Power conditioning system

The power adjustment system uses AI to determine power command values for interconnected resources, addressing deviations in interconnection point power by adjusting resource power exchange based on economic efficiency, thus maintaining planned power values efficiently.

JP2024169000APending Publication Date: 2024-12-05FUJI ELECTRIC CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023086161
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-25
Publication Date
2024-12-05

AI Technical Summary

Technical Problem

Existing power systems with interconnected resources face challenges in maintaining interconnection point power at a planned value due to the arbitrary determination of electricity supply and demand based on market prices, leading to deviations and reduced economic efficiency, especially with resources that have variable output and demand response controls.

Method used

A power adjustment system using AI technology to determine power command values for multiple resources, adjusting interconnection point power and auxiliary power command values within resource constraints, prioritizing economic efficiency, and utilizing resources with varying responsiveness to maintain planned power exchange without frequent recalculation.

Benefits of technology

The system effectively maintains interconnection point power at planned values by adjusting resource power exchange, reducing the need for frequent operation plan recalculations and enhancing economic efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024169000000001_ABST
    Figure 2024169000000001_ABST
Patent Text Reader

Abstract

To provide a power conditioning system that can maintain the interconnection point power at the planned value while eliminating the time and hassle required to create an operation plan by operating each resource according to power command values created on the basis of multiple planned values that take economic efficiency into account, their priority information, adjustment power command values, etc.SOLUTION: In a power conditioning system including a resource A that receives and transmits AC power to and from a grid 40, and a resource B that produces a predetermined amount of a parameter using power supplied from the grid 40, and that adjusts the power of resources A and B so as to maintain the power at a grid-connection point 41 at a grid-connection point power planned value, a controller 30 determines power command values for the resources A and B to achieve each planned value in accordance with a priority taking into consideration economic efficiency, on the basis of the grid-connection point power planned value, the charge / discharge amount planned value of the resource A, the planned value equivalent to the production volume by the resource B, and the auxiliary power command value, within a range which satisfies the constraints of the resources A and B.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a power adjustment system that determines an optimal power command value for each resource under a predetermined interconnection point power plan value while considering the economic efficiency in the power supply and demand market and the adjustment power market in a power system in which multiple resources are interconnected. Here, the above resources include devices, circuits, means, and facilities that can send and receive AC power to and from the power system, and devices, circuits, means, and facilities that produce various materials and energy by using AC power supplied from the power system. [Background technology]

[0002] Patent Document 1 discloses a power supply system and a control method thereof that manages the allocation of power supplied to a hydrogen production device using a power regulator and a storage battery and the output of a wind power generation device so that the interconnection point power, which fluctuates depending on the output of the wind power generation device, in a power system to which a wind power generation device is connected follows a target value, or that manages the injection output of a fuel cell to which the produced hydrogen is supplied into the power system. Patent document 1 also describes adjusting the target value of the power supplied to the hydrogen production device or the target value of the output injected from the fuel cell to the power grid depending on whether the output of the wind power generation device is insufficient or not compared to the target value of the interconnection point power. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2017-225273 A (

[0010] ,

[0011] , Fig. 1, etc.) Summary of the Invention [Problem to be solved by the invention]

[0004] When multiple resources such as wind power generation equipment, hydrogen production equipment, and fuel cells connected to a power grid generate (generate) or consume electricity, the operation plan, including the target value of the interconnection point power, is determined arbitrarily, mainly based on the selling price in the electricity supply and demand market, rather than following the instructions of the grid operator, as in the case of adjustment power to maintain the electricity supply and demand balance.

[0005] The above operational plan can be realized by making full use of AI (Artificial Intelligence) technology, etc., but because the amount of calculation required makes it impossible to create plans frequently, it is necessary to allow for a certain amount of time for calculation cycles. However, in resources such as power generation facilities that use so-called governor-free control, the output changes from moment to moment, and in resources that use demand response control in which the output command changes in a short span, the amount of power exchanged with the power grid may deviate from the planned value due to the long calculation period, which may reduce economic efficiency. On the other hand, creating a plan that takes economic efficiency into account every time there is a deviation from the planned value requires a lot of time and money.

[0006] Therefore, the problem to be solved by the present invention is to provide a power adjustment system that can maintain the interconnection point power at a planned value while eliminating the time and complexity required to create an operation plan by operating each resource in accordance with a power command value created based on multiple planned values ​​that take economic efficiency into consideration, their priority information, adjustment power command values, etc. [Means for solving the problem]

[0007] In order to solve the above problem, the present invention provides a power adjustment system that includes a plurality of resources including a resource capable of transmitting and receiving AC power to and from a power grid, or a resource capable of producing a parameter using AC power supplied from the power grid, and adjusts power of the plurality of resources so as to maintain power at a grid-connection point between the plurality of resources and the power grid at a grid-connection point power planned value, an auxiliary power command value that is a power command value for the grid-connection point that is undetermined at a stage of creating the planned value, or a sum of these, and is characterized in that the system further includes a controller that determines power command values ​​for each of the plurality of resources to achieve each planned value and command value in accordance with a priority taking economy into consideration, based on the grid-connection point power planned value, the transmission and reception power planned values ​​of the plurality of resources, and the auxiliary power command value, within a range that satisfies constraints set for each of the plurality of resources. According to the present invention, the interconnection point power can be maintained at a planned value by appropriately adjusting the power exchanged between each resource and the power grid, without increasing the frequency of creating or calculating operation plans.

[0008] The auxiliary power command value is, for example, an adjustment capability command value that is undetermined at the stage of creating each planned value. This adjustment capability command value is a power command value used for governor-free control, load frequency control, economical load distribution control, etc., and by determining the power command value for each resource based on the interconnection point power command value that reflects this adjustment capability command value, it is possible to build a power adjustment system that can quickly respond to adjustment capability that occurs irregularly during actual operation.

[0009] In addition, the controller may further operate to determine a power command value for resource A and a power command value for resource B for achieving each planned value in accordance with a priority taking into consideration economic efficiency, based on the charge / discharge amount planned value for resource A. Here, resource B may be, for example, a hydrogen production device, which has characteristics that make it unable to immediately respond to the interconnection point power command value and the auxiliary power command value due to its operating principle. According to these inventions, it is possible to create a power command value for resource A that cancels the response delay caused by resource B and achieves the interconnection point power plan value.

[0010] The controller may also have a function of determining the priority of the multiple resources and the interconnection point power in order of highest priority, and setting the power command value of resources other than the resource with the lowest priority to the power required to achieve the transmission and reception power planned value of resources other than the resource with the lowest priority, and a function of setting the power command value of the resource with the lowest priority to the sum of the power required to achieve the interconnection point power planned value and the power required to track the auxiliary power command value minus the total power required to achieve each planned value of all resources other than the resource with the lowest priority. According to the above configuration, by using the resource with the lowest priority as a buffer, it is possible to operate so that the transmission and reception power plan value, the interconnection point power plan value, and the auxiliary power command value of the other resources are achieved. Also, when the interconnection point power has the lowest priority, it is possible to operate so that the transmission and reception power plan values ​​of all resources are achieved.

[0011] The controller may also have a function of, when a power command value of resource C, which is any one of the multiple resources, is outside the adjustable range of the transmitted and received power of resource C, adding the amount of power that exceeds the adjustable range of the power command value of resource C to the power command value of a resource or interconnection point power that has one priority higher than resource C. According to the above configuration, when it is difficult to achieve the transmission / reception power plan value, the interconnection point power plan value, and the auxiliary power command value of other resources by only using the resource with the lowest priority as a buffer, the resources with the lowest priority are operated to become buffers in order, so that the planned values ​​with higher priorities can be achieved. Note that when the resource with a priority level higher than resource C is not one of the multiple resources but the interconnection point power, no special operation is executed.

[0012] The controller may also have a function of, when the total value of the power command values ​​of the multiple resources exceeds the equipment capacity of the interconnection point, subtracting the amount of power that the total value exceeds the equipment capacity of the interconnection point from the power command value of a resource that has one priority higher than the interconnection point power. According to the above configuration, when the power that should be transmitted and received at the interconnection point in order to achieve the planned value of the power to be transmitted and received of a resource with a higher priority cannot be transmitted and received due to equipment capacity constraints, a resource with a priority level one level higher than the interconnection point power can be operated as a buffer, thereby making it possible to achieve the planned value with the higher priority.

[0013] The controller may also have a function of adding either the difference between the power transmitted / received by any one of the plurality of resources and a power command value, or the difference between the power command value of the resource and the power command value of the resource via a rate of change limiter or a low-pass filter taking into account the responsiveness of the resource, to the power command value of a resource having the next lowest responsiveness after the resource. According to the above configuration, by having resources with high responsiveness bear the power command values ​​that resources with low responsiveness are unable to keep up with, it is possible to operate in a way that achieves higher priority planned values ​​while taking into account the responsiveness of each resource.

[0014] In a mode in which the plurality of resources includes a resource A capable of receiving and transmitting AC power to and from the power grid, and a resource B capable of producing a parameter by using AC power supplied from the power grid, the controller selects two planned values ​​with high priorities from among a grid-connection point power planned value, a charge / discharge amount planned value which is the power transfer planned value of the resource A, and a production amount equivalent planned value which is the power transfer planned value of the resource B, and calculates instantaneous power required to achieve the charge / discharge amount planned value as P Breq The instantaneous power required to achieve the planned production volume is P Hreq , the power command value at the interconnection point is P Treq When I said that, (a) When the charge / discharge amount plan value and the interconnection point power plan value have high priority, the power command value for resource B is set to P Treq -PBreq The power command value for resource A is P Treq a function of subtracting the power command value for resource B from (b) When the production volume equivalent plan value and the interconnection point power plan value have high priority, the power command value for resource B is set to P Hreq The power command value for resource A is P Treq a function of subtracting the power command value for resource B from (c) When the charge / discharge amount plan value and the production amount plan value have high priority, the power command value for resource B is set to P Hreq The power command value for resource A is P Breq The function of The device may also include: This allows control so that the two planned values ​​with the highest priority out of the planned values ​​are achieved. Furthermore, when the priority of the interconnection point power planned value is high as in (a) and (b) above, even if resource B with low responsiveness cannot instantaneously respond to the power command value, a power command value that cancels out the deviation between the production volume equivalent planned value and the actual value and achieves the interconnection point power command value can be output to resource A with high responsiveness. Note that "responsiveness" refers to the speed at which a resource responds to a command value (responsiveness).

[0015] In addition, it is desirable to determine the priorities of the charge / discharge amount plan value, the production amount equivalent plan value, and the interconnection point power plan value based on the priorities calculated from the equipment constraints of resource A and resource B and the priorities calculated taking into account economic efficiency.

[0016] In addition, the controller may transition to a resource A priority mode in which the priority of the charge / discharge amount plan value for resource A is set so that the priority is equal to or higher than a predetermined priority level based on a comparison result between the charge amount of resource A as resource information and a plurality of threshold values. Furthermore, the controller may transition to a resource B priority mode in which the priority of the charge / discharge amount plan value for resource B is set so that the priority is equal to or higher than a predetermined priority level, depending on the result of comparing the production amount or storage amount of resource B as resource information with a plurality of threshold values. According to these inventions, it is possible to adjust the power supply to each resource so that the charge amount of resource A and the production or storage amount of resource B do not exceed predetermined thresholds. In addition, by setting multiple sets of upper and lower thresholds for the charge amount of resource A, it is possible to prevent the power supply to resource A from fluctuating.

[0017] The controller may also be operable to change the priorities of at least two of the plan values ​​in accordance with a deviation between one of the plan values ​​and its actual value. According to this invention, when the deviation between one planned value and its actual value disappears or the deviation becomes small to a certain extent, the priority of that planned value is lowered and the priority of the other planned values ​​is increased, thereby making it possible to aim to achieve each planned value under appropriate priorities according to changes in the control variables for the interconnection point power and resource A or B.

[0018] In addition, when the priority of the interconnection point power planned value is high, the controller may calculate a power command value for resource B by apportioning the power required to achieve the interconnection point power planned value using the amount of power required to achieve the charge / discharge amount planned value for resource A and numerical data corresponding to the priority of the charge / discharge amount planned value, and the amount of power required to achieve a production volume equivalent planned value for resource B and numerical data corresponding to the priority of the production volume equivalent planned value, and may also calculate a power command value for resource A by subtracting the calculated power command value for resource B from the power required to achieve the interconnection point power planned value. As a result, the more power a resource requires and the higher the priority of its planned value, the greater the power consumption allocated to it. For example, it is possible to achieve the interconnection point power planned value with the highest priority while controlling the order in which the charge amount of resource A and the production amount by resource B approach the planned values. Effect of the Invention

[0019] According to the present invention, it is possible to appropriately adjust the power exchanged between multiple resources and the power grid, thereby maintaining the interconnection point power at a planned value, without increasing the frequency of creating or calculating operation plans. [Brief description of the drawings]

[0020] [Figure 1] 1 is an overall configuration diagram of a power adjustment system according to a first embodiment of the present invention. [Diagram 2] FIG. 2 is a block diagram showing a first embodiment of a controller in FIG. 1. [Diagram 3] 1 is an explanatory diagram of a state in which interconnection point power is proportionally divided according to the power consumption of a power storage device and the power consumption of a hydrogen production device. FIG. [Figure 4] 3 is an explanatory diagram of upper and lower thresholds of the storage battery SOC in the first embodiment of the present invention. FIG. [Diagram 5] 3 is a diagram showing the internal configuration of a priority signal generating unit in FIG. 2. [Figure 6] FIG. 4 is an explanatory diagram of a function for calculating a priority score in the first embodiment of the present invention. [Figure 7] FIG. 4 is an explanatory diagram of the priority of each planned value in the first embodiment of the present invention. [Figure 8] FIG. 2 is a block diagram showing a second embodiment of the controller in FIG. 1; [Figure 9] FIG. 9 is an internal configuration diagram of a hydrogen production command calculation unit in FIG. 8. [Figure 10] FIG. 11 is an overall configuration diagram of a power adjustment system according to a second embodiment of the present invention. [Figure 11] FIG. 11 is a block diagram of a controller in FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0021] A: First embodiment Hereinafter, an embodiment of the present invention will be described with reference to the drawings. Fig. 1 is an overall configuration diagram of a power adjustment system according to a first embodiment of the present invention. In Fig. 1, resource A and resource B are connected in parallel, and the parallel connection point is connected to an AC power grid 40 via an interconnection point 41.

[0022] Resource A is, for example, a power storage device, and charges and discharges storage battery 12 through the operation of PCS (Power Conditioning System) 11, and exchanges AC power between interconnection point 41 and PCS 11. Resource B is various devices, circuits, means, and equipment that consume AC power supplied from the power grid 40 and produce various parameters (substances such as gas and liquid, and energy such as heat and electricity), and includes, for example, gas generation devices (hydrogen production devices, ozone generation devices, etc.), power generation devices (fuel cells, biomass power generation devices, etc.), and heating devices (electric furnaces, incinerators, etc.).

[0023] The controller 30 is an information processing device equipped with a calculation device such as a CPU, an input / output device, a storage device, a communication interface, etc. The controller 30 creates and outputs operation commands for resources A and B based on a planning command received from a higher-level or external control device such as an EMS (Energy Management System) or input by an operator's operation, the system frequency of the power system 40, an adjustment power command value (auxiliary power command value in the claims) that is irregularly generated to perform governor-free control, load frequency control, etc., and the interconnection point power and feedback values ​​from resources A and B. The specific configuration and functions of the controller 30 will be described later.

[0024] The planning commands received by the controller 30 include the selling prices of electricity and regulating power, the selling prices of various products produced by resource B, interconnection point power planning values ​​for each fixed time period planned by the system operator, and economic losses (penalties and opportunity losses) to be imposed on consumers who own each of resources A and B if these planned values ​​are not achieved. The planning command also includes a charge / discharge amount planned value for resource A and a production amount equivalent planned value corresponding to the amount of material or energy produced by resource B. The charge / discharge amount planned value for resource A may be a planned value of the SOC (charge amount or charging rate) or input / output power value of the storage battery 12. The production amount equivalent planned value for resource B may be a planned value of the amount of material or energy produced by resource B, or a planned value of power (power consumption) required for the production.

[0025] The charge / discharge planned value for resource A and the planned value equivalent to the production volume by resource B are determined by the EMS or the system operator according to the charge / discharge power of resource A and the usage plan and purpose of the product of resource B. The interconnection point power plan value may be, for example, the interconnection point power requirement that is already clear at the power supply and demand planning stage for the adjustment capacity traded in the supply and demand adjustment market or the command value of the aggregator, or may include a predicted value of the interconnection point power requirement that is not yet clear. The interconnection point power plan value may also include a baseline notified to the aggregator in advance, a reference value plan notified to the system operator, or a power generation plan value (a plan value of power to be bought and sold separately from the adjustment capacity traded in the supply and demand adjustment market or the command value of the aggregator).

[0026] In addition, the above planning command may include priority information for each planned value, which is determined based on the economic loss when the three types of planned values ​​(the interconnection point power planned value, the charge / discharge amount planned value for resource A, and the production volume equivalent planned value for resource B) are not reached or the economic loss when the adjustment capacity deviates from the plan. The controller 30 calculates a priority score (numerical data equivalent to priority) for each planned value based on the priority information and the deviation of each controlled variable and the time remaining until the plan is to be achieved, as described below, and creates a power storage device priority signal A and a hydrogen production device priority signal B by comparing the priority scores, as described in more detail below with reference to Figures 2, 5, etc.

[0027] As is well known, adjustment capability is the power used for governor-free control, load frequency control, and economical load dispatch control for the purpose of adjusting the supply and demand balance of the entire power system. This adjustment capability is divided into primary adjustment capability (governor-free control), secondary adjustment capability (load frequency control), tertiary adjustment capability (economical load dispatch control), etc., in order of the shortest response time (response time) to the command value and the shortest output duration. The adjustment capability command value input to the controller 30 is not necessarily clear at the stage of creating a plan command, as in the case of governor-free control of resource A according to the system frequency. For this reason, the controller 30 creates and outputs operation commands for resources A and B (including power command values ​​for each) reflecting adjustment capability command values ​​that are irregularly generated during the actual operation of this system.

[0028] In addition, while resource A generally has high responsiveness to the interconnection point power command value and the adjustment capability command value, there may be resources B, such as hydrogen production equipment and fuel cells, that cannot respond quickly to the interconnection point power command value and the adjustment capability command value due to their operating principles.

[0029] A-1: First Example Next, FIG. 2 is a block diagram showing a first embodiment of the controller 30 (reference numeral 30A), in which resource A in FIG. 1 is a power storage device and resource B is a hydrogen production device. 2, a controller 30A includes various power command value generating units 31, 32, and 33, a change rate limiter 34, a priority signal generating unit 35, addition and subtraction means 36a to 36g, and switch means SW1, SW2, and SW3.

[0030] The interconnection point power command value creation unit 31 generates an interconnection point power command value (instantaneous value) P based on the interconnection point power plan value, the adjustment power command value, and the system frequency. Treq and outputs it to the addition and subtraction means 36a, 36b, and 36c. The battery charging power command value generating unit 32 generates a power command value (instantaneous value) P required for charging the battery 12 based on the planned value and feedback value of the SOC of the battery 12. Breqand outputs it to the switch means SW1 and the addition / subtraction means 36d. The hydrogen production power command value creation unit 33 creates a power command value (instantaneous value) P required for hydrogen production based on the planned value of the hydrogen production amount and the feedback value of the hydrogen production amount. Hreq and outputs it to the addition and subtraction means 36d and 36e.

[0031] The addition / subtraction means 36a, 36d, 36c add or subtract input signals with the codes shown in the figure, and the output of the addition / subtraction means 36c is input to the addition / subtraction means 36b via switch means SW2. The addition / subtraction means 36e adds or subtracts the input signal with the code shown, and its output signal is input to the change rate limiter 34 via the switch means SW3 and the addition / subtraction means 36f. The output signal of the rate of change limiter 34 is the power command value P H At the same time, the signal is input to the addition / subtraction means 36g and is added / subtracted with the output signal of the addition / subtraction means 36b to obtain the power command value P B In Fig. 2, the power command value P H The power command value P B The actual power consumption value (power consumption value) of the hydrogen production equipment is used to calculate the power command value P B It is also possible to calculate As described above, the change rate limiter 34 takes into consideration the low responsiveness of the hydrogen production device, and limits the power command value P H at a speed that allows the hydrogen production device to respond.

[0032] The priority signal creation unit 35 creates and outputs a power storage device priority signal A and a hydrogen production device priority signal B based on priority information of three planned values ​​consisting of the interconnection point power planned value, the charge / discharge amount planned value for resource A (SOC planned value of the storage battery 12), and the production volume equivalent planned value for resource B (hydrogen production volume planned value), the feedback values ​​of the storage battery SOC and the hydrogen production volume, and the deviation between the feedback values ​​of the storage battery SOC, hydrogen production volume, and interconnection point power and each planned value. Specifically, a priority score (numerical data) corresponding to the priority of each planned value is calculated using a function (a function included in the priority information of each planned value) with the deviation between each feedback value of the battery SOC, hydrogen production volume, and grid-connection point power and each planned value as variables. If it is stipulated that the higher the priority score, the higher the priority, and the two planned values ​​with the highest priority scores (i.e., the two planned values ​​with the highest priorities) are set as priorities 1 and 2, then the on / off of the battery storage device priority signal A and the hydrogen production device priority signal B is determined based on the combination of the two planned values ​​corresponding to priorities 1 and 2, as shown in Table 1. [Table 1]

[0033] As is clear from Table 1, when the power storage device priority signal A is on, the two planned values ​​with high priority will always include the charge / discharge amount planned value of the power storage device (the SOC planned value of storage battery 12), and when the hydrogen production device priority signal B is on, the two planned values ​​with high priority will always include the planned value equivalent to the production volume of the hydrogen production device (the hydrogen production volume planned value).

[0034] The priority information for each planned value may be determined based on at least one of the economic loss per unit of power amount that is expected when the planned value is not achieved when the planned value is converted into power amount and the economic loss incurred when the actual value deviates from a certain range around the planned value. The reason for determining the priority information in this way is that the economic loss may increase in proportion to the deviation between the planned value and the actual value, and the economic loss may increase suddenly when the actual value deviates from a certain range around the planned value, and therefore it is desirable to set a higher priority for planned values ​​that have a larger economic loss, thereby reducing the economic loss.

[0035] 2 are turned on / off according to the on / off logic of priority signals A and B shown in Table 1. That is, switch means SW1 is turned on when priority signal A is on, switch means SW3 is turned on when priority signal B is on, and switch means SW2 is turned on when priority signals A and B are both on.

[0036] As a result, the power command value for the hydrogen production device and the power command value for the power storage device output from the controller 30A in Fig. 2 in response to the on / off state of the priority signals A and B are as follows: Note that for the sake of simplicity, it is assumed that the power command values ​​are not limited by the rate of change limiter 34. (1) Priority signal A is on, priority signal B is off Power command value P of hydrogen production equipment H =P Treq -P Breq Power command value P for the power storage device B =P Treq -P H =P Breq (2) Priority signal A is off, priority signal B is on Power command value P of hydrogen production equipment H =P Treq +(P Hreq -P Treq )=P Hreq Power command value P for the power storage device B =P Treq -P H =P Treq -P Hreq (3) Priority signals A and B are both on Power command value P of hydrogen production equipment H =P Treq -P Breq +{P Hreq -(P Treq -P Breq )}=P Hreq Power command value P for the power storage device B =P Treq +(P Breq +P Hreq -P Treq )-P H =PBreq

[0037] As described above, when (1) priority signal A is on and priority signal B is off, and when (2) priority signal A is off and priority signal B is on (in Table 1, the priority of the interconnection point power plan value is high, and the priority is 1 or 2), the interconnection point power command value P Treq to the power command value P of the hydrogen production unit H The value obtained by subtracting (P Treq -P Hreq ) is the power command value P B It states that: As a result, even if the hydrogen production device, which has low responsiveness, cannot respond instantaneously to the command value, the delay is cancelled out and the interconnection point power command value P Treq A power command value P of the power storage device that achieves B can be obtained. In addition, (3) when both priority signals A and B are on, the power command value P H P Hreq is output as is, and the power command value P B P Breq will be output as is.

[0038] Power command value P of the power storage device B is transmitted to the PCS 11 in the storage device (resource A) as part of the operation command in FIG. B At the same time, the power at the interconnection point 41 is adjusted to the interconnection point power command value P Treq The power conversion is performed so that the power can be quickly adapted to the demands. On the other hand, the power command value P H is transmitted to the hydrogen production device (resource B) as part of the operation command in FIG. 1, and AC power for producing hydrogen by electrolyzing pure water is supplied from the interconnection point 41. This power command value P H In addition, in conjunction with the storage device, the power at the interconnection point 41 is controlled to its command value P TreqHowever, taking into consideration the fact that the hydrogen production device has a low responsiveness to a command value as described above, the command value is given to the hydrogen production device via a rate of change limiter 34. Here, the power command value P B ,P H It goes without saying that the value is within a range that satisfies the constraints of the rated capacity and rated output of the electricity storage device and the hydrogen production device.

[0039] In addition, when the priority of the interconnection point power plan value is high (as described above, (1) priority signal A is on and priority signal B is off, and (2) priority signal A is off and priority signal B is on), the amount of power required to achieve the storage battery SOC plan value is calculated as W b The numerical data corresponding to the priority of the planned value (priority score described later) is k b The amount of electricity required to achieve the planned hydrogen production volume is W h , the numerical data corresponding to the priority of the planned value (also the priority score) is k h The power required to achieve the interconnection point power plan value (receiving power direction is positive) is P tide In this case, the controller 30A notifies the hydrogen production device that its power consumption is {W h k h / (W h k h +W b k b )}P tide The power command value P H The storage device is provided with P tide From the above {W h k h / (W h k h +W b k b )}P tide minus P Treq -{W h k h / (W h k h +W b k b )}P tide ={W b k b / (W h k h +W b kb )}P tide The power command value P B It may be given as:

[0040] In other words, as shown in Figure 3, the power P required to achieve the interconnection point power plan value is tide (Power required to achieve the planned hydrogen production volume value): (Power required to achieve the planned battery SOC value) = (W h k h ):(W b k b ) to generate the power command value for each resource. As a result, the higher the power consumption of the resource and the higher the priority of the planned value, the lower the interconnection point power P tide As a result, it is possible to adjust the power so that both the hydrogen production amount and the storage battery SOC are brought as close as possible to their respective planned values ​​while achieving the interconnection point power planned value with high priority. In this case, it is possible to determine whether to give priority to the hydrogen production amount or the storage battery SOC in bringing them closer to their respective planned values, depending on the priority of the two.

[0041] The priority signal creation unit 35 shown in FIG. 2 receives the SOC of the storage battery 12 as feedback as resource information, and the priority signal creation unit 35 compares this feedback value with the first and second upper and lower threshold values ​​shown in FIG. 4 to create the storage device priority signal A. 4 is a threshold for forcibly giving top priority to the planned value of the storage battery SOC (setting the power storage unit priority mode) when the SOC of the storage battery 12 exceeds this threshold. The second upper limit threshold is a threshold for canceling the power storage unit priority mode and transitioning to a control mode for achieving the planned value with the highest priority output from each of the priority score calculation units 35a to 35c when the SOC falls below this threshold during the power storage unit priority mode. The first lower limit threshold is a threshold for forcibly giving top priority to the planned value of the storage battery SOC (switching to the power storage unit priority mode) when the SOC falls below this threshold. The second lower limit threshold is a threshold for canceling the power storage unit priority mode and switching to a control mode for achieving the planned value with the highest priority output from each of the priority score calculation units 35a to 35c when the SOC exceeds this threshold during the power storage unit priority mode.

[0042] In the battery priority mode, the planned value of the storage battery SOC is considered to have the highest priority, regardless of the priority information of each planned value input to the controller 30A. This battery priority mode corresponds to the case where the priority signal A in Table 1 is on (the above-mentioned (1) the case where the priority signal A is on and the priority signal B is off, and (3) the case where both the priority signals A and B are on), and the power command value for the battery is P B =P Breq It is.

[0043] In this way, by forcibly shifting to the power storage device priority mode according to the SOC of the storage battery 12, the charge / discharge plan value of the power storage device can be achieved with the highest priority. If the second upper and lower limit thresholds are set inside the first upper and lower limit thresholds as shown in FIG. 4, the amount of power and time required for the SOC to change from when the power storage device priority mode is entered to when the mode is released can be achieved. However, by setting the first and second upper and lower limit thresholds in this way, the problem of power oscillation caused by frequent switching on and off of the power storage device priority mode can be avoided. Instead of providing the second upper and lower limit thresholds, the power storage device priority mode may be released after the SOC has been below the first upper limit threshold or above the first lower limit threshold for a certain period of time.

[0044] In addition, as shown in FIG. 2, the hydrogen storage amount is fed back to the priority signal creation unit 35 as resource information, and the priority signal creation unit 35 compares this feedback value with the first and second upper limit thresholds (first upper limit threshold > second upper limit threshold) to create the hydrogen production device priority signal B. The first upper limit threshold is a threshold for forcibly giving top priority to the planned value of the hydrogen production amount (switching to hydrogen production device priority mode) when the hydrogen storage amount exceeds this threshold. The second upper limit threshold is a threshold for canceling the hydrogen production device priority mode and switching to a control mode that achieves the planned value with the highest priority output from each priority score calculation unit 35a to 35c when the hydrogen storage amount falls below this threshold during the hydrogen production device priority mode. As a result, for example, if there is a threshold below which hydrogen should not be stored due to tank capacity constraints, by setting the first upper limit threshold below this threshold, the amount of hydrogen stored can be controlled so that it does not exceed the first upper limit threshold or the increase due to the planned value of the hydrogen production amount. Incidentally, in this embodiment, devices that consume the produced hydrogen are not included in the control targets, so the first and second lower limit thresholds as shown in FIG. 4 are not necessary.

[0045] FIG. 5 is a diagram showing the internal configuration of the priority signal generating unit 35. As shown in FIG. Based on the knowledge that the priorities of the hydrogen production volume planned value, the battery SOC planned value, and the grid-connection point power planned value are values ​​that can change depending on the deviation between the planned values ​​and the actual values, in Figure 5, the priority score calculation units 35a, 35b, 35c, the hydrogen production device priority mode determination unit 35f, the storage device priority mode determination unit 35g, and the comparison unit 35h operate to calculate appropriate priority scores for each planned value depending on the deviation between each feedback value and each planned value, and priority signals A and B are created based on these priority scores.

[0046] In Figure 5, priority information for the hydrogen production volume planned value and the deviation between the feedback value (actual value) of the hydrogen production volume and the planned value are input to the priority score calculation unit 35a, and the priority score for the hydrogen production volume planned value is calculated by substituting the deviation into a predetermined function as priority information. The priority score calculation unit 35b for the interconnection point power planned value receives priority information for the interconnection point power planned value and the deviation between the feedback value (actual value) of the interconnection point power and the planned value, and calculates the priority score for the interconnection point power planned value by substituting the deviation into a predetermined function as priority information, and outputs the result to the comparison unit 35h. The priority score calculation unit 35c for the battery SOC planned value receives priority information for the battery SOC planned value and the deviation between the feedback value (actual value) of the battery SOC and the planned value, and calculates the priority score for the battery SOC planned value by substituting the deviation into a predetermined function as priority information.

[0047] For example, as shown in Fig. 6(a), a function f(x) such that the greater the deviation x between the original planned value and the actual value of the hydrogen production volume, the greater the priority score of the hydrogen production volume plan value is sent as priority information from the upper system to the priority score calculation unit 35a in the priority signal creation unit 35. Then, by substituting the current deviation X into the function f(x), a priority score f(X) is calculated as a unique numerical value, and this value is used as the priority score k. h In the function f(x) shown in FIG. 6(a), C is the slope and Y0 is the intercept. The above-mentioned calculation process of the priority score is basically the same for the priority score calculation units 35b and 35c for the other planned values.

[0048] 5, the hydrogen production device priority mode determination unit 35f determines that the hydrogen production device priority mode has been entered when the feedback value of the hydrogen storage amount exceeds the first upper limit threshold as described above, and outputs a large numerical value so that the planned value of the hydrogen production device is prioritized. This numerical value may be any value (101 or more) as long as it is larger than the maximum value (e.g., 100) of the priority score output from the priority score calculation units 35a, 35b, 35c. Furthermore, the power storage device priority mode determination unit 35g determines that the power storage device priority mode has been entered when the feedback value of the storage battery SOC exceeds the first upper limit threshold as shown in Fig. 4, and outputs a large numerical value so that the power storage device is prioritized. As in the above, this numerical value may be any value as long as it is sufficiently larger than the priority score that the priority score calculation units 35a, 35b, and 35c can output.

[0049] Therefore, in the hydrogen production device priority mode, the priority score k is calculated by the addition / subtraction means 35d. h In the power storage device priority mode, sufficiently larger numerical data is input to the comparison unit 35h, and the priority score k is calculated through the addition / subtraction means 35e. b Sufficiently larger numerical data is input to the comparison unit 35h. In the comparison unit 35h, the outputs of the addition / subtraction means 35d and 35e and the output of the priority score calculation unit 35b of the interconnection point power plan value (priority score k p ) and determines the two planned values ​​with the highest priority (planned values ​​with priority 1 or 2) in Table 1 mentioned above, and determines and outputs the on / off logic of priority signals A and B based on the two planned values.

[0050] As a result of the above operations, in the comparison unit 35h, when there is a large deviation between the feedback value of the hydrogen production amount and the planned value, and when the hydrogen production device priority mode is in effect, the planned value of the hydrogen production device is at least included in the two planned values ​​with high priority, and when there is a large deviation between the feedback value of the battery SOC and the planned value, and when the power storage device priority mode is in effect, the planned value of the power storage device is at least included in the two planned values ​​with high priority. This makes it possible to adjust the interconnection point power, hydrogen production amount, and battery SOC in accordance with the deviation between the feedback value and the planned value of each controlled variable and a priority that is appropriately determined depending on the type of priority mode.

[0051] It is not necessary that the planned value of the power storage device is given the highest priority in the power storage device priority mode, or that the planned value of hydrogen production is given the highest priority in the hydrogen production device priority mode. For example, the priority signal creation unit 35 may create a priority signal so that the planned value of the storage battery is given priority 2 or higher (priority 1 or 2) in the power storage device priority mode, and so that the planned value of hydrogen production is given priority 2 or higher (priority 1 or 2) in the hydrogen production device priority mode. According to this method, it is possible to operate resources having lower priority plan values ​​so as to achieve the plan of the resource in priority mode without changing the priority of the plan value or command value that is desired to be the highest priority. When a plan value other than the plan or command value that is desired to be the highest priority is in priority mode, the priority of the plan or command value that is desired to be the highest priority may automatically become the lowest, but this does not pose a problem because it is impossible to follow the plan or command value that is desired to be the highest priority unless the priority mode of at least one of the resources is released in the first place.

[0052] The deviation between the feedback value of each controlled variable and the planned value can be not only a positive value (shortage) but also a negative value (excess). Therefore, the priority information sent from the upper system may include a function corresponding to the positive or negative deviation (shortage or excess), such as f1(x) shown in Fig. 6(b). This allows charging and discharging (forward current / reverse current) so that the battery SOC and the interconnection point power do not deviate from the target values. In addition, although this embodiment does not include a means for consuming the produced hydrogen, it is possible to stop production or minimize the output power to the hydrogen production device so that hydrogen is not produced in excess. In addition, in Figures 6(a) and (b), the priority scores are calculated using functions f(x) and f1(x) of the deviation x between the feedback value of each controlled variable and the planned value, but the above functions may be functions of the deviation between the feedback value and the planned value of another controlled variable. For example, the priority score of a storage battery may be a function of the deviation between the feedback value of the hydrogen production volume and the plan, or the deviation between the feedback value of the interconnection point power and the planned value. Furthermore, the priority score of a storage battery may be a function of the remaining time until the planned value is to be achieved.

[0053] Next, Fig. 7 shows an example in which the priority signal creation unit 35 changes the priority of each planned value depending on the deviation between the feedback value (actual value) of each controlled variable and the planned value. Here, as an example, the planned values ​​of the interconnection point power, hydrogen production amount, and storage battery SOC are assigned priorities of 1, 2, and 3, respectively, until the actual value of the hydrogen production amount reaches a, which is close to the planned value, and when the actual value of the hydrogen production amount exceeds a, the priority of the planned value of the hydrogen production amount is lowered to 3 and replaced with the planned value of the storage battery SOC. The magnitude of the predetermined value a and the slope of the hydrogen production amount may be determined taking into consideration economic losses due to not reaching the planned value, etc. Even if each planned value cannot be achieved exactly, it may be sufficient if it reaches a certain approximation. Therefore, when the actual value of the hydrogen production amount, etc. approaches the planned value, the priority of the planned value is lowered and other planned values ​​are given priority, which contributes to the achievement of each planned value as a whole. The above-mentioned operation of changing the priority of each planned value is carried out by using the priority scores k k calculated by the priority score calculation units 35a, 35b, and 35c in FIG. h ,k p ,k b This can be achieved by reflecting the above in determining the priority.

[0054] A-2: Second Example FIG. 8 is a block diagram showing a second embodiment of the controller 30 (reference numeral 30B), and this second embodiment also corresponds to a case in which resource A in FIG. 1 is a power storage device and resource B is a hydrogen production device.

[0055] The controller 30B in FIG. 8 differs from the controller 30A in FIG. 2 mainly in that the switch means SW1 in FIG. 2 has been removed, a hydrogen production command calculation unit 37 has been provided instead of the rate of change limiter 34 in FIG. 2, and the switch means SW3 is turned on when both priority signals A and B are on. The hydrogen production command calculation unit 37 receives feedback values ​​of the hydrogen production amount and the storage battery SOC, planned values, and priority information, as well as a signal (A∩B) that is turned on when both priority signals A and B are on. This signal (A∩B) is turned off when the interconnection point power planned value is included in the two planned values ​​with high priority. Furthermore, the hydrogen production command calculation unit 37 receives the output of the addition and subtraction means 36f as P in is entered as

[0056] In the above configuration, when the priority of the planned value of the hydrogen production amount and the storage battery SOC is high (both are priority 1 or 2), the priority signals A and B are both turned on according to Table 1, and the switch means SW2 and SW3 are both turned on. The input of the hydrogen production command calculation unit 37 is P in =P Hreq The hydrogen production command calculation unit 37 operates in the same manner as the change rate limiter 34 in FIG. Hreq This is the power command value P H The power command value P B P Breq It becomes.

[0057] In addition, when the priority of either the hydrogen production amount or the battery SOC plan value is 3 (when the priority of the interconnection point power plan value is 1 or 2), both of the switch means SW2 and SW3 are turned off. As a result, the input of the hydrogen production command calculation unit 37 is P in =P Treq The power command value P H is calculated. Also, the power command value P B is the interconnection point power command value P Treq to the power command value P of the hydrogen production unit H The value is the subtraction value. In FIG. 8, the power command value P H The power command value P B In the same manner as in the first embodiment, the actual power value (power consumption value) of the hydrogen production device is used to calculate the power command value P B It is also possible to calculate

[0058] FIG. 9 is a diagram showing the internal configuration of the hydrogen production command calculation unit 37 in FIG. The hydrogen production volume plan value priority score calculation unit 37a calculates the priority score k of the hydrogen production volume plan value by the same operation as the priority score calculation unit 35a in FIG. h 5. The battery SOC planning value priority score calculation unit 37b calculates the battery SOC planning value priority score k b Calculate these priority scores k h ,k b is input to the hydrogen production command distributor 37c. In addition, the externally input P in is the power P required to achieve the interconnection point power plan value. tide is input to the hydrogen production command distributor 37c.

[0059] On the other hand, the deviation between the planned value of the hydrogen production amount and the feedback value is calculated by the addition / subtraction means 37d, and this deviation is input to the power amount conversion unit 37f to convert it into the power amount W required to achieve the planned value of the hydrogen production amount. h In addition, the deviation between the planned value of the battery SOC and the feedback value is calculated by the addition / subtraction means 37e, and this deviation is input to the power amount conversion unit 37g to convert the amount of power W required to achieve the planned value of the battery SOC. b is calculated. These power amounts W h ,W b is input to the hydrogen production command distributor 37c.

[0060] The hydrogen production command distribution unit 37c uses the various input signals described above to calculate the power consumption of the hydrogen production device {W h k h / (W h k h +W b k b )}P tide The power consumption is input to the command selection unit 37h as a signal x. The command selection unit 37h also receives a signal (A∩B) and a power P in is input as the signal y. The command selection unit 37h outputs a signal x when the signal (A∩B) is off. tide =P in =P Treq Therefore, the command selection unit 37h outputs the power consumption of the hydrogen production device as {W h k h / (W h k h +W b k b )}P Treq will be output. Also, when the signal (A∩B) is on, the input signal y of the command selection unit 37h, i.e., the power P in P Hreq And this P Hreq is output as is. The above operation is performed in order to make the hydrogen production command calculation unit 37 function in the same way as the rate of change limiter 34 in FIG. The change rate limiter 37i following the command selector 37h determines the power command value P H It functions to adjust the speed at which changes in pressure are detected and then provide the changes to the hydrogen production system.

[0061] According to the controller 30B of the second embodiment, when the interconnection point power planned value is included in the two planned values ​​with high priority (priority 1 or 2), the operation described in claim 10 becomes possible, and when the interconnection point power planned value is not included in the two planned values ​​with high priority, the operation described in claim 7 becomes possible. Note that the operation described in claim 10 may be performed only when the interconnection point power planned value has the highest priority (priority 1), and the operation described in claim 7 may be performed in other cases.

[0062] B: Second embodiment Next, Fig. 10 is an overall configuration diagram of a power adjustment system according to a second embodiment of the present invention. In Fig. 10, a plurality of resources A to D are connected in parallel, and the parallel connection point is connected to an AC power grid 40 via an interconnection point 41.

[0063] Like resources A and B in the first embodiment, resources A to D are various devices, circuits, means, and equipment that receive AC power supplied from power grid 40 and produce various parameters (substances such as gas and liquid, and energy such as heat and electricity), and include, for example, storage batteries, gas generation devices (hydrogen production devices, ozone generation devices, etc.), power generation devices (fuel cells, biomass power generation devices, etc.), and heating devices (electric furnaces, incinerators, etc.). Of resources A to D, resource A is the most responsive resource, resource B is the second most responsive resource after resource A, resource C is the second most responsive resource after resource B, and resource D is the least responsive resource.

[0064] The controller 30C, like the controller 30A or 30B in the first embodiment, is an information processing device equipped with a calculation device such as a CPU, an input / output device, a storage device, a communication interface, etc., and creates and outputs operation commands for resources A to D based on planning commands received from a higher-level or external control device such as an EMS or input by an operator's operation, the system frequency of the power system 40, an adjustment power command value (auxiliary power command value in the claims) that is generated irregularly to perform governor-free control, load frequency control, etc., and the interconnection point power and feedback values ​​from resources A to D. The specific configuration and functions of the controller 30C will be described later.

[0065] The planning command received by the controller 30C includes the selling price of electricity and adjustment power, the selling prices of products produced by resources A to D if any, interconnection point power planning values ​​for each fixed time period planned by the system operator, and economic losses (penalties) to be imposed on consumers who own each of resources A to D if these planned values ​​are not achieved. The planning command includes planned values ​​of charge / discharge amounts of resources A to D or planned values ​​equivalent to production amounts corresponding to the amounts of materials or energy produced. In the case of planned values ​​of charge / discharge amounts, planned values ​​of charging power amounts or input / output power values ​​may be used, and in the case of planned values ​​equivalent to production amounts, planned values ​​of the amounts of materials or energy produced or planned values ​​of power (power consumption) required for the production may be used.

[0066] The charge / discharge amount plan values ​​or production amount equivalent plan values ​​of resources A to D are determined by the EMS or the system operator according to the resource charge / discharge power or product usage plan / purpose of use. The interconnection point power plan value is the interconnection point power demand amount that is clear at the power supply and demand planning stage, such as when performing demand response control, and may be a predicted value. The interconnection point power plan value may also include a reference value plan (a planned value of power to be bought and sold separately from demand response) notified to the grid operator in advance.

[0067] In addition, the above planning command may include priority information for each planned value, which is determined based on the economic loss when the five types of planned values ​​(the interconnection point power planned value and the charge / discharge amount planned values ​​or the production amount equivalent planned values ​​for resources A to D) are not reached or the economic loss when the adjustment capacity deviates from the plan.

[0068] The adjustment capability command value input to the controller 30C is not necessarily clear at the stage of creating a plan command, as in the case of governor-free control according to the system frequency, as in the controllers 30A and 30B in the first embodiment. For this reason, the controller 30C creates and outputs operation commands for the resources A to D (including power command values ​​for each of them) reflecting adjustment capability command values ​​that are irregularly generated during the actual operation of this system.

[0069] Among resources A to D, resource A has the highest responsiveness and has the ability to respond immediately to the interconnection point power command value and the adjustment capacity command value, whereas among resources B to D, there may be some resources, such as hydrogen production equipment and fuel cells, that cannot respond immediately to the interconnection point power command value and the adjustment capacity command value due to their operating principles.

[0070] FIG. 11 is a block diagram showing the controller 30C. In FIG. 11, a controller 30C includes a required power command value generating section 38, change rate limiters 38a to 38c, and addition / subtraction means 39a to 39f.

[0071] The required power command value creation unit 38 generates the required power command value P for the resources A to D based on the interconnection point power plan value, the adjustment power command value, the system frequency, the operation plans of the resources A to D which are the plan commands for each of the resources A to D, the feedback values ​​of the resources A to D, and the priority information of each plan value. Areq ~P Dreq Create a. The required power command value creating unit 38 determines the priority order of each planned value based on the deviation between the priority information and each controlled variable. For example, similar to the controller 30A or 30B in the first embodiment, the required power command value creating unit 38 may calculate a priority score (numerical data corresponding to a priority) based on the deviation between the priority information and each controlled variable, and determine the priority order in descending order of the planned values ​​having the largest priority score. In addition, similar to the controller 30A or 30B in the first embodiment, when the charge amount or the storage amount of the product as each resource information exceeds or falls below a certain threshold, the priority of the planned value may be determined by a resource priority mode in which the priority is set to a predetermined level or higher.

[0072] The required power command value creation unit 38 determines the required power command value P Areq ~P Dreq Determine. (1) In the case of a resource with a planned value that has a higher priority than the grid-connection point power The power (instantaneous value) required to achieve the planned value of each resource is the required power command value for that resource. For example, it is the amount of power required from the present time until the time when the plan is to be achieved divided by the time until the time when the plan is to be achieved. (2) For the resource with the lowest planned priority The required power command value for that resource is the power (instantaneous value) required to track the interconnection power planning value and the adjustment power command value minus the sum of the power (instantaneous value) required to achieve the planning values ​​of other resources. (3) For other resources The power (instantaneous value) required to achieve the planned value of each resource becomes the requested power command value of that resource. However, if the requested power command value of a resource with one lower priority exceeds the maximum capacity or falls short of the minimum capacity of the resource with one lower priority, the requested power command value of that resource is the excess amount added to it.

[0073] According to the above embodiment, in order from a resource having a planned value with a lower priority, a power command value that achieves a planned value with a higher priority can be set as the required power command value of that resource.

[0074] In addition, if the sum of the required power command values ​​of each resource that becomes the interconnection point power exceeds the installed capacity of the interconnection point power as a result of the above operation, the controller 30C may subtract the excess from the required power command value of the resource that has a priority level one level higher than the interconnection point power, and for resources that have a priority level two or more levels higher than the interconnection point power, may determine the required power command value of the resource in accordance with the above (3). This allows the required power command value for a resource to be determined in order from the resource with the lower priority planned value, taking into account the constraints of the installed capacity of the interconnection point power, and to be the power command value that achieves the planned value with the higher priority.

[0075] The controller 30C determines the required power command value P Dreq is input to the change rate limiter 38c, and the output of the change rate limiter 38c is the power command value P D The output is as follows: The change rate limiter 38c takes into account the low responsiveness of the resource D and sets the power command value P D This is provided to allow resource D to change at a speed that is responsive to the resource.

[0076] In addition, the controller 30C calculates the required power command value P Creq The required power command value P Dreq and further via the addition / subtraction means 39f, the power command value PD The power command value P for resource D to be subtracted by the addition / subtraction means 39f is input to the change rate limiter 38b. D may be a feedback value of the power exchanged with the resource D. The output of the change rate limiter 38b is set as the power command value P C The output is as follows: The change rate limiter 38b takes into account the low responsiveness of the resource C and sets the power command value P C This is provided to allow resource C to change the value at a speed that is responsive to the resource. According to the above configuration, the difference between the input and output of the change rate limiter 38c is the required power command value P Creq Since the power command value P Dreq The component that resource D cannot keep up with and is cut by the change rate limiter 38c can be made to be borne by resource C.

[0077] In addition, the controller 30C calculates the required power command value P Breq The required power command value P Creq and further via the addition / subtraction means 39d, the power command value P C The power command value P of the resource C to be subtracted by the addition / subtraction means 39d is input to the change rate limiter 38a. C may be a feedback value of the power exchanged with the resource C. The output of the change rate limiter 38a is set as the power command value P B The output is as follows: The change rate limiter 38a takes into account the low responsiveness of the resource B and sets the power command value P B This is provided to allow resource B to change the value at a speed that is responsive to the resource. According to the above configuration, the difference between the input and output of the change rate limiter 38b is the required power command value P Breq Since the power command value P CreqThe component that resource C cannot keep up with and is cut by the change rate limiter 38b can be made to be borne by resource B.

[0078] In addition, the controller 30C calculates the required power command value P Areq The requested power command value P Breq and further via the addition / subtraction means 39b, the power command value P B The power command value P of resource A is A At this time, the power command value P of the resource B to be subtracted by the addition / subtraction means 39b is output as B may be a feedback value of the actual amount of power exchanged in resource B. According to the above configuration, the difference between the input and output of the change rate limiter 38a is the required power command value P Areq Since the power command value P Breq The component that resource B cannot keep up with and is cut by the change rate limiter 38a can be made to be borne by resource A.

[0079] As mentioned above, the required power command value P Areq ~P Dreq may be a power command value that achieves tracking of a planned value or command value with a higher priority, and is not necessarily a power command value that achieves the planned value of the resource. Therefore, the required power command value P Areq ~P Dreq If tracking is not possible as planned, there is a risk that tracking of planned or command values, which have higher priority, will not be achieved. According to the controller 30C, the required power command value P of each resource except for the resource A having the highest responsiveness is Breq ~P Dreq When a command value that changes too quickly for each resource to keep up with is input, the power that the resource could not keep up with can be superimposed on the command value of a resource with higher responsiveness. Areq ~P DreqThis makes it easier to track planned values ​​with higher priorities, making it easier to achieve planned values ​​with higher priorities.

[0080] For example, when the priority of the grid-connection power is the highest, the required power command value P Areq ~P Dreq is output from the required power command value creation unit 38 so that the sum coincides with the power value (instantaneous value) required to follow the interconnection point power plan value and the adjustment capability command value. According to the controller 30C, due to the low responsiveness of the resources, the required power command value P Breq ~P Dreq Even if the power consumption of each resource is not kept up to the target, the power consumption that could not be kept up to is compensated for by the resource with higher responsiveness. Therefore, the sum of the output of all resources is equal to the required power command value P Areq ~P Dreq This makes it possible to track the planned value and adjustment capability command value of the interconnection point power with the highest priority.

[0081] Furthermore, according to the controller 30C, the required power command value P Breq ~P Dreq When a command value that changes at a speed that each resource cannot keep up with is input, the amount of power that cannot be kept up with can be superimposed on the command value of the resource with the next highest responsiveness. As a result, the power that the less responsive resources B to D were unable to keep up with can be borne by the most responsive resource A in order of the slowest resources that can respond, without being borne by the most responsive resource A alone. A When the power requirement command value P Breq ~P Dreq This can avoid situations where the above-mentioned objectives are not achieved.

[0082] In the second embodiment, only the case where there are four resources has been described, but the number of resources may be any number equal to or greater than two. In this case, the required power command value creating unit 38 may create required power command values ​​for all resources by the method described above. Furthermore, the requested power command value of the resource with the lowest responsiveness may be used as the power command value of that resource as is. Furthermore, the required power command value of the most responsive resource can be determined by subtracting the required power command value of the next most responsive resource and then adding the power command value or power feedback value of the next most responsive resource to the required power command value of that resource. In addition, the required power command value of other resources can be calculated by subtracting the required power command value of the resource with the next highest responsiveness after the resource in question, and then adding the power command value or power feedback value of the resource with the next highest responsiveness after the resource in question to the required power command value of the other resource. Furthermore, the required power command value of each resource may be subjected to the above calculation, and then passed through a change rate limiter or a low-pass filter to convert it into a command value to which the resource can respond, and the result may be used as the power command value of each resource. The change rate limiter and the low-pass filter are collectively expressed as a smoothing means for suppressing (i.e., smoothing) the time fluctuation of the command value.

[0083] In the second embodiment, the required power command value P Areq ~P Dreq However, the power command value P A ~P D That is, the required power command value P Areq ~P Dreq The elements that modify the required power command value P may be omitted. For example, the change rate limiters 38a to 38c and the adding and subtracting means 39a to 39f in FIG. 11 may be omitted. Areq ~P Dreq At least some of the elements that modify the power command value may be included in the required power command value generating unit 38.

[0084] In the first and second embodiments, the power command values ​​are generated based on the planned values ​​of the respective resources. However, the power command values ​​may be generated based on the charging and discharging of resources or temporary requirements of products.

[0085] As described above, in the power adjustment system of the present invention, the basic principle is to follow the priorities of various planned values ​​taking into account economic efficiency, while also taking into account the responsiveness and constraints of each resource, and by flexibly changing the priorities depending on the achievement status of the planned values ​​and determining the power command value for each resource, it is possible to adjust the power of the entire system so as to maintain the interconnection point power and the power supplied to each resource according to the planned values. [Explanation of symbols]

[0086] A, B, C, D: Resources 11: PCS 12: Battery 30, 30A, 30B, 30C: Controller 31: Interconnection point power command value creation unit 32: Battery charging power command value creation unit 33: Hydrogen production power command value creation unit 34: Rate of change limiter 35: Priority signal generator 35a: Priority score calculation unit for hydrogen production volume plan value 35b: Priority score calculation unit for interconnection point power plan value 35c: Battery SOC planning value priority score calculation unit 35f: Hydrogen production device priority mode determination unit 35g: Power storage device priority mode determination unit 35h: Comparison section 36a, 36b, 36c, 36d, 36e, 36f, 36g: Addition and subtraction means 37: Hydrogen production command calculation unit 37a: Priority score calculation unit for hydrogen production volume plan value 37b: Battery SOC planning value priority score calculation unit 37c: Hydrogen production command distribution section 37d, 37e: Addition and subtraction means 37f, 37g: Electric energy conversion section 37h: Command selection section 37i: Rate of change limiter 38: Required power command value creation unit 38a, 38b, 38c: Rate of change limiter 39a, 39b, 39c, 39d, 39e, 39f: Addition and subtraction means 40: Power system 41: Connection point

Claims

1. A power generation system includes a plurality of resources including a resource capable of transmitting and receiving AC power between the power generation system and a power grid, or a resource capable of producing a parameter by using AC power supplied from the power grid, A power adjustment system that adjusts power of the plurality of resources so as to maintain power at a connection point between the plurality of resources and the power system at a connection point power plan value, an auxiliary power command value that is a power command value for the connection point that is undetermined at a stage of creating the plan value, or a total value thereof, a controller that determines power command values ​​for each of the plurality of resources to achieve each planned value and command value in accordance with a priority taking into consideration economic efficiency, based on the interconnection point power planned value, the transmission / reception power planned values ​​of the plurality of resources, and the auxiliary power command value, within a range that satisfies a constraint set for each of the plurality of resources. A power conditioning system comprising:

2. 2. The power conditioning system according to claim 1, The controller: determining a priority order of the plurality of resources and the interconnection point power in descending order of the priority; A function of setting a power command value of a resource other than the resource with the lowest priority as a power required to achieve a planned value of the power transfer of the resource other than the resource with the lowest priority; a function of setting a power command value of a resource having the lowest priority as a sum of the power required to achieve the interconnection point power plan value and the power required to follow the auxiliary power command value, minus the total power required to achieve each plan value of all resources other than the resource having the lowest priority; A power conditioning system comprising:

3. 3. The power conditioning system according to claim 2, The controller: When a power command value of a resource C, which is any one of the plurality of resources, is outside an adjustable range of power transmitted and received by the resource C, the power command value of the resource C that exceeds the adjustable range is added to a power command value of a resource that has one priority higher than the resource C. A power conditioning system comprising:

4. 3. The power conditioning system according to claim 2, The controller: When a total value of power command values ​​of the plurality of resources exceeds an installation capacity of the interconnection point, a power amount corresponding to the total value exceeding the installation capacity of the interconnection point is subtracted from a power command value of a resource having a priority level one level higher than the interconnection point power. A power conditioning system comprising:

5. 5. The power conditioning system according to claim 4, The controller: a function of adding one of a difference between a power command value and an input / output power of any one of the plurality of resources, and a difference between the power command value of the resource and a power command value of the resource that has been filtered through a rate of change limiter or a low-pass filter in consideration of the responsiveness of the resource, to a power command value of a resource having the second lowest responsiveness after the resource. A power conditioning system comprising:

6. 6. The power conditioning system according to claim 5, the plurality of resources include a resource A capable of receiving and transmitting AC power between the power grid and a resource B capable of producing a parameter using AC power supplied from the power grid; The controller: Among the interconnection point power plan value, the charge / discharge amount plan value which is the transfer power plan value of resource A, and the production amount equivalent plan value which is the transfer power plan value of resource B, two plan values ​​with high priorities are selected, and the instantaneous power required to achieve the charge / discharge amount plan value is calculated as P BreqThe instantaneous power required to achieve the planned value equivalent to the production volume is P Hreq , the power command value of the interconnection point is P Treq When I said that, When the charge / discharge amount plan value and the interconnection point power plan value have high priority, the power command value for resource B is set to P Treq -P Breq The power command value for resource A is set to P Treq a function of subtracting the power command value for resource B from the When the production volume equivalent plan value and the interconnection point power plan value have high priority, the power command value for resource B is Hreq The power command value for resource A is set to P Treq a function of subtracting the power command value for resource B from the When the charge / discharge amount plan value and the production amount equivalent plan value have high priority, the power command value for resource B is set to P Hreq The power command value for resource A is set to P Breq The function of A power conditioning system comprising:

7. 6. The power conditioning system according to claim 1, The controller: A power adjustment system characterized by determining priorities of the transmission and reception power plan values ​​and the interconnection point power plan values ​​of the multiple resources based on priorities calculated from equipment constraints of the multiple resources and priorities calculated taking into account economic efficiency.

8. 6. The power conditioning system according to claim 1, The controller transitions to a resource D priority mode in which a priority of the planned power transfer value of resource D is set so that the priority is higher than a predetermined priority level depending on a comparison result between the charge amount of resource D, which is one of the multiple resources, and multiple thresholds, or the production or storage amount of resource D and multiple thresholds, and determines a power command value of at least one resource other than resource D so that the planned power transfer value of resource D is achieved.

9. 6. The power conditioning system according to claim 1, The power adjustment system is characterized in that the controller changes the priority of at least one of the planned values ​​depending on the deviation between the interconnection point power planned value or the transmission / reception power planned values ​​of the multiple resources and its actual value, or depending on the remaining time until the planned value is to be achieved.

10. 2. The power conditioning system according to claim 1, The power adjustment system is characterized in that, when the priority of the interconnection point power planned value is high, the controller calculates a power command value for a resource that is not the most responsive resource among the multiple resources by apportioning the power required to achieve the interconnection point power planned value of each of the multiple resources using the amounts of power required to achieve each of the transfer power planned values ​​of the multiple resources and the numerical data corresponding to the priority of each of the transfer power planned values ​​of the multiple resources, and calculates a power command value for the most responsive resource among the multiple resources by subtracting the sum of the calculated power command values ​​for the resource that is not the most responsive resource among the multiple resources from the power required to achieve the interconnection point power planned value.

Citation Information

Patent Citations

  • Power supply system and control method for the same

    JP2017225273A