Measurement method, measuring device, measurement system, and measurement program

The method calculates speed waveforms from bridge observation data to determine railway vehicle speed amplitudes, addressing laser beam deviation issues and improving measurement accuracy by distinguishing between constant, decelerating, and accelerating speeds.

JP2024166842APending Publication Date: 2024-11-29SEIKO EPSON CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023083222
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-19
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The existing method for measuring the speed of a railway vehicle using a laser beam on a rail surface is prone to deviation, which can reduce measurement accuracy.

Method used

A method and system that calculates a speed waveform based on observation data from an observation device on a bridge, determining speed amplitudes when a railway vehicle approaches and exits the bridge, using acceleration data from sensors to determine if the vehicle is traveling at a constant speed, decelerating, or accelerating.

Benefits of technology

Provides an accurate index to determine whether a railway vehicle is traveling at a constant speed, decelerating, or accelerating by analyzing speed amplitudes, regardless of changes in vehicle speed, enhancing measurement accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024166842000001_ABST
    Figure 2024166842000001_ABST
Patent Text Reader

Abstract

To provide a measurement method with which it is possible to calculate information that serves as an index for easily determining when a railway vehicle ran on a bridge whether it was running at a constant speed, a decelerated speed, or an accelerated speed.SOLUTION: A measurement method includes: a speed waveform calculation step in which observation points of a bridge are observed and, on the basis of observation data outputted from an observation device that detects a physical quantity as a response to the action on the observation points in multiple regions of a railway vehicle running on the bridge, a speed waveform of the bridge due to running of the railway vehicle when the observation points are displaced, is calculated; and a speed amplitude calculation step in which, on the basis of the speed waveform, calculations are made of an entry time speed amplitude representing an amplitude of the speed waveform at the time the railway vehicle enters the bridge and an exit time speed amplitude representing the amplitude of the speed waveform at the time the railway vehicle exits the bridge.SELECTED DRAWING: Figure 16
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a measurement method, a measurement device, a measurement system, and a measurement program. [Background technology]

[0002] Patent Document 1 describes a railway vehicle speed measurement method in which a differential LDV is mounted on a railway vehicle, a laser beam from a laser light source is irradiated onto objects such as rails, sleepers, gravel, auxiliary rails, and ATS on the side where the rails are laid, the scattered light from these objects is received by the light receiving element of the differential LDV, a Doppler signal is extracted, and the ground speed is measured from this Doppler signal. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2014-6161 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, in the method described in Patent Document 1, the laser beam may deviate from the rail surface, which may result in a decrease in measurement accuracy. [Means for solving the problem]

[0005] One aspect of the measurement method according to the present invention is to a velocity waveform calculation process for calculating a velocity waveform, which is a waveform of the velocity at which the observation point is displaced, based on observation data output from an observation device that observes an observation point on a bridge and detects physical quantities that are responses to the actions of multiple parts of a railway vehicle traveling on the bridge on the observation point; a speed amplitude calculation step of calculating, based on the speed waveform, an approach speed amplitude, which is the amplitude of the speed waveform when the railroad vehicle approaches the bridge, and an exit speed amplitude, which is the amplitude of the speed waveform when the railroad vehicle exits the bridge; Includes.

[0006] One aspect of the measuring device according to the present invention is a velocity waveform calculation unit that calculates a velocity waveform that is a waveform of the velocity at which the observation point is displaced based on observation data output from an observation device that observes an observation point on a bridge and detects physical quantities that are responses to actions on the observation point of multiple parts of a railway vehicle traveling on the bridge; a speed amplitude calculation unit that calculates, based on the speed waveform, an approach speed amplitude, which is the amplitude of the speed waveform when the railroad vehicle approaches the bridge, and an exit speed amplitude, which is the amplitude of the speed waveform when the railroad vehicle exits the bridge; Includes.

[0007] One aspect of the measurement system according to the present invention is An embodiment of the measuring device; The observation device; Equipped with.

[0008] One aspect of the measurement program according to the present invention is a velocity waveform calculation process for calculating a velocity waveform, which is a waveform of the velocity at which the observation point is displaced, based on observation data output from an observation device that observes an observation point on a bridge and detects physical quantities that are responses to the actions of multiple parts of a railway vehicle traveling on the bridge on the observation point; a speed amplitude calculation step of calculating, based on the speed waveform, an approach speed amplitude, which is the amplitude of the speed waveform when the railroad vehicle approaches the bridge, and an exit speed amplitude, which is the amplitude of the speed waveform when the railroad vehicle exits the bridge; Have the computer run the following. [Brief description of the drawings]

[0009] [Figure 1] FIG. 1 is a diagram showing an example of the configuration of a measurement system. [Diagram 2] A cross-sectional view of the superstructure in Figure 1 taken along line AA. [Diagram 3] 4 is a diagram illustrating acceleration detected by an acceleration sensor. [Figure 4]FIG. 2 is a diagram showing an example of the vehicle length LC (Cm) and the distance between the axles La (aw(Cm,n)). [Diagram 5] An explanatory diagram of the structural model of the bridge superstructure. [Figure 6] FIG. 13 is a diagram showing an example of a deflection amount wstd(aw(Cm,n),t). [Figure 7] FIG. 13 is a diagram showing an example of a deflection amount Cstd(Cm,t). [Figure 8] FIG. 13 is a graph showing an example of a deflection amount Tstd(t). [Figure 9] FIG. 4 is a diagram showing an example of the amount of deflection Tstd(t) when a railway vehicle is decelerating. [Figure 10] FIG. 4 is a diagram showing an example of the amount of deflection Tstd(t) when a railway vehicle is accelerating. [Figure 11] FIG. 2 is a diagram showing an example of a velocity waveform v(t) when a railway vehicle is decelerating. [Figure 12] FIG. 2 is a diagram showing an example of a velocity waveform v(t) when a railway vehicle is accelerating. [Figure 13] FIG. 2 is a diagram showing an example of a speed waveform v(t) when a railway vehicle is traveling at a constant speed. [Figure 14] FIG. 2 is a diagram showing an example of a velocity waveform v(t) when a railway vehicle is decelerating. [Figure 15] FIG. 2 is a diagram showing an example of a velocity waveform v(t) when a railway vehicle is accelerating. [Figure 16] FIG. 4 is a flowchart showing an example of a procedure of a measurement method according to the first embodiment. [Figure 17] 1A and 1B are diagrams showing configuration examples of a sensor, a measuring device, and a monitoring device. [Figure 18] FIG. 13 is a diagram showing an example of calculation of an approach time ti and an exit time to. [Figure 19] FIG. 13 is a diagram showing an example of calculating the number of vehicles CT. [Figure 20] FIG. 11 is a flowchart showing an example of a procedure of a measurement method according to a second embodiment. [Figure 21] FIG. 13 is a diagram showing an example of the arrangement of a measurement device according to a second embodiment. [Figure 22] FIG. 13 is a flowchart showing an example of a procedure of a velocity amplitude calculation step in the third embodiment. [Figure 23] FIG. 2 is a diagram showing an example of multiple positive peaks and multiple negative peaks selected in a velocity waveform v(t). [Figure 24] FIG. 4 is a diagram showing an example of a first approximate straight line Sv_pk_P(t) and a second approximate straight line Sv_pk_N(t). [Diagram 25] FIG. 4 is a diagram showing an example of an approach speed amplitude Svi and an exit speed amplitude Svo. [Figure 26] FIG. 13 is a flowchart showing an example of a procedure of a velocity amplitude calculation step in the fourth embodiment. [Figure 27] FIG. 2 is a diagram showing an example of n positive peaks and n negative peaks selected in a velocity waveform v(t). [Figure 28] FIG. 2 is a diagram showing an example of n peak amplitudes Sv_PN(1) to Sv_PN(n). [Figure 29] FIG. 4 is a diagram showing an example of an approach speed amplitude Svi and an exit speed amplitude Svo. [Diagram 30] FIG. 13 is a diagram showing another example of the configuration of the measurement system. [Diagram 31] FIG. 13 is a diagram showing another example of the configuration of the measurement system. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] Preferred embodiments of the present invention will be described in detail below with reference to the drawings. Note that the embodiments described below do not unduly limit the contents of the present invention described in the claims. Furthermore, not all of the configurations described below are necessarily essential components of the present invention.

[0011] 1. First embodiment 1-1. Measurement system configuration Railway vehicles passing over bridges are heavy and can be measured by BWIM. BWIM is an abbreviation for Bridge Weigh in Motion, and is a technology that measures the weight and number of axles of railway vehicles passing over a bridge by treating the bridge as a "scale" and measuring the deformation of the bridge. A bridge that can analyze the weight of a passing railway vehicle from responses such as deformation and strain is a structure where BWIM can function, and the BWIM system, which applies the physical process between the action on the bridge and the response, makes it possible to measure the weight of a passing railway vehicle.

[0012] Fig. 1 is a diagram showing an example of a measurement system according to this embodiment. As shown in Fig. 1, a measurement system 10 according to this embodiment includes a measurement device 1 and at least one sensor 2 provided on a bridge 5. The measurement system 10 may also include a monitoring device 3.

[0013] The bridge 5 is composed of a superstructure 7 and a substructure 8. FIG. 2 is a cross-sectional view of the superstructure 7 taken along line AA in FIG. 1. As shown in FIGS. 1 and 2, the superstructure 7 includes a bridge deck 7a including a deck F, a main girder G, a cross girder (not shown), a support 7b, a rail 7c, a sleeper 7d, and a ballast 7e. As shown in FIG. 1, the substructure 8 includes a pier 8a and an abutment 8b. The superstructure 7 is a structure that is bridged over either one of the adjacent abutments 8b and pier 8a, two adjacent abutments 8b, or two adjacent piers 8a. Both ends of the superstructure 7 are located at the positions of the adjacent abutments 8b and pier 8a, the positions of the two adjacent abutments 8b, or the positions of the two adjacent piers 8a.

[0014] When a railway vehicle 6 enters the superstructure 7 of the bridge 5, the load of the railway vehicle 6 causes the superstructure 7 to bend, but since the railway vehicle 6 is made up of multiple cars connected together, the bending of the superstructure 7 is repeated periodically as each car passes.

[0015] The measurement device 1 and each sensor 2 are connected, for example, by a cable (not shown) and communicate with each other via a communication network such as CAN. CAN is an abbreviation for Controller Area Network. Alternatively, the measurement device 1 and each sensor 2 may communicate with each other via a wireless network.

[0016] Each sensor 2 outputs observation data including a physical quantity occurring when the railcar 6 travels across the bridge 5. In this embodiment, each sensor 2 is an acceleration sensor, and the observation data is acceleration data including an acceleration occurring when the railcar 6 travels across the bridge 5. Each sensor 2 may be, for example, a quartz acceleration sensor or a MEMS acceleration sensor. MEMS is an abbreviation for Micro Electro Mechanical Systems.

[0017] In this embodiment, each sensor 2 is installed in the longitudinal center of the superstructure 7 of the bridge 5, specifically, in the longitudinal center of the main girder G. However, it is sufficient for each sensor 2 to be able to detect acceleration generated by the running of the railroad vehicle 6, and the installation position is not limited to the central part of the superstructure 7. If each sensor 2 is installed on the deck F of the superstructure 7, there is a risk that it will be destroyed by the running of the railroad vehicle 6, and there is also a risk that the measurement accuracy will be affected by local deformation of the bridge deck 7a. Therefore, in the example of Figs. 1 and 2, each sensor 2 is installed on the main girder G of the superstructure 7.

[0018] The deck F, main girders G, etc. of the superstructure 7 are deflected in the vertical direction due to the load of the railway vehicle 6 passing over the bridge 5. Each sensor 2 detects the acceleration of the deflection of the deck F and main girders G due to the load of the railway vehicle 6 passing over the bridge 5.

[0019] Based on the acceleration data output from each sensor 2, the measuring device 1 calculates the amplitude of the speed at which a predetermined observation point on the bridge 5 is displaced when the railcar 6 approaches and leaves the bridge 5, and determines whether the railcar 6 is traveling at a constant speed, decelerating, or accelerating. The measuring device 1 is installed, for example, on the bridge abutment 8b.

[0020] The measuring device 1 and the monitoring device 3 can communicate with each other via a communication network 4, such as a wireless network for mobile phones and the Internet. The measuring device 1 transmits measurement data including a determination result of the traveling of the railway vehicle 6 when the railway vehicle 6 passes over a bridge 5 to the monitoring device 3. The monitoring device 3 stores the measurement data in a storage device (not shown) and may perform processing such as monitoring the railway vehicle 6 and determining abnormalities in the superstructure 7 based on the measurement data.

[0021] In this embodiment, the bridge 5 is a railway bridge, for example, a steel bridge, a girder bridge, an RC bridge, etc. RC is an abbreviation for Reinforced Concrete.

[0022] As shown in FIG. 2, in this embodiment, an observation point R is set in association with the sensor 2. In the example of FIG. 2, the observation point R is set at a position on the surface of the superstructure 7 vertically above the sensor 2 provided on the main girder G. That is, the sensor 2 is an observation device that observes the observation point R, detects a physical quantity that is a response to the action of multiple parts of the railway vehicle 6 traveling on the bridge 5 on the observation point R, and outputs observation data including the detected physical quantity. For example, each of the multiple parts of the railway vehicle 6 is an axle or a wheel, but hereinafter, it is assumed that it is an axle. Also, in this embodiment, each sensor 2 is an acceleration sensor, and detects acceleration as a physical quantity. The sensor 2 may be provided at a position where it can detect the acceleration occurring at the observation point R due to the traveling of the railway vehicle 6, but it is preferable to provide it at a position close to the vertical of the observation point R.

[0023] The number and installation positions of the sensors 2 are not limited to the examples shown in Figs. 1 and 2, and various modifications are possible.

[0024] The measurement device 1 acquires acceleration in a direction intersecting with the plane of the superstructure 7 of the bridge 5 on which the railcar 6 runs, based on acceleration data, which is observation data output from the sensor 2. The plane of the superstructure 7 on which the railcar 6 runs is defined by the direction in which the railcar 6 runs, i.e., the X direction which is the longitudinal direction of the superstructure 7, and the direction perpendicular to the direction in which the railcar 6 runs, i.e., the Y direction which is the width direction of the superstructure 7. As the railcar 6 runs, the observation point R is deflected in a direction perpendicular to the X and Y directions. Therefore, in order to accurately calculate the magnitude of the acceleration of the deflection, it is desirable for the measurement device 1 to acquire acceleration in a direction perpendicular to the X and Y directions, i.e., the Z direction which is the normal direction of the deck F.

[0025] 3 is a diagram illustrating the acceleration detected by the sensor 2. The sensor 2 is an acceleration sensor that detects acceleration occurring in each of three axial directions that are perpendicular to each other.

[0026] In order to detect the acceleration of the deflection at observation point R due to the running of the railway vehicle 6, the sensor 2 is installed so that one of the three detection axes, the x-axis, the y-axis, and the z-axis, intersects with the X-direction and the Y-direction. Since the observation point R deflects in a direction perpendicular to the X-direction and the Y-direction, the sensor 2 is ideally installed so that one axis is aligned with the Z-direction perpendicular to the X-direction and the Y-direction, i.e., the normal direction of the floor board F, in order to accurately detect the acceleration of the deflection.

[0027] However, when the sensor 2 is installed on the superstructure 7, the installation location may be tilted. Even if one of the three detection axes of the sensor 2 is not installed in the normal direction of the floor board F, the error is small and negligible as long as it is roughly oriented in the normal direction. Furthermore, even if one of the three detection axes of the sensor 2 is not installed in the normal direction of the floor board F, the measurement device 1 can correct the detection error due to the tilt of the sensor 2 by using a three-axis composite acceleration obtained by combining the accelerations of the x-axis, y-axis, and z-axis. Furthermore, the sensor 2 may be a one-axis acceleration sensor that detects at least the acceleration occurring in a direction approximately parallel to the vertical direction, or the acceleration in the normal direction of the floor board F.

[0028] The measurement method according to this embodiment, which is executed by the measurement apparatus 1, will be described in detail below.

[0029] 1-2. Details of the measurement method In this embodiment, the measurement device 1 calculates a speed waveform, which is a waveform of the speed at which the observation point R is displaced, based on the acceleration data output from the sensor 2, and calculates an approach speed amplitude, which is the amplitude of the speed waveform at the time the railway vehicle 6 approaches the bridge 5, and an exit speed amplitude, which is the amplitude of the speed waveform at the time the railway vehicle 6 leaves the bridge 5. Then, the measurement device 1 compares the approach speed amplitude with the exit speed amplitude to determine whether the railway vehicle 6 is traveling at a constant speed, decelerating, or accelerating.

[0030] In the following, since actual measurement data of the acceleration when one railway vehicle 6 travels at a constant speed, decelerated, and accelerated across the bridge 5 is not available, a deflection amount approximating the actual displacement of the bridge 5 is calculated based on environmental information including the dimensions of the railway vehicle 6 and the dimensions of the bridge 5, and a structural model of the superstructure 7 of the bridge 5. Then, the theory of the measurement method of this embodiment is explained by substituting the speed waveform calculated from the actually measured acceleration data with the speed waveform obtained by differentiating the calculated deflection amount.

[0031] The environmental information may include the dimensions of the bridge 5, for example, the bridge length L B and the position L of observation point R x Includes bridge length L B is the length of the bridge 5, which in this embodiment is the distance between the approach end and the exit end of the superstructure 7. For example, when the bridge 5 has multiple superstructures 7, the bridge length L B is the distance between the entrance end and exit end of each superstructure 7. Also, the position L of the observation point R x is the distance from the entrance end of the superstructure 7 to the observation point R. The environmental information also includes the dimensions of the railcar 6, for example, the length L of each car of the railcar 6. C (C m ), number of axles for each vehicle a T (C m ) and the distance between the axles of each vehicle La(a w (Cm ,n)) is included. C m is the vehicle number, and the length of each vehicle L C (C m ) starts with C m The distance between the two ends of the th car. The number of axles in each car is a T (C m ) starts with C m n is the axle number of each vehicle, 1≦n≦a T (C m ) The distance between the axles of each vehicle is La(a w (C m ,n)) is C from the beginning when n=1. m The distance between the tip of the th car and the first axle from the front, and when n≧2, the distance between the n-1th axle from the front and the nth axle. m Length of the th vehicle L C (C m ) and the distance between the axles La(a w (C m ,n)) is shown below. The dimensions of the railway vehicle 6 and the dimensions of the superstructure 7 can be measured by known methods. A database of the dimensions of the railway vehicle 6 passing over the bridge 5 may be created in advance, and the dimensions of the relevant vehicle may be referenced based on the passing time.

[0032] In addition, when it is assumed that a railway vehicle 6 having an arbitrary number of cars with the same dimensions is traveling on the superstructure 7 of the bridge 5, the environmental information is the length L C (C m ), number of axles in the vehicle a T (C m ) and the distance between the axles La(a w (C m ,n)).

[0033] Number of railcars 6 C T With the parameter, the total number of axles of railcar 6, Ta T is the number of axles of each vehicle included in the environmental information. T (C m ) is used to calculate using formula (1).

[0034]

number

[0035] C from the front axle of railcar 6 m Distance D to the nth axle of the nth vehicle wa (a w (C m ,n) is the length L of each vehicle included in the environmental information C (C m ), number of axles for each vehicle a T (C m ) and the distance between the axles of each vehicle La(a w (C m ,n)) is calculated by formula (2). In formula (2), L C (C m )=L C (1) is assumed to be the case.

[0036]

number

[0037] In formula (2), C m =C T , n=a T (C T ) from the front axle of the railcar 6 to the rear axle of the rearmost railcar, D wa (a w (C T ,a T (C T ))) is calculated.

[0038]

number

[0039] The time t for the rail vehicle 6 to pass through the superstructure 7 of the bridge 5 s With parameters, the average speed of railcar 6 v avg is the bridge length L included in the environmental information B and distance Dwa (a w (C T ,a T (C T ))) is used to calculate using equation (4).

[0040]

number

[0041] By substituting equation (3) into equation (4), the average speed of railcar 6, v avg is calculated.

[0042]

number

[0043] In the superstructure 7 of the bridge 5, one or more bridge decks 7a, each consisting of a deck F and a main girder G, are considered to be arranged in a continuous manner, and the displacement of one bridge deck 7a is considered to be the displacement at the center in the longitudinal direction. The load applied to the superstructure 7 moves from one end of the superstructure 7 to the other end. At this time, the deflection amount, which is the displacement of the center of the superstructure 7, can be expressed using the position of the load on the superstructure 7 and the load amount. In order to express the deflection deformation when the axle of the railroad vehicle 6 moves on the superstructure 7 as a trajectory of the deflection amount due to the movement of a single point load on the beam, a structural model shown in Figure 5 is considered, and the deflection amount at the middle part is calculated in the structural model. In Figure 5, P is the load. a is the load position from the entry end of the superstructure 7 on the side where the railroad vehicle 6 enters. b is the load position from the exit end of the superstructure 7 on the side where the railroad vehicle 6 exits. The structural model shown in Figure 5 is a simple beam supported at both ends with both ends as supports.

[0044]

number

[0045] In equation (6), the function H a is defined as equation (7).

[0046]

number

[0047] By transforming equation (6), we obtain equation (8).

[0048]

number

[0049] On the other hand, the bending moment M is expressed by the formula (9). In the formula (9), θ is the angle, I is the second moment, and E is the Young's modulus.

[0050]

number

[0051] Substituting equation (9) into equation (8), we obtain equation (10).

[0052]

number

[0053] Equation (11) is calculated by integrating equation (10) with respect to the observation position x, and equation (12) is obtained. In equation (12), C1 is an integral constant.

[0054]

number

[0055]

number

[0056] Furthermore, equation (13) is calculated by integrating equation (12) with respect to the observation position x, to obtain equation (14). In equation (14), C2 is an integral constant.

[0057]

number

[0058]

number

[0059] In equation (14), θx represents the amount of deflection, and equation (15) is obtained by replacing θx with the amount of deflection w.

[0060]

number

[0061] From Figure 5, b=L B Since -a, equation (15) is transformed into equation (16).

[0062]

number

[0063] When x=0, the deflection w=0, and x≦a, H a = 0, so in equation (16) we have x = w = H a Substituting =0 and rearranging, we obtain equation (17).

[0064]

number

[0065] Also, x=L B With the deflection amount w=0, x>a, H a = 1, so in equation (16) we add x = L B ,w=0,H a Substituting =1 and rearranging, we obtain equation (18).

[0066]

number

[0067] In equation (18), b = L B Substituting -a, we obtain equation (19).

[0068]

number

[0069] By substituting the integral constant C1 of equation (18) and the integral constant C2 of equation (17) into equation (15), equation (20) is obtained.

[0070]

number

[0071] By transforming equation (20), the deflection w at observation position x when load P is applied to position a is expressed by equation (21).

[0072]

number

[0073] Deflection w at the central observation position x when load P is at the center of the superstructure 7 0.5LB , x=0.5LB, a=b=0.5LB, H a = 0, this is expressed by equation (22). 0.5LB is the maximum amplitude of the deflection w.

[0074]

number

[0075] The deflection w at any observation position x is the deflection w 0.5LB When the position a of the load P is closer to the entry end than the observation position x, x>a, so H is added to equation (22). a Substituting =1 gives equation (23).

[0076]

number

[0077] Position a of load P is a=L B r, and in equation (23), a = L B r,b=L B Substituting (1-r) and rearranging, the deflection amount w is normalized to the deflection amount w by equation (24). std r is the bridge length L B This shows the ratio of position a of load P to

[0078]

number

[0079] Similarly, if the position a of the load P is closer to the forward end than the observation position x, then x≦a, and H is added to equation (22). a Substituting =0 gives us equation (25).

[0080]

number

[0081] Position a of load P is a=L B r, and in equation (25), a = L B r,b=L B Substituting (1-r) and rearranging, the deflection amount w is normalized to the deflection amount w by equation (26). std is obtained.

[0082]

number

[0083] Combining equations (24) and (26), we can obtain the arbitrary observation position x=L x Deflection amount w std(r) is expressed by equation (27). In equation (27), the function R(r) is expressed by equation (28). Equation (27) is an approximation equation for the deflection of the superstructure 7, which is a structure, and is based on a structural model of the superstructure 7. Specifically, equation (27) is an approximation equation normalized by the maximum amplitude of deflection at the center position between the approach end and the exit end of the superstructure 7.

[0084]

number

[0085]

number

[0086] When a railway vehicle 6 travels at a constant speed on a bridge 5, any axle of the railway vehicle 6 is located at a position L of the observation point R from the approach end of the superstructure 7. x The time it takes to reach xn is the average velocity v calculated by equation (5) avg It is calculated using equation (29).

[0087]

number

[0088] Also, any axle of the railcar 6 has length L B The time t required for the superstructure 7 to pass through ln is calculated using equation (30).

[0089]

number

[0090] Railroad Car 6 C m The time t0 (C m ,n) is the approach time t i , the distance D calculated by equation (2) wa (aw (C m , n)) and the average velocity v calculated by equation (5) avg It is calculated using equation (31).

[0091]

number

[0092] Using equations (29), (30) and (31), C m The deflection w of the nth axle of the nth vehicle, expressed by equation (27), std Deflection w when (r) is replaced with time std (a w (C m In equation (32), the function R(t) is expressed by equation (33). Figure 6 shows the deflection w std (a w (1,1),t)~w std (a w An example of (1,4),t) is shown below.

[0093]

number

[0094]

number

[0095] Also, according to equation (34), C m Deflection amount C caused by the th vehicle std (C m ,t) is calculated. T = Deflection C due to 10 railcars 6 std (1,t)~C std (10,t) is shown.

[0096]

number

[0097] Furthermore, by using equation (35), the deflection amount T std (t) is calculated. T = Deflection T due to 10 trains 6 std An example of (t) is shown below.

[0098]

number

[0099] Deflection amount T std Since (t) is generated by the movement of the railcar 6, which is the load P, the deflection T std (t) is the deflection T when the railcar 6 is traveling at a constant speed. std (t) is the waveform stretched in the time direction.

[0100] When the acceleration a0 of the railroad vehicle 6 is constant, the running speed v a (t) is the approach time t i 0, approach time t i Let the speed of railcar 6 at v = 0 be v i is obtained by equation (36).

[0101]

number

[0102] Railroad car 6 has a speed of v i The travel distance u1(t) when traveling at a constant speed is obtained by equation (37) with u1(t=0).

[0103]

number

[0104] Moreover, the travel distance u2(t) when the railway vehicle 6 accelerates or decelerates at a constant acceleration a0 is obtained by equation (38) where u2(t=0).

[0105]

number

[0106] From equations (37) and (38), equation (39) is obtained.

[0107]

number

[0108] From equation (39), the deflection T when the railway vehicle 6 decelerates at a constant acceleration a0 is std (t) is the deflection T when the railcar 6 is traveling at a constant speed. std (t) is the time domain of {1 / (a0 / 2v i )t+1} times. std (t) is shown by a solid line, and the deflection amount T std In the example of FIG. 9, the number of railcars C T is 16.

[0109] In addition, from equation (39), the deflection amount T when the railway vehicle 6 accelerates and runs at a constant acceleration a0 is std (t) is the deflection T when the railcar 6 is traveling at a constant speed. std (t) is the time domain of {1 / (a0 / 2v i )t+1} times the deflection T std (t) is shown by a solid line, and the deflection amount T std In the example of FIG. 10, the number of railcars C T is 16.

[0110] Deflection amount T stdThe velocity waveform of the displacement change is obtained by differentiating (t). std The velocity waveform v(t) obtained by differentiating (t) when the railway vehicle 6 is decelerating is shown by a solid line, and the deflection amount T std The dashed line shows the velocity waveform v(t) when the railway vehicle 6 is traveling at a constant speed, which is obtained by differentiating the deflection amount T std The velocity waveform v(t) obtained by differentiating (t) when the railcar 6 is accelerating is shown by a solid line, and the deflection amount T std The dashed line shows the velocity waveform v(t) when the railway vehicle 6 is traveling at a constant speed, which is obtained by differentiating (t).

[0111] As described above, the measurement device 1 actually measures the amount of deflection T std Instead of calculating the velocity waveform from (t), the measurement device 1 calculates a velocity waveform, which is a waveform of the velocity at which the observation point R is displaced, based on the acceleration data output from the sensor 2. Then, based on the calculated velocity waveform, the measurement device 1 determines whether the railway vehicle 6 is traveling at a constant speed, decelerating, or accelerating. Specifically, first, the measurement device 1 integrates the acceleration data a(t) output from the sensor 2, which is an acceleration sensor, to generate a velocity waveform v(t) as shown in equation (40). In equation (40), ΔT is the time interval of samples. Note that the measurement device 1 may perform high-pass filtering on the acceleration data a(t) to remove low-frequency signals contained in the acceleration data a(t), and integrate the high-pass filtered acceleration data a(t) using equation (40). Alternatively, the measurement device 1 may integrate the acceleration data a(t) using equation (40) and then perform high-pass filtering to generate the velocity waveform v(t).

[0112]

number

[0113] Next, the measurement device 1 measures the approach speed amplitude Svi and the amplitude of the velocity waveform v(t) when the railway vehicle 6 advances onto the bridge 5, S vo For example, as shown in Figs. 13, 14, and 15, the measurement device 1 calculates the difference between the first and second positive peaks and the negative peaks of the velocity waveform v(t) as the approach velocity amplitude S vi The difference between the penultimate positive peak and the negative peak is the advance velocity amplitude S vo 13 shows the speed waveform v(t) when the railway vehicle 6 runs at a constant speed, FIG. 14 shows the speed waveform v(t) when the railway vehicle 6 runs at a decelerated speed, and FIG. 15 shows the speed waveform v(t) when the railway vehicle 6 runs at an accelerated speed. As described above, since actual measurement data of acceleration is not available, the example of FIG. 13 uses the speed waveform v(t) at a constant speed shown by the dashed line in FIG. 11 and FIG. 12 instead. Also, the example of FIG. 14 uses the speed waveform v(t) at the time of deceleration shown by the solid line in FIG. 11 instead. Also, the example of FIG. 15 uses the speed waveform v(t) at the time of acceleration shown by the solid line in FIG. 12 instead.

[0114] The measurement device 1 then measures the approach velocity amplitude S vi ≒Velocity amplitude S when advancing vo If so, it is determined that the railway vehicle 6 has been traveling at a constant speed, and the approach speed amplitude S vi >Speed ​​amplitude S when advancing vo If so, it is determined that the railcar 6 is decelerating, and the approach speed amplitude S vi <Velocity amplitude S when advancing vo If ±ΔS, the measurement device 1 determines that the railcar 6 is accelerating. v With the threshold set at -ΔS v ≦S vi -S vo ≦ΔS v In the case of S, it is determined that the railcar 6 was traveling at a constant speed. vi -S vo >ΔS v In the case of S, it is determined that the railcar 6 is decelerating. vi -S vo <-ΔS v In this case, it may be determined that the railcar 6 is accelerating.

[0115] As shown in FIG. 9 and FIG. 10, the deflection amount T std (t) is the deflection T when the railcar 6 is traveling at a constant speed. std (t) is a waveform that expands or contracts in the time direction, but the amount of deflection T std Since the amplitude of (t) is determined by the load of the railcar 6, the deflection amount T std The amplitude of (t) does not change. The displacement waveform of bridge 5 obtained by double integrating the measured acceleration data a(t) has a deflection of T std 13, 14, and 15, the amplitude of the displacement waveform of the bridge 5 does not change even if the speed of the railway vehicle 6 changes. Therefore, in order to determine whether the railway vehicle 6 is traveling at a constant speed, decelerating, or accelerating based on the displacement waveform of the bridge 5, it is necessary to capture the change in the period of the vibration component contained in the displacement waveform, and it is not necessarily easy to determine whether the railway vehicle 6 is traveling based on the displacement waveform of the bridge 5. In contrast, as shown in Figures 13, 14, and 15, the amplitude of the speed waveform v(t) changes depending on the speed of the railway vehicle 6, so it is easy to determine whether the railway vehicle 6 is traveling based on the speed waveform v(t).

[0116] 1-3. Measurement method procedure 16 is a flow chart showing an example of the procedure of the measurement method according to the first embodiment. In this embodiment, the measurement device 1 executes the procedure shown in FIG.

[0117] 16, first, in an observation data acquisition step S10, the measurement device 1 observes an observation point R on a bridge 5, and acquires observation data output from an observation device that detects a physical quantity that is a response to an action on the observation point R of multiple parts of a railway vehicle 6 traveling on the bridge 5. In this embodiment, the sensor 2 is an acceleration sensor, the physical quantity detected by the sensor 2 is acceleration, and the observation data is acceleration data a(t).

[0118] Next, in a velocity waveform calculation step S20, the measurement device 1 calculates a velocity waveform v(t), which is a waveform of the velocity of displacement of the observation point R of the bridge 5, based on the acceleration data a(t), which is the observation data acquired in step S10. For example, in the velocity waveform calculation step S20, the measurement device 1 performs high-pass filter processing on the acceleration data a(t) and then integrates the acceleration data a(t) using the above-mentioned equation (40) to calculate the velocity waveform v(t). Alternatively, the measurement device 1 may integrate the acceleration data a(t) using the above-mentioned equation (40) and then perform high-pass filter processing to calculate the velocity waveform v(t).

[0119] Next, in a speed amplitude calculation step S30, the measurement device 1 calculates an approach speed amplitude S , which is the amplitude of the speed waveform v(t) when the railroad vehicle 6 approaches the bridge 5, based on the speed waveform v(t) calculated in step S20. vi and the amplitude of the velocity waveform v(t) of the railway vehicle 6 when it approaches the bridge 5, S vo For example, the measurement device 1 calculates the difference between the first and second positive peaks and the negative peak of the velocity waveform v(t) as the approach velocity amplitude S vi The difference between the penultimate positive peak and the negative peak is the advance velocity amplitude S vo It may be calculated as:

[0120] Next, in a running determination step S40, the measurement device 1 determines the approach speed amplitude S vi and the velocity amplitude S vo For example, the measurement device 1 compares ±ΔS v With the threshold set at -ΔS v ≦S vi -S vo ≦ΔS v In the case of S, it is determined that the railcar 6 was traveling at a constant speed. vi -S vo >ΔS v In the case of S, it is determined that the railcar 6 is decelerating. vi -S vo <-ΔS vIn this case, it may be determined that the railcar 6 is accelerating.

[0121] Next, in a measurement data output step S50, the measurement device 1 outputs the measurement data including the traveling determination result of step S40 to the monitoring device 3. Specifically, the measurement device 1 transmits the measurement data to the monitoring device 3 via the communication network 4. The measurement data includes, in addition to the traveling determination result, acceleration data a(t), a velocity waveform v(t), and an entry velocity amplitude S vi , speed amplitude S at the time of advance vo etc.

[0122] Then, the measuring device 1 repeats the processes of steps S10 to S50 until the measurement is completed in step S60.

[0123] 1-4. Configuration of sensors, measuring devices and monitoring devices FIG. 17 is a diagram showing an example of the configuration of the sensor 2, the measuring device 1, and the monitoring device 3.

[0124] As shown in FIG. 17, the sensor 2 includes a communication unit 21, an acceleration sensor 22, a processor 23, and a storage unit 24.

[0125] The storage unit 24 is a memory that stores various programs, data, etc. for the processor 23 to perform calculation processing and control processing. The storage unit 24 also stores programs, data, etc. for the processor 23 to realize predetermined application functions.

[0126] The acceleration sensor 22 detects the acceleration occurring in each of the three axial directions.

[0127] The processor 23 executes an observation program 241 stored in the storage unit 24 to control the acceleration sensor 22, generate observation data 242 based on the acceleration detected by the acceleration sensor 22, and store the generated observation data 242 in the storage unit 24. In this embodiment, the observation data 242 is acceleration data a(t).

[0128] Under the control of the processor 23, the communication unit 21 transmits the observation data 242 stored in the memory unit 24 to the measurement device 1.

[0129] As shown in FIG. 17, the measurement device 1 includes a first communication unit 11, a second communication unit 12, a storage unit 13, and a processor .

[0130] The first communication unit 11 receives the observation data 242 from the sensor 2, and outputs the received observation data 242 to the processor 14. As described above, the observation data 242 is acceleration data a(t).

[0131] The storage unit 13 is a memory that stores programs, data, etc. for the processor 14 to perform calculation processing and control processing. The storage unit 13 also stores various programs, data, etc. for the processor 14 to realize predetermined application functions. The processor 14 may also receive various programs, data, etc. via the communication network 4 and store them in the storage unit 13.

[0132] The processor 14 generates measurement data 133 based on the observation data 242 received by the first communication unit 11 , and stores the generated measurement data 133 in the memory unit 13 .

[0133] In this embodiment, the processor 14 executes the measurement program 131 stored in the storage unit 13 to function as an observation data acquisition unit 141, a speed waveform calculation unit 142, a speed amplitude calculation unit 143, a traveling determination unit 144, and a measurement data output unit 145. That is, the processor 14 includes the observation data acquisition unit 141, the speed waveform calculation unit 142, the speed amplitude calculation unit 143, the traveling determination unit 144, and the measurement data output unit 145.

[0134] The observation data acquisition unit 141 acquires the observation data 242 received by the first communication unit 11, and stores it in the storage unit 13 as the observation data 132. That is, the observation data acquisition unit 141 performs the process of the observation data acquisition step S10 in FIG.

[0135] The velocity waveform calculation unit 142 calculates a velocity waveform v(t), which is a waveform of the velocity of displacement of the observation point R of the bridge 5, based on the acceleration data a(t) which is the observation data 132 acquired by the observation data acquisition unit 141. For example, the velocity waveform calculation unit 142 performs high-pass filter processing on the acceleration data a(t) and then integrates the acceleration data a(t) using the above-mentioned equation (40) to calculate the velocity waveform v(t). Alternatively, the velocity waveform calculation unit 142 may integrate the acceleration data a(t) using the above-mentioned equation (40) and then perform high-pass filter processing to generate the velocity waveform v(t). That is, the velocity waveform calculation unit 142 performs the processing of the velocity waveform calculation step S20 in FIG. 16.

[0136] The speed amplitude calculation unit 143 calculates an approach speed amplitude S vi and the amplitude of the velocity waveform v(t) of the railway vehicle 6 when it approaches the bridge 5, S vo For example, the velocity amplitude calculation unit 143 calculates the difference between the first and second positive peaks and the negative peaks of the velocity waveform v(t) as the approach velocity amplitude S vi The difference between the penultimate positive peak and the negative peak is the advance velocity amplitude S vo That is, the velocity amplitude calculation unit 143 performs the process of the velocity amplitude calculation step S30 in FIG.

[0137] The travel determination unit 144 determines the approach speed amplitude S calculated by the speed amplitude calculation unit 143. vi and the velocity amplitude S vo For example, the travel determining unit 144 compares ±ΔS v With the threshold set at -ΔS v ≦S vi -S vo ≦ΔS v In the case of S, it is determined that the railcar 6 was traveling at a constant speed. vi -S vo >ΔS vIn the case of S, it is determined that the railcar 6 is decelerating. vi -S vo <-ΔS v In this case, it may be determined that the railcar 6 is accelerating.

[0138] The result of the traveling determination by the traveling determination unit 144 is stored in the storage unit 13 as at least a part of the measurement data 133. The measurement data 133 includes, in addition to the traveling determination result, acceleration data a(t), a velocity waveform v(t), and an entry velocity amplitude S vi , speed amplitude S at the time of advance vo etc.

[0139] The measurement data output unit 145 reads out the measurement data 133 stored in the storage unit 13, and outputs the measurement data 133 to the monitoring device 3. Specifically, under the control of the measurement data output unit 145, the second communication unit 12 transmits the measurement data 133 stored in the storage unit 13 to the monitoring device 3 via the communication network 4. That is, the measurement data output unit 145 performs the process of the measurement data output step S50 in FIG.

[0140] In this way, the measurement program 131 is a program that causes the measurement device 1, which is a computer, to execute each procedure of the flowchart shown in FIG.

[0141] As shown in FIG. 17, the monitoring device 3 includes a communication unit 31, a processor 32, a display unit 33, an operation unit 34, and a storage unit 35.

[0142] The communication unit 31 receives measurement data 133 from the measurement device 1 and outputs the received measurement data 133 to the processor 32 .

[0143] The display unit 33 displays various types of information under the control of the processor 32. The display unit 33 may be, for example, a liquid crystal display or an organic EL display. EL is an abbreviation for Electro Luminescence.

[0144] The operation unit 34 outputs operation data corresponding to an operation by a user to the processor 32. The operation unit 34 may be, for example, an input device such as a mouse, a keyboard, or a microphone.

[0145] The storage unit 35 is a memory that stores various programs, data, etc. for the processor 32 to perform calculation processing and control processing. The storage unit 35 also stores programs, data, etc. for the processor 32 to realize predetermined application functions.

[0146] The processor 32 acquires the measurement data 133 received by the communication unit 31, evaluates changes in the condition of the bridge 5 over time based on the acquired measurement data 133, generates evaluation information, and displays the generated evaluation information on the display unit 33.

[0147] In this embodiment, the processor 32 functions as a measurement data acquiring unit 321 and a monitoring unit 322 by executing a monitoring program 351 stored in the storage unit 35. That is, the processor 32 includes the measurement data acquiring unit 321 and the monitoring unit 322.

[0148] The measurement data acquisition unit 321 acquires the measurement data 133 received by the communication unit 31, and adds the acquired measurement data 133 to the measurement data sequence 352 stored in the storage unit .

[0149] The monitoring unit 322 statistically evaluates changes over time in the condition of the bridge 5 based on the measurement data sequence 352 stored in the memory unit 35. Then, the monitoring unit 322 generates evaluation information indicating the evaluation result, and displays the generated evaluation information on the display unit 33. The user can monitor the condition of the bridge 5 based on the evaluation information displayed on the display unit 33.

[0150] The monitoring unit 322 may perform processes such as monitoring the railway vehicle 6 and judging an abnormality in the bridge 5 based on the measurement data sequence 352 stored in the memory unit 35.

[0151] Furthermore, the processor 32 transmits information for adjusting the operating conditions of the measuring device 1 and the sensor 2 to the measuring device 1 via the communication unit 31 based on operation data output from the operation unit 34. The operating conditions of the measuring device 1 are adjusted based on the information received via the second communication unit 12. Furthermore, the measuring device 1 transmits information for adjusting the operating conditions of the sensor 2 received via the second communication unit 12 to the sensor 2 via the first communication unit 11. The operating conditions of the sensor 2 are adjusted based on the information received via the communication unit 21.

[0152] In addition, the processors 14, 23, and 32 may realize the functions of each part by individual hardware, or may realize the functions of each part by integrated hardware. For example, the processors 14, 23, and 32 include hardware, and the hardware may include at least one of a circuit for processing digital signals and a circuit for processing analog signals. The processors 14, 23, and 32 may be a CPU, a GPU, or a DSP. CPU stands for Central Processing Unit, GPU stands for Graphics Processing Unit, and DSP stands for Digital Signal Processor. In addition, the processors 14, 23, and 32 may be configured as a custom IC such as an ASIC to realize the functions of each part, or may realize the functions of each part by a CPU and an ASIC. ASIC stands for Application Specific Integrated Circuit, and IC stands for Integrated Circuit.

[0153] The storage units 13, 24, and 35 are configured by, for example, various IC memories such as ROM, flash ROM, and RAM, hard disks, memory cards, and other recording media. ROM stands for Read Only Memory, RAM stands for Random Access Memory, and IC stands for Integrated Circuit. The storage units 13, 24, and 35 include non-volatile information storage devices that are devices or media readable by a computer, and various programs, data, and the like may be stored in the information storage devices. The information storage devices may be optical disks such as DVDs and CDs, hard disk drives, or various types of memories such as card-type memories and ROMs.

[0154] 17 shows only one sensor 2, multiple sensors 2 may each generate observation data 242 and transmit it to the measurement device 1. In this case, the measurement device 1 receives the multiple observation data 242 transmitted from the multiple sensors 2, generates multiple measurement data 133, and transmits it to the monitoring device 3. In addition, the monitoring device 3 receives the multiple measurement data 133 transmitted from the measurement device 1, and monitors the state of the bridge 5 based on the received multiple measurement data 133.

[0155] 1-5.Effects As described above, in the measurement method of the first embodiment, the measurement device 1 calculates the velocity waveform v(t) of the displacement of the observation point R based on the acceleration data a(t) output from the sensor 2, and calculates the velocity amplitude S of the railway vehicle 6 when the railway vehicle 6 approaches the bridge 5. vi and the velocity amplitude S vois calculated. Since the amplitude of the displacement at observation point R is determined by the load of the railway vehicle 6, the amplitude of the displacement at observation point R does not change whether the railway vehicle 6 is traveling at a constant speed, decelerating, or accelerating. On the other hand, when the railway vehicle 6 is traveling at a constant speed, the period in which the displacement at observation point R oscillates is almost constant, whereas when the railway vehicle 6 is traveling at a decelerating or accelerating speed, the period in which the displacement at observation point R oscillates changes gradually. However, depending on the conditions, it may be difficult to grasp the change in this oscillation period and determine whether the railway vehicle 6 was traveling at a constant speed, decelerating, or accelerating. In contrast, when the railway vehicle 6 is traveling at a constant speed, the departure speed amplitude S vo is the velocity amplitude S at the time of approach vi On the other hand, when the railcar 6 decelerates, the exit speed amplitude S vo is the velocity amplitude S at the time of approach vi When the railcar 6 accelerates, the departure speed amplitude S vo is the velocity amplitude S at the time of approach vi This velocity amplitude S vi and the velocity amplitude S vo From the difference between these values, it is easy to determine whether the railway vehicle 6 was traveling at a constant speed, decelerating, or accelerating. Therefore, according to the measurement method of the first embodiment, the measurement device 1 can calculate information that serves as an index for easily determining whether the railway vehicle 6 was traveling at a constant speed, decelerating, or accelerating when it traveled over the bridge 5.

[0156] According to the measurement method of the first embodiment, the measurement device 1 measures the advance velocity amplitude S vo is the velocity amplitude S at the time of approach vi If the speed amplitude S is approximately equal to the speed amplitude S, the railcar 6 is determined to be traveling at a constant speed. vo is the velocity amplitude S at the time of approach vi If the amplitude is smaller than , it is determined that the railcar 6 is decelerating, and the departure speed amplitude S vo is the velocity amplitude S at the time of approach vi If it is greater than this, it can be determined that the railcar 6 is accelerating.

[0157] 2. Second embodiment In the following, the second embodiment will be described mainly with respect to the differences from the first embodiment, with the same reference numerals used for the same components as in the first embodiment, and explanations that overlap with the first embodiment will be omitted or simplified.

[0158] In the second embodiment, the measurement device 1 is configured to measure the approach velocity amplitude S vi , speed amplitude S at the time of advance vo and the average speed v of the railway vehicle 6 traveling on the bridge 5. avg Based on this, the approach speed v of the railway vehicle 6 to the bridge 5 i and advance speed v o Calculate.

[0159] Specifically, the measurement device 1 first measures the passing time t s For example, as shown in FIG. 18, the measurement device 1 calculates the time when the acceleration data a(t) first crosses the threshold TH as the entry time t i The time when the acceleration data a(t) finally crosses the threshold TH is called the exit time t o Then, the measurement device 1 calculates the advance time t o and approach time t i The difference between the time t s As mentioned above, since the actual measurement data of the acceleration data a(t) is not available, in the example of FIG. 18, the deflection amount T during deceleration shown by the solid line in FIG. 9 is calculated. std The velocity waveform v(t) during deceleration shown by the solid line in FIG. 11 above, obtained by differentiating (t), is further differentiated to produce an acceleration waveform, which is shown as acceleration data a(t).

[0160]

number

[0161] The measuring device 1 also measures the number of railcars 6 C T For example, as shown in FIG. 19, the measurement device 1 calculates the number of positive peaks P nCount the number of vehicles C by using equation (42). T In the example of FIG. 19, the number of positive peaks P n is 17, and the number of vehicles is C T is 16. Note that, since no actual measurement data of the acceleration data a(t) has been obtained, in the example of Figure 19, the velocity waveform v(t) during deceleration shown by the solid line in Figure 11 is shown instead of the velocity waveform v(t) obtained by differentiating the acceleration data a(t) using the above-mentioned equation (40).

[0162]

number

[0163] Next, the measuring device 1 measures the average speed v avg For example, the measurement device 1 calculates the bridge length L by using the formula (43). B and the length of the train L, which is the length of the railcar 6. T The sum of these is the transit time t s By dividing by the average speed v avg Calculate the train length L T is the distance D from the front axle of railcar 6 to the rearmost axle of the rearmost railcar wa (a w (C T ,a T (C T ))).

[0164]

number

[0165] If the acceleration of the train 6 is constant, its average speed v avg and the approach speed v of the railroad vehicle 6 to the bridge 5. i and advance speed v o The relationship is expressed by equation (44).

[0166]

number

[0167] On the other hand, the average amplitude of the velocity waveform v(t) is the average velocity amplitude S v_avg and the velocity amplitude S at the time of approach of the velocity waveform v(t) vi and the velocity amplitude S vo The relationship is expressed by equation (45).

[0168]

number

[0169] When railcar 6 is traveling at a constant speed, its exit speed is v o is the approach speed v i As shown in Figure 13 above, the velocity amplitude at the time of advancement S vo is the velocity amplitude S at the time of approach vi Also, when the railcar 6 decelerates, the exit speed v o is the approach speed v i As shown in Fig. 14, the velocity amplitude at the time of advancement S vo is the velocity amplitude S at the time of approach vi When the railcar 6 accelerates, the exit speed v o is the approach speed v i As shown in Fig. 15 above, the velocity amplitude S vo is the velocity amplitude S at the time of approach vi Therefore, as shown in equation (46), the average velocity v avg and the mean velocity amplitude S v_avg is in a proportional relationship.

[0170]

number

[0171] Therefore, the measurement device 1 calculates the approach speed v by using equations (47) and (48). i and advance speed v o can be calculated respectively.

[0172]

number

[0173]

number

[0174] Fig. 20 is a flow chart showing an example of the procedure of the measurement method of the second embodiment. In Fig. 20, the same reference numerals are given to steps that perform the same processes as those in Fig. 16. In this embodiment, the measurement device 1 executes the procedure shown in Fig. 20.

[0175] 20, first, similarly to the first embodiment, the measurement device 1 performs each process of the observation data acquisition step S10, the speed waveform calculation step S20, the speed amplitude calculation step S30, and the traveling determination step S40. The processes of the observation data acquisition step S10, the speed waveform calculation step S20, the speed amplitude calculation step S30, and the traveling determination step S40 in the measurement method of the second embodiment are similar to those in the first embodiment, and therefore the description thereof will be omitted.

[0176] Next, in an average speed calculation step S42, the measurement device 1 calculates an average speed v at which the railcar 6 travels on the bridge 5 based on the acceleration data a(t) that is the observation data acquired in step S10 and environmental information including the dimensions of the railcar 6 and the dimensions of the bridge 5 that have been created in advance. avg The environmental information is calculated based on the bridge length L B , position L of observation point R x , the length L of each of the railcars 6 C (C m ), number of axles for each vehicle a T (C m ) and the distance La (a w (C m Specifically, the measurement device 1 defines the time when the acceleration data a(t) first crosses the threshold TH as the entry time t i The time when the acceleration data a(t) finally crosses the threshold TH is called the exit time t o Next, the measurement device 1 calculates the passing time ts Next, the measurement device 1 calculates the number of positive peaks P n Count the number of vehicles, C, using the above equation (42). T Next, the measurement device 1 calculates the calculated number of vehicles C T Substituting this into the above equation (3), the train length L T The distance D from the front axle of railcar 6 to the rearmost axle of the rearmost railcar wa (a w (C T ,a T (C T Then, the measuring device 1 calculates the bridge length L B and train length L T Using the above equation (43), the average velocity v avg Calculate.

[0177] Next, in the approach / exit velocity calculation step S44, the measurement device 1 calculates the approach velocity amplitude S vi and the velocity amplitude S vo and the average velocity v calculated in step S42 avg Based on this, the approach speed v of the railway vehicle 6 to the bridge 5 is i and advance speed v o Specifically, the measurement device 1 calculates the approach speed v i Calculate the advance velocity v using the above equation (48). o Calculate.

[0178] Next, in a measurement data output step S50, the measurement device 1 outputs the travel determination result in step S40 and the approach speed amplitude S vi and the velocity amplitude S vo To the monitoring device 3, the measurement device 1 outputs the measurement data including the acceleration data a(t), the velocity waveform v(t), and the approach velocity amplitude S vi , speed amplitude S at the time of advance vo , average speed v avg etc.

[0179] Then, the measuring device 1 repeats the processes of steps S10 to S50 until the measurement is completed in step S60.

[0180] The functions of the sensor 2 and the monitoring device 3 in the second embodiment are similar to those in the first embodiment, and therefore the description thereof will be omitted. Fig. 21 is a diagram showing an example of the configuration of a measuring device 1 in the second embodiment.

[0181] 21, the measurement device 1 in the second embodiment includes, similarly to the first embodiment, a first communication unit 11, a second communication unit 12, a storage unit 13, and a processor 14. The functions of the first communication unit 11, the second communication unit 12, and the storage unit 13 are similar to those in the first embodiment, and therefore description thereof will be omitted.

[0182] In this embodiment, the processor 14 executes the measurement program 131 stored in the storage unit 13 to function as an observation data acquisition unit 141, a speed waveform calculation unit 142, a speed amplitude calculation unit 143, a running determination unit 144, a measurement data output unit 145, an average speed calculation unit 146, and an approach / entrance speed calculation unit 147. That is, the processor 14 includes the observation data acquisition unit 141, the speed waveform calculation unit 142, the speed amplitude calculation unit 143, the running determination unit 144, the measurement data output unit 145, the average speed calculation unit 146, and the approach / entrance speed calculation unit 147. The functions of the observation data acquisition unit 141, the speed waveform calculation unit 142, the speed amplitude calculation unit 143, and the running determination unit 144 are the same as those in the first embodiment, and therefore the description thereof will be omitted. The observation data acquisition unit 141 performs the process of the observation data acquisition step S10 in FIG. 20. The speed waveform calculation unit 142 performs the process of the speed waveform calculation step S20 in FIG. 20. Moreover, the speed amplitude calculation unit 143 performs the process of the speed amplitude calculation step S30 in Fig. 20. Moreover, the traveling determination unit 144 performs the process of the traveling determination step S40 in Fig. 20.

[0183] The average speed calculation unit 146 calculates an average speed v at which the railcar 6 travels on the bridge 5 based on the acceleration data a(t), which is the observation data acquired by the observation data acquisition unit 141, and environmental information 134 including the dimensions of the railcar 6 and the dimensions of the bridge 5 that have been created in advance.avg The environmental information 134 is stored in the storage unit 13, and the bridge length L B , position L of observation point R x , the length L of each of the railcars 6 C (C m ), number of axles for each vehicle a T (C m ) and the distance La (a w (C m Specifically, the average speed calculation unit 146 first determines the time when the acceleration data a(t) first crosses the threshold TH as the entry time t i The time when the acceleration data a(t) finally crosses the threshold TH is called the exit time t o Next, the average speed calculation unit 146 calculates the transit time t s Next, the average velocity calculation unit 146 calculates the number of positive peaks P n Count the number of vehicles, C, using the above equation (42). T Next, the average speed calculation unit 146 calculates the calculated number of vehicles C T Substituting this into the above equation (3), the train length L T The distance D from the front axle of railcar 6 to the rearmost axle of the rearmost railcar wa (a w (C T ,a T (C T Then, the average speed calculation unit 146 calculates the bridge length L B and train length L T Using the above equation (43), the average velocity v avg That is, the average velocity calculation unit 146 performs the process of the average velocity calculation step S42 in FIG.

[0184] The approach / exit speed calculation unit 147 calculates the approach speed amplitude S vi and the velocity amplitude S vo and the average velocity v calculated by the average velocity calculation unit 146 avgBased on this, the approach speed v of the railway vehicle 6 to the bridge 5 is i and advance speed v o Specifically, the approach / exit speed calculation unit 147 calculates the approach speed v i Calculate the advance velocity v using the above equation (48). o That is, the approach / advance speed calculation unit 147 performs the process of the approach / advance speed calculation step S44 in FIG.

[0185] The travel determination result by the travel determination unit 144 and the approach speed v calculated by the approach / exit speed calculation unit 147 i and advance speed v o are stored in the storage unit 13 as at least a part of the measurement data 133. The measurement data 133 further includes acceleration data a(t), a velocity waveform v(t), and an approach velocity amplitude S vi , speed amplitude S at the time of advance vo , average speed v avg etc.

[0186] The measurement data output unit 145 reads out the measurement data 133 stored in the storage unit 13, and outputs the measurement data 133 to the monitoring device 3. That is, the measurement data output unit 145 performs the process of the measurement data output step S50 in FIG.

[0187] Other functions of the measurement device 1 in the second embodiment are similar to those in the first embodiment, and therefore description thereof will be omitted.

[0188] In the measurement method of the second embodiment described above, the measurement device 1 calculates the average speed v at which the railway vehicle 6 travels on the bridge 5 based on the acceleration data a(t) output from the sensor 2 and environmental information including the dimensions of the railway vehicle 6 and the dimensions of the bridge 5 that have been created in advance. avg Calculate the approach velocity amplitude S vi and the velocity amplitude S vo and the average speed v avg Based on this, the approach speed v of the railway vehicle 6 to the bridge 5 is i and advance speed v oTherefore, according to the measurement method of the second embodiment, the measurement device 1 calculates the approach speed v of the railway vehicle 6 to the bridge 5 based on the acceleration data a(t) and the environmental information, regardless of whether the railway vehicle 6 is traveling at a constant speed, decelerating, or accelerating. i and advance speed v o can be calculated.

[0189] In addition, according to the measurement method of the second embodiment, it is possible to achieve the same effects as the measurement method of the first embodiment.

[0190] 3. Third embodiment In the following, for the third embodiment, components similar to those in the first or second embodiment are given the same symbols, and explanations that overlap with the first or second embodiment are omitted or simplified, and the following mainly describes the differences from the first and second embodiments.

[0191] A flow chart showing an example of the procedure of the measurement method of the third embodiment is similar to that of FIG. 16 or 20, and therefore is not shown. The processes of the observation data acquisition step S10, the speed waveform calculation step S20, and the traveling determination step S40 in the measurement method of the third embodiment are similar to those of the first embodiment, and therefore their explanations are omitted. Furthermore, the processes of the average speed calculation step S42 and the approach / exit speed calculation step S44 in the measurement method of the third embodiment are similar to those of the second embodiment, and therefore their explanations are omitted. Furthermore, the process of the measurement data output step S50 in the measurement method of the third embodiment is similar to those of the first or second embodiment, and therefore their explanations are omitted. In the measurement method of the third embodiment, the approach speed amplitude S in the speed amplitude calculation step S30 is calculated. vi and the velocity amplitude S vo The calculation method of is different from that of the first and second embodiments.

[0192] FIG. 22 is a flowchart showing an example of the procedure of the velocity amplitude calculation step S30 in the third embodiment.

[0193] As shown in FIG. 22, first, in step S301, the measurement device 1 determines the approach time t of the railway vehicle 6 to the bridge 5 based on the acceleration data a(t). i and departure time t o For example, as described above, the measurement device 1 calculates the time when the acceleration data a(t) first crosses the threshold value TH as the entry time t i The time when the acceleration data a(t) finally crosses the threshold TH is called the exit time t o It is calculated as follows.

[0194] Next, in step S302, the measurement device 1 i and the advance time t o A number of positive peaks between v(t) and t(t) that do not include the first and last positive peaks of the velocity waveform v(t) are selected.

[0195] In step S303, the measurement device 1 detects the approach time t i and the advance time t o A number of negative peaks between v(t) and t(t) that do not include the first and last negative peaks of the velocity waveform v(t) are selected.

[0196] The number of positive peaks selected in step S302 and the number of negative peaks selected in step S303 may be the same or different. Fig. 23 shows an example of multiple positive peaks and multiple negative peaks selected in the velocity waveform v(t). In the example of Fig. 23, the multiple selected positive peaks are marked with circles, and seven positive peaks from the third to the ninth of the eleven positive peaks are selected. In addition, the multiple selected negative peaks are marked with squares, and eight negative peaks from the second to the ninth of the eleven negative peaks are selected.

[0197] Next, in step S304, the measurement device 1 calculates a first approximation line S based on the multiple positive peaks selected in step S302. v_pk_P For example, the measurement device 1 uses a plurality of positive peaks to calculate a first approximation line S represented by the formula (49) by the least squares method. v_pk_P (t) first order coefficient aP and the zeroth coefficient b P Calculate.

[0198]

number

[0199] In step S305, the measurement device 1 calculates a second approximation line S based on the multiple negative peaks selected in step S303. v_pk_N For example, the measurement device 1 uses a plurality of negative peaks to calculate the second approximation line S represented by the formula (50) by the least squares method. v_pk_N (t) first order coefficient a N and the zeroth coefficient b N The first approximation line S v_pk_P (t) and second approximate straight line S v_pk_N An example of (t) is shown below.

[0200]

number

[0201] Next, in step S306, the measurement device 1 measures the approach velocity amplitude S vi Assuming that the approach time is t i The first approximation line S in v_pk_P (t) and the second approximate straight line S v_pk_N (t) Calculate the difference between the first approximation line S v_pk_P (t) and the second approximate straight line S v_pk_N (t) and the difference line S v_pk (t) is obtained by equation (51), and equation (52) is obtained by substituting equations (49) and (50) into equation (51). The measurement device 1 calculates the approach time t at time t in equation (52) as shown in equation (53). i Substituting the above, the approach velocity amplitude S vi Calculate.

[0202]

number

[0203]

number

[0204]

number

[0205] In step S307, the measurement device 1 measures the advance speed amplitude S vo Then, the advance time t o The first approximation line S in v_pk_P (t) and the second approximate straight line S v_pk_N The measurement device 1 calculates the difference between the time t of the advance and the time t of the advance as shown in equation (54). o Substituting the above, the velocity amplitude at the time of advancement S vo Figure 25 shows the approach velocity amplitude S vi and the velocity amplitude S vo An example is shown below.

[0206]

number

[0207] The configurations of the sensor 2, the measuring device 1, and the monitoring device 3 in the third embodiment are the same as those in FIG. 17 or FIG. 21, and therefore are not shown. In the measuring device 1 in the third embodiment, the velocity amplitude calculation unit 143 calculates the approach velocity amplitude S based on the velocity waveform v(t) in the same manner as in the first or second embodiment. vi and the velocity amplitude S vo is calculated, but the calculation method is different from that in the first and second embodiments.

[0208] First, the speed amplitude calculation unit 143 calculates the speed amplitude at which the railroad vehicle 6 approaches the bridge 5 based on the acceleration data a(t) that is the observation data 132 acquired by the observation data acquisition unit 141. i and departure time t o For example, the velocity amplitude calculation unit 143 calculates the time when the acceleration data a(t) first crosses the threshold value TH as the entry time t iThe time when the acceleration data a(t) finally crosses the threshold TH is called the exit time t o It is calculated as follows.

[0209] Next, the velocity amplitude calculation unit 143 calculates the approach time t i and the advance time t o The velocity amplitude calculation unit 143 selects a plurality of positive peaks between the entry time t i and the advance time t o A number of negative peaks between v(t) and t(t) that do not include the first and last negative peaks of the velocity waveform v(t) are selected.

[0210] Next, the velocity amplitude calculation unit 143 calculates the first approximation line S represented by the above-mentioned equation (49) based on the selected multiple positive peaks. v_pk_P Based on the selected negative peaks, the velocity amplitude calculation unit 143 calculates the second approximation line S v_pk_N Calculate (t).

[0211] Next, the velocity amplitude calculation unit 143 calculates the approach velocity amplitude S vi Assuming that the approach time is t i The first approximation line S in v_pk_P (t) and the second approximate straight line S v_pk_N The speed amplitude calculation unit 143 calculates the difference between the exit speed amplitude S vo Then, the advance time t o The first approximation line S in v_pk_P (t) and the second approximate straight line S v_pk_N Specifically, the velocity amplitude calculation unit 143 calculates the difference between the approach time t and the time t in the above-mentioned equation (52). i Substituting the above, the approach velocity amplitude S vi Calculate the time t of the above equation (52) and set the time t o Substituting the above, the velocity amplitude at the time of advancement S vo Calculate.

[0212] In this manner, the velocity amplitude calculation unit 143 performs the process of the velocity amplitude calculation step S30 in FIG. 16 or FIG. 20, specifically, the process of steps S301 to S307 in FIG.

[0213] Other functions of the measuring device 1 in the third embodiment are similar to those in the first or second embodiment, and therefore their description will be omitted. Also, functions of the sensor 2 and the monitoring device 3 in the third embodiment are similar to those in the first or second embodiment, and therefore their description will be omitted.

[0214] In the measurement method of the third embodiment described above, the measurement device 1 calculates the approach velocity amplitude S based on a plurality of positive and negative peaks of the velocity waveform v(t) excluding the first and last positive and negative peaks. vi and the velocity amplitude S vo When the leading axle of the railway vehicle 6 enters the bridge 5 or when the last axle of the railway vehicle 6 leaves the bridge 5, the speed at which the displacement of the bridge 5 changes is relatively small, so the first and last positive and negative peaks are likely to be smaller than the other positive and negative peaks. Therefore, according to the measurement method of the third embodiment, the measurement device 1 eliminates the influence of the first and last positive and negative peaks, which are relatively smaller than the other positive and negative peaks in the velocity waveform v(t), and calculates the approach speed amplitude S vi and the velocity amplitude S vo can be calculated with high accuracy.

[0215] In addition, according to the measurement method of the third embodiment, it is possible to achieve the same effects as the measurement method of the first or second embodiment.

[0216] 4. Fourth embodiment In the following, with respect to the fourth embodiment, components similar to those in the first or second embodiment are given the same symbols, and explanations that overlap with the first or second embodiment are omitted or simplified, and the following mainly describes the differences from the first and second embodiments.

[0217] A flow chart showing an example of the procedure of the measurement method of the fourth embodiment is similar to that of FIG. 16 or FIG. 20, and therefore is not shown. The processes of the observation data acquisition step S10, the speed waveform calculation step S20, and the traveling determination step S40 in the measurement method of the fourth embodiment are similar to those of the first embodiment, and therefore their explanations are omitted. Furthermore, the processes of the average speed calculation step S42 and the approach / exit speed calculation step S44 in the measurement method of the fourth embodiment are similar to those of the second embodiment, and therefore their explanations are omitted. Furthermore, the process of the measurement data output step S50 in the measurement method of the fourth embodiment is similar to those of the first or second embodiment, and therefore their explanations are omitted. In the measurement method of the fourth embodiment, the approach speed amplitude S in the speed amplitude calculation step S30 is calculated. vi and the velocity amplitude S vo The calculation method of is different from that of the first and second embodiments.

[0218] FIG. 26 is a flowchart showing an example of the procedure of the velocity amplitude calculation step S30 in the fourth embodiment.

[0219] As shown in FIG. 26, first, in step S311, the measurement device 1 calculates the approach time t i and departure time t o For example, as described above, the measurement device 1 calculates the time when the acceleration data a(t) first crosses the threshold value TH as the entry time t i The time when the acceleration data a(t) finally crosses the threshold TH is called the exit time t o It is calculated as follows.

[0220] Next, in step S312, the measurement device 1 i and the advance time t o n positive peaks between v(t) and t(t) that do not include the first positive peak and the last positive peak of the velocity waveform v(t), where n is an integer equal to or greater than 2, are selected.

[0221] In step S313, the measurement device 1 detects the approach time t i and the advance time t on negative peaks between v(t) and t(t) that do not include the first negative peak and the last negative peak of the velocity waveform v(t) are selected.

[0222] The number of positive peaks selected in step S312 is the same as the number of negative peaks selected in step S313, and each of the selected n positive peaks and each of the selected n negative peaks are adjacent to each other. Fig. 27 shows an example of n positive peaks and n negative peaks selected in the velocity waveform v(t). In the example of Fig. 27, n=9, and the selected 9 positive peaks are marked with circles, and the 9 positive peaks from the 2nd to the 10th of the 11 positive peaks are selected. In addition, the selected 9 negative peaks are marked with squares, and the 9 negative peaks from the 2nd to the 10th of the 11 negative peaks are selected.

[0223] Next, in step S314, the measurement device 1 calculates the k-th positive peak S among the n positive peaks selected in step S312 for each integer k between 1 and n. v_P (k) and the k-th negative peak S among the n negative peaks selected in step S313. v_N The difference between the kth peak amplitude S v_PN (k) is calculated. That is, the kth peak amplitude S v_PN (k) is calculated by equation (55). The k-th peak amplitude S v_PN (k) at time t PN (k) is the kth positive peak S v_P (k) at time t P (k) and the kth negative peak S v_N (k) at time t N The n peak amplitudes S v_PN (1)~S v_PN In the example of FIG. 28, n=9, and the calculated peak amplitude S v_PN (k) is marked with a triangle.

[0224]

number

[0225]

number

[0226] Next, in step S315, the measurement device 1 calculates the n peak amplitudes S v_PN (1)~S v_PN Based on (n), the approximate line S v_pk For example, the measurement device 1 calculates n peak amplitudes S v_PN (1)~S v_PN (n), the approximation line S expressed by equation (57) is found by the least squares method. v_pk (t) first order coefficient a PN and the zeroth coefficient b PN Calculate.

[0227]

number

[0228] Next, in step S316, the measurement device 1 measures the approach velocity amplitude S vi Assuming that the approach time is t i Approximation line S in v_pk The measurement device 1 calculates the amplitude of the approach time t at the time t in equation (57) as shown in equation (58). i Substituting the above, the approach velocity amplitude S vi Calculate.

[0229]

number

[0230] In step S317, the measurement device 1 measures the advance speed amplitude S vo Then, the advance time t o Approximation line S in v_pk The measurement device 1 calculates the amplitude of the advance time t at the time t of the equation (57) as shown in the equation (59). o Substituting the above, the velocity amplitude at the time of advancement Svo Figure 29 shows the approach velocity amplitude S vi and the velocity amplitude S vo An example is shown below.

[0231]

number

[0232] The configurations of the sensor 2, the measuring device 1, and the monitoring device 3 in the fourth embodiment are the same as those in FIG. 17 or FIG. 21, and therefore are not shown. In the measuring device 1 of the fourth embodiment, the velocity amplitude calculation unit 143 calculates the approach velocity amplitude S based on the velocity waveform v(t) in the same manner as in the first or second embodiment. vi and the velocity amplitude S vo is calculated, but the calculation method is different from that in the first and second embodiments.

[0233] First, the speed amplitude calculation unit 143 calculates the speed amplitude at which the railroad vehicle 6 approaches the bridge 5 based on the acceleration data a(t) that is the observation data 132 acquired by the observation data acquisition unit 141. i and departure time t o For example, the velocity amplitude calculation unit 143 calculates the time when the acceleration data a(t) first crosses the threshold value TH as the entry time t i The time when the acceleration data a(t) finally crosses the threshold TH is called the exit time t o It is calculated as follows.

[0234] Next, the velocity amplitude calculation unit 143 calculates the approach time t i and the advance time t o The velocity amplitude calculation unit 143 selects n positive peaks between the entry time t i and the advance time t o n negative peaks not including the first negative peak and the last negative peak of the velocity waveform v(t) are selected between v(t) and v(t), where n is an integer equal to or greater than 2.

[0235] Next, for each integer k between 1 and n, the velocity amplitude calculation unit 143 calculates the k-th positive peak S among the selected n positive peaks by using the above-mentioned equation (55). v_P (k) and the k-th negative peak S among the n negative peaks selected in step S313. v_N The difference between the kth peak amplitude S v_PN Calculate (k).

[0236] Next, the velocity amplitude calculation unit 143 calculates the n peak amplitudes S v_PN (1)~S v_PN Based on (n), the approximate straight line S expressed by the above equation (57) v_pk Calculate (t).

[0237] Next, the velocity amplitude calculation unit 143 calculates the approach velocity amplitude S vi Assuming that the approach time is t i Approximation line S in v_pk Specifically, the velocity amplitude calculation unit 143 calculates the amplitude of the approach time t i Substituting the above, the approach velocity amplitude S vi Calculate the time t of the above equation (57) and set the time t o Substituting the above, the velocity amplitude at the time of advancement S vo Calculate.

[0238] In this manner, the velocity amplitude calculation unit 143 performs the process of the velocity amplitude calculation step S30 in FIG. 16 or FIG. 20, specifically, the process of steps S311 to S317 in FIG.

[0239] Other functions of the measuring device 1 in the fourth embodiment are similar to those in the first or second embodiment, and therefore their description will be omitted. Also, functions of the sensor 2 and the monitoring device 3 in the fourth embodiment are similar to those in the first or second embodiment, and therefore their description will be omitted.

[0240] In the measurement method of the fourth embodiment described above, the measurement device 1 calculates the approach velocity amplitude S based on a plurality of positive and negative peaks of the velocity waveform v(t) excluding the first and last positive and negative peaks. viand the velocity amplitude S vo When the leading axle of the railway vehicle 6 enters the bridge 5 or when the last axle of the railway vehicle 6 leaves the bridge 5, the speed at which the displacement of the bridge 5 changes is relatively small, so the first and last positive and negative peaks are likely to be smaller than the other positive and negative peaks. Therefore, according to the measurement method of the fourth embodiment, the measurement device 1 eliminates the influence of the first and last positive and negative peaks, which are relatively smaller than the other positive and negative peaks in the velocity waveform v(t), and calculates the approach speed amplitude S vi and the velocity amplitude S vo can be calculated with high accuracy.

[0241] In addition, according to the measurement method of the fourth embodiment, it is possible to achieve the same effects as the measurement method of the first or second embodiment.

[0242] 5. Variations The present invention is not limited to the present embodiment, and various modifications are possible within the scope of the present invention.

[0243] In each of the above embodiments, the sensor 2, which is the observation device, is an acceleration sensor that outputs acceleration data a(t), but the observation device is not limited to an acceleration sensor. For example, the observation device may be an impact sensor, a pressure sensor, a strain gauge, an image measuring device, a load cell, or a displacement gauge.

[0244] The impact sensor detects impact acceleration as a response to an action on each axle of the railway vehicle 6 at observation point R. The pressure sensor, strain gauge, and load cell detect stress changes as a response to an action on each axle of the railway vehicle 6 at observation point R. The image measuring device uses image processing to detect displacement as a response to an action on each axle of the railway vehicle 6 at observation point R. The displacement gauge is, for example, a contact type displacement gauge, a ring type displacement gauge, a laser displacement gauge, a pressure sensor, or a displacement measuring device using optical fiber, and detects displacement as a response to an action on each axle of the railway vehicle 6 at observation point R.

[0245] As an example, FIG. 30 shows a configuration example of the measurement system 10 using a ring-type displacement meter as the observation device. FIG. 31 shows a configuration example of the measurement system 10 using an image measuring device as the observation device. In FIG. 30 and FIG. 31, the same components as those in FIG. 1 are given the same reference numerals, and their description will be omitted. In the measurement system 10 shown in FIG. 30, a piano wire 41 is fixed between the upper surface of the ring-type displacement meter 40 and the lower surface of the main girder G directly above it, and the ring-type displacement meter 40 measures the displacement of the piano wire 41 due to the deflection of the superstructure 7 and transmits the measured displacement data to the measurement device 1. The measurement device 1 generates measurement data 133 based on the displacement data transmitted from the ring-type displacement meter 40. In the measurement system 10 shown in FIG. 31, a camera 50 transmits an image of a target 51 provided on the side of the main girder G to the measurement device 1. The measuring device 1 processes the image transmitted from the camera 50, calculates the displacement of the target 51 due to the deflection of the upper structure 7 to generate displacement data, and generates the measurement data 133 based on the generated displacement data. In the example of Fig. 31, the measuring device 1 generates the displacement data as an image measuring device, but an image measuring device (not shown) different from the measuring device 1 may generate the displacement data by image processing.

[0246] In addition, in each of the above embodiments, each sensor 2 is provided on the main girder G of the superstructure 7, but it may also be provided on the surface or interior of the superstructure 7, the underside of the deck F, the pier 8a, etc.

[0247] In each of the above embodiments, the measurement device 1 determines the approach time t i is calculated based on the observation data output from the observation device observing the approach end of the upper structure 7. i Similarly, in each of the above embodiments, the measurement device 1 may calculate the departure time t o is calculated based on the observation data output from the observation device that observes the advancing end of the upper structure 7. o may be calculated.

[0248] The above-described embodiment and modifications are merely examples, and the present invention is not limited to these. For example, the embodiments and modifications can be appropriately combined.

[0249] The present invention includes configurations that are substantially the same as the configurations described in the embodiments, for example, configurations with the same functions, methods, and results, or configurations with the same purpose and effects. The present invention also includes configurations in which non-essential parts of the configurations described in the embodiments are replaced. The present invention also includes configurations that achieve the same effects as the configurations described in the embodiments, or configurations that can achieve the same purpose. The present invention also includes configurations in which publicly known technology is added to the configurations described in the embodiments.

[0250] The following can be derived from the above-described embodiment and modifications.

[0251] One aspect of the measurement method is a velocity waveform calculation process for calculating a velocity waveform, which is a waveform of the velocity at which the observation point is displaced, based on observation data output from an observation device that observes an observation point on a bridge and detects physical quantities that are responses to the actions of multiple parts of a railway vehicle traveling on the bridge on the observation point; a speed amplitude calculation step of calculating, based on the speed waveform, an approach speed amplitude, which is the amplitude of the speed waveform when the railroad vehicle approaches the bridge, and an exit speed amplitude, which is the amplitude of the speed waveform when the railroad vehicle exits the bridge; Includes.

[0252] In this measurement method, a speed waveform, which is a waveform of the speed at which the observation point is displaced, is calculated based on the observation data output from the observation device, and an approach speed amplitude, which is the amplitude of the speed waveform when the railway vehicle approaches the bridge, and an exit speed amplitude, which is the amplitude of the speed waveform when the railway vehicle leaves the bridge, are calculated. Since the amplitude of the displacement at the observation point is determined by the load of the railway vehicle, the amplitude of the displacement at the observation point does not change whether the railway vehicle is traveling at a constant speed, decelerating, or accelerating. On the other hand, when the railway vehicle is traveling at a constant speed, the period in which the displacement at the observation point oscillates is almost constant, whereas when the railway vehicle is traveling at a decelerating or accelerating speed, the period in which the displacement at the observation point oscillates gradually changes. However, depending on the conditions, it may be difficult to grasp the change in the oscillation period and determine whether the railway vehicle was traveling at a constant speed, decelerating, or accelerating. On the other hand, when the railway vehicle travels at a constant speed, the exit speed amplitude is approximately equal to the approach speed amplitude, whereas when the railway vehicle travels at a decelerated speed, the exit speed amplitude is smaller than the approach speed amplitude, and when the railway vehicle travels at an accelerated speed, the exit speed amplitude is larger than the approach speed amplitude. From the difference between the approach speed amplitude and the exit speed amplitude, it is easy to determine whether the railway vehicle was traveling at a constant speed, decelerated, or accelerated. Therefore, according to this measurement method, it is possible to calculate information that serves as an index for easily determining whether the railway vehicle was traveling at a constant speed, decelerated, or accelerated when it traveled over a bridge.

[0253] One aspect of the measurement method is an average speed calculation step of calculating an average speed at which the railway vehicle travels on the bridge based on the observation data and environmental information that has been created in advance and includes dimensions of the railway vehicle and dimensions of the bridge; an approach / exit speed calculation step of calculating an approach speed and an exit speed of the railway vehicle with respect to the bridge based on the approach speed amplitude, the exit speed amplitude, and the average speed; may include:

[0254] According to this measurement method, regardless of whether the railway vehicle is traveling at a constant speed, decelerating, or accelerating, the approaching and exiting speeds of the railway vehicle relative to the bridge can be calculated based on observation data output from an observation device observing an observation point on the bridge and pre-created environmental information.

[0255] One aspect of the measurement method is The method may include a traveling determination step of comparing the approaching speed amplitude with the exiting speed amplitude to determine whether the railway vehicle is traveling at a constant speed, decelerating, or accelerating.

[0256] According to this measurement method, when the exiting speed amplitude is approximately equal to the entry speed amplitude, it can be determined that the railway vehicle has traveled at a constant speed, when the exiting speed amplitude is smaller than the entry speed amplitude, it can be determined that the railway vehicle has traveled at a decelerated speed, and when the exiting speed amplitude is larger than the entry speed amplitude, it can be determined that the railway vehicle has traveled at an accelerated speed.

[0257] In one embodiment of the measurement method, The velocity amplitude calculation step includes: selecting a plurality of positive peaks, excluding a first positive peak and a last positive peak, of the velocity waveform between an approach time and an exit time of the railroad vehicle from the bridge; selecting a plurality of negative peaks between the approach time and the exit time, excluding a first negative peak and a last negative peak of the velocity waveform; calculating a first approximation line based on the plurality of positive peaks; calculating a second approximation line based on the plurality of negative peaks; calculating a difference between the first approximation line and the second approximation line at the approach time as the approach velocity amplitude; calculating a difference between the first approximation line and the second approximation line at the time of advancing as the advancing speed amplitude; may include:

[0258] In this measurement method, the approach speed amplitude and the exit speed amplitude are calculated based on multiple positive and negative peaks excluding the first and last positive and negative peaks of the speed waveform. When the first part of the multiple parts of the railway vehicle enters a bridge or when the last part of the multiple parts of the railway vehicle exits a bridge, the speed at which the displacement of the bridge changes is relatively small, so the first and last positive and negative peaks tend to be smaller than the other positive and negative peaks. Therefore, according to this measurement method, the influence of the first and last positive and negative peaks, which are relatively smaller than the other positive and negative peaks in the speed waveform, can be eliminated, and the approach speed amplitude and the exit speed amplitude can be calculated with high accuracy.

[0259] In one embodiment of the measurement method, The velocity amplitude calculation step includes: selecting n positive peaks of the speed waveform, excluding a first positive peak and a last positive peak, between an approach time and an exit time of the railway vehicle from the bridge, where n is an integer equal to or greater than 2; selecting n negative peaks between the entry time and the exit time, excluding the first negative peak and the last negative peak of the velocity waveform; calculating, for each integer k between 1 and n, a kth peak amplitude which is a difference between a kth positive peak of the n positive peaks and a kth negative peak of the n negative peaks; calculating an approximation line based on the n peak amplitudes; calculating an amplitude of the approximation line at the approach time as the approach velocity amplitude; calculating an amplitude of the approximation line at the time of advancing as the advancing speed amplitude; may include:

[0260] In this measurement method, the approach speed amplitude and the exit speed amplitude are calculated based on multiple positive and negative peaks excluding the first and last positive and negative peaks of the speed waveform. When the first part of the multiple parts of the railway vehicle enters a bridge or when the last part of the multiple parts of the railway vehicle exits a bridge, the speed at which the displacement of the bridge changes is relatively small, so the first and last positive and negative peaks tend to be smaller than the other positive and negative peaks. Therefore, according to this measurement method, the influence of the first and last positive and negative peaks, which are relatively smaller than the other positive and negative peaks in the speed waveform, can be eliminated, and the approach speed amplitude and the exit speed amplitude can be calculated with high accuracy.

[0261] In one embodiment of the measurement method, The environmental information may include a length of the bridge, a length of each car of the railway vehicle, and a position of each of the plurality of parts of the railway vehicle.

[0262] In one embodiment of the measurement method, Each of the plurality of parts may be an axle or a wheel.

[0263] In one embodiment of the measurement method, The observation device may be an acceleration sensor.

[0264] One aspect of the measurement device is a velocity waveform calculation unit that calculates a velocity waveform that is a waveform of the velocity at which the observation point is displaced based on observation data output from an observation device that observes an observation point on a bridge and detects physical quantities that are responses to actions on the observation point of multiple parts of a railway vehicle traveling on the bridge; a speed amplitude calculation unit that calculates, based on the speed waveform, an approach speed amplitude, which is the amplitude of the speed waveform when the railroad vehicle approaches the bridge, and an exit speed amplitude, which is the amplitude of the speed waveform when the railroad vehicle exits the bridge; Includes.

[0265] According to this measuring device, when the railway vehicle runs at a constant speed, the exit speed amplitude is approximately equal to the approach speed amplitude, whereas when the railway vehicle runs at a decelerated speed, the exit speed amplitude is smaller than the approach speed amplitude, and when the railway vehicle runs at an accelerated speed, the exit speed amplitude is larger than the approach speed amplitude. From the difference between the approach speed amplitude and the exit speed amplitude, it is easy to determine whether the railway vehicle was running at a constant speed, decelerated, or accelerated. Therefore, according to this measuring device, it is possible to calculate information that serves as an index for easily determining whether the railway vehicle was running at a constant speed, decelerated, or accelerated when it ran over a bridge.

[0266] One aspect of the measurement system is An embodiment of the measuring device; The observation device; Equipped with.

[0267] One aspect of the measurement program is a velocity waveform calculation process for calculating a velocity waveform, which is a waveform of the velocity at which the observation point is displaced, based on observation data output from an observation device that observes an observation point on a bridge and detects physical quantities that are responses to the actions of multiple parts of a railway vehicle traveling on the bridge on the observation point; a speed amplitude calculation step of calculating, based on the speed waveform, an approach speed amplitude, which is the amplitude of the speed waveform when the railroad vehicle approaches the bridge, and an exit speed amplitude, which is the amplitude of the speed waveform when the railroad vehicle exits the bridge; Have the computer run the following.

[0268] According to this measurement program, when the railway vehicle travels at a constant speed, the exit speed amplitude is approximately equal to the approach speed amplitude, whereas when the railway vehicle travels at a decelerated speed, the exit speed amplitude is smaller than the approach speed amplitude, and when the railway vehicle travels at an accelerated speed, the exit speed amplitude is larger than the approach speed amplitude. From the difference between the approach speed amplitude and the exit speed amplitude, it is easy to determine whether the railway vehicle was traveling at a constant speed, decelerated, or accelerated. Therefore, according to this measurement program, it is possible to calculate information that serves as an index for easily determining whether the railway vehicle was traveling at a constant speed, decelerated, or accelerated when it traveled over a bridge. [Explanation of symbols]

[0269] Reference Signs List 1...Measuring device, 2...Sensor, 3...Monitoring device, 4...Communication network, 5...Bridge, 6...Railway vehicle, 7...Superstructure, 7a...Bridge deck, 7b...Bearing, 7c...Rail, 7d...Sleeper, 7e...Ballast, F...Deck, G...Main girder, 8...Substructure, 8a...Pier, 8b...Abutment, 10...Measuring system, 11...First communication unit, 12...Second communication unit, 13...Memory unit, 14...Processor, 21...Communication unit, 22...Acceleration sensor, 23...Processor, 24...Memory unit, 31...Communication unit, 32...Processor, 33...Display unit, 34...Operation unit, 35...Memory unit, 40... ring-type displacement meter, 41... piano wire, 50... camera, 51... target, 131... measurement program, 132... observation data, 133... measurement data, 134... environmental information, 141... observation data acquisition unit, 142... speed waveform calculation unit, 143... speed amplitude calculation unit, 144... running judgment unit, 145... measurement data output unit, 146... average speed calculation unit, 147... approach / exit speed calculation unit, 241... observation program, 242... observation data, 321... measurement data acquisition unit, 322... monitoring unit, 351... monitoring program, 352... measurement data string

Claims

1. a velocity waveform calculation process for calculating a velocity waveform, which is a waveform of the velocity at which the observation point is displaced, based on observation data output from an observation device that observes an observation point on a bridge and detects physical quantities that are responses to actions on the observation point of multiple parts of a railway vehicle traveling on the bridge; a speed amplitude calculation step of calculating, based on the speed waveform, an approach speed amplitude, which is the amplitude of the speed waveform when the railroad vehicle approaches the bridge, and an exit speed amplitude, which is the amplitude of the speed waveform when the railroad vehicle exits the bridge; Measurement methods, including

2. In claim 1, an average speed calculation step of calculating an average speed at which the railway vehicle travels on the bridge based on the observation data and environmental information that has been created in advance and includes dimensions of the railway vehicle and dimensions of the bridge; an approach / exit speed calculation step of calculating an approach speed and an exit speed of the railway vehicle with respect to the bridge based on the approach speed amplitude, the exit speed amplitude, and the average speed; Measurement methods, including

3. In claim 1, the measurement method including a traveling determination step of comparing the approaching speed amplitude with the exiting speed amplitude to determine whether the railway vehicle is traveling at a constant speed, decelerating, or accelerating.

4. In claim 1, The velocity amplitude calculation step includes: selecting a plurality of positive peaks, excluding a first positive peak and a last positive peak, of the velocity waveform between an approach time and an exit time of the railway vehicle from the bridge; selecting a plurality of negative peaks between the approach time and the exit time, excluding a first negative peak and a last negative peak of the velocity waveform; calculating a first approximation line based on the plurality of positive peaks; calculating a second approximation line based on the plurality of negative peaks; calculating a difference between the first approximation line and the second approximation line at the approach time as the approach velocity amplitude; calculating a difference between the first approximation line and the second approximation line at the time of advancing as the advancing speed amplitude; Measurement methods, including

5. In claim 1, The velocity amplitude calculation step includes: selecting n positive peaks, excluding a first positive peak and a last positive peak, of the speed waveform between an approach time and an exit time of the railway vehicle from the bridge, where n is an integer equal to or greater than 2; selecting n negative peaks between the entry time and the exit time, excluding the first and last negative peaks of the velocity waveform; calculating, for each integer k between 1 and n, a kth peak amplitude that is a difference between a kth positive peak of the n positive peaks and a kth negative peak of the n negative peaks; calculating an approximation line based on the n peak amplitudes; calculating an amplitude of the approximation line at the approach time as the approach velocity amplitude; calculating an amplitude of the approximation line at the time of advancing as the advancing speed amplitude; Measurement methods, including

6. In claim 2, A measurement method, wherein the environmental information includes a length of the bridge, a length of each car of the railway vehicle, and a position of each of the multiple parts of the railway vehicle.

7. In any one of claims 1 to 6, A measurement method in which each of the multiple parts is an axle or a wheel.

8. In any one of claims 1 to 6, The measurement method, wherein the observation device is an acceleration sensor.

9. a velocity waveform calculation unit that calculates a velocity waveform that is a waveform of the velocity at which the observation point is displaced based on observation data output from an observation device that observes an observation point on a bridge and detects physical quantities that are responses to actions on the observation point of multiple parts of a railway vehicle traveling on the bridge; a speed amplitude calculation unit that calculates, based on the speed waveform, an approach speed amplitude, which is the amplitude of the speed waveform when the railroad vehicle approaches the bridge, and an exit speed amplitude, which is the amplitude of the speed waveform when the railroad vehicle exits the bridge; 4. A measuring device comprising:

10. The measurement device according to claim 9 ; The observation device; A measurement system equipped with

11. a velocity waveform calculation process for calculating a velocity waveform, which is a waveform of the velocity at which the observation point is displaced, based on observation data output from an observation device that observes an observation point on a bridge and detects physical quantities that are responses to actions on the observation point of multiple parts of a railway vehicle traveling on the bridge; a speed amplitude calculation step of calculating, based on the speed waveform, an approach speed amplitude, which is the amplitude of the speed waveform when the railroad vehicle approaches the bridge, and an exit speed amplitude, which is the amplitude of the speed waveform when the railroad vehicle exits the bridge; A measurement program that causes a computer to execute the following.

Citation Information

Patent Citations

  • Railway vehicle speed measurement method and measuring device therefor

    JP2014006161A