Fine bubble generation device

The microbubble generator stabilizes microbubble production by alternating gas introduction operations, addressing the instability issue in existing systems by maintaining continuous fine bubble generation.

JP2024167954APending Publication Date: 2024-12-05RINNAI CORP
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023084296
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-23
Publication Date
2024-12-05

AI Technical Summary

Technical Problem

Existing fine bubble generators require alternating gas introduction and bubble generation operations, leading to instability in microbubble production due to gas consumption during introduction, causing microbubbles to disappear during non-generation phases.

Method used

A microbubble generator with a control device that alternates first and second gas introduction operations through on-off valves, allowing continuous microbubble generation by managing liquid and gas flow to maintain stable bubble production.

Benefits of technology

Stable generation of microbubbles is achieved by alternating gas introduction operations, ensuring continuous fine bubble production without interruption, even during gas supply, thus maintaining consistent bubble generation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024167954000001_ABST
    Figure 2024167954000001_ABST
Patent Text Reader

Abstract

To provide technique capable of continuously and stably generating fine bubbles in the liquid in a liquid tank.SOLUTION: A control device of a fine bubble generation device can execute fine bubble generating operation in which a pressure pump is driven to pressurize and supply liquid from a tank supply path to a tank, and also supply liquid in which gas is pressurized and dissolved from the tank to a liquid tank through a tank discharge path. The control device can execute gas introducing operation to carry out first gas introducing operation and second gas introducing operation alternately during the execution of the fine bubble generating operation. The control device is configured to discharge the liquid from a gas / liquid replacement path to introduce gas into the gas / liquid replacement path with a first on-off valve closed and a second on-off valve open in the first gas introducing operation. The control device is configured to discharge the liquid into the gas / liquid replacement path from the tank to introduce the gas into the tank from the gas / liquid replacement path with the first on-off valve open and the second on-off valve closed in the second gas introducing operation.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The technology disclosed in this specification relates to a microbubble generating device. [Background technology]

[0002] Patent Document 1 discloses a fine-bubble generating device including a tank for pressurizing and dissolving a gas in a liquid, a tank supply path for supplying the liquid to the tank, a pressure pump provided in the tank supply path, a tank discharge path for discharging the liquid in which the gas is pressurized and dissolved from the tank to a liquid tank, a fine-bubble generating nozzle provided in the tank discharge path for reducing the pressure of the liquid in which the gas is pressurized and dissolved to generate fine bubbles, a gas supply path for supplying the gas to the tank, an on-off valve provided in the gas supply path, and a control device. The control device alternately performs a gas introduction operation for introducing the gas into the tank by supplying the liquid from the tank to the liquid tank with the on-off valve open, and a fine-bubble generating operation for driving the pressure pump to pressurize and supply the liquid from the tank supply path to the tank and supply the liquid in which the gas is pressurized and dissolved from the tank to the liquid tank via the tank discharge path with the on-off valve closed. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2009-18118 A Summary of the Invention [Problem to be solved by the invention]

[0004] In the micro-bubble generator of Patent Document 1, the gas introduction operation and the micro-bubble generation operation cannot be performed simultaneously, and the gas introduction operation supplies gas to the tank, and the micro-bubble generation operation consumes gas from the tank, so the gas introduction operation and the micro-bubble generation operation must be performed alternately. However, since micro-bubbles cannot be generated in the liquid supplied from the tank to the liquid vat during the gas introduction operation, the micro-bubbles generated in the liquid in the liquid vat during the micro-bubble generation operation disappear during the gas introduction operation, making it difficult to stably generate micro-bubbles in the liquid in the liquid vat. This specification provides a technology that can stably generate micro-bubbles in the liquid in the liquid vat. [Means for solving the problem]

[0005] In a first aspect of the present technology, a fine-bubble generating device may include a tank for pressurizing and dissolving a gas in a liquid, a tank supply path for supplying the liquid to the tank, a pressure pump provided in the tank supply path, a tank discharge path for discharging the liquid in which the gas is pressurized and dissolved from the tank to a liquid tank, a fine-bubble generating nozzle provided in the tank discharge path for reducing the pressure of the liquid in which the gas is pressurized and dissolved to generate fine bubbles, a gas-liquid exchange path for discharging the liquid from the tank and supplying the gas to the tank, a first on-off valve provided in the gas-liquid exchange path, a second on-off valve provided in the gas-liquid exchange path at a position farther from the tank than the first on-off valve, and a control device. The control device may be capable of performing a fine-bubble generating operation in which the pressurizing pump is driven to pressurize and supply the liquid from the tank supply path to the tank, and the liquid in which the gas is pressurized and dissolved from the tank to the liquid tank via the tank discharge path. The control device may be capable of performing a gas introduction operation in which a first gas introduction operation and a second gas introduction operation are alternately performed during the fine bubble generating operation. The control device may be configured to, in the first gas introduction operation, discharge the liquid from the gas-liquid exchange path and introduce the gas into the gas-liquid exchange path with the first on-off valve closed and the second on-off valve open. The control device may be configured to, in the second gas introduction operation, discharge the liquid from the tank to the gas-liquid exchange path and introduce the gas from the gas-liquid exchange path into the tank with the first on-off valve open and the second on-off valve closed.

[0006] In the above-mentioned fine-bubble generator, the gas introduction operation is performed during the fine-bubble generation operation, and the first gas introduction operation and the second gas introduction operation are alternately performed to supply gas to the tank. Therefore, it is not necessary to interrupt the fine-bubble generation operation to supply gas to the tank, and the fine-bubble generation operation can be performed continuously. With this configuration, fine bubbles can be stably generated continuously in the liquid in the liquid tank.

[0007] In a second aspect, the fine-bubble generating device in the first aspect may further include a first liquid level sensor for detecting whether the liquid level in the tank is equal to or higher than a first liquid level. The liquid level at the point where the gas-liquid exchange path is connected to the tank may be lower than the first liquid level. The control device may be configured to start the gas introduction operation when the liquid level in the tank becomes equal to or higher than the first liquid level from below the first liquid level while the fine-bubble generating operation is being performed and the gas introduction operation is not being performed.

[0008] When the fine bubble generating operation is being performed and the gas introduction operation is not being performed, the amount of gas in the tank decreases, so the liquid level in the tank rises. On the other hand, when the fine bubble generating operation is being performed and the gas introduction operation is being performed, the amount of gas in the tank increases, so the liquid level in the tank drops. With the above configuration, it is possible to prevent the liquid level in the tank from excessively rising above the first liquid level while the fine bubble generating operation is being performed.

[0009] In a third aspect, in the second aspect described above, the control device may be configured to stop the gas introduction operation when, while performing the fine bubble generation operation and the gas introduction operation, the liquid level in the tank falls from above the first liquid level to below the first liquid level and this state of the liquid level in the tank being below the first liquid level continues for a first predetermined time.

[0010] According to the above configuration, it is possible to prevent the liquid level in the tank from dropping excessively while the fine bubble generating operation is being performed.

[0011] In a fourth aspect, the fine-bubble generating device in the first aspect may further include a second liquid level sensor for detecting whether the liquid level in the tank is equal to or higher than a second liquid level. The liquid level at the point where the gas-liquid exchange path is connected to the tank may be lower than the second liquid level. The control device may be configured to stop the gas introduction operation when the liquid level in the tank falls from equal to or higher than the second liquid level to less than the second liquid level while the fine-bubble generating operation is being performed and the gas introduction operation is being performed.

[0012] According to the above configuration, it is possible to prevent the liquid level in the tank from dropping below the second liquid level and dropping excessively while the fine bubble generating operation is being performed.

[0013] In a fifth aspect, in the fourth aspect described above, the control device may be configured to start the gas introduction operation when, while the fine bubble generation operation is being performed and the gas introduction operation is not being performed, the liquid level in the tank rises from below the second liquid level to or above the second liquid level, and the state in which the liquid level in the tank is above the second liquid level continues for a second predetermined time.

[0014] According to the above configuration, it is possible to suppress an excessive rise in the liquid level in the tank while the fine bubble generating operation is being performed.

[0015] In a sixth aspect, in the first aspect, the fine-bubble generating device may further include a first liquid level sensor for detecting whether the liquid level in the tank is equal to or higher than a first liquid level, and a second liquid level sensor for detecting whether the liquid level in the tank is equal to or higher than a second liquid level lower than the first liquid level. The liquid level at the point where the gas-liquid exchange path is connected to the tank may be lower than the second liquid level. The control device may be configured to start the gas introduction operation when the liquid level in the tank becomes equal to or higher than the first liquid level from below the first liquid level while the fine-bubble generating operation is being performed and the gas introduction operation is not being performed. The control device may be configured to stop the gas introduction operation when the liquid level in the tank becomes equal to or higher than the second liquid level from the second liquid level while the fine-bubble generating operation is being performed and the gas introduction operation is being performed.

[0016] According to the above configuration, during the execution of the fine bubble generating operation, it is possible to suppress both the liquid level in the tank from excessively rising above the first liquid level and the liquid level in the tank from excessively dropping below the second liquid level. Also, according to the above configuration, it is possible to accurately manage the amount of gas supplied into the tank from the start to the stop of the gas introduction operation.

[0017] In a seventh aspect, in any one of the first to sixth aspects, the fine-bubble generating device may further include a gas introduction unit that is arranged in the gas-liquid exchange path between the first on-off valve and the second on-off valve and configured to introduce the gas into the gas-liquid exchange path.

[0018] According to the above configuration, when the gas introduction operation is being performed, it is possible to more stably discharge liquid from the gas-liquid exchange path and introduce gas into the gas-liquid exchange path. [Brief description of the drawings]

[0019] [Figure 1] FIG. 1 is a diagram showing a schematic configuration of a water heating device 2 of a first embodiment. [Diagram 2]2 is a schematic cross-sectional view of a bathtub adaptor 132 of the hot water heater 2 of the first embodiment. FIG. [Diagram 3] 4 is a flowchart of a process executed by a control device 150 during a water filling operation of the hot water heating device 2 in the first embodiment. [Figure 4] 3 is a diagram illustrating an example of a water flow in the water heating device 2 of the first embodiment. FIG. [Diagram 5] 5 is a diagram showing a schematic diagram of another example of the water flow in the water heating device 2 of the first embodiment. FIG. [Figure 6] 4 is a flowchart of a process executed by a control device 150 during a fine bubble generating operation of the hot water device 2 in the first embodiment. [Figure 7] 6 is a diagram showing a schematic diagram of still another example of the water flow in the water heating device 2 of the first embodiment. FIG. [Figure 8] 6 is a diagram showing a schematic diagram of still another example of the water flow in the water heating device 2 of the first embodiment. FIG. [Figure 9] 4 is a flowchart of a process executed by a control device 150 during an air introduction operation of the hot water device 2 in the first embodiment. [Figure 10] FIG. 11 is a diagram illustrating a schematic configuration of a water heating device 202 according to a second embodiment. [Figure 11] 10 is a flowchart of a process executed by the control device 150 during a fine bubble generating operation of the water heating device 202 of the second embodiment. [Figure 12] FIG. 11 is a diagram illustrating a schematic configuration of a water heating device 302 according to a third embodiment. [Figure 13] 13 is a flowchart of a process executed by the control device 150 during a fine bubble generating operation of the water heating device 302 of the third embodiment. [Figure 14] FIG. 11 is a diagram illustrating a schematic configuration of a water heating device 402 according to a fourth embodiment. [Figure 15] 10 is a flowchart of a process executed by the control device 150 during a fine bubble generating operation of the water heating device 402 of the fourth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0020] Example 1 1, the hot water device 2 of this embodiment includes a heat source unit 10, an air pressurization dissolution unit 50, a bathtub adapter 132, and a control device 150. The hot water device 2 heats water supplied from a water supply source 160 such as a tap, and can supply the water heated to a desired temperature to a faucet 170 installed in a kitchen or the like, or to a bathtub 130 installed in a bathroom. The hot water device 2 can also generate fine air bubbles in the water in the bathtub 130 that a user uses for bathing.

[0021] (Configuration of heat source unit 10) The heat source unit 10 includes a first heat source unit 12, a second heat source unit 14, a water supply passage 16, a hot water outlet passage 18, a bypass passage 20, a bypass servo 22, a hot water inlet passage 24, a hot water filling valve 26, a water volume sensor 28, a forward circulation passage 30, a return circulation passage 32, a bathtub circulation pump 34, and a water flow switch 36.

[0022] The upstream end of the water supply passage 16 is connected to a water supply source 160, and the downstream end of the water supply passage 16 is connected to the first heat source unit 12. The upstream end of the hot water outlet passage 18 is connected to the first heat source unit 12, and the downstream end of the hot water outlet passage 18 is connected to a faucet 170. The first heat source unit 12 is a combustion heat source unit that heats water by, for example, burning fuel gas. The first heat source unit 12 heats the water flowing in from the water supply passage 16 and sends the heated water to the hot water outlet passage 18.

[0023] The upstream end of the bypass passage 20 is connected to the water supply passage 16, and the downstream end of the bypass passage 20 is connected to the hot water outlet passage 18. The bypass servo 22 is provided at the point where the bypass passage 20 connects to the water supply passage 16. The bypass servo 22 can adjust the ratio of the flow rate of water flowing from the water supply passage 16 to the hot water outlet passage 18 via the first heat source unit 12 and the flow rate of water flowing from the water supply passage 16 to the hot water outlet passage 18 via the bypass passage 20 by adjusting the opening degree of the built-in valve body. By adjusting the opening degree of the bypass servo 22, the hot water outlet passage 18 downstream of the point where the bypass passage 20 is connected is supplied with water whose temperature has been adjusted to a desired temperature by mixing high-temperature water flowing from the first heat source unit 12 and low-temperature water flowing from the bypass passage 20 at a desired ratio. The hot water outlet passage 18 downstream of the point where the bypass passage 20 is connected is provided with an outlet hot water temperature thermistor 18a that detects the temperature of the water in the hot water outlet passage 18.

[0024] The upstream end of the molten metal pouring passage 24 is connected to the molten metal outlet passage 18 downstream of the point where the bypass passage 20 is connected, and the downstream end of the molten metal pouring passage 24 is connected to the return circulation passage 32. The molten metal filling valve 26 is provided in the molten metal pouring passage 24 and opens and closes the molten metal pouring passage 24. The molten metal filling valve 26 is normally kept closed. The water volume sensor 28 is provided in the molten metal pouring passage 24 and detects the amount of water flowing through the molten metal pouring passage 24.

[0025] The upstream end of the circulation return path 32 is connected to the heat source return path 60 of the air pressurized dissolving unit 50, and the downstream end of the circulation return path 32 is connected to the second heat source device 14. The upstream end of the circulation outward path 30 is connected to the second heat source device 14, and the downstream end of the circulation outward path 30 is connected to the heat source outward path 68 of the air pressurized dissolving unit 50. The second heat source device 14 is, for example, a combustion heat source device that heats water by burning fuel gas. The second heat source device 14 heats the water flowing from the circulation return path 32 and sends the heated water to the circulation outward path 30. A circulation return path thermistor 32a that detects the temperature of the water in the circulation return path 32 is provided near the upstream end of the circulation outward path 30. A circulation outward path thermistor 30a that detects the temperature of the water in the circulation outward path 30 is provided near the downstream end of the circulation outward path 30.

[0026] The bathtub circulation pump 34 is provided in the circulation return path 32 downstream of the connection point of the molten metal pouring path 24, and sends water in the circulation return path 32 toward the second heat source unit 14. The water flow switch 36 is provided in the circulation return path 32 between the bathtub circulation pump 34 and the second heat source unit 14, and detects whether water is flowing in the circulation return path 32.

[0027] (Configuration of the air pressure dissolving unit 50) The air pressurization dissolution unit 50 includes a tank 52, a heat source return path 60, a heat source outward path 68, a tank return path 74, a tank outward path 64, a connecting passage 66, a first three-way valve 80, a second three-way valve 82, a check valve 84, a tank water supply valve 86, a first pressurization pump 88, a second pressurization pump 90, an air-liquid exchange path 92, a first opening / closing valve 94, a second opening / closing valve 96, and an air introduction unit 98.

[0028] The tank 52 can store water therein. The tank 52 is used to generate air-dissolved water by pressurizing and dissolving air in water. A high water level electrode 52a, a low water level electrode 52b, and an earth electrode 52c are installed inside the tank 52 to detect the water level in the tank 52. The water level detected by the low water level electrode 52b (hereinafter also referred to as the lower limit water level) is lower than the water level detected by the high water level electrode 52a (hereinafter also referred to as the upper limit water level). When the water surface of the water stored in the tank 52 is not in contact with the low water level electrode 52b and the high water level electrode 52a, no current flows between the low water level electrode 52b and the earth electrode 52c, and an OFF signal is output to the control device 150. When the water surface of the water stored in the tank 52 is in contact with the low water level electrode 52b and the high water level electrode 52a, a current flows between the low water level electrode 52b and the earth electrode 52c, and an ON signal is output to the control device 150.

[0029] One end of the heat source return line 60 is connected to a communication passage 66, and the other end of the heat source return line 60 is connected to the circulation return line 32 of the heat source unit 10. The communication passage 66 connects the first three-way valve 80 and the second three-way valve 82. The first three-way valve 80 is connected to the communication passage 66, the first bathtub water passage 62, and the tank outward line 64. The first three-way valve 80 can be switched between a first communication state (see Figures 7 and 8) in which the tank outward line 64 and the first bathtub water passage 62 are connected, a second communication state (see Figure 1) in which the tank outward line 64 and the communication passage 66 are connected, and a third communication state (see Figures 4 and 5) in which the first bathtub water passage 62, the tank outward line 64, and the communication passage 66 are connected. The upstream end of the tank outgoing passage 64 is connected to the bottom of the tank 52, and the downstream end of the tank outgoing passage 64 is connected to the first three-way valve 80. The tank outgoing passage 64 is provided with a check valve 84 that allows water to flow from the tank 52 to the first three-way valve 80 and prohibits water from flowing from the first three-way valve 80 to the tank 52. One end of the first bathtub water passage 62 is connected to the first three-way valve 80, and the other end of the first bathtub water passage 62 is connected to the bathtub adapter 132.

[0030] One end of the heat source outgoing path 68 is connected to the circulation outgoing path 30 of the heat source unit 10, and the other end of the heat source outgoing path 68 is connected to the second three-way valve 82. The second three-way valve 82 is connected to the communication passage 66, the heat source outgoing path 68, and the second bathtub water passage 70. The second three-way valve 82 can switch between a fourth communication state (see Figures 7 and 8) in which the second bathtub water passage 70 and the communication passage 66 communicate with each other, and a fifth communication state (see Figures 1, 4, and 5) in which the heat source outgoing path 68 and the second bathtub water passage 70 communicate with each other. One end of the second bathtub water passage 70 is connected to the second three-way valve 82, and the other end of the second bathtub water passage 70 is connected to the bathtub adapter 132.

[0031] The upstream end of the tank return line 74 is connected to the heat source outward line 68, and the downstream end of the tank return line 74 (hereinafter also referred to as the inlet 74a) is connected to the top of the tank 52. The water level at the point where the inlet 74a of the tank return line 74 is connected to the tank 52 is higher than the upper limit water level detected by the high water level electrode 52a. The tank water supply valve 86 is provided in the tank return line 74 and opens and closes the tank return line 74. The tank water supply valve 86 is normally closed. The first pressurizing pump 88 and the second pressurizing pump 90 are provided downstream of the tank water supply valve 86 in the tank return line 74. The first pressurizing pump 88 and the second pressurizing pump 90 pressurize the water in the tank return line 74 and send it toward the tank 52. In the tank return line 74, the first pressurizing pump 88 is disposed upstream of the second pressurizing pump 90. The water sent from the tank return line 74 to the tank 52 flows into the tank 52 via the inlet 74a.

[0032] One end of the gas-liquid exchange path 92 (hereinafter, also referred to as the outlet 92a) is connected to the bottom of the tank 52. The water level at the point where the outlet 92a of the gas-liquid exchange path 92 is connected to the tank 52 is lower than the lower limit water level detected by the low water level electrode 52b. The other end of the gas-liquid exchange path 92 is disposed facing the drain groove 180. The gas-liquid exchange path 92 is disposed so that the height monotonically decreases (i.e., there is no point where the height increases) from one end to the other end (i.e., from the tank 52 to the drain groove 180). The first opening / closing valve 94 is provided in the gas-liquid exchange path 92 and opens and closes the gas-liquid exchange path 92. The second opening / closing valve 96 is provided in the gas-liquid exchange path 92 on the other end side (i.e., the side farther from the tank 52) than the first opening / closing valve 94 and opens and closes the gas-liquid exchange path 92. The first opening / closing valve 94 and the second opening / closing valve 96 are normally closed.

[0033] The air introduction unit 98 is provided in the gas-liquid exchange passage 92 at a location between the first on-off valve 94 and the second on-off valve 96. The air introduction unit 98 includes an air introduction passage 100, a check valve 102, and an air pump 104. One end of the air introduction passage 100 is connected to the gas-liquid exchange passage 92, and the other end is connected to the air pump 104. The air pump 104 sends air into the air introduction passage 100. The check valve 102 is provided in the air introduction passage 100, and allows air to flow from the air pump 104 toward the gas-liquid exchange passage 92, and prohibits water from flowing from the gas-liquid exchange passage 92 toward the air pump 104.

[0034] (Configuration of bathtub adapter 132) Next, the bathtub adapter 132 provided on the wall 130a of the bathtub 130 will be described with reference to Figures 2(a) and (b). Figure 2(a) shows the flow of water in the bathtub adapter 132 when water flows from the first bathtub water channel 62 toward the bathtub 130 and from the bathtub 130 toward the second bathtub water channel 70 (for example, the state of Figure 7). Figure 2(b) shows the flow of water in the bathtub adapter 132 when water flows from the bathtub 130 toward the first bathtub water channel 62 and from the second bathtub water channel 70 toward the bathtub 130 (for example, the state of Figure 5).

[0035] The bathtub adaptor 132 has a first water passage 136 and a second water passage 138. The first water passage 136 is connected to the first bathtub water passage 62, and the second water passage 138 is connected to the second bathtub water passage 70. The first water passage 136 branches into a first discharge passage 136a and a first suction passage 136b. The first discharge passage 136a is connected to a first discharge port 134a provided on the front surface 132a of the bathtub adaptor 132. The water discharged from the first discharge port 134a into the bathtub 130 is discharged in front of the wall portion 130a of the bathtub 130, that is, in a direction perpendicular to the wall portion 130a of the bathtub 130. The first discharge passage 136a is provided with a backflow prevention portion 140a that prevents water from flowing from the bathtub 130 toward the first bathtub water passage 62, and a fine bubble generating nozzle 142 that is arranged upstream of the backflow prevention portion 140a (on the first bathtub water passage 62 side). The fine bubble generating nozzle 142 reduces the pressure of the water passing through the fine bubble generating nozzle 142. The first suction passage 136b is connected to a first suction port 134b provided on the front surface 132a of the bathtub adapter 132. The first suction passage 136b is provided with a backflow prevention portion 140b that prevents water from flowing from the first bathtub water passage 62 toward the bathtub 130.

[0036] The second water passage 138 branches into a second discharge passage 138a and a second suction passage 138b. The second suction passage 138b is connected to a second suction port 134c provided on the front surface 132a of the bathtub adapter 132. The second suction passage 138b is provided with a check portion 140c that prevents water from flowing from the second bathtub water passage 70 toward the bathtub 130. The second discharge passage 138a is connected to a second discharge port 134d provided on the lower surface 132b of the bathtub adapter 132. Water discharged from the second discharge port 134d is discharged downward, that is, in a direction parallel to the wall portion 130a of the bathtub 130. The second discharge passage 138a is provided with a check portion 140d that prevents water from flowing from the bathtub 130 toward the second bathtub water passage 70.

[0037] (Configuration of control device 150) The control device 150 shown in Fig. 1 controls the operation of each component of the heat source unit 10 and the air pressurized dissolution unit 50. The control device 150 is configured to be able to communicate with a remote control 154 that can be operated by a user. The control device 150 includes a memory 152, and is capable of storing various settings input by the user, such as the set temperature and set water volume for the water filling operation, and the set temperature for the reheating operation. Through the remote control 154, the user can give instructions to start and end the water filling operation, the fine bubble generation operation, and the reheating operation, which will be described later.

[0038] (Bath filling operation) The water filling operation starts when the user issues a command to start the water filling operation on the remote control 154. Alternatively, the water filling operation may start when the user sets the start time of the water filling operation on the remote control 154 and the control device 150 determines that the start time of the water filling operation has arrived. When starting the water filling operation, the control device 150 sets the first three-way valve 80 and the second three-way valve 82 to the third communication state and the fifth communication state, respectively (see Figures 4 and 5). From this state, the control device 150 executes the processing shown in Figure 3.

[0039] In S2, the control device 150 executes the air removal process. Specifically, the control device 150 opens the water filling valve 26 and starts heating the water by the first heat source unit 12. As a result, as shown in FIG. 4, water adjusted to the set temperature flows from the hot water outlet path 18 through the hot water supply path 24 into the circulation return path 32. The water that flows into the circulation return path 32 branches into a flow toward the upstream side (i.e., the heat source return path 60) and a flow toward the downstream side (i.e., the second heat source unit 14). The water that flows from the circulation return path 32 to the heat source return path 60 flows into the bathtub 130 via the communication path 66, the first three-way valve 80, the first bathtub water path 62, and the bathtub adapter 132. The water that flows from the circulation return path 32 to the second heat source unit 14 flows into the bathtub 130 via the circulation outward path 30, the heat source outward path 68, the second three-way valve 82, the second bathtub water path 70, and the bathtub adapter 132. As a result, the first bathtub water channel 62 and the second bathtub water channel 70 are filled with water, and any air remaining inside the first bathtub water channel 62 and the second bathtub water channel 70 is expelled into the bathtub 130. When the accumulated water volume detected by the water volume sensor 28 reaches a predetermined value (e.g., 6 L), the control device 150 closes the water filling valve 26 and ends heating by the first heat source unit 12, thereby ending the air removal process.

[0040] In S4, the control device 150 executes a process for detecting remaining water in the bathtub 130. Specifically, as shown in FIG. 5, the control device 150 drives the bathtub circulation pump 34 and determines whether there is remaining water in the bathtub 130 based on whether the water flow switch 36 detects a water flow. If there is no remaining water in the bathtub 130 and the bathtub adapter 132 is not submerged in water, the water flow switch 36 does not detect a water flow even if the bathtub circulation pump 34 is driven. In contrast, if there is remaining water in the bathtub 130 and the bathtub adapter 132 is submerged in water, the water flow switch 36 detects a water flow when the bathtub circulation pump 34 is driven. If there is remaining water in the bathtub 130 in S4 (if YES), the process proceeds to S6. If there is no remaining water in the bathtub 130 in S4 (if NO), the process proceeds to S10.

[0041] In S6, the control device 150 performs a process to determine the amount of water remaining in the bathtub 130. Specifically, the control device 150 drives the bathtub circulation pump 34 and stores the temperature detected by the circulation return thermistor 32a as the pre-heating temperature. After that, the control device 150 starts heating the water with the second heat source unit 14. As a result, as shown in FIG. 5, the remaining water in the bathtub 130 is sent to the second heat source unit 14 via the bathtub adapter 132, the first bathtub water passage 62, the first three-way valve 80, the communication passage 66, the heat source return passage 60, and the circulation return passage 32. The remaining water heated by the second heat source unit 14 is returned to the bathtub 130 via the circulation outward passage 30, the heat source outward passage 68, the second three-way valve 82, the second bathtub water passage 70, and the bathtub adapter 132. When the temperature detected by the circulation return thermistor 32a becomes equal to or higher than the set temperature, the control device 150 stores the temperature detected by the circulation return thermistor 32a as the post-heating temperature, and then stops the bathtub circulation pump 34 and ends the heating of water by the second heat source unit 14. The control device 150 then calculates the amount of remaining water in the bathtub 130 from the temperature rise obtained by subtracting the pre-heating temperature from the post-heating temperature and the integrated amount of heat in the second heat source unit 14 in S6.

[0042] In S8, the control device 150 subtracts the amount of remaining water in the bathtub 130 determined in S6 from the set amount of water for the water filling operation to update the set amount of water for the water filling operation.

[0043] In S10, the control device 150 opens the water filling valve 26 and starts heating by the first heat source unit 12. As a result, as shown in Fig. 4, water adjusted to the set temperature flows from the hot water outlet line 18 through the hot water supply line 24 into the circulation return line 32. The water flowing into the circulation return line 32 branches into a flow toward the upstream side (i.e., the heat source return line 60) and a flow toward the downstream side (i.e., the second heat source unit 14). The water flowing from the circulation return line 32 to the heat source return line 60 flows into the bathtub 130 via the communication passage 66, the first three-way valve 80, the first bathtub water passage 62, and the bathtub adapter 132. The water flowing from the circulation return line 32 to the second heat source unit 14 flows into the bathtub 130 via the circulation outward line 30, the heat source outward line 68, the second three-way valve 82, the second bathtub water passage 70, and the bathtub adapter 132.

[0044] In S12, control device 150 waits until the accumulated water volume detected by water volume sensor 28 reaches the set water volume for the water filling operation. Note that the accumulated water volume here is the sum of the accumulated water volume detected by water volume sensor 28 in the air removal process in S2 and the accumulated water volume since the start of filling bathtub 130 with water in S10. When the accumulated water volume reaches the set water volume (YES), processing proceeds to S14.

[0045] In S14, the control device 150 closes the water filling valve 26 and terminates the heating of water by the first heat source unit 12.

[0046] In S16, the control device 150 drives the bathtub circulation pump 34 and obtains the temperature detected by the circulation return thermistor 32a as the bathtub water temperature. The control device 150 then determines whether the bathtub water temperature is equal to or higher than the set temperature. If the bathtub water temperature is lower than the set temperature (NO), the process proceeds to S18. If the bathtub water temperature is equal to or higher than the set temperature (YES), the process proceeds to S20.

[0047] In S18, the control device 150 performs a reheating process for the water in the bathtub 130. Specifically, the control device 150 drives the bathtub circulation pump 34 and starts the heating of the water by the second heat source unit 14. As a result, as shown in FIG. 5, the water in the bathtub 130 is sent to the second heat source unit 14 via the bathtub adapter 132, the first bathtub water passage 62, the first three-way valve 80, the communication passage 66, the heat source return path 60, and the circulation return path 32. The water heated by the second heat source unit 14 is returned to the bathtub 130 via the circulation outward path 30, the heat source outward path 68, the second three-way valve 82, the second bathtub water passage 70, and the bathtub adapter 132. When the temperature detected by the circulation return thermistor 32a becomes equal to or higher than the set temperature, the control device 150 stops the bathtub circulation pump 34 and ends the heating of the water by the second heat source unit 14.

[0048] In S20, the control device 150 notifies the user that the water filling operation has been completed via the remote control 154. After S20, the processing in FIG.

[0049] (Fine bubble generation operation) The fine bubble generating operation is started when the user issues a command to start the fine bubble generating operation via the remote control 154. In addition, in the hot water heater 2 of this embodiment, the fine bubble generating operation is also started automatically after the above-mentioned water filling operation is completed. In other words, the fine bubble generating operation is executed in conjunction with the execution of the water filling operation. When starting the fine bubble generating operation, the control device 150 sets the first three-way valve 80 and the second three-way valve 82 to the third communication state and the fifth communication state, respectively (see Figures 4 and 5). From this state, the control device 150 executes the process shown in Figure 6.

[0050] In S22, the control device 150 executes a cold water reduction process. Specifically, when the temperature detected by the circulation forward thermistor 30a or the circulation return thermistor 32a is equal to or lower than a predetermined temperature, the control device 150 drives the bathtub circulation pump 34 and starts heating the water by the second heat source unit 14. When low-temperature water remains inside the circulation forward path 30 or the circulation return path 32 due to this cold water reduction process, as shown in FIG. 5, the low-temperature water flows into the bathtub adapter 132 via the heat source forward path 68, the second three-way valve 82, and the second bathtub water path 70, and is discharged from the second outlet 134d on the bottom surface 132b of the bathtub adapter 132 into the bathtub 130. Therefore, even if the user is taking a bath in the bathtub 130, it is possible to prevent low-temperature water from being discharged directly toward the user's body. When a predetermined time has elapsed since the start of the cold water mitigation process, the control device 150 stops the bathtub circulation pump 34 and terminates the heating of water by the second heat source unit 14, thereby terminating the cold water mitigation process.

[0051] In S24, the control device 150 starts supplying the air-dissolved water from the tank 52 to the bathtub 130. Specifically, as shown in FIG. 7, the control device 150 sets the first three-way valve 80 to the first communication state, sets the second three-way valve 82 to the fourth communication state, opens the tank water supply valve 86, and drives the bathtub circulation pump 34, the first pressurizing pump 88, and the second pressurizing pump 90. As a result, the water in the bathtub 130 is supplied to the tank 52 via the bathtub adapter 132, the second bathtub water passage 70, the second three-way valve 82, the communication passage 66, the heat source return path 60, the circulation return path 32, the second heat source unit 14, the circulation outward path 30, the heat source outward path 68, and the tank return path 74. At this time, the water pressurized by the first pressurizing pump 88 and the second pressurizing pump 90 is supplied to the tank 52. As a result, air is pressurized and dissolved in the water inside the tank 52. The water in which the air has been pressurized and dissolved is then supplied to the bathtub 130 from the tank 52 via the tank outward path 64, the first three-way valve 80, the first bathtub water path 62, and the bathtub adapter 132. At this time, the water in which the air has been pressurized and dissolved is depressurized to below atmospheric pressure as it passes through the fine bubble generating nozzle 142 of the first discharge path 136a of the bathtub adapter 132, and is pressurized to atmospheric pressure as it is sprayed into the bathtub 130, generating fine bubbles in the water in the bathtub 130.

[0052] In S26, the control device 150 determines whether the water level of the tank 52 is equal to or higher than the lower limit water level based on the detection signal from the low water level electrode 52b. If the water level of the tank 52 is equal to or higher than the lower limit water level (YES), the process proceeds to S28. If the water level of the tank 52 is below the lower limit water level (NO), the process proceeds to S34.

[0053] In S28, the control device 150 starts the air introduction operation (see FIG. 9). The air introduction operation will be described in detail later. Air is introduced into the tank 52 while the air introduction operation is being performed.

[0054] In S30, the control device 150 judges whether the water level of the tank 52 falls below the lower limit water level based on the detection signal from the low water level electrode 52b. In this embodiment, the amount of air introduced into the tank 52 when the air introduction operation is being performed is greater than the amount of air in the fine bubbles generated in the water of the bathtub 130. Therefore, when the air introduction operation is being performed, the amount of air in the tank 52 increases and the water level of the tank 52 falls. If the water level of the tank 52 falls below the lower limit water level (if YES), the process proceeds to S32. If the water level of the tank 52 is equal to or greater than the lower limit water level (if NO), the process proceeds to S34.

[0055] In S32, the controller 150 ends the air introduction operation.

[0056] In S34, the control device 150 determines whether the water level of the tank 52 is equal to or higher than the upper limit water level based on the detection signal from the high water level electrode 52a. When the air introduction operation is not being performed, air is not introduced into the tank 52, so the amount of air in the tank 52 decreases by generating fine air bubbles in the water of the bathtub 130, and the water level of the tank 52 rises. If the water level of the tank 52 is equal to or higher than the upper limit water level (YES), the process proceeds to S36. If the water level of the tank 52 is below the upper limit water level (NO), the process proceeds to S38.

[0057] In S36, the controller 150 starts the air introduction operation.

[0058] In S38, the control device 150 judges whether the operation time of the fine bubble generating operation has reached the set time. Here, the operation time of the fine bubble generating operation is the time elapsed since the start of the fine bubble generating operation. In the hot water device 2 of this embodiment, when the fine bubble generating operation is performed independently without being linked to the execution of the water filling operation, the set time is set to, for example, 10 minutes. In contrast, when the fine bubble generating operation is performed in conjunction with the execution of the water filling operation, the set time is set to, for example, 30 minutes. If the operation time has not reached the set time (if NO), the process returns to S30. When the operation time has reached the set time (if YES), the process proceeds to S40.

[0059] In S40, the control device 150 stops the bathtub circulating pump 34, the first pressure pump 88, and the second pressure pump 90, and ends the supply of air-dissolved water from the tank 52 to the bathtub 130.

[0060] In S42, the control device 150 ends the air introduction operation if the air introduction operation is being performed.

[0061] In S44, the control device 150 executes a tank cleaning process. Specifically, the control device 150 opens the water filling valve 26 and starts heating the water by the first heat source unit 12. As a result, as shown in Fig. 8, water adjusted to the set temperature flows from the hot water outlet path 18 through the hot water supply path 24 into the circulation return path 32. The water that flows into the circulation return path 32 branches into a flow toward the upstream side (i.e., the heat source return path 60) and a flow toward the downstream side (i.e., the second heat source unit 14). The water that flows from the circulation return path 32 to the heat source return path 60 flows into the bathtub 130 via the communication path 66, the second three-way valve 82, the second bathtub water path 70, and the bathtub adapter 132. In addition, the water flowing from the circulation return path 32 to the second heat source unit 14 flows into the bathtub 130 via the circulation outward path 30, the heat source outward path 68, the tank return path 74, the tank 52, the tank outward path 64, the first three-way valve 80, the first bathtub water path 62, and the bathtub adapter 132. This cleans the inside of the tank 52. After S44, the processing in FIG. 6 ends.

[0062] (Air introduction operation) When the air introduction operation is started in S28 or S36 in FIG. 6, the control device 150 executes the process shown in FIG.

[0063] In S46, the control device 150 starts the first air introduction operation. Specifically, the control device 150 closes the first on-off valve 94, opens the second on-off valve 96, and drives the air pump 104. As a result, water in the gas-liquid exchange passage 92 downstream of the first on-off valve 94 is discharged to the drain groove 180, and air sent into the air introduction passage 100 by the air pump 104 is introduced into the gas-liquid exchange passage 92 downstream of the first on-off valve 94.

[0064] In S48, the control device 150 waits until the first operation time has elapsed since the start of the first air introduction operation in S46. When the first operation time has elapsed (YES), the process proceeds to S50.

[0065] In S50, the controller 150 ends the first air introduction operation. Specifically, the controller 150 closes the second on-off valve 96 and stops the air pump 104.

[0066] In S52, the control device 150 starts the second air introduction operation. Specifically, the control device 150 closes the second on-off valve 96, stops the air pump 104, and opens the first on-off valve 94. As a result, air that has accumulated between the first on-off valve 94 and the second on-off valve 96 of the gas-liquid exchange passage 92 flows into the tank 52, and water in the tank 52 flows into the gas-liquid exchange passage 92.

[0067] In S54, the control device 150 waits until the second operation time has elapsed since the second air introduction operation was started in S52. When the second operation time has elapsed (YES), the process proceeds to S56.

[0068] In S56, the controller 150 ends the second air introducing operation. Specifically, the controller 150 closes the first on-off valve 94. After S56, the process returns to S46.

[0069] The control device 150 repeatedly executes the process shown in Fig. 9 until the air introduction operation is terminated in S32 or S42 in Fig. 6. As a result, while the air introduction operation is being executed, the first air introduction operation (S46-S50) and the second air introduction operation (S52-S56) are repeatedly executed, and air is introduced into the tank 52.

[0070] (Reheating operation) The reheating operation starts when the user instructs the start of the reheating operation with the remote control 154. When starting the reheating operation, the control device 150 sets the first three-way valve 80 to the third communication state and the second three-way valve 82 to the fifth communication state (see Fig. 4 and Fig. 5). From this state, the control device 150 drives the bathtub circulation pump 34 and starts heating the water by the second heat source unit 14. As a result, as shown in Fig. 5, the water in the bathtub 130 is sent to the second heat source unit 14 via the bathtub adapter 132, the first bathtub water passage 62, the first three-way valve 80, the communication passage 66, the heat source return passage 60, and the circulation return passage 32. The water heated by the second heat source unit 14 is returned to the bathtub 130 via the circulation outward passage 30, the heat source outward passage 68, the second three-way valve 82, the second bathtub water passage 70, and the bathtub adapter 132. When the temperature detected by the circulation return thermistor 32a becomes equal to or higher than the set temperature, the control device 150 stops the bathtub circulation pump 34 and ends the heating of water by the second heat source unit 14. The control device 150 then notifies the user via the remote control 154 that the reheating operation has been completed, and ends the reheating operation.

[0071] Example 2 As shown in Fig. 10, the hot water device 202 of this embodiment has a configuration substantially similar to that of the hot water device 2 of the first embodiment. The hot water device 202 of this embodiment is different from the hot water device 2 of the first embodiment in that the tank 52 is provided with a high water level electrode 52a and an earth electrode 52c, but does not have a low water level electrode 52b. In addition, in the hot water device 202 of this embodiment, when performing a fine bubble generating operation, the control device 150 executes the process shown in Fig. 11 instead of the process shown in Fig. 6. The following describes the differences between the process shown in Fig. 11 and the process shown in Fig. 6.

[0072] 11, after S24 and if NO in S38, the process proceeds to S62. In S62, the control device 150 determines whether the water level of the tank 52 is equal to or higher than the upper water level based on the detection signal from the high water level electrode 52a. If the water level of the tank 52 is equal to or higher than the upper water level (YES), the process proceeds to S64. If the water level of the tank 52 is below the upper water level (NO), the process proceeds to S66.

[0073] In S64, the controller 150 starts the air introduction operation (see FIG. 9).

[0074] In S66, the control device 150 judges whether the state in which the water level of the tank 52 is below the upper limit water level has continued for a first predetermined time based on the detection signal from the high water level electrode 52a. The first predetermined time is the estimated time for the water level of the tank 52 to drop from the upper limit water level to the lower limit water level while the air introduction operation is being performed, and is a time shorter than the set time of S38. If the state in which the water level of the tank 52 is below the upper limit water level has continued for the first predetermined time (YES), the process proceeds to S68. If the state in which the water level of the tank 52 is below the upper limit water level has not continued for the first predetermined time (NO), the process proceeds to S38.

[0075] In S68, the controller 150 ends the air introduction operation. After S68, the process proceeds to S38.

[0076] According to the hot water device 202 of this embodiment, the start and end of the air introduction operation can be controlled by using the high water level electrode 52a without using the low water level electrode 52b.

[0077] Example 3 As shown in Fig. 12, the hot water device 302 of this embodiment has a configuration substantially similar to that of the hot water device 2 of the first embodiment. The hot water device 302 of this embodiment has a low water level electrode 52b and an earth electrode 52c inside the tank 52, but differs from the hot water device 2 of the first embodiment in that it does not have a high water level electrode 52a. In addition, in the hot water device 302 of this embodiment, when performing the fine bubble generating operation, the control device 150 executes the process shown in Fig. 13 instead of the process shown in Fig. 6. The following describes the differences between the process shown in Fig. 13 and the process shown in Fig. 6.

[0078] In the process shown in FIG. 13, after S24 and if NO in S38, the process proceeds to S72. In S72, the control device 150 judges whether the state in which the water level of the tank 52 is equal to or higher than the lower limit water level continues for a second predetermined time based on the detection signal from the low water level electrode 52b. The second predetermined time is the estimated time for the water level of the tank 52 to rise from the lower limit water level to the upper limit water level in a state in which the air introduction operation is not being performed, and is a time shorter than the set time of S38. If the state in which the water level of the tank 52 is equal to or higher than the lower limit water level continues for the second predetermined time (if YES), the process proceeds to S74. If the state in which the water level of the tank 52 is equal to or higher than the lower limit water level does not continue for the second predetermined time (if NO), the process proceeds to S76.

[0079] In S74, the controller 150 starts the air introduction operation (see FIG. 9).

[0080] In S76, the control device 150 determines whether the water level of the tank 52 falls below the lower limit water level based on the detection signal from the low water level electrode 52b. If the water level of the tank 52 falls below the lower limit water level (YES), the process proceeds to S78. If the water level of the tank 52 is equal to or higher than the lower limit water level (NO), the process proceeds to S38.

[0081] In S78, the controller 150 ends the air introduction operation. After S78, the process proceeds to S38.

[0082] According to the hot water device 302 of this embodiment, the start and end of the air introduction operation can be controlled by using the low water level electrode 52b without using the high water level electrode 52a.

[0083] Example 4 As shown in FIG. 14, the hot water device 402 of this embodiment has a configuration substantially similar to that of the hot water device 2 of the first embodiment. The hot water device 302 of this embodiment differs from the hot water device 2 of the first embodiment in that the tank 52 does not have a high water level electrode 52a or a low water level electrode 52b inside, but has an intermediate water level electrode 52d instead. The water level detected by the intermediate water level electrode 52d (hereinafter also referred to as the intermediate water level) is lower than the upper limit water level and higher than the lower limit water level. In addition, in the hot water device 402 of this embodiment, when performing the fine bubble generating operation, the control device 150 executes the process shown in FIG. 15 instead of the process shown in FIG. 6. The process shown in FIG. 15 will be described below in terms of differences from the process shown in FIG. 6.

[0084] In the process shown in FIG. 15, after S24 and if NO in S38, the process proceeds to S82. In S82, the control device 150 judges whether the state in which the water level of the tank 52 is equal to or higher than the intermediate water level continues for a third predetermined time based on the detection signal from the intermediate water level electrode 52d. The third predetermined time is the expected time for the water level of the tank 52 to rise from the intermediate water level to the upper water level in a state in which the air introduction operation is not being performed, and is a time shorter than the set time of S38. If the state in which the water level of the tank 52 is equal to or higher than the intermediate water level continues for the third predetermined time (if YES), the process proceeds to S84. If the state in which the water level of the tank 52 is equal to or higher than the intermediate water level does not continue for the third predetermined time (if NO), the process proceeds to S86.

[0085] In S84, the controller 150 starts the air introduction operation (see FIG. 9).

[0086] In S86, the control device 150 judges whether the state in which the water level of the tank 52 is below the intermediate water level continues for a fourth predetermined time based on the detection signal from the intermediate water level electrode 52d. The fourth predetermined time is the estimated time for the water level of the tank 52 to drop from the intermediate water level to the lower limit water level while the air introduction operation is being performed, and is a time shorter than the set time of S38. If the state in which the water level of the tank 52 is below the intermediate water level continues for the fourth predetermined time (YES), the process proceeds to S88. If the state in which the water level of the tank 52 is below the intermediate water level has not continued for the fourth predetermined time (NO), the process proceeds to S38.

[0087] In S88, the controller 150 ends the air introduction operation. After S88, the process proceeds to S38.

[0088] According to the hot water device 402 of this embodiment, the start and end of the air introduction operation can be controlled by using the intermediate water level electrode 52d, without using the high water level electrode 52a or the low water level electrode 52b.

[0089] (Modification) In the above-mentioned hot water devices 2, 202, 302, 402, the air introduction unit 98 may be configured to include an air vent valve (not shown) instead of the check valve 102 and the air pump 104. In addition, in the above-mentioned hot water devices 2, 202, 302, 402, if the other end of the gas-liquid exchange passage 92 is open to the atmosphere and sufficient air flows into the gas-liquid exchange passage 92 as water is discharged from the gas-liquid exchange passage 92 to the drain groove 180, the air introduction unit 98 may not be provided.

[0090] In the above water heaters 2, 202, 302, 402, one end of the gas-liquid exchange passage 92 may be connected to the tank 52 at a location where the water level is lower than the lower limit water level, and may be connected to the tank 52 at a location other than the bottom of the tank 52.

[0091] In the above-mentioned hot water devices 2, 202, 302, 402, a type of water level sensor (e.g., an infrared sensor, etc.) other than the water level electrodes (i.e., the high water level electrode 52a, the low water level electrode 52b, the earth electrode 52c, the intermediate water level electrode 52d) may be used to detect whether the water level in the tank 52 is above the upper water level, the lower water level and / or the intermediate water level.

[0092] In the above-mentioned hot water devices 2, 202, 302, 402, the control device 150 may execute the first air introduction operation of S46-S50 in Fig. 9 before starting the air introduction operation in S28, S36, S64, S74, S84 in Fig. 6, Fig. 11, Fig. 13, Fig. 15 (for example, after starting the supply of air-dissolved water in S24, or after finishing the air introduction operation in S32, S68, S78, S88). In this case, when the control device 150 starts the air introduction operation in S28, S36, S64, S74, S84, it can skip the first air introduction operation of S46-S50 in Fig. 9 and start with the second air introduction operation of S52-S56.

[0093] In the above-described hot water device 302, in the process of S72 which is performed in a state where the air introduction operation has never been started since the process of Fig. 13 was started, the control device 150 may determine whether or not the water level of the tank 52 is equal to or higher than the lower limit water level based on the detection signal from the low water level electrode 52b. In this case, if the water level of the tank 52 is equal to or higher than the lower limit water level (YES), the process proceeds to S74, and if the water level of the tank 52 falls below the lower limit water level (NO), the process proceeds to S76.

[0094] In the above-described water heating device 402, in the process of S82 which is performed in a state in which the air introduction operation has never been started since the process of Fig. 15 was started, the control device 150 may determine whether or not the water level of the tank 52 is equal to or higher than the intermediate water level based on the detection signal from the intermediate water level electrode 52d. In this case, if the water level of the tank 52 is equal to or higher than the intermediate water level (YES), the process proceeds to S84, and if the water level of the tank 52 is less than the intermediate water level (NO), the process proceeds to S86.

[0095] In the above-mentioned hot water devices 2, 202, 302, 402, in the fine bubble generating operation executed in conjunction with the execution of the hot water filling operation, the cold water reduction process of S22 in FIG. 6, FIG. 11, FIG. 13, and FIG. 15 may be omitted.

[0096] In the above-mentioned hot water devices 2, 202, 302, 402, the tank cleaning process in S44 in FIG. 6, FIG. 11, FIG. 13, and FIG. 15 may be omitted.

[0097] In the above-mentioned hot water devices 2, 202, 302, 402, in S38 of Figures 6, 11, 13 and 15, instead of the operation time determination process, the process may be configured to return to S30 or S62, S72 or S82 without proceeding to S40 and continue fine bubble generating operation until the user instructs via the remote control 154 to end the fine bubble generating operation, and to proceed to S40 when the user instructs via the remote control 154 to end the fine bubble generating operation.

[0098] In the above hot water heaters 2, 202, 302, 402, when a fine bubble generating operation is performed in conjunction with the execution of a bath filling operation, the notification of completion of bath filling in S20 of Fig. 3 may be performed while the fine bubble generating operation is being performed, rather than at the end of the bath filling operation. More specifically, the notification of completion of bath filling may be performed after the operation time of the fine bubble generating operation reaches a predetermined notification time (e.g., 2 minutes) that allows sufficient fine bubbles to be generated in the water of the bathtub 130. With this configuration, the user can delay the timing of entering the bathroom, and the user can be prevented from entering the bathroom before sufficient fine bubbles are generated in the water of the bathtub 130.

[0099] In the above-mentioned hot water devices 2, 202, 302, 402, the user may be able to switch, via the remote control 154, whether or not to execute the fine bubble generating operation in conjunction with the execution of the water filling operation.

[0100] In the above-described hot water devices 2, 202, 302, 402, air is introduced into the tank 52, but instead of air, gas such as carbon dioxide, hydrogen, oxygen, etc. may be introduced into the tank 52. In this case, a gas-filled tank (not shown) filled with gas may be connected to the air pump 104 of the air introduction unit 98.

[0101] In the above-mentioned hot water heaters 2, 202, 302, 402, during the bath filling operation, a set amount of water is stored in the bathtub 130 based on the accumulated water amount detected by the water amount sensor 28. Alternatively, the hot water heaters 2, 202, 302, 402 may be configured to be provided with a water level sensor capable of detecting the water level of the bathtub 130, for example, and to store water at the set water level in the bathtub 130 during the bath filling operation based on the water level of the bathtub 130 detected by the water level sensor.

[0102] In the above-mentioned hot water devices 2, 202, 302, 402, the heat source unit 10 is connected to the faucet 170, and the air pressurization dissolution unit 50 is connected to the bathtub 130. Alternatively, the heat source unit 10 may be connected to another heat utilization location, and the air pressurization dissolution unit 50 may be connected to another liquid tank.

[0103] As described above, in one or more embodiments, the hot water device 2, 202, 302, 402 (an example of a fine bubble generating device) includes the tank 52 that pressurizes and dissolves air (an example of a gas) in water (an example of a liquid), the tank return path 74 (an example of a tank supply path) that supplies water to the tank 52, a first pressurizing pump 88 and a second pressurizing pump 90 (an example of a pressurizing pump) provided in the tank return path 74, the tank outward path 64 that discharges the water in which air has been pressurized and dissolved from the tank 52 to the bathtub 130 (an example of a liquid tank), and a first bathtub water The device is equipped with a passage 62, a bathtub adapter 132 (an example of a tank discharge passage), a fine bubble generating nozzle 142 provided in the bathtub adapter 132 to generate fine bubbles by decompressing water in which air is pressurized and dissolved, a gas-liquid exchange passage 92 that discharges water from the tank 52 and supplies air to the tank 52, a first opening / closing valve 94 provided in the gas-liquid exchange passage 92, a second opening / closing valve 96 provided in the gas-liquid exchange passage 92 at a position farther from the tank 52 than the first opening / closing valve 94, and a control device 150. The control device 150 is capable of executing a fine bubble generating operation in which the water is pressurized and supplied to the tank 52 from the tank return passage 74 by driving the first pressurizing pump 88 and the second pressurizing pump 90, and the water in which air is pressurized and dissolved is supplied from the tank 52 to the bathtub 130 via the tank forward passage 64, the first bathtub water passage 62, and the bathtub adapter 132. The control device 150 can perform an air introduction operation (an example of a gas introduction operation) in which a first air introduction operation (an example of a first gas introduction operation) and a second air introduction operation (an example of a second gas introduction operation) are alternately performed during the execution of the fine bubble generation operation. The control device 150 is configured to discharge water from the gas-liquid exchange passage 92 and introduce air into the gas-liquid exchange passage 92 with the first on-off valve 94 closed and the second on-off valve 96 open during the first air introduction operation. The control device 150 is configured to discharge water from the tank 52 to the gas-liquid exchange passage 92 and introduce air from the gas-liquid exchange passage 92 into the tank 52 with the first on-off valve 94 open and the second on-off valve 96 closed during the second air introduction operation.

[0104] In the above-mentioned hot water devices 2, 202, 302, 402, air can be supplied to the tank 52 by executing the air introduction operation during the fine bubble generation operation and alternately executing the first air introduction operation and the second air introduction operation. Therefore, it is not necessary to interrupt the fine bubble generation operation to supply air to the tank 52, and the fine bubble generation operation can be executed continuously. With this configuration, fine bubbles can be stably generated continuously in the water of the bathtub 130.

[0105] In one or more embodiments, the hot water device 2, 202 further includes a high water level electrode 52a (an example of a first liquid level sensor) that detects whether the water level (an example of a liquid level) of the tank 52 is equal to or higher than an upper limit water level (an example of a first liquid level). The water level at the point where the gas-liquid exchange path 92 is connected to the tank 52 is lower than the upper limit water level. The control device 150 is configured to start the air introduction operation when the water level of the tank 52 rises from below the upper limit water level to equal to or higher than the upper limit water level while the fine bubble generation operation is being performed and the air introduction operation is not being performed.

[0106] When the fine bubble generating operation is being performed but the air introduction operation is not being performed, the amount of air in the tank 52 decreases, and the water level in the tank 52 rises. When the fine bubble generating operation is being performed but the air introduction operation is being performed, the amount of air in the tank 52 increases, and the water level in the tank 52 drops. With the above configuration, it is possible to prevent the water level in the tank 52 from excessively rising beyond the upper water level while the fine bubble generating operation is being performed.

[0107] In one or more embodiments, the control device 150 of the hot water device 202 is configured to stop the air introduction operation when the fine bubble generation operation is being performed and the air introduction operation is being performed, if the water level of the tank 52 falls from above the upper limit water level to below the upper limit water level, and the state in which the water level of the tank 52 is below the upper limit water level continues for a first predetermined time.

[0108] According to the above configuration, it is possible to prevent the water level in the tank 52 from dropping excessively while the fine bubble generating operation is being performed.

[0109] In one or more embodiments, the water heater 2, 302 further includes a low water level electrode 52b (an example of a second liquid level sensor) that detects whether the water level (an example of a liquid level) of the tank 52 is equal to or higher than a lower limit water level (an example of a second liquid level). The water level at the point where the gas-liquid exchange passage 92 is connected to the tank 52 is lower than the lower limit water level. The control device 150 is configured to stop the air introduction operation when the fine bubble generation operation is being performed and the air introduction operation is being performed and the water level of the tank 52 falls from equal to or higher than the lower limit water level to below the lower limit water level.

[0110] According to the above configuration, it is possible to prevent the water level in the tank 52 from falling below the lower limit water level and dropping excessively while the fine bubble generating operation is being performed.

[0111] In one or more embodiments, the control device 150 of the hot water device 302 is configured to start the air introduction operation when the fine bubble generation operation is being performed and the air introduction operation is not being performed, when the water level of the tank 52 rises from below the lower limit water level to above the lower limit water level and the state in which the water level of the tank 52 is above the lower limit water level continues for a second predetermined time.

[0112] According to the above configuration, it is possible to prevent the water level in the tank 52 from rising excessively while the fine bubble generating operation is being performed.

[0113] In one or more embodiments, the hot water device 2 further includes a high water level electrode 52a (an example of a first liquid level sensor) for detecting whether the water level (an example of a liquid level) of the tank 52 is equal to or higher than an upper limit water level (an example of a first liquid level), and a low water level electrode 52b (an example of a second liquid level sensor) for detecting whether the water level of the tank 52 is equal to or higher than a lower limit water level (an example of a second liquid level) that is lower than the upper limit water level. The water level at the point where the gas-liquid exchange passage 92 is connected to the tank 52 is lower than the lower limit water level. The control device 150 is configured to start an air introduction operation when the water level of the tank 52 goes from below the upper limit water level to equal to or higher than the upper limit water level while the fine bubble generation operation is being performed and the air introduction operation is not being performed. The control device 150 is configured to stop an air introduction operation when the water level of the tank 52 goes from equal to or higher than the lower limit water level to lower than the lower limit water level while the fine bubble generation operation is being performed and the air introduction operation is being performed.

[0114] According to the above configuration, during the execution of the fine bubble generating operation, it is possible to suppress both the water level of the tank 52 from excessively rising above the upper limit water level and the water level of the tank 52 from excessively dropping below the lower limit water level. Also, according to the above configuration, it is possible to accurately manage the amount of air supplied into the tank 52 from the start to the stop of the air introduction operation.

[0115] In one or more embodiments, the hot water device 2, 202, 302, 402 further includes an air introduction unit 98 (an example of a gas introduction unit) that is disposed between the first on-off valve 94 and the second on-off valve 96 in the gas-liquid exchange path 92 and is configured to introduce air into the gas-liquid exchange path 92.

[0116] According to the above configuration, when the air introduction operation is being performed, water can be discharged from the gas-liquid exchange passage 92 and air can be introduced into the gas-liquid exchange passage 92 more stably.

[0117] Although each embodiment has been described in detail above, these are merely examples and do not limit the scope of the claims. The technology described in the claims includes various modifications and variations of the specific examples exemplified above. The technical elements described in this specification or drawings exhibit technical utility alone or in various combinations, and are not limited to the combinations described in the claims at the time of filing. In addition, the technology exemplified in this specification or drawings can achieve multiple objectives simultaneously, and achieving one of these objectives is itself technically useful. [Explanation of symbols]

[0118] 2: Hot water device 10: Heat source unit 12: 1st heat source machine 14:Second heat source machine 16: Water supply channel 18: Hot water outlet 18a: Hot water outlet temperature thermistor 20: Bypass road 22: Bypass servo 24: Pouring channel 26: Bath valve 28: Water level sensor 30:Circulation route 30a: Circulation forward thermistor 32: Circulation return route 32a: Circulation return thermistor 34: Bathtub circulation pump 36: Water flow switch 50: Air pressure dissolving unit 52: Tank 52a: High water level electrode 52b: Low water level electrode 52c: Earth electrode 52d: Intermediate water level electrode 60: Return to heat source 62: First bathtub waterway 64:Tank outbound 66:Communication path 68:Heat source outward route 70: Second bathtub waterway 74: Tank Return 74a:Inlet 80: First three-way valve 82: 2nd three-way valve 84: Check valve 86: Tank water supply valve 88: First pressure pump 90: Second pressure pump 92: Gas-liquid exchange path 92a: Outlet 94: First opening and closing valve 96: Second opening and closing valve 98: Air induction unit 100: Air intake passage 102: Check valve 104: Air pump 130: Bathtub 130a: Wall part 132: Bathtub adapter 132a:Front 132b: Bottom surface 134a: 1st discharge port 134b: First intake port 134c: Second intake port 134d: 2nd discharge port 136: 1st waterway 136a: 1st discharge path 136b: First intake passage 138: 2nd waterway 138a: Second discharge path 138b: Second intake passage 140a: Check valve 140b: Check valve 140c: Check valve 140d: Check valve 142: Microbubble generating nozzle 150: Control device 152: Memory 154: Remote control 160: Water supply source 170: Karan 180: Drain 202: Hot water equipment 302: Hot water equipment 402: Hot water equipment

Claims

1. A tank for dissolving gas under pressure in liquid; a tank supply line for supplying the liquid to the tank; a pressure pump provided in the tank supply line; a tank discharge passage for discharging the liquid in which the gas is pressurized and dissolved from the tank to a liquid tank; a fine bubble generating nozzle provided in the tank discharge path for generating fine bubbles by reducing the pressure of the liquid in which the gas is pressurized and dissolved; a gas-liquid replacement path that discharges the liquid from the tank and supplies the gas to the tank; A first on-off valve provided in the gas-liquid exchange path; a second on-off valve provided in the gas-liquid exchange path at a position farther from the tank than the first on-off valve; A control device is provided. the control device is capable of executing a fine bubble generating operation in which the pressurizing pump is driven to pressurize and supply the liquid from the tank supply path to the tank, and the liquid in which the gas is pressurized and dissolved is supplied from the tank to the liquid tank via the tank discharge path, The control device is capable of performing a gas introduction operation in which a first gas introduction operation and a second gas introduction operation are alternately performed during the execution of the fine bubble generation operation, the control device is configured to, in the first gas introducing operation, discharge the liquid from the gas-liquid exchange path and introduce the gas into the gas-liquid exchange path with the first on-off valve closed and the second on-off valve opened, The control device is configured to, in the second gas introduction operation, open the first on-off valve and close the second on-off valve, discharge the liquid from the tank to the gas-liquid exchange path, and introduce the gas from the gas-liquid exchange path into the tank.

2. The apparatus further includes a first liquid level sensor that detects whether the liquid level in the tank is equal to or higher than a first liquid level, a liquid level at a point where the gas-liquid exchange path is connected to the tank is lower than the first liquid level; The fine-bubble generating device of claim 1, wherein the control device is configured to start the gas introduction operation when the liquid level in the tank rises from below the first liquid level to above the first liquid level while the fine-bubble generating operation is being performed and the gas introduction operation is not being performed.

3. The fine-bubble generating device of claim 2, wherein the control device is configured to stop the gas introduction operation when the fine-bubble generating operation is being performed and the gas introduction operation is being performed and the liquid level in the tank falls from above the first liquid level to below the first liquid level and the state in which the liquid level in the tank is below the first liquid level continues for a first predetermined time.

4. The liquid level sensor further includes a second liquid level sensor that detects whether the liquid level in the tank is equal to or higher than a second liquid level, a liquid level at a portion where the gas-liquid exchange path is connected to the tank is lower than the second liquid level; The fine-bubble generating device of claim 1, wherein the control device is configured to stop the gas introduction operation when the liquid level in the tank falls from above the second liquid level to below the second liquid level while the fine-bubble generating operation is being performed and the gas introduction operation is being performed.

5. The fine-bubble generating device of claim 4, wherein the control device is configured to start the gas introduction operation when, while the fine-bubble generating operation is being performed and the gas introduction operation is not being performed, the liquid level in the tank rises from below the second liquid level to above the second liquid level and the state in which the liquid level in the tank is above the second liquid level continues for a second predetermined time.

6. a first liquid level sensor that detects whether the liquid level in the tank is equal to or higher than a first liquid level; The liquid level sensor further includes a second liquid level sensor that detects whether the liquid level in the tank is equal to or higher than a second liquid level that is lower than the first liquid level, a liquid level at a portion where the gas-liquid exchange path is connected to the tank is lower than the second liquid level; the control device is configured to start the gas introduction operation when the liquid level in the tank rises from less than the first liquid level to equal to or greater than the first liquid level while the fine bubble generation operation is being performed and the gas introduction operation is not being performed, The fine-bubble generating device of claim 1, wherein the control device is configured to stop the gas introduction operation when the liquid level in the tank falls from above the second liquid level to below the second liquid level while the fine-bubble generating operation is being performed and the gas introduction operation is being performed.

7. 7. The fine-bubble generating device according to claim 1, further comprising a gas introduction unit disposed in the gas-liquid exchange path between the first on-off valve and the second on-off valve and configured to introduce the gas into the gas-liquid exchange path.

Citation Information

Patent Citations

  • Fine air bubble generator

    JP2004290804A

  • Fine air bubble generator

    JP2022089137A

  • Fine bubble generation device

    JP2023012783A

  • Microbubble generator

    JP2009018118A