The system stabilization system addresses the challenge of prolonged calculation cycles by efficiently determining stabilization control targets through reduced calculations and effective ranking, optimizing the shutdown of generators to prevent synchronization issues.
Patent Information
- Application Number
- JP2023083837
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-22
- Publication Date
- 2024-12-04
AI Technical Summary
Conventional stabilization control methods require extensive transient stability calculations as the number of renewable energy sources and synchronous generators increase, leading to longer calculation cycles and increased costs due to the need for additional computers.
A system stabilization system that includes a calculation unit performing calculations at a constant cycle, determining stabilization control targets, and a control unit executing necessary shutdowns, utilizing a transient stability calculation unit, control necessity determination, control candidate generation, effect ranking evaluation, and control target determination to reduce the number of calculations required.
This system reduces the computational burden by roughly estimating the stabilizing effect of each control candidate, determining effect rankings, and selecting optimal shutdown targets, thereby avoiding longer calculation cycles and system complexity.
Smart Images

Figure 2024167627000001_ABST
Abstract
Description
[Technical field]
[0001] The present embodiment relates to a system stabilization system that determines, in a power system including a synchronous generator and a renewable energy power source, a synchronous generator, a renewable energy power source, and the like that are targets of stabilization control. [Background technology]
[0002] When an accident such as a ground fault occurs in a power system, stabilization control is performed in a power system stabilization system. Stabilization control is a control that prevents synchronous generators from stepping out in the event of a power system accident by quickly shutting off some synchronous generators when an accident occurs. In stabilization control, a power system model is created from power system information collected at regular intervals, and the state of the power system when a power system accident predicted by transient stability calculation occurs is evaluated to determine whether or not a synchronous generator will step out. There is a stabilization control method that determines in advance, before an accident occurs, which synchronous generators to shut off as targets of stabilization control required to prevent stepping out.
[0003] In recent years, the number of renewable energy power sources, which have a different structure from synchronous generators, has been increasing. In stabilization control, methods are being considered that include renewable energy power sources as targets for cutoff to prevent loss of synchronism. [Prior art documents] [Non-patent literature]
[0004] [Non-Patent Document 1] "Appendix 2: Examples of Relay Systems for Preventing Loss of Step", Technical Report of the Institute of Electrical Engineers of Japan No. 801, pp. 153-154, The Institute of Electrical Engineers of Japan, October 2000 [Patent documents]
[0005] [Patent Document 1] Patent No. 6223833 [Patent Document 2] Patent No. 7098515 Summary of the Invention [Problem to be solved by the invention]
[0006] In conventional stabilization control, the force acting to prevent loss of synchronism, i.e., the stabilization effect, is evaluated, and transient stability calculations are performed in order of the highest stabilization effect to select the synchronous generators and renewable energy power sources to be shut off to prevent loss of synchronism. Transient stability calculations are also performed when evaluating stabilization effect. Specifically, for the renewable energy power sources and synchronous generators that are candidates for shutoff, the stabilization effect is evaluated based on the results of transient stability calculations for each case in which they are shut off individually and in combination.
[0007] As the number of renewable energy sources and synchronous generators that are candidates for interruption increases, the number of transient stability calculations required to evaluate the stabilization effect increases. As the number of interruption candidates increases, the calculation cycle becomes longer, which may result in a decrease in the performance of the grid stabilization system. In addition, in order to optimize the calculation cycle, extra computers must be prepared, which is unavoidable.
[0008] The present embodiment is intended to solve the above-mentioned problem, and has an object to provide a power grid stabilization system that reduces the amount of calculation required to determine a shutoff target for preventing a synchronous generator from losing synchronism. [Means for solving the problem]
[0009] The power system stabilization system of the embodiment includes a calculation unit that performs calculations at a constant cycle and determines a stabilization control target for each assumed accident, and a control unit that executes stabilization control to shut off the stabilization control target, and the calculation unit further includes the following configuration. (1) A transient stability calculation unit that calculates stability regarding the assumed fault in a power system including a synchronous generator and a renewable energy power source by performing a transient stability calculation. (2) A control necessity determination unit that determines whether or not stabilization control is necessary based on the calculation result of the transient stability calculation under a condition without stabilization control. (3) A control candidate generating unit that generates a list of stabilization control candidates for the assumed accident. (4) An effect ranking evaluation unit that estimates a stabilization effect of each stabilization control candidate based on the list of stabilization control candidates and determines an effect ranking for the stabilization control candidates. (5) A control object determination unit that determines the stabilization control object from the stabilization control candidates based on a calculation result of the transient stability calculation by the transient stability calculation unit that is calculated sequentially based on the effect ranking. [Brief description of the drawings]
[0010] [Figure 1] 1 is an overall diagram illustrating a configuration of a power grid stabilization system according to a first embodiment. FIG. [Diagram 2] 11 is a table showing an example of a list of stabilization control candidates. [Diagram 3] 4 is a flowchart showing the operation of the power grid stabilization system according to the first embodiment. [Figure 4] 5 is a flowchart showing an operation of evaluating a stabilization effect of the power grid stabilization system according to the first embodiment. [Diagram 5] FIG. 11 is an overall diagram illustrating a configuration of a power grid stabilization system according to a second embodiment. [Figure 6] 10 is a flowchart showing an operation of evaluating a stabilization effect of the power grid stabilization system according to the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0011] [1. First embodiment] [1-1. Overall composition] The first embodiment will be specifically described below with reference to the drawings. In the following description, when there are multiple devices or components with the same configuration, they will be described with the same reference numerals. Furthermore, multiple identical components will be distinguished by adding a suffix such as "1" or "2" to the end of a common reference numeral with a hyphen "-" between them. Note that when multiple identical components are not to be distinguished from one another, only the common reference numerals will be shown and the suffixes will be omitted.
[0012] FIG. 1 is a schematic diagram showing a configuration example of a power grid stabilization system 11 according to a first embodiment and a power grid 1 to which the power grid stabilization system 11 is applied.
[0013] (power system) The power system 1 includes bus bars 2 (bus bars 2-1 to 2-5), power transmission lines 3 (power transmission lines 3-1 to 3-5), transformers 4 (transformers 4-1 to 4-6), generators 5 (generators 5-1 to 5-6), and circuit breakers 6 (circuit breakers 6-1 to 6-6).
[0014] The generator 5 is a renewable energy power source or a synchronous generator. A renewable energy power source is a power source that generates electricity using renewable energy such as solar power or wind power and is connected via a power converter. A synchronous generator is a device that generates electricity by driving a synchronous machine such as a thermal power machine, a nuclear power machine, or a hydroelectric power machine, although various energies are used for generating electricity. The electricity generated by the generator 5 is supplied to consumers via the transformer 4, the bus bar 2, and the transmission line 3.
[0015] The transformer 4 transforms the voltage of the power generated by the generator 5 to a predetermined voltage. The transformers 4-1 to 4-6 convert the voltage of the power output from the generators 5-1 to 5-6, respectively, to predetermined voltages. For example, the transformer 4-1 is configured to transform the voltage of the power generated by the generator 5-1 to a predetermined voltage.
[0016] The circuit breaker 6 is a switch that cuts off the supply of power generated by the generator 5 to consumers. The circuit breakers 6-1 to 6-6 cut off the power output from 5-1 to 5-6, respectively. For example, the circuit breaker 6-1 is configured to cut off the supply of power generated by the generator 5-1.
[0017] (Grid Stabilization System) The power system stabilization system 11 includes an information terminal 12 (information terminals 12-1 to 12-5), a control terminal 13 (control terminals 13-1 to 13-4), a transmission system 14, a calculation unit 15, and a control unit 16.
[0018] Information terminal 12 is a detection device that measures information (hereinafter referred to as system information) related to power supplied from generator 5 to consumers via bus 2. Information terminals 12-1 to 12-5 measure system information regarding power supplied via buses 2-1 to 2-5, respectively. For example, information terminal 12-1 measures system information including power information related to power supplied by power transmission lines 3-1, 3-2, and 3-5 connected to bus 2-1, and connection information of power transmission line 3-1, etc.
[0019] The system information includes power information on the power supply and demand state of each component of the power system 1 (bus 2, transmission line 3, transformer 4, generator 5, circuit breaker 6) and connection information on their connection state. The power information includes information such as the active power and reactive power of the transmission line 3 and transformer 4, and the bus voltage applied to the bus 2. The connection information includes information on the connection state of the transmission line 3 and transformer 4. The system information further includes information such as the voltage and phase angle of each bus 2 in the power system 1, the active power flow and reactive power flow of the transmission line 3, and start / stop information of the generator 5.
[0020] The information terminal 12 is configured to be able to acquire accident information relating to an accident, such as a ground fault, that has occurred in an electric power device in the electric power system 1. The accident information is, for example, information indicating the electric power device involved in the accident and the nature of the accident when an accident occurs in the power transmission line 3.
[0021] The control terminal 13 is a terminal that controls the shutoff of the circuit breaker 6. The control terminal 13 is connected to the control unit 16 via a transmission system 14. The control terminals 13-1 to 13-4 can control the circuit breakers 6-1 to 6-6 in response to a control signal from the control unit 16, and shut off the supply of power from the generators 5-1 to 5-6. For example, the control terminal 13-1 is configured to control the circuit breakers 6-1 and 6-2 in response to a control signal from the control unit 16, and control the shutoff of the supply of power from the generators 5-1 and 5-2 via the bus 2-4.
[0022] The transmission system 14 is composed of a wired or wireless dedicated line, a telephone line, an Internet line, etc. The transmission system 14 transmits a control signal transmitted from a control unit 16 of the power grid stabilization system 11 to a control terminal 13 arranged in each circuit breaker 6. The transmission system 14 transmits system information and the like transmitted from an information terminal 12 arranged in the power grid 1 to a calculation unit 15 of the power grid stabilization system 11.
[0023] The calculation unit 15 is configured by a computer or the like. The control unit 16 is configured by a digital relay equipped with a transmitting / receiving circuit or the like. The calculation unit 15 and the control unit 16 are connected to be able to communicate with each other. The calculation unit 15 and the control unit 16 can also be configured as one unit using a computer. The processing range of the calculation unit 15 and the control unit 16 by hardware and the processing range of the software including a program can be set appropriately and are not limited to a specific embodiment.
[0024] The calculation unit 15 has a function of repeating calculations at a constant cycle in advance before an accident occurs, stabilizing the power system 1, and determining, for each assumed accident, a stabilization control target to be shut off in order to prevent the generator 5 from losing synchronism. The calculation unit 15 receives system information measured by the information terminal 12 and the like via the transmission system 14. The calculation unit 15 includes a storage unit 151, a system data creation unit 152, a transient stability calculation unit 153, a control necessity determination unit 154, a control candidate generation unit 155, an effect ranking evaluation unit 156, and a control target determination unit 157.
[0025] The storage unit 151 is a storage unit that stores various information necessary for the operation of the power grid stabilization system 11. The storage unit 151 is configured with a storage medium such as a semiconductor memory or a hard disk. The storage unit 151 stores assumed accident conditions in the power grid 1, system information acquired from the information terminal 12, data and calculation results created by each component of the calculation unit 15, and the like. The stored information is configured to be usable for the calculations of each component of the calculation unit 15 and for output to the control unit 16.
[0026] The system data creation unit 152 is a processing unit that creates a system model based on system information acquired via the transmission system 14 and various setting information stored in advance. The system model is data that models the power system 1. The system data creation unit 152 transmits the created system model to the transient stability calculation unit 153.
[0027] The transient stability calculation unit 153 is a calculation unit that performs an analysis simulation based on the system model created by the system data creation unit 152. The transient stability calculation unit 153 is configured to be able to calculate stability regarding an assumed accident under a condition without stabilization control or a condition with stabilization control. The transient stability calculation unit 153 outputs a calculation result calculated under a condition without stabilization control to the control necessity determination unit 154.
[0028] When performing calculation under the condition with stabilization control, the transient stability calculation unit 153 is configured to select one assumed accident condition from a plurality of assumed accident conditions set in advance and perform transient stability calculation. The transient stability calculation unit 153 is configured to perform transient stability calculation in descending order of effect rank of stabilization control candidates according to the effect rank determined by the effect rank evaluation unit 156.
[0029] The control necessity determination unit 154 is a processing unit that determines whether stabilization control is necessary based on the calculation result calculated by the transient stability calculation unit 153 under conditions without stabilization control. The control necessity determination unit 154 checks whether the generator 5 will step out if stabilization control is not performed under a certain assumed accident condition. If the control necessity determination unit 154 determines that the generator 5 will become unstable, it determines that stabilization control is necessary. Furthermore, if there is no unstable generator 5, the control necessity determination unit 154 determines that stabilization control is unnecessary. The control necessity determination unit 154 associates information regarding the necessity of stabilization control with the assumed accident condition and stores it in the memory unit 151.
[0030] The control candidate generating unit 155 is a processing unit that generates a list of stabilization control candidates for a hypothetical accident when the control necessity determining unit 154 determines that stabilization control is necessary. The stabilization control candidates refer to the generators 5 and the like that can be targets of stabilization control for hypothetical accident conditions. The control candidate generating unit 155 may be configured to acquire a list of stabilization control candidates that meet the conditions from a list of stabilization control candidates for each hypothetical accident condition that is stored in advance in the storage unit 151. For example, when three generators 5-1 to 5-3 are candidates for stabilization control, the control candidate generating unit 155 generates a list of stabilization control candidates as shown in FIG. 2.
[0031] In FIG. 2, 1 to 3 indicate stabilization control candidates when each generator 5 is turned off one by one, 4 to 6 indicate a combination of two generators 5, and 7 indicates a case where all generators 5 are shut off. In this way, the stabilization control candidates may be a single generator 5 or a combination of multiple generators 5. Note that the target of stabilization control is not limited to generators 5. The target of stabilization control may be a transmission line 3 to which multiple generators 5 are aggregated. In other words, any candidate that can create a situation in which active power is lost from the majority of the remaining power system 1 by shutting off a part of the power system 1 can be the target of stabilization control.
[0032] The effect ranking evaluation unit 156 is a processing unit that estimates the stabilization effect of each stabilization control candidate based on the list of stabilization control candidates created by the control candidate generation unit 155, and determines the effect ranking of the stabilization control candidates in the list. The effect ranking evaluation unit 156 includes an information extraction unit 1561, an immediate active power calculation unit 1562, an active power conversion unit 1563, an increment calculation unit 1564, a normalization unit 1565, and a ranking determination unit 1566. Note that, although the generator 5 is defined as a renewable energy power source and a synchronous generator in the above description, the estimation of the stabilization effect by the effect ranking evaluation unit 156 targets a synchronous generator, and is therefore described as a synchronous generator.
[0033] The information extraction unit 1561 is a processing unit that extracts predetermined information required to calculate the effective power equivalent to one synchronous generator from the calculation result calculated under the condition without stabilization control by the transient stability calculation unit 153. Specifically, the information extraction unit 1561 extracts the admittance matrix [Y] immediately before stabilization control that represents the connection state of the power system 1, the node injection current vector [I] that represents the state of the synchronous generators, etc. immediately before stabilization control, and the internal impedance Z of each synchronous generator. G and the internal voltage E of the synchronous generator just before stabilization control G and the effective power P of each synchronous generator just before stabilization control G is extracted from the results of transient stability calculation under conditions without stabilization control.
[0034] The immediate-after active power calculation unit 1562 performs a circuit calculation reflecting the interruption of the selected stabilization control candidate, and calculates the active power P of each synchronous generator immediately after the stabilization control. G The immediate-after active power calculation unit 1562 first reflects a state in which a synchronous generator included in the selected stabilization control candidate is shut off in the admittance matrix [Y] immediately before the stabilization control. Next, the immediate-after active power calculation unit 1562 calculates the inverse matrix [Y] of the admittance matrix [Y]. -1 Calculate the inverse matrix [Y] -1 The node voltage vector [V] immediately after stabilization control is calculated by multiplying this by the node injection current vector [I] immediately before stabilization control.
[0035] Then, the immediate active power calculation unit 1562 calculates the terminal voltage V G is extracted from the node voltage vector [V], and the internal impedance Z of each synchronous generator is calculated. G and the internal voltage E G Using the above, the effective power P of each synchronous generator immediately after stabilization control is calculated using the following (Equation 1). G Calculate.
[0036] (Number 1) TIFF2024167627000002.tif33159
[0037] In the above (Equation 1), V G And, EG And Z G is a complex number. Conj() is a function to find the conjugate of a complex number, and is used in R. e {} is a function that extracts the real part of a complex number.
[0038] The active power converter 1563 converts the active power P G The active power conversion unit 1563 converts the active power P of each synchronous generator immediately before the stabilization control extracted by the information extraction unit 1561 into the active power P of each synchronous generator immediately before the stabilization control. G is converted into the effective power P equivalent to one synchronous generator.
[0039] The conversion equations used in the conversion process in the active power converter 1563 are shown in (Equation 2) to (Equation 6). (Number 2) TIFF2024167627000003.tif63135
[0040] (Number 3) TIFF2024167627000004.tif65130
[0041] (Number 4) TIFF2024167627000005.tif64117
[0042] (Number 5) TIFF2024167627000006.tif72156
[0043] (Number 6) TIFF2024167627000007.tif39130
[0044] In the above (Equation 2) to (Equation 6), i = 1 to n correspond to unstable synchronous generators, and j = 1 to m correspond to stable synchronous generators. A synchronous generator that has stepped out of step in a transient stability calculation without stabilization control is classified as an unstable synchronous generator, and the rest are classified as stable synchronous generators. P Gis the active power of each synchronous generator, P1 is the total active power of the unstable synchronous generators, and P2 is the total active power of the stable synchronous generators. M is the unit inertia constant of each synchronous generator, M1 is the total inertia constant of the unstable synchronous generators, and M2 is the total inertia constant of the stable synchronous generators.
[0045] In addition, the active power conversion unit 1563 converts the active power P of each synchronous generator immediately after the stabilization control calculated by the immediate active power calculation unit 1562. G is converted into active power P equivalent to one synchronous generator. The conversion can be performed using the above (Equation 2) to (Equation 6), but if a synchronous generator is included in the selected combination of stabilization control candidates, the amount of the synchronous generator included in the selected combination of stabilization control candidates is subtracted from the total active power value P1 of the unstable synchronous generators, or the total active power value P2 of the stable synchronous generators, or the total inertia constant value M1 of the unstable synchronous generators, or the total inertia constant value M2 of the stable synchronous generators.
[0046] The increment calculation unit 1564 is a calculation unit that calculates the increment of active power P before and after stabilization control from the difference between the active power P equivalent to one synchronous generator immediately after stabilization control and the active power P equivalent to one synchronous generator immediately before stabilization control. The increment calculation unit 1564 calculates the increment of active power P before and after stabilization control for each of the stabilization control candidates generated by the control candidate generation unit 155.
[0047] The normalization unit 1565 is a processing unit that normalizes the increase in the active power P before and after the stabilization control calculated by the increase calculation unit 1564. The normalization unit 1565 calculates a normalized value by dividing the active power P before and after the stabilization control by the control amount. Here, the control amount is the total value of the active power P before the occurrence of the accident of the generators 5 included in each candidate for stabilization control.
[0048] The ranking determination unit 1566 is a processing unit that determines the ranking of the stabilization control candidates by rearranging the stabilization control candidates included in the list of stabilization control candidates in descending order of the increment or normalized value, based on the increment of active power P calculated by the increment calculation unit 1564 or the normalized value obtained by the normalization unit 1565. The ranking determination unit 1566 rearranges the stabilization control candidates included in the list to create an effect ranking table, and stores the effect ranking table in the storage unit 151.
[0049] The control target determination unit 157 is a processing unit that determines the target of stabilization control from among the stabilization control candidates based on the calculation result of the transient stability calculation by the transient stability calculation unit 153, which is calculated sequentially based on the effect order determined by the effect order evaluation unit 156. The control target determination unit 157 determines whether or not there is an unstable state, such as a step-out of the generator 5, from the calculation result of the transient stability calculation, and if there is no unstable state, determines the stabilization control candidate as the stabilization control target. In addition, if there is an unstable state in the calculation result of the transient stability calculation, the control target determination unit 157 determines the calculation result of the stabilization control candidate with the next effect order. The control target determination unit 157 stores the identification information of the determined stabilization control target in the storage unit 151 in association with the assumed accident condition. The control target determination unit 157 may transmit the identification information of the determined stabilization control target to the control unit 16 in association with the assumed accident condition, and store it in the storage unit of the control unit 16.
[0050] The control unit 16 is a processing unit that outputs a control signal for cutting off the stabilization control target and executes stabilization control. When the control unit 16 receives accident information from the information terminal 12 via the transmission system 14, it searches for information matching the accident that has occurred from the assumed accident conditions and the identification information of the stabilization control target passed from the control target determination unit 157. Then, the control unit 16 transmits a control signal for cutting off the corresponding stabilization control target found to the corresponding control terminal 13 via the transmission system 14.
[0051] [1-2. Operation of the First Embodiment] The stabilization control procedure of this embodiment will be described with reference to Figs. 3 and 4. Fig. 3 is a flowchart showing a process for determining a stabilization control target by the stabilization grid system of this embodiment. Fig. 4 is a flowchart showing a process for evaluating the effectiveness ranking of stabilization control candidates. In the following explanation, the flow for determining the stabilization control target will be specifically explained, and an explanation of the actual accident content and the shutoff of the generator 5 will be omitted.
[0052] As described above, in the power system stabilization system 11, before an accident occurs, calculations are repeated at a fixed period to determine the target of stabilization control for each assumed accident. First, the power system data creation unit 152 takes in power system information such as the voltage, active power, reactive power, and open / close state of the circuit breaker 6 measured by the information terminal 12, and combines this with various setting information stored in advance to create a power system model (step S100).
[0053] Next, the transient stability calculation unit 153 selects one assumed accident condition from a plurality of assumed accident conditions that have been set in advance (step 200), and determines whether or not the determination of the stabilization control target has been completed for all assumed accident conditions (step S300).
[0054] If the calculations have not been completed for all assumed accident conditions (No in step S300), the transient stability calculation unit 153 first performs a transient stability calculation under a condition without stabilization control (step S400). The control necessity determination unit 154 determines whether or not there is an unstable state, such as a loss of synchronism of the generator 5, based on the calculation result under the condition without stabilization control calculated by the transient stability calculation unit 153 (step S500).
[0055] If the result of the transient stability calculation indicates that the generator 5 is not unstable (No in step S500), the control necessity determination unit 154 associates the control content that stabilization control is not required with the content of the assumed accident condition set in step S200 and stores it (step S600). Then, the process returns to step S200, and the transient stability calculation unit 153 performs calculation for the next assumed accident condition.
[0056] On the other hand, if the transient stability calculation results in the generator 5 becoming unstable (Yes in step S500), the control necessity determination unit 154 determines that stabilization control is necessary. When the control necessity determination unit 154 determines that stabilization control is necessary, the control candidate generation unit 155 generates a list of preset stabilization control candidates (step S700).
[0057] The effect ranking evaluation unit 156 estimates the stabilization effect of each stabilization control candidate based on the list of stabilization control candidates created by the control candidate generation unit 155, and determines the ranking of the stabilization control candidates in the list (step S800). The ranking of the stabilization control candidates in step S800 will be described in detail with reference to FIG.
[0058] 4, the information extraction unit 1561 extracts necessary information from the calculation result calculated by the transient stability calculation unit 153 under the condition of no stabilization control (step S801). Then, the active power conversion unit 1563 converts the active power P G is converted into active power P equivalent to one synchronous generator (step S802).
[0059] Next, the effect ranking evaluation unit 156 judges whether or not the effect evaluation of all candidates has been completed for the list of stabilization control candidates generated in step S700 of Fig. 3 (step S803). If the effect evaluation of all stabilization control candidates has not been completed (No in step S803), the effect ranking evaluation unit 156 selects one stabilization control candidate that has not been evaluated from the list of stabilization control candidates (step S804). Then, the immediate-after active power calculation unit 1562 performs a circuit calculation that reflects a state in which a synchronous generator included in the selected stabilization control candidate is shut off, and calculates the active power P G Calculate (step S805).
[0060] The active power conversion unit 1563 converts the active power P of each synchronous generator immediately after the stabilization control calculated by the immediate active power calculation unit 1562. Gis converted into active power P equivalent to one synchronous generator (step S806). Then, the increment calculation unit 1564 calculates the increment of active power P before and after the stabilization control from the difference between the active power P equivalent to one synchronous generator immediately after the stabilization control and the active power P equivalent to one synchronous generator immediately before the stabilization control (step S807).
[0061] Then, the process returns to step S803, and steps S803 to S807 are repeated to calculate the increase in active power before and after stabilization control for each of all stabilization control candidates in the list generated in step S700 of Fig. 2. When the effect evaluation of all stabilization control candidates in the list of stabilization control candidates has been completed (Yes in step S803), the normalization unit 1565 normalizes the increase in active power P before and after stabilization control calculated by the increase calculation unit 1564 by the controlled variable. Furthermore, the ranking determination unit 1566 creates an effect ranking table in which the stabilization control candidates included in the list of stabilization control candidates are sorted in descending order of normalized value based on the normalized value calculated by the normalization unit 1565, and stores the effect ranking table in the storage unit 151 (step S808).
[0062] In step S800, the stabilization effect of each stabilization control candidate is roughly calculated, and the order of the stabilization control candidates in the list is determined, and the process proceeds to step S900 in Fig. 3. Then, control object determination unit 157 selects the stabilization control candidate with the highest stabilization effect in the effect order table (step S900), and outputs it to transient stability calculation unit 153. Transient stability calculation unit 153 performs transient stability calculation under the condition with stabilization control for the stabilization control candidates acquired from control object determination unit 157 (step S1000).
[0063] If the result of the transient stability calculation indicates that the generator 5 is not in an unstable state, such as stepping out of synchronism (No in step S1100), the control target determination unit 157 determines the stabilization control candidate as the stabilization control target. The control target determination unit 157 associates identification information of the determined stabilization control target with the assumed accident condition and stores it in the storage unit 151 (step S1200), and proceeds to setting the next assumed accident condition (step S200). Then, if the calculation for all assumed accident conditions is completed and the determination of the stabilization control target required to prevent stepping out is completed (Yes in step S300), the process ends. On the other hand, if the result of the transient stability calculation indicates that the generator 5 is in an unstable state, such as stepping out of synchronism (Yes in step S1100), the process returns to the selection of the stabilization control candidate (step S900).
[0064] [1-3. Effects of the first embodiment] (1) In the power system 11 of the present embodiment, the power system stabilization system 11 includes a calculation unit 15 that performs calculations at regular intervals and determines a stabilization control target for each assumed accident, and a control unit 16 that executes stabilization control to shut off the stabilization control target. The calculation unit 15 includes a transient stability calculation unit 153 that calculates stability regarding an assumed accident by transient stability calculation in a power system 1 including a synchronous generator and a renewable energy power source, a control necessity determination unit 154 that determines whether stabilization control is necessary or not based on a calculation result of the transient stability calculation under a condition without stabilization control, a control candidate generation unit 155 that generates a list of stabilization control candidates for the assumed accident, an effect ranking evaluation unit 156 that estimates the stabilization effect of each stabilization control candidate based on the list of stabilization control candidates and determines an effect ranking for the stabilization control candidates, and a control target determination unit 157 that determines a stabilization control target from the stabilization control candidates based on the calculation results of the transient stability calculation by the transient stability calculation unit 153, which are calculated sequentially based on the effect ranking.
[0065] In conventional stabilization control, the stabilization effect of each stabilization control candidate was evaluated based on the results of a transient stability calculation. In other words, the transient stability calculation was also performed when determining the effect ranking of the stabilization control candidates. This resulted in an increase in the number of transient stability calculations, which could lead to a longer calculation period and a more complicated system.
[0066] On the other hand, the effect ranking evaluation unit 156 of this embodiment roughly calculates the stabilization effect of each stabilization control candidate and determines the effect ranking of the stabilization control candidates. In other words, no transient stability calculation is performed when determining the effect ranking of the stabilization control candidates. This makes it possible to provide a power grid stabilization system 11 that reduces the amount of calculation required to determine the cutoff target required to prevent loss of synchronism of a synchronous generator. In such a power grid stabilization system 11, it is possible to avoid an increase in the calculation period and a complication of the system.
[0067] (2) The effect ranking evaluation unit 156 of the calculation unit 15 includes an information extraction unit 1561 that extracts predetermined information including the active power of each synchronous generator immediately before the stabilization control from the calculation results calculated by the transient stability calculation unit 153 under conditions without stabilization control; an immediate active power calculation unit 1562 that performs circuit calculations reflecting the shutdown of the selected stabilization control candidate to calculate the active power of each synchronous generator immediately after the stabilization control; an active power conversion unit 1563 that converts the active power of each synchronous generator into active power equivalent to one synchronous generator; an increment calculation unit 1564 that determines the increase in active power before and after the stabilization control from the difference between the active power equivalent to one synchronous generator immediately after the stabilization control and the active power equivalent to one synchronous generator immediately before the stabilization control; and a ranking determination unit 1566 that determines the effect ranking of the stabilization control candidates by sorting the stabilization control candidates in order of largest increase.
[0068] The transient stability calculation involves repeating calculations including the solution of differential equations at time intervals of 10 milliseconds or the like to determine a time series state of several hundred milliseconds to 10 seconds, which can take a long time to calculate and can result in a long calculation period. In this embodiment, the information extraction unit 1561 uses information extracted from the calculation results calculated by the transient stability calculation unit 153 under conditions without stabilization control to calculate the active power of each synchronous generator immediately after stabilization control, and the immediate after active power calculation unit 1562 calculates the active power of each synchronous generator immediately after stabilization control. Therefore, it is possible to select a combination of highly effective stabilization control candidates with a small amount of calculation (calculation time).
[0069] (3) The information extraction unit 1561 further extracts an admittance matrix immediately before the stabilization control from the calculation result calculated by the transient stability calculation unit 153 under the condition of no stabilization control, and the immediate after active power calculation unit 1562 performs a circuit calculation that reflects the shutdown of the selected stabilization control candidate in the admittance matrix immediately before the stabilization control.
[0070] Using the admittance matrix immediately before the stabilization control extracted by the information extraction unit 1561, an immediate after active power calculation unit 1562 calculates the active power of each synchronous generator immediately after the stabilization control. In this embodiment, the increase in active power before and after the stabilization control converted into the amount equivalent to one synchronous generator can be calculated by circuit calculation using a combination of matrix calculation and arithmetic operations. This makes it possible to reduce the calculation load.
[0071] (4) The effect ranking evaluation unit 156 of the calculation unit 15 further includes a normalization unit 1565 that normalizes the increase before and after the stabilization control, and the ranking determination unit 1566 determines the effect ranking of the stabilization control candidates by sorting the stabilization control candidates in descending order of the normalized increase values.
[0072] The increase in active power before and after stabilization control increases in proportion to the number of synchronous generators to be controlled. Therefore, the more stabilization control candidates there are that control a larger number of generators, the higher the stabilization effect is likely to be calculated. Therefore, by providing a normalization unit 1565 and determining the effect ranking with a value obtained by normalizing the increase, it becomes possible to determine the effect ranking more accurately.
[0073] [2. Second embodiment] [2-1. Overall composition] A power grid stabilization system 11 according to the second embodiment will be described with reference to Figs. 5 and 6. The power grid stabilization system 11 according to the present embodiment has basically the same configuration as the power grid stabilization system 11 according to the first embodiment. In the following description, "not included in the selected stabilization control candidates" is referred to as "non-stabilization control candidate." For example, a synchronous generator that is not included in the selected stabilization control candidates will be described as a synchronous generator that is not a stabilization control candidate.
[0074] The power system stabilization system 11 of this embodiment further includes a previous active power totalizer 1570, a power flow calculation data creation unit 1571, a first power flow calculation execution unit 1572, a change ratio calculation unit 1573, a second power flow calculation execution unit 1574, a third power flow calculation execution unit 1575, a non-candidate active power totalizer 1576, and a fourth power flow calculation execution unit 1577. For convenience of explanation, the power flow calculation execution units will be explained by dividing them into a first power flow calculation execution unit to a fourth power flow calculation execution unit, but there is no intention to exclude the case where all the power flow calculations are performed by the same processing unit.
[0075] Moreover, the grid stabilization system 11 of the present embodiment does not have the immediate-after active power calculation unit 1562 of the first embodiment. In the description of the present embodiment, the same components as those in the grid stabilization system 11 of the first embodiment are denoted by the same reference numerals, and duplicated descriptions will be omitted.
[0076] In this embodiment, the information extraction unit 1561 extracts information necessary for power flow calculation, such as the voltage, active power, and reactive power of each node, from the calculation result calculated under conditions without stabilization control by the transient stability calculation unit 153. Also, as in the above embodiment, the information extraction unit 1561 extracts the active power P G is extracted from the results of transient stability calculation under conditions without stabilization control.
[0077] The immediately preceding active power summing unit 1570 calculates the active power P of each synchronous generator immediately before the stabilization control extracted by the information extracting unit 1561. GAdd up the total value ΣP G0 This is a processing unit that calculates the above.
[0078] The power flow calculation data creation unit 1571 is a processing unit that creates power flow calculation data that reflects the state immediately before the stabilization control. The power flow calculation data creation unit 1571 creates power flow calculation data that reflects the state immediately before the stabilization control by reflecting data such as the voltage, active power, and reactive power of each node extracted by the information extraction unit 1561 in the input data for power flow calculation used to calculate the initial value of the transient stability calculation.
[0079] The first power flow calculation executing unit 1572 is a calculation unit that executes a first power flow calculation under predetermined conditions. The first power flow calculation executing unit 1572 is configured to execute a first power flow calculation in which a certain amount of reactive power Q is changed at a generator node included in a selected stabilization control candidate. The first power flow calculation executing unit 1572 also executes a power flow calculation before changing the reactive power Q.
[0080] The change ratio calculation unit 1573 is a processing unit that calculates the change ratio of reactive power Q for each generator node other than the stabilization control candidates from the result of the first power flow calculation. The change ratio calculation unit 1573 calculates the change ratio using the calculation result of the power flow calculation in which a certain amount of reactive power is changed in a generator node included in the selected stabilization control candidate, executed by the first power flow calculation execution unit 1572. Therefore, it can be said that the change ratio indicates how the influence of changing a certain amount of reactive power in a generator node included in the selected stabilization control candidate propagates to the generator 5 other than the stabilization control candidate.
[0081] The change ratio calculation unit 1573 is configured to calculate a change amount ΔQ of reactive power Q in a synchronous generator node other than the stabilization control candidate, and to obtain a Q change ratio for each synchronous generator node other than the stabilization control candidate by the following (Equation 7).
[0082] (Number 7) TIFF2024167627000008.tif34139
[0083] In the above (Equation 7), i is the number of the synchronous generator that is not a candidate for stabilization control, and n is the total number of synchronous generators that are not a candidate for stabilization control.
[0084] The second power flow calculation execution unit 1574 is a calculation unit that executes a second power flow calculation under a predetermined condition. The second power flow calculation execution unit 1574 is configured to set the setting value of the active power of the generators included in the selected stabilization control candidate to zero, and then to perform a second power flow calculation by dividing the total active power of the generators included in the selected stabilization control candidate immediately before stabilization control by a Q change ratio described later and adding it to the active power of the synchronous generators not included in the stabilization control candidates. In the second power flow calculation, when a generator included in the selected stabilization control candidate is shut off, it can be said that the power flow calculation is performed after setting, using the Q change ratio, how the active power output by the shut off generator is to be covered by the synchronous generators not included in the stabilization control candidates.
[0085] The third power flow calculation execution unit 1575 is a calculation unit that executes the third power flow calculation under predetermined conditions. The third power flow calculation execution unit 1575 is configured to calculate the load fluctuation from the voltage of each node in the result of the second power flow calculation, the voltage of each node immediately before the stabilization control, and the load voltage characteristics set in the transient stability calculation using the following (Equation 8) and (Equation 9), and to perform the third power flow calculation reflecting these.
[0086] (Number 8) TIFF2024167627000009.tif44169
[0087] In the above (Equation 8), ΔP L (i) is the change in the active power load at the i-th load node, P L0 (i) is the set value of the active power load at the i-th load node, and αP is the voltage characteristic of the active power load.
[0088] (Number 9) TIFF2024167627000010.tif34130
[0089] In the above (equation 9), ΔQ L(i) is the reactive power load fluctuation at the i-th load node, Q L0 (i) is the set value of the reactive power load at the i-th load node, αQ is the voltage characteristic of the reactive power load, Va(i) is the voltage of the i-th load node in the result of the second power flow calculation that takes stabilization control into account, and Vb(i) is the voltage of the i-th load node in the result of the power flow calculation that corresponds to the initial value of the transient stability calculation.
[0090] The state of the grid changes before and after the second power flow calculation, and the voltage distribution changes. If the voltage distribution changes, power consumption increases or decreases. The third power flow calculation takes into account the load voltage characteristics and increases or decreases in the load due to voltage fluctuations, improving the accuracy of calculations of the active power of the synchronous generator after stabilization control.
[0091] The non-candidate active power totalizer 1576 totals the active powers of all the synchronous generators that are not candidates for stabilization control from the calculation result of the third power flow calculation, and obtains a total value ΣP G1 This is the calculation section that calculates the following:
[0092] The fourth power flow calculation execution unit 1577 is a calculation unit that executes the fourth power flow calculation under a predetermined condition. G1 and the total value ΣP calculated by the previous active power totalizer 1570 G0 The fourth power flow calculation execution unit 1577 pro rataly divides the difference between the above two power generators by the Q change ratio calculated by the change ratio calculation unit 1573, adds it to the active power of the synchronous generator that is not a candidate for stabilization control, and then performs the fourth power flow calculation. The fourth power flow calculation execution unit 1577 adds the active power in the power flow calculation data created by the power flow calculation data creation unit 1571. It can be said that the fourth power flow calculation execution unit 1577 calculates the final post-control state by power flow calculation.
[0093] [2-2. Operation of the Second Embodiment] The stabilization control procedure of this embodiment will be described with reference to Fig. 6. Fig. 6 is a flowchart showing a process for evaluating the effect order of stabilization control candidates. In the following, a flow related to the evaluation of the effect order by the effect order evaluation unit 156 will be specifically described.
[0094] First, the information extraction unit 1561 extracts information necessary for power flow calculation, such as the voltage, active power, and reactive power of each node, from the calculation result calculated by the transient stability calculation unit 153 under the condition of no stabilization control, and the active power P G Then, the previous active power summing unit 1570 extracts the active power P G Add up the total value ΣP G0 (Step S811) The sum ΣP G0 will be used in the processing described later.
[0095] The active power conversion unit 1563 converts the active power P G is converted into active power P equivalent to one synchronous generator (step S812). Step S812 is the same process as step S802 above. Next, the power flow calculation data creation unit 1571 reflects data such as the voltage, active power, and reactive power of each node extracted by the information extraction unit 1561 in the input data for power flow calculation used to calculate initial values for transient stability calculation, and creates power flow calculation data reflecting the state immediately before stabilization control (step S813). The power flow calculation data is used in the processes described later.
[0096] Next, the effect ranking evaluation unit 156 determines whether or not the effect evaluation of all candidates has been completed for the list of stabilization control candidates generated in step S700 of Fig. 3 (step S814). If the effect evaluation of all stabilization control candidates has not been completed (step S814 No), the effect ranking evaluation unit 156 selects one stabilization control candidate that has not been evaluated from the list of stabilization control candidates (step S815).
[0097] The first power flow calculation executing unit 1572 performs a first power flow calculation in which a certain amount of reactive power Q is changed at a generator node included in the selected stabilization control candidate. That is, the first power flow calculation executing unit 1572 performs power flow calculation before and after changing the reactive power Q. Then, the change ratio calculating unit 1573 calculates the amount of change ΔQ of reactive power Q at a synchronous generator node other than the stabilization control candidate from the result of the first power flow calculation, and calculates the Q change ratio for each synchronous generator node other than the stabilization control candidate (step S816).
[0098] The second power flow calculation executing unit 1574 sets the setting value of the active power of the generator 5 included in the selected stabilization control candidate to zero, and then divides the total active power of the generator 5 included in the selected stabilization control candidate immediately before stabilization control by the Q change ratio, and adds it to the active power of the synchronous generator not included in the stabilization control candidate to perform the second power flow calculation (step S817). The third power flow calculation executing unit 1575 calculates the load fluctuation from the voltage of each node in the result of the second power flow calculation, the voltage of each node immediately before stabilization control, and the load voltage characteristic set in the transient stability calculation, and performs the third power flow calculation after reflecting the calculation result (step S818).
[0099] The non-candidate active power totalizer 1576 totals the active powers of all the synchronous generators that are not candidates for stabilization control from the calculation result of the third power flow calculation, and obtains a total value ΣP G1 Next, the fourth power flow calculation executing unit 1577 calculates the total value ΣP G1 and the total value ΣP calculated in step S811 G0 The difference is prorated by the Q change ratio calculated in step S816, and added to the active power of the synchronous generator that is not a candidate for stabilization control, and then a fourth power flow calculation is performed (step S820). At this time, the power flow calculation data before adding the active power is the power flow calculation data created in step S813. The fourth power flow calculation calculates the state immediately after the stabilization control.
[0100] The active power conversion unit 1563 converts the active power P Gis converted into active power P equivalent to one synchronous generator (step S821). Then, the increment calculation unit 1564 calculates the increment of active power P before and after the stabilization control from the difference between the active power P equivalent to one synchronous generator immediately after the stabilization control and the active power P equivalent to one synchronous generator immediately before the stabilization control (step S822).
[0101] Then, the process returns to step S814, and steps S814 to S822 are repeated to calculate the increase in active power before and after stabilization control for each of all stabilization control candidates in the list generated in step S700 of Fig. 2. When the effect evaluation of all stabilization control candidates in the list of stabilization control candidates has been completed (Yes in step S814), the normalization unit 1565 normalizes the increase in active power P before and after stabilization control calculated by the increase calculation unit 1564 by the controlled variable. Furthermore, the ranking determination unit 1566 creates an effect ranking table in which the stabilization control candidates included in the list of stabilization control candidates are sorted in descending order of normalized value based on the normalized value calculated by the normalization unit 1565, and stores the effect ranking table in the storage unit 151 (step S823).
[0102] [2-3. Effects of the second embodiment] (1) The effect ranking evaluation unit 156 of the calculation unit 15 includes an information extraction unit 1561 that extracts predetermined information including the active power of each synchronous generator immediately before the stabilization control from the calculation results calculated by the transient stability calculation unit 153 under conditions without stabilization control; power flow calculation execution units 1572, 1574, 1575, 1577 that perform power flow calculations reflecting the shutoff of selected stabilization control candidates and calculate the active power of each synchronous generator immediately after the stabilization control; an active power conversion unit 1563 that converts the active power of each synchronous generator into active power equivalent to one synchronous generator; an increment calculation unit 1564 that calculates the increase in active power before and after the stabilization control from the difference between the active power equivalent to one synchronous generator immediately after the stabilization control and the active power equivalent to one synchronous generator immediately before the stabilization control; and a ranking determination unit 1566 that determines the effect ranking of the stabilization control candidates by sorting the stabilization control candidates in order of largest increase.
[0103] The transient stability calculation requires time to calculate a time series state of several hundred milliseconds to 10 seconds by repeating calculations including the solution of differential equations at time intervals of 10 milliseconds, and this can result in a long calculation period. In this embodiment, the power flow calculation execution units 1572, 1574, 1575, and 1577 calculate the active power of each synchronous generator immediately after stabilization control using information extracted by the information extraction unit 1561 from the calculation results calculated by the transient stability calculation unit 153 under conditions without stabilization control. Therefore, it is possible to select a combination of highly effective stabilization control candidates with a small amount of calculation (calculation time).
[0104] When the power flow calculation executing units 1572, 1574, 1575, and 1577 calculate the active power of each synchronous generator immediately after stabilization control, the power grid stabilization system 11 can be configured using an engine called a power flow calculation. Therefore, since only a few changes are required to the power grid stabilization system 11, an economical program can be provided.
[0105] (2) The power flow calculation execution units 1572, 1574, 1575, and 1577 perform a first power flow calculation in which a certain amount of reactive power is changed at a generator node included in the selected stabilization control candidate, a second power flow calculation in which the active power of the selected stabilization control candidate is allocated to the synchronous generator other than the stabilization control candidate, a third power flow calculation in which a load fluctuation calculated from the result of the second power flow calculation is reflected, and a total value ΣP of the active power of the synchronous generator other than the stabilization control candidate is calculated. G1 and the total value of the active power just before stabilization control ΣP G0 and a fourth power flow calculation in which the difference between the power supply voltage Vp and the power supply voltage Vs is added to the power supply voltage Vs of the synchronous generator that is not a candidate for stabilization control.
[0106] By executing the first to fourth power flow calculations, the state immediately after stabilization control can be calculated by the power flow calculation, taking into account the load voltage characteristics and the increase or decrease in the load due to voltage fluctuations. Therefore, it is possible to improve the calculation accuracy of the active power of the synchronous generator immediately after stabilization control.
[0107] 3. Other embodiments In this specification, several embodiments of the present invention have been described, but these embodiments are presented as examples and are not intended to limit the scope of the invention. The above-mentioned embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the scope of the invention. These embodiments and their modifications are included in the scope of the invention and its equivalents as well as in the scope and gist of the invention. The following is an example.
[0108] (1) In the above embodiment, the increase in active power before and after control of all synchronous generators converted into one unit, which occurs when each combination in the stabilization control candidate list is controlled, is calculated and used for evaluating the stabilization effect. However, for example, a list of stabilization control candidates may be generated by controlling one generator at each of the stabilization control candidates shown by numbers 1 to 3 in Fig. 2, calculating the increase in active power before and after control converted into one unit, and sequentially adding stabilization control candidates in descending order of active power increase until the system becomes stable. Then, the stabilization control candidate that was set when the system became stable can be determined as the stabilization control target.
[0109] (2) Furthermore, a method may be used in which the increase in active power when only one of each of the stabilization control candidates is controlled is calculated, the increase in active power is divided by the control amount to obtain a normalized value, and the stabilization control candidates are added in descending order of normalized value until stability is achieved, and the stabilization control candidate set when stability is achieved is set as the control target required for stabilization. Here, the control amount is the active power that was being output by the generator at each of the stabilization control candidates before the accident occurred.
[0110] (3) Alternatively, a list may be created in which combinations of stabilization control candidates are grouped by the number of stabilization control candidates, such as 1 unit, 2 units, 3 units, etc. Then, in each group, they may be sorted in descending order of the increase in active power before and after control, or in descending order of the normalized value obtained by dividing the increase in active power by the control amount, and the first-ranked stabilization control combination in each group may be set in order until a stable combination is found, and whether it is stable or unstable may be confirmed. [Explanation of symbols]
[0111] 1: Power system 2, 2-1~2-5: Bus bar 3, 3-1 to 3-5: Power lines 4, 4-1 to 4-6: Transformer 5, 5-1 to 5-6: Generator 6, 6-1 to 6-6: Circuit breaker 11: Power grid stabilization system 12, 12-1~12-5: Information terminal 13, 13-1 to 13-4: Control terminal 14: Transmission system 15: Arithmetic section 16: Control unit 151: Storage section 152: System data creation department 153: Transient stability calculation section 154: Control necessity determination unit 155: Control candidate generation unit 156: Efficacy Ranking Evaluation Section 157: Control target determination unit 1561: Information extraction part 1562: Immediately after active power calculation unit 1563: Active power converter 1564: Increment calculation unit 1565: Normalization section 1566: Ranking Decision Section 1570: Last minute active power total 1571: Power flow calculation data creation section 1572: First load flow calculation execution unit 1573: Change ratio calculation section 1574: Second load flow calculation execution unit 1575: Third Power Flow Calculation Unit 1576: Non-candidate active power total part 1577: Fourth Power Flow Calculation Execution Unit
Claims
1. A power grid stabilization system including a calculation unit that performs calculations at a constant cycle and determines a stabilization control target for each assumed accident, and a control unit that executes stabilization control to shut off the stabilization control target, The calculation unit is A transient stability calculation unit that calculates stability regarding the assumed fault by transient stability calculation in a power system including a synchronous generator and a renewable energy power source; a control necessity determination unit that determines whether or not stabilization control is required based on a calculation result of the transient stability calculation under a condition without stabilization control; a control candidate generation unit that generates a list of stabilization control candidates for the assumed accident; an effect ranking evaluation unit that estimates a stabilization effect of each stabilization control candidate based on the list of stabilization control candidates and determines an effect ranking of the stabilization control candidates; a control object determination unit that determines the stabilization control object from the stabilization control candidates based on a calculation result of the transient stability calculation by the transient stability calculation unit, the calculation result being sequentially calculated based on the effect ranking.
2. The effect ranking evaluation unit of the calculation unit is an information extraction unit that extracts predetermined information including an effective power of each synchronous generator immediately before the stabilization control from a calculation result calculated by the transient stability calculation unit under a condition without the stabilization control; an immediate active power calculation unit that performs a circuit calculation reflecting the interruption of the selected stabilization control candidate and calculates an active power of each synchronous generator immediately after the stabilization control; an active power converter that converts the active power of each synchronous generator into active power equivalent to that of one synchronous generator; an increment calculation unit that calculates an increment in active power before and after the stabilization control from a difference between an active power equivalent to one synchronous generator immediately after the stabilization control and an active power equivalent to one synchronous generator immediately before the stabilization control; a ranking determination unit that determines the effect ranking of the stabilization control candidates by sorting the stabilization control candidates in descending order of the increase amount; The power grid stabilization system according to claim 1 .
3. The information extraction unit further extracts an admittance matrix immediately before stabilization control from a calculation result calculated by the transient stability calculation unit under a condition without stabilization control, The immediate-after active power calculation unit performs a circuit calculation in which the interruption of the selected stabilization control candidate is reflected in an admittance matrix immediately before the stabilization control. The power grid stabilization system according to claim 2.
4. The effect ranking evaluation unit of the calculation unit is an information extraction unit that extracts predetermined information including an effective power of each synchronous generator immediately before the stabilization control from a calculation result calculated by the transient stability calculation unit under a condition without the stabilization control; a power flow calculation execution unit that performs a power flow calculation reflecting the interruption of the selected stabilization control candidate and calculates the active power of each synchronous generator immediately after the stabilization control; an active power converter that converts the active power of each synchronous generator into active power equivalent to that of one synchronous generator; an increment calculation unit that calculates an increment in active power before and after the stabilization control from a difference between an active power equivalent to one synchronous generator immediately after the stabilization control and an active power equivalent to one synchronous generator immediately before the stabilization control; a ranking determination unit that determines the effect ranking of the stabilization control candidates by sorting the stabilization control candidates in descending order of the increase amount; The power grid stabilization system according to claim 1 .
5. The power flow calculation execution unit is A first power flow calculation in which a certain amount of reactive power is changed at a generator node included in the selected stabilization control candidate; a second power flow calculation that allocates the active power of the selected stabilization control candidate to the synchronous generator that is not a stabilization control candidate; a third power flow calculation that reflects a load fluctuation calculated from a result of the second power flow calculation; and a fourth power flow calculation that is performed by adding a difference between a total value of active power of synchronous generators that are not candidates for stabilization control and a total value of active power immediately before stabilization control to the synchronous generators that are not candidates for stabilization control; The power grid stabilization system according to claim 4 , configured to execute the following:
6. The effect ranking evaluation unit of the calculation unit further includes a normalization unit that normalizes the increase before and after the stabilization control, the rank determination unit determines the effect rank of the stabilization control candidates by sorting the stabilization control candidates in descending order of the normalized value of the increase. The power grid stabilization system according to claim 2 or 4.
Citation Information
Patent Citations
Stability deciding system of power system
JP1995135738A
Power system stabilization method, power system stabilization apparatus and recording medium
JP2001339862A
Electric power supply system stabilizing unit
JP2015130777A
Power limited machine selection method, power limited machine selection program, and recording medium therefor
JP2018019456A
Power system stabilizing device
JP2018074828A
Cited By
Power grid emergency control resource selection method and system based on dynamic coupling
CN121618456A