Control device and method of controlling air conditioning system
Through priority control equipment and methods, the problem of uneven distribution of waste heat among multiple equipment is solved, and efficient utilization of waste heat resources and equipment efficiency is achieved.
Patent Information
- Application Number
- JP2023123215
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-07-28
- Publication Date
- 2025-02-07
AI Technical Summary
The prior art is difficult to effectively adjust the allocation of waste heat between absorption refrigerators, hot water supply and heating equipment, resulting in waste of resources and inefficiency.
A control equipment and method are designed to ensure that waste heat is used first in hot water supply and heating equipment by adjusting the distribution priority of waste heat, and the waste heat is used as a heat source, combined with the calculation unit and the valve control system to achieve reasonable distribution of waste heat.
It realizes efficient utilization of waste heat resources, improves the operation efficiency of absorption refrigerators, hot water supply and heating equipment, and reduces resource waste.
Smart Images

Figure 2025019553000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a control device and a control method for an air conditioning system. [Background technology]
[0002] Patent Document 1 discloses an absorption chiller that utilizes waste heat from a power generation device. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2018-141564 A Summary of the Invention [Problem to be solved by the invention]
[0004] The present disclosure provides a control device and a control method for an absorption chiller that appropriately adjusts the utilization of waste heat in a configuration in which waste heat from a power generation device is utilized as a heat source for an absorption chiller, hot water supply, and space heating. [Means for solving the problem]
[0005] The control device in the present disclosure is a control device provided in an air conditioning system that includes at least an absorption chiller that uses waste hot water warmed by waste heat from a power generation unit as a heat source, a hot water heat exchanger that uses the waste hot water as a heat source, and a heating heat exchanger that uses the waste hot water as a heat source, and is equipped with a control unit that controls an adjustment means for adjusting the supply state of the waste hot water to the heating heat exchanger, and the control unit controls the adjustment means in accordance with a priority setting of whether or not to give priority to the hot water heat exchanger over other waste heat utilization equipment in utilizing the waste heat of the power generation unit.
[0006] The control method for an air conditioning system in the present disclosure is a control method for an air conditioning system that includes at least an absorption chiller that uses waste hot water warmed by waste heat from a power generation unit as a heat source, a hot water heat exchanger that uses the waste hot water as a heat source, and a heating heat exchanger that uses the waste hot water as a heat source, and controls an adjustment means for adjusting the supply state of the waste hot water to the heating heat exchanger in accordance with a priority setting that specifies whether the hot water heat exchanger is given priority over other waste heat utilization equipment in utilizing the waste heat of the power generation unit. Effect of the Invention
[0007] The control device and the control method for an air conditioning system disclosed herein appropriately limit the use of waste heat in heating in an air conditioning system that uses waste heat from a power generation device as a heat source for an absorption chiller, hot water supply, and heating. Thus, in a configuration in which the waste heat from a power generation device is used as a heat source for multiple devices, the use of waste heat can be appropriately adjusted. [Brief description of the drawings]
[0008] [Figure 1] Schematic configuration diagram of an air conditioning system according to a first embodiment [Diagram 2] Configuration diagram of an absorption chiller in embodiment 1 [Diagram 3] Flowchart showing the operation of the air conditioning control device in the first embodiment DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] (The knowledge and other information that formed the basis of this disclosure) At the time when the inventors came up with the present disclosure, there was a technology in which waste heat from a power generation device that drives a generator using an engine or the like was utilized in an absorption chiller. In addition, a technology in which waste heat from a generator or the like was utilized in a hot water supply device was also known. However, the inventors discovered a problem in that when waste heat is utilized in an absorption chiller, a hot water supply device, and a heating device, it is difficult to appropriately adjust the amount of waste heat utilized by each device. In order to solve this problem, the inventors came up with the subject of the present disclosure. Therefore, the present disclosure provides a control device and a control method for an absorption chiller that appropriately adjust the utilization of waste heat in a configuration in which waste heat from a power generation device is utilized as a heat source for an absorption chiller, hot water supply, and heating.
[0010] Hereinafter, the embodiments will be described in detail with reference to the drawings. However, in some cases, more detailed explanations than necessary may be omitted. For example, detailed explanations of already well-known matters or duplicate explanations of substantially the same configurations may be omitted. It should be noted that the accompanying drawings and the following description are provided to enable those skilled in the art to fully understand the present disclosure, and are not intended to limit the subject matter described in the claims.
[0011] (Embodiment 1) [1-1. Configuration] [1-1-1. Air conditioning system configuration] FIG. 1 is a schematic configuration diagram of an air conditioning system 1 according to the first embodiment. The air conditioning system 1 is configured by connecting a power generation device 4 and a device that utilizes the waste heat of the power generation device 4 via a waste heat supply path 7. As devices that utilize waste heat, FIG. 1 shows a heating heat exchanger 5, a hot water heat exchanger 6, and an absorption chiller 10. The number of power generation devices 4 and absorption chillers 10 included in the air conditioning system 1 is arbitrary. The configuration and number of devices that utilize waste heat are also arbitrary. In this embodiment, as an example, a configuration in which the air conditioning system 1 includes three power generation devices 4, a heating heat exchanger 5, a hot water heat exchanger 6, and two absorption chillers 10 will be described.
[0012] The power generation device 4 is a device that generates power by driving a generator 41 with a driving source. The driving source may be, for example, a gas engine or a diesel engine, and the type is not particularly limited. In this embodiment, an example in which an engine 42 is used as the driving source is shown.
[0013] The air conditioning system 1 recovers waste heat from the engine 42 of the power generation device 4 by a heat medium flowing through the waste heat supply path 7. For example, the power generation device 4 includes a radiator 43 that dissipates heat from the engine 42. The heat medium flowing through the waste heat supply path 7 is supplied to the radiator 43 by a pump 71. The radiator 43 exchanges heat between the waste heat of the engine 42 and the heat medium flowing through the waste heat supply path 7. The heat medium flowing through the waste heat supply path 7 is, for example, water, and may contain antifreeze, rust inhibitor, or other additives. The water flowing through the waste heat supply path 7 is heated by the waste heat of the engine 42 in the radiator 43, becomes hot water, and is supplied to the heating utilization heat exchanger 5, the hot water utilization heat exchanger 6, and the absorption chiller 10. The hot water flowing through the waste heat supply path 7 is called waste hot water.
[0014] The radiator 43 may be configured to directly exchange heat between the water flowing through the waste heat supply path 7 and the engine 42. The radiator 43 may also be configured to exchange heat between the water flowing through the waste heat supply path 7 and the cooling water of the engine 42.
[0015] The power generation device 4 may be a cogeneration system that utilizes the waste heat of the engine 42, for example, in a water heater. In this case, the radiator 43 exchanges heat between the heat medium that supplies the waste heat of the engine 42 to a waste heat utilization device and the water flowing through the waste heat supply path 7. As a result, the waste heat of the engine 42 that has been utilized in the power generation device 4 is supplied through the waste heat supply path 7.
[0016] The air conditioning system 1 includes a plurality of power generation devices 4. The power generation devices 4 are connected in parallel to a waste heat supply path 7. With this configuration, the waste heat of each power generation device 4 is supplied to the heating utilization heat exchanger 5, the hot water utilization heat exchanger 6, and the absorption chiller 10 through the waste heat supply path 7.
[0017] The heating heat exchanger 5 is connected to the absorption chiller 10, and uses waste heat from the power generation device 4 to provide auxiliary heating during heating operation of the absorption chiller 10. The waste heat supply path 7 is provided with a heating three-way valve 72 that switches between supplying and blocking hot water from the waste heat supply path 7 to the heating heat exchanger 5.
[0018] The hot water heat exchanger 6 heats water for hot water supply by waste heat of the power generation device 4. Waste hot water is supplied to the hot water heat exchanger 6 through the waste heat supply path 7, while waste hot water is supplied through the hot water supply pipe 6A by the hot water pump 61. The hot water heat exchanger 6 heats the water flowing through the hot water supply pipe 6A with the waste heat of the power generation device 4 by exchanging heat between the waste hot water in the waste heat supply path 7 and the water flowing through the hot water supply pipe 6A. The water heated in the hot water heat exchanger 6 is supplied to a hot water supply device (not shown) connected to the hot water supply pipe 6A. The hot water pump 61 operates in conjunction with the operating state of the hot water supply device connected to the hot water supply pipe 6A. For example, when the temperature of the waste hot water in the hot water storage tank of the hot water supply device drops, the hot water pump 61 operates to supply the hot water heated by the hot water heat exchanger 6 to the hot water supply device. The waste heat supply path 7 is provided with a hot water three-way valve 76 that switches between supplying and blocking the waste hot water from the waste heat supply path 7 to the hot water utilization heat exchanger 6.
[0019] The absorption chiller 10 is a device that uses waste heat from the power generation device 4 to supply cold water and hot water for air conditioning. The absorption chiller 10 is sometimes called an absorption chiller / heater. The absorption chiller 10 is connected to a hot water supply pipe 73 that branches off from the waste heat supply path 7, and waste hot water is supplied to the regenerator 15 of the absorption chiller 10 through the hot water supply pipe 73. The hot water supply pipe 73 is provided with a three-way valve 74 that switches between supplying and blocking the waste hot water from the hot water supply pipe 73 to the absorption chiller 10.
[0020] In the air conditioning system 1 shown in FIG. 1, the symbols T1, T2, T4, T5, T6, T7, T8, T9, and T10 indicate temperature sensors. In the following description, the temperature detected by the temperature sensor T1 is expressed as temperature T1. The same applies to the temperature sensors T2, T5, T6, T9, and T10. The temperature sensor T1 is located downstream of the power generation device 4 and upstream of the heating utilization heat exchanger 5 in the flow direction of the waste hot water in the waste heat supply path 7. The temperature sensor T1 can detect the temperature of the waste hot water heated by the waste heat of the power generation device 4. The temperature sensor T4 is located between the heating utilization heat exchanger 5 and the absorption chiller 10, and detects the temperature of the waste hot water immediately before it flows from the waste heat supply path 7 into the absorption chiller 10. In the control of the absorption chiller 10, the temperature detected by the temperature sensor T4 is regarded as the temperature of the waste hot water supplied from the power generation device 4 to the absorption chiller 10. The temperature sensor T5 is located between the absorption chiller 10 and the hot water heat exchanger 6 in the flow direction of the waste heat supply path 7. The temperature detected by the temperature sensor T5 is the temperature of the waste hot water supplied to the hot water heat exchanger 6.
[0021] [1-1-2. Configuration of the control system for air conditioning systems] The air conditioning system 1 includes an air conditioning control device 2 that controls an absorption chiller 10 , and a power generation control device 3 that controls a power generation device 4 .
[0022] The multiple power generation devices 4 of the air conditioning system 1 are each connected to the power generation control device 3 by a communication line 1C. The power generation control device 3 executes control of the power generation devices 4. Control by the power generation control device 3 includes, for example, starting, operating, and stopping the power generation devices 4. There is no limit to the number of power generation devices 4 that are the subject of control by the power generation control device 3. The power generation control device 3 can operate all of the power generation devices 4 that are the subject of control by the power generation control device 3, operate only some of them, or stop all of the power generation devices 4.
[0023] The power generation control device 3 determines the number of operating power generation devices 4 according to, for example, the utilization state of the waste heat in the heating utilization heat exchanger 5, the hot water utilization heat exchanger 6, and the absorption chiller 10.
[0024] The power generation control device 3 is connected to the pump 71 via a communication line (not shown). The power generation control device 3 operates the pump 71 corresponding to the power generation device 4 that is to execute operation among the power generation devices 4 connected to the power generation control device 3. This is one example, and the pump 71 may be configured to start and stop operation in conjunction with the start and stop of operation of the power generation device 4, for example.
[0025] The air conditioning control device 2 is connected to each of the absorption chillers 10 constituting the air conditioning system 1 via a communication line 1B.
[0026] As shown in FIG. 1, the air conditioning control device 2 includes a control unit 201 and a storage unit 202. The control unit 201 is a computer equipped with a CPU (Central Processing Unit), an MPU (Micro Processor Unit), a microcontroller, or other processor. The control unit 201 includes the above-mentioned processor, a ROM (Read Only Memory), and a RAM (Random Access Memory), and controls the absorption chiller 10 by executing a program with the processor. The storage unit 202 has a non-volatile storage area, and stores the program executed by the processor and data processed by the processor.
[0027] The control unit 201 is connected to a communication unit 221, an input unit 222, and a display unit 223. The communication unit 221 is a communication device having a transmitter and a receiver. The communication unit 221 is connected to the power generation control device 3 via a communication line 1A. The communication unit 221 transmits and receives various signals and data to and from the power generation control device 3 in accordance with the control of the control unit 201. The communication unit 221 is connected to each absorption chiller 10 via a communication line 1B. The communication unit 221 transmits various signals and data related to the control of the absorption chiller 10 to the absorption chiller 10 in accordance with the control of the control unit 201.
[0028] The communication unit 221 is connected to the heating three-way valve 72, the three-way valve 74, the hot water supply three-way valve 76, the pump 51, and the hot water supply pump 61 via communication lines (not shown). The communication unit 221 operates each of the heating three-way valve 72, the three-way valve 74, and the hot water supply three-way valve 76 under the control of the control unit 201.
[0029] For example, when the heating-use heat exchanger 5 becomes operable, the communication unit 221 operates the heating three-way valve 72 to make it possible to supply waste hot water from the waste heat supply path 7 to the heating-use heat exchanger 5. This allows the heating-use heat exchanger 5 to use the waste heat of the power generation device 4. The communication unit 221 can also operate the heating three-way valve 72 to block the supply of waste hot water from the waste heat supply path 7 to the heating-use heat exchanger 5, in which case the heating-use heat exchanger 5 cannot use the waste heat of the power generation device 4. Similarly, for example, when the hot water-use heat exchanger 6 becomes operable, the communication unit 221 operates the hot water three-way valve 76 to make it possible to supply waste hot water from the waste heat supply path 7 to the hot water-use heat exchanger 6. This allows the hot water-use heat exchanger 6 to use the waste heat of the power generation device 4. In addition, the communication unit 221 can also operate the hot water three-way valve 76 to cut off the supply of waste hot water from the waste heat supply path 7 to the hot water utilization heat exchanger 6, in which case the hot water utilization heat exchanger 6 will be unable to utilize the waste heat from the power generation device 4.
[0030] The input unit 222 accepts input operations by an operator who manages the air conditioning control device 2. The input unit 222 outputs an operation signal indicating the input content to the control unit 201. The input unit 222 may be configured to accept input using, for example, another computer installed in a location different from the air conditioning control device 2.
[0031] The display unit 223 displays information related to the control executed by the air conditioning control device 2. The display unit 223 includes a display device such as a liquid crystal display, an LED (Light Emitting Diode) indicator, or other display device. The display unit 223 displays information corresponding to the operating state of the air conditioning control device 2 and the operating state of the absorption chiller 10.
[0032] The control unit 201 includes an acquisition unit 211 and a processing unit 212. The acquisition unit 211 and the processing unit 212 may be functional units configured by a processor executing a program.
[0033] The acquisition unit 211 acquires the detected temperatures of the temperature sensors T1, T2, T4, T5, T6, T7, T8, T9, and T10. The processing unit 212 controls the air conditioning system 1 based on the information acquired by the communication unit 221 through communication, the input accepted by the input unit 222, and the detected temperatures acquired by the acquisition unit 211. For example, the processing unit 212 controls the operation of the absorption chiller 10 based on temperatures T1, T4, T13, T14, and the like indicating the temperature of the waste hot water supplied from the waste heat supply path 7 to the absorption chiller 10. In addition, the processing unit 212 transmits information regarding the number of operating power generation units 4 to the power generation control device 3 based on the temperature of the waste hot water supplied to the absorption chiller 10, and the like. The operation of the control unit 201 will be described in detail later with reference to a flowchart.
[0034] [1-1-3. Configuration of absorption chiller] FIG. 2 is a configuration diagram of the absorption chiller 10 according to the first embodiment. The absorption chiller 10 is a water chiller / heater that supplies cold water and hot water by using water as a refrigerant and an aqueous lithium bromide (LiBr) solution as an absorbing liquid.
[0035] The absorption chiller 10 includes an evaporator 11, an absorber 12 arranged in parallel with the evaporator 11, an evaporator-absorber shell 13 housing the evaporator 11 and the absorber 12, a regenerator 15, and a condenser 16. The absorption chiller 10 also includes an indoor unit 17, a cooler 18, a gas burner 20, a dilute absorbent pump 31, a refrigerant pump 32, a concentrated absorbent pump 33, and a cooling water pump 35. In the absorption chiller 10, the above-mentioned devices are connected by piping via a concentrated absorbent pipe 21, a dilute absorbent pipe 22, refrigerant pipes 23, 24, 25, a cooling water pipe 26, a cold water pipe 27, and the like to form a circulation path. The heating-use heat exchanger 5 shown in FIG. 2 may also be included in the configuration of the absorption chiller 10.
[0036] The pressure inside the evaporator / absorber barrel 13 is kept at a high vacuum state, and water, which is a refrigerant, evaporates in the evaporator 11 and moves inside the evaporator / absorber barrel 13 to the absorber 12. The water forms a liquid pool 11A at the bottom of the evaporator 11. The evaporator / absorber barrel 13 is provided with a refrigerant pipe 25 that opens to the bottom of the evaporator 11, and an end of the refrigerant pipe 25 is connected to a sprayer arranged at the top of the evaporator 11. A refrigerant pump 32 is provided on the refrigerant pipe 25. The refrigerant pump 32 transports the water in the liquid pool 11A to the top of the evaporator 11, whereby the water is sprayed inside the evaporator 11.
[0037] The evaporator 11 is connected to the indoor unit 17 via a cold water pipe 27. The cold water flowing through the cold water pipe 27 exchanges heat with the air in a heat exchanger (not shown) of the indoor unit 17, and the cooled air is supplied to the room, thereby realizing a cooling operation. The indoor unit 17 acts as a heat load for the absorption chiller 10.
[0038] Between the evaporator 11 and the indoor unit 17, cold water (brine) is circulated and supplied through a cold water pipe 27. A heat transfer pipe 27A formed as a part of the cold water pipe 27 is arranged inside the evaporator 11, and during cooling operation of the absorption chiller 10, the brine flowing through the heat transfer pipe 27A exchanges heat with the refrigerant and is cooled. During heating operation of the absorption chiller 10, the brine is heated in the heat transfer pipe 27A and sent to the indoor unit 17 through the cold water pipe 27. A pump 51 for transporting the brine is provided in the cold water pipe 27.
[0039] In the cold water pipe 27, a heating heat exchanger 5 is connected via a hot water pipe 5A to a path for circulating the brine from the indoor unit 17 to the evaporator 11. The heating heat exchanger 5 exchanges heat between the brine returning from the indoor unit 17 to the evaporator 11 and the waste hot water flowing through the waste heat supply path 7.
[0040] 2, temperature sensors T7, T8, T13, and T14 are provided in the cold water pipe 27. Below, the temperature detected by the temperature sensor T7 is referred to as temperature T7, and the same applies to the temperature sensors T8, T13, and T14. The temperature sensor T8 is disposed in a path where water flows from the indoor unit 17 to the heating-use heat exchanger 5, and the temperature sensor T7 is disposed in a path where water flows from the heating-use heat exchanger 5 to the evaporator 11. Temperature sensor T13 is disposed between the heating-use heat exchanger 5 and the evaporator 11, and detects the temperature of the brine flowing into the heat transfer tube 27A. The temperature detected by temperature sensor T13 is defined as inlet water temperature T13. Temperature sensor T14 is disposed between the evaporator 11 and the indoor unit 17, and detects the temperature of the brine flowing out from the heat transfer tube 27A to the indoor unit 17. The temperature detected by temperature sensor T14 is defined as outlet water temperature T14. Inlet water temperature T13 corresponds to an example of a "chilled water inlet temperature", and outlet water temperature T14 corresponds to an example of a "chilled water outlet temperature".
[0041] The absorber 12 has a function of absorbing the refrigerant vapor evaporated in the evaporator 11 into the absorbing liquid, and maintaining the pressure inside the evaporator-absorber shell 13 at a high vacuum state. A dilute absorbing liquid reservoir 12A is formed in the lower part of the absorber 12, in which dilute absorbing liquid diluted by absorbing the refrigerant vapor is stored. One end of a dilute absorbing liquid pipe 22 having a dilute absorbing liquid pump 31 is connected to the dilute absorbing liquid reservoir 12A. The dilute absorbing liquid pump 31 is an inverter-controllable pump, and is configured so that the driving amount of the dilute absorbing liquid pump 31 can be varied by controlling the inverter frequency.
[0042] The dilute absorbent pipe 22 is provided between the absorber 12 and the regenerator 15, and opens into the inside of the regenerator 15. A hot water supply pipe 73 branched off from the waste heat supply path 7 is connected to the regenerator 15, and a heat transfer pipe 73A formed in a part of the hot water supply pipe 73 is disposed inside the regenerator 15.
[0043] The regenerator 15 uses the waste heat of the power generation device 4 and the gas burner 20 as a heat source for heating and regenerating the absorbing liquid. Inside the regenerator 15, the dilute absorbing liquid sent through the dilute absorbing liquid pipe 22 forms an absorbing liquid reservoir 15A. The heat transfer pipe 73A heats the absorbing liquid reservoir 15A with waste hot water sent through the hot water supply pipe 73, thereby heating and regenerating the absorbing liquid. The gas burner 20 is accommodated in a shell (not shown) attached to the regenerator 15. The gas burner 20 heats the absorbing liquid reservoir 15A with a flame, thereby heating and regenerating the absorbing liquid. The ignition and extinguishing of the gas burner 20, and the flow rate of the fuel gas supplied to the gas burner 20 are controlled by the air conditioning control device 2. For example, when the heat from the heat transfer pipe 73A is insufficient, the air conditioning control device 2 causes the gas burner 20 to perform heating, thereby promoting the heating and regeneration of the absorbing liquid. The heat transfer tube 73A is a first heat source that heats the absorption liquid by utilizing waste heat from the power generation device 4, and the gas burner 20 is a second heat source. Under the control of the air conditioning control device 2, the absorption chiller 10 can be operated using only the heat transfer tube 73A as a heat source, or using both the heat transfer tube 73A and the gas burner 20 as heat sources.
[0044] One end of a concentrated absorption liquid pipe 21 is connected to the regenerator 15. The other end of the concentrated absorption liquid pipe 21 is connected to a sprayer provided on the upper part of the absorber 12. A concentrated absorption liquid pump 33 is provided on the concentrated absorption liquid pipe 21. The concentrated absorption liquid pump 33 delivers the concentrated absorption liquid from the regenerator 15 to the absorber 12, and the delivered concentrated absorption liquid is sprayed inside the absorber 12 by the sprayer.
[0045] One end of the refrigerant pipe 23 opens at the top of the regenerator 15. The other end of the refrigerant pipe 23 opens into the inside of the condenser 16, and the refrigerant separated from the dilute absorption liquid in the regenerator 15 is sent to the condenser 16 through the refrigerant pipe 23.
[0046] The absorber 12 and the condenser 16 are provided with a cooling water pipe 26 for circulating cooling water sequentially through the absorber 12 and the condenser 16. The cooling water pipe 26 is connected to a cooler 18. The cooler 18 is, for example, a cooling tower, and cools the cooling water flowing through the cooling water pipe 26. A cooling water pump 35 is provided in the cooling water pipe 26. The cooling water cooled by the cooler 18 is transported by the cooling water pump 35 to the absorber 12, and cools the concentrated absorption liquid sprayed inside the absorber 12. The cooling water pipe 26 is disposed inside the condenser 16, and cools the water vapor in the condenser 16.
[0047] The above is the flow of the absorbing liquid and the refrigerant when the absorption chiller 10 performs cooling operation, and when the absorption chiller 10 performs heating operation, the on-off valve 37 provided on the cooling water pipe 26 is closed. In this case, the water vapor heated in the regenerator 15 flows into the evaporator 11 without condensing in the condenser 16, and heats the heat transfer tube 27A. As a result, the brine flowing through the heat transfer tube 27A becomes hot, and this brine flows into the indoor unit 17 to supply hot water for heating.
[0048] During heating operation of the absorption chiller 10, the heating three-way valve 72 (FIG. 1) is opened under the control of the air conditioning control device 2. With the heating three-way valve 72 open, waste hot water is supplied from the waste heat supply path 7 to the heating heat exchanger 5, and heat is exchanged between the waste hot water and the brine. In this way, the heating heat exchanger 5 heats the brine returning from the indoor unit 17 to the evaporator 11 with the waste heat of the power generation device 4, thereby achieving the effect of improving the heating efficiency of the absorption chiller 10.
[0049] The dilute absorbent pump 31, the refrigerant pump 32, the concentrated absorbent pump 33, the cooling water pump 35, and the on-off valve 37 are connected to the air conditioning control device 2 through control lines (not shown) etc. The air conditioning control device 2 controls each of the above-mentioned parts to cause the absorption chiller 10 to perform cooling operation and heating operation.
[0050] 1, the air conditioning control device 2 is connected to each absorption chiller 10 included in the air conditioning system 1 via a communication line 1B. The air conditioning control device 2 individually controls the multiple absorption chillers 10 to perform cooling operation and heating operation. For example, when the air conditioning control device 2 receives an input of an instruction to start the absorption chiller 10 via the input unit 222, it starts the operation of the absorption chiller 10. Furthermore, while the absorption chiller 10 is operating, the air conditioning control device 2 calculates an air conditioning load based on the inlet water temperature T13 and the outlet water temperature T14, and controls the operating state of the absorption chiller 10 in accordance with the calculated air conditioning load. Furthermore, for example, the air conditioning control device 2 controls the cooling water pump 35 and the on-off valve 37 to switch the absorption chiller 10 between cooling operation and heating operation.
[0051] [1-2. Operation of air conditioning system] Next, the operation of the air conditioning control device 2 will be described. The operation of the air conditioning control device 2 described here relates to the process of controlling the opening and closing of the heating three-way valve 72. The heating three-way valve 72 corresponds to an example of a "heating use adjustment valve" and an "adjustment means", the hot water supply three-way valve 76 corresponds to an example of a "hot water supply use adjustment valve", and the air conditioning control device 2 corresponds to an example of a "control device".
[0052] In this embodiment, the air conditioning control device 2 controls the opening and closing state of the heating three-way valve 72. The opening and closing states of the heating three-way valve 72 include an ON state and an OFF state. The ON state is a state in which waste hot water as a heat medium flows from the waste heat supply path 7 to the heating heat exchanger 5, and can be called a fully open state. The OFF state is a state in which waste hot water does not flow from the waste heat supply path 7 to the heating heat exchanger 5, and can be called a fully closed state. The heating three-way valve 72 is configured to be switchable between two states, the ON state and the OFF state, by the control of the air conditioning control device 2. The heating three-way valve 72 may also be capable of controlling the state between the ON state and the OFF state. That is, the heating three-way valve 72 may be capable of being set to an arbitrary opening degree between a fully open state and a fully closed state. In this case, the air conditioning control device 2 controls the opening degree of the heating three-way valve 72 to a fully open state, a fully closed state, and an arbitrary opening degree between the fully open state and the fully closed state.
[0053] In addition, in the air conditioning control device 2, when the waste heat of the power generation device 4 is used by the hot water heat exchanger 6 and other waste heat utilization equipment, it is possible to set whether or not to prioritize the hot water heat exchanger 6 over the other waste heat utilization equipment. This setting is called a priority setting. The air conditioning control device 2 performs the priority setting according to the contents of the input received by the input unit 222, for example. The contents of the priority setting are stored in the memory unit 202. The other waste heat utilization equipment includes equipment that uses waste hot water as a heat source. For example, in the air conditioning system 1, the heating utilization heat exchanger 5 and the absorption chiller 10 can be the other waste heat utilization equipment. In addition, when the air conditioning system 1 includes equipment that utilizes waste heat other than the heating utilization heat exchanger 5 and the absorption chiller 10, there is no restriction on this equipment being the "other waste heat utilization equipment".
[0054] 3 is a flowchart showing the operation of the air conditioning control device 2 in embodiment 1. In FIG.
[0055] The air conditioning control device 2 acquires the temperature of the waste hot water supplied to the heating heat exchanger 5 (step S11). Specifically, the air conditioning control device 2 acquires the temperature T1, which is the temperature detected by the temperature sensor T1. The air conditioning control device 2 determines whether the temperature T1 of the waste hot water is higher than a preset temperature threshold value (step S12). The temperature threshold value is, for example, 65°C.
[0056] If the temperature T1 is equal to or lower than the temperature threshold value (step S12: NO), the air conditioning control device 2 turns the heating three-way valve 72 to the OFF state (step S13) and ends this process.
[0057] When the air conditioning control device 2 determines that the temperature T1 is higher than the temperature threshold value (step S12: YES), the air conditioning control device 2 switches the heating three-way valve 72 to the ON state (step S14). After that, the air conditioning control device 2 starts PID control based on the temperature T7 detected by the temperature sensor T7 (step S15). The PID control started in step S15 is referred to as control (A).
[0058] The temperature sensor T7 is a sensor disposed in the hot water pipe 5A downstream of the heating-use heat exchanger 5, and detects the temperature of the water (brine) after passing through the heating-use heat exchanger 5. The PID control started in step S15 is a control for determining the opening degree of the heating three-way valve 72 so that the detected temperature T7, which is the temperature of the water after passing through the heating-use heat exchanger 5, becomes a preset target temperature TD.
[0059] After starting the control of step S15, the air conditioning control device 2 refers to the contents of the priority setting and determines whether or not the hot water heat exchanger 6 has been set to have priority (step S16). If the priority setting has been set to have priority over the hot water heat exchanger 6 (step S16: YES), the air conditioning control device 2 proceeds to step S17. On the other hand, if the priority setting has been set to not have priority over the hot water heat exchanger 6 (step S16: NO), the air conditioning control device 2 proceeds to step S18, which will be described later.
[0060] In step S17, the air conditioning control device 2 determines whether the hot water supply three-way valve 76 is in the ON state (step S17). That is, the air conditioning control device 2 determines whether waste hot water is being supplied from the waste heat supply path 7 to the hot water utilization heat exchanger 6. The ON state determined in step S17 includes all states other than the OFF state, and for example, even if the hot water supply three-way valve 76 has a small opening degree, it is determined to be in the ON state. If the hot water supply three-way valve 76 is not in the ON state (step S17: NO), the air conditioning control device 2 proceeds to step S18. If the hot water supply three-way valve 76 is in the ON state (step S17: YES), the air conditioning control device 2 proceeds to step S19.
[0061] In step S18, the air conditioning control device 2 sets the control target value a to a preset low temperature setting value (step S17), and proceeds to step S20, which will be described later. In step S19, the air conditioning control device 2 sets the control target value a to a preset high temperature setting value (step S19), and proceeds to step S20.
[0062] The low temperature set value is a specific temperature preset as a target value for PID control. The high temperature set value is a specific temperature preset as a target value for PID control, or a temperature calculated using preset parameters. The low temperature set value is a temperature lower than the high temperature set value. For example, the low temperature set value is set to 65.0 [°C], and the high temperature set value is set to (Tr+5.0) [°C]. Tr is a parameter that is the reference for the high temperature set value, and can be changed by input through the input unit 222, and as a specific example, it is set to Tr=70.
[0063] In step S20, the air conditioning control device 2 starts PID control based on the detected temperature T4 of the temperature sensor T4 using the target value a (step S20). The temperature sensor T4 is a sensor disposed downstream of the heating-use heat exchanger 5 in the waste heat supply path 7, and is a sensor located between the heating-use heat exchanger 5 and the absorption chiller 10. The temperature sensor T4 detects the temperature of the waste hot water downstream of the position where the waste hot water after passing through the heating-use heat exchanger 5 flows back to the waste heat supply path 7. The more waste heat used in the heating-use heat exchanger 5, the lower the detected temperature T4 of the temperature sensor T4 becomes, and the less waste heat used in the heating-use heat exchanger 5, the higher the detected temperature T4 becomes. The PID control started in step S20 is referred to as control (B).
[0064] When the air conditioning control device 2 is set to give priority to the hot water heat exchanger 6 by the priority setting, the target value a of the detection temperature T4, which is the temperature of the waste hot water after passing through the heating heat exchanger 5, is set to a high temperature. This limits the use of waste heat in the heating heat exchanger 5, while allowing devices connected to the waste heat supply path 7 downstream of the heating heat exchanger 5 to use a large amount of waste heat. This device includes the hot water heat exchanger 6. When the air conditioning control device 2 is set not to prioritize the hot water heat exchanger 6, the target value a of the detected temperature T4 is set to a low temperature. This allows the temperature of the waste hot water that passes through the heating heat exchanger 5 and returns to the waste heat supply path 7 to be lower. In other words, the heating heat exchanger 5 is allowed to use more waste heat. Therefore, the heating heat exchanger 5 can use more waste heat for heating than when the target value a is set to a high temperature.
[0065] After step S20, the air conditioning control device 2 controls the heating three-way valve 72 based on the control value of the control (A) started in step S15 and the control value of the control (B) started in step S20 (step S21). In detail, the air conditioning control device 2 acquires the control value of the control (A) and the control value of the control (B) in step S21. The control value of the PID control is specifically the amount of change in the opening of the heating three-way valve 72, and is the amount of change that changes the opening of the heating three-way valve 72.
[0066] In step S21, the air conditioning control device 2 performs so-called low-select control for, for example, the two acquired control values. That is, the air conditioning control device 2 adopts the smaller of the two control values and operates the heating three-way valve 72 according to the adopted control value. In this case, there is an advantage that the amount of change in the opening degree of the heating three-way valve 72 can be suppressed, and the temperature of the waste hot water flowing through the waste heat supply path 7 is stabilized.
[0067] The air conditioning control device 2 executes the operation shown in Fig. 3 at a predetermined time interval while the air conditioning system 1 is in operation. The air conditioning control device 2 may also detect the detected temperature T1 of the temperature sensor T1 at a period shorter than the above-mentioned predetermined time interval, and execute interrupt control when the temperature T1 changes from a temperature equal to or lower than the temperature threshold to a temperature higher than the temperature threshold, and when the temperature T1 changes from a temperature higher than the temperature threshold to a temperature equal to or lower than the temperature threshold. In this case, the air conditioning control device 2 may start the operation of step S12 in Fig. 3 in response to the interrupt control.
[0068] The temperature threshold value, the target temperature TD, the low setting value and the high setting value of the target value a described above in relation to the operation are stored in the storage unit 202, for example. Furthermore, the PID control described above as a method for controlling the opening degree of the heating three-way valve 72 is just one example, and the air conditioning control device 2 may control the opening degree of the heating three-way valve 72 using a function, a table, a program, or AI (Artificial Intelligence).
[0069] [1-3. Effects, etc.] As described above, the air conditioning control device 2 of this embodiment is provided in an air conditioning system 1 including at least an absorption chiller 10 that uses waste hot water warmed by waste heat from a power generation device 4 as a heat source, a hot water heat exchanger 6 that uses waste hot water as a heat source, and a heating heat exchanger 5 that uses waste hot water as a heat source. The air conditioning control device 2 includes a control unit 201 that controls an adjustment means that adjusts the supply state of waste hot water to the heating heat exchanger 5. The control unit 201 controls the adjustment means in accordance with a priority setting of whether or not the hot water heat exchanger 6 is given priority over the heating heat exchanger 5 in the utilization of waste heat from the power generation device 4. The adjustment means is, for example, a heating three-way valve 72.
[0070] According to this, when the waste heat of the power generation device 4 is utilized in the absorption chiller 10, the hot water heat exchanger 6, and the heating heat exchanger 5, the supply of waste heat to the heating heat exchanger 5 can be adjusted according to the utilization of the waste heat in the hot water heat exchanger 6. Therefore, when the waste heat of the power generation device 4 is utilized by a plurality of devices, the utilization of the waste heat can be appropriately adjusted.
[0071] The absorption chiller 10, the hot water heat exchanger 6 and the heating heat exchanger 5 are connected to a waste heat supply path 7 through which waste hot water flows. The adjustment means is a heating three-way valve 72 that adjusts the supply of waste hot water from the waste heat supply path 7 to the heating heat exchanger 5. The control unit 201 controls the heating three-way valve 72 in accordance with a priority setting.
[0072] According to this, it is possible to set an operation in which the hot water heat exchanger 6 is given priority or not with regard to the utilization of waste heat by adjusting the supply of waste hot water to the heating heat exchanger 5. Therefore, when the waste heat of the power generation device 4 is utilized by a plurality of devices, the utilization of the waste heat can be appropriately adjusted.
[0073] A hot water three-way valve 76 is disposed in the waste heat supply path 7 to adjust the supply of heat medium from the waste heat supply path 7 to the hot water heat exchanger 6. The hot water heat exchanger 6 is connected to the waste heat supply path 7 downstream of the absorption chiller 10 and the heating heat exchanger 5. The control unit 201 controls the heating three-way valve 72 based on the state of the hot water three-way valve 76 when the hot water heat exchanger 6 is set to have priority by the priority setting.
[0074] This allows the supply of waste hot water to the heating heat exchanger 5 to be adjusted according to the operating state of the hot water heat exchanger 6 that receives the supply of waste hot water downstream of the heating heat exchanger 5. Therefore, it is possible to set an operation in which the hot water heat exchanger 6 is given priority over the heating heat exchanger 5, or an operation in which the hot water heat exchanger 6 is not given priority in terms of waste heat utilization. Therefore, when waste heat from the power generation device 4 is utilized by multiple devices, the utilization of the waste heat can be appropriately adjusted.
[0075] When the temperature of the waste hot water supplied from the waste heat supply path 7 to the heating use heat exchanger 5 is lower than the temperature threshold value, the control unit 201 stops the supply of the waste hot water to the heating use heat exchanger 5 using the heating use regulating valve.
[0076] According to this, when the temperature of the waste hot water is low, it is possible to stop the utilization of the waste heat in the heating heat exchanger 5. Therefore, it is possible to make the utilization of the waste heat in the heating heat exchanger 5 and the supply of the waste heat to other devices in an appropriate state.
[0077] The control method of this embodiment is a control method for an air conditioning system 1 including at least an absorption chiller 10 that uses waste hot water warmed by waste heat from a power generation device 4 as a heat source, a hot water heat exchanger 6 that uses the waste hot water as a heat source, and a heating heat exchanger 5 that uses the waste hot water as a heat source. This control method controls an adjustment means that adjusts the supply state of waste hot water to the heating heat exchanger 5 in accordance with a priority setting of whether or not the hot water heat exchanger 6 is given priority over the heating heat exchanger 5 in utilizing the waste heat of the power generation device 4. According to this, when the waste heat of the power generation device 4 is utilized in the heating heat exchanger 5, the supply of the waste heat to the heating heat exchanger 5 can be adjusted according to the utilization of the waste heat in the hot water heat exchanger 6. Therefore, when the waste heat of the power generation device 4 is utilized by a plurality of devices, the utilization of the waste heat can be appropriately adjusted.
[0078] (Other embodiments) As described above, the above-mentioned embodiment has been described as an example disclosed in the present application. However, the technology in the present disclosure is not limited to this, and can be applied to an embodiment in which modifications, substitutions, additions, omissions, etc. are made. In addition, it is also possible to combine the components described in the above-mentioned embodiment to create a new embodiment. Therefore, other embodiments will be exemplified below.
[0079] In the above-described embodiment, for example, the control device that performs the processing shown in Fig. 3 may be a device other than the air conditioning control device 2. That is, in the air conditioning system 1 including the air conditioning control device 2 that controls the operation of the absorption chiller 10, the processing shown in Fig. 3 may be executed by a device other than the air conditioning control device 2.
[0080] In the above-described embodiment, an example has been described in which the power generation control device 3 that controls the operation of the power generation device 4 and the air conditioning control device 2 are configured as separate devices. For example, in the above-described embodiment, in the air conditioning system 1, the air conditioning control device 2 may have the function of the power generation control device 3, and the power generation control device 3 may be omitted. In this case, the air conditioning control device 2 may be configured as a device that executes control of air conditioning, etc. using the absorption chiller 10, and control regarding the number of power generation devices 4 in operation, etc.
[0081] In the above-described embodiment, an example has been described in which the control unit 201 performs control based on the temperature detected by the temperature sensor T7 in the PID control (A) started in step S15. In the control (A), the control unit 201 may perform control so that the inlet water temperature T13 detected by the temperature sensor T13 becomes the target temperature TD.
[0082] The configuration of the absorption chiller 10 described in the above embodiment is an example. For example, the heat transfer tube 73A and the gas burner 20 do not need to be provided in the same place in the regenerator 15, and a configuration in which a part for heating the absorbing liquid by the heat transfer tube 73A and a part for heating the absorbing liquid by the gas burner 20 are provided separately may be used. The regenerator 15 may be divided into a first regenerator for heating and regenerating the absorbing liquid by the heat transfer tube 73A and a second regenerator for heating and regenerating the absorbing liquid by the gas burner 20. The absorption chiller 10 may be a double-effect refrigeration device having a low-temperature regenerator and a high-temperature regenerator. In the above embodiment, the gas burner 20 has been described as the second heat source of the regenerator 15, but the absorption chiller 10 may be configured to include a heat source other than the gas burner 20.
[0083] The operation of the air conditioning control device 2 in the above-mentioned embodiment can be realized as a program executed by a processor. This program can also be realized in a form stored in a non-transitory computer-readable storage medium. The above-mentioned operation can also be realized by storing this program in a server device or the like and having the air conditioning control device 2 download the program from the server device. The processor of the control unit 201 may be configured with a single processor or multiple processors. The processor of the control unit 201 may be hardware programmed to realize the corresponding functional units. The processor of the control unit 201 may be configured with, for example, an ASIC (Application Specific Integrated Circuit) or an FPGA (Field Programmable Gate Array).
[0084] The configuration of the air conditioning control device 2 shown in Fig. 1 is one example, and the specific implementation form is not particularly limited. In other words, it is not necessarily necessary to implement hardware corresponding to each unit individually, and it is also possible to implement a configuration in which one processor executes a program to realize the functions of each unit. Also, some of the functions realized by software in the above-mentioned embodiment may be hardware, or some of the functions realized by hardware may be software.
[0085] The step units of the operation shown in Fig. 3 are divided according to the main processing contents in order to facilitate understanding of the operation, and the operation is not limited by the manner in which the processing units are divided or the names thereof. The operation may be divided into more step units according to the processing contents. In addition, one step unit may be divided so as to include more processing. In addition, the order of the steps may be appropriately changed within a range that does not interfere with the purpose of this disclosure.
[0086] It should be noted that the above-described embodiments are intended to illustrate the technology of the present disclosure, and various modifications, substitutions, additions, omissions, and the like can be made within the scope of the claims or their equivalents.
[0087] (Additional Note) The above description of the embodiments discloses the following techniques.
[0088] (Technology 1) A control device provided in an air conditioning system including at least an absorption chiller that uses waste hot water heated by waste heat from a power generation unit as a heat source, a hot water heat exchanger that uses the waste hot water as a heat source, and a heating heat exchanger that uses the waste hot water as a heat source, the control device comprising a control unit that controls an adjustment means that adjusts the supply state of the waste hot water to the heating heat exchanger, and the control unit controls the adjustment means in accordance with a priority setting that specifies whether or not the hot water heat exchanger is to be given priority over other waste heat utilization equipment in utilizing the waste heat from the power generation unit. According to this, when the waste heat of the power generation device is utilized in the heating heat exchanger, the supply of the waste heat to the heating heat exchanger can be adjusted according to the utilization of the waste heat in the hot water heat exchanger. Therefore, when the waste heat of the power generation device is utilized in a plurality of devices, the utilization of the waste heat can be appropriately adjusted.
[0089] (Technology 2) The absorption chiller, the hot water utilization heat exchanger, and the heating utilization heat exchanger are connected to a waste heat supply path through which the waste hot water flows, the adjustment means is a heating utilization adjustment valve that adjusts the supply of the waste hot water from the waste heat supply path to the heating utilization heat exchanger, and the control unit controls the heating utilization adjustment valve in accordance with the priority setting. According to this, the supply of waste hot water to the heating heat exchanger can be adjusted according to the utilization of waste heat in the hot water heat exchanger. Therefore, it is possible to realize an operation in which the hot water heat exchanger is prioritized over the heating heat exchanger and an operation in which the priority is not given to the hot water heat exchanger with respect to utilization of waste heat. Therefore, when the waste heat of the power generation device is utilized by multiple devices, utilization of the waste heat can be appropriately adjusted.
[0090] (Technology 3) A hot water utilization adjustment valve is disposed in the waste heat supply path, adjusting the supply of the waste hot water from the waste heat supply path to the hot water utilization heat exchanger, and the hot water utilization heat exchanger is connected to the waste heat supply path downstream of the absorption chiller and the heating utilization heat exchanger, and the control unit controls the heating utilization adjustment valve based on a state of the hot water utilization adjustment valve when the priority setting is set to give priority to the hot water utilization heat exchanger over the other waste heat utilization equipment. A control device as described in Technology 2. According to this, the supply of waste heat to the heating heat exchanger can be adjusted according to the operating state of the hot water heat exchanger that receives a supply of waste hot water downstream of the heating heat exchanger. Therefore, it is possible to set an operation in which the hot water heat exchanger is given priority over the heating heat exchanger, or an operation in which the hot water heat exchanger is not given priority in terms of the use of waste heat. Therefore, when the waste heat of a power generation device is used by multiple devices, the use of the waste heat can be appropriately adjusted.
[0091] (Technology 4) The control device according to Technology 2 or Technology 3, wherein the control unit stops the supply of the waste hot water to the heating-use heat exchanger by the heating-use adjustment valve when the temperature of the waste hot water supplied from the waste heat supply path to the heating-use heat exchanger is lower than a temperature threshold value. According to this, when the temperature of the waste hot water is low, the utilization of the waste heat in the heating heat exchanger can be stopped, so that the utilization of the waste heat in the heating heat exchanger and the supply of the waste heat to other devices can be made appropriate.
[0092] (Technology 5) A control method for an air conditioning system including at least an absorption chiller that uses waste hot water heated by waste heat from a power generation unit as a heat source, a hot water heat exchanger that uses the waste hot water as a heat source, and a heating heat exchanger that uses the waste hot water as a heat source, the control method controlling an adjustment means that adjusts the supply state of the waste hot water to the heating heat exchanger in accordance with a priority setting that specifies whether or not the hot water heat exchanger is given priority over other waste heat utilization equipment in utilizing the waste heat from the power generation unit. According to this, when the waste heat of the power generation device is utilized in the heating heat exchanger, the supply of the waste heat to the heating heat exchanger can be adjusted according to the utilization of the waste heat in the hot water heat exchanger. Therefore, when the waste heat of the power generation device is utilized in a plurality of devices, the utilization of the waste heat can be appropriately adjusted. [Industrial Applicability]
[0093] INDUSTRIAL APPLICABILITY As described above, the control device and the control method for an absorption chiller according to the present invention can be used to control an air conditioning system that uses waste heat from a power generation plant as a heat source for an absorption chiller, hot water supply, and heating. [Explanation of symbols]
[0094] 1. Air conditioning system 1A, 1B, 1C communication lines 2 Air conditioning control device (control device) 3. Power generation control device 4. Power generation equipment 5 Heat exchanger for heating 5A hot water pipe 6. Hot water heat exchanger 6A hot water pipe 7 Waste heat supply channel 10 Absorption chiller 11 Evaporator 11A Liquid pool 12 Absorber 12A Dilute absorbent liquid reservoir 13 Evaporator absorber shell 15 Regenerator 15A Absorbent reservoir 16 Condenser 17 Indoor unit 18 Cooler 20 Gas burner 21 Thick absorbent pipe 22 Dilute absorption pipe 23, 24, 25 Refrigerant pipes 26 Cooling water pipe 27 Cold water pipe 27A Heat transfer tube 31 Dilute absorption liquid pump 32 Refrigerant pump 33 Thick absorbent pump 35 Cooling water pump 37 On-off valve 41 Generator 42 Engine 43 Radiator 51, 71 Pump 61 Hot water pump 72 Three-way valve for heating (heating use control valve, control means) 74 Three-way valve 76 Three-way valve for hot water supply (hot water supply adjustment valve) 73 Hot water supply pipe 73A Heat transfer tube 201 Control section 202 Storage section 211 Acquisition Department 212 Processing section 221 Communications Department 222 Input section T13 Inlet water temperature T14 outlet water temperature
Claims
1. A control device provided in an air conditioning system including at least an absorption chiller that uses waste hot water heated by waste heat from a power generation device as a heat source, a hot water heat exchanger that uses the waste hot water as a heat source, and a heating heat exchanger that uses the waste hot water as a heat source, A control unit is provided for controlling an adjustment unit for adjusting a supply state of the waste hot water to the heating heat exchanger, The control unit controls the adjustment means in accordance with a priority setting as to whether the hot water heat exchanger is to be given priority over other waste heat utilization devices in utilizing the waste heat of the power generation device.
2. the absorption chiller, the hot water heat exchanger and the heating heat exchanger are connected to a waste heat supply passage through which the waste hot water flows; the adjusting means is a heating use adjusting valve that adjusts the supply of the waste hot water from the waste heat supply path to the heating use heat exchanger, The control device according to claim 1 , wherein the control unit controls the heating utilization adjustment valve in accordance with the priority setting.
3. a hot water utilization adjustment valve for adjusting the supply of the waste hot water from the waste heat supply path to the hot water utilization heat exchanger is disposed in the waste heat supply path; the hot water heat exchanger is connected to the waste heat supply path downstream of the absorption chiller and the heating heat exchanger; The control device according to claim 2, wherein the control unit controls the heating utilization adjustment valve based on the state of the hot water utilization adjustment valve when the priority setting is set to give priority to the hot water utilization heat exchanger over the other waste heat utilization equipment.
4. The control device according to claim 2, wherein the control unit stops the supply of the waste hot water to the heating use heat exchanger by the heating use adjustment valve when the temperature of the waste hot water supplied from the waste heat supply path to the heating use heat exchanger is lower than a temperature threshold value.
5. A method for controlling an air conditioning system including at least an absorption chiller that uses waste hot water heated by waste heat from a power generation device as a heat source, a hot water heat exchanger that uses the waste hot water as a heat source, and a heating heat exchanger that uses the waste hot water as a heat source, comprising: A control method for an air conditioning system, comprising: controlling an adjustment means for adjusting the supply state of the waste hot water to the heating heat exchanger in accordance with a priority setting as to whether the hot water heat exchanger is to be given priority over other waste heat utilization equipment in utilizing the waste heat of the power generation device.
Citation Information
Patent Citations
Waste heat utilization absorption type refrigeration system and absorption type refrigerator
JP2018141564A