Control device and method of controlling absorption type refrigerator

Through controlling equipment and methods, the start time and heat source utilization of the absorption refrigerator are optimized, and the problem of insufficient waste heat in the early start of the power generation equipment is solved, and efficient start-up and energy efficiency of the absorption refrigerator are achieved.

JP2025019551APending Publication Date: 2025-02-07PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023123213
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-07-28
Publication Date
2025-02-07

AI Technical Summary

Technical Problem

The prior art is difficult to efficiently utilize the waste heat of power generation equipment to operate absorption refrigerators, especially in the early stages of power generation equipment starting.

Method used

Through control equipment and methods, the waste heat of the power generation equipment is used as the heat source to optimize the start time of the absorption refrigerator to ensure that the refrigerator is started when the waste heat is sufficient, and waste heat is used as the main heat source during the startup process, and auxiliary heat sources are supplemented if necessary.

Benefits of technology

It improves the efficiency of the absorption refrigerator during startup, ensures efficient utilization of waste heat resources, reduces the use of additional heat sources, and improves the energy efficiency of the overall system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2025019551000001_ABST
    Figure 2025019551000001_ABST
Patent Text Reader

Abstract

To provide a control device capable of efficiently operating an air conditioning system using waste heat of a power generator in an absorption type refrigerator, and a method of controlling the absorption type refrigerator.SOLUTION: A control device according to an embodiment is provided in an air conditioning system including a power generator, and controls an absorption type refrigerator using waste hot water warmed by waste heat of the power generator as a heat source. The control device includes a receiving unit for receiving a start instruction of the air conditioning system, and a control unit for determining a timing for transmitting the start instruction to the absorption type refrigerator based on a temperature of the waste hot water after receiving the start instruction.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a control device and a control method for an absorption chiller. [Background technology]

[0002] Patent Document 1 discloses an absorption chiller that utilizes waste heat from a power generation device. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2018-141564 A Summary of the Invention [Problem to be solved by the invention]

[0004] The present disclosure provides a control device for efficiently operating an air conditioning system that utilizes waste heat from a power generation unit in an absorption chiller, and a control method for the absorption chiller. [Means for solving the problem]

[0005] The control device in the present disclosure is a control device that is provided in an air conditioning system including a power generation device and controls an absorption chiller that uses waste hot water heated by waste heat from the power generation device as a heat source, and includes a reception unit that receives a start-up instruction for the air conditioning system, and a control unit that, after receiving the start-up instruction, determines the timing of sending a start-up instruction to the absorption chiller based on the temperature of the waste hot water.

[0006] The control method for an absorption chiller in the present disclosure is a control method for controlling an absorption chiller that is provided in an air conditioning system including a power generation unit and uses waste hot water heated by waste heat from the power generation unit as a heat source by a control device, and when the control device receives a start-up instruction for the air conditioning system, determines the timing for sending a start-up instruction to the absorption chiller based on the temperature of the waste hot water, and sends the start-up instruction to the absorption chiller at the determined timing. Effect of the Invention

[0007] The control device and the control method for an absorption chiller disclosed herein can improve the operating efficiency at the start-up of an absorption chiller that utilizes waste heat from a power generation unit, thereby enabling an air conditioning system that utilizes waste heat from a power generation unit in an absorption chiller to be operated efficiently. [Brief description of the drawings]

[0008] [Figure 1] Schematic configuration diagram of an air conditioning system according to a first embodiment [Diagram 2] Configuration diagram of an absorption chiller in embodiment 1 [Diagram 3] Flowchart showing the operation of the air conditioning control device in the first embodiment [Figure 4] Flowchart showing the operation of the air conditioning control device in the first embodiment [Diagram 5] FIG. 1 is an explanatory diagram showing an example of the operation of an air conditioning control device according to a first embodiment; DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] (The knowledge and other information that formed the basis of this disclosure) At the time when the inventors came up with the present disclosure, there was a technology in which waste heat from a power generation device that drives a generator using an engine or the like was utilized in an absorption chiller. However, the inventors discovered a problem with the conventional technology in that it was difficult to operate the absorption chiller efficiently immediately after the power generation device was started up because only a small amount of waste heat was supplied to the absorption chiller. In order to solve this problem, the inventors came up with the subject of the present disclosure. In view of the above, the present disclosure provides a control device for efficiently operating an air conditioning system that utilizes waste heat from a power generation device in an absorption chiller, and a control method for the absorption chiller.

[0010] Hereinafter, the embodiments will be described in detail with reference to the drawings. However, in some cases, more detailed explanations than necessary may be omitted. For example, detailed explanations of already well-known matters or duplicate explanations of substantially the same configurations may be omitted. It should be noted that the accompanying drawings and the following description are provided to enable those skilled in the art to fully understand the present disclosure, and are not intended to limit the subject matter described in the claims.

[0011] (Embodiment 1) [1-1. Configuration] [1-1-1. Air conditioning system configuration] FIG. 1 is a schematic configuration diagram of an air conditioning system 1 according to the first embodiment. The air conditioning system 1 is configured by connecting a power generation device 4 and a device that utilizes the waste heat of the power generation device 4 via a waste heat supply path 7. As devices that utilize waste heat, FIG. 1 shows a heating heat exchanger 5, a hot water heat exchanger 6, and an absorption chiller 10. The number of power generation devices 4 and absorption chillers 10 included in the air conditioning system 1 is arbitrary. The configuration and number of devices that utilize waste heat are also arbitrary. In this embodiment, as an example, a configuration in which the air conditioning system 1 includes three power generation devices 4, a heating heat exchanger 5, a hot water heat exchanger 6, and two absorption chillers 10 will be described.

[0012] The power generation device 4 is a device that generates power by driving a generator 41 with a driving source. The driving source may be, for example, a gas engine or a diesel engine, and the type is not particularly limited. In this embodiment, an example in which an engine 42 is used as the driving source is shown.

[0013] The air conditioning system 1 recovers waste heat from the engine 42 of the power generation device 4 by a heat medium flowing through the waste heat supply path 7. For example, the power generation device 4 includes a radiator 43 that dissipates heat from the engine 42. The heat medium flowing through the waste heat supply path 7 is supplied to the radiator 43 by a pump 71. The radiator 43 exchanges heat between the waste heat of the engine 42 and the heat medium flowing through the waste heat supply path 7. The heat medium flowing through the waste heat supply path 7 is, for example, water, and may contain antifreeze, rust inhibitor, or other additives. The water flowing through the waste heat supply path 7 is heated by the waste heat of the engine 42 in the radiator 43, becomes hot water, and is supplied to the heating utilization heat exchanger 5, the hot water utilization heat exchanger 6, and the absorption chiller 10. The hot water flowing through the waste heat supply path 7 is called waste hot water.

[0014] The radiator 43 may be configured to directly exchange heat between the water flowing through the waste heat supply path 7 and the engine 42. The radiator 43 may also be configured to exchange heat between the water flowing through the waste heat supply path 7 and the cooling water of the engine 42.

[0015] The power generation device 4 may be a cogeneration system that utilizes the waste heat of the engine 42, for example, in a water heater. In this case, the radiator 43 exchanges heat between the heat medium that supplies the waste heat of the engine 42 to a waste heat utilization device and the water flowing through the waste heat supply path 7. As a result, the waste heat of the engine 42 that has been utilized in the power generation device 4 is supplied through the waste heat supply path 7.

[0016] The air conditioning system 1 includes a plurality of power generation devices 4. The power generation devices 4 are connected in parallel to a waste heat supply path 7. With this configuration, the waste heat of each power generation device 4 is supplied to the heating utilization heat exchanger 5, the hot water utilization heat exchanger 6, and the absorption chiller 10 through the waste heat supply path 7.

[0017] The heating heat exchanger 5 is connected to the absorption chiller 10, and uses waste heat from the power generation device 4 to provide auxiliary heating during heating operation of the absorption chiller 10. The waste heat supply path 7 is provided with a heating three-way valve 72 that switches between supplying and blocking hot water from the waste heat supply path 7 to the heating heat exchanger 5.

[0018] The hot water heat exchanger 6 heats water for hot water supply by waste heat of the power generation device 4. Waste hot water is supplied to the hot water heat exchanger 6 through the waste heat supply path 7, while waste hot water is supplied through the hot water supply pipe 6A by the hot water pump 61. The hot water heat exchanger 6 heats the water flowing through the hot water supply pipe 6A with the waste heat of the power generation device 4 by exchanging heat between the waste hot water in the waste heat supply path 7 and the water flowing through the hot water supply pipe 6A. The water heated in the hot water heat exchanger 6 is supplied to a hot water supply device (not shown) connected to the hot water supply pipe 6A. The hot water pump 61 operates in conjunction with the operating state of the hot water supply device connected to the hot water supply pipe 6A. For example, when the temperature of the waste hot water in the hot water storage tank of the hot water supply device drops, the hot water pump 61 operates to supply the hot water heated by the hot water heat exchanger 6 to the hot water supply device. The waste heat supply path 7 is provided with a hot water three-way valve 76 that switches between supplying and blocking the waste hot water from the waste heat supply path 7 to the hot water utilization heat exchanger 6.

[0019] The absorption chiller 10 is a device that uses waste heat from the power generation device 4 to supply cold water and hot water for air conditioning. The absorption chiller 10 is sometimes called an absorption chiller / heater. The absorption chiller 10 is connected to a hot water supply pipe 73 that branches off from the waste heat supply path 7, and waste hot water is supplied to the regenerator 15 of the absorption chiller 10 through the hot water supply pipe 73. The hot water supply pipe 73 is provided with a three-way valve 74 that switches between supplying and blocking the waste hot water from the hot water supply pipe 73 to the absorption chiller 10.

[0020] In the air conditioning system 1 shown in FIG. 1, the symbols T1, T2, T4, T5, T6, T7, T8, T9, and T10 indicate temperature sensors. In the following description, the temperature detected by the temperature sensor T1 is expressed as temperature T1. The same applies to the temperature sensors T2, T5, T6, T9, and T10. The temperature sensor T1 is located downstream of the power generation device 4 and upstream of the heating utilization heat exchanger 5 in the flow direction of the waste hot water in the waste heat supply path 7. The temperature sensor T1 can detect the temperature of the waste hot water heated by the waste heat of the power generation device 4. The temperature sensor T4 is located between the heating utilization heat exchanger 5 and the absorption chiller 10, and detects the temperature of the waste hot water immediately before it flows from the waste heat supply path 7 into the absorption chiller 10. In the control of the absorption chiller 10, the temperature detected by the temperature sensor T4 is regarded as the temperature of the waste hot water supplied from the power generation device 4 to the absorption chiller 10. The temperature sensor T5 is located between the absorption chiller 10 and the hot water heat exchanger 6 in the flow direction of the waste heat supply path 7. The temperature detected by the temperature sensor T5 is the temperature of the waste hot water supplied to the hot water heat exchanger 6.

[0021] [1-1-2. Configuration of the control system for air conditioning systems] The air conditioning system 1 includes an air conditioning control device 2 that controls an absorption chiller 10 , and a power generation control device 3 that controls a power generation device 4 .

[0022] The multiple power generation devices 4 of the air conditioning system 1 are each connected to the power generation control device 3 by a communication line 1C. The power generation control device 3 executes control of the power generation devices 4. Control by the power generation control device 3 includes, for example, starting, operating, and stopping the power generation devices 4. There is no limit to the number of power generation devices 4 that are the subject of control by the power generation control device 3. The power generation control device 3 can operate all of the power generation devices 4 that are the subject of control by the power generation control device 3, operate only some of them, or stop all of the power generation devices 4.

[0023] The power generation control device 3 determines the number of operating power generation devices 4 according to, for example, the utilization state of the waste heat in the heating utilization heat exchanger 5, the hot water utilization heat exchanger 6, and the absorption chiller 10.

[0024] The power generation control device 3 is connected to the pump 71 via a communication line (not shown). The power generation control device 3 operates the pump 71 corresponding to the power generation device 4 that is to execute operation among the power generation devices 4 connected to the power generation control device 3. This is one example, and the pump 71 may be configured to start and stop operation in conjunction with the start and stop of operation of the power generation device 4, for example.

[0025] The air conditioning control device 2 is connected to each of the absorption chillers 10 constituting the air conditioning system 1 via a communication line 1B.

[0026] As shown in FIG. 1, the air conditioning control device 2 includes a control unit 201 and a storage unit 202. The control unit 201 is a computer equipped with a CPU (Central Processing Unit), an MPU (Micro Processor Unit), a microcontroller, or other processor. The control unit 201 includes the above-mentioned processor, a ROM (Read Only Memory), and a RAM (Random Access Memory), and controls the absorption chiller 10 by executing a program with the processor. The storage unit 202 has a non-volatile storage area, and stores the program executed by the processor and data processed by the processor.

[0027] The control unit 201 is connected to a communication unit 221, an input unit 222, and a display unit 223. The communication unit 221 is a communication device having a transmitter and a receiver. The communication unit 221 is connected to the power generation control device 3 via a communication line 1A. The communication unit 221 transmits and receives various signals and data to and from the power generation control device 3 in accordance with the control of the control unit 201. The communication unit 221 is connected to each absorption chiller 10 via a communication line 1B. The communication unit 221 transmits various signals and data related to the control of the absorption chiller 10 to the absorption chiller 10 in accordance with the control of the control unit 201.

[0028] The communication unit 221 is connected to the heating three-way valve 72, the three-way valve 74, the hot water supply three-way valve 76, the pump 51, and the hot water supply pump 61 via communication lines (not shown). The communication unit 221 operates each of the heating three-way valve 72, the three-way valve 74, and the hot water supply three-way valve 76 under the control of the control unit 201.

[0029] For example, when the heating-use heat exchanger 5 becomes operable, the communication unit 221 operates the heating three-way valve 72 to make it possible to supply waste hot water from the waste heat supply path 7 to the heating-use heat exchanger 5. This allows the heating-use heat exchanger 5 to use the waste heat of the power generation device 4. The communication unit 221 can also operate the heating three-way valve 72 to block the supply of waste hot water from the waste heat supply path 7 to the heating-use heat exchanger 5, in which case the heating-use heat exchanger 5 cannot use the waste heat of the power generation device 4. Similarly, for example, when the hot water-use heat exchanger 6 becomes operable, the communication unit 221 operates the hot water three-way valve 76 to make it possible to supply waste hot water from the waste heat supply path 7 to the hot water-use heat exchanger 6. This allows the hot water-use heat exchanger 6 to use the waste heat of the power generation device 4. In addition, the communication unit 221 can also operate the hot water three-way valve 76 to cut off the supply of waste hot water from the waste heat supply path 7 to the hot water utilization heat exchanger 6, in which case the hot water utilization heat exchanger 6 will be unable to utilize the waste heat from the power generation device 4.

[0030] The input unit 222 accepts input operations by an operator who manages the air conditioning control device 2. The input unit 222 outputs an operation signal indicating the input content to the control unit 201. The input unit 222 may be configured to accept input using, for example, another computer installed in a location different from the air conditioning control device 2.

[0031] The display unit 223 displays information related to the control executed by the air conditioning control device 2. The display unit 223 includes a display device such as a liquid crystal display, an LED (Light Emitting Diode) indicator, or other display device. The display unit 223 displays information corresponding to the operating state of the air conditioning control device 2 and the operating state of the absorption chiller 10.

[0032] The control unit 201 includes an acquisition unit 211 and a processing unit 212. The acquisition unit 211 and the processing unit 212 may be functional units configured by a processor executing a program.

[0033] The acquisition unit 211 acquires the detected temperatures of the temperature sensors T1, T2, T4, T5, T6, T7, T8, T9, and T10. The processing unit 212 controls the air conditioning system 1 based on the information acquired by the communication unit 221 through communication, the input accepted by the input unit 222, and the detected temperatures acquired by the acquisition unit 211. For example, the processing unit 212 controls the operation of the absorption chiller 10 based on temperatures T1, T4, T13, T14, and the like indicating the temperature of the waste hot water supplied from the waste heat supply path 7 to the absorption chiller 10. In addition, the processing unit 212 transmits information regarding the number of operating power generation units 4 to the power generation control device 3 based on the temperature of the waste hot water supplied to the absorption chiller 10, and the like. The operation of the control unit 201 will be described in detail later with reference to a flowchart.

[0034] [1-1-3. Configuration of absorption chiller] FIG. 2 is a configuration diagram of the absorption chiller 10 according to the first embodiment. The absorption chiller 10 is a water chiller that uses water as a refrigerant and an aqueous lithium bromide (LiBr) solution as an absorbing liquid, thereby supplying cold water and hot water.

[0035] The absorption chiller 10 includes an evaporator 11, an absorber 12 arranged in parallel with the evaporator 11, an evaporator-absorber shell 13 housing the evaporator 11 and the absorber 12, a regenerator 15, and a condenser 16. The absorption chiller 10 also includes an indoor unit 17, a cooler 18, a gas burner 20, a dilute absorbent pump 31, a refrigerant pump 32, a concentrated absorbent pump 33, and a cooling water pump 35. In the absorption chiller 10, the above-mentioned devices are connected by piping via a concentrated absorbent pipe 21, a dilute absorbent pipe 22, refrigerant pipes 23, 24, 25, a cooling water pipe 26, a cold water pipe 27, and the like to form a circulation path. The heating-use heat exchanger 5 shown in FIG. 2 may also be included in the configuration of the absorption chiller 10.

[0036] The pressure inside the evaporator / absorber barrel 13 is kept at a high vacuum state, and water, which is a refrigerant, evaporates in the evaporator 11 and moves inside the evaporator / absorber barrel 13 to the absorber 12. The water forms a liquid pool 11A at the bottom of the evaporator 11. The evaporator / absorber barrel 13 is provided with a refrigerant pipe 25 that opens to the bottom of the evaporator 11, and an end of the refrigerant pipe 25 is connected to a sprayer arranged at the top of the evaporator 11. A refrigerant pump 32 is provided on the refrigerant pipe 25. The refrigerant pump 32 transports the water in the liquid pool 11A to the top of the evaporator 11, whereby the water is sprayed inside the evaporator 11.

[0037] The evaporator 11 is connected to the indoor unit 17 via a cold water pipe 27. The cold water flowing through the cold water pipe 27 exchanges heat with the air in a heat exchanger (not shown) of the indoor unit 17, and the cooled air is supplied to the room, thereby realizing a cooling operation. The indoor unit 17 acts as a heat load for the absorption chiller 10.

[0038] Between the evaporator 11 and the indoor unit 17, cold water (brine) is circulated and supplied through a cold water pipe 27. A heat transfer pipe 27A formed as a part of the cold water pipe 27 is arranged inside the evaporator 11, and during cooling operation of the absorption chiller 10, the brine flowing through the heat transfer pipe 27A exchanges heat with the refrigerant and is cooled. During heating operation of the absorption chiller 10, the brine is heated in the heat transfer pipe 27A and sent to the indoor unit 17 through the cold water pipe 27. A pump 51 for transporting the brine is provided in the cold water pipe 27.

[0039] In the cold water pipe 27, a heating heat exchanger 5 is connected via a hot water pipe 5A to a path for circulating the brine from the indoor unit 17 to the evaporator 11. The heating heat exchanger 5 exchanges heat between the brine returning from the indoor unit 17 to the evaporator 11 and the waste hot water flowing through the waste heat supply path 7.

[0040] 2, temperature sensors T7, T8, T13, and T14 are provided in the cold water pipe 27. Below, the temperature detected by the temperature sensor T7 is referred to as temperature T7, and the same applies to the temperature sensors T8, T13, and T14. The temperature sensor T8 is disposed in a path where water flows from the indoor unit 17 to the heating-use heat exchanger 5, and the temperature sensor T7 is disposed in a path where water flows from the heating-use heat exchanger 5 to the evaporator 11. Temperature sensor T13 is disposed between the heating-use heat exchanger 5 and the evaporator 11, and detects the temperature of the brine flowing into the heat transfer tube 27A. The temperature detected by temperature sensor T13 is defined as inlet water temperature T13. Temperature sensor T14 is disposed between the evaporator 11 and the indoor unit 17, and detects the temperature of the brine flowing out from the heat transfer tube 27A to the indoor unit 17. The temperature detected by temperature sensor T14 is defined as outlet water temperature T14. Inlet water temperature T13 corresponds to an example of a "chilled water inlet temperature", and outlet water temperature T14 corresponds to an example of a "chilled water outlet temperature".

[0041] The absorber 12 has a function of absorbing the refrigerant vapor evaporated in the evaporator 11 into the absorbing liquid, and maintaining the pressure inside the evaporator-absorber shell 13 at a high vacuum state. A dilute absorbing liquid reservoir 12A is formed in the lower part of the absorber 12, in which dilute absorbing liquid diluted by absorbing the refrigerant vapor is stored. One end of a dilute absorbing liquid pipe 22 having a dilute absorbing liquid pump 31 is connected to the dilute absorbing liquid reservoir 12A. The dilute absorbing liquid pump 31 is an inverter-controllable pump, and is configured so that the driving amount of the dilute absorbing liquid pump 31 can be varied by controlling the inverter frequency.

[0042] The dilute absorbent pipe 22 is provided between the absorber 12 and the regenerator 15, and opens into the inside of the regenerator 15. A hot water supply pipe 73 branched off from the waste heat supply path 7 is connected to the regenerator 15, and a heat transfer pipe 73A formed in a part of the hot water supply pipe 73 is disposed inside the regenerator 15.

[0043] The regenerator 15 uses the waste heat of the power generation device 4 and the gas burner 20 as a heat source for heating and regenerating the absorbing liquid. Inside the regenerator 15, the dilute absorbing liquid sent through the dilute absorbing liquid pipe 22 forms an absorbing liquid reservoir 15A. The heat transfer pipe 73A heats the absorbing liquid reservoir 15A with waste hot water sent through the hot water supply pipe 73, thereby heating and regenerating the absorbing liquid. The gas burner 20 is accommodated in a shell (not shown) attached to the regenerator 15. The gas burner 20 heats the absorbing liquid reservoir 15A with a flame, thereby heating and regenerating the absorbing liquid. The ignition and extinguishing of the gas burner 20, and the flow rate of the fuel gas supplied to the gas burner 20 are controlled by the air conditioning control device 2. For example, when the heat from the heat transfer pipe 73A is insufficient, the air conditioning control device 2 causes the gas burner 20 to perform heating, thereby promoting the heating and regeneration of the absorbing liquid. The heat transfer tube 73A is a first heat source that heats the absorption liquid by utilizing waste heat from the power generation device 4, and the gas burner 20 is a second heat source. Under the control of the air conditioning control device 2, the absorption chiller 10 can be operated using only the heat transfer tube 73A as a heat source, or using both the heat transfer tube 73A and the gas burner 20 as heat sources.

[0044] One end of a concentrated absorption liquid pipe 21 is connected to the regenerator 15. The other end of the concentrated absorption liquid pipe 21 is connected to a sprayer provided on the upper part of the absorber 12. A concentrated absorption liquid pump 33 is provided on the concentrated absorption liquid pipe 21. The concentrated absorption liquid pump 33 delivers the concentrated absorption liquid from the regenerator 15 to the absorber 12, and the delivered concentrated absorption liquid is sprayed inside the absorber 12 by the sprayer.

[0045] One end of the refrigerant pipe 23 opens at the top of the regenerator 15. The other end of the refrigerant pipe 23 opens into the inside of the condenser 16, and the refrigerant separated from the dilute absorption liquid in the regenerator 15 is sent to the condenser 16 through the refrigerant pipe 23.

[0046] The absorber 12 and the condenser 16 are provided with a cooling water pipe 26 for circulating cooling water sequentially through the absorber 12 and the condenser 16. The cooling water pipe 26 is connected to a cooler 18. The cooler 18 is, for example, a cooling tower, and cools the cooling water flowing through the cooling water pipe 26. A cooling water pump 35 is provided in the cooling water pipe 26. The cooling water cooled by the cooler 18 is transported by the cooling water pump 35 to the absorber 12, and cools the concentrated absorption liquid sprayed inside the absorber 12. The cooling water pipe 26 is disposed inside the condenser 16, and cools the water vapor in the condenser 16.

[0047] The above is the flow of the absorbing liquid and the refrigerant when the absorption chiller 10 performs cooling operation, and when the absorption chiller 10 performs heating operation, the on-off valve 37 provided on the cooling water pipe 26 is closed. In this case, the water vapor heated in the regenerator 15 flows into the evaporator 11 without condensing in the condenser 16, and heats the heat transfer tube 27A. As a result, the brine flowing through the heat transfer tube 27A becomes hot, and this brine flows into the indoor unit 17 to supply hot water for heating.

[0048] During heating operation of the absorption chiller 10, the heating three-way valve 72 (FIG. 1) is opened under the control of the air conditioning control device 2. With the heating three-way valve 72 open, waste hot water is supplied from the waste heat supply path 7 to the heating heat exchanger 5, and heat is exchanged between the waste hot water and the brine. In this way, the heating heat exchanger 5 heats the brine returning from the indoor unit 17 to the evaporator 11 with the waste heat of the power generation device 4, thereby achieving the effect of improving the heating efficiency of the absorption chiller 10.

[0049] The dilute absorbent pump 31, the refrigerant pump 32, the concentrated absorbent pump 33, the cooling water pump 35, and the on-off valve 37 are connected to the air conditioning control device 2 through control lines (not shown) etc. The air conditioning control device 2 controls each of the above-mentioned parts to cause the absorption chiller 10 to perform cooling operation and heating operation.

[0050] 1, the air conditioning control device 2 is connected to each absorption chiller 10 included in the air conditioning system 1 via a communication line 1B. The air conditioning control device 2 individually controls the multiple absorption chillers 10 to perform cooling operation and heating operation. For example, when the air conditioning control device 2 receives an input of an instruction to start the absorption chiller 10 via the input unit 222, it starts the operation of the absorption chiller 10. Furthermore, while the absorption chiller 10 is operating, the air conditioning control device 2 calculates an air conditioning load based on the inlet water temperature T13 and the outlet water temperature T14, and controls the operating state of the absorption chiller 10 in accordance with the calculated air conditioning load. Furthermore, for example, the air conditioning control device 2 controls the cooling water pump 35 and the on-off valve 37 to switch the absorption chiller 10 between cooling operation and heating operation.

[0051] [1-2. Operation of air conditioning system] Next, the operation of the air conditioning control device 2 will be described. The operation of the air conditioning control device 2 described here relates to the processing when the air conditioning system 1 is started up under the control of the air conditioning control device 2. The air conditioning control device 2 corresponds to an example of a "control device", the input unit 222 corresponds to an example of a "reception unit", and the engine 42 corresponds to an example of a "driving source".

[0052] In this embodiment, the input unit 222 is configured to be able to accept input of a start instruction and a stop instruction for the air conditioning system 1. When the processing unit 212 accepts input of a start instruction by the input unit 222 while the air conditioning system 1 is stopped, the processing unit 212 performs control to start the air conditioning system 1. A state in which the air conditioning system 1 is stopped refers to, for example, a state in which the power generation device 4 and the absorption chiller 10 of the air conditioning system 1 are not operating. In this state, the air conditioning control device 2 does not control the heating three-way valve 72, the three-way valve 74, the hot water supply three-way valve 76, and other equipment such as pumps.

[0053] The processing unit 212 executes a series of startup sequences for starting up the air conditioning system 1. In the startup sequence of the air conditioning system 1, the processing unit 212 first starts up the power generation device 4. Specifically, the processing unit 212 transmits a startup signal instructing the startup of the power generation device 4 to the power generation control device 3 via the communication unit 221. In response to this startup signal, the power generation control device 3 controls the power generation device 4 and starts the operation of the power generation device 4.

[0054] After the power generation device 4 is started, the processing unit 212 starts the absorption chiller 10. Specifically, the processing unit 212 transmits a start signal to the absorption chiller 10 by the communication unit 221. The start signal transmitted to the absorption chiller 10 is, for example, a signal instructing a drive unit (not shown) that operates the absorption chiller 10 to start. The drive unit is, for example, a drive device that supplies power to the dilute absorbent pump 31, the refrigerant pump 32, the concentrated absorbent pump 33, the cooling water pump 35, the on-off valve 37, the three-way valve 74, and the like. This drive device may be a device that supplies power to a vacuum pump (not shown) that maintains the inside of the evaporator absorber shell 13 at a high vacuum. The absorption chiller 10 may also include a controller that operates the dilute absorbent pump 31, the refrigerant pump 32, the concentrated absorbent pump 33, the cooling water pump 35, the on-off valve 37, the three-way valve 74, and the vacuum pump under the control of the air conditioning control device 2. In this case, the air conditioning control device 2 also transmits a start signal to the above-mentioned controller. In this way, the air conditioning control device 2 transmits a start-up signal, thereby starting the operation of the absorption chiller 10. The start-up signal corresponds to an example of a "start-up instruction".

[0055] The processor 212 determines the timing of transmitting a start-up signal to the absorption chiller 10 based on, for example, the temperature of waste hot water supplied from the power generation device 4 to the absorption chiller 10. Furthermore, the processor 212 performs control to switch the operation mode of the absorption chiller 10 in the start-up sequence.

[0056] As described above, the absorption chiller 10 uses the first heat source and the second heat source as heat sources for heating the regenerator 15. The first heat source is waste heat supplied from the power generation device 4, specifically, waste hot water flowing through the waste heat supply path 7. The second heat source is the gas burner 20. The processing unit 212 operates the absorption chiller 10 in a first operation mode in which the use of the second heat source is restricted, and in a second operation mode in which the restriction on the use of the second heat source is looser than that in the first operation mode. The first operation mode and the second operation mode are exclusively switched. In the second operation mode, the absorption chiller 10 can use the gas burner 20, which is the second heat source, but this does not mean that the gas burner 20 is necessarily used during operation in the second operation mode. For example, whether or not the absorption chiller 10 actually performs heating using the gas burner 20 is determined according to the thermal load of the indoor unit 17, etc. The second operation mode may be an embodiment in which the use of the second heat source is not restricted at all, or may be an embodiment in which the restrictions are alleviated compared to the first operation mode.

[0057] The restriction on the use of the second heat source in the first operation mode may be such that the use of the second heat source is completely prohibited. In this case, the first operation mode is a mode in which the second heat source is not used as a heat source for the absorption chiller 10. The second operation mode is a mode in which both the first heat source and the second heat source can be used as heat sources. The restriction on the use of the second heat source in the first operation mode may be such that an upper limit is set on the frequency or duration of use of the second heat source. In this case, the second operation mode is a mode in which there is no upper limit on the frequency or duration of use of the second heat source, or the upper limit is higher than that in the first operation mode. The first mode of operation may be referred to as a burner limited mode and the second mode of operation may be referred to as an unlimited mode.

[0058] The processor 212 designates the operation mode of the absorption chiller 10 to the first operation mode when transmitting a start-up signal to the absorption chiller 10. After a standby time has elapsed since the absorption chiller 10 was started up, the processor 212 transitions the absorption chiller 10 to the second operation mode.

[0059] The processing unit 212 determines the standby time based on the number of power generation units 4 in operation in the air conditioning system 1. In the air conditioning system 1, as described above, the power generation control device 3 determines the number of power generation units 4 to operate according to, for example, the amount of power generation required by the power load. The processing unit 212 acquires the number of power generation units 4 in operation by communicating with the power generation control device 3, and determines the standby time based on the acquired number.

[0060] In the configuration example of the air conditioning system 1 shown in Fig. 1, an air conditioning control device 2 controls multiple absorption chillers 10. When a start-up sequence is executed, the air conditioning control device 2 starts up one absorption chiller 10. After one absorption chiller 10 has started up, the air conditioning control device 2 starts up the other absorption chillers 10 according to the heat load of the absorption chiller 10, etc. In the following, a start-up sequence for starting up one absorption chiller unit 10 after receiving an input of a start-up instruction for the air conditioning system 1 via the input unit 222 will be described.

[0061] 3 and 4 are flowcharts showing the operation of the air conditioning control device 2 in embodiment 1. In Fig. 3 and Fig. 4, steps S13, S21, and S23 are executed by the acquisition unit 211, and the other steps are executed by the processing unit 212.

[0062] When the air conditioning control device 2 receives an input of a start-up instruction for the air conditioning system 1 via the input unit 222 (step S11), it starts up the power generation device 4 by sending a start-up signal for the power generation device 4 to the power generation control device 3 (step S12).

[0063] The air conditioning control device 2 acquires the temperature of the waste hot water in the waste heat supply path 7 (step S13). Specifically, the air conditioning control device 2 acquires the temperature T1, which is the temperature detected by the temperature sensor T1, in step S13.

[0064] The air conditioning control device 2 determines whether the temperature of the waste hot water acquired in step S13 is equal to or higher than a preset activation threshold (step S14). If the temperature of the waste heat is lower than the activation threshold (step S14: NO), the air conditioning control device 2 returns to step S13. The activation threshold is, for example, 65°C.

[0065] If the temperature of the waste hot water is equal to or higher than the start-up threshold (step S14: YES), the air conditioning control device 2 transmits a start-up signal to the absorption chiller 10 (step S15). When transmitting the start-up signal in step S15, the air conditioning control device 2 designates the operation mode of the absorption chiller 10 as the first operation mode, and starts up the absorption chiller 10.

[0066] Next, the air conditioning control device 2 executes a standby time determination process (step S16). Details of the standby time determination process are shown in FIG.

[0067] In FIG. 4, the air conditioning control device 2 acquires the outlet water temperature T14 (step S21). The air conditioning control device 2 determines the first standby time TE1 based on the temperature difference between the outlet water temperature T14 and a preset value corresponding to the outlet water temperature T14 (step S22). The preset value of the outlet water temperature T14 is, for example, 7°C.

[0068] A specific example of the process in step S22 will be described. The air conditioning control device 2 executes the calculation of the following formula (1) to obtain the temperature difference a between the outlet water temperature T14 and the set value. a = outlet water temperature T14 - set value ... (1) When the temperature difference a in the above formula (1) is a negative value (a<0), the air conditioning control device 2 sets a=0. Next, the air conditioning control device 2 calculates the first standby time TE1 by the calculation of the following formula (2). TE1 = 60 - 3 × a … (2) The unit of the first waiting time TE1 calculated by the above formulas (1) and (2) is, for example, minutes.

[0069] In this example, the higher the outlet water temperature T14, the shorter the first standby time TE1, and the lower the outlet water temperature T14, the longer the first standby time TE1. For example, when the outlet water temperature T14 is 25° C. and the set value is 7° C., the first standby time TE1 is calculated to be 6 minutes by the following formula (3). TE1 = 60-3 × (25-7) = 6 [min] … (3)

[0070] The air conditioning control device 2 communicates with the power generation control device 3 via the communication unit 221 to acquire the number of operating power generation devices 4 that are in operation (step S23). The air conditioning control device 2 determines the second standby time TE2 based on the acquired number of operating power generation devices 4 (step S24).

[0071] A specific example of the process in step S24 will be described below. The air conditioning control device 2 calculates, as a normalized value, the ratio B of the number of operating power generation devices 4 to all the power generation devices 4 included in the air conditioning system 1, using the following formula (4). B = Number of operating power generating units 4 / Total number of power generating units 4 … (4) The air conditioning control device 2 calculates the second standby time TE2 by the following formula (5) using the ratio B obtained by the above formula (4) and a preset parameter b. The value of the parameter b is 30, for example. TE2 = b × B … (5)

[0072] In this example, the second standby time TE2 is longer as the number of operating power generation devices 4 increases. For example, if the total number of power generation devices 4 is three, the number of operating power generation devices 4 is one, and the parameter b is 30, the second standby time TE2 is calculated to be six minutes by the following formula (6). TE2 = 30 × (1 / 3) = 10 [min] … (6) In the above exemplary calculation, the first waiting time TE1 and the second waiting time TE2 may be limited to integers in order to improve the efficiency of control.

[0073] The air conditioning control device 2 calculates the standby time based on the first standby time TE1 and the second standby time TE2 (step S25). For example, the air conditioning control device 2 determines the standby time to be the sum of the first standby time TE1 and the second standby time TE2. After calculating the standby time, the air conditioning control device 2 proceeds to step S17 in FIG. 3.

[0074] In step S17, the air conditioning control device 2 determines whether or not a time equivalent to the standby time has elapsed since the start-up signal was sent to the absorption chiller 10 in step S15 (step S17). If the time equivalent to the standby time has not elapsed (step S17: NO), the air conditioning control device 2 waits in step S17.

[0075] If the time equivalent to the standby time has elapsed (step S17: YES), the air conditioning control device 2 switches the operation mode of the absorption chiller 10 to the second operation mode (step S18), and ends the start-up sequence.

[0076] Fig. 5 is an explanatory diagram showing an example of the operation of the air conditioning control device 2. Fig. 5(a) is a graph showing an example of the change in temperature T1. Fig. 5(b) shows the operating state of the power generation device 4, Fig. 5(c) shows the operating state of the absorption chiller 10, and Fig. 5(d) shows the execution state of the second operating mode of the absorption chiller 10.

[0077] In the example of Fig. 5(a), the timing when a start-up instruction is input to the air conditioning system 1 is assumed to be time P1. At time P1, the temperature T1 is lower than the start-up threshold value TH. When the power generation device 4 starts operating at time P1, the temperature T1 starts to rise due to the waste heat of the power generation device 4. When the temperature T1 reaches a temperature equal to or higher than the start-up threshold value TH at time P2, a start-up signal is output to the absorption chiller 10, and the absorption chiller 10 starts up.

[0078] After starting the absorption chiller 10, the air conditioning control device 2 waits for a standby time L. At a time P3 when the standby time L has elapsed, the air conditioning control device 2 switches the operation mode of the absorption chiller 10 to the second operation mode.

[0079] The set values, start-up thresholds, parameters, and arithmetic expressions described in relation to the above operations are stored, for example, in the storage unit 202. The processing shown in the above expressions (1) to (6) is an example, and the air conditioning control device 2 can be configured to determine the standby time L, the first standby time TE1, and the second standby time TE2 using more complex functions, tables, programs, or AI (Artificial Intelligence).

[0080] [1-3. Effects, etc.] As described above, the air conditioning control device 2 is provided in the air conditioning system 1 including the power generation device 4, and controls the absorption chiller 10 that uses, as a heat source, waste hot water heated by waste heat from the power generation device 4. The air conditioning control device 2 includes an input unit 222 that receives a start-up instruction for the air conditioning system 1. The air conditioning control device 2 includes a control unit 201 that, after receiving the start-up instruction, determines the timing of sending a start-up signal to the absorption chiller 10 based on the temperature of the waste hot water.

[0081] This can improve the operating efficiency at the start-up of the absorption chiller 10 that utilizes the waste heat of the power generation device 4. For example, the absorption chiller 10 can be started after the temperature of the waste hot water supplied from the power generation device 4 to the absorption chiller 10 has increased after the power generation device 4 has been started. As a result, the absorption chiller 10 can be started after the power generation device 4 has supplied waste heat to the absorption chiller 10, and the absorption chiller 10 can be operated efficiently immediately after the start-up of the absorption chiller 10. Therefore, the air conditioning system 1 that utilizes the waste heat of the power generation device 4 in the absorption chiller 10 can be operated efficiently.

[0082] The air conditioning control device 2 includes a communication unit 221 that transmits a start-up signal to the absorption chiller 10. The air conditioning control device 2 transmits the start-up signal to the absorption chiller 10 in response to a change in the temperature of the waste hot water from a temperature lower than a preset start-up threshold value to a temperature equal to or higher than the threshold value.

[0083] According to this, the absorption chiller 10 starts up after the temperature of the waste hot water has risen due to the operation of the power generation unit 4. Therefore, immediately after the absorption chiller 10 starts up, the absorption chiller 10 can utilize the waste heat of the power generation unit 4. Therefore, when the air conditioning system 1 starts up, the absorption chiller 10 can be operated more efficiently.

[0084] The absorption chiller 10 can use either the waste hot water or a second heat source different from the waste hot water, or both the waste hot water and the second heat source, as a heat source. The control unit 201 operates the absorption chiller 10 in a first operation mode in which the second heat source is not used by transmitting a start-up signal, and then operates the absorption chiller 10 in a second operation mode in which both the waste hot water and the second heat source can be used as heat sources.

[0085] This makes it possible to prevent the absorption chiller 10 from using the second heat source due to the temperature of the waste hot water not having risen sufficiently immediately after the start of the absorption chiller 10. This makes it possible to prevent an increase in the energy used by the absorption chiller 10 until the temperature of the waste hot water rises sufficiently. Therefore, when the air conditioning system 1 is started up, the absorption chiller 10 can be operated more efficiently.

[0086] The control unit 201 determines a standby time for waiting for switching to the second operation mode, and operates the absorption chiller 10 in the second operation mode after the standby time has elapsed since the start-up signal was transmitted.

[0087] According to this, by keeping the absorption chiller 10 on standby in the first operation mode until the temperature of the waste heat rises sufficiently, it is possible to suppress an increase in the energy used by the absorption chiller 10 immediately after startup. Therefore, when the air conditioning system 1 is started up, the absorption chiller 10 can be operated more efficiently.

[0088] The control unit 201 determines the standby time based on at least one of the cold water inlet temperature and the cold water outlet temperature of the absorption chiller 10.

[0089] According to this, the standby time for which the absorption chiller 10 is kept on standby in the first operation mode is determined based on the magnitude of the thermal load of the absorption chiller 10. Therefore, the standby time can be determined taking into consideration the magnitude of the waste heat required by the absorption chiller 10 immediately after startup, and therefore it is possible to prevent the absorption chiller 10 from using the second heat source due to a shortage of waste heat relative to the thermal load. This makes it possible to prevent an increase in the energy used by the absorption chiller 10 immediately after startup. Therefore, it is possible to operate the absorption chiller 10 more efficiently when the air conditioning system 1 is started up.

[0090] The air conditioning system 1 includes a plurality of power generation devices 4. The control unit 201 determines the standby time based on at least one of the chilled water inlet temperature and the chilled water outlet temperature, and the number of power generation devices 4 in operation in the air conditioning system 1. Specifically, the control unit 201 determines a first standby time TE1 based on the outlet water temperature T14 on the outflow side of the absorption chiller 10 and a set value, determines a second standby time TE2 based on the number of operating power generation devices 4, and determines the standby time L from the first standby time TE1 and the second standby time TE2.

[0091] According to this, the standby time is determined taking into consideration the magnitude of the thermal load of the absorption chiller 10 and the number of operating power generation units 4. The number of operating power generation units 4 affects the degree of increase in the temperature of the waste hot water due to the operation of the power generation units 4. Therefore, by operating the absorption chiller 10 in the first operation mode only for the standby time reflecting the degree of increase in the temperature of the waste hot water, it is possible to effectively prevent the absorption chiller 10 from using the second heat source due to insufficient waste heat for the thermal load of the absorption chiller 10. Therefore, it is possible to prevent an increase in the energy used by the absorption chiller 10 immediately after startup. Therefore, it is possible to operate the absorption chiller 10 more efficiently when the air conditioning system 1 is started up.

[0092] The power generation device 4 has a generator and a driving source that drives the generator. The air conditioning system 1 has a waste heat supply path 7 that circulates and supplies waste hot water heated by waste heat from the driving source to the regenerator of the absorption chiller 10. The control unit 201 acquires the temperature of the waste hot water flowing from the waste heat supply path 7 to the regenerator 15 as the temperature of the waste heat supplied from the power generation device 4 to the absorption chiller 10.

[0093] According to this, the temperature of the waste heat supplied from the power generation device 4 to the absorption chiller 10 can be efficiently detected as the temperature of the waste hot water flowing through the waste heat supply path 7.

[0094] The control method of this embodiment is a control method for controlling, by an air conditioning control device 2, an absorption chiller 10 that is provided in an air conditioning system 1 including a power generation device 4 and uses waste hot water heated by waste heat from the power generation device 4 as a heat source. In this control method, when a start-up instruction for the air conditioning system 1 is received by the air conditioning control device 2, the timing for transmitting a start-up signal to the absorption chiller 10 is determined based on the temperature of the waste hot water. The air conditioning control device 2 transmits the start-up signal to the absorption chiller 10 at the determined timing.

[0095] This makes it possible to improve the operating efficiency at the start-up of the absorption chiller 10 that utilizes the waste heat of the power generation device 4. For example, the absorption chiller 10 can be started after the temperature of the waste hot water supplied from the power generation device 4 to the absorption chiller 10 has risen after the power generation device 4 has been started. As a result, the absorption chiller 10 can be started after the power generation device 4 has supplied waste heat to the absorption chiller 10, and the absorption chiller 10 can be operated efficiently immediately after the start-up of the absorption chiller 10. Therefore, the air conditioning system that utilizes the waste heat of the power generation device in the absorption chiller can be operated efficiently.

[0096] (Other embodiments) As described above, the above-mentioned embodiment has been described as an example disclosed in the present application. However, the technology in the present disclosure is not limited to this, and can be applied to an embodiment in which modifications, substitutions, additions, omissions, etc. are made. In addition, it is also possible to combine the components described in the above-mentioned embodiment to create a new embodiment. Therefore, other embodiments will be exemplified below.

[0097] In the above-described embodiment, an example has been described in which the air conditioning control device 2 detects and processes the temperature T1 as the temperature of the waste hot water supplied from the power generation device 4 to the absorption chiller 10. This is just one example, and for example, the air conditioning control device 2 may detect the temperature T4 as the temperature of the waste hot water supplied from the power generation device 4 to the absorption chiller 10. In the above-described embodiment, instead of using the outlet water temperature T14 in the standby time determination process shown in Fig. 4, the standby time may be determined using the inlet water temperature T13. In this case, the standby time can be calculated in the same way as when the outlet water temperature T14 is used, by using a preset setting value for the inlet water temperature T13, various parameters, and arithmetic expressions. Also, the air conditioning control device 2 may determine the standby time using both the inlet water temperature T13 and the outlet water temperature T14.

[0098] In the above-described embodiment, for example, the control device that performs the processes shown in Fig. 3 and Fig. 4 may be a device other than the air conditioning control device 2. That is, in the air conditioning system 1 including the air conditioning control device 2 that controls the operation of the absorption chiller 10, the processes shown in Fig. 3 and Fig. 4 may be executed by a device other than the air conditioning control device 2.

[0099] The configuration of the absorption chiller 10 described in the above embodiment is an example. For example, the heat transfer tube 73A and the gas burner 20 do not need to be provided in the same place in the regenerator 15, and a configuration in which a portion for heating the absorbing liquid by the heat transfer tube 73A and a portion for heating the absorbing liquid by the gas burner 20 are provided separately may be used. In addition, the regenerator 15 may be divided into a first regenerator for heating and regenerating the absorbing liquid by the heat transfer tube 73A and a second regenerator for heating and regenerating the absorbing liquid by the gas burner 20. The absorption chiller 10 may be a double-effect refrigeration device having a low-temperature regenerator and a high-temperature regenerator. In the above embodiment, the gas burner 20 has been described as the second heat source of the regenerator 15 . However, the absorption chiller 10 may be configured to include a heat source other than the gas burner 20 .

[0100] The operation of the air conditioning control device 2 in the above-mentioned embodiment can be realized as a program executed by a processor. This program can also be realized in a form stored in a non-transitory computer-readable storage medium. The above-mentioned operation can also be realized by storing this program in a server device or the like and having the air conditioning control device 2 download the program from the server device. The processor of the control unit 201 may be configured with a single processor or multiple processors. The processor of the control unit 201 may be hardware programmed to realize the corresponding functional units. The processor of the control unit 201 may be configured with, for example, an ASIC (Application Specific Integrated Circuit) or an FPGA (Field Programmable Gate Array).

[0101] The configuration of the air conditioning control device 2 shown in Fig. 1 is one example, and the specific implementation form is not particularly limited. In other words, it is not necessarily necessary to implement hardware corresponding to each unit individually, and it is also possible to implement a configuration in which one processor executes a program to realize the functions of each unit. Also, some of the functions realized by software in the above-mentioned embodiment may be hardware, or some of the functions realized by hardware may be software.

[0102] The step units of the operation shown in Figures 3 and 4 are divided according to the main processing contents in order to make the operation easier to understand, and the operation is not limited by the way in which the processing units are divided or the names of the processing units. The operation may be divided into more step units according to the processing contents. Also, one step unit may be divided so as to include more processing. Also, the order of the steps may be appropriately changed within a range that does not interfere with the purpose of this disclosure.

[0103] It should be noted that the above-described embodiments are intended to illustrate the technology of the present disclosure, and various modifications, substitutions, additions, omissions, and the like can be made within the scope of the claims or their equivalents.

[0104] (Additional Note) The above description of the embodiments discloses the following techniques.

[0105] (Technology 1) A control device that is provided in an air conditioning system including a power generation device and controls an absorption chiller that uses waste hot water heated by waste heat from the power generation device as a heat source, the control device comprising: a reception unit that receives a start-up instruction for the air conditioning system; and a control unit that, after receiving the start-up instruction, determines the timing of sending a start-up instruction to the absorption chiller based on the temperature of the waste hot water. This makes it possible to improve the operating efficiency at the start-up of the absorption chiller that utilizes the waste heat of the power generation unit, thereby enabling the air conditioning system that utilizes the waste heat of the power generation unit in the absorption chiller to be operated efficiently.

[0106] (Technology 2) The control device according to Technology 1, further comprising a communication unit that transmits the start-up instruction to the absorption chiller, and transmits the start-up instruction to the absorption chiller in response to a change in temperature of the waste hot water from a temperature lower than a preset start-up threshold to a temperature equal to or higher than the start-up threshold. According to this, the absorption chiller starts up after the temperature of the waste hot water is raised by the operation of the power generation unit, so that the absorption chiller can utilize the waste heat of the power generation unit immediately after the absorption chiller starts up. Therefore, the absorption chiller can be operated more efficiently when the air conditioning system starts up.

[0107] (Technology 3) The control device described in Technology 1, wherein the absorption chiller can use either the waste hot water or a second heat source different from the waste hot water, or both the waste hot water and the second heat source as a heat source, and the control unit operates the absorption chiller in a first operation mode in which the second heat source is not used as a heat source by sending the start-up instruction, and thereafter operates the absorption chiller in a second operation mode in which both the waste hot water and the second heat source can be used as heat sources. This prevents the absorption chiller from using the second heat source due to the waste hot water not having risen sufficiently in temperature immediately after the absorption chiller is started, thereby reducing the energy used by the absorption chiller. Therefore, the absorption chiller can be operated more efficiently when the air conditioning system is started.

[0108] (Technical 4) The control device according to Technical 3, wherein the control unit determines a waiting time for waiting for switching to the second operation mode, and operates the absorption chiller in the second operation mode after the waiting time has elapsed since transmitting the start-up instruction. This makes it possible to reduce the amount of energy used by the absorption chiller immediately after startup, thereby enabling the absorption chiller to operate more efficiently when the air conditioning system is started up.

[0109] (Technical 5) The control device according to Technical 4, wherein the control unit determines the standby time based on at least one of a cold water inlet temperature and a cold water outlet temperature of the absorption chiller. This prevents the absorption chiller from using the second heat source due to a shortage of waste heat relative to the thermal load of the absorption chiller, and reduces the energy used by the absorption chiller immediately after startup. Therefore, the absorption chiller can be operated more efficiently when the air conditioning system is started up.

[0110] (Technology 6) The air conditioning system includes a plurality of the power generation devices, and the control unit determines the standby time based on at least one of the chilled water inlet temperature and the chilled water outlet temperature and the number of the power generation devices operating in the air conditioning system.The control device described in Technology 5. According to this, the absorption chiller is operated in the first operation mode for only the standby time that reflects the degree of rise in the temperature of the waste hot water, and the absorption chiller is effectively prevented from using the second heat source. This reduces the energy used by the absorption chiller immediately after startup, and allows the absorption chiller to operate more efficiently when the air conditioning system is started up.

[0111] (Technology 7) The power generation device has a generator and a driving source that drives the generator, the air conditioning system has a waste heat supply path that circulates and supplies waste hot water heated by waste heat from the driving source to a regenerator of the absorption chiller, and the control unit acquires the temperature of the waste hot water flowing from the waste heat supply path to the regenerator. This is the control device described in Technology 1. This makes it possible to efficiently detect the waste heat supplied from the power generation device to the absorption chiller.

[0112] (Technology 8) A control method for controlling an absorption chiller that is installed in an air conditioning system including a power generation unit and uses waste hot water heated by waste heat from the power generation unit as a heat source by a control device, the control method comprising the steps of: when a start-up instruction for the air conditioning system is received by the control device, determining a timing for sending a start-up instruction to the absorption chiller based on a temperature of the waste hot water, and sending the start-up instruction to the absorption chiller at the determined timing. This makes it possible to improve the operating efficiency at the start-up of the absorption chiller that utilizes the waste heat of the power generation unit, thereby enabling the air conditioning system that utilizes the waste heat of the power generation unit in the absorption chiller to be operated efficiently. [Industrial Applicability]

[0113] INDUSTRIAL APPLICABILITY As described above, the control device and the control method for an absorption chiller according to the present invention can be used in a waste heat utilization air conditioning system that utilizes waste heat from a power generation device in an absorption chiller. [Explanation of symbols]

[0114] 1. Air conditioning system 1A, 1B, 1C communication lines 2 Air conditioning control device (control device) 3. Power generation control device 4. Power generation equipment 5 Heat exchanger for heating 5A hot water pipe 6. Hot water heat exchanger 6A hot water pipe 7 Waste heat supply line 10 Absorption chiller 11 Evaporator 11A Liquid pool 12 Absorber 12A Dilute absorbent liquid reservoir 13 Evaporator absorber shell 15 Regenerator 15A Absorbent reservoir 16 Condenser 17 Indoor unit (heat exchanger) 18 Cooler 20 Gas burner 21 Thick absorbent pipe 22 Dilute absorption pipe 23, 24, 25 Refrigerant pipes 26 Cooling water pipe 27 Cold water pipe 27A Heat transfer tube 31 Dilute absorption liquid pump 32 Refrigerant pump 33 Thick absorbent pump 35 Cooling water pump 37 On-off valve 41 Generator 42 Engine (power source) 43 Radiator 51, 71 Pump 61 Hot water pump 72 Three-way valve for heating 74 Three-way valve 76 Three-way hot water valve 73 Hot water supply pipe 73A Heat transfer tube 201 Control section 202 Storage section 211 Acquisition Department 212 Processing section 221 Communications Department 222 Input section (reception section) T13 Inlet water temperature T14 outlet water temperature

Claims

1. A control device that is provided in an air conditioning system including a power generation device and controls an absorption chiller that uses waste hot water heated by waste heat from the power generation device as a heat source, A reception unit that receives a start-up instruction for the air conditioning system; a control unit that determines a timing for transmitting a start-up instruction to the absorption chiller based on a temperature of the waste hot water after receiving the start-up instruction; A control device comprising:

2. a communication unit that transmits the start-up instruction to the absorption chiller; The control device according to claim 1 , wherein the start-up instruction is transmitted to the absorption chiller in response to a change in temperature of the waste hot water from a temperature lower than a preset start-up threshold to a temperature equal to or higher than the start-up threshold.

3. The absorption chiller can use either the waste hot water or a second heat source different from the waste hot water, or both the waste hot water and the second heat source as a heat source, 2. The control device according to claim 1, wherein the control unit, by transmitting the start-up instruction, operates the absorption chiller in a first operation mode in which the second heat source is not used as a heat source, and thereafter operates the absorption chiller in a second operation mode in which both the waste hot water and the second heat source can be used as heat sources.

4. The control unit is determining a waiting time for waiting for switching to the second operation mode; The control device according to claim 3 , wherein the control device operates the absorption chiller in the second operation mode after a standby time has elapsed since the transmission of the start-up instruction.

5. The control device according to claim 4 , wherein the control unit determines the standby time based on at least one of a cold water inlet temperature and a cold water outlet temperature of the absorption chiller.

6. The air conditioning system includes a plurality of the power generation devices, The control device according to claim 5 , wherein the control unit determines the standby time based on at least one of the chilled water inlet temperature and the chilled water outlet temperature and the number of the power generation devices in operation in the air conditioning system.

7. The power generation device includes a generator and a drive source that drives the generator, the air conditioning system has a waste heat supply passage for circulating and supplying waste hot water heated by waste heat of the driving source to a regenerator of the absorption chiller, The control device according to claim 1 , wherein the control unit acquires a temperature of the waste hot water flowing into the regenerator from the waste heat supply path.

8. A control method for controlling an absorption chiller that is provided in an air conditioning system including a power generation device and uses waste hot water heated by waste heat from the power generation device as a heat source, by a control device, comprising: By the control device, determining a timing for transmitting a start-up instruction to the absorption chiller based on a temperature of the waste hot water when a start-up instruction of the air conditioning system is received; transmitting the start instruction to the absorption chiller at the determined timing; A method for controlling an absorption chiller.

Citation Information

Patent Citations

  • Waste heat utilization absorption type refrigeration system and absorption type refrigerator

    JP2018141564A