Systems and methods for robotic assisted foundation installation
The robot-assisted foundation installation system addresses the challenge of precise column alignment on challenging construction sites by using live data streaming and grid control to optimize pillar positioning, enhancing construction efficiency and reducing costs.
Patent Information
- Application Number
- JP2024524662
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2021-10-26
- Filing Date
- 2022-10-26
- Publication Date
- 2024-11-19
Smart Images

Figure 2024542975000001_ABST
Abstract
Description
[Technical field]
[0001] CROSS-REFERENCE TO RELATED APPLICATIONS This application claims priority to U.S. Provisional Patent Application No. 63 / 272,055, entitled “System And Method For Robotics-Assisted Foundation Installation,” filed on October 26, 2021, the contents of which are incorporated herein by reference.
[0002] The claimed subject matter relates generally to the field of construction, and more particularly to the installation of underground foundations and building support column assemblies that require precise placement of the column(s). [Background technology]
[0003] The offerings that developers can bring to market are shaped by the tools and methods that are widely accepted in the construction industry. These optimize construction under a set of specific conditions and site requirements that create an industry standard for a well-built feel. These standards are familiar, accepted, risk-mitigated, and cost-effective to the extent that the types of sites for which these tools and methods are suitable are available for development. However, many commercial areas are lacking buildable sites that are favored by the industry. This shortage increases the cost of land and labor, but the increased cost does not improve the quality, precision, or durability of the building material in any way. One possible solution to the resulting decoupling of quality and cost is to develop new strategies to build cost-effectively on sites that industry standards classify as "difficult" sites. If one can build cost-effectively on sites that are expensive using the widely accepted tools and methods, one can take advantage of undervalued land to provide higher quality buildings, while at the same time creating real estate assets that are reasonably aligned with market competition.
[0004] A common problem in construction is the difficulty and cost of achieving accurate foundation column grid layouts on sites with terrain or access obstacles or other challenges. The problem is the ability to reconcile acceptable construction tolerances at the base of the column, where the foundation support meets the ground, with the target machining tolerances required at the top of the column to receive off-site manufactured (factory assembled) components. The sensitivity of column top alignment is driven by the need to precisely align bolt holes to the prescribed geometry of the off-site manufactured components so that the composite assembly adheres to its structural engineering requirements and the multi-module building does not encounter spatial overlaps (interferences) or gaps in the column grid. The higher the foundation columns are, or the more varied the offset heights (due to undulating terrain below), the greater the risk of not achieving the required column top machining tolerances. A system capable of accurately and consistently positioning the tops of columns to accept prefabricated structures, frames, or elements would easily convert a shortage of buildable land into a surplus, creating an entirely new land inventory for cost-effective development.
[0005] There is a need for new construction strategies that leverage advances in prefabricated off-site construction techniques and combine them with technologically accelerated installation strategies to make precise installation of off-site fabricated buildings on difficult sites faster, easier, and cheaper. Accordingly, a system and method that facilitates leveling of foundation columns is desired. Summary of the Invention
[0006] In one embodiment, live streaming data input reporting the X, Y, and Z positions of the pole tops are transmitted from all survey stations as data packages to a grid control system, which may include a computing device with memory; software; wireless communication devices for data input and output, e.g., Wi-Fi, or input and output ports for data transmission, optionally hardwired; a power source; and is weatherproof and suitable for outdoor use. The grid control system receives the live streaming data and associates the specific data with a specific pole in the array (the "grid"). The grid control system compares the actual position of the pole in the grid with a target position based on the requirements of the structure to be supported. After determining the difference between the actual position and the target position, the grid control system then sends commands to a pole positioning tool associated with each pole. Each pole positioning tool has an actuator that is instructed by the grid control system to adjust the position of the associated pole. Once the live streaming data confirms that each pole is in the proper position, the pole is fixed in place.
[0007] In this embodiment, in addition to instructing individual tools to move individual pillars a particular distance, an advantage of the system is that it can communicate with multiple pillars in the array and perform a "global optimization" of the pillar array set. This global optimization may include commanding some or all of the pillars to move equal distances as a collective. Such a command may be the result of the grid control system determining that a single pillar cannot reach its target position, for example, because the target position of the single pillar exceeds the range in which the pillar can be moved by the pillar's tool. As a result of that determination regarding the single pillar, the grid control system may command some or all of the other pillars to move as a collective to a new target grid position that is recalculated by the grid control system to remedy the out-of-range problem caused by the single pillar.
[0008] Embodiments are illustrated by way of example, and not limitation, in the figures of the accompanying drawings, in which like reference symbols indicate similar elements and in which: [Brief description of the drawings]
[0009] [Figure 1] FIG. 1 illustrates a cross-sectional view of an aspect of an embodiment of a robotic assisted foundation installation system. [Diagram 2] FIG. 1 illustrates a cross-sectional view of an aspect of an embodiment of a robotic assisted foundation installation system. [Diagram 3] 1A-1D are perspective views illustrating aspects of an embodiment of a robotic assisted foundation installation system. [Figure 4] 4 is a perspective view illustrating aspects of the embodiment of the robotic assisted foundation installation system of FIG. [Diagram 5] FIG. 4 illustrates a cross-sectional view of an aspect of an embodiment of the robotic assisted foundation installation system of FIG. [Figure 6] FIG. 4 illustrates a cross-sectional view of an aspect of an embodiment of the robotic assisted foundation installation system of FIG. [Figure 7] FIG. 4 illustrates a cross-sectional view of an aspect of an embodiment of the robotic assisted foundation installation system of FIG. [Figure 8] 4 is a perspective view illustrating aspects of the embodiment of the robotic assisted foundation installation system of FIG. [Figure 9] FIG. 4 illustrates a cross-sectional view of an aspect of an embodiment of the robotic assisted foundation installation system of FIG. [Figure 10A] 4 is a perspective view illustrating aspects of the embodiment of the robotic assisted foundation installation system of FIG. [Figure 10B] FIG. 4 illustrates a cross-sectional view of an aspect of an embodiment of the robotic assisted foundation installation system of FIG. [Figure 11A] 4A-4D illustrate cross-sectional views of aspects of an embodiment of the robotic assisted foundation installation system of FIG. 3 during different steps in a method of using the system. [Figure 11B]4A-4D illustrate cross-sectional views of aspects of an embodiment of the robotic assisted foundation installation system of FIG. 3 during different steps in a method of using the system. [Figure 11C] 4A-4D illustrate cross-sectional views of aspects of an embodiment of the robotic assisted foundation installation system of FIG. 3 during different steps in a method of using the system. [Figure 11D] 4A-4D illustrate cross-sectional views of aspects of an embodiment of the robotic assisted foundation installation system of FIG. 3 during different steps in a method of using the system. [Figure 11E] 4A-4D illustrate cross-sectional views of aspects of an embodiment of the robotic assisted foundation installation system of FIG. 3 during different steps in a method of using the system. [Figure 11F] 4A-4D illustrate cross-sectional views of aspects of an embodiment of the robotic assisted foundation installation system of FIG. 3 during different steps in a method of using the system. [Figure 11G] 4A-4D illustrate cross-sectional views of aspects of an embodiment of the robotic assisted foundation installation system of FIG. 3 during different steps in a method of using the system. [Figure 11H] 4A-4D illustrate cross-sectional views of aspects of an embodiment of the robotic assisted foundation installation system of FIG. 3 during different steps in a method of using the system. [Figure 11I] 4A-4D illustrate cross-sectional views of aspects of an embodiment of the robotic assisted foundation installation system of FIG. 3 during different steps in a method of using the system. [Figure 11J] 4A-4D illustrate cross-sectional views of aspects of an embodiment of the robotic assisted foundation installation system of FIG. 3 during different steps in a method of using the system. [Figure 11K] 4A-4D illustrate cross-sectional views of aspects of an embodiment of the robotic assisted foundation installation system of FIG. 3 during different steps in a method of using the system. [Figure 12] FIG. 1 illustrates a cross-sectional view of an aspect of an embodiment of a robotic assisted foundation installation system. [Figure 13]13 is a perspective view illustrating aspects of the embodiment of the robotic assisted foundation installation system of FIG. [Figure 14] FIG. 13 illustrates a cross-sectional view of an aspect of the embodiment of the robotic assisted foundation installation system of FIG. [Figure 15] FIG. 1 illustrates a cross-sectional view of an aspect of an embodiment of a robotic assisted foundation installation system. [Figure 16] FIG. 1 illustrates a cross-sectional view of an aspect of an embodiment of a robotic assisted foundation installation system. [Figure 17] 1A-B are perspective views illustrating aspects of an embodiment of a robot-assisted foundation installation system. [Figure 18A] 17A-17C illustrate cross-sectional views of aspects of the embodiment of the robotic assisted foundation installation system of FIG. 16 during different steps in a method of using the system. [Figure 18B] 17A-17C illustrate cross-sectional views of aspects of the embodiment of the robotic assisted foundation installation system of FIG. 16 during different steps in a method of using the system. [Figure 18C] 17A-17C illustrate cross-sectional views of aspects of the embodiment of the robotic assisted foundation installation system of FIG. 16 during different steps in a method of using the system. [Figure 18D] 17A-17C illustrate cross-sectional views of aspects of the embodiment of the robotic assisted foundation installation system of FIG. 16 during different steps in a method of using the system. [Figure 19A] 1A-1D are perspective views illustrating aspects of an embodiment of a robotic assisted foundation installation system. [Figure 19B] FIG. 19B illustrates a cross-sectional view of an aspect of an embodiment of the robotic assisted foundation installation system of FIG. [Figure 20] 1A-1D are perspective views illustrating aspects of an embodiment of a robotic assisted foundation installation system. [Figure 21] 1 is a flowchart illustrating steps in a method of using an embodiment of a robotic assisted foundation installation system. [Figure 22] 1 is a flowchart illustrating steps in a method of using an embodiment of a robotic assisted foundation installation system. [Figure 23] FIG. 1 is an exemplary block diagram illustrating an embodiment of a system for implementing an embodiment of the method of the present disclosure. [Figure 24] FIG. 1 is an exemplary block diagram illustrating a computing device. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] The embodiments describe a robotic assisted foundation installation system that uses communication between electronic surveying and geolocation products to determine pillar top positions, specify a foundation pillar top grid, orient the pillar tops to the specified positions, and maintain the pillar tops at the specified positions while the pillars are fixed in place. Once fixed in place, the pillar top grid has the alignment accuracy required to install a prefabricated building, frame, or infrastructure element.
[0011] The goal of an embodiment of a robot-assisted foundation installation solution is the continuous installation of habitable structures. Consider prior techniques of site-based continuous production, where the assembly line idea is inverted, i.e., specialized labor moves from site to site, rather than the manufactured goods themselves moving through successive stages of an assembly line, as exemplified by the construction of a tract house on an easy-to-build site by a builder / developer. For example, as vertical construction begins in a typical tract home construction, a trench digger starts and completes work at site "A" before moving to site "B" where the trench digger labor replicates the same or similar results. Instead of trench diggers, a rebar installation team travels to site "A", followed by concrete pourers, and so on, continuing the flow of labor throughout all subdivision development lots.
[0012] Embodiments of the robotic-assisted foundation installation solution facilitate a similar capability for serial production of structures, but also facilitate production on challenging construction sites, such as sites with steep terrain, remote or island topography, sites with multiple obstacles or uninterruptible watersheds, or even sites that are partially or completely located on water.
[0013] FIGURE 1 illustrates a cross-sectional view of an aspect of an embodiment of a robotic assisted foundation installation system 100. FIGURE 1 illustrates the intended result for a structure 10 located on a hypothetical difficult site 20 and supported by foundation columns 110a...110c. The system 100 is used to precisely align the building column tops 118a...118c as shown by a plane 202a in preparation for the addition of the structure 10.
[0014] In this description, a reference numeral having an additional letter designation (e.g., 110a) represents a particular instance of a generic element (e.g., 110). Thus, a description directed to a generic element (e.g., 110) should be understood to apply equally to each specific instance (e.g., 110a...110c).
[0015] The foundation column 110 includes an underground base 116. A connector 114 is attached to the underground base 116. The connector 114 includes two parts: a connection base 120 and an upper connector 122. The upper telescopic column 112 is received within the upper connector 122. The underground base 116 is a helical pier (or helical pile), which is one of many known types of underground foundations, and in embodiments, the connection base 120 may be adapted to interface with other types of underground foundations. The underground base 116 and the connector 114 are fixed relative to each other at the site 20 prior to the addition of the upper column 112.
[0016] The system 100 may use the foundation column 110 in the following general manner: With the ground foundation 116 and the coupler 114 in place, a column positioning tool, such as the column positioning tool 310 (FIG. 4), 402 (FIG. 15), or 502 (FIG. 16), is attached to the top coupler 122, and the top column 112 is inserted into the positioning tool. The system 100 then determines a target position for the column top 118 and instructs the positioning tool to move the column 112 relative to the top coupler 122 until the column 118 is within a predetermined tolerance of the target position. To do so, multiple rounds of re-measuring and re-positioning may be performed. Once it is determined that the column top 118 is within tolerance from the target position, the column 112 is locked in place relative to the top coupler 122. In some embodiments, this locking is achieved by pouring grout into the top coupler 122 and allowing it to harden. The positioning tool remains in place while the grout hardens and the position of the column top 118 may be remeasured and repositioned by the system 100 until the grout has hardened to a level where repositioning is no longer possible. After the grout has hardened, the positioning tool may be removed for later reuse. The system 100 may perform this method for many columns 110 simultaneously, as will be described in more detail, for example, with respect to Figures 3-5.
[0017] FIG. 2 illustrates a cross-sectional view of an embodiment of a robot-assisted foundation installation system 200. FIG. 2 illustrates the intended result for a structure 10 on a hypothetical difficult site 20 and supported by an embodiment of foundation columns 210d...210f. Similar to the system 100, the system 200 is used to precisely align the building column tops 118d...118f as shown by the plan 202a in preparation for the addition of the structure 10. In this embodiment, the foundation column 210 includes an underground foundation 216 including a lower underground foundation 124 and a lower telescopic column 126. The upper telescopic column 112 is received within the lower column 126. The underground foundation 124 is made of precast concrete, which is one of many known types of underground foundations. Thus, the lower column 126 can be adapted to interface with other types of underground foundations. The ground foundation 124 and the lower column 126 are secured to one another at the site 20 prior to the addition of the upper column 112 .
[0018] The system 200 may use the foundation pillar 210 in the following general manner: With the ground foundation 124 and the lower pillar 126 in place, a pillar positioning tool, such as the pillar positioning tool 310 (FIG. 4), 402 (FIG. 15), or 502 (FIG. 16), is attached to the upper coupler 122, and the upper pillar 112 is inserted into the positioning tool. The system 200 then determines a target position for the pillar top 118 and instructs the positioning tool to move the pillar 112 relative to the lower pillar 126 until the pillar 118 is within a predetermined tolerance of the target position. To do so, multiple rounds of re-measuring and re-positioning may be performed. Once it is determined that the pillar top 118 is within tolerance from the target position, the pillar 112 is fixed in place relative to the lower pillar 126. In some embodiments, this fixing is achieved by pouring grout into the lower pillar 126 and allowing it to harden. The positioning tool remains in place while the grout hardens and the position of the column top 118 may be remeasured and repositioned by the system 200 until the grout has hardened to a level where repositioning is no longer possible. After the grout has hardened, the positioning tool may be removed for later reuse. As with the system 100, the system 200 can perform this method for many columns 210 simultaneously.
[0019] In Figures 1 and 2, the system 100, 200 can accommodate a variety of anticipated sites by using a telescoping configuration between the upper telescoping column 112 and the coupler 114 or the lower telescoping column 126. A two-piece "telescopic" steel column interface (labeled as column 112 and coupler 114 in Figure 2) connects the in-ground foundation (either concrete or spiral piers installed with reasonable construction tolerances for variations from the true grid) to a receiving plate on which a prefabricated structure, frame or element can rest (with mechanical tolerances and high precision to the true grid). It is this telescoping mechanism that allows high flexibility in laying the grid array of foundation piers over rough and uneven terrain, opening up the possibility of robot-assisted solutions for sequential installation.
[0020] Both the coupler 114 and the lower telescoping column 126 connect to in-ground foundation elements (e.g., spiral piers or precast concrete) that can be installed with reasonable construction tolerances that are looser than those required for the column tips 118, which require precise mechanical tolerances for a true grid. The telescoping mechanism of the system 100, 200 allows high flexibility in laying the grid array of foundation piers over rough and uneven terrain, opening up the possibility of robotic assisted solutions for serial installation.
[0021] FIG. 3 is a perspective view illustrating aspects of an embodiment of the robot-assisted foundation installation system 100. In FIG. 3, each foundation column 110 is provided with a geolocation device 204 on top of the column tip 118. In an embodiment, the geolocation device 204 may include a reflector, or a GPS position indicator. In FIG. 3, plane 202a represents the height that each column tip 118a...118r must reach, within a tolerance. Plane 202b illustrates that, in an embodiment, the system 100, 200 may have different target positions for different sets of column tips. Thus, plane 202a is at a first height and may be the target height for column tips 118a...118l, and plane 202b is at a different height and may be the target height for column tips 118m...118r.
[0022] FIG. 4 is a perspective view illustrating aspects of an embodiment of the robot-assisted foundation installation of the system 100 of FIG. 3. In FIG. 4, couplers 114 are shown in various states of misalignment. For example, coupler 114a is shown tilted slightly to the left. The downward angle of coupler 114a indicates misalignment from the vertical axis of the upper column 112a. Similarly, couplers 114g and 114h indicate misalignment. Meanwhile, coupler 110b represents an ideal installation. FIG. 4 illustrates that some embodiments can be used to correct both ground foundation misalignment and deviation of the ground foundation from a specific installation height. This functionality is provided by the column positioning tool 310 in combination with coupler 114. The pillar positioning tools 310, with reference to the particular tool 310b, comprise actuators capable of moving the upper pillar 112 in five degrees of freedom (translation in the X, Y, and Z directions 312, with the X, Y plane parallel to the plane 202a, and rotation about the X and Y axes).
[0023] This feature allows the post 112 to be tilted about the X and Y axes and its base to be translated in the X, Y, and Z directions within the coupler 114, so that the upper post 112 has a range of tilt orientations shown by the range cone 308. For example, the upper post 112b has a range cone 308b indicating that the post tip 118b can be positioned anywhere of the intersection of the range cone 308b and the plane 202a. The range cone 308 is not defined relative to a specific central bottom point of the coupler 114. Instead, the ability to translate the bottom of the upper post 112 in the X, Y, and Z directions within the coupler 114 increases the potential angles of rotation about the X and Y axes, expanding the range cone 308. The lower target point 304 indicates the desired intersection of the axis of the upper post 112 with the bottom of the coupler 114 after the post 112 is moved to align with the target alignment axis 302. For example, the target point 304a is not the bottom dead center of the coupler 114a. The target point 304a indicates the alignment axis of the upper post 112a after the post 112a is aligned with the target alignment 302a. In this alignment, the post 112 can be translated by the positioning tool 310a along the Z axis to move the post tip 118a with a tolerance distance from the plane 202a. Similarly, the couplers 114g and 114h are not aligned correctly, so that the target points 304g and 304h are off-center. The positioning of the target point 304 is described with reference to FIG. 11A-FIG.
[0024] Thus, if the target position of the pillar tip 118 is within the associated range cone 308 and within the Z-axis range 306 of potential motion of the associated positioning tool 310, the positioning tool 310 can be instructed by the system 100 to adjust the position of the upper pillar 112 until the pillar tip 118 is properly positioned on the plane 202a.
[0025] Plane 202c shows a portion of plane 202a. The grid pattern shows the problem solved by the embodiment, which is to move each pillar tip 118 to a target location on the grid of plane 202c. The first problem is that before the height of plane 202a can be determined, the initial position of the tip 118 must be determined. Next, a range cone 308 and Z axis range 306 are determined for each foundation pillar 110. Plane 202c is then calculated such that the target X, Y, and Z positions for each pillar tip 118 fall within the range 308 and Z axis range 306 for that pillar tip.
[0026] FIG. 5 illustrates a cross-sectional view of an aspect of the embodiment of the robotic assisted foundation installation system 100 of FIG. 3. In FIG. 5, the system 100 is shown to include a grid resolution system 300 that resolves a grid, e.g., planes 202a, 202b, 202c, and instructs a pillar positioning tool 310 to move the pillar tip 118 to a target location. The grid resolution system 300 includes a positioning system 290 that communicates with a grid control system 295 using a protocol as described with reference to FIG. 23 and FIG. 24. The positioning system 290 determines the position of the pillar tip 118 using a geolocation device 204. The positioning system 290 provides its initial position information to the grid control system 295, which can also communicate with and control the pillar positioning tool 310. The grid control system 295 resolves the grid for the planes 202a using information about the range cone 308 and Z-axis range 306 for each foundation pillar 110. The grid control system 295 then instructs each pillar positioning tool 310 to move as necessary to align and position the tip 118 with the target location on the grid. In this example, "solving the grid" begins with the grid control system 295 receiving a given target spacing grid (e.g., the grid placement required to support the structure 10) and a target common (or stepped) z-level. In some installations, due to errors in the installation of the ground foundation, the system 295 may have to solve a best fit solution for the installation based on practical constraints, such as the bottoms of some pillars 112 cannot be located on the grid because they will contact the inside wall of the top connector 122 before they reach the target location. Thus, the system 295 may have to adjust the target positions of all other pillars to account for the constraint imposed on the grid by one pillar. In such cases, a subroutine in the software of the computer system 295 revisits the pillar angles after the grid is solved, determines which pillar is the most eccentric, and determines the effect on other pillars that minimizes the eccentricity by distributing the offset across the remaining pillars.If the effect of distributing the offset is acceptable, the grid is resolved by distributing the offset of the most eccentric pillar across all other pillars in the system.
[0027] In some embodiments, the positioning system 290 includes a total survey system and the geolocation device 204 is a reflector used by the total survey system to determine the position of the associated pole tip 118. Such computer controlled survey systems are used by the construction industry and such systems can be used to provide the position data used by the computer system 295. Generally, total survey stations are used in surveying and building construction and are electro-optical instruments that combine an electronic theodolite with electronic distance measurement (EDM). This technology allows for the measurement of both vertical and horizontal angles and distance from the instrument to a particular point. Traditionally, it was a manual tool, but robotics has revolutionized this tool, making it more efficient than ever before. An example of a total survey system includes the Leica iCON iCB70 Manual Construction Total Station.
[0028] In some embodiments, inputs reporting the X, Y, Z position of the pole tip 118, or the bottom of the pole 112, or both, are streamed from all survey stations to an embodiment of a control system 295. The control system 295 receives the live streaming data and associates it with a particular pole, whether it is a single standalone pole or multiple poles in an array. After solving the grid, the control system 295 can send commands to any of the poles to adjust their position.
[0029] An advantage of the control system is that it is possible to communicate with multiple pillars in an array, allowing for a "global optimization" of the array set, or more precisely, an "action command" that pertains between all the pillars 110 in the array. The command may be that all or some of the pillars must move an equal distance as a group, or if one pillar reaches a tolerance limit (such as meeting an edge constraint), some or all of the set may be commanded to move an equal distance to mitigate a collision inconsistency affecting the pillar that has reached that limit.
[0030] With such a control system, there is no inherent limit to the number of poles that can be managed, however, that number may be limited in a particular construction iteration by the practical range of modern wireless communications and / or the processing power of the computer selected for use during construction.
[0031] FIG. 6 illustrates a cross-sectional view of an aspect of an embodiment of the robotic assisted foundation installation system 100 of FIG. 3. In FIG. 6, the pole positioning tool 310a is shown after being attached to the coupler 114a, on top of the upper coupler 122. In FIG. 6, the target point 304a indicates the position of the bottom end of the upper pole 112a where the upper pole 112a will have the desired vertical alignment. The target point 304a is determined before the upper pole 112a is inserted into the positioning tool 310a. FIG. 6 also further illustrates that the positioning system 290 determines the position of the pole tip 118a using the geolocation device 204a. In an embodiment, the device 204a is a reflector and the positioning system 290 determines the position of the pole tip 118a, but in other embodiments, the device 204a may be a GPS device that provides the position of the pole tip 118a to the positioning system 290 or directly provides the position of the pole tip 118a to the grid control system 295. In some embodiments, the grid control system 295 communicates with the position determination system 290 and instructs the station 290 to re-determine the position of the pole tip 118 .
[0032] With this information regarding system embodiments, various aspects of the embodiments can be described in more detail.
[0033] In an embodiment, precision robotic positioners such as positioning tool 310 are intended for serial production. Therefore, the robotic elements and their securing, locking and unlocking functions must be developed to be reusable. Since the equipment will be deployed in a construction environment, it should be robust and made of replaceable parts so that damaged elements can be replaced with new elements so that the life cycle investment in the equipment is justified.
[0034] The positioning tool 310 is a robotic device that can position both the column tip 118 and the bottom of the upper column 112 through a software interface and can hold this desired position through subsequent steps of grouting and curing to achieve a structure-resistant connection integrating the upper column 112 with the ground foundation 116 and the coupler 114. This is accomplished through the use of the positioning tool 310 within a broader integrated system (FIG. 5) that includes live stream point survey data from the total survey system 290, interpretation of this live stream data by the grid control system 295, and physical positioning response to this data of actual position relative to the target location facilitated by the column positioning tool 310 operating from the intermediate coupler 114 that includes the connection base 120 mechanically fixed to the ground foundation 116. The ground foundation 116 is one of several ground foundation variants that have been primarily installed by conventional means. As long as the column tips 118 and associated column bases 112 can be precisely positioned in three-dimensional space, the positions of a wide array of columns can be controlled in unison through software to achieve precise point-loaded column-bed geometries (grids of planes 202a, 202b, 202c) upon which ex-site fabricated architectural elements of various sizes, such as building 10, and resulting ground offsets, such as planes 202a, 202b, 202c, that are not necessarily limited to a single Z-plane grid, can be installed with precise bolt-hole alignment.
[0035] FIG. 7 illustrates a cross-sectional view of an aspect of the embodiment of the robotic assisted foundation installation system 100 of FIG. 3. In FIG. 7, the pillar positioning tool 310 is shown to include actuators 314a...314c, which connect between the pillar sleeve 320 and the tool ring base 318 at a pivot connection point 334. The pillar 112 passes through the pillar gripping sleeve 321 and into and through the protective sleeve 317. The pillar gripping sleeve 321 holds the pillar with a compressive force such that the extension or contraction of the actuators 314a...314c is applied to the pillar 112. The movement of the pillar 112 caused by the extension and contraction of the actuators 314a...314c causes the upper pillar 112 to telescope relative to the coupler 114. During such telescopic movement, the protective sleeve 317 is free to move vertically within the pillar sleeve 316. With the post 112 protected inside the sleeve 317 and separated from the sleeve 316, the actuator 314 can change the Z axis position of the post 112 without friction between the post 112 and any part of the post positioning tool 310. The post sleeve 316 can be translated in the X,Y plane 312 by extension or contraction of the actuators 314d...314f, which connect between the tool ring base 318 and the post sleeve 316 at the pivot connection point. The alignment tabs 325 can be connected to corresponding alignment tabs 324 on the upper coupler 122 when the post alignment tool 310 is connected to the coupler 114.
[0036] The coupler 114 includes an upper coupler 122 and a coupling base 120. Alignment tabs 324 are spaced about the periphery of the upper coupler diameter 322 that is received within the tool ring base 318. The upper coupler 122 is essentially hollow and defines a receiver 326. A limiting range pin 328 is received within the upper post 112 as the post 112 is lowered through the post positioning tool 310, which occurs after the tool 310 is attached to the coupler 114.
[0037] A portion 330 of the upper coupler 122 is received within the connection base 120, and the upper coupler 122 and connection base 120 are connected using fasteners 332. The connection base 120, and particularly the portion of the connection base 120 below portion 330, may be adapted to attach to different types of ground foundations. Thus, the use of different lower couplers, which are relatively simple devices, allows for the use of the same upper coupler 122 and the same column positioning tool 310 without having to adapt the upper coupler 122 or tool 310 to different ground foundations. Thus, through modifications to the connection base 120, the coupler 114 may be adapted to attach to foundations such as pier and beam, helical piles (as shown in FIG. 1), auger-cast piles, fiberglass composite piles, precast concrete (as shown in FIGS. 2 and 12), pin piles, and load-bearing retaining walls.
[0038] Thus, in an embodiment, the connector 114 provides a purpose-designed grout receptacle 326 to achieve a structurally significant (in vertical cross-section) overlap of the precisely positioned upper column 112 within the receptacle 326 such that grout injection into the receptacle 326 may structurally connect the precisely positioned upper column 112 to the ground foundation system 116. The connector 114 is a system element that interfaces between the building support upper column 112 and the underlying ground foundation 116 via the connection base 120. The connector 114 is designed to anticipate the mechanical attachment of the column positioning tool 310, allowing for grout injection 338 that does not interfere with the performance of the positioning tool 310, and then allows them to be released and retrieved for future reuse once the grout has hardened and the telescopic connections are structurally complete. The connector 114 may be installed either fully below the completed grade, partially below the completed grade, or fully above the completed grade, depending on the optimal scenario in which the structural connection may be complete to the site slope 20.
[0039] FIG. 8 is a perspective view illustrating aspects of the embodiment of the robotic assisted foundation installation system 100 of FIG. 3. In FIG. 8, the tool base ring 318 is shown having tab slots 336 configured to receive the tabs 324 from the top coupler 122. An annular opening 338 is provided between the tool ring base 318 and the column sleeve 316 for adding grout to the receptacle 326 of the top coupler 122. The irregular line 340 indicates the approximate location of the top grout fill line on the top coupler 122. Thus, adding grout to the receptacle 326 of the top coupler 122 does not constrain the column positioning tool 310 to the top coupler 122, and the tool 310 can be removed after the grout has set.
[0040] From Figure 8 it can be further seen that the pillar positioning tool 310 can precisely control the X, Y and Z position of both the pillar top 118 and the pillar bottom through a combination of tilt and translation by mechanical robotic means using an upper set of actuators 314a...314c and a lower set of actuators 314d...314f. With the pillar 112 gripped by the pillar sleeve 320, the upper actuators 314a...314c, in controlling the X, Y and Z position of the pillar sleeve 320, also control the height and tilt of the pillar 112. Further translation of the lower actuators 314d...314e in the X and Y directions can act to change the angle of the pillar 112 relative to the vertical, either moving the pillar 112 closer to vertical or increasing the tilt.
[0041] 9 is a diagram illustrating a cross-sectional view of an aspect of the embodiment of the robotic assisted foundation installation system 100 of FIG. 3. In FIG. 9, a receiving portion 331 of the connection base 120 is configured to receive a portion 330 of the upper coupler 122 and be secured to the upper coupler 122 using fasteners 332. A pier cap 344 and a plate 346 including a threaded portion 348 are secured within the connection base. The pier cap 344 is configured to receive the top of the ground foundation 116, and the threaded portion 348 is configured to mate with corresponding threads 342 on the top of the ground foundation 116. Thus, for a different ground configuration, the pier cap 344, plate 346, and threads 348 can be removed and replaced with elements adapted to connect the connection base 120 to the different ground configuration.
[0042] In an embodiment, the connection base 120 is a purpose-designed element at the lower end of the connector 114 that allows for attachment of the upper connector 122 to a variety of in-ground foundation elements, including but not limited to, helical piers, pin foundations, drop-in precast foundations, concrete and / or composite piers, as well as (but not limited to) stem walls, retaining walls, and slab-on-grade connections. Each of these types of connections may be joined to the same version of the upper connector 122 with a version of the connection base 120 adapted for the particular type of connection.
[0043] Figure 10A is a perspective view illustrating aspects of the embodiment of the robotic assisted foundation installation system of Figure 3. In Figure 10A, the limit range pin 328a is shown centered on the range pin adjustment platter 350. The position of the limit range pin 328a at the base of the receiver 326 can be adjusted prior to installation of the upper post 112.
[0044] 10B illustrates a cross-sectional view of an embodiment of the upper coupler 122. In FIG. 10B, the range pin adjustment platter 350 is shown having an upper plate and a lower plate forming a groove therebetween. A circular bracket attached to the inner wall of the coupler 122 includes a flange that extends into the groove, which prevents the lower plate, and therefore the pin 328a, from being pulled out of the receiver 326.
[0045] With respect to use of the system 200, and with respect to Figures 2 and 5, generally, after preliminary site preparation and a surveyed layout, workers arrive at the site 20 to install the telescoping column support's ground foundation 124 and bottom sleeve 126. This process is fairly routine and can be performed quickly with reduced pressure to provide precision, since the bottom telescoping column support 126 is proportionally oversized relative to the top support 112.
[0046] Once the lower pier foundations 124 are installed, properly cured, and load tested, the next crew arrives with precision "total survey" equipment: a grid resolution system 300 including a positioning system 290 and a grid control system 295, a robotic assisted column positioning tool 310, and the upper telescoping column supports 118. The column positioning tool 310 is installed on each of the lower column supports 126. Geolocation targets 204 (i.e., survey reflectors if the positioning system 290 is a total survey station) are attached to mounting platforms on each of the upper telescoping columns 112, which are then sleeved into receiving connections formed by the column positioning tool 310 on the lower column 126.
[0047] Each column positioning tool 310 is installed to form a temporary secure mechanical connection between the upper telescoping column 112 and the connecting base 126, and thus the ground foundation. The column positioning tools 310 can act in concert to position and hold the structural support column 112 at a target X, Y, and Z location until completion of a grout curing period, at which point each column positioning tool 310 can be removed for reuse elsewhere.
[0048] Through communication between the positioning system 290 and the grid control system 295 resulting in updated position data being provided to the grid control system 295, the system 295 instructs the pole positioning tool 310 to adjust the X, Y, and Z position of each of the upper poles 112, with the positioning system 290 tracking the geolocation targets attached to each receiving platform, until the system 200 resolves the intended pole grid relative to the plane 202a. In this example, "resolve the grid" means physically placing the pole tips in the correct locations. Once the grid is set, the pole positioning tool 310 is locked into place. This position is maintained throughout the following steps, with occasional position verification tests at regular intervals.
[0049] The next crew arrives on site and pours construction grout into the hollow column cavity of the lower telescoping column 126 to mechanically unite the lower telescoping column 126 with the upper telescoping column 112 in a fixed, permanent position. Once the construction grout has cured, the column positioning tool 310 and geolocation target 204 are removed. The completed substructure is now ready to receive a prefabricated building, frame or element, such as the building 10, for the site.
[0050] Thus, the use of the column positioning tool 310 and grid solution system 300 allows the column tip 118 to be positioned with mechanical tolerances for joining the structure 10, even when the lower support 126 and ground foundation 124 are performed with traditional on-site construction errors.
[0051] In an embodiment, the grid resolution system 300 can perform simultaneous localization and mapping by combining the functionality of a positioning system 290, such as a full survey system in an embodiment, with a control system 295. The positioning system 290 is the source of data for the grid resolution system 300, from which 1) a grid pattern is established for all piers, e.g., foundation columns 110), 2) an initial fixed point of calculation is positioned relative to the digital model, and 3) the actual location of all piers is determined. When the system 290 is a full survey system, it produces data using a laser survey system and a reflector. The control system 295 uses data from the positioning system 290 to perform the orientation of the piers and columns in the appropriate positions by 1) locating a calculated initial fixed point in relation to the ground, and 2) using the true data derived by the positioning system 290 (the actual starting position adjustments of all pier tops relative to the initial fixed ground reference point, each other, and to the actual site 20) to determine the required movement of each upper column 112, e.g., in the X, Y, Z directions, required to accurately align the column tips 118 with the target grid, e.g., on the plane 202a. Optionally, 3) in an embodiment, the control system 295 allows the upper columns 112 of the entire fixed model to have circular degrees of freedom (system tolerances) to find the best possible fit for the entire pier system. Upon determining the required movements, the grid control system 295 directs the pillar positioning tools, such as pillar positioning tools 310, 402, or 502, one associated with each pier, to move the upper pillars 112 in a coordinated manner to that particular pier, respectively, in the required directions, so that the resulting position of the pillar tips 118 is precisely aligned with the desired pier model. In an embodiment, the pillar positioning tools may have different degrees of freedom. For example, the pillar positioning tool 310 has five degrees of freedom (three translations, two rotations), the pillar positioning tool 402 has three degrees of freedom (one translation, two rotations), and the pillar positioning tool 404 has three degrees of freedom (three translations).Once a precisely aligned orientation is achieved, the pillar positioning tool preferably has the capability of maintaining the pillar in position while the top pillar is fixed in place, which may take up to 96 hours depending on the type of grout. During the curing time, the position of the pillar tip 118 may be periodically measured and adjusted as necessary.
[0052] 2, in an embodiment, a pillar positioning tool such as any of tools 310, 402, 502 can be attached to the lower telescoping pillar 126, with the fit being made when the pillar 126 is, for example, a square profile HSS section. The pillar 126 may be a vertically oriented building pillar adapted to receive the pillar positioning tool by simply cutting off the top. In such a case, the attachment of the pillar positioning tool to the pillar 126 is by gravity, with the tool resting on the cut wall of the pillar, and mechanically, by some fastening method, for example, bolts placed in precision cut holes in the pillar 126 and used to secure the tool with a base ring, such as base ring 318, 406, or 516, to hold the tool both together. In an embodiment, a standoff such as standoff 532 (FIG. 18B) can be configured to connect to the pillar (of any configuration) on one end and to the tool (of any configuration) on the other end. Even then, the tightening method may not provide a horizontal base for the pillar positioning tool, and therefore neither its calibration nor its operation should depend on a horizontal mounting; furthermore, the pillar positioning tools 310, 402, and 502, in some embodiments, can read deviations from horizontal and compensate for it in the operation of the upper telescoping pillar.
[0053] Similarly, the upper telescoping post 112 can be a square profile HHS section of small overall dimensions relative to the bottom. The only connection to this element is by mechanical fastening in precision holes cut at precisely predetermined locations. To gain the most control over the manipulation of the upper post 112 relative to the coupling 114, mechanical connections may be required at two locations with offset heights, for example, upper actuator set 314a...314c and lower actuator set 314d...314f, as a function of the estimated rotational forces possible as a function of the overall height and weight of the upper element of the telescoping assembly.
[0054] In an embodiment, the pole positioning tool 310 preferably has a weight and scale appropriate for its desired functionality, and is preferably operable, set up and removed, optimally by one, but at most two, skilled workers.
[0055] With further reference to FIG. 2, an embodiment of a method for installing a foundation may include the following steps: Step 1) A digital model is constructed providing the determined target grid matrix. Step 2) Digital site mapping of the construction site topography is performed, whether the construction site is being modified or not to accommodate construction. Step 3) Traditional pier foundations are placed, either by concrete / aggregate / rebar or driven spiral pier installation (e.g., in-ground foundations 116, 124). Step 4) Once the foundation bases are set, a commercially available all-survey station 295 (robotic laser surveying system) is used to identify the position and any tolerances between the bases relative to the target grid matrix identified in step 1, using geolocated reflectors 204 on the top of each column base. This process relies on software whose performance is characterized as simultaneous positioning and mapping (SLAM) adjustment of a sensor stack, which by definition is a computational problem of building or updating a map of an unknown environment while simultaneously tracking the position of an agent within it. Step 5) The location of the lower foundation upon completion of construction is determined. If the result is that the bottom foundation at the end of construction meets the tolerance requirements of the target grid matrix identified in step 1, proceed to the foundation placement process. If not, identify and replace the defective foundation. Step 6) The position of the initial fixed point of the calculation is determined (this is the reference point that creates the initial direct relationship to the digital construction model). Step 7) The computer system 295 instructs the column positioning tool 310 to position the entire foundation target grid matrix to best fit the entire system within the predetermined level of system tolerance ("solve the grid matrix"). Step 8) The upper columns 112 covered with the survey reflector 204 are placed within the top of the established lower columns 124, and each upper column 112 is supported by the column positioning tool 310. Step 9) The positioning system 290 is used to identify the definition of the actual position of all the upper columns 112, which is determined by placing the reflector 204 on the top of each column 112 (where the structure 10 will be attached later).Step 9 provides important data to understand the current position of all columns 112 relative to each other and relative to the expected optimized target grid matrix. Step 10) The grid control system 295 instructs the column positioning tool 310 to move and reposition the upper columns 112 to X, Y, Z positions that align the column tips 118 with each other and accurately match the desired peer grid matrix model. Step 11) The column positioning tool 310 locks the upper columns 112 in place for, for example, 72 hours or more after the building grout is applied. Step 12) The column positioning tool 310 can be separated, removed, and packaged for return to storage between deployments.
[0056] 11A-11K are diagrams illustrating cross-sectional views of aspects of the embodiment of the robotic assisted foundation installation system of FIG. 3 during different steps in a method of using the system 100. Specifically, FIGS. 11A-11K illustrate steps involved in the use and reuse of a pillar positioning tool, in this example pillar positioning tool 310 is used. In FIG. 11A, the site 20 is prepared by installing an earth foundation. The earth foundation 116a is used as an example in this description and should be understood to represent multiple earth foundations distributed within the site 20. In FIG. 11B, the link base 120 is attached to the foundation 116a threading the threaded portion 348 into the threaded hole 342. In FIG. 11C, the upper connector 122 is inserted into the portion 331 of the link base 120 and secured in place using the fastener 332. In FIG. 11D, the pillar positioning tool 310 is lowered onto the top coupler 122 so that the tool ring base 318 fits over the top diameter 322. The tool 310 is secured to the coupler 122 by bolting tabs 324 (FIG. 11C) and 325 together. In FIG. 11E, the pillar positioning tool 310 is instructed by the grid resolution system 300 to position the pillar sleeve 320 directly below or close to the estimated target location on a plane (e.g., plane 202a). In FIG. 11E, the laser sight 385 is placed on the pillar sleeve 320 and the beam 387 is used to move the pin adjustment platter 350 so that the limit range pin 328 reaches the target pin location 354. In FIG. 11E, the sleeve 320 is oriented toward the bottom top coupler 122 as if the bottom of the pillar 122 were needed. That is, how the laser pointer 385 precisely marks the target location of the bottom pillar relative to the limit pin 328a. Note that in Figure 11E everything looks nice and vertically aligned, but if the top of the foundation is curved so that the top coupler 122 is bent relative to the axis of the target column, the sleeve 320 (actually all of the moving parts of 310a) will realign to make the sleeve 320 vertical. At this point, fasteners 373 (Figure 12) can be used to lock the platter 350 in place against the bottom of the top coupler 122.The fasteners may be "nails" such as those provided by a Hilti gun.
[0057] In FIG. 11F, the upper telescoping column 112 is lowered into the column gripping sleeve 321. In FIG. 11G, the telescoping column 112 is lowered until the limit range pin 328 is received in the lower end of the telescoping column 112 and the column tip 118 is at a height where it is estimated to be near the target location. At this time, the column sleeve 320 is tightened. The tightening device is not shown, but may include known tightening devices, such as one or more bolts that are threaded through the sleeve 320 and into the column 112. After all of the multiple columns 112 are installed, for each column, the grid resolution system 300 determines the location of each column tip. In this example, the position determination system 290 is a full survey station that uses the reflector 204 to determine the column position. Once the position is determined for each pole tip 118, the grid control system 295 receives the position data and, given the grid pattern required by the structure 10, solves the grid by calculating a plane and, for each of the plurality of pole tips, a target X, Y, Z position on that plane that is both at a precise location on the given grid and within the range of motion of the associated pole positioning tool. The grid control system 295 then instructs each pole position tool 310, in this case actuators 314a...314f, to move the associated pole tip to the target X, Y, Z position. This may not require all pole tips 118 to be moved, as some pole tips may be properly positioned. In FIG. 11H, the computer system 295 instructs the position determination system 290 to remeasure the position of the pole tips 118 that were moved, or a subset of pole tips 118. Target 354 indicates that post tip 118a is at the target X, Y, Z location for purposes of this discussion (target 354 does not appear in actual use). Note that as post 112a is moved from the position in FIG. 11G to the position in FIG. 11H, it is lifted (as indicated by the additional portion of retaining pin 328a that is visible) and tilted to the right from this point, and possibly even in or out of the plane of the page, which is possible given the three degrees of freedom of movement provided by post positioning tool 310.The process of 1) measuring the position of the column tip, 2) determining the column tip position error, 3) indicating the column tip repositioning, and 4) re-measuring is repeated until all column tips are within a given predetermined tolerance of the target X, Y, Z position. In FIG. 11I, grout 358 is injected into the upper connector 122 through the column positioning tool 310. While the grout 358 hardens, the process of 1) measuring the column tip position, 2) determining the column tip position error, 3) indicating the column tip repositioning, and 4) re-measuring can continue. In some embodiments, the frequency of execution of this process after grout or other hardening material is applied may be reduced compared to the process described with reference to FIG. 11H. In FIG. 11I, the target 356 indicates that the column tip 118a is at the target X, Y, Z position after the grout hardens, for the purposes of this discussion (the target 356 does not appear in actual use). In FIG. 11J, the positioning tool 310 is removed from the top coupler 122 and the telescoping column 122, leaving the top coupler 122 in place. The site 20 is improved by the addition of filler 360. In FIG. 11K, the structure 10 is positioned on top of the columns 112. As a result of using the system 100, each column tip 118 is at the height of the plane 202a, located on that plane within Z tolerance, and at an X, Y location within the X, Y tolerance required for positioning the structure 10. In an embodiment, a column cap 540 (FIG. 19A) is placed over the column tips 118, allowing the geolocation device 204 to be recessed into the column cap 540. The column cap 540 may be an integral part of the structure 10 or may be an element to which the structure 10 is later attached.
[0058] 11F-11K illustrate the use of a post cap 540 (FIGS. 19A, 19B) having a prism 546 as a reflector 204, which folds into the post cap 540 so that it can be left in place when the structure 10 is added on top of the post 112. In other embodiments, the reflector 204 is removed before adding the structure 10.
[0059] FIG. 12 illustrates a cross-sectional view of an aspect of an embodiment of a robotic foundation installation system. In FIG. 12, an underground foundation 366 may be suitable for cases where the overall construction does not require a deep underground foundation. The underground foundation 366 is a variation of the coupler 114. With the underground foundation 366, the precast element 368 forms a receptacle 376. The foundation 366 includes an alignment tab 324. When the column positioning tool 310 is lowered to receive the foundation 366 within the base ring 318, the tab 324 may be mated with the tab 325 of the tool 310, as may be done with the coupler 114. The foundation 366 further includes a limited range pin 372 and a pin adjustment platter 370, which are similar to the limited range pin 328 and the pin adjustment platter 350 of the upper coupler 122. An optional cylinder 374 may be disposed around the foundation 366 and supported by a ledge 380. When the pillar positioning tool 310 is connected to the foundation 366, the cylinder 374 extends a distance above the base ring 318, which helps prevent loose soil or rock from falling into the grout receptacle 376. Any material other than construction grout in the receptacle 376 will reduce the strength of the connection. The descriptions of the placement and use of the pillar positioning tool 310 on the upper connector 122 in Figures 11D-11K apply equally to the placement and use of the pillar positioning tool 310 on the ground foundation 366.
[0060] FIG. 13 is a perspective view illustrating aspects of the embodiment of the robotic assisted foundation installation system of FIG. 12. In FIG. 13, the cylinder 374 is shown removable from the foundation 366. FIG. 14 is a cross-sectional view illustrating aspects of the embodiment of the robotic assisted foundation installation system of FIG. 12. In FIG. 14, the receptacle 376 is shown filled with grout 358, similar to the condition of the upper connector 122 of FIG. 11J. Fasteners 373 are shown protruding into the foundation 368. Fasteners 373 hold the platter 370 in place and may be "nails" such as those produced by a Hilti gun.
[0061] FIG. 15 illustrates a cross-sectional view of aspects of an embodiment of a robotic assisted foundation installation system 400. Not all construction cases require a full repertoire of tilt and translation control. Some examples may require tilt but not full translation positioning. The system 400 includes a column positioning tool 402 that provides the ability to tilt the column 112 about the X and Y axes, and includes a grid solving system 300 for solving the grid. The tool 402 includes a column sleeve 404 connected to a ring base 406 by actuators 314a...314c. The ring base 406 fits over an upper connector 408 and holds a portion of the upper connector 408 internally, which provides stability and eliminates the need for an analog of the alignment tab 324. Within the grout receptacle 412, the upper connector 418 includes a centering web 410 that constrains the lower end of the column 112 to approximately the center of the connector 408 in the X and Y directions. The upper coupler 418 is attached to the linkage base 120 in the same manner as described with reference to the upper coupler 122 of FIG. 11C. With the linkage base 120, upper coupler 408, and post positioning tool 402 connected, the tool 402 receives the post 112 into the post sleeve 404. The post 112 then slides through the receiver 412 and into the sleeve 404, bottoming out within the centering web 410. In general, the description of the placement and use of the post positioning tool 310 on the upper coupler 122 of FIGS. 11C-11K applies equally to the placement and use of the post positioning tool 402 on the coupler 408, except for the fact that the upper coupler 408 does not provide for repositioning of the range limiting pin 328a of FIG. 11E, and this embodiment of the post positioning tool 402 does not provide for movement of the post 112 in the Z-axis, as the sleeve 404 does not grip the post 112, but instead allows the post 112 to slide freely therein.
[0062] In an embodiment, the sleeve 404 may be provided with a clamping device that grips the post 112, and using the actuators 314a...314c, the post positioning tool 402 may raise the post 112 along the Z-axis from the centering web 410. In this embodiment, the descriptions of the placement and use of the post positioning tool 310 on the upper coupler 122 in Figures 11C-11K generally equally apply to the placement and use of the post positioning tool 402 on the coupler 408, except that the upper coupler 408 does not provide for repositioning of the range limiting pin 328a in Figure 11E.
[0063] FIG. 16 illustrates a cross-sectional view of an aspect of an embodiment of a robotic assisted foundation installation system 500, which is a solution to a construction case requiring translation control. The system 500 includes a pillar positioning tool 502 that provides the ability to translate the pillar 112 along the X, Y, and Z axes, and includes a grid solving system 300 for solving the grid. The tool 502 includes a grip 504 connected to a grip base 506. The grip 504 clamps to the pillar 112. The grip base 506 is translatable along the Z axis (or axis of the pillar 112) by an actuator 510a connected between the grip base 506 and the top bracket 508. The actuator 510a is configured to move the grip base 506 relative to the top bracket 508 along the rail 522 (FIG. 17A). The top bracket 508 is translatable relative to the middle bracket 512 by an actuator 510b configured to move the top bracket 508 along the rail 24 (FIG. 17A). The middle bracket 512 is rotatable about the Z axis by actuator 510c configured to rotate the middle bracket 512 relative to the bottom bracket 514. Thus, Z axis translation can be achieved by having the grid control system 295 appropriately guide the actuator 510a. X, Y translation can be achieved, for example, by having the grid control system 295 direct the actuator 501c to rotate the middle bracket 512 until the line of potential movement of the pillar 112 intersects with the desired X, Y position, and then having the grid control system 295 direct the actuator 510b to move the top bracket 508 along the rails 524 until the pillar 122 reaches the target X, Y position.
[0064] In FIG. 16, the ring base 516 fits over the top connector 518 and holds a portion of the top connector 518 internally, providing stability and eliminating the need for an analog of the alignment tab 324. The top connector 518 includes a grout receiver 520 but does not include a limiting pin or centering web. The top connector 518 is attached to the linkage base 120 in the same manner as described with reference to the top connector 122 of FIG. 11C. With the linkage base 120, the top connector 518, and the column positioning tool 502 connected, the tool 502 receives the column 112 into the grip 504. The column 112 is then positioned and clamped by the grip 504 in a position where the column tip 118 is within the reach of the tool 502. In general, the description of the use of the column positioning tool 310 on the upper coupler 122 in Figures 11G-11K applies equally to the use of the column positioning tool 502 on the coupler 408, except for the fact that the upper coupler 518 does not include the range limiting pin 328a of Figure 11E and the tool 502 does not provide tilt, but instead translates the Z axis of the column 112 and translates the column 112 along the X and Y axes with an associated rotation about the Z axis. Also, a slight difference exists in that the coupler 518 must be provided with a port for grout entry (see Figures 18A-18D).
[0065] FIG 17A is a perspective view illustrating aspects of an embodiment of a robotic assisted foundation installation system 500 having a column positioning tool 502 and a tool ring base 517 that is slightly different from the tool ring base 516 of FIG 16. FIG 17A illustrates rails 522 along which the grip base 506 can be translated along the Z axis relative to the top bracket 508 by actuator 510a. The top bracket 508 slides along rails 524 as it is translated relative to the middle bracket 512 by actuator 510b. In FIG 17B, grout ports 519 indicate where grout can be added to a receptacle 520.
[0066] 18A-18D illustrate cross-sectional views of aspects of an embodiment of robotic assisted foundation installation system 500 during different steps in a method of using system 500. In these methods, upper coupler 518 is replaced with lower telescoping post 126 of post 216d (FIG. 2). Thus, FIGS. 18A-18D illustrate the adaptable nature of a post positioning tool such as post positioning tool 502. Also, FIGS. 18A-18D illustrate steps involved in using and reusing a post positioning tool, similar to the steps illustrated with respect to FIGS. 11A-11K.
[0067] In Fig. 18A, the site 20 is prepared by installing an underground foundation. The underground foundation 124 is used as an example in this description and should be understood to represent a plurality of underground foundations distributed in the site 20. In the lower underground foundation 124, the lower telescopic column 126 is fixed using a typical construction method with a typical construction accuracy. A grout spout 530 is provided in the lower telescopic column 126.
[0068] In FIG. 18B, the collar standoff 532 is placed on the column 126, the column 126 is received within the standoff 532, and the grout spout 534 is aligned with the grout spout 530. Similarly, the column positioning tool 502 is placed on the standoff 532, the standoff 532 is received within the tool ring base 516, and the grout spout 538 is aligned with the grout spout 536. In an embodiment, the collar standoff 532 may be modified so that it may be used on columns of different sizes or configurations. Thus, the tool 502 may be used to position the column 112 on foundations of different configurations by modifying only the standoff 532. The column 112 is then lowered into the grip 504 and positioned such that the target position of the column tip 118 is within the range of motion of the column positioning tool 502. The column 112 is then clamped by the grip 504.
[0069] 18C shows the alignment of grout injection ports 536 and 538 with ports 530 and 534. The lower grout ports at 530, 534 provide for grout to be introduced using a hose. The upper grout ports at 536, 538 allow for excess drainage of the construction grout so that the column positioning tool 502 is not damaged. After all of the columns 112 are in this configuration, the grid solving system 300 determines the position of each column tip, the system 500 solves the grid as described with respect to FIGS. 11G-11K, and the grid control system 295 directs the tool 502 to cause the actuators 510a...510c to translate the column tips 118 to their target X, Y, Z positions and maintain their positions until the grout has hardened.
[0070] FIG. 18D shows the position of the upper column 112 after the grout has hardened in the lower column 126, the column positioning tool 502 has been removed, and the column 112 is ready to support the structure 10.
[0071] FIG. 19A is a perspective view illustrating aspects of an embodiment of a robotic foundation installation system. FIG. 19A illustrates a column cap 540, such as cap 362, that is provided with a prism 546 that folds within the column cap. FIG. 19B is a cross-sectional view of column cap 540. Because prism 546 folds within column cap 540, cap 540 eliminates the need for the construction team to remove reflector 204 from column tip 118 after column 112 is secured in place, for example by hardened grout. Column cap 540 includes a cylindrical opening 552 and spring 550 below prism 546. When there is insufficient force against lid 548, spring 550 causes prism 546 to emerge from opening 552 to the extent of spring travel. When a force is applied that overcomes the spring 550, such as when the structure 10 is placed on the lid 548, the force causes the prism 546 to retract into the opening 552 (e.g., as shown in FIG. 11K). In an embodiment, the cap 540 includes a cylindrical base 556 that can be inserted onto the top of the post 112 and held there with a fastener through a port 558. In other embodiments, the cap 540 can be configured to receive the post 112 therein, similar to the post cap 362 (FIG. 17A). The cap 540 is also shown with an annular groove 554. As shown in FIG. 11K, a bolt can be threaded through the structure into the groove 554, which creates an interference fit between the bolt and the post cap 540, preventing the structure from separating from the post. In an embodiment, the spring 544 may be replaced with other suitable mechanisms, such as a leaf spring or a resilient material.
[0072] FIG. 20 is a perspective view illustrating aspects of an embodiment of a robotic assisted foundation installation system. In FIG. 20, the pillar positioning tool 310 is shown to include a tool control system 560. The tool control system 560 is connected to and controls the position of each actuator 314a...314f. An exemplary set of exemplary control lines 564 is shown. One control line set 566 includes control lines for both actuators 314b and 314e. The tool control system 560 includes a power source 562 that provides power to the actuators 314a...314f and internal components including signal electronics or other communication devices for communication between the tool control system 560 and the control system 295. Although the tool control system 560 is shown with respect to the pillar positioning tool 310, the pillar positioning tools 402, 502 also include a tool control system 450 configured to control the actuators of these tool control systems and to communicate with the grid control system 295.
[0073] FIG. 20 is a perspective view illustrating aspects of an embodiment of a robotic assisted foundation installation system. In FIG. 20, the pillar positioning tool 310 is shown to include a tool control system 560. The tool control system 560 is connected to and controls the position of each actuator 314a...314f. An exemplary set of actuator drive ports 564 is shown. One control line set 566 includes control lines for both actuators 314b and 314e. The tool control system 560 includes a power supply 562 that provides power to the actuators 314a...314f via the actuator drive ports 564 and to internal components including signal electronics or other communication devices for communication between the tool control system 560 and the control system 295, as described with reference to FIGS. 23 and 24.
[0074] FIG. 21 is a flow chart illustrating steps of a method 2100 of using an embodiment of a robot-assisted foundation installation system. In step 2102 of the method 2100, a plurality of building supports are installed on a construction site. In step 2104, for each building support from the plurality of building supports: step 2106) an interface is provided on each building support of the plurality of building supports, defining an interior space; step 2108) a pillar from the plurality of pillars is positioned within the interior space of each interface such that a first end of the pillar is within the interior space and a second end of the pillar is outside the interior space; step 2110) each pillar is connected to a dedicated actuator assembly configured to move the pillar relative to the building support; step 2112) an actual position of the second end is determined using a data acquisition system. In step 2114, for each second end from the plurality of pillars, using the determined actual positions of the second ends of the plurality of pillars: step 2116) a target position of each second end is determined; and step 2118) an offset between the actual position and the target position is determined. In step 2120, the offset for the subset of second ends is determined to be greater than a first predetermined tolerance from the target position. In step 2122), for each second end from the subset of second ends, an attached actuator assembly moves the second end toward the target position for that second end. In step 2124), for each second end from the subset of second ends, the offset is determined to be within the first predetermined tolerance using a data acquisition system. Then, in step 2126, each post is fixed at a predetermined position within the interior space of its associated interface. In some embodiments, an additional step after step 2122 includes determining that for some subset of second ends, the offset remains greater than the first predetermined tolerance, in which case steps 2122 and 2123 are repeated until step 2124 is achieved. In other words, the position of each second end is determined and then moved toward its target position until it is determined to be within a predetermined tolerance of its target position.
[0075] 22 is a flow chart illustrating steps of a method 2200 of using an embodiment of a robotic assisted foundation installation system. In the method 2200, the grid solution system: step 2202) determines a target grid layout including X, Y, Z positions for each pillar in the grid; step 2204) determines a current grid layout including X, Y, Z positions for each pillar in the grid; step 2206) for each pillar, determines a delta offset at the target position and the current position; step 2208) for each pillar, determines an associated positioning tool movement required to remove the delta offset; step 2210) for each pillar, directs a movement to the positioning tool to remove the delta offset; step 2212) redetermine the grid layout X, Y, Z positions for each pillar; step 2214) repeats steps 2204-2212 until all pillar offsets are within tolerance; step 2216) indicates to the user that all pillar offsets are within tolerance. After grout has been added to secure the columns in place, in step 2218), the grid resolution system may perform steps 2204-2214 as the grout hardens.
[0076] In an embodiment, the grid solving system may perform steps 2204-2216 to fit a model of evaporation cure time for building grout. As a result of the fit, the location checks and resulting corrections may be performed initially once per minute at a decaying frequency until the grout is substantially cured, where the frequency is predictable based on the mixture and a model of hourly ambient temperature and humidity variations over the expected curing period.
[0077] In some embodiments, the grid control system 295 may be driven by software following an algorithm prepared according to a singular cooperative mode of controlling the pillar positioning tool, which is iterative and does not require extensive computing power. In such an algorithm, the system performs a trial and error process for each pillar, for example moving the actuator a certain distance in a first direction, testing the offset, and if the offset is not within tolerance, adjusting the direction of the actuator control according to the change in offset, moving the actuator again, retesting, and repeating until the offset is within tolerance. Such an algorithm uses this system of guesses and checks in a feedback loop that attempts to align the current position of the pillar top with the target position, by testing for less or more offset against the target position, calculating the offset, and commanding the pillar positioning tool to make incremental moves in the appropriate scale until the target position is reached. The iterations in the feedback loop can be made on a time scale of seconds, rather than milliseconds (common in robotic implementations), in order to reduce the demands on computing power and actuator resolution without compromising the accuracy of the results. For a given pillar array, this control mode may result in making hundreds of corrective adjustments per minute.
[0078] In some embodiments, the grid control system 295 may be driven by software according to algorithms prepared according to a forward tuning mode for controlling the pillar positioning tools. In this control mode, after determining the pillar offset, for each pillar positioning tool, the system 295 builds a digital twin model of the tool flex state (i.e., actuator movement) required to position the pillar at the target position. In this control mode, the system 295 moves the tool to what is modeled to be the best tool state, and then begins an iterative loop of test / move / test until the target pillar position is reached. The advantage of this forward tuning mode is that there is less "hunting" than in the single tuning mode. This control mode requires more computational power (e.g., to render the digital twin model) and more carefully structured target inputs, but can reduce the time of active tuning to the extent that the entire system is substantially aligned to the target in a single step (after which only fine tuning is required).
[0079] In some embodiments, the grid control system 295 may be driven by software according to algorithms prepared according to a differential adjustment mode of controlling the pole positioning tools. This control mode is based on the logic that if the control system commands that the actual positions of the pole positions match the target positions of the digital twin model, then the desired actuator flex to achieve those positions will be the result. In this control mode, after determining the pole offsets, for each pole positioning tool, the grid control system 295 builds a digital twin model of the target pole positions. The advantage of this is that it dramatically limits the scope of hunting and promises to achieve completion on the first attempt. This approach to the control of the pole positioning tools may result in achieving positioning accuracy for one or more poles with only one adjustment step.
[0080] From single-cooperation to forward-cooperation to differential-cooperation, the coding complexity escalates dramatically, as does the computational power required to get the result. This is a good / better / best escalation of system performance versus speed to completion. EXAMPLES
[0081] An exemplary system for robotic assisted foundation installation includes a grid solving system 300 for solving the grid, where the positioning system 290 is a full survey system for acquiring position data by using a laser to bounce off a geolocation device 204 (in this case a prism 546), the grid solving system 300: determines the location of the initial fixed point relative to an idealized model of the pier configuration required for the planned structure (i.e. the system determines which pillars of the planned structure are the parents (fixed points to be tested and verified) and which pillars (other pillars) are the children), determines the actual locations of all the piers using the system 290 and devices 204 placed on each pier, and determines the location of the initial fixed point relative to the site (i.e. the fixed point for re-searching relative to the site is always the pillar selected as the parent). Grid control system 295: Using the "true" data derived by the laser survey system (actual starting positions of all pier tops relative to an initial fixed point of calculation in relation to the idealized model, each other, and the site), determines the required movement of each pier, e.g., in X, Y, Z coordinates, required to precisely align the actual pier tip position to the idealized model. In calculating the required movement of each pier, system 295 can allow the entire fixed model to have circular degrees of freedom (system tolerances) in order to find the best possible fit for the entire pier system. The pillar positioning tool in this example can be a tool such as any of tools 310, 402, or 502, and is configured to move pillar 112 in X, Y, Z directions to precisely align it to the desired pier model. One skilled in the art will appreciate that the actuators are specified to be rated for the load of pillar 112, including when surrounded by grout. The pillar positioning tool is configured to hold the position of each pier precisely in place for approximately 96 hours, which is based on the curing time of the grout. During that curing time, the tool is expected to be actively manipulating the pillar for one hour. In another example, the grout cure time is 72 hours.The tool control system provided on the pillar positioning tool includes an actuator controller and a self-contained power source sized to accommodate the communication and actuator power requirements throughout the grout cure time (which may include a 10 amp actuator), and the expected time of active operation. Battery power is the preferred solution, but where this is not possible or feasible, on-site generator power is acceptable. The pillar positioning tool is preferably easy to maintain in the field and can accommodate both round and square pillars 112. For example, any of the tools 310, 402, 502 can accept round or square pillars 112, so long as the associated range limit pins are sized to fit within the pillar, e.g., the pillars 112 can be 4 inch square hollow structural steel (HSS) with variable lengths from 4 to 16 feet. With such pillars 112, the payload capacity of the pillar positioning tool is expected to be 200 to 300 lbs. In this example, the pillar positioning tool has X, Y, and Z translation capabilities like tools 310 and 502, and is sized to adjust the position in the X and Y directions by at least 3 inches from center, and a range of 14 inches in the Z direction.
[0082] FIG. 23 is an exemplary block diagram illustrating an embodiment of a system for implementing embodiments of the methods of the present disclosure, such as those described with reference to previous figures, and in particular shows a positioning system 290, a grid control system 295, and a tool control system 560.
[0083] 23, computer network 2300 includes a number of computing devices 2310a-2310b (each of which may implement a positioning system 290, a grid control system 295, and a tool control system 560) and one or more server systems 2320 coupled to a communication network 2360 via a number of communication links 2330. The communication network 2360 provides a mechanism for allowing various components of the distributed network 2300 to communicate with each other and exchange information. Thus, FIG. 23 illustrates a system for implementing and for communication between the positioning system 290, the grid control system 295, and the tool control system 560.
[0084] The communications network 2360 itself includes one or more interconnected computer systems and communications links. The communications links 2330 may include wired links, optical links, satellite or other wireless communications links, wave propagation links, or any other mechanism for communication of information. Various communications protocols may be used to facilitate communication between the various systems shown in FIG. 23. These communications protocols may include TCP / IP, UDP, HTTP protocol, Wireless Application Protocol (WAP), BLUETOOTH, Zigbee, 802.11, 802.15, 6LoWPAN, LiFi, Google Weave, NFC, GSM, CDMA, other cellular data communications protocols, wireless telephony protocols, Internet telephony, IP telephony, digital voice, Voice over Broadband (VoBB), broadband telephony, Voice over IP (VoIP), vendor-specific protocols, customized protocols, and the like. In one embodiment, communications network 2360 is the Internet, while in other embodiments communications network 2360 may be any suitable communications network including a local area network (LAN), a wide area network (WAN), a wireless network, a cellular network, a personal area network, an intranet, a private network, a near field communication (NFC) network, a public network, a switched network, a peer-to-peer network, and combinations thereof.
[0085] In an embodiment, the server 2320 is not located near the user of the computing device, but communicates through a network. In a different embodiment, the server 2320 is a device that the user can wear or that can be located nearby at all times. In an embodiment, the server 2320 has a large battery to power a long-range communication network such as a cell network (LTE, 5G) or Wi-Fi. The server 2320 communicates with other components of the system via a wired link or via low-power short-range wireless communication such as Bluetooth. In an embodiment, one of the other components of the system plays the role of a server, for example, PC 2310b.
[0086] The distributed computer network 2300 of FIG. 23 is merely an example of an embodiment incorporating the present invention and does not limit the scope of the present invention as set forth in the claims. Those skilled in the art will recognize other variations, modifications, and alternatives. For example, two or more server systems 2320 may be connected to the communication network 2360. As another example, multiple computing devices 2310a-2310b may be coupled to the communication network 2360 through an access provider (not shown) or through some other server system.
[0087] Computing devices 2310a-2310b typically request information from a server system that provides the information. A server system, by definition, typically has more computing and storage capacity than these computing devices, which are often portable devices, mobile communication devices, or other computing devices that play the role of a client in a client-server operation. However, a particular computing device may operate as both a client and a server, depending on whether the computing device is requesting or providing the information. Aspects of the embodiments may be implemented using a client-server environment or a cloud-cloud computing environment.
[0088] The server 2320 is responsible for receiving information requests from the computing devices 2310a-2310b, performing the necessary processing to fulfill the request, and transferring the results corresponding to the request back to the requesting computing device. The necessary processing to fulfill the request may be performed by the server system 2320 or may alternatively be delegated to other servers connected to the communication network 2360 or to other communication networks 2360. The server 2320 may be located close to the computing device 2310 or may be remote from the computing device 2310. The server 2320 may be a hub controlling a local enclave of things in an Internet of Things scenario.
[0089] The computing devices 2310a-2310b allow users to access and query information or applications stored by the server system 2320. Examples of computing devices include portable electronic devices (e.g., mobile communications devices), such as the Apple iPhone®, Apple iPad®, Palm Pre™, or any of the various operating systems used in Internet of Things (IoT) devices, or automobiles or other vehicles, or real-time operating systems (RTOS), such as Apple iOS™, Android™ OS, Google Chrome OS, Symbian OS™, Windows 10, Windows Mobile® OS, Palm OS™, or Palm Web OS™, or RIOT OS, Windows 10 for IoT, WindRiver VxWorks, Google Brillo, ARM Mbed OS, Embedded Apple iOS and OS X, Nucleus RTOS, Green Hills Integrity, or Contiki, or any of the various operating systems used in automobiles or other vehicles, or real-time operating systems (RTOS), such as Microware OS-9, VxWorks, QNX Neutrino, FreeRTOS, Micrium μC / OS-II, Micrium μC / OS-III, Windows It is any computing device that runs any of a variety of programmable logic controller (PLC) or programmable automation controller (PAC) operating systems, such as CE, TI-RTOS, RTEMS, etc. Other operating systems may be used. In a particular embodiment, a "web browser" application running on the computing device allows a user to select, access, search, or query information and / or applications stored by server system 2320.Examples of web browsers include the Android browser provided by Google, the Safari (registered trademark) browser provided by Apple, the Opera Web browser provided by Opera Software, the BlackBerry (registered trademark) browser provided by Research In Motion, the Internet Explorer (registered trademark) and Internet Explorer Mobile browsers provided by Microsoft Corporation, and the Firefox (registered trademark) and Firefox for Mobile browsers provided by Mozilla (registered trademark).
[0090] Figure 24 is an exemplary block diagram illustrating a computing device 2400 of an embodiment. The computing device 2400 may be any of the computing devices 2310 of Figure 23. The computing device 2400 may include a display, screen, or monitor 2405, a housing 2410, and input devices 2415. The housing 2410 houses well-known computer components, some of which are not shown, such as a processor 2420, memory 2425, a battery 2430, a speaker, a transceiver, an antenna 2435, a microphone, ports, jacks, connectors, a camera, an input / output (I / O) controller, a display adapter, a network interface, a mass storage device 2440, and various sensors.
[0091] The input device(s) 2415 may also include a touch screen (e.g., resistive, surface acoustic wave, capacitive sensing, infrared, optical imaging, dispersive signal, or acoustic pulse recognition), a keyboard (e.g., electronic or physical keyboard), buttons, switches, a stylus, or combinations thereof.
[0092] The mass storage device 2440 may include flash and other non-volatile solid state storage or solid state drives (SSD), such as flash drives, flash memory, or USB flash drives. Other examples of mass storage devices include mass disk drives, floppy disks, magnetic disks, optical disks, magneto-optical disks, fixed disks, hard disks, SD cards, CD-ROMs, recordable CDs, DVDs, recordable DVDs (e.g., DVD-R, DVD+R, DVD-RW, DVD+RW, HD-DVD, or Blu-ray Discs), battery-backed volatile memory, tape storage devices, readers, and other similar media, and combinations thereof.
[0093] The embodiments can also be used with computer systems having different configurations, for example, with additional or fewer subsystems, and can include systems provided by Arduino or Raspberry Pi. For example, the computer system can include more than one processor (i.e., a multiprocessor system that can allow for parallel processing of information), or the system can include a cache memory. The computer system shown in FIG. 24 is only one example of a computer system suitable for use with the embodiments. Other configurations of subsystems suitable for use with the embodiments will be readily apparent to those skilled in the art. For example, in certain implementations, the computing device is a mobile communication device, such as a smartphone or tablet computer. Specific examples of smartphones include the Droid Incredible and Google Nexus One provided by HTC Corporation, the iPhone or iPad provided by Apple, and many others. The computing device can be a laptop or netbook. In another specific implementation, the computing device is a non-portable computing device, such as a desktop computer or a workstation.
[0094] A computer implementation or computer executable version of program instructions useful for implementing the embodiments may be embodied using, stored on, or associated with a computer readable medium. A computer readable medium may include any medium involved in providing instructions to one or more processors for execution, such as memory 2425 or mass storage device 2440. Such media may take many forms, including, but not limited to, non-volatile media, volatile media, transmission media, non-print media, and print media. Non-volatile media include, for example, flash memory, or optical or magnetic disks. Volatile media include static or dynamic memory, such as cache memory or RAM. Transmission media include coaxial cables, copper wire, fiber optic lines, and wires arranged in a bus. Transmission media may also take the form of electromagnetic waves, radio frequency, acoustic, or light waves, such as those generated during radio wave and infrared data communications.
[0095] For example, a binary, machine-executable version of the software useful for implementing the embodiments may be stored or resident in RAM or cache memory, or in mass storage device 2440. The source code of this software may also be stored or resident in mass storage device 2440 (e.g., a flash drive, hard disk, magnetic disk, tape, or CD-ROM). As a further example, code useful for implementing the embodiments may be transmitted over wires, radio waves, or over a network such as the Internet. In another specific embodiment, a computer program product is provided that includes various software program code for implementing features of the embodiments.
[0096] The computer software product may be written in any of a variety of suitable programming languages, such as C, C++, C#, Pascal, Fortran, Perl, Matlab (from MathWorks, www.mathworks.com), SAS, SPSS, JavaScript, CoffeeScript, Objective-C, Swift, Objective-J, Ruby, Rust, Python, Erlang, Lisp, Scara, Clojure, and Java. The computer software product may be a separate application having data entry and data display modules. Alternatively, the computer software product may be a class that can be instantiated as a distributed object. The computer software product may also be component software, such as Java Beans (from Oracle) or Enterprise Java Beans (from Oracle EJB).
[0097] The system's operating system may be the Android operating system, iPhone OS (i.e., iOS), Symbian, BlackBerry OS, Palm web OS, Bada, MeeGo, Maemo, Limo, or Brew OS. Other examples of operating systems include the Microsoft Windows family of operating systems (e.g., Windows 95, 98, Me, Windows NT, Windows 2000, Windows XP, Windows XP x64 edition, Windows Vista, Windows 10 or other Windows versions, Windows CE, Windows Mobile, Windows Phone, Windows 10 Mobile), Linux, HP-UX, UNIX, Sun OS, Solaris, Mac OS X, Alpha OS, AIX, IRIX32, or IRIX64, or any of the various operating systems used in Internet of Things (IoT) devices, or automobiles, or other vehicles, or real-time operating systems (RTOS), such as RIOT OS, Windows 10 for IoT, WindRiver VxWorks, Google Brillo, ARM Mbed OS, Embedded Apple iOS and OS X, Nucleus RTOS, Green Hills Integrity, or Contiki, or any of the various operating systems used in Internet of Things (IoT) devices, or automobiles, or other vehicles, or real-time operating systems (RTOS), such as Microware OS-9, VxWorks, QNX Neutrino, FreeRTOS, Micrium μC / OS-II, Micrium μC / OS-III, Windows Any of a variety of Programmable Logic Controller (PLC) or Programmable Automation Controller (PAC) operating systems, such as CE, TI-RTOS, RTEMS, etc. Other operating systems may also be used.
[0098] Further, the computer may be connected to a network, using which it can interface with other computers. The network may be an intranet, an internet, or the Internet, among others. The network may be a wired network (e.g., using connections such as copper and RS232 connectors), a telephone network, a packet network, an optical network (e.g., using optical fibers), or a wireless network, or any combination thereof. For example, data and other information may be passed between computers and components (or steps) of systems useful for practicing the embodiments using a wireless network employing protocols such as Wi-Fi (IEEE standards 802.11, 802.11a, 802.11b, 802.11e, 802.11g, 802.11i, and 802.11n, to name just a few), or other protocols such as BLUETOOTH or NFC or 802.15 or cellular, or the communication protocols may include TCP / IP, UDP, HTTP protocol, Wireless Application Protocol (WAP), BLUETOOTH, Zigbee, 802.11, 802.15, 6LoWPAN, LiFi, Google Weave, NFC, GSM, CDMA, other cellular data communication protocols, wireless telephone protocols, etc. For example, signals from a computer may be transferred, at least in part, wirelessly to components or other computers.
[0099] The following paragraphs present enumerated embodiments. 1. Installing a plurality of building supports on a construction site; for each building support from the plurality of building supports: providing an interface on each building support of the plurality of building supports, the interface defining an interior space; positioning a post from a plurality of posts within the interior space of each interface, wherein a first end of the post is within the interior space and a second end of the post is outside the interior space; connecting an actuator assembly to each pillar configured to move the pillar relative to the building support; determining an actual position of the second end using a data acquisition system; and using the determined actual locations of the second ends of the plurality of pillars, for each second end from the plurality of pillars: a target position for each second end; and an offset between the actual position and the target position; and determining determining, for a second subset of ends, that the offset is greater than a first predetermined tolerance from the target position; for each second end from the subset of second ends, causing the attached actuator assembly to move the second end toward the target position for that second end; determining, for each second end from the subset of second ends, that the offset has changed to be within the first predetermined tolerance using the data acquisition system; fixing each post in a predetermined position within said interior space of its associated interface; A method comprising: 2. The data acquisition system includes a whole survey station; 2. The method of claim 1, wherein the step of determining an actual position of the second end using a data acquisition system includes using the entire survey station and a reflector attached to the second end to determine the actual position of the second end. 3. The target locations of the second ends of the plurality of posts define a plane; the first predetermined tolerance includes a distance of the second end from the plane; 2. The method of embodiment 1, wherein the actuator assembly is configured to tilt the post to move the second end towards the target position. 4. The target locations of the second ends of the plurality of posts define a plane; the first predetermined tolerance includes a distance of the second end from the plane; 2. The method of embodiment 1, wherein the actuator assembly is configured to translate the post to move the second end towards the target position. 5. The target locations of the second ends of the plurality of posts define a plane; the first predetermined tolerance includes a distance of the second end from the plane; 2. The method of embodiment 1, wherein the actuator assembly is configured to tilt and translate the post to move the second end towards the target position. 6. determining, for each building support from the plurality of building supports, an actual inclination of the column using the data acquisition system; using the determined actual tilts of the plurality of columns to determine, for each column from the plurality of columns, a misalignment between the actual tilt and a target tilt; The target position; determining, for a subset of columns of the plurality of columns, that the actual tilt is greater than a second predetermined tolerance from the target tilt; for each pillar from the subset of pillars, causing the attached actuator assembly to tilt the pillar towards the target tilt; determining, for each pillar from the subset of pillars, using the data acquisition system, that the misalignment is within the second predetermined tolerance; 6. The method of embodiment 5, further comprising: 7. The method of embodiment 1, wherein the step of connecting an actuator assembly to each pillar configured to move the pillar relative to the building support includes connecting the actuator assembly to the pillar and to the interface at which the pillar is positioned. 8. The method of embodiment 1, wherein the step of fixing each post in position within the interior space of its associated interface comprises filling the interior space around the post with a material that, when hardened, fixes the position of the post relative to the interface. 9. An interface defining an interior space configured to receive a first end of a post and configured to couple to a building support; 1. An actuator assembly comprising: a first portion configured to hold the post; at least one actuator connected to the first portion and configured to move the first portion, wherein a second end of the post is moved relative to the interface when the first end of the post is received within the interior space and the post is held by the first portion; and the actuator assembly including: A system comprising: 10. The actuator assembly further includes a second portion configured to couple to the interface; the at least one actuator includes a plurality of linear actuators, each linear actuator connected between the first portion and the second portion and configured to move the first portion relative to the second portion; 10. The system of embodiment 9, wherein the plurality of linear actuators are configured to move the first part relative to the second part, and when the second part is coupled to the interface, the first end of the pillar is received within the interior space, and the pillar is held by the first part, the plurality of linear actuators are controllable to tilt the pillar relative to the interface. 11. The actuator assembly further includes a second portion configured to couple to the interface; the at least one actuator includes a plurality of linear actuators, each linear actuator connected to the first portion and the second portion and configured to translate the first portion relative to the second portion; the first portion includes a clamp configured to hold the post against movement relative to the first portion; 10. The system of embodiment 9, wherein the plurality of linear actuators are configured to move the first part relative to the second part, and when the second part is coupled to the interface and the pillar is held by the first part, the plurality of linear actuators are controllable to translate the pillar relative to the interface. 12. The first part includes a clamp configured to hold the post against movement relative to the first part; The actuator assembly includes: a second portion configured to couple to the interface; a third portion configured to hold the post; The at least one actuator comprises: a first plurality of linear actuators, each of the first plurality of linear actuators being connected between the first portion and the second portion; a second plurality of linear actuators, each of the second plurality of linear actuators connected between the third portion and the second portion; the first plurality of linear actuators are configured to translate the second portion in three dimensions; the second plurality of linear actuators are configured to move the third portion in a plane; The system of embodiment 9, wherein the second part is coupled to the interface, the pillar is held by the first part so that the pillar does not move relative to the first part, and when the pillar is held by the second part, the first plurality of linear actuators and the second plurality of linear actuators are controllable to tilt and translate the pillar relative to the interface. 13. The internal space of the interface is a pin configured to be received within an opening in the first end of the post and to limit a range of motion of the first end; or 10. The system of embodiment 9, comprising either an adapter having an inclined element such that the first end faces the center of the interior space. 14. A system for controlling the position of a plurality of columns relative to a plurality of building supports, comprising: a plurality of interfaces, each interface defining an interior space configured to receive a first end of a post; a plurality of actuator assemblies, each configured to move a column relative to a building support; 1. A computing system comprising: instructions; and a data acquisition system configured to determine, for each pillar of a plurality of pillars, a position of a second end of the pillar, the data acquisition system comprising: the plurality of building supports are installed on a construction site; An interface is provided on each building support; a post is positioned within the interior space of each interface such that a first end of the post is within the interior space and a second end of the post is exterior to the interior space; When an actuator assembly is connected to each column, The instructions, when executed by the computing system, cause the system to perform operations, the operations including: determining, for each building support from the plurality of building supports, an actual location of the second end using the data acquisition system; using the determined actual locations of the second ends of the plurality of pillars, for each second end from the plurality of pillars: a target position for each second end; and an offset between the actual position and the target position; and determining determining, for a second subset of ends, that the offset is greater than a first predetermined tolerance from the target position; for each second end from the subset of second ends, causing the attached actuator assembly to move the second end toward the target position for that second end; for each second end from the plurality of posts, determining using the data acquisition system that the offset has changed to be within the first predetermined tolerance; indicating to a user that the offset is within the first predetermined tolerance for each second end from the plurality of posts; the computing system, The system comprising: 15. The data acquisition system includes a whole survey station; The system of embodiment 14, wherein for each building support from the plurality of building supports, the operation of determining the actual position of the second end using the data acquisition system is performed when a reflector is attached to the second end and the actual position of the second end is determined using the entire survey station. 16. The target locations of the second ends of the plurality of posts define a plane; the first predetermined tolerance includes a distance of the second end from the plane; 15. The system of embodiment 14, wherein the actuator assembly is configured to tilt the pillar to move the second end toward the target position. 17. The target locations of the second ends of the plurality of posts define a plane; the first predetermined tolerance includes a distance of the second end from the plane; 15. The system of embodiment 14, wherein the actuator assembly is configured to translate the post to move the second end towards the target position. 18. The target locations of the second ends of the plurality of posts define a plane; the first predetermined tolerance includes a distance of the second end from the plane; 15. The system of embodiment 14, wherein the actuator assembly is configured to tilt and translate the pillar to move the second end towards the target position. 19. The operation further comprises: determining, for each building support from the plurality of building supports, an actual inclination of the column using the data acquisition system; using the determined actual tilts of the plurality of columns to determine, for each column from the plurality of columns, a misalignment between the actual tilt and a target tilt; The target position; determining, for a subset of columns of the plurality of columns, that the actual tilt is greater than a second predetermined tolerance from the target tilt; for each pillar from the subset of pillars, causing the attached actuator assembly to tilt the pillar towards the target tilt; determining, for each pillar from the subset of pillars, using the data acquisition system, that the misalignment is within the second predetermined tolerance; indicating to a user that the misalignment is within the second predetermined tolerance for each second end from the subset of posts; 20. The system of embodiment 18, comprising: 20. An actuator assembly is connected to each column; 15. The system of embodiment 14, wherein the actuator assembly is connected to the pillar and to the interface on which the pillar is positioned.
[0100] While the present embodiment has been described with respect to specific embodiments, it will be recognized that further variations can be devised without departing from the inventive concept.
[0101] The terms used herein are for the purpose of describing particular embodiments only and are not intended to limit the claimed subject matter. As used herein, the term "and / or" includes any and all combinations of one or more of the associated listed items. As used herein, the singular forms "a", "an" and "the" are intended to include the plural as well as the singular, unless the context clearly indicates otherwise. It will be further understood that the terms "comprise" and / or "comprising", as used herein, specify the presence of stated features, steps, operations, elements, and / or components, but do not exclude the presence of one or more other features, steps, operations, elements, components, and / or groups thereof.
[0102] Unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by those skilled in the art to which the present invention belongs. Furthermore, terms as defined in commonly used dictionaries should be interpreted as having a meaning consistent with their meaning in the context of the relevant art and this disclosure, and will not be interpreted in an idealized or overly formal sense unless expressly defined in this specification.
[0103] In describing the embodiments, it will be understood that a number of elements, techniques, and steps are disclosed, each of which has individual advantages and each of which can also be used in combination with one or more, or in some cases all, of the other disclosed elements or techniques, and the specification and claims should be read with the understanding that such combinations are fully within the scope of the subject matter of the embodiments and claims.
[0104] In the above and throughout the description, numerous specific details are set forth in order to fully understand the embodiments of the present disclosure. However, it will be apparent to one skilled in the art that the embodiments can be practiced without such specific details. In other instances, well-known structures and devices are shown in block diagram form to facilitate explanation. The description of the preferred embodiments is not intended to limit the scope of the appended claims. Furthermore, in the methods disclosed herein, various steps are disclosed that illustrate some of the functionality of the embodiments. These steps are merely examples and are not meant to be limiting in any way. Other steps and functions may be contemplated without departing from the scope of the disclosure or the embodiments.
Claims
1. placing a plurality of building supports on a construction site; for each building support from the plurality of building supports: providing an interface on each building support of the plurality of building supports, the interface defining an interior space; positioning a post from a plurality of posts within the interior space of each interface, wherein a first end of the post is within the interior space and a second end of the post is outside the interior space; connecting an actuator assembly to each pillar configured to move the pillar relative to the building support; determining an actual position of the second end using a data acquisition system; and using the determined actual positions of the second ends of the plurality of pillars, for each second end from the plurality of pillars; a target position for each second end; and an offset between the actual position and the target position; and determining determining, for a second subset of ends, that the offset is greater than a first predetermined tolerance from the target position; for each second end from the subset of second ends, causing the attached actuator assembly to move the second end toward the target position for that second end; for each second end from the subset of second ends, determining using the data acquisition system that the offset has changed to be within the first predetermined tolerance; Fixing each post in a predetermined position within said interior space of its associated interface; A method comprising:
2. the data acquisition system includes a full survey station; 2. The method of claim 1, wherein the step of determining an actual location of the second end using a data acquisition system includes using the entire survey station and a reflector attached to the second end to determine the actual location of the second end.
3. the target locations of the second ends of the plurality of posts define a plane; the first predetermined tolerance includes a distance of the second end from the plane; The method of claim 1 , wherein the actuator assembly is configured to tilt the post to move the second end toward the target position.
4. the target locations of the second ends of the plurality of posts define a plane; the first predetermined tolerance includes a distance of the second end from the plane; The method of claim 1 , wherein the actuator assembly is configured to translate the post to move the second end toward the target position.
5. the target locations of the second ends of the plurality of posts define a plane; the first predetermined tolerance includes a distance of the second end from the plane; The method of claim 1 , wherein the actuator assembly is configured to tilt and translate the post to move the second end towards the target position.
6. determining, for each building support from the plurality of building supports, an actual inclination of the column using the data acquisition system; using the determined actual tilts of the plurality of columns to determine, for each column from the plurality of columns, a misalignment between the actual tilt and a target tilt; The target position; determining, for a subset of columns of the plurality of columns, that the actual tilt is greater than a second predetermined tolerance from the target tilt; for each pillar from the subset of pillars, causing the attached actuator assembly to tilt the pillar towards the target tilt; determining, for each pillar from the subset of pillars, using the data acquisition system, that the misalignment is within the second predetermined tolerance; The method of claim 5 further comprising:
7. 2. The method of claim 1, wherein the step of connecting an actuator assembly to each pillar configured to move the pillar relative to the building support comprises connecting the actuator assembly to the pillar and to the interface at which the pillar is positioned.
8. 2. The method of claim 1, wherein the step of fixing each post in position within the interior space of its associated interface comprises filling the interior space around the post with a material that, when hardened, fixes the position of the post relative to the interface.
9. an interface defining an interior space configured to receive a first end of the post and configured to couple to a building support; 1. An actuator assembly comprising: a first portion configured to hold the post; at least one actuator connected to the first portion and configured to move the first portion, wherein a second end of the post is moved relative to the interface when the first end of the post is received within the interior space and the post is held by the first portion; and the actuator assembly including: A system comprising:
10. the actuator assembly further includes a second portion configured to couple to the interface; the at least one actuator includes a plurality of linear actuators, each linear actuator connected between the first portion and the second portion and configured to move the first portion relative to the second portion; 10. The system of claim 9, wherein the plurality of linear actuators are configured to move the first portion relative to the second portion, and when the second portion is coupled to the interface, the first end of the pillar is received within the interior space, and the pillar is held by the first portion, the plurality of linear actuators are controllable to tilt the pillar relative to the interface.
11. the actuator assembly further includes a second portion configured to couple to the interface; the at least one actuator includes a plurality of linear actuators, each linear actuator connected to the first portion and the second portion and configured to translate the first portion relative to the second portion; the first portion includes a clamp configured to hold the post against movement relative to the first portion; 10. The system of claim 9, wherein the plurality of linear actuators are configured to move the first portion relative to the second portion, and wherein when the second portion is coupled to the interface and the post is held by the first portion, the plurality of linear actuators are controllable to translate the post relative to the interface.
12. the first portion includes a clamp configured to hold the post against movement relative to the first portion; The actuator assembly includes: a second portion configured to couple to the interface; a third portion configured to hold the post; The at least one actuator comprises: a first plurality of linear actuators, each of the first plurality of linear actuators connected between the first portion and the second portion; a second plurality of linear actuators, each of the second plurality of linear actuators connected between the third portion and the second portion; the first plurality of linear actuators are configured to translate the second portion in three dimensions; the second plurality of linear actuators are configured to move the third portion in a plane; 10. The system of claim 9, wherein the second portion is coupled to the interface, the pillar is held by the first portion such that the pillar does not move relative to the first portion, and when the pillar is held by the second portion, the first plurality of linear actuators and the second plurality of linear actuators are controllable to tilt and translate the pillar relative to the interface.
13. The interior space of the interface is a pin configured to be received within an opening in the first end of the post and to limit a range of motion of the first end; or 10. The system of claim 9, further comprising either an adapter having an inclined element such that the first end faces a center of the interior space.
14. 1. A system for controlling the position of a plurality of poles relative to a plurality of building supports, comprising: a plurality of interfaces, each interface defining an interior space configured to receive a first end of a post; a plurality of actuator assemblies, each configured to move a column relative to a building support; 1. A computing system comprising: instructions; and a data acquisition system configured to determine, for each pillar of a plurality of pillars, a position of a second end of the pillar, the data acquisition system comprising: the plurality of building supports are installed on a construction site; An interface is provided on each building support; a post is positioned within the interior space of each interface such that a first end of the post is within the interior space and a second end of the post is exterior to the interior space; When an actuator assembly is connected to each column, The instructions, when executed by the computing system, cause the system to perform operations, the operations including: determining, for each building support from the plurality of building supports, an actual location of the second end using the data acquisition system; using the determined actual positions of the second ends of the plurality of pillars, for each second end from the plurality of pillars; a target position for each second end; and an offset between the actual position and the target position; and determining determining, for a second subset of ends, that the offset is greater than a first predetermined tolerance from the target position; for each second end from the subset of second ends, causing the attached actuator assembly to move the second end toward the target position for that second end; for each second end from the plurality of posts, determining using the data acquisition system that the offset has changed to be within the first predetermined tolerance; indicating to a user that the offset is within the first predetermined tolerance for each second end from the plurality of posts; the computing system, The system comprising:
15. the data acquisition system includes a full survey station; 15. The system of claim 14, wherein for each building support from the plurality of building supports, the operation of determining an actual position of the second end using the data acquisition system is performed when a reflector is attached to the second end and the entire survey station is used to determine the actual position of the second end.
16. the target locations of the second ends of the plurality of posts define a plane; the first predetermined tolerance includes a distance of the second end from the plane; The system of claim 14 , wherein the actuator assembly is configured to tilt the post to move the second end towards the target position.
17. the target locations of the second ends of the plurality of posts define a plane; the first predetermined tolerance includes a distance of the second end from the plane; The system of claim 14 , wherein the actuator assembly is configured to translate the post to move the second end towards the target position.
18. the target locations of the second ends of the plurality of posts define a plane; the first predetermined tolerance includes a distance of the second end from the plane; The system of claim 14 , wherein the actuator assembly is configured to tilt and translate the post to move the second end towards the target position.
19. The operation further comprises: determining, for each building support from the plurality of building supports, an actual inclination of the column using the data acquisition system; using the determined actual tilts of the plurality of columns to determine, for each column from the plurality of columns, a misalignment between the actual tilt and a target tilt; The target position; determining, for a subset of columns of the plurality of columns, that the actual tilt is greater than a second predetermined tolerance from the target tilt; for each pillar from the subset of pillars, causing the attached actuator assembly to tilt the pillar towards the target tilt; determining, for each pillar from the subset of pillars, using the data acquisition system, that the misalignment is within the second predetermined tolerance; indicating to a user that the misalignment is within the second predetermined tolerance for each second end from the subset of posts; The system of claim 18 , comprising:
20. An actuator assembly is connected to each post; The system of claim 14 , wherein the actuator assembly is connected to the post and to the interface at which the post is positioned.