Method for supplying raw material gas, device for supplying raw material gas, and device for forming film on substrate

By adjusting power to heaters based on the correlation between temperature and carrier gas supply, the method stabilizes film formation rates in CVD processes, addressing inefficiencies caused by varying raw material amounts.

JP2024167757APending Publication Date: 2024-12-04TOKYO ELECTRON LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023084041
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-22
Publication Date
2024-12-04

AI Technical Summary

Technical Problem

Existing methods for controlling the flow rate of raw material gas in CVD processes fail to maintain a consistent film formation rate due to variations in the remaining amount of solid raw material, leading to inefficiencies in film deposition.

Method used

The method involves controlling the power supplied to heaters in the raw material container based on a predetermined correlation between the temperature and the amount of carrier gas, adjusting the power supply to maintain a desired film formation rate by monitoring the cumulative supply of carrier gas.

Benefits of technology

This approach ensures stable and consistent film formation rates by compensating for changes in the remaining amount of solid raw material, prolonging the replacement cycle of the raw material and maintaining the set film formation rate throughout the process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024167757000001_ABST
    Figure 2024167757000001_ABST
Patent Text Reader

Abstract

To supply a raw material gas so as to obtain a desired film forming rate by controlling power to be supplied to a heater from a correlation between a temperature for heating the raw material and a carrier gas supply amount.SOLUTION: Provided is a method for supplying a raw material gas, which includes: a step for supplying power to a heater provided to a raw material container storing a solid raw material, and heating the inside of the raw material container to sublimate the solid raw material; a step for supplying a carrier gas into the raw material container heated by the heater, mixing the carrier gas with the sublimated raw material, and supplying the mixed result as a raw material gas to a consumption area where a substrate is disposed; and a step for obtaining an index value having a correspondence relationship with the remaining amount of the solid raw material. When performing the step for sublimating the solid raw material, power corresponding to the index value when performing the step is supplied to the heater on the basis of a correspondence relationship between a preset index value and the power supplied to the heater.SELECTED DRAWING: Figure 9A
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a method for supplying a source gas, an apparatus for supplying a source gas, and an apparatus for forming a film on a substrate. [Background technology]

[0002] For example, when forming a metal film or the like on a substrate by CVD, a source gas obtained from a solid source may be used. As a specific example, a solid source stored in a source container is heated and sublimated, and mixed with a carrier gas supplied from a carrier gas source to obtain a source gas, which is then supplied to a processing container containing a substrate to form a film.

[0003] Patent Document 1 describes a method of calculating the flow rate of the source gas by measuring the gas pressure in the process gas supply line with a pressure gauge. If the calculated source gas flow rate differs from the set flow rate according to the recipe, the method describes a control method of adjusting the temperature of the source container by a temperature control program to adjust the flow rate of the source gas to achieve a desired film thickness. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2008-240119 A Summary of the Invention [Problem to be solved by the invention]

[0005] The present disclosure provides a technique for supplying a source gas so as to obtain a desired film formation rate by controlling the power supplied to a heater based on the correlation between the temperature at which the source gas is heated and the amount of carrier gas supplied. [Means for solving the problem]

[0006] The method for supplying a raw material gas according to the present disclosure includes: supplying power to a heater provided in a source vessel containing a solid source material to heat the inside of the source vessel, thereby sublimating the solid source material; supplying a carrier gas into the source container heated by the heater, mixing the carrier gas with the sublimated source, and supplying the mixture as a source gas to a consumption area in which a substrate is disposed; determining an index value corresponding to the remaining amount of the solid raw material; When performing the step of sublimating the solid raw material, power corresponding to the index value at the time of performing the step is supplied to the heater based on a correspondence relationship between the preset index value and the power supplied to the heater. Effect of the Invention

[0007] According to the present disclosure, by controlling the power supplied to the heater based on the correlation between the temperature at which the source material is heated and the amount of carrier gas supplied, the source gas can be supplied so as to obtain a desired film formation rate. [Brief description of the drawings]

[0008] [Figure 1] 1 is a plan view illustrating a substrate processing system according to an embodiment of the present disclosure. [Diagram 2] 2 is a vertical sectional side view showing a Ru film forming module of the substrate processing system. FIG. [Diagram 3] 4 is a vertical sectional side view showing a source gas supply device provided in the Ru film formation processing module. FIG. [Figure 4] FIG. 4 is a block diagram showing the source gas supply device in a comparative example. [Diagram 5] 10 is a graph showing a change in film formation rate according to the comparative example of the source gas supply method. [Figure 6] 4 is a graph showing changes in power supplied to each heater according to the source gas supply method. [Figure 7] FIG. 2 is a block diagram showing an electrical configuration of a raw material gas supply device in the embodiment. [Figure 8] 4 is a diagram showing the operation of the raw material gas supply device; FIG. [Figure 9A] 11 is a graph showing a change in power supplied to a side heater according to the source gas supply method in the embodiment. [Figure 9B] 10 is a graph showing a change in power supplied to a bottom heater according to the source gas supply method. [Figure 9C] 4 is a graph showing a change in power supplied to an upper heater according to the source gas supply method. [Figure 10] 4 is a graph showing a change in film formation rate depending on the source gas supply method. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] The substrate processing system 1 shown in FIG. 1 is configured to perform a film forming process for forming a TiN (titanium nitride) film and a Ru (ruthenium) film as a barrier metal on a wafer W. The substrate processing system 1 is configured as a multi-chamber system including a plurality of processing modules 101, 102, 103, and 104 for performing an oxide film removal process, which is a pre-processing for the film formation, and a film forming process for forming a TiN film and a Ru film. Of the two types of processing modules 101 and 102 for performing the oxide film removal process, the COR processing module 101 performs a COR (Chemical Oxide Removal) process for transforming an oxide film formed on a surface of a metal base (for example, a Si layer described later) into a reaction product. The PHT processing module 102 performs a PHT (Post Heat Treatment) process for sublimating the reaction product. The TiN film forming processing module 103 performs a TiN film forming process, and the Ru film forming processing module 104 performs a Ru film forming process.

[0010] In addition, when a Ru film is formed directly on a metal base without forming a barrier metal such as a TiN film, the oxide film may be removed by Ar (argon) gas plasma or H2 gas plasma instead of performing the COR process and the PHT process. In this case, the substrate processing system 1 is provided with a plasma processing module for removing the oxide film instead of the COR process module 101 and the PHT process module 102.

[0011] Returning to the explanation of FIG. 1, in addition to the processing modules 101 to 104, the substrate processing system 1 includes a loader module 61, a load lock module 62, first and second vacuum transfer modules 63 and 64, and a connection module 65.

[0012] 1, the loader module 61, the load lock module 62, the first vacuum transfer module 63, the connection module 65, and the second vacuum transfer module 64 are arranged linearly in the front-rear direction in this order. In the following description of the substrate processing system 1, the side where the loader module 61 is located is referred to as the front side, and the side where the second vacuum transfer module 64 is located is referred to as the rear side.

[0013] The loader module 61 includes a housing whose interior is at atmospheric pressure, a transfer mechanism 61a for the wafer W provided in the housing, and a load port 68. In this example, four load ports 68 are provided in a row on the left and right side of the front side of the housing. A transfer container C for storing the wafer W, called a FOUP (Front Opening Unified Pod), is placed on each load port 68. The transfer mechanism 61a is, for example, configured with a multi-joint arm that can move left and right, and can transfer the wafer W between the transfer container C on each load port 68 and each load lock module 62.

[0014] In this embodiment, three load lock modules 62 are provided side by side when viewed from the front side. Each load lock module 62 has a housing, and the housing is connected to the loader module 61 and the first vacuum transfer module 63 via gate valves (not shown) provided on the front and rear sides of the housing. When the gate valves on the front and rear sides of the housing are closed, the pressure inside the housing can be freely changed between atmospheric pressure and vacuum pressure. A stage on which the wafer W is placed is provided inside the housing, and the stage is configured to be able to deliver the wafer W to the transfer mechanism 61a and a vacuum transfer mechanism 69 (described later) that access the load lock module 62, respectively.

[0015] The first and second vacuum transfer modules 63, 64 are similarly configured and each include a housing 63a, 64a and a vacuum transfer mechanism 69 provided in the housing 63a, 64a. One end of an exhaust pipe is connected to the housing 63a, 64a, and the inside of the housing 63a, 64a is maintained in a vacuum atmosphere by the exhaust mechanism connected via the exhaust pipe. The exhaust mechanism is, for example, a turbo molecular pump.

[0016] In this embodiment, two connection modules 65 are provided side by side. Each connection module 65 has a housing, and the housing is connected to the housing 63a, 64a of each vacuum transfer module 63, 64. The inside of the housing of the connection module 65 is made into a vacuum atmosphere with the same pressure as the inside of the housing 63a, 64a by exhausting by the exhaust mechanism. A wafer W is placed in the housing of the connection module 65, and a stage configured to be able to transfer the wafer W between the housing and a vacuum transfer mechanism 69 described later is provided.

[0017] When viewed from the front side, a COR processing module 101 and a PHT processing module 102 are connected to both the left and right sides of the front side of the housing 63a of the first vacuum transfer module 63 via gate valves G1. The COR processing module 101 is disposed on the left side, and the PHT processing module 102 is disposed on the right side. In this manner, one COR processing module 101 and one PHT processing module 102 are provided around the first vacuum transfer module 63.

[0018] When viewed from the front side, the TiN film forming processing modules 103 are connected to both the left and right sides of the rear side of the housing 63a of the first vacuum transfer module 63 via gate valves G1. In this manner, two TiN film forming processing modules 103 are provided around the first vacuum transfer module 63. The transfer of the wafer W between these processing modules 101 to 103 and the load lock module 62 is performed by a vacuum transfer mechanism 69 constituted by, for example, an articulated arm that can move back and forth and left and right. The vacuum transfer mechanism 69 also transfers the wafer W between these processing modules 101 to 103 and the connection module 65 and between these processing modules 101 to 103 in the same manner.

[0019] Two Ru film formation processing modules 104 arranged side by side in the front and rear are connected via gate valves G1 to the left and right sides of the housing 64a of the second vacuum transfer module 64 when viewed from the front side. The transfer of the wafer W between the Ru film formation processing modules 104 and the connection module 65 is performed by, for example, a vacuum transfer mechanism 69 of the second vacuum transfer module 64. In this manner, four Ru film formation processing modules 104 are provided around the second vacuum transfer module 64.

[0020] As shown in FIG. 2 as a representative example of the above-described processing modules 101-104, each of the processing modules 101-104 includes a processing container 41 which is evacuated to create a vacuum atmosphere therein, and a substrate mounting table 42 which is provided within the processing container 41 and on which a wafer W is placed, and each processing step is performed within the processing container 41.

[0021] The substrate processing system 1 includes a control unit 200, which is a computer, and the control unit 200 includes a program. The program includes instructions (steps) for carrying out the above-mentioned processing steps of the wafer W and the transport step of the wafer W. The program is stored in a storage medium, such as a compact disc, a hard disk, a DVD, a non-volatile memory, etc., and is read from the storage medium and installed in the control unit 200.

[0022] The control unit 200 outputs control signals to each part of the substrate processing system 1 according to the program, and controls the operation of each part. Specifically, the control unit 200 controls the operation of the processing modules 101-104, opening and closing of the gate valve G1, the operation of the transfer mechanism 61a and the vacuum transfer mechanism 69, the operation of the exhaust mechanism, switching of the pressure in the load lock module 62, and the like. Specific examples of the control of the operation of the processing modules 101-104 include temperature control of the wafer W by supplying power to a heater or the like, which will be described later, and control of supply and cut-off of each gas into the processing vessel 41.

[0023] Here, a description will be given of the transfer path of the wafer W in the substrate processing system 1. The wafer W is first transferred in the order of the transfer container C → the loader module 61 → the load lock module 62 → the first vacuum transfer module 63 → the COR processing module 101. Then, the wafer W which has been subjected to the COR process in the COR processing module 101 is transferred in the order of the COR processing module 101 → the first vacuum transfer module 63 → the PHT processing module 102.

[0024] Then, the wafer W which has undergone the PHT process in the PHT process module 102 is transferred in the order of the PHT process module 102 → the first vacuum transfer module 63 → the TiN film forming process module 103. The wafer W which has undergone the TiN film forming process in the TiN film forming process module 103 is transferred in the order of the TiN film forming process module 103 → the first vacuum transfer module 63 → the connection module 65 → the second vacuum transfer module 64 → the Ru film forming process module 104. The wafer W which has undergone the Ru film forming process in the Ru film forming process module 104 is transferred in the order of the Ru film forming process module 104 → the second vacuum transfer module 64 → the connection module 65 → the first vacuum transfer module 63 → the load lock module 62 → the loader module 61, and is returned to the transfer container C.

[0025] Although individual illustrations are omitted, we will first briefly describe the COR processing module 101, the PHT processing module 102, and the TiN film forming processing module 103. Each of these processing modules 101 to 103 includes a processing vessel, a substrate mounting stage disposed in the processing vessel, a substrate heater provided on the substrate mounting stage, and various gas supply mechanisms.

[0026] The substrate heater of the COR processing module 101 is configured to heat the wafer W placed on the mounting table to a heating temperature of 60° C. or higher, for example, by circulating a temperature control fluid through a pipe formed in the substrate mounting portion. The COR processing module 101 also includes a mixed gas supply mechanism as a gas supply mechanism configured to supply a mixed gas of HF (hydrogen fluoride) gas, NH3 (ammonia) gas, and an inert gas for altering the oxide film. The mixed gas supply mechanism is configured to supply various gases to a shower head provided in the processing chamber.

[0027] The substrate heater of the PHT processing module 102 uses, for example, resistance heat and is configured to heat the wafer W to a temperature higher than that of the wafer W in the COR process. The inert gas supply unit, which is a gas supply mechanism of the PHT processing module 102, is configured to supply inert gas, such as N2 (nitrogen) gas, directly to the processing vessel without passing through a shower head. By supplying the inert gas, reaction products sublimated in the processing vessel can be quickly purged and the pressure in the processing vessel can be adjusted.

[0028] The TiN film forming module 103 forms a TiN film by, for example, a thermal atomic layer deposition (ALD, Atomic Layer Deposition). The substrate heater in the TiN film forming module 103 heats the wafer W to, for example, 700°C to 1000°C. The gas supply mechanism is configured to alternately supply a source gas containing the source material of the TiN film and a reactive gas that reacts with the source gas to the processing chamber, for example, via the supply of a purge gas. For example, the source gas is TiCl4 (titanium tetrachloride) gas, and the reactive gas is NH3 (ammonia) gas.

[0029] The configuration of the Ru film forming module 104 will be described below with reference to Fig. 2. Fig. 2 is a vertical cross-sectional side view showing the Ru film forming module 104. The Ru film forming module 104 forms Ru3(CO) 12 A raw material gas containing a gas (hereinafter sometimes referred to as DCR gas) is continuously supplied to form a Ru film by thermal CVD. The processing vessel 41 described above is a substantially cylindrical vessel with an open top and bottom. A substrate mounting table 42 for holding a wafer W substantially horizontally is provided within the processing vessel 41. An N2 gas supply unit (not shown) is connected to the processing vessel 41, and is configured to supply N2 gas into the processing vessel 41 as needed.

[0030] A bottom lid 41a is provided at the opening on the lower surface side of the processing vessel 41, and a vacuum exhaust path 43 is connected to the bottom lid 41a via an exhaust port. A vacuum exhaust unit 44, for example a vacuum pump, configured to perform vacuum exhaust of the gas inside the processing vessel 41 is provided downstream of the vacuum exhaust path 43. An APC valve (not shown), for example, is provided as a pressure control valve between the processing vessel 41 and the vacuum exhaust unit 44 on the vacuum exhaust path 43. The opening and closing operation of the APC valve is controlled based on the result of measuring the pressure inside the processing vessel 41 by a pressure measuring unit P2 connected to the processing vessel 41.

[0031] A loading / unloading port is formed on the side of the processing vessel 41 for loading / unloading the wafer W between the second vacuum transfer module 64, and this loading / unloading port is configured to be freely opened and closed by a gate valve G1. The above-mentioned substrate mounting table 42 is made of, for example, aluminum nitride or quartz, and has a substrate heater made of a resistance heating element embedded therein for heating the wafer W. The substrate heater generates heat when power is supplied from a power supply unit (not shown), and heats the wafer W mounted on the substrate mounting table 42 to a temperature within a range of, for example, 100°C to 250°C.

[0032] A support portion 45 extending downward is connected to the center of the lower surface of the substrate mounting table 42. The support portion 45 is disposed penetrating the bottom cover portion 41a. The substrate mounting table 42 has, for example, three transfer pins (not shown) formed on the upper surface thereof so as to penetrate the substrate mounting table 42 and be able to freely protrude and retract. The transfer pins thus provided on the substrate mounting table 42 transfer the wafer W between the substrate mounting table 42 and the vacuum transfer mechanism 69, and place the wafer W on the substrate mounting table 42.

[0033] A shower head 50 is airtightly attached to the opening on the upper surface side of the processing vessel 41 via, for example, a heat-resistant insulating member. The shower head 50 is disposed at a position facing the wafer W disposed on the substrate mounting table 42. The shower head 50 includes, for example, a cylindrical housing 51 and a diffusion chamber 52 provided inside the housing 51 for diffusing a source gas. A gas supply hole 53 is formed in the upper surface of the housing 51 to which a gas supply mechanism 58 described later is connected and through which the source gas is supplied. A number of discharge holes 54 are formed in the lower surface of the housing 51 for discharging the supplied source gas toward the wafer W.

[0034] The diffusion chamber 52 is provided with the diffusion plates 55 and 56 spaced apart from each other so as to divide the diffusion chamber 52 into three spaces in the vertical direction. The diffusion plates 55 and 56 are each formed with a plurality of through holes 55a and 56a that form a flow path for the raw material gas. The through holes 56a of the diffusion plate 56 are arranged at different positions so as not to face the discharge holes 54 formed on the lower surface of the housing 51. The through holes 55a of the diffusion plate 55 are also arranged at different positions so as not to face the through holes 56a of the diffusion plate 56. By arranging the through holes 55a and 56a in the above-described manner for the diffusion plates 55 and 56, the raw material gas can be prevented from blowing through the through holes 55a and 56a and the discharge holes 54 in a straight line, and the raw material gas can be uniformly discharged from each discharge hole 54 while being sufficiently dispersed in the housing 51 that constitutes the showerhead 50.

[0035] The gas supply mechanism 58 includes a gas supply path 59 and a source gas supply source 10 provided on the upstream side of the gas supply path 59 for supplying a source gas. A downstream end of the gas supply path 59 is connected to a gas supply hole 53 provided on an upper surface of the shower head 50. Valves V1 and V2 are provided on the gas supply path 59 on the downstream side of the source gas supply source 10. Of the valves V1 and V2, the valve V1 provided on the downstream side is, for example, a shutoff valve, and performs an operation of supplying and cutting off the source gas to the processing vessel 41.

[0036] On the other hand, the valve V2 is for performing an operation of discharging the raw material gas in the raw material gas supply source 10 to the outside. Between the valves V1 and V2 in the gas supply path 59, a pressure measuring unit P1 is connected to measure the pressure of the raw material gas flowing through the valves. Furthermore, between the valves V1 and V2 in the gas supply path 59, an exhaust path 60 provided with a valve V6 is connected. The downstream end of the exhaust path 60 is connected to the vacuum exhaust unit 44, and is configured to be able to discharge the raw material gas directly toward the vacuum exhaust unit 44 without passing through the processing vessel 41. In addition, a heating unit (not shown) is provided in the gas supply path 59 and the exhaust path 60, and the heating unit heats the entire gas supply path 59 and the exhaust path 60 including the valves V1, V2, and V6. This makes it possible to suppress the raw material gas from re-solidifying and adhering to the gas supply path 59 and the exhaust path 60 including the valves V1, V2, and V6.

[0037] The control unit 200 described above also has a function of controlling the Ru film formation process in the Ru film formation module 104. The control unit 200 has a storage unit 201 and programs for executing each film formation process, and operates each component in the Ru film formation module 104. Specifically, the control unit 200 has a program for executing a source gas supply process described later, and operates each component of the gas supply mechanism 58.

[0038] The source gas supply source 10 of the Ru film forming module 104 according to the present disclosure will be described in detail below with reference to FIG. 3. FIG. 3 is a vertical cross-sectional side view showing the source gas supply source 10, and temperature sensors TCa, TCb, and TCc and power supply units 21a, 21b, and 21c, which will be described later, are omitted from the illustration. The source gas supply source 10 includes a source container 11 that stores a solid source S for generating DCR gas contained in the source gas, a plurality of heaters 12 provided in the source container 11 for heating the solid source S, and a carrier gas supply unit 13. The solid source S is, for example, solid Ru3(CO) formed in a granular shape. 12 It is.

[0039] The carrier gas supply unit 13 is configured to supply, as a carrier gas, for example, CO (carbon monoxide) gas to the source material container 11. The CO gas is a carrier gas that is used to convert solid Ru3(CO) 12 The carrier gas supply unit 13 includes a CO gas source 13a, an inlet passage 13b connecting the CO gas source 13a and the source container 11, and a flow rate control unit 13c provided in the inlet passage 13b.

[0040] The flow rate control unit 13c is equipped with a flow rate meter for CO gas and corresponds to a measurement unit that measures the supply amount of CO gas. The supply path 13b branches into two, for example, downstream of the flow rate control unit 13c, and one downstream end is connected to the raw material container 11 via a valve V3, and the other downstream end is connected to the downstream side of the valve V2 in the gas supply path 59 via a valve V4. With this configuration, the carrier gas supply unit 13 is configured to be able to switch between a flow path that supplies the carrier gas to the raw material container 11 and a flow path that bypasses the raw material container 11 and directly supplies the carrier gas to the gas supply path 59.

[0041] The source material container 11 has a substantially cylindrical shape, a main body 14 that opens at the top end, and a top lid 15 that is detachably and airtightly attached to the top end of the main body 14. The top lid 15 forms the top surface of the source material container 11 and has a substantially disk shape. A source material gas discharge port 15a is formed at the center of the top lid 15 for discharging the source material gas generated in the source material container 11 to the gas supply path 59. A carrier gas supply port 15b is formed at the side end of the top lid 15 for supplying CO gas to the source material container 11. The flow path cross-sectional area of ​​the carrier gas supply port 15b is smaller than the flow path cross-sectional area of ​​the source material gas discharge port 15a.

[0042] The main body 14 includes a bottom 14a constituting the bottom surface of the raw material container 11, and a side 14b constituting the side surface of the raw material container 11. The bottom 14a has a disk shape and is wider outward than the lower end of the side 14b. The upper end of the side 14b is wider outward to form a flange, and is configured to removably attach an upper lid 15 having the same diameter. The raw material container 11 is configured such that the internal space of the main body 14 can be opened upward when the upper lid 15 is removed.

[0043] In the internal space of the raw material container 11, a raw material placement section 16 for holding the granular solid raw material S is disposed. The raw material placement section 16 is formed so as to protrude downward from the lower surface of the top lid 15. The up-down direction with respect to the raw material gas supply source 10 is the same as the vertical direction, and the dimension in the up-down direction may be referred to as the height or depth. The height of the raw material placement section 16 is approximately the same as the depth of the internal space of the main body 14. The raw material placement section 16 is accommodated in the raw material container 11 by attaching the top lid 15 to the main body 14. In this case, the lower surface of the raw material placement section 16 is disposed so as to contact the bottom 14a of the main body 14. The raw material placement section 16 is removed from the internal space of the main body 14 by removing the main body 14 from the top lid 15 and pulling it upward, and the raw material placement section 16 can be removed from the internal space of the main body 14 as appropriate, and the solid raw material can be replenished.

[0044] The raw material placement section 16 is configured in a substantially cylindrical shape with a diameter smaller than the inner space of the raw material container 11. The raw material placement section 16 is configured with multiple stages, for example, six stages, of tray sections 17 arranged at intervals from each other along the vertical direction. The tray sections 17 correspond to the raw material holding tray in this embodiment. These tray sections 17 are configured in substantially the same annular shape, and are each arranged around a cylindrical central flow passage 18 extending along the vertical direction. The central flow passage 18 is arranged directly below the raw material gas discharge port 15a of the upper lid 15, and has substantially the same flow passage cross-sectional area as the raw material gas discharge port 15a.

[0045] Specifically, the tray section 17 is composed of a horizontally arranged annular bottom section 17a, an inner protrusion 17b provided inside the bottom section 17a, and a cylindrical outer wall section 17c formed to extend downward from the lower surface of the upper cover 15 and hold the outer periphery of the bottom section 17a. The inner protrusion 17b is provided to protrude upward from the bottom section 17a. Each tray section 17 is formed with such bottom section 17a, inner protrusion 17b, and outer wall section 17c to form an annular recess that opens upward. In the annular recess, a large number of granular solid raw materials S can be held in a stable state while preventing them from falling from the tray section 17. In addition, the space above each tray section 17 arranged at intervals in the vertical direction forms a raw material gas generation space SP in which the solid raw material S is sublimated to generate DCR gas and mixed with CO gas to obtain raw material gas. Each raw material gas generation space SP has approximately the same volume as each other.

[0046] The inner protrusion 17b formed on the inner periphery of each tray portion 17 forms an annular gap 17d between the upper tray portion 17 and the top cover 15. Each raw material gas generation space SP is connected to the central flow passage 18 through these gaps 17d. Meanwhile, the upper end of the outer wall portion 17c of the topmost stage formed in a cylindrical shape is connected to the lower surface of the top cover 15. That is, each tray portion 17 is provided so as to be suspended from the top cover 15 through the outer wall portion 17c. The outer wall portion 17c surrounding the uppermost tray portion 17 is disposed on the inside of the outer wall portion 17c of the region below it. A plurality of carrier gas inlet holes 17e penetrating from the inside to the outside are formed in the region of the outer wall portion 17c corresponding to each raw material gas generation space SP. The plurality of carrier gas inlet holes 17e are uniformly formed in the annular outer wall portion 17c at the same angular intervals, for example, at intervals of 30°C.

[0047] As described above, the raw material placement section 16 is disposed so that its bottom 17a, which is its lower surface, contacts the bottom 14a of the main body section 14. In addition, a cylindrical carrier gas flow path 19 is formed between the outer surface of the cylindrical outer wall section 17c and the inner surface of the main body section 14. The upper end of the carrier gas flow path 19 communicates with the carrier gas supply port 15b. The radial width of the carrier gas flow path 19 is configured to be larger at the outer wall section 17c of the uppermost tray section 17, which is its upper end, than the region below it.

[0048] As described above, the raw material container 11 is provided with a plurality of heaters 12, each of which includes a bottom heater 12a attached to the bottom 14a, a side heater 12b attached to the side 14b, and an upper heater 12c attached to the top lid 15. Each of the heaters 12a to 12c is supplied with power from power supply units 21a to 21c, which will be described later. The bottom heater 12a is, for example, a linear resistance heating element, and is embedded in the bottom 14a along the radial direction.

[0049] The side heater 12b and the upper heater 12c are composed of, for example, a sheet-shaped resistance heating element. The side heater 12b is arranged so as to cover the entire outer surface of the side portion 14b, and the upper heater 12c is arranged so as to cover the entire upper surface of the upper lid 15. A joint constituting the upstream end of the gas supply path 59 is airtightly attached to the center side of the upper lid 15, and the gas supply path 59 is connected to the central flow path 18 via the raw material gas discharge port 15a. A joint constituting the downstream end of the introduction path 13b is airtightly attached to the side end side of the upper lid 15, and the introduction path 13b is connected to the carrier gas flow path 19 via the carrier gas supply port 15b. The upper heater 12c has openings corresponding to the raw material gas discharge port 15a and the carrier gas supply port 15b.

[0050] These heaters 12 (12a-12c) heat the source container 11 to heat the solid source S contained in the source container 11 to a preset temperature, thereby sublimating it and generating DCR gas. In this way, to indirectly control the temperature of the solid source S, power supply units 21a-21c that supply power are connected to the heaters 12a-12c, and temperature sensors TCa, TCb, and TCc as shown in Fig. 7 are provided corresponding to the heaters 12a-12c of the source container 11. The temperature sensors TCa, TCb, and TCc are attached to measure the temperatures of the bottom 14a, side 14b, and top lid 15, respectively.

[0051] The power supply units 21a, 21b, and 21c are configured to supply adjusted power to the heaters 12a, 12b, and 12c, respectively. The power supply units 21a to 21c and the temperature sensors TCa to TCc are connected to the control unit 200 described above. The control unit 200 operates the power supply units 21a to 21c to adjust the temperatures of the bottom portion 14a, the side portion 14b, and the top cover 15 to their respective set temperatures. The control unit 200 also performs various controls in the raw material gas supplying process. The control unit 200 also operates the flow rate control unit 13c to supply a predetermined flow rate of CO gas.

[0052] The raw material gas supply source 10 having the configuration described above corresponds to the "apparatus for supplying raw material gas" in this embodiment, and the Ru film formation processing module 104 having the raw material gas supply source 10 corresponds to the "apparatus for forming a film on a substrate" in this embodiment.

[0053] Before describing the source gas supply method of the present disclosure, a comparative source gas supply method employing general feedback control will be described below for comparison with the source gas supply method of the present disclosure.

[0054] The source gas supplying process of the comparative embodiment will be described with reference to Figs. 4 to 6. Fig. 4 is a block diagram showing a source gas supplying source in the comparative embodiment, with the branched downstream end of the supply path 13b partially omitted. Fig. 5 is a graph showing the change in Ru film formation rate (Ru film thickness formed per unit time) versus the remaining amount of solid source in the source gas supplying process of the comparative embodiment, and Fig. 6 is a graph showing the change in power Wa, Wb, and Wc supplied to each heater 12a, 12b, and 12c versus the remaining amount of solid source in the same process.

[0055] In the comparative raw material gas supply method, the control unit 200 performs feedback control to increase or decrease the power supplied from the power supply units 21a to 21c to each heater 12 so that the temperatures of the bottom 14a, the side 14b, and the top lid 15 approach their respective set temperatures based on the measurements of the temperature sensors TCa, TCb, and TCc. In this raw material gas supply method, the solid raw material S is heated through the raw material container 11 (bottom 14a, side 14b, and top lid 15) to sublimate the solid raw material S and generate DCR gas. The set temperatures of the bottom 14a, side 14b, and top lid 15 are set by preliminary experiments or the like so that the Ru film formation rate is constant under a condition of a predetermined CO gas supply flow rate.

[0056] However, it was found that when the source gas is supplied under the above-mentioned conditions while performing feedback control, the deposition rate of the Ru film may decrease as the film formation process progresses and the remaining amount of the solid source S in the source container 11 decreases, as shown in Fig. 5. When the power supplied to each of the heaters 12a to 12c was checked as the deposition rate of the Ru film decreases, it was found that the supplied power also tends to decrease in accordance with the decrease in the deposition rate of the Ru film, even though the temperature setting value was not changed.

[0057] The reason why the above-mentioned phenomenon occurs is presumed to be that the total heat capacity of the source container 11 and the solid source S decreases as the solid source S sublimes and the remaining amount decreases. Therefore, the amount of heat required to maintain the temperatures of the bottom 14a, side 14b, and top lid 15 of the source container 11 at the above-mentioned temperature setting value also decreases, and the power supplied to each heater 12a to 12c also decreases. However, when the power supplied to each heater 12a to 12c decreases, even if the temperatures of the bottom 14a, side 14b, and top lid 15 are maintained at the temperature setting value, it is considered that the temperature drop on the surface of the solid source S held in the tray unit 17 is greater than the detection value of the temperature sensors TCa, TCb, and TCc. As a result, the DCR gas concentration decreases due to the decrease in the amount of sublimation from the solid source S, which is considered to cause a decrease in the film formation rate. In consideration of these phenomena, in the source gas supply method of the present disclosure, the film formation rate is adjusted by upwardly correcting the supply power to each heater 12, which decreases with the decrease in the remaining amount of source gas.

[0058] Hereinafter, the operation of the raw material gas supplying process of the present disclosure will be described in detail with reference to Figs. 7 to 10. Fig. 7 is a block diagram showing the raw material gas supply source of the present disclosure. Fig. 8 is an operation diagram of the raw material gas supplying process of the present disclosure. In Fig. 8, the flow of CO gas is indicated by a solid line, and the flow of the raw material gas, which is a mixed gas of CO gas and DCR gas produced by sublimation of the solid raw material S, is indicated by a dashed line. Figs. 7 and 8 omit the illustration of the branched downstream end of the supply path 13b. Figs. 9A to 9C are graphs showing the change in power of each heater with respect to the remaining amount of the solid raw material in the same process, and Fig. 10 is a graph showing the change in Ru film formation rate with respect to the remaining amount of the solid raw material in the same process.

[0059] When the source gas supply process is performed, a power supply recipe for each heater 12 in the source gas supply process is created by a preliminary test. Specifically, a power supply recipe for the heater 12 required to maintain the film formation rate R1 at each remaining amount is created in accordance with the change in the remaining amount of the solid source material S. For example, at the start of Ru film formation when the supply of the source gas to the wafer W is started, the source material container 11 initially contains, for example, an initial remaining amount M1=2500 [g] of the solid source material S. The pressure in the source material container 11 and the supply amount of CO gas per unit time may be constant values ​​or may be changed according to the change in the remaining amount of the solid source material S. For example, the pressure may be about 40 [mTorr] to 150 [mTorr]. On the other hand, the source material container 11 is not set to a fixed set temperature, but is left to change according to the supply power. Therefore, the temperature sensors TCa, TCb, and TCc are used to monitor the temperatures of the bottom 14a, the side 14b, and the top cover 15. The target deposition rate R1 may also be referred to as the set deposition rate R1.

[0060] 7, for example, after the wafer W is loaded into the processing vessel 41, the supply of power to the heater 12 is started, the valves V1 and V4 are closed, and the valves V2, V3, and V6 are opened. The flow rate control unit 13c of the carrier gas supply unit 13 starts supplying CO gas heated to a predetermined temperature (e.g., 80° C.) at a preset flow rate. Next, the vacuum exhaust unit 44 performs a vacuum exhaust operation, and causes the carrier gas to flow, for example, into the source vessel 11 through the gas supply path 59. Then, the heaters 12a to 12c are supplied with power adjusted by the power supply units 21a to 21c, and the source vessel 11 and the solid source S are heated.

[0061] Then, when the temperature of the source container 11 becomes constant, the valve V6 is closed while the valve V1 is opened to start supplying the source gas from the source gas supply source 10 to the processing container 41. The carrier gas supply unit 13 continues to supply gas into the source container 11 at a constant flow rate during the Ru film formation process, that is, from when the valve V1 is opened until it is closed. During the Ru film formation process, the source container 11, the gas supply path 59, the exhaust path 60, and the processing container 41 are constantly heated by the heating unit described above so that the temperatures are kept constant at the above-mentioned predetermined temperatures, at least to prevent the source gas from re-solidifying.

[0062] The process of generating the raw material gas will be described below. As shown by the solid line in FIG. 8, first, the CO gas supplied from the introduction passage 13b flows into the carrier gas flow passage 19 through the carrier gas supply port 15b. The cylindrical carrier gas flow passage 19 has a narrower radial width in a region below the upper end. Therefore, the CO gas that flows into the upper end is prevented from moving straight downward and flows in the circumferential direction, and flows downward from the entire circumference of the upper end. Then, the CO gas flowing downward around the entire circumference of the carrier gas flow passage 19 flows into a plurality of carrier gas inlet holes 17e that open on the outer surface of the raw material placement part 16.

[0063] The CO gas flowing into each carrier gas inlet 17e is supplied from all directions at intervals of 30°C to the raw material gas generation space SP of each tray section 17 arranged vertically. The CO gas is then diffused toward the center and circumferential directions in the radial direction in the raw material gas generation space SP, and flows over the solid raw material S arranged in an annular manner. As a result, the DCR gas and CO gas obtained by sublimation of the solid raw material S heated in the raw material container 11 are mixed in the raw material gas generation space SP, and a raw material gas with a uniform concentration is obtained. The "DCR gas" corresponds to the "raw material in the raw material gas" in the claims.

[0064] The generated source gas flows toward each gap 17d in each annular source gas generation space SP, and flows from each gap 17d into the central flow passage 18. The DCR gas that flows into the central flow passage 18 flows upward through the central flow passage 18 and flows through the source gas outlet 15a through the gas supply path 59 toward the shower head 50. The CO gas that flows into the shower head 50 is discharged into the processing vessel 41 so as to be uniform on the surface of the wafer W. Then, a Ru film is formed on the wafer W uniformly on the surface at approximately the set film formation rate R1. From this point of view, the processing vessel 41 of the Ru film formation processing module 104 corresponds to the consumption area of ​​the source gas in this embodiment. In this disclosure, in order to form a Ru film by maintaining this set film formation rate R1 even if the solid source material is reduced, the supply power to each heater 12, which decreases with the decrease in the remaining amount of the solid source material, is controlled so as to supply a constant amount of source gas.

[0065] In the above-mentioned preliminary test, first, when the solid source material S is stored in an initial remaining amount M1, power capable of realizing the set film formation rate R1 is supplied to each heater 12. As described with reference to FIG. 5 and FIG. 6, the powers Wa1, Wb1, and Wc1 supplied to each heater 12a, 12b, and 12c capable of realizing the set film formation rate R1 in the initial remaining amount M1 state are previously grasped. Then, if film formation on the wafer W in the preliminary test is continued in this order, the film formation rate R changes. For example, if film formation is continued without changing the powers Wa1, Wb1, and Wc1 supplied to each heater 12, the film formation rate R becomes larger than the set film formation rate R1.

[0066] Therefore, film formation is performed while successively decreasing the power supplied to each heater 12, and the powers Wa2, Wb2, and Wc2 supplied to each heater 12 that provide the set film formation rate R1 at the current time are identified. After the supplied powers Wa2, Wb2, and Wc2 are identified, the remaining amount M2 of the solid source material S at that time is measured. After that, by repeating the above-mentioned operation, a correspondence relationship between the remaining amount M of the solid source material S in the source material container 11 and the powers Wa', Wb', and Wc' supplied to each heater 12 to achieve the set film formation rate R1 is obtained, as shown in Figures 9A to 9C.

[0067] 9A to 9C, the changes in the supply powers Wa, Wb, and Wc in the comparative example described with reference to Fig. 6 are shown by dashed lines. Comparing the supply powers shown by the dashed lines (comparative example) and the solid lines (present disclosure) in these figures, it can be said that an offset correction is performed to increase the supply power to each heater 12 in response to a decrease in the solid source material S in the source container 11.

[0068] On the other hand, in an actual film formation process, there are cases where the remaining amount M of the solid source material S cannot be measured over time. However, if the set film formation rate R1 is constantly maintained, the consumption rate of the solid source material S and the concentration of the DCR gas in the source gas are constant. Then, if the cumulative supply amount X[L (standard condition)] of the carrier gas supplied from the flow rate control unit 13c of the carrier gas supply unit 13 to the source container 11 is grasped, the consumption amount N of the solid source material S can be known. Then, if the consumption amount N is subtracted from the initial remaining amount M1 of the solid source material S, the remaining amount M at that time can be known. Therefore, the correspondence relationship between the remaining amount M of the solid source material S and the power Wa', Wb', and Wc' supplied to each heater 12 in Figures 9A to 9C can be rewritten as a correspondence relationship with the cumulative supply amount X of the carrier gas.

[0069] 9A to 9C and the supply powers Wa', Wb', and Wc' to each heater 12 are stored as a table in the memory unit 201 of the control unit 200. Based on the cumulative supply amount X of the carrier gas that increases with the deposition of the wafer W, the supply powers Wa', Wb', and Wc' corresponding to the cumulative supply amount X are supplied to each heater 12.

[0070] The operation of the substrate processing system 1, which performs a series of processes including the above-described raw material gas supply process, will be described with reference to Figures 1 and 2. Before starting a series of processes in the substrate processing system 1, a plurality of recesses are formed on the surface of the wafer W for forming a wiring layer in a previously performed etching process. The recesses are provided so as to reach, for example, a Si (silicon) layer, and a silicon oxide film is formed at the bottom of the recesses by natural oxidation of the Si layer due to contact with the air atmosphere when the wafer W is transported.

[0071] When the vacuum transfer mechanism 69 in the first vacuum transfer module 63 receives the wafer W from the load lock module 62 shown in FIG.

[0072] In the COR processing module 101, the pressure inside the processing vessel is adjusted in advance by the vacuum exhaust unit so that a vacuum atmosphere is created inside the processing vessel. The gate valve G1 of the COR processing module 101 is opened, and the wafer W is introduced into the processing vessel from the entrance by the vacuum transfer mechanism 69. The wafer W is then transferred to the substrate mounting table, and the vacuum transfer mechanism 69 is moved out of the processing vessel and the gate valve G1 is closed. The pressure and temperature inside the processing vessel are adjusted according to the recipe settings for the COR process. Next, a mixed gas of HF gas and NH3 gas for the COR process is supplied to the processing vessel 41. This alters the silicon oxide film and forms a reaction product.

[0073] When the COR process is completed, the wafer W on which the reaction products have been formed is unloaded from the COR process module 101 in the reverse order of the loading procedure. The wafer W is then transported to the PHT process module 102. Thereafter, the wafer W is loaded into the PHT process module 102 in the same order as the loading procedure into the COR process module 101, and the PHT process is performed. The pressure and temperature in the process chamber are adjusted according to the recipe for the PHT process, and an inert gas is supplied to heat-treat the wafer W. The reaction products of the heat-treated wafer W are sublimated, the silicon oxide film is removed, and the unoxidized Si layer is exposed at the bottom of the recess.

[0074] After the PHT process is completed, the wafer W from which the silicon oxide film has been removed is carried out from the PHT process module 102 and similarly carried into the TiN film forming process module 103, where the TiN film forming process is performed. The pressure and temperature in the process vessel are adjusted according to the recipe for the TiN film forming process, and the source gas and the reactive gas are alternately supplied to form the TiN film in the recess. When the wafer W is transferred from the PHT process module 102 to the TiN film forming process module 103, it is transferred via the first vacuum transfer module 63, which is a transfer path in a vacuum atmosphere, so that the wafer W is not exposed to the atmosphere. Therefore, it is possible to prevent the surface of the Si layer exposed in the recess from being re-oxidized by the atmosphere.

[0075] After the TiN film formation process is completed, the wafer W with the TiN film formed in the recess is transferred out of the TiN film formation module 103 and similarly transferred into the Ru film formation module 104. When the wafer W is transferred from the TiN film formation module 103 to the Ru film formation module 104, it is transferred via the first vacuum transfer module 63, the second vacuum transfer module 64, and the connection module 65, which are transfer paths in a vacuum atmosphere, so that the wafer W with the TiN film formed thereon can be transferred without being exposed to the air atmosphere.

[0076] A Ru film formation process is performed on the wafer W loaded into the Ru film formation module 104. In the Ru film formation module 104 before the wafer W is loaded, N2 gas is directly supplied from an N2 gas supply unit (not shown) into the processing vessel 41 with the valve V1 closed, and the aperture of the APC valve provided in the vacuum exhaust path 43 is adjusted based on the measurement result from the pressure measurement unit P2. This creates a vacuum atmosphere in the processing vessel 41 with a predetermined pressure (e.g., 7 to 10 Torr).

[0077] In this state, the gate valve G1 provided at the transfer port of the wafer W of the processing vessel 41 is opened, and the vacuum transfer mechanism 69 holding the wafer W is inserted into the processing vessel 41 from the second vacuum transfer module 64 through the transfer port. Then, the wafer W is transferred to above the substrate mounting table 42 located at the standby position described above. Next, the wafer W is transferred onto the raised support pins (not shown), and thereafter, the vacuum transfer mechanism 69 is removed from the processing vessel 41, and the gate valve G1 is closed. At the same time, the support pins are lowered, and the wafer W is mounted on the substrate mounting table 42.

[0078] Next, the wafer W is heated to a predetermined temperature (e.g., 120 to 250° C.) by a heater provided on the substrate mounting table 42. When the temperature of the wafer W reaches the predetermined temperature, the aperture of the APC valve of the vacuum exhaust path 43 is adjusted, and the inside of the processing vessel 41 is depressurized to a predetermined pressure (e.g., 5 mTorr to 100 mTorr). When the depressurization of the inside of the processing vessel 41 is completed, a source gas supply step is performed by the source gas supply source 10 so that the gas supply mechanism 58 starts supplying the source gas into the processing vessel 41.

[0079] Meanwhile, the control unit 200 sequentially processes the wafers W over a period from when the use of the source container 11 containing the solid source material S of the initial remaining amount M1, which is a specified amount, is started until the remaining amount of the solid source material S reaches a preset lower limit value. As a result, the integrated supply amount X of the carrier gas supplied to the source container 11 is grasped (process of calculating the integrated supply amount). Based on the correspondence relationship shown in FIG. 9A to FIG. 9C, the supply powers Wa', Wb', and Wc' corresponding to the integrated supply amount X of the carrier gas at the current time are supplied to each heater 12. As a result, the solid source material S heated in the source container 11 is sublimated (process of sublimating the solid source material), and the DCR gas obtained by the sublimation, which is the source material, and the CO gas, which is the carrier gas, are mixed and flow out of the source container 11 as a source gas (process of supplying as source gas). At the same time, when the valve V1 on the gas supply path 59 side is opened and the opening degree of the valve V2 is adjusted, the raw material gas is supplied into the processing vessel 41 via the shower head 50, and formation of a Ru film on the wafer W by CVD (Chemical Vapor Deposition) is initiated.

[0080] As described above, the powers Wa', Wb', and Wc' supplied to each heater 12 are adjusted to a value that can maintain the set film formation rate R1 even if the remaining amount of the solid source material S in the source material container 11 changes. Therefore, a source gas with a uniform concentration of DCR gas is supplied to each wafer W that is sequentially subjected to film formation processing in the Ru film formation processing module 104, and a Ru film can be stably formed between surfaces under the condition of the set film formation rate R1. Even during the film formation processing of each wafer W, the powers Wa', Wb', and Wc' supplied to each heater 12 may be adjusted as needed according to an increase in the cumulative supply amount X of the carrier gas. In addition, the powers Wa', Wb', and Wc' supplied to each heater 12 may be set based on the cumulative supply amount X of the carrier gas up to that point before film formation of the next wafer W is started, and the supply power may be intermittently adjusted by fixing the supply power during the processing period of the wafer W.

[0081] When the Ru film formation is completed, the valve V1 is closed, and the wafer W is transferred out of the processing vessel 41, transferred into the load lock module 62, and returned to the transfer vessel C via the loader module 61 in the reverse order to the above.

[0082] As described above, according to the present disclosure, the source gas can be supplied so as to obtain a desired film formation rate. That is, the power supplied to each heater 12 is grasped by a preliminary experiment or the like so that the set film formation rate R1 is maintained even if the remaining amount M of the solid source S in the source container 11 changes. Then, the above supply power is associated with the integrated supply amount X of the carrier gas, which is an index for estimating the remaining amount M of the solid source S in the source container 11. Then, during the film formation process on the wafer W, power is supplied to each heater 12a to 12c based on this correspondence. This reduces the influence of the change in heat capacity caused by the change in the remaining amount M of the solid source S, and stable film formation at the set film formation rate R1 can be realized. In addition, by adjusting the supply power using the correspondence of the present disclosure, the source gas can be continuously supplied while controlling the remaining amount of the solid source S to the set film formation rate R1 (specifically, within an allowable range including the set film formation rate R1) until the remaining amount of the solid source S is about zero. Therefore, the replacement period of the solid source S for refilling and replacing the solid source S can be extended.

[0083] In this operation, in the present disclosure, the carrier gas is continuously supplied at a constant flow rate, but this is not a necessary requirement. For example, the carrier gas may be supplied intermittently during the film formation process, such as in ALD (Atomic Layer Deposition), or the flow rate of the carrier gas may be changed during the film formation process. Even in this case, the integrated supply amount can be appropriately grasped by the flow rate control unit 13c of the carrier gas supply unit 13 or a flow rate meter newly provided in the introduction path 13b, for example. However, when the flow rate of the carrier gas is changed, in order to avoid a change in the concentration of the DCR gas in the raw material gas, the correspondence shown in Figures 9A to 9C needs to be changed according to the carrier gas flow rate, as described later.

[0084] In this operation, the integrated supply amount referred to when supplying the power is not necessarily measured during the raw material gas supplying process as disclosed herein. For example, when the supply amount of the carrier gas is preset, such as a constant amount per unit time, as disclosed herein, the integrated supply amount can be predicted in advance without being acquired successively during the raw material gas supplying process. Therefore, the power supplied to each heater 12 may be adjusted based on, for example, a predicted integrated supply amount without measuring the integrated supply amount of the carrier gas.

[0085] In addition, when the same film formation process is repeatedly performed on a large number of wafers W, power adjustment is possible in the same way without prior prediction or measuring and grasping the cumulative supply amount of carrier gas for each wafer W. Specifically, even if the cumulative supply amount is not grasped for each wafer W, power may be supplied in the same way as for the wafer W on which a film was formed before. In addition, it is not essential to measure the cumulative supply amount and adjust the supply power periodically at regular intervals as in the present disclosure, and the measurement may be performed intermittently, or in the case of a carrier gas supply pattern in which the supply is repeatedly interrupted, the measurement may be performed at the end of the previous carrier gas supply. And, it is not essential that the measurement and adjustment of the supply power are performed in one-to-one correspondence as in the present disclosure, and the measurement or adjustment of the supply power may be performed frequently.

[0086] The correspondence relationship between the integrated supply flow rate of the carrier gas and the supply power changes, for example, if the supply flow rate per unit time of the carrier gas changes. Therefore, when the supply flow rate of the carrier gas is changed, a correspondence relationship corresponding to each supply flow rate is acquired. Then, it is preferable to store a plurality of correspondence relationships (tables) acquired for the plurality of different flow rates in the memory unit 201 of the control unit 200. As a result, when the flow rate of the carrier gas is changed, the control unit 200 can switch the correspondence relationship used to adjust the supply power to the heater 12 and execute an appropriate supply power.

[0087] The correspondence relationship may be obtained for various conditions related to, for example, the initial remaining amount M1 of the solid source material S, the form of the solid source material S, the type of carrier gas, the set deposition rate R1, the recipe, and other set values. For example, taking the set deposition rate R1 as an example, if the correspondence relationship of different set deposition rates Rx (x=1, 2, 3, ...) is obtained, the deposition rate can be appropriately adjusted in the deposition process. If multiple different correspondence relationships can be obtained, these correspondence relationships can be appropriately interpolated and used by, for example, interpolating or extrapolating them using numerical processing.

[0088] In the above embodiment, the adjustment of the supply power is performed based on the relationship between the integrated supply amount of the carrier gas and the power supplied to the heater 12, using the integrated supply amount as an index value indicating the remaining amount of the solid raw material S, but examples of the index value are not limited to this. For example, the weight of the raw material container 11 containing the solid raw material S may be used as the index value indicating the remaining amount of the solid raw material S. In this case, the supply power is adjusted based on the previously obtained relationship between the weight of the raw material container 11 containing the solid raw material S and the supply power.

[0089] The actual deposition rate adjusted to the set deposition rate R1 by the above-mentioned adjustment of the supply power is not necessarily limited to being controlled to a constant value, but may be controlled within an allowable range, for example, to the extent that the film thickness after the deposition process is within a management value. The adjustment of the supply power is preferably adjusted within a range of, for example, ±10% of the supply power Wa'-Wc' according to the corresponding relationship. The adjustment of the supply power is not limited to continuously changing the value of the power as shown in Figs. 9A-9C, but may be changed in a stepwise manner at a constant value. The adjustment of the supply power may be adjusted by appropriately turning on and off the power supply, so that the amount of heat is changed in the same way as the value of the power is changed and supplied to the source material container 11.

[0090] The adjustment of the supply power using the above-mentioned correspondence is preferably performed for all the heaters 12a to 12c as in the present disclosure, but may not be performed for some of the heaters 12, such as the upper heater 12c. The heaters 12 do not have to be provided at the bottom 14a, the side 14b, and the top lid 15 as in the present disclosure, and for example, one heater 12 may be provided at the lower side of the raw material container 11. The temperature sensors TCa to TCc do not have to be provided corresponding to each heater 12, and for example, a temperature sensor may be provided corresponding to any one of the heaters 12 to monitor the temperature of the raw material container 11. In addition, in the adjustment of the supply power, the inside of the raw material container 11 is depressurized by the vacuum exhaust unit 44 via the exhaust path 60, but the depressurization is not essential and may be positive pressure, for example.

[0091] The source gas is not limited to a mixed gas of DCR gas and CO gas, but may be a mixed gas of a gas containing a source of a film to be formed on the wafer W and a carrier gas selected according to the gas. Specifically, the gas produced by sublimation of a solid source may be AlCl3 (aluminum chloride) gas containing a source of an AlN (aluminum nitride) film, or WCl5 (tungsten chloride) gas containing a source of a W (tungsten) film, and in this case, the reactive gas is supplied to the processing vessel 41. The carrier gas may be an inert gas such as N2 gas other than CO gas.

[0092] It should be noted that the embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The above-described embodiments may be omitted, substituted, modified, and combined in various forms without departing from the scope and spirit of the appended claims. [Explanation of symbols]

[0093] S solid raw material W wafer Wa' Power supply amount Wb' Power supply amount Wc' Power supply amount X Total supply 11 Raw material container 12 Heater 41 Processing vessel

Claims

1. 1. A method for supplying a source gas, comprising: supplying electric power to a heater provided in a source container accommodating a solid source material, and heating the inside of the source container to sublimate the solid source material; supplying a carrier gas into the source container heated by the heater, mixing the carrier gas with the sublimated source, and supplying the mixture as a source gas to a consumption area in which a substrate is disposed; determining an index value corresponding to the remaining amount of the solid raw material; a step of supplying to the heater, when performing the step of sublimating the solid raw material, power corresponding to the index value at the time of the step being performed, based on a correspondence relationship between the preset index value and the power supplied to the heater.

2. The method according to claim 1 , wherein the index value is an integrated supply amount obtained by integrating the supply amount of the carrier gas supplied into the source material container.

3. 3. The method according to claim 2, wherein the step of calculating the integrated supply amount includes integrating the supply amount of the carrier gas over a period from a start of use of a source container containing a specified amount of the solid source until a remaining amount of the solid source reaches a preset lower limit value.

4. The method according to claim 2, wherein the correspondence between the cumulative supply amount of the carrier gas and the power supplied to the heater is set so that the supply amount per unit time of the raw material in the raw material gas supplied to the consumption area is a preset value.

5. 2. The method according to claim 1, wherein the raw material container has a plurality of stages of raw material holding trays spaced apart from each other in the vertical direction, the solid raw material is held on each of the raw material holding trays, and the carrier gas supplied into the raw material container passes over these raw material holding trays to be mixed with the sublimated raw material.

6. 2. The method according to claim 1, wherein the heater is provided at a plurality of positions different from each other in the source container, and a correspondence between the index value and the power supplied to the heater is set for each of the heaters.

7. In an apparatus for supplying a raw material gas, a raw material container that contains a solid raw material and is equipped with a heater for heating the solid raw material; a power supply for supplying power to the heater; a carrier gas introduction passage for supplying a carrier gas to the raw material container; an index value calculation unit for calculating an index value having a corresponding relationship with the remaining amount of the solid raw material; a source gas flow path for supplying the source gas obtained in the source container to a consumption area in which a substrate is disposed; A control unit, The control unit is configured to output control signals to execute the following processing steps: a processing step of supplying power to the heater and heating the inside of the raw material container to sublimate the solid raw material; a processing step of supplying the carrier gas into the raw material container heated by the heater, mixing the carrier gas with the sublimated raw material, and supplying the carrier gas to the consumption area as a raw material gas; and a processing step of calculating the index value. When performing the processing step of sublimating the solid raw material, the control unit supplies to the heater power corresponding to the index value at the time of performing the processing step based on a correspondence between the preset index value and the power supplied to the heater.

8. The apparatus according to claim 7 , wherein the index value calculation unit is a supply amount integrating unit that obtains, as the index value, an integrated supply amount by integrating the supply amount of the carrier gas supplied from the carrier gas supply unit.

9. 9. The apparatus according to claim 8, wherein in the processing step of calculating the integrated supply amount, the supply amount of the carrier gas is integrated over a period from a start of use of a source container containing a specified amount of the solid source until a remaining amount of the solid source reaches a preset lower limit value.

10. The apparatus of claim 8, wherein the correspondence between the cumulative supply amount of the carrier gas and the power supplied to the heater is set so that the supply amount per unit time of the raw material in the raw material gas supplied to the consumption area is a preset value.

11. 8. The apparatus according to claim 7, wherein the source container has a plurality of stages of source material holding trays spaced apart from each other in the vertical direction, the solid source material is held on each of the source material holding trays, and the carrier gas supplied into the source container passes over these source material holding trays to be mixed with the sublimated source material.

12. 8. The apparatus according to claim 7, wherein the heater is provided at a plurality of positions different from each other in the source container, and a corresponding relationship between the index value and the power supplied to the heater is set for each of the heaters.

13. An apparatus for forming a film on a substrate, comprising: A source gas supply device according to any one of claims 7 to 12, a processing vessel that is the consumption area and has a mounting stage for placing the substrate; Equipped with The control unit is configured to place the substrate on the mounting table and output a control signal for executing a processing step of forming a film on the substrate using the source gas supplied from the source gas supply device to the processing vessel.