Method for providing adjustability, control program, and uninterruptible power supply
By employing UPS systems to disconnect from or reverse power flow to the grid during frequency instability, the method addresses the slow response times of existing adjustment power systems, achieving rapid frequency stabilization.
Patent Information
- Application Number
- JP2023084011
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-22
- Publication Date
- 2024-12-04
- Estimated Expiration
- 2043-05-22
AI Technical Summary
The response time of existing adjustment power systems is too long, ranging from 15 to 45 minutes for tertiary adjustment and 10 seconds for future secondary and primary adjustment, making it difficult to maintain frequency stability in power systems with high renewable energy penetration.
A method utilizing uninterruptible power supplies (UPS) to provide reverse power flow and frequency regulation by disconnecting from the commercial grid during frequency drops and supplying power from storage batteries, or by reversing power flow back to the grid during frequency instability.
The method achieves a response time of approximately 200 milliseconds, significantly shorter than conventional systems, without requiring additional equipment, and allows for immediate frequency stabilization.
Smart Images

Figure 2024167737000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a method for providing adjustment capability to a commercial power grid, a control program, and an uninterruptible power supply. [Background technology]
[0002] In recent years, power generation methods using renewable energy such as solar power generation and wind power generation have become widespread. These power sources have no inertia because they are connected to the power grid via inverters. Therefore, the greater the proportion of power supply from renewable energy sources in the total power supply in a power grid, the lower the inertia of the power grid.
[0003] The decrease in inertia force makes it difficult to maintain a constant frequency if the amount of power supply drops suddenly due to a power grid accident. If the frequency drops significantly, it may develop into a large-scale blackout.
[0004] In order to prevent power outages and other disruptions, it is necessary to match demand with supply. The electricity required to match supply and demand at power plants and other facilities in response to changes in demand is called "adjustment capacity." Adjustment capacity is traded in a nationwide market called the supply and demand adjustment market (Patent Document 1). [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2020-67919 A Summary of the Invention [Problem to be solved by the invention]
[0006] The response time (the time required for the output to change from the issuance of a command to the command value) of tertiary control reserve currently traded is 15 to 45 minutes. The shortest response time for secondary control reserve and primary control reserve that will be traded in the future is also 10 seconds. The object of the present invention is to realize a control reserve providing method, control program, and uninterruptible power supply device that shortens the response time to instantaneous. Note that instantaneous means a time shorter than the conventional response time, for example, less than 10 seconds. [Means for solving the problem]
[0007] A method for providing adjustment power according to one aspect of the present application includes, when a frequency of a commercial power grid is equal to or lower than a predetermined threshold, supplying reverse flow power to the commercial power grid from an uninterruptible power supply device connected to the commercial power grid. Effect of the Invention
[0008] In one aspect of the present application, it is possible to shorten the response time. [Brief description of the drawings]
[0009] [Figure 1] FIG. 1 is an explanatory diagram showing an example of a power supply system diagram including a UPS system. [Diagram 2] FIG. 2 is an explanatory diagram showing an example of a UPS circuit configuration diagram. [Diagram 3] FIG. 1 is an explanatory diagram showing the operation of an under-frequency load shedding method. [Figure 4] FIG. 4 is an explanatory diagram showing the operation of a UPS pseudo inertia force control method. [Diagram 5] FIG. 2 is a block diagram showing an example of a hardware configuration of a UPS. [Figure 6] FIG. 2 is a block diagram showing an example of a hardware configuration of a UPS. [Figure 7] 13 is a flowchart showing an example of a procedure for adjustment power providing processing. [Figure 8] 13 is a flowchart showing an example of a procedure for adjustment power providing processing. [Figure 9] FIG. 11 is an explanatory diagram showing an example of setting a standby time. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] (Embodiment 1) An embodiment will be described below with reference to the drawings. Fig. 1 is an explanatory diagram showing an example of a power system diagram including a UPS system. High-voltage AC power drawn from a commercial power system passes through a power receiving circuit and a special high-voltage transformer (not shown) and is distributed via a feeder. A circuit breaker 2 is disposed in the front stage of the UPS system 1. The squares in Fig. 1 represent circuit breakers, with white boxes indicating a cut-off state and black boxes indicating a current-carrying state. The UPS system 1 includes a UPS input panel, a UPS transformer panel, a UPS main body, and a UPS output panel.
[0011] The adjustment capability proposed in this specification is characterized by the use of a UPS. The UPS in this specification is assumed to be a continuous inverter power supply type UPS. A continuous inverter power supply type UPS normally supplies input from the commercial power system to connected devices via an inverter. By passing the power through an inverter, it is possible to constantly supply regulated power stably regardless of the state of the commercial power system. In a continuous inverter power supply type UPS, the inverter circuit constantly supplies power, so it is called a continuous inverter power supply type.
[0012] FIG. 2 is an explanatory diagram showing an example of a UPS circuit configuration diagram. The UPS shown in FIG. 2 is a UPS that employs a double conversion method among continuous inverter power supply methods. As shown in FIG. 2, the input commercial power is converted to DC power by a converter, and used to charge the storage battery, and is also converted back to AC via an inverter and supplied to the equipment. It is called a double conversion method because it performs two conversions, from AC to DC and from DC to AC. In the following explanation, the double conversion type UPS will be simply called UPS.
[0013] The adjustment capability proposed in this specification provides adjustment capability by using three functions of the UPS: the first is a commercial synchronization function, the second is a cutoff function, and the third is a power supply function.
[0014] The commercial synchronization function is a function that supplies CVCF (Constant Voltage Constant Frequency) power while synchronizing with commercial power. For example, when the frequency of power supplied from the commercial power source is within a predetermined range, for example, within a few percent (typically 1, 2, 3, 4, or 5%) of the rated frequency, the UPS outputs power with the same frequency as the commercial power source. When the frequency of power supplied from the commercial power source is not within the predetermined range, the inverter corrects the frequency to the rated frequency and supplies the power to the equipment. To realize such a commercial synchronization function, the UPS has the ability to monitor the frequency of the commercial power and change the control when the frequency exceeds or falls below a threshold value. Here, the ability to change the control when the frequency falls below the threshold value is used to provide adjustment power.
[0015] If the commercial power supply becomes unstable or if the power supply is cut off (a power outage occurs), the UPS will supply the equipment with power stored in the storage battery for a certain period of time. At that time, the UPS will operate an uninterruptible switch to switch the power supply source from the commercial power system to the storage battery.
[0016] Needless to say, a UPS has a power supply function that uses a storage battery to supply power. This power supply function is used to achieve adjustment capability.
[0017] Next, a method for providing adjustment capability using a UPS will be described. In this specification, two types of adjustment capability are proposed as new types of adjustment capability. The two methods are an under-frequency load shedding method and a UPS pseudo-inertia force control method.
[0018] Figure 3 is an explanatory diagram showing the operation of the underfrequency load shedding method. In the underfrequency load shedding method, when the frequency of the commercial power system is lower than a predetermined threshold, the circuit breaker 2 (circuit breaker) is operated to cut off the power supply from the commercial power system to the UPS system 1. As a result, the UPS system 1 no longer consumes power from the commercial power system, and adjustment power is provided by down DR. Note that power is supplied to various devices connected to the UPS system 1 from a storage battery built into the UPS.
[0019] 4 is an explanatory diagram showing the operation of the UPS pseudo inertia force control method. In the pseudo inertia force control method, when the frequency of the commercial power system is lower than a predetermined threshold, the UPS 10 supplies power to various connected devices from the built-in storage battery, and also causes a part of the power that the storage battery can supply to flow back to the commercial power system. As a result, the UPS system 1 supplies power to the commercial power system, providing power adjustment capability.
[0020] Next, the operation of the UPS 10 will be described in detail for each of the underfrequency load shedding method and the pseudo inertia force control method. Fig. 5 is a block diagram showing an example of the hardware configuration of the UPS. Fig. 5 is a block diagram showing the normal state of the UPS 10 that executes the underfrequency load shedding method.
[0021] The UPS 10 includes a control unit 11, a detection element 12, a monitoring unit 13, a converter 14, an inverter 15, a storage battery 16, a switch 17, and a switch 18. The control unit 11 has one or more arithmetic processing devices such as a CPU (Central Processing Unit), an MPU (Micro-Processing Unit), a GPU (Graphics Processing Unit), etc. The control unit 11 reads and executes a control program 1P (program, program product) (not shown) to perform various information processing, control processing, etc.
[0022] The detection element 12 is configured by, for example, a detection resistor, and detects the state (frequency, voltage level, etc.) of the commercial power system that is the input power source. The detection element 12 outputs the detection result to the monitoring unit 13.
[0023] The monitoring unit 13 monitors the state of the commercial power system based on the detection result of the detection element 12 (detection unit), and outputs the monitoring result to the control unit 11. For example, when the monitoring unit 13 detects an abnormality in which the frequency of the commercial power system falls below a predetermined threshold, the monitoring unit 13 generates information indicating the content of the abnormality and outputs it to the control unit 11.
[0024] Converter 14 converts AC power supplied from a commercial power system into DC power of a predetermined level and supplies it to storage battery 16. Storage battery 16 is charged by the output from converter 14. Converter 14 also outputs the DC power to inverter 15.
[0025] Inverter 15 converts the DC power output by converter 14 into AC power of the same frequency as the commercial power system (50 Hz north of Kanto, 60 Hz west of Kansai) and approximately the same voltage level, and outputs it.
[0026] The storage battery 16 is a backup power source that supplies power to external devices in the event of an abnormality in the commercial power system. The storage battery 16 is composed of a lithium ion battery, a nickel-cadmium battery, a lead storage battery, a nickel metal hydride battery, or the like.
[0027] The switch 17 is a normally closed switch, that is, a switch whose contacts are normally closed. In the normal state, the switch supplies AC input from the commercial power system to the UPS 10. When the monitoring unit 13 detects an abnormality in the commercial power system, the switch 17 transitions from a state in which the contacts are closed to a state in which the contacts are open under the control of the control unit 11. This disconnects the UPS 10 from the commercial power system, and AC input from the commercial power system is no longer supplied to the UPS 10. This provides the commercial power system with regulation power through down DR.
[0028] The switch 18 is an uninterruptible switch that switches the power supply source from the commercial power system to the storage battery. In a normal state, the switch 18 energizes the converter 14 and the inverter 15. When the monitoring unit 13 detects an abnormality in the commercial power system, the contacts of the switch 18 are switched under the control of the control unit 11, and the output from the storage battery 16 is supplied to the inverter 15. The power supplied by the storage battery 16 also serves as the power source for operating the UPS 10.
[0029] Fig. 6 is a block diagram showing an example of the hardware configuration of a UPS. Fig. 6 is a block diagram showing an abnormal state of a UPS 10 that executes the pseudo inertial force control method. The abnormal state refers to when the frequency of the commercial power system falls below a predetermined threshold. The components of the UPS 10 are the same as those in Fig. 5, so the description will be omitted.
[0030] The following describes the operation of the UPS 10. When the monitoring unit 13 detects an abnormality in the commercial power system, the contacts of the switch 18 are switched under the control of the control unit 11, and the output from the storage battery 16 is supplied to the inverter 15.
[0031] Also, the switch 17 maintains the contacts closed. Power from the storage battery 16 is reversed to the converter 14. The converter 14 operates as an inverter by reversing the input and output. The power converted to AC by the converter 14 operating as an inverter is supplied to the commercial power system. In other words, an increase adjustment power is provided to the commercial power system. The storage battery 16 and the converter 14 operating as an inverter are an example of a supply unit.
[0032] Next, information processing performed by the UPS 10 will be described. Fig. 7 and Fig. 8 are flow charts showing an example of the procedure of the adjustment capability provision processing. Fig. 7 shows the procedure of the adjustment capability provision processing in the frequency underload shedding method. The control unit 11 of the UPS 10 acquires the frequency of the commercial power system from the monitoring unit 13 (step S1). The control unit 11 judges whether the acquired frequency is equal to or lower than a predetermined threshold (step S2). If the control unit 11 judges that the acquired frequency exceeds the predetermined threshold (NO in step S2), it executes step S1 again. If the control unit 11 judges that the acquired frequency is equal to or lower than the predetermined threshold (YES in step S2), it switches the switch 17 (step S3) and ends the processing. By switching the switch 17, the UPS 10 is disconnected from the commercial power system, and adjustment capability is provided.
[0033] FIG. 8 shows the procedure of the adjustment capability providing process in the pseudo inertial force control method. The control unit 11 of the UPS 10 acquires the frequency of the commercial power system from the monitoring unit 13 (step S11). The control unit 11 judges whether the acquired frequency is equal to or lower than a predetermined threshold (step S12). If the control unit 11 judges that the acquired frequency exceeds the predetermined threshold (NO in step S12), it executes step S11 again. If the control unit 11 judges that the acquired frequency is equal to or lower than the predetermined threshold (YES in step S12), it switches the switch 18 (step S13). The control unit 11 starts reverse power flow from the storage battery 16 to the commercial power system (step S14), and ends the process. The UPS 10 supplies power from the storage battery 16 to various connected devices, and provides adjustment capability to the commercial power system by reverse power flow.
[0034] 7 and 8 show processing in which the control unit 11 polls the frequency, but interrupt processing by the monitoring unit 13 may also be performed. An interrupt routine for executing step S3 in FIG. 7 and an interrupt routine for executing steps S13 and S14 in FIG. 8 are prepared. A threshold is set in the monitoring unit 13. When the monitoring unit 13 detects that the frequency of the commercial power system has fallen below a predetermined threshold, it executes an interrupt and executes the interrupt routine.
[0035] In the above description, the underfrequency load shedding method and the pseudo inertial force control method have been described as methods for providing adjustment capability. Both methods cannot be executed simultaneously by the same UPS 10. However, when multiple UPS 10 are installed, a UPS 10 (second uninterruptible power supply) that operates using the underfrequency load shedding method and a UPS 10 (uninterruptible power supply) that operates using the pseudo inertial force control method may be mixed.
[0036] The present embodiment has the following advantages. The adjustment capability by the underfrequency load shedding method is provided by switching switch 17. The adjustment capability by the pseudo inertia force control method is provided by switching switch 18. The time required for switching switches 17 and 18 is about 200 milliseconds after monitoring unit 13 detects an abnormality in the commercial power system. Therefore, it is possible to provide an adjustment capability with a shorter response time than conventional adjustment capabilities. Furthermore, it is not necessary to add new equipment in order to provide the adjustment capability, and it can be realized simply by changing the control program of UPS 10. As a result, it contributes to the inexpensive realization of safe and secure urban development.
[0037] (Incentives) When the UPS system 1 provides adjustment capacity, an incentive may be given to the operator of the UPS system 1. It is appropriate to determine the amount of incentive according to the amount of power provided as adjustment capacity and the duration of provision. The amount of power that can be provided as adjustment capacity and the duration of provision can be estimated from the performance and operating environment of the UPS 10, so the amount of incentive to be given may be determined based on the amount of power to be provided (estimated supply amount) and the duration of provision (estimated supply duration) expected for each UPS system 1, and the determined amount of incentive may be given when adjustment capacity is provided.
[0038] Also, the amount of the incentive may be given by measuring the amount of power (reverse flow power) provided as the adjustment capacity and the time of provision (supply time). In this case, a power meter is installed in a position close to the UPS system 1 in the system connecting the UPS system 1 and the commercial power system. In this case, although the installation of the power meter is required, it is possible to more accurately calculate the amount of the incentive. Note that the degree of contribution to the stable supply of power differs between the case where the adjustment capacity is provided by operating the UPS 10 in the under-frequency load shedding method and the case where the adjustment capacity is provided by operating the UPS 10 in the pseudo inertia force control method. Therefore, it is preferable to use a different method for calculating the incentive so that the amount of the incentive is relatively larger in the case of the pseudo inertia force control method.
[0039] (Embodiment 2) In the first embodiment, when the UPS 10 detects that the frequency of the commercial power grid is equal to or lower than a threshold, the UPS system 1 immediately provides adjustment capability. In the present embodiment, a plurality of UPS systems 1 are installed at different positions in a power distribution network, and they provide adjustment capability.
[0040] In this embodiment, in providing adjustment power by a plurality of UPS systems 1, the time from when it is detected that the frequency of the commercial power system has fallen below a predetermined threshold to when adjustment power is provided (hereinafter, "standby time") is made different depending on the location of each UPS system 1. FIG. 9 is an explanatory diagram showing an example of setting the standby time. In FIG. 9, UPS systems 1-1, 1-2, and 1-3 are present in order of proximity to the substation. On the premise that a drop in frequency is propagated from the substation in sequence with a slight time difference, the UPS system 1-1 closest to the substation provides adjustment power immediately upon detecting a drop in frequency. The next closest UPS system 1-2 waits 100 milliseconds after detecting a drop in frequency, and then provides adjustment power. The next UPS system 1-3 waits 200 milliseconds after detecting a drop in frequency, and then provides adjustment power. To simplify the explanation, the UPS 10 that provides adjustment power at each time is one each, but multiple UPS systems may be used. In other words, when the multiple UPS 10s constituting the first group detect a drop in frequency, they immediately provide adjustment power, and the multiple UPS 10s constituting the second group detect a drop in frequency and then wait 200 milliseconds before providing adjustment power.
[0041] The standby time of each UPS 10 is planned based on the topology of the power distribution network, the power that each UPS 10 can provide as adjustment power, and the time of provision. The operators or owners of each UPS system 1 are not necessarily the same person. Therefore, it is desirable to have an aggregator that is responsible for adjusting the standby times of multiple UPS 10.
[0042] In this embodiment, since a plurality of UPS 10 provide adjustment capacity with different standby times, it is possible to extend the time for which the adjustment capacity is provided, compared to a case in which the UPS 10 start providing the adjustment capacity at the same time. This makes it possible to provide the adjustment capacity required by the grid operator in the time period between when the adjustment capacity is provided immediately after the frequency drops and when the provision of other adjustment capacity starts.
[0043] The technical features (constituent elements) described in each embodiment can be combined with each other, and by combining them, new technical features can be formed. The embodiments disclosed herein are illustrative in all respects and should not be considered as limiting. The scope of the present invention is defined by the claims, not by the above meaning, and is intended to include all modifications within the scope and meaning equivalent to the claims. In addition, the claims are written in a format in which a claim cites two or more other claims (multiple claim format), but this is not limited to this format. The claims may be written in a format in which multiple claims cite at least one other claim (multi-multi claim format). [Explanation of symbols]
[0044] 1: UPS system 10:UPS (Uninterruptible power supply) 11: Control section 12: Detector element 13: Monitoring Department 14: Converter 15: Inverter 16: Battery 17: Switch 18: Switch 1P: Control program 2: Circuit breaker
Claims
1. When the frequency of a commercial power system is equal to or lower than a predetermined threshold, a reverse flow power is supplied to the commercial power system from an uninterruptible power supply device connected to the commercial power system. How to provide adjustment force.
2. The reverse flow power is supplied based on a pseudo inertia force control method. The method for providing adjustment power according to claim 1 .
3. a second uninterruptible power supply that cuts off the input from the commercial power system when the frequency is equal to or lower than the threshold value; The method for providing adjustment power according to claim 1 or 2.
4. The expected value of the supply amount and supply time of the reverse flow power is determined in advance. The method for providing adjustment power according to claim 1 or 2.
5. When the uninterruptible power supply supplies the reverse flow power, an incentive is given to an operator of the uninterruptible power supply. The method for providing adjustment power according to claim 1 or 2.
6. measuring an amount of reverse flow power supplied from the uninterruptible power supply to the commercial power grid; The incentive is determined based on the measured amount of reverse flow power. The method for providing adjustment power according to claim 5 .
7. When the frequency becomes equal to or lower than the threshold, the second uninterruptible power supply cuts off the input from the commercial power grid, thereby measuring an amount of power according to the adjustment capability provided; An incentive is determined based on the measured amount of power using a calculation method different from the incentive based on the amount of reverse flow power. The method for providing adjustment power according to claim 6.
8. A plurality of the uninterruptible power supplies are connected to the commercial power system, and a waiting time from when the frequency becomes equal to or lower than the threshold value until when the supply of the reverse flow power is started is set for each of the uninterruptible power supplies. The method for providing adjustment power according to claim 1 or 2.
9. When the frequency of a commercial power grid is equal to or lower than a threshold, an uninterruptible power supply is caused to supply reverse flow power to the commercial power grid. Control program.
10. A detection unit that detects a frequency of a commercial power system; a supply unit that supplies reverse flow power to the commercial power grid when the frequency detected by the detection unit is equal to or lower than a threshold value; An uninterruptible power supply comprising:
11. When the frequency of the commercial power system is equal to or lower than a predetermined threshold, an input from the commercial power system to an uninterruptible power supply device connected to the commercial power system is cut off. How to provide adjustment force.
12. An incentive is given to an operator of the uninterruptible power supply device according to the amount of power that the uninterruptible power supply device would have received from the commercial power system if the input had not been cut off. The method for providing adjustment power according to claim 11.
13. When the frequency of a commercial power system is equal to or lower than a predetermined threshold, an input from the commercial power system to an uninterruptible power supply device connected to the commercial power system is cut off. Control program.
14. A detection unit that detects a frequency of a commercial power system; a cutoff unit that cuts off an input from the commercial power system when the frequency detected by the detection unit is equal to or lower than a threshold value; An uninterruptible power supply comprising:
Citation Information
Patent Citations
Power managing device and power monitoring control device
JP2016019427A
Billing management system, and billing management method
JP2017027587A
Controller, control method, and program
JP2018042351A
Processing apparatus, processing method, and program
JP2019050667A
Ac-DC converter control device
JP2019080476A