Method for blowing down a marine reliquefaction system

The blowdown method using nitrogen gas to purge the heat exchanger and reliquefaction line addresses refrigerant leakage and fluid flow control issues, enhancing system efficiency and safety in marine reliquefaction systems.

JP2024536462AActive Publication Date: 2024-10-04HANWHA OCEAN CO LTD (KR)
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2024521770
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2021-10-28
Filing Date
2021-12-27
Publication Date
2024-10-04
Estimated Expiration
2041-12-27

AI Technical Summary

Technical Problem

Existing reliquefaction systems in marine environments face issues with refrigerant leakage and composition changes, leading to decreased liquefaction efficiency and potential damage to heat exchangers due to uncontrolled fluid flow during abnormal operations.

Method used

A blowdown method using nitrogen gas to purge the heat exchanger and reliquefaction line, bypassing the gas-liquid separator and utilizing pressure compensation and nitrogen blanket lines to control fluid flow and maintain pressure, thereby preventing thermal stress on the heat exchanger.

Benefits of technology

Reduces thermal stress and fatigue on the heat exchanger, preventing damage and reducing maintenance costs while maintaining system efficiency without additional equipment installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024536462000001_ABST
    Figure 2024536462000001_ABST
Patent Text Reader

Abstract

A blowdown method for a marine reliquefaction system is disclosed. In the blowdown method of the present invention, evaporated gas generated in a storage tank is compressed by a compressor, the compressed gas is supplied to a heat exchanger through a reliquefaction line to be cooled, and the cooled and reliquefied reliquefied gas is supplied to a gas-liquid separator to be separated and then recovered in a storage tank. A pressure compensation line is provided downstream of the compressor of the reliquefaction line, bypassing the heat exchanger and connected to an upper portion of the gas-liquid separator, and a nitrogen blanket line is provided to supply nitrogen gas to the pressure compensation line. When a trip occurs in the reliquefaction system, nitrogen gas is supplied to the pressure compensation line from the nitrogen blanket line, and the nitrogen gas supplied to the pressure compensation line is sent downstream of the compressor to supply nitrogen gas to the heat exchanger through the reliquefaction line, and the heat exchanger and the reliquefaction line are purged with nitrogen, and the compressed gas and the reliquefied gas remaining in the heat exchanger and the reliquefaction line are discharged.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a blowdown method for a reliquefaction system for a ship, and more particularly to an evaporated gas reliquefaction system for reliquefying evaporated gas generated in a storage tank installed on a ship, and to a blowdown method for a reliquefaction system for a ship, which quickly blows down compressed gas and reliquefied gas remaining in a heat exchanger and a reliquefaction line of the reliquefaction system when the reliquefaction system trips, thereby preventing damage to the heat exchanger. [Background technology]

[0002] Natural gas, which is mainly composed of methane, is attracting attention as an environmentally friendly fuel because it emits almost no environmental pollutants when burned. Liquefied natural gas (LNG) is obtained by liquefying natural gas by cooling it to about -163°C at normal pressure (standard atmospheric pressure). Since the volume of liquefied natural gas is reduced to about 1 / 600 of that of gaseous natural gas, it is very suitable for long-distance transportation using sea routes. For this reason, natural gas is mainly stored and transported in the liquid state of LNG, which is advantageous for storage and transportation.

[0003] Because the liquefaction point of natural gas is an extremely low temperature of approximately -163°C at normal pressure, LNG storage tanks are usually insulated to keep LNG in a liquid state, but even if LNG storage tanks are insulated, it is difficult to completely block external heat. Therefore, as external heat is continuously transferred to the LNG storage tank, the LNG in the LNG storage tank naturally vaporizes during the LNG transportation process, generating boil-off gas (BOG).

[0004] If evaporation gas continues to be generated in an LNG storage tank, the pressure in the LNG storage tank will rise. If the pressure in the storage tank exceeds the set safety pressure, an emergency such as tank rupture may occur, so it is necessary to use a safety valve to release the evaporation gas to the outside of the storage tank. However, since evaporation gas is one type of LNG loss and is a major problem in terms of LNG transportation efficiency and fuel efficiency, various methods are used to treat the evaporation gas generated in the storage tank.

[0005] In recent years, methods have been developed and are being used that involve using evaporative gas at fuel demand sources such as ship engines, re-liquefying evaporative gas and recovering it in storage tanks, or a combination of these two methods. Summary of the Invention [Problem to be solved by the invention]

[0006] When applying a reliquefaction cycle to a ship, typical reliquefaction cycles that reliquefy evaporated gas include the SMR cycle and the C3MR cycle. The C3MR cycle (Propane-precooled Mixed Refrigerant Cycle) uses a single refrigerant, propane, to cool the evaporated gas, and then uses a mixed refrigerant to reliquefy it, while the SMR cycle (Single Mixed Refrigerant Cycle) uses a mixed refrigerant composed of multiple components to reliquefy the evaporated gas.

[0007] In these SMR and C3MR cycles, a mixed refrigerant is used, and as the liquefaction process progresses, the refrigerant leaks. This causes the composition ratio of the mixed refrigerant to change, decreasing the liquefaction efficiency. Therefore, it is necessary to maintain the refrigerant composition by continuously measuring the composition ratio of the mixed refrigerant and replenishing the missing refrigerant components.

[0008] As another reliquefaction method utilizing a reliquefaction cycle, a single-cycle reliquefaction method in which nitrogen refrigerant is used is known.

[0009] Nitrogen refrigerant has a lower cooling efficiency than refrigeration cycles that use mixed refrigerants. However, since nitrogen refrigerant is an inert substance, it is very safe. In addition, since the refrigerant does not undergo phase change, it has the advantage of being easily applicable to ships.

[0010] The reliquefaction system includes a compressor that receives the evaporated gas and compresses the supplied evaporated gas, a heat exchanger that cools the compressed gas obtained by compressing the evaporated gas in the compressor by heat exchange with a refrigerant, and a refrigerant circulation section in which the refrigerant used for heat exchange with the compressed gas in the heat exchanger circulates. In the case of a reliquefaction system that applies a refrigeration cycle using a nitrogen refrigerant, in the refrigerant circulation section, the nitrogen refrigerant discharged from the heat exchanger after heat exchange in the heat exchanger is compressed, supplied to the heat exchanger and cooled, further cooled by expansion, and then supplied to the heat exchanger again, thereby circulating the nitrogen refrigerant.

[0011] However, if the flow of fluid entering and exiting the heat exchanger cannot be quickly controlled during abnormal operation of the reliquefaction system, excessive thermal stress will be placed on the heat exchanger, which is sensitive to temperature changes, which may lead to damage to the heat exchanger due to fatigue failure, etc., or a shortened lifespan of the heat exchanger equipment.

[0012] The present invention solves these problems and provides a method for quickly controlling the flow of fluid into and out of a heat exchanger during abnormal operation of a reliquefaction system to prevent damage to the heat exchanger. [Means for solving the problem]

[0013] In order to solve the above problems, in an embodiment of the present invention, there is provided a blowdown method for a reliquefaction system for a ship, the reliquefaction system compresses evaporated gas generated from liquefied gas stored in a storage tank of a ship using a compressor, supplies the compressed gas resulting from the compressed evaporated gas to a heat exchanger through a reliquefaction line to be cooled, supplies the cooled and reliquefied reliquefied gas to a gas-liquid separator to be separated, and then recovers the reliquefied gas in the storage tank, and provides a pressure compensation line connected to an upper portion of the gas-liquid separator from a downstream side of the compressor of the reliquefaction line, bypassing the heat exchanger, to the reliquefaction system for the ship, and a nitrogen blanket line for supplying nitrogen gas to the heat exchanger inlet, and when a trip occurs in the reliquefaction system, nitrogen gas is supplied from the nitrogen blanket line to the pressure compensation line, the nitrogen gas supplied to the pressure compensation line is sent to the reliquefaction line downstream of the compressor, and nitrogen gas is supplied to the heat exchanger via the reliquefaction line, the heat exchanger and the reliquefaction line are purged with nitrogen, and the compressed gas and reliquefied gas remaining in the heat exchanger and the reliquefaction line are discharged.

[0014] Furthermore, in the present invention, it is preferable that the ship reliquefaction system is provided with a bypass line that is connected to the storage tank from the downstream side of the heat exchanger of the reliquefaction line, bypassing the gas-liquid separator, a first valve that is provided on the reliquefaction line downstream of a branch point of the bypass line, and a second valve that is provided on the bypass line, and that the compressed gas, the reliquefied gas and the nitrogen gas discharged from the heat exchanger and the reliquefaction line are discharged from the bypass line.

[0015] In the present invention, it is preferable that the marine reliquefaction system further comprises: a third valve provided upstream of a connection point of the pressure compensation line with a nitrogen blanket line; a fourth valve provided in the nitrogen blanket line; and a fifth valve provided downstream of a connection point of the pressure compensation line with the nitrogen blanket line.

[0016] Furthermore, in the present invention, it is preferable that the refrigerant circulating through a refrigerant circulation line is supplied to the heat exchanger as the refrigerant for cooling the compressed gas, and that the uncompressed evaporative gas discharged from the storage tank and prior to being supplied to the compressor is supplied to the heat exchanger and then supplied to the compressor, and that the compressed gas is cooled in the heat exchanger by heat exchange with the refrigerant and the uncompressed evaporative gas.

[0017] In the present invention, it is preferable that the refrigerant circulating through the refrigerant circulation line is nitrogen, and the heat exchanger is an aluminum brazed heat exchanger.

[0018] In the present invention, further, it is preferable that the pressure in the gas-liquid separator is maintained by flash gas generated from the reliquefied gas supplied to the gas-liquid separator, and the reliquefied gas in the gas-liquid separator is supplied to the storage tank, and when the reliquefied gas supplied to the gas-liquid separator is supercooled and the pressure in the gas-liquid separator cannot be maintained by the flash gas, evaporative gas or nitrogen gas is supplied to the gas-liquid separator through the pressure compensation line to maintain the pressure in the gas-liquid separator. Effect of the Invention

[0019] The present invention reduces the thermal stress on the heat exchanger, reduces thermal fatigue of the heat exchanger, and prevents damage to the heat exchanger by purging the heat exchanger and reliquefaction line with nitrogen and quickly discharging the compressed gas and reliquefied gas remaining in the heat exchanger and reliquefaction line during abnormal operation, such as when the reliquefaction system trips.

[0020] In addition, by utilizing existing equipment without having to install additional facilities, the installation costs and installation space required for the reliquefaction system can be reduced, and by preventing damage to the heat exchanger and the piping connected to the heat exchanger, maintenance costs can be reduced and the safety of the ship can be improved. [Brief description of the drawings]

[0021] [Figure 1] An operation example in which nitrogen gas is supplied from a nitrogen blanket line to maintain the pressure in a gas-liquid separator of a marine reliquefaction system to which the blowdown method of an embodiment of the present invention is applied is shown typically. [Diagram 2] An example of operation in which the present invention is applied to blowdown when a trip occurs in the reliquefaction system shown in FIG. 1 is shown diagrammatically. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0022] The operational advantages and objectives attained by the embodiments of the present invention will now be described, by way of example only, with reference to the drawings and the contents depicted in the drawings.

[0023] Hereinafter, the configuration and operation of the embodiment of the present invention will be described with reference to the drawings. Note that, as far as possible, the same reference numerals are used to denote the same components in the different drawings.

[0024] The ship according to the embodiment of the present invention described later may be any type of ship provided with a storage tank for storing liquefied gas. Representative examples include ships having self-propelling capability, such as an LNG carrier, a liquid hydrogen carrier, and an LNG RV (regasification vessel), as well as floating offshore structures having no propulsion capability, such as an LNG FPSO (floating production storage offloading) and an LNG FSRU (floating storage regasification unit).

[0025] In addition, this embodiment can liquefy gas at a low temperature for transportation, and can be applied to the reliquefaction cycle of all kinds of liquefied gases that generate evaporated gas during storage. Examples of such liquefied gases include liquefied natural gas (LNG), liquefied ethane gas (LEG), liquefied petroleum gas (LPG), liquefied ethylene gas, and liquefied propylene gas. In the embodiment described below, LNG, which is one of the representative liquefied gases, will be described as an example.

[0026] Fig. 1 shows an example of operation in which nitrogen gas is supplied from a nitrogen blanket line to maintain the pressure in a gas-liquid separator of a marine reliquefaction system to which a blowdown method according to an embodiment of the present invention is applied. Fig. 2 shows an example of operation in which the present invention is applied to blowdown when a trip occurs in the reliquefaction system shown in Fig. 1.

[0027] First, in the reliquefaction system for ships to which this embodiment is applied, evaporated gas generated from liquefied gas stored in a storage tank CH of the ship is discharged from a vapor header, supplied to a compressor to be compressed, and supplied as fuel to an onboard engine, etc. as necessary. The evaporated gas that is not supplied as fuel is supplied to a heat exchanger 100 through a reliquefaction line RL, where it is cooled and reliquefied, and then the reliquefied gas is returned to the storage tank CH.

[0028] In this reliquefaction system, evaporated gas generated from liquefied gas stored in a storage tank CH of the ship is discharged from a vapor header (not shown) and supplied to a compressor (not shown) through a gas supply line (not shown). The gas supply line connects the storage tank CH and the compressor via a heat exchanger, and the uncompressed evaporated gas discharged from the storage tank CH and before being supplied to the compressor is supplied to the heat exchanger as a refrigerant.

[0029] The evaporated gas compressed by the compressor is supplied again to the heat exchanger 100 and cooled by the cold energy of the uncompressed evaporated gas supplied from the gas supply line.

[0030] In addition to the non-compressed evaporative gas, other refrigerants circulating through a refrigerant circulation line (not shown) can also be supplied to the heat exchanger 100. For example, nitrogen (N2) is used as the refrigerant circulating through the refrigerant circulation line. In addition, the refrigerant circulation line is provided with a refrigerant compressor that compresses the nitrogen refrigerant and a refrigerant expander that expands the nitrogen refrigerant compressed by the refrigerant compressor. The nitrogen refrigerant in the refrigerant circulation line is compressed by the refrigerant compressor, supplied to the heat exchanger 100 and cooled, expanded and cooled by the refrigerant expander, and supplied to the heat exchanger 100 again as a refrigerant, and circulates through the refrigerant circulation line. In this way, in the heat exchanger 100, heat is exchanged between four flows: the evaporative gas compressed by the compressor, the non-compressed evaporative gas before being supplied to the compressor, the refrigerant cooled by expansion in the refrigerant expander, and the refrigerant compressed by the refrigerant compressor.

[0031] In addition, a cryogenic heat exchanger is used for the heat exchanger 100 in accordance with the refrigeration cycle of the evaporated gas generated from the cryogenic LNG and the nitrogen refrigerant, and for example, a brazed aluminum heat exchanger (BAHE) is used.

[0032] The evaporated gas cooled in the heat exchanger 100 is supplied to the gas-liquid separator 200 for gas-liquid separation, and the separated re-liquefied gas is collected in the storage tank CH. In addition, a bypass line BL is provided which branches off from the re-liquefaction line RL downstream of the heat exchanger 100 of the re-liquefaction line RL, bypasses the gas-liquid separator 200, and is connected to the storage tank CH. The bypass line BL can also directly supply the re-liquefied gas cooled in the heat exchanger 100 to the storage tank CH. In addition, a first valve V1 is provided downstream of the branch point of the bypass line BL of the re-liquefaction line RL. In addition, a second valve V2 for opening and closing the bypass line BL is provided in the bypass line BL.

[0033] Incidentally, when the valve LV provided downstream of the gas-liquid separator 200 is opened in order to supply the reliquefied gas separated in the gas-liquid separator 200 to the storage tank CH, the pressure inside the gas-liquid separator 200 changes. Even in such a case, the pressure inside the gas-liquid separator 200 can be maintained by the flash gas (i.e., off-gas) generated from the reliquefied gas supplied into the gas-liquid separator 200, so that the reliquefied gas inside the gas-liquid separator 200 can be supplied to the storage tank CH.

[0034] However, when the liquefied gas cooled by heat exchange with the nitrogen refrigerant is supercooled and supplied to the gas-liquid separator 200, there is a risk that almost no off-gas is generated, and when the valve LV downstream of the gas-liquid separator 200 is opened, the pressure in the gas-liquid separator 200 may suddenly drop. In order to compensate for the pressure in the gas-liquid separator 200 and maintain the pressure in the gas-liquid separator 200, the re-liquefaction system to which this embodiment is applied is provided with a pressure compensation line PL that branches off from the re-liquefaction line RL downstream of the compressor of the re-liquefaction line RL and is connected to the upper part of the gas-liquid separator 200, and a nitrogen blanket line NBL that supplies nitrogen gas to the pressure compensation line PL. As a result, even when the re-liquefied gas in the gas-liquid separator 200 is supplied to the storage tank CH, the pressure in the gas-liquid separator 200 can be maintained by supplying evaporated gas or nitrogen gas to the gas-liquid separator 200 from the pressure compensation line PL.

[0035] A third valve V3 is provided upstream of the connection point of the pressure compensation line PL with the nitrogen blanket line NBL. A fourth valve V4 is provided in the nitrogen blanket line NBL. A fifth valve V5 is provided downstream of the connection point of the pressure compensation line PL with the nitrogen blanket line NBL.

[0036] 1, in an operation example in which nitrogen gas is supplied from the nitrogen blanket line NBL to maintain the pressure in the gas-liquid separator 200 in the reliquefaction system to which this embodiment is applied, the third valve V3 is closed, and the fourth valve V4 and the fifth valve V5 are opened to supply nitrogen gas from the nitrogen blanket line NBL to the upper part of the gas-liquid separator 200. By supplying nitrogen gas to the upper part of the gas-liquid separator 200 in this manner to maintain the pressure in the gas-liquid separator 200, the reliquefied gas in the gas-liquid separator 200 can be smoothly supplied to the storage tank CH.

[0037] Here, the temperature of the evaporated gas discharged from the storage tank CH and supplied to the heat exchanger 100 is usually about -100°C, and may be -130°C or lower depending on the state of the storage tank CH. For example, when the temperature of the evaporated gas changes suddenly, such as at the initial start of the reliquefaction system, or when the temperature difference between the temperature of the heat exchanger 100 and the temperature of the evaporated gas is large, the heat exchanger 100 may be subjected to excessive thermal stress. In particular, when the flow of the fluid flowing in and out of the heat exchanger 100 cannot be controlled quickly during abnormal operation of the reliquefaction system, excessive thermal stress may be applied to the heat exchanger 100, which may lead to damage to the heat exchanger 100 due to fatigue fracture or the like, or a shortened lifespan of the heat exchanger 100. In order to prevent such damage to the heat exchanger 100, in this embodiment, compressed gas and reliquefied gas remaining in the heat exchanger 100 and in the piping connected to the heat exchanger 100 are quickly discharged (blow-down) during abnormal operation of the reliquefaction system.

[0038] FIG. 2 is a schematic diagram showing an example of operation in which blowdown is performed by the blowdown method of the present embodiment when the reliquefaction system is operating abnormally, particularly when a trip occurs.

[0039] In this embodiment, the pressure compensation line PL and the nitrogen blanket line NBL, which are provided to maintain the pressure in the gas-liquid separator 200, are used to perform nitrogen purging of the heat exchanger 100 and the reliquefaction line RL, and to discharge the compressed gas and reliquefied gas remaining in the heat exchanger 100 and the reliquefaction line RL.

[0040] That is, when a trip occurs in the reliquefaction system, the fourth valve V4 and the third valve V3 are opened to supply nitrogen gas from the nitrogen blanket line NBL to the pressure compensation line PL, and the nitrogen gas supplied to the pressure compensation line PL is sent to the downstream side of the compressor of the reliquefaction line RL to supply nitrogen gas through the reliquefaction line RL to the heat exchanger 100. In addition, nitrogen purging (N2 purging) is performed on the heat exchanger 100 and the reliquefaction line RL, and the first valve V1 installed upstream of the gas-liquid separator 200 is closed and the second valve V2 installed in the bypass line BL is opened to discharge (blow-down) the compressed gas and reliquefied gas remaining in the heat exchanger 100 and the reliquefaction line RL from the bypass line BL.

[0041] As described above, during abnormal operation of the reliquefaction system, by purging the heat exchanger 100 and the reliquefaction line RL with nitrogen and quickly discharging the compressed gas and reliquefied gas remaining in the heat exchanger 100 and the reliquefaction line RL, it is possible to reduce the thermal stress on the heat exchanger 100, reduce the thermal fatigue of the heat exchanger 100, and prevent damage to the heat exchanger 100.

[0042] In particular, by utilizing existing equipment rather than needing to install additional facilities, the installation costs and installation space of the reliquefaction system can be reduced, and by preventing damage to the heat exchanger 100 and the piping connected to the heat exchanger 100, maintenance costs can be reduced and the safety of the ship can be improved.

[0043] The present invention is not limited to the above-described embodiment, and it will be obvious to those skilled in the art to which the present invention pertains that various changes or modifications can be made without departing from the technical gist of the present invention.

Claims

1. 1. A method for blowing down a marine reliquefaction system, comprising the steps of: The re-liquefaction system for a ship compresses evaporated gas generated from liquefied gas stored in a storage tank of the ship by a compressor, supplies the compressed gas resulting from the compressed evaporated gas to a heat exchanger through a re-liquefaction line to cool the compressed gas, supplies the cooled and re-liquefied re-liquefied gas to a gas-liquid separator to separate the re-liquefied gas, and recovers the gas in the storage tank. the marine vessel reliquefaction system is provided with a pressure compensation line that is connected from a downstream side of the compressor of the reliquefaction line to an upper portion of the gas-liquid separator, bypassing the heat exchanger, and a nitrogen blanket line that supplies nitrogen gas to the pressure compensation line; When a trip occurs in the reliquefaction system, nitrogen gas is supplied from the nitrogen blanket line to the pressure compensation line, the nitrogen gas supplied to the pressure compensation line is sent to the reliquefaction line downstream of the compressor, and nitrogen gas is supplied to the heat exchanger via the reliquefaction line, the heat exchanger and the reliquefaction line are purged with nitrogen, and the compressed gas and reliquefied gas remaining in the heat exchanger and the reliquefaction line are discharged. A method for blowing down a marine reliquefaction system.

2. The marine reliquefaction system further comprises: a bypass line that is connected to the storage tank from a downstream side of the heat exchanger of the reliquefaction line, bypassing the gas-liquid separator; and a first valve provided on the reliquefaction line downstream of a branch point of the bypass line; and a second valve provided in the bypass line; The compressed gas, the reliquefied gas and the nitrogen gas discharged from the heat exchanger and the reliquefaction line are discharged from the bypass line.

2. A method for blowing down a marine reliquefaction system as claimed in claim 1.

3. The marine reliquefaction system further comprises: a third valve provided upstream of the connection point of the pressure compensation line with the nitrogen blanket line; and a fourth valve provided in the nitrogen blanket line; and a fifth valve provided downstream of a connection point of the pressure compensation line with a nitrogen blanket line; 3. A method for blowing down a marine reliquefaction system as claimed in claim 2.

4. A refrigerant circulating through a refrigerant circulation line is supplied to the heat exchanger as a refrigerant for cooling the compressed gas; The uncompressed evaporated gas discharged from the storage tank and before being supplied to the compressor is supplied to the heat exchanger, and then supplied to the compressor; The heat exchanger is configured to cool the compressed gas by heat exchange with the refrigerant and the non-compressed evaporated gas.

4. A method for blowing down a marine reliquefaction system as claimed in claim 3.

5. The refrigerant circulating through the refrigerant circulation line is nitrogen, The heat exchanger is an aluminum brazed heat exchanger.

5. A method for blowing down a marine reliquefaction system as claimed in claim 4.

6. maintaining a pressure in the gas-liquid separator by using a flash gas generated from the reliquefied gas supplied to the gas-liquid separator, and supplying the reliquefied gas in the gas-liquid separator to the storage tank; When the reliquefied gas supplied into the gas-liquid separator is supercooled and the pressure in the gas-liquid separator cannot be maintained by the flash gas, the pressure in the gas-liquid separator is maintained by supplying evaporated gas or nitrogen gas to the gas-liquid separator through the pressure compensation line. A method for blowing down a marine reliquefaction system according to any one of claims 1 to 5.

Citation Information

Patent Citations

  • Evaporative emission supercooling liquefaction operation system of liquefied natural gas carrier

    JP2006200735A

  • Boil-Off Gas Reliquefaction System and Method of Discharging Lubrication Oil in the Same

    KR101938176B1

  • Liquefaction system of boil-off gas and ship having the same

    KR102246344B1