or a steel cover.
[0022] According to this aspect, with regard to the second slit, which is set longer than the first slit having a structural slit length for manufacturing reasons, ultimately, the area of the second slit toward the center of the restraining material that is longer than the first slit is blocked by a steel hole filling portion or a steel cover, thereby suppressing a decrease in rigidity of the end of the restraining material due to the second slit being too long.
[0023] Another aspect of the double tube brace according to the present invention is as follows: The end joint material is a cross gusset plate, At both ends of the restraint material, at positions corresponding to the end joining materials, a first slit having a structural slit length to prevent interference with the end joining materials when the core material deforms during an earthquake is provided, and at least a portion of the end joining material is loosely fitted into the first slit.
[0024] According to this aspect, the end joint material is a cross gusset plate, so that the end joint material can have high strength. Furthermore, the first slits are provided at the positions corresponding to the end joint materials at both ends of the restraint material to prevent interference with the core material during an earthquake, and a part of the end joint material is loosely fitted into the first slits, so that the end of the restraint material can be prevented from being damaged due to interference with the end joint material.
[0025] Another aspect of the double tube brace according to the present invention is as follows: The present invention is characterized in that one of the two ends of the restraint material and the end joining material corresponding to that end are positioned and fixed to each other by anti-slip welding or welding via anti-slip steel material.
[0026] According to this aspect, one of the two ends of the restraining material and the corresponding end joining material are positioned and fixed to each other by anti-slip welding or the like, so that the joint between the core material and the end joining material can be maintained wedged inside the two ends of the restraining material.
[0027] Another aspect of the double tube brace according to the present invention is as follows: an engaging portion is provided on the core material, and an engaged portion is provided on the inside of the first separate pipe or the second separate pipe at a position corresponding to the engaging portion, The engaging portion engages with the engaged portion to prevent the core material and the restraining material from slipping.
[0028] According to this aspect, the engaging portion provided on the core material engages with the engaged portion provided on the inside of the first or second split pipe, thereby making it possible to maintain the joints between the core material and the end joining material wedged inside both ends of the restraint material.
[0029] In addition, one aspect of a method for manufacturing a double-tube brace according to the present invention is to A1 step of inserting one of two first restraining members, which is formed of a second steel pipe having a total length longer than the length of the core material and a diameter larger than that of the first steel pipe, around the core material formed of a first steel pipe, exposing both ends of the core material, and fixing end joining members to be joined to other members to both ends; and B1 process, in which one of the first restraining members is moved toward one end of the core member, and a plurality of first split pipes obtained by dividing the second steel pipe in the circumferential direction are joined around the core member to form the other first restraining member, and the two first restraining members are joined to form a restraining member that surrounds the core member, with the joint between the core member and the end joining member being wedged inside the respective ends of the two first restraining members.
[0030] According to this aspect, one of the first restraining materials is inserted around the core material, both ends of the core material are exposed and the end joining material is fixed, and then one of the first restraining materials is moved toward one end of the core material, and, for example, two first split pipes are joined around the core material to form the other first restraining material, and the restraining material is formed by joining the two first restraining materials.This manufacturing method makes it possible to relatively easily manufacture a double-tube brace with the joint between the core material and the end joining material wedged inside the restraining material.
[0031] Another aspect of the method for manufacturing a double-tube brace according to the present invention is to A2 step of inserting two first restraining members, which are formed of second steel pipes and have a diameter larger than that of the first steel pipe and a total length shorter than that of the core material formed of a first steel pipe, around the core material formed of the first steel pipe, moving the two first restraining members toward the center of the core material to expose both ends of the core material, and fixing end joining members to be joined to other members to both ends; and B2 step of moving the two first restraining members of the steel pipes toward both ends of the core member to form a gap between the two first restraining members, interposing a plurality of second split pipes into which the second member is circumferentially divided, and joining the plurality of second split pipes to each other to form a second restraining member, and joining the second restraining member to the two first restraining members to form a restraining member that surrounds the core member and is made up of the first restraining member and the second restraining member, with the joints of the core member and the end joining members wedged inside the ends of each of the two first restraining members.
[0032] According to this embodiment, two first restraining members are inserted around the core material and moved toward the center of the core material, both ends of the core material are exposed and the end joining members are fixed, and then multiple second split tubes are joined to each other between the two first restraining members to form the second restraining member, and the restraining member is formed by joining the second restraining member to the two first restraining members.This manufacturing method makes it possible to relatively easily manufacture a double-tube brace with the joints between the core material and the end joining members wedged inside the restraining members.
[0033] Another aspect of the method for manufacturing a double-tube brace according to the present invention is to A3 step of inserting two first restraining members, which are made of a second steel pipe and have a larger diameter than the first steel pipe and have a total length shorter than the length of the core material, around a core material made of a first steel pipe, inserting a second restraining member, which is made of a third steel pipe and has a larger diameter than the second steel pipe, around the two first restraining members, moving the two first restraining members toward the center of the core material to expose both ends of the core material, and fixing end joining members to be joined to other members to both ends; and step B3 of moving the two first constraining materials toward both ends of the core material to form a gap between the two first constraining materials, aligning the second constraining material so that it straddles the two first constraining materials, and joining the second constraining material and the two first constraining materials to form a constraining material surrounding the core material consisting of the first constraining material and the second constraining material, with the joints between the core material and the end joining material wedged inside the ends of each of the two first constraining materials.
[0034] According to this aspect, a double-tube brace can be relatively easily manufactured in which the joints between the core material and the end joints are wedged inside the restraining material by a manufacturing method in which two first restraining materials are inserted around a core material, a second restraining material is inserted around the two first restraining materials, the two first restraining materials are moved toward the center of the core material, both ends of the core material are exposed, and the end joints are fixed, and then the two first restraining materials and the second restraining material are joined to form the restraining material.
[0035] Another aspect of the method for manufacturing a double-tube brace according to the present invention is to Step C, in which an end joint material to be joined to another member is fixed to one end of a core material formed of a first steel pipe, and a restraining material is inserted from the other end side of the core material, the restraining material being formed of a second steel pipe having a diameter larger than that of the first steel pipe, being longer than the core material, and having first slits at positions corresponding to the end joint materials at both ends, the first slits having a structural slit length to prevent interference with the end joint materials when the core material is deformed during an earthquake, and at least one of the first slits being a second slit longer than the other first slit; The method is characterized by having a step D of exposing the other end of the core material by moving the restraining material toward the end joining material and inserting the end joining material into the second slit, fixing a separate end joining material to the other end, moving the restraining material toward the center of the core material, and inserting the corresponding end joining material into the first slit and the second slit at both ends of the restraining material.
[0036] According to this aspect, a first slit with a structural slit length is provided at a position corresponding to the end joining material on one of both ends of the restraining material, and a second slit longer than the structural slit length is provided at a position corresponding to the end joining material on the other of both ends of the restraining material.A restraining material longer than the core material is inserted into a core material to which an end joining material is fixed at one end, and the end joining material is passed through the second slit, exposing the other end of the core material.A separate end joining material is fixed to the other end, and the restraining material is moved toward the center of the core material, making it possible to relatively easily manufacture a double-tube brace in which the joint between the core material and the end joining material is wedged inside the restraining material. Effect of the Invention
[0037] As can be understood from the above explanation, the double-tube brace and its manufacturing method of the present invention can provide a double-tube brace in which the core material is surrounded by a restraining material, and the joint between the core material and the end joining material is surrounded by the restraining material, preventing the joint from becoming a structural weak point. [Brief description of the drawings]
[0038] [Figure 1] FIG. 2 is an exploded perspective view of an example of a double tube brace according to the first embodiment. [Diagram 2] FIG. 2 is a perspective view of an example of a double-tube brace according to the first embodiment. [Figure 3A] FIG. 4 is an explanatory diagram illustrating an example of a method for manufacturing the double pipe brace according to the first embodiment. [Figure 3B] 3B is an explanatory diagram illustrating an example of a method for producing the double pipe brace according to the first embodiment, following FIG. 3A. FIG. [Figure 3C] FIG. 3C is an explanatory diagram illustrating an example of a method for producing the double pipe brace according to the first embodiment, following FIG. 3B. [Figure 4] FIG. 11 is a perspective view of an example of a double pipe brace according to a second embodiment. [Figure 5A] FIG. 11 is an explanatory diagram illustrating an example of a method for manufacturing a double pipe brace according to the second embodiment. [Figure 5B] FIG. 5B is an explanatory diagram illustrating an example of a method for producing the double pipe brace according to the second embodiment, following FIG. 5A. [Figure 5C] FIG. 5C is an explanatory diagram illustrating an example of a method for producing the double pipe brace according to the second embodiment, following FIG. 5B. [Figure 6] FIG. 11 is a perspective view of an example of a double pipe brace according to a third embodiment. [Figure 7A] FIG. 11 is an explanatory diagram illustrating an example of a method for manufacturing a double pipe brace according to the third embodiment. [Figure 7B]7B is an explanatory diagram illustrating an example of a method for producing the double pipe brace according to the third embodiment, following FIG. 7A. FIG. [Figure 8] FIG. 11 is a perspective view of an example of a double pipe brace according to a fourth embodiment. [Figure 9A] FIG. 13 is an explanatory diagram illustrating an example of a method for manufacturing a double pipe brace according to the fourth embodiment. [Figure 9B] 9B is an explanatory diagram illustrating an example of a method for producing the double pipe brace according to the fourth embodiment, following FIG. 9A. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0039] Hereinafter, a double-tube brace and a method for manufacturing the same according to each embodiment will be described with reference to the accompanying drawings. In this specification and the drawings, substantially identical components are designated by the same reference numerals to avoid redundant description.
[0040] [Double tube brace according to the first embodiment and its manufacturing method] First, a double-tube brace according to the first embodiment and an example of a method for manufacturing the same will be described with reference to Figures 1 to 3. Here, Figure 1 is an exploded perspective view of an example of a double-tube brace according to the first embodiment, and Figure 2 is a perspective view of an example of a double-tube brace according to the first embodiment. Also, Figures 3A, 3B, and 3C are explanatory views for explaining an example of a method for manufacturing the double-tube brace according to the first embodiment, respectively.
[0041] The double-tube brace 60 shown in Figures 1 and 2 has a core material 10 formed from a first steel pipe with an outer diameter of φ1 and a length t1, and a restraint material 30 formed from a second steel pipe with an outer diameter of φ2 that is larger than the first steel pipe and surrounds the core material 10.
[0042] An end plate 14 is welded to each of both ends 12, 13 of the core material 10, and an end joining member 20 to be joined to another member is welded to each end plate 14 at a joining portion 15.
[0043] Here, the other components (not shown) to which the end joint material 20 is joined are, for example, brackets or gusset plates that protrude inward from a pair of diagonally opposite corner portions of the building frame.
[0044] Two engaging portions 18 are provided on the outer peripheral surface 11 of the core material 10 so as to protrude laterally and engage with respective engaged portions 38 of two first divided pipes 35 constituting a first restraining member 31 described below. Note that only one of the engaging portions 18 is shown in Figures 1 and 2.
[0045] The end joint material 20 is formed by a cross gusset plate, which is formed by one end having a width substantially the same as the width φ1 of the end of the core material 10, a gusset plate 21 tapering from the one end and having a width t4 wider than φ1, and a pair of gusset plates 24 perpendicular to a pair of wide faces of the gusset plate 21 and welded to the wide faces. The gusset plates 21, 24 are each provided with bolt holes 21a, 24a through which a bolt is inserted when the gusset plates 21, 24 are bolted to another member (not shown).
[0046] Here, the maximum width t4 of the cross gusset plate 20 in the vertical and horizontal directions is set to be larger than the outer diameter φ2 of the restraint material 30.
[0047] Since the end connectors 20 are cross gusset plates, the rigidity of the end connectors 20 is increased, which prevents the end connectors 20 from being destroyed first during an earthquake, and allows the seismic energy to be transmitted to the entire core material 10. This allows the double-tube brace 60 to exhibit its initial seismic energy absorption ability.
[0048] The restraining member 30 is formed of a second steel pipe having an outer diameter of φ2 that is larger than the first steel pipe, and includes two first restraining members 31A, 31B whose total length (t2+t3) of their respective lengths t2, t3 is longer than the length t1 of the core member 10. Here, the lengths t2, t3 of the two first restraining members 31A, 31B may be the same length or different lengths.
[0049] One first restraining member 31A is a single member formed from the second steel pipe, while the other first restraining member 31B is formed from two first split pipes 35 obtained by splitting the second steel pipe into two in the circumferential direction. Here, the first restraining member 31B may be formed from three or more first split pipes obtained by splitting the second steel pipe into three or more in the circumferential direction.
[0050] First slits 36A are formed from one end 33 of the first restraint member 31A toward the inside at positions corresponding to the gusset plates 21, 24 of the cross gusset plate 20. In the illustrated example, four first slits 36A corresponding to the cross gusset plates 21, 24 are provided at 90 degree intervals.
[0051] 2, each of the first slits 36A is adapted to receive a part of the gusset plates 21, 24 loosely. Here, the length t5 of the first slits 36A is set to a structural slit length that prevents interference with the end joint material 20 when the core material 10 is deformed during an earthquake.
[0052] The other end 32 of the first restraint member 31A is an end that is welded to the other first restraint member 31B.
[0053] On the other hand, the two first split pipes 35 that form the other first restraint member 31B are half pipes of a second steel pipe, and the first restraint member 31B is formed by welding together their respective circumferential ends 39.
[0054] One end 33 of the first split tube 35 is provided with a first slit 36A into which the gusset plates 21, 24 of the cross gusset plate 20 are loosely fitted, and also with a split slit 37 which forms the first slit 36A when both first split tubes 35 are integrated together.
[0055] Furthermore, each of the first divided pipes 35 is provided with an engaged portion 38 (recess) with which one of the two engaging portions 18 (protrusions) provided on the core member 10 is engaged.
[0056] As shown in Figure 2, one first restraint member 31A is arranged around the core material 10 so that a portion of each gusset plate 21, 24 of one cross gusset plate 20 is loosely fitted into each of its first slits 36A, and similarly, the other first restraint member 31B is arranged so that a portion of each gusset plate 21, 24 of the other cross gusset plate 20 is loosely fitted into each of its first slits 36A, and the ends 32 of both first restraint members 31A, 31B are welded together to form a double tube brace 60 in which a restraint member 30 longer than the core material 10 surrounds the core material 10.
[0057] In the double pipe brace 60, the engaged portions 38 of the first divided pipes 35 are fitted into the engaging portions 18 of the core material 10, thereby preventing the restraining member 30 from shifting relative to the core material 10. Here, instead of the illustrated example of a slip prevention measure in which the engaging portions 18 engage with the engaged portions 38, one end 33 of both end portions 33 of the restraining member 30 and the end connecting member 20 corresponding to the end 33 may be joined to each other by slip-prevention welding or welding via a slip-prevention steel material.
[0058] In the double-tube brace 60, a pair of joints 15 connecting both ends of the core material 10 to a pair of end joint members 20 are both wedged into the inside of the corresponding first restraining members 31. This configuration prevents the joints 15 from being exposed to the outside from the restraining members 30, thereby preventing the double-tube brace 60 from becoming a structurally weak part.
[0059] That is, as described above, since the end joint members 20 are cross gusset plates with high rigidity, the end joint members 20 are prevented from being pre-fractured, but if the joint 15 between the core member 10 and the end joint members 20 is located outside the restraining member 30 surrounding the core member 10 and exposed to the outside, the joint 15, which is the rigidity change point where the rigidity changes from the end joint members 20 to the core member 10, is likely to become a structurally weak part, and although the end joint members 20 with increased rigidity do not undergo pre-fracture, there is concern that the joint 15 may be pre-fractured. In response to this, by inserting the joint 15 into the inside of the restraining member 30 as in the illustrated example, the joint 15, which may become a structurally weak part, can be reinforced by the restraining member 30, and the initial seismic energy absorption of the double-tube brace 60 can be exhibited.
[0060] Next, an example of a method for manufacturing the double pipe brace 60 will be described with reference to FIG.
[0061] First, as shown in FIG. 3A, one of the first restraint members 31A formed from the second steel pipe is inserted around the core member 10 formed from the first steel pipe, and the first restraint member 31A is moved in the X1 direction toward the center of the core member 10 to expose a pair of end plates 14 at both ends of the core member 10. End joining members 20 are welded and joined to both end plates 14 to form a joint 15 (A1 process).
[0062] 3B, the first restraining member 31A is moved toward the end in the X2 direction, and a portion of each gusset plate 21, 24 of the end joining member 20 is loosely fitted into the first slit 36A. Next, the pair of first split pipes 35 are fitted in the X3 direction so that the engaging portions 18 of the core material 10 engage with the corresponding engaged portions 38 of the first split pipes 35.
[0063] 3C, the circumferential ends 39 of the first separate pipes 35 are welded together to form the first restraining member 31B. At this time, a portion of the gusset plates 21, 24 of the corresponding end joining member 20 is loosely fitted into each of the first slits 36A of the first restraining member 31B.
[0064] Furthermore, the ends 32 of the first restraining members 31A, 31B are welded together to form the restraining member 30, the restraining member 30 is arranged around the core material 10, and the double-tube brace 60 is produced with both of the pair of joints 15 wedged inside the restraining member 30 (this is process B1).
[0065] According to the manufacturing method of the illustrated example, in a double-tube brace 60 in which a restraining material 30 longer than the core material 10 surrounds the core material 10 and the end connecting material 20 has a width t4 larger than the outer diameter φ2 of the restraining material 30, it is possible to relatively easily manufacture a structure in which the joint 15 between the core material 10 and the end connecting material 20 is inserted inside the restraining material 30.
[0066] [Double tube brace according to the second embodiment and its manufacturing method] Next, a double-tube brace according to the second embodiment and an example of a method for manufacturing the same will be described with reference to Figures 4 and 5. Here, Figure 4 is an exploded perspective view of an example of a double-tube brace according to the second embodiment, and Figures 5A, 5B, and 5C are explanatory views for explaining an example of a method for manufacturing the double-tube brace according to the second embodiment, respectively.
[0067] 4, the core material 10 and the pair of end connecting members 20 joined to both ends thereof are similar to those of the double-tube brace 60, but the configuration of the restraining member 30A surrounding the core material 10 differs from that of the restraining member 30 of the double-tube brace 60. Specifically, the restraining member 30A has a total length t6 of two first restraining members 31C that is shorter than the length t1 of the core material 10, and is provided with a second restraining member 40 of length t7 between the two first restraining members 30C that connects them together, and the restraining member 30A is formed by welding the two first restraining members 31C and the second restraining member 40 to each other.
[0068] Both the first restraining member 31C and the second restraining member 40 are formed from a second steel pipe, and the overall length of the restraining member 30A (2×t6+t7) is set to be longer than the length t1 of the core material 10. Here, the lengths t6 of the two first restraining members 31C in the illustrated example are the same, but they may be different lengths.
[0069] One end 33 of each of the first restraining members 31C is provided with four first slits 36A into which parts of the gusset plates 21, 24 of the cross gusset plate 20 fit loosely.
[0070] The second restraining member 40 is formed by two second split pipes 41 obtained by dividing the second steel pipe in the circumferential direction, and the circumferential end portions 49 of the respective second split pipes 41 are welded together to form the second restraining member 40. The end portions 32 of the two first restraining members 31C on either side of the second restraining member 40 are welded together to both ends 42, 43 of the second restraining member 40 to form a restraining member 30A, and a double-pipe brace 60A is formed in which the core material 10 is surrounded by restraining members 30A that are longer than the core material 10.
[0071] As with the double-tube brace 60, in the double-tube brace 60A, a pair of joints 15 connecting both ends of the core material 10 to a pair of end joint members 20 are both wedged inside the corresponding first restraining members 31. This configuration prevents the joints 15 from becoming structurally weaker parts of the double-tube brace 60A due to exposure to the outside from the restraining members 30A.
[0072] Next, an example of a method for manufacturing the double pipe brace 60A will be described with reference to FIG.
[0073] First, as shown in Figure 5A, two first restraint members 31C formed from a second steel pipe are inserted around a core material 10 formed from a first steel pipe, and the two first restraint members 31C are moved in the X4 direction toward the center of the core material 10 to expose a pair of end plates 14 at both ends of the core material 10. End joining members 20 are welded and joined to both end plates 14 to form a joint 15.
[0074] 5A, unlike the examples shown in Figures 1 and 2, the illustrated core material 10 has a pair of engagement portions 18 provided at the center position in the longitudinal direction of the core material 10. This is because, in this example, two second divided pipes 41 are attached to the center region in the longitudinal direction of the core material 10 (this is step A2).
[0075] 5B, the two first restraining members 31C are moved toward the end sides in the X5 direction, and are positioned with a portion of each gusset plate 21, 24 of the end joining member 20 loosely fitted into each first slit 36A, thereby forming a gap G between the end parts 32 of the two first restraining members 31C. Next, the pair of second divided pipes 41 are fitted into this gap G in the X6 direction so that the engaging portions 18 of the core material 10 engage with the corresponding engaged portions 48 of each second divided pipe.
[0076] Then, as shown in FIG. 5C, the circumferential ends 49 of the second split pipes 41 are welded together to form the second restraint member 40.
[0077] Furthermore, the end portions 32 of the two first restraining members 31C are welded to both ends 42, 43 of the second restraining member 40 to form the restraining member 30A, and the restraining member 30A is arranged around the core material 10. The double-tube brace 60A is produced with both of the pair of joints 15 wedged inside the restraining member 30A (this is process B2).
[0078] According to the manufacturing method of the illustrated example, in a double-tube brace 60A in which a restraining material 30A longer than the core material 10 surrounds the core material 10 and the end joint material 20 has a width t4 larger than the outer diameter φ2 of the restraining material 30A, it is possible to relatively easily manufacture a structure in which the joint 15 between the core material 10 and the end joint material 20 is inserted inside the restraining material 30A.
[0079] [Third embodiment of double-tube brace and its manufacturing method] Next, a double-tube brace according to the third embodiment and an example of a method for manufacturing the same will be described with reference to Figures 6 and 7. Here, Figure 6 is an exploded perspective view of an example of a double-tube brace according to the third embodiment, and Figures 7A and 7B are explanatory views for explaining an example of a method for manufacturing the double-tube brace according to the third embodiment, respectively.
[0080] In the double-tube brace 60B shown in Fig. 6, the core material 10 and the pair of end connecting members 20 joined to both ends thereof are similar to those of the double-tube braces 60, 60A, but the configuration of the restraining member 30B surrounding the core material 10 differs from that of the restraining member 30, 30A of the double-tube brace 60, 60A. Specifically, in the restraining member 30B, the total length t6 of two first restraining members 31C formed from second steel pipes is shorter than the length t1 of the core material 10, a second restraining member 50 formed from a third steel pipe with a length t8 and having an outer diameter φ3 larger than the outer diameter φ2 of the second steel pipe is disposed on the outer periphery of the ends 32 of the two first restraining members 30C, and the two first restraining members 31C and the second restraining member 50 are welded together to form the restraining member 30B.
[0081] The total length (2×t6+t8) of the two first constraining members 31C and the second constraining member 50 is set to be longer than the length t1 of the core material 10. Here, the lengths t6 of the two first constraining members 31C in the illustrated example are the same, but they may be different lengths.
[0082] One end 33 of each of the first restraining members 31C is provided with four first slits 36A into which parts of the gusset plates 21, 24 of the cross gusset plate 20 fit loosely.
[0083] The outer surfaces of the two first restraint members 31C on either side of the second restraint member 50 are welded together to both ends 52, 53 of the second restraint member 50 to form a restraint member 30B, and a double-tube brace 60A is formed in which the core material 10 is surrounded by restraint members 30B that are longer than the core material 10.
[0084] Although not shown in the figure, for example, the end 33 of one of the first restraint members 31C and the corresponding end joining member 20 can be welded together (welded for preventing slippage) to prevent slippage between the core material 10 and the restraint member 30B.
[0085] As with the double-tube braces 60 and 60A, in the double-tube brace 60B, a pair of joints 15 connecting both ends of the core material 10 to a pair of end joint members 20 are both wedged inside the corresponding first restraining members 31. This configuration prevents the joints 15 from becoming structurally weaker in the double-tube brace 60B due to exposure to the outside from the restraining members 30B.
[0086] Next, an example of a method for manufacturing the double pipe brace 60B will be described with reference to FIG.
[0087] First, as shown in Figure 7A, two first restraint members 31C formed from a second steel pipe are inserted around a core material 10 formed from a first steel pipe, and a second restraint member 50 formed from a third steel pipe is inserted around the two first restraint members 31C. The two first restraint members 31C are then moved in the X7 direction toward the center of the core material 10, exposing a pair of end plates 14 at both ends of the core material 10, and end joining members 20 are welded and joined to both end plates 14 to form a joint 15 (process A3).
[0088] 7B, the two first restraining members 31C are moved toward the end side in the X8 direction, and positioned with a portion of each gusset plate 21, 24 of the end connecting member 20 loosely fitted into each first slit 36A. Next, the outer circumferential surfaces of the two first restraining members 31C and the ends 52, 53 of the second restraining member 50 are welded together to form the restraining member 30B, and the restraining member 30B is disposed around the core member 10, and the double-tube brace 60B is manufactured with both of the pair of connecting portions 15 wedged inside the restraining members 30B (this is step B3).
[0089] According to the manufacturing method of the illustrated example, in a double-tube brace 60B in which a restraining member 30B longer than the core material 10 surrounds the core material 10 and the end joint member 20 has a width t4 larger than the outer diameter φ2 of the first restraining member 31 that constitutes the restraining member 30B, it is possible to relatively easily manufacture a structure in which the joint 15 between the core material 10 and the end joint member 20 is inserted inside the restraining member 30B.
[0090] [Double tube brace according to the fourth embodiment and its manufacturing method] Next, a double-tube brace according to the third embodiment and an example of a method for manufacturing the same will be described with reference to Figures 8 and 9. Here, Figure 8 is an exploded perspective view of an example of a double-tube brace according to the fourth embodiment, and Figures 9A and 9B are explanatory views for explaining an example of a method for manufacturing the double-tube brace according to the fourth embodiment, respectively.
[0091] In the double-tube brace 60C shown in Fig. 8, the core material 10 and a pair of end joint members 20 joined to both ends thereof are similar to those of the double-tube braces 60, 60A, 60B, but the configuration of the restraining member 30C surrounding the core material 10 differs from that of the restraining members 30, 30, 30B of the double-tube braces 60, 60A, 60B. Specifically, the restraining member 30C is a single restraining member formed of a second steel tube with a length t9 longer than the length t1 of the core material 10, and one end 33 is provided with four first slits 36A into which parts of the gusset plates 21, 24 of the cross gusset plate 20 fit loosely, while the other end 32 is provided with four second slits 36B with a length t9 longer than the length t5 of the first slits 36A, and parts of the gusset plates 21, 24 of the cross gusset plate 20 fit loosely into the second slits 36B.
[0092] Since the second slit 36B, which is longer than the structural slit length t5, is provided at one end 32 of the restraining material 30C, as described below, during production, an end joining material 20 is fixed to one end 12 (end plate 14) of the restraining material 30C, which is longer than the core material 10, and then the restraining material 30C is slid to loosely fit each gusset plate 21, 24 into each second slit 36B, and by sliding it, the other end 13 (end plate 14) is exposed to the outside of the restraining material 30C and a separate end joining material 20 can be fixed to the end 13.
[0093] After the pair of end joint members 20 are fixed to both ends 12, 13 (end plates 14) of the core material 10, the second slit 36B is longer than the structural slit length t5, which may lead to a decrease in strength of the end of the restraining member 30C. Therefore, after the pair of end joint members 20 are fixed to the core material 10, as shown in FIG. 9B, a hole filling portion 36C made of steel is provided in the region of the second slit 36B on the central side of the restraining member 30C that is longer than the structural slit length t5 to close the region, or a steel cover (not shown) is provided to close the region, so that the second slit 36B becomes the first slit 36A, and a double-tube brace 60C is formed in which the core material 10 is surrounded by the restraining member 30C that is longer than the core material 10.
[0094] As with the double-tube braces 60, 60A, and 60B, in the double-tube brace 60C, the pair of joints 15 connecting both ends of the core material 10 to the pair of end joint members 20 are both wedged inside the first restraining member 30C. This configuration prevents the joints 15 from becoming structurally weaker in the double-tube brace 60C due to exposure to the outside from the restraining member 30C.
[0095] Next, an example of a method for manufacturing the double pipe brace 60C will be described with reference to FIG.
[0096] First, as shown in FIG. 9A, an end joining material 20 is fixed to one end 12 (end plate 14) of a core material 10 formed from a first steel pipe, and a restraint material 30C is inserted from the other end 13 side of the core material 10.
[0097] As described above, the restraint material 30C is longer than the core material 10, and has a second slit 36B at the end 32 on the side where the end joining material 20 is already fixed to the core material 10, and a first slit 36A at the other end 33 (the above is process C).
[0098] As shown in Figure 9A, the restraint material 30C is moved in the X9 direction toward the end joining material 20 (left side in the illustrated example), and each gusset plate 21, 24 of the end joining material 20 is loosely fitted into each second slit 36B and slid to expose the other end 13 (end plate 14) of the core material 10, and a separate end joining material 20 (the end joining material on the right side in the illustrated example) is fixed to the other end 13.
[0099] Next, as shown in Figure 9B, the end joint material 20 is fixed to the end portion 13 (end plate 14) of the core material 10 exposed to the outside, and the restraint material 30C is moved in the Z10 direction toward the center of the core material 10, so that each gusset plate 21, 24 of the right-side end joint material 20 is loosely fitted into each first slit 36A on the right side of the restraint material 30C.
[0100] Finally, a steel filler 36C is provided to close the central area of second slit 36B, which is longer than the structural slit length, thereby turning second slit 36B into first slit 36A and producing a double-tube brace 60C in which core material 10 is surrounded by restraining material 30C that is longer than core material 10 (this is process D).
[0101] According to the manufacturing method of the illustrated example, in a double-tube brace 60C in which a restraining material 30C longer than the core material 10 surrounds the core material 10 and the end joint material 20 has a width t4 larger than the outer diameter φ2 of the restraining material 30C, it is possible to relatively easily manufacture a structure in which the joint 15 between the core material 10 and the end joint material 20 is inserted inside the restraining material 30C.
[0102] In addition, the present invention is not limited to the configuration shown here, and may be implemented in other embodiments in which other components are combined with the configurations and the like of the above-mentioned embodiment. In this regard, the present invention may be modified within the scope of the gist of the present invention, and may be appropriately determined according to the application form. [Explanation of symbols]
[0103] 10: Core material 11:Outer surface 12,13:End 14: End plate 15: Joint 18: Engagement part (convex part) 20: End joint material (cross gusset plate) 21: First gusset plate 21a: Bolt hole 24: Second gusset plate 24a: Bolt hole 30,30A,30B,30C:Restraint material 31,31A,31B,31C: 1st restraint material 32:33:End 35: 1st split tube 36A: First slit 36B: Second slit 36C: Hole filling section 37: Split slit 38: Engaged portion (recess) 39: Circumferential end 40:Second restraint material (second steel pipe) 41:Second split tube 42,43:End 48: Recess 49: Circumferential end 50:Second restraint material (third steel pipe) 52,53:End 60, 60A, 60B, 60C: Double tube brace G: Gap
Claims
1. A core material formed by a first steel pipe; An end joining material is fixed to both ends of the core material and joined to another member; a restraining member formed of a second steel pipe having a larger diameter than the first steel pipe and surrounding the core material; The restraining member includes two first restraining members whose total length is longer than the length of the core member; One of the first restraint members is formed by a plurality of first split pipes obtained by splitting the second steel pipe in the circumferential direction, A double-tube brace, characterized in that the two first restraint materials are joined with the joints between the core material and the end joint material wedged inside the respective ends of the two first restraint materials.
2. A core material formed by a first steel pipe; An end joining material is fixed to both ends of the core material and joined to another member; a restraining member formed of a second steel pipe having a larger diameter than the first steel pipe and surrounding the core material; The restraining material includes two first restraining materials whose total length is shorter than the length of the core material, and a second restraining material connecting the two first restraining materials, A double-tube brace, characterized in that the two first restraining materials are connected by the second restraining material with the joint between the core material and the end joining material wedged inside the respective ends of the two first restraining materials.
3. the second restraint member is formed by a plurality of second split pipes obtained by dividing the second steel pipe in the circumferential direction, 3. The double-tube brace according to claim 2, wherein the plurality of second split tubes are interposed between the two first restraint members in a state of being joined to each other and joined to the two first restraint members.
4. The second restraint member is formed of a third steel pipe having a larger diameter than the second steel pipe, The double-tube brace according to claim 2, characterized in that the ends of the two first restraint members are housed inside both ends of the second restraint member and joined to each other.
5. A core material formed by a first steel pipe; An end joining material is fixed to both ends of the core material and joined to another member; a restraining member formed of a second steel pipe having a larger diameter than the first steel pipe, surrounding the core material, and longer than the core material; The joints between the core material and the end joint material are wedged inside the two ends of the restraint material, a first slit having a structural slit length for preventing interference with the end joint material when the core material is deformed during an earthquake is provided at positions corresponding to the end joint material at both ends of the restraint material, and at least a part of the end joint material is loosely fitted into the first slit; A double-tube brace, characterized in that the first slit at least at one of both ends of the restraint material is a second slit that is longer than a structural slit length.
6. 6. The double-tube brace according to claim 5, wherein a region of the second slit toward the center of the restraint material that is longer than a structural slit length is blocked by a steel filler or a steel cover.
7. The end joint material is a cross gusset plate, 3. A double-tube brace as described in claim 1 or 2, characterized in that a first slit having a structural slit length is provided at positions corresponding to the end joint materials at both ends of the restraint material to prevent interference with the end joint materials when the core material deforms during an earthquake, and at least a portion of the end joint materials is loosely fitted into the first slit.
8. 6. A double-tube brace as claimed in claim 1, 2 or 5, characterized in that one of the two ends of the restraint material and the end joint material corresponding to said one end are positioned and fixed to each other by shear-stop welding or welding via a shear-stop steel material.
9. an engaging portion is provided on the core material, and an engaged portion is provided on an inner side of the first separate pipe or the second separate pipe at a position corresponding to the engaging portion, 4. The double-tube brace according to claim 1, wherein the engaging portion engages with the engaged portion to prevent the core material and the restraining material from slipping.
10. A1 step of inserting one of two first restraining members, which is formed of a second steel pipe having a total length longer than the length of the core material and a diameter larger than that of the first steel pipe, around a core material formed of a first steel pipe, exposing both ends of the core material, and fixing end joining materials to be joined to other members to both ends; and B1 step of moving one of the first restraining members toward one end of the core member, joining a plurality of first split pipes obtained by dividing the second steel pipe circumferentially around the core member to form the other first restraining member, and joining the two first restraining members to form a restraining member that surrounds the core member, with the joint between the core member and the end joining member being wedged inside the respective ends of the two first restraining members.
11. A2 step of inserting two first restraining members, which are formed of second steel pipes and have a diameter larger than that of the first steel pipe and a total length shorter than that of the core material formed of a first steel pipe, around the periphery of the core material formed of the first steel pipe, moving the two first restraining members toward the center of the core material to expose both ends of the core material, and fixing end joining members to be joined to other members to both ends; and step B2 of moving the two first restraining members toward both ends of the core member to form a gap between the two first restraining members, interposing a plurality of second split pipes obtained by dividing the second steel pipe in the circumferential direction into the gap, joining the plurality of second split pipes to each other to form a second restraining member, and joining the second restraining member to the two first restraining members to form a restraining member that surrounds the core member and is made of the first restraining member and the second restraining member, with the joints of the core member and the end joining members wedged inside the ends of each of the two first restraining members.
12. A3 step of inserting two first restraining members, which are made of a second steel pipe and have a larger diameter than the first steel pipe and have a total length shorter than the length of the core material, around a core material made of a first steel pipe, inserting a second restraining member, which is made of a third steel pipe and has a larger diameter than the second steel pipe, around the two first restraining members, moving the two first restraining members toward the center of the core material to expose both ends of the core material, and fixing end joining members to be joined to other members to both ends; and step B3 of moving the two first restraining materials toward both ends of the core material to form a gap between the two first restraining materials, aligning the second restraining material so that it straddles the two first restraining materials, and joining the second restraining material and the two first restraining materials to form a restraining material surrounding the core material consisting of the first restraining material and the second restraining material, with the joints of the core material and the end joining material wedged inside the ends of each of the two first restraining materials.
13. a step C of fixing an end joint material to be joined to another member to one end of a core material formed of a first steel pipe, and inserting a restraining material from the other end side of the core material, the restraining material being formed of a second steel pipe having a diameter larger than the first steel pipe, being longer than the core material, and having first slits at positions corresponding to the end joint materials at both ends, the first slits having a structural slit length to prevent interference with the end joint materials when the core material is deformed during an earthquake, and at least one of the first slits being a second slit longer than the other first slit; and process D of exposing the other end of the core material by moving the restraining material toward the end joining material and inserting the end joining material into the second slit, fixing a separate end joining material to the other end, moving the restraining material toward the center of the core material, and inserting the corresponding end joining material into the first slit and the second slit at both ends of the restraining material.
Citation Information
Patent Citations
Brace material
JP7116008B2
Cited By
Buckling restrained brace and method of manufacturing same
JP7679534B1
Buckling-restrained brace and its manufacturing method
JP7761792B1
Buckling-restrained brace and its manufacturing method
JP7780685B1