Business management computer, business management method and program

The business management computer system addresses the challenge of manual data input by linking worker reports with management databases to automatically generate summary tables, enhancing cost tracking and profitability analysis.

JP2025093341AActive Publication Date: 2025-06-24HIMUKA EISHIN SANGYO CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2023208922
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-12-12
Publication Date
2025-06-24
Estimated Expiration
2043-12-12

AI Technical Summary

Technical Problem

Existing business management systems fail to automatically input necessary data from worker-generated work daily reports into management databases, leading to difficulties in data utilization for business improvement, risk management, and unclear cost calculations, which hinders profitability analysis and overall business management.

Method used

A business management computer system that links worker-generated work reports with management databases, automatically extracting and registering data to create summary tables such as production volume, monthly expenses, and budget comparisons, eliminating the need for manual input.

Benefits of technology

Facilitates improved business management by automatically generating summary tables, enabling clear cost tracking, reducing expenses, and increasing profitability through automated data integration and analysis.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2025093341000001_ABST
    Figure 2025093341000001_ABST
Patent Text Reader

Abstract

To achieve administrative improvement by associating daily work report with a database managed on a business administration side in business management.SOLUTION: A business management computer which manages business comprises: a reception part which receives input of pre-start data on the business; an acquisition part which acquires a daily work report on the business that a worker creates; an extraction part which extracts work data input to the daily work report; a registration part which registers the extracted work data by extraction items; and a creation part which creates a summary sheet for business management on the business based upon the received pre-start data and the registered work data.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a business management system, a business management method, and a program.

Background Art

[0002] In a business, for example, at a construction site, workers create a work daily report each time they work, and work reports are made. However, even after all the work of the day is completed, the work daily report must be created, and such a situation is troublesome for the workers.

[0003] On the other hand, when a business manager summarizes expenses related to the business, etc., it is normal for the business manager to input the necessary data into the database of the computer managed by the management side while looking at the work daily report created by the worker.

[0004] Therefore, for example, in Patent Document 1, it is disclosed that a work daily report that is a prerequisite for cost management is generated using voice recognition technology (Patent Document 1).

Prior Art Documents

Patent Documents

[0005]

Patent Document 1

Summary of the Invention

Problems to be Solved by the Invention

[0006] However, in the system of Patent Document 1, although the created work daily report is stored in the database, the data necessary for summarizing accounting, etc., is not input from the work daily report into the database managed by the management side. Therefore, it is difficult to utilize the data included in the work daily report as data that should be grasped by business managers and management managers for business improvement.

[0007] Therefore, unless the business manager inputs the data required from the work report into the database, the business manager cannot ensure safety in performing operations involving risks such as setup and arrangement omissions at the site, as well as the use of heavy machinery, transportation of heavy materials, and working at heights. In addition, the business manager cannot grasp the status of the ongoing site, revenue and expenditure, estimates, output, etc., and cannot prevent omissions and leaks such as billing omissions, payment omissions, and schedule forgetting.

[0008] As a result, since the labor costs and transportation costs for each site become unclear, it becomes difficult to calculate the cost based on ambiguous estimated grounds for the planned execution, and without being able to grasp the trend of costs against the budget, the revenue and expenditure countermeasures are delayed and the entire business cannot be grasped. Therefore, the management issue that the cause analysis of deteriorating profitability cannot be performed and the management improvement of the site and the business operator cannot be expected still remains.

[0009] Therefore, the inventors focused on the fact that by linking the database managed by the management side and the work report, for example, by considering labor saving, construction period shortening, etc. from the design to the construction of the business, the productivity of the business can be improved.

[0010] In view of such problems, an object of the present invention is to provide a system for improving management in business management by linking a database managed by the management side and a work report.

Means for Solving the Problems

[0011] The present invention provides the following means for solving the problems.

[0012] The invention according to the first feature is a business management computer for managing a business, a reception unit for receiving input of pre-start data of the business, an acquisition unit for acquiring a work report of the business created by a worker, an extraction unit for extracting work data input into the work report, a registration unit for registering the extracted work data for each extraction item A creation unit that creates a summary table for business management of the said business based on the received pre-start data and the registered work data, A business management computer provided with the above is provided.

[0013] According to the invention according to the first feature, by linking the work diary created by the worker and the database managed by the business management side, there is no need to manually input the work diary into the database, and a summary table necessary for business management is automatically created. Therefore, it becomes easy to improve the management of the site or business operator undertaking the business, such as cost reduction and profit increase.

[0014] The invention according to the second feature is the invention according to the first feature, The pre-start data includes an itemized statement, a process sheet, and an execution budget, The business management summary table is a production volume summary table, a monthly expense summary table, a budget-actual comparison table, and / or a site attendance record by employee, and a management computer is provided.

[0015] According to the invention according to the second feature, since the production volume summary table, the monthly expense summary table, the budget-actual comparison table, or the site attendance record by employee business is automatically created, it is possible to grasp the site situation and income and expenditure during the business process. Therefore, it becomes possible to immediately confirm the profitability of the business unit.

[0016] The invention according to the third feature is the invention according to the first feature, and a business management computer in which the said business is a construction project is provided.

[0017] According to the invention according to the third feature, even in a construction project business where information regarding costs and cost compositions is complicated, there is no need to manually input the work diary into the database, and a summary table necessary for business management is automatically created. Therefore, it becomes easy to improve the management of the site or business operator undertaking the business, such as cost reduction and profit increase.

[0018] Although the present invention belongs to the category of computer systems, it also exhibits similar functions and effects according to the category in other categories such as methods and programs.

Advantages of the Invention

[0019] According to the present invention, in business management, it becomes possible to provide a system for improving management by linking the database managed by the management side with the work daily report.

Brief Description of the Drawings

[0020]

Figure 1

Figure 2

Figure 3

Figure 4

Figure 5

Figure 6

Figure 7

Figure 8

Figure 9

Figure 10

Figure 11

Figure 12

Mode for Carrying Out the Invention

[0021] Hereinafter, the best mode for carrying out the present invention will be described with reference to the drawings. Note that this is merely an example, and the technical scope of the present invention is not limited thereto.

[0022] [Outline of an Embodiment] Based on FIG. 1, a preferred embodiment of the present invention will be described. FIG. 1 is a diagram for explaining the outline of the business management computer 1 of an embodiment. The business management computer 1 is a computer for managing a business.

[0023] Note that the business management computer 1 may include other terminals, devices, etc. For example, a different computer may be used for each user. In this case, the business management computer 1 will execute each of the processes described later by any one or a plurality of combinations of a computer and other included terminals, devices, etc.

[0024] Also, the business management computer 1 may be realized by, for example, one terminal device, may be realized by a plurality of terminal devices, or may be realized by a virtual device such as a cloud computer.

[0025] The business management computer 1 is, for example, a computer such as a desktop personal computer, a notebook personal computer, or a server, a mobile terminal such as a smartphone or a tablet terminal, a wearable terminal such as a head-mounted display like smart glasses or a smartwatch, etc.

[0026] An outline of the processes executed by the business management computer 1 of the present embodiment will be described. The business management computer 1 receives the input of pre-operation data 100 for the business (step S1). Specifically, the business management computer 1 takes in, as file data, the pre-operation data 100 including at least the breakdown statement 110, the process schedule 120, and the execution budget statement 130 from a user such as a business administrator.

[0027] The reception of the input of the pre-operation data 100 may be directly received by the business management computer 1 from an external medium or the like, or may be received by the business management computer 1 via a communication network from another terminal or the like connected to the communication network.

[0028] Next, the business management computer 1 acquires the work report 200 of the business created by the worker (step S2). Specifically, the business management computer 1 takes in, as file data, the work report 200 created by the worker. The work report 200 may be directly acquired by the business management computer 1 from an external medium or the like, or may be acquired by the business management computer 1 receiving it via a communication network from another terminal or the like connected to the communication network. The work report 200 will be described later.

[0029] Next, the business management computer 1 extracts the work data input into the work report 200 (step S3). Specifically, the data of a predetermined extraction item input into the work report 200 acquired in step S2 is extracted as work data 210. The method for extracting the work data is not particularly limited in the present invention.

[0030] Next, the business management computer 1 registers the extracted work data 210 for each extraction item (step S4). Specifically, the business management computer 1 stores the work data 210 extracted in step S3 in the management database 300 for each predetermined extraction item to store it. The management database 300 will be described later.

[0031] Next, the business management computer 1 creates a business management summary table 400 based on the received pre-start data 100 and the registered work data 210 (step S5). Specifically, the business management computer 1 creates a production volume summary table 410, a production volume management book 310, a monthly expense summary table 420, a budget-actual comparison table 430, and an employee-by-employee on-site attendance book 440 based on the breakdown statement 110, process table 120, execution budget statement 130 received in step S1, and the work data 210 registered in step S4.

[0032] When creating the business management summary table 400, the business management computer 1 may create all of the production volume summary table 410, the production volume management book 310, the monthly expense summary table 420, the budget-actual comparison table 430, and the employee-by-employee on-site attendance book 440, or may create one or any combination of these according to the user's selection input or the like.

[0033] The created business management summary table 400 described above may be displayed from the business management computer 1, may be printed and output to a printer or the like, or may be output as file data. The output file data may be stored inside or outside the business management computer 1, or may be transmitted via a communication network to other terminals or the like connected to the communication network.

[0034] The above is an overview of the processing executed by the business management computer 1.

[0035] [System Configuration of Business Management Computer 1] Based on FIG. 2, the system configuration of the business management computer 1 according to the present embodiment of the present invention will be described. FIG. 2 is a diagram showing the system configuration of the business management computer 1 according to the present embodiment of the present invention. In FIG. 2, the business management computer 1 is a computer for managing a business.

[0036] Note that the business management computer 1 may include other terminals, devices, etc. For example, different computers may be used for each user. In this case, the business management computer 1 will execute each of the processes described below by any one or a plurality of combinations of a computer and other included terminals, devices, etc.

[0037] Also, the business management computer 1 may be realized by, for example, a single terminal device, may be realized by a plurality of terminal devices, or may be realized by a virtual device such as a cloud computer.

[0038] The business management computer 1 is, for example, a computer such as a desktop personal computer, a notebook personal computer, or a server, a mobile terminal such as a smartphone or a tablet terminal, a wearable terminal such as a head-mounted display such as smart glasses or a smartwatch, etc.

[0039] The business management computer 1 includes, as a control unit and a processing unit, a CPU (Central Processing Unit), a GPU (Graphics Processing Unit), a RAM (Random Access Memory), a ROM (Read Only Memory), etc. The control unit issues execution commands to the processing unit, imaging unit, communication unit, input unit, output unit, and storage unit described later, and the processing unit performs data calculations and makes determinations on calculation results, etc.

[0040] The business management computer 1 includes, as a communication unit, a device for enabling communication with other terminals, devices, etc. The communication method may be wireless or wired.

[0041] The business management computer 1 is assumed to include functions necessary for a user to operate the business management computer 1 as an input unit. As examples for realizing input, it is possible to include a liquid crystal display that realizes a touch panel function, a keyboard, a mouse, a pen tablet, a hardware button on the device, a microphone for performing voice recognition, etc. The present invention is not particularly limited by the input method.

[0042] The business management computer 1 shall be equipped with functions necessary for a user to operate the business management computer 1 as an output unit. As an example for realizing the output, forms such as display on a display unit such as a liquid crystal display, a PC display, a projector, etc., and voice output are conceivable. The present invention is not particularly limited by the output method.

[0043] The business management computer 1 shall be equipped with data storage by means of a hard disk, a semiconductor memory, a recording medium, a memory card, etc. as a storage unit. The storage destination of the data may be a cloud service, a database, or the like.

[0044] The control unit realizes the reception unit 10, the acquisition unit 11, the extraction unit 12, the registration unit 13, and the creation unit 14 in cooperation with the processing unit.

[0045] The above is the system configuration of the business management computer 1.

[0046] [Creation process of management summary table] Based on FIG. 3, the creation process of the management summary table executed by the business management computer 1 of the present embodiment will be described. FIG. 3 is a diagram showing a flowchart of the creation process of the management summary table executed by the business management computer 1 of the present embodiment. The processes executed by each of the above-described units will be described in conjunction with this process.

[0047] The reception unit 10 of the business management computer 1 receives the input of pre-start data 100 of the business (step S11). Specifically, the reception unit 10 takes in the pre-start data 100 including at least the breakdown statement 110, the process schedule 120, and the execution budget statement 130 from a user such as a business administrator as file data into its own storage unit. The file format of the pre-start data 100 is not particularly limited, but the Excel format is preferred, and the text (tab-separated) format is more preferred.

[0048] The breakdown statement 110 is described in a predetermined format as shown in FIG. 4 regarding the breakdown of the business at the time of contract. Regarding the format, there is no particular limitation as long as it is a predetermined one. Also, the items and data described in the breakdown statement 110 include various work items such as the work type names related to the business starting with the business name of the business at the time of the business contract, and costs, etc. However, as long as it is a predetermined one, any items and data may be described.

[0049] The process schedule 120 is described in a predetermined format as shown in FIG. 5 regarding the processes of the contract business. Regarding the format, there is no particular limitation as long as it is a predetermined one. Also, the items and data described in the process schedule 120 include the number of days required for each process of the business, the schedule until the delivery date, the progress status of each, etc. However, as long as it is a predetermined one, any items and data may be described.

[0050] The execution budget statement 130 is described in a predetermined format as shown in FIG. 6 regarding the budget prepared assuming the cost for each site of the contract business. Regarding the format, there is no particular limitation as long as it is a predetermined one. Also, the items and data described in the process schedule 120 include the means and materials to be adopted at the site, quantity, labor cost, period, etc. However, as long as it is a predetermined one, any items and data may be described.

[0051] The acceptance of the input of the pre-start data 100 may be directly accepted from an external medium or the like into the storage unit of the business management computer 1, or may be accepted by receiving through the communication network from another terminal or the like connected to the communication network by the communication unit of the business management computer 1.

[0052] The reception unit 10 stores and memorizes the various data included in the received pre-start data 100 in the management database 300 provided in its own storage unit. The management database 300 will be described later.

[0053] Next, the acquisition unit 11 of the business management computer 1 acquires the work daily report 200 of the business created by the worker (step S12). Specifically, the acquisition unit 11 takes in the work daily report 200 created by the worker as file data into its own storage unit. The file format of the work daily report 200 is not particularly limited, but the Excel format is preferred, and the text (tab-delimited) format is even more preferred.

[0054] The work daily report 200 is described in a predetermined format as shown in FIG. 7 regarding the worker's daily work report. The format is not particularly limited as long as it is a predetermined one. Also, the items and data described in the work daily report 200 include items and expenses related to various work progress such as business name, work content, work type name, and subcontractor labor costs, etc. However, any items and data may be described as long as they are predetermined.

[0055] The acquisition of the work daily report 200 may be directly acquired from an external medium or the like into the storage unit of the business management computer 1, or may be acquired by receiving it via a communication network from another terminal or the like connected to the communication network by the communication unit of the business management computer 1.

[0056] Next, the extraction unit 12 of the business management computer 1 extracts the work data input into the work daily report 200 (step S13). Specifically, the data of the predetermined extraction items input into the work daily report 200 acquired in step S12 is extracted as work data 210. The extraction items include, for example, business name, business classification, work content, worker name, working hours, labor costs, business name, and breakdown of expenses. The extraction method of the work data 210 is not particularly limited in the present invention.

[0057] Next, the registration unit 13 of the business management computer 1 registers the extracted work data 210 for each extraction item (step S14). Specifically, the registration unit 13 stores the work data 210 extracted in step S13 in the management database 300 for each of the above-mentioned predetermined extraction items for storage.

[0058] The management database 300 is a database stored in the storage unit of the business management computer 1. The management database 300 stores various data included in the breakdown statement 110, process schedule 120, and execution budget statement 130 received in step S11, and work data 210 extracted from the work report 200 in step S13.

[0059] The various data stored in the management database 300 include, for example, data related to the business such as business number, business name, customer, business in charge, contract date, completion (scheduled) date, business period, contract amount, standard expense rate, etc., and data related to the breakdown of expenses such as labor costs, outsourcing costs, material costs, lease fees, vehicle management fees, fuel costs, travel and transportation expenses, etc., but are not limited to these. These various data may be changeable via the input unit of the business management computer 1.

[0060] Next, the creation unit 14 of the business management computer 1 creates a business management summary table 400 based on the received pre-start data 100 and the registered work data 210 (step S15). Specifically, as shown in FIG. 8, the creation unit 14 creates a production volume summary table 410, a monthly expense summary table 420, a budget-actual comparison table 430, and an employee-by-employee on-site attendance record 440 based on the breakdown statement 110, process schedule 120, execution budget statement 130, and work data 210 registered in step S14 that were received in step S11.

[0061] The production volume summary table 410 is a breakdown by work type for an arbitrary period and is described in a predetermined format as shown in FIG. 9. There are no particular restrictions on the format as long as it is a predetermined one. Also, the items and data described in the production volume summary table 410 include items related to the production volume for an arbitrary period of the business such as construction name, specifications, initial amount at the time of the initial contract, change amount at the time of change, increase or decrease, current production volume, cumulative production volume, remaining balance, etc., but any items and data may be described as long as they are predetermined.

[0062] The monthly expense summary table 420 is a summary of various expenses such as labor, expenses, materials, outsourcing, etc. for each month, and is described in a predetermined format as shown in FIG. 10. Regarding the format, there is no particular limitation as long as it is a predetermined one. Also, the items and data described in the monthly expense summary table 420 include items related to expenses for any period of the business, such as sales amount, expenses, breakdown of expenses, etc., and any items and data may be described as long as they are predetermined.

[0063] The budget vs. actual comparison table 430 is a summary of the comparison between the actual performance and the budget for labor, expenses, materials, and labor, and is described in a predetermined format as shown in FIG. 11. Regarding the format, there is no particular limitation as long as it is a predetermined one. Also, the items and data described in the budget vs. actual comparison table 430 include items related to the comparison between the actual performance and the budget for any period of the business, such as construction classification, material and labor classification, execution budget, actual amount, difference, etc., and any items and data may be described as long as they are predetermined.

[0064] The employee-by-employee on-site attendance record 440 is an on-site attendance record of employees for an arbitrary period, and is described in a predetermined format as shown in FIG. 12. Regarding the format, there is no particular limitation as long as it is a predetermined one. Also, the items and data described in the employee-by-employee on-site attendance record 440 include items related to the attendance record of employees related to the business for any period, such as date, working hours, presence or absence of accommodation, construction name, work content, etc., and any items and data may be described as long as they are predetermined.

[0065] When creating the management summary table 400, the production quantity summary table 410, the production quantity management document 310, the monthly expense summary table 420, the budget vs. actual comparison table 430, and the employee-by-employee on-site attendance record 440 may all be created simultaneously by the creation unit 14, or one or any combination of these may be created according to the user's selection input from the input unit, etc. Also, according to the user's input of the aggregation range period from the input unit, the management summary table 400 for the said aggregation range may be output.

[0066] The above-mentioned summary table 400 for business management created may be displayed on the display unit of the business management computer 1, may be output from the output unit to a printer or the like, may be stored as file data in the storage unit of the business management computer 1, or may be transmitted via a communication network to other terminals or the like connected to the communication network by the communication unit. The data format of the output file data may be any format such as the PDF format.

[0067] The above is the summary table creation process for management.

[0068] According to the business management computer 1 of the present embodiment, since the work report created by the worker is linked with the database managed by the management side, there is no need to manually input the work report into the database, and the summary table necessary for business management is automatically created. Therefore, it becomes easy to improve the management of the on-site and the business operator who undertakes the business, such as reducing expenses and increasing profits.

[0069] Also, according to the business management computer 1 of the present embodiment, since the production volume summary table, monthly expense summary table, budget actual performance comparison table, or employee-by-employee on-site attendance record business is automatically created, it is possible to grasp the on-site situation and revenue and expenditure during the business process. Therefore, it becomes possible to immediately confirm the profitability of each business unit.

[0070] Furthermore, according to the business management computer 1 of the present embodiment, even in a construction work business where information regarding costs and cost compositions is complex, there is no need to manually input the work report into the database, and the summary table necessary for business management is automatically created. Therefore, it becomes easy to improve the management of the on-site and the business operator who undertakes the business, such as reducing expenses and increasing profits.

[0071] The above-described means and functions are realized by a computer (including a CPU, an information processing device, and various terminals) reading and executing a predetermined program. The program is provided, for example, in a form provided from one or more computers via a network (in the form of cloud services, SaaS: Software as a Service). Further, the program is provided, for example, in a form recorded on a computer-readable recording medium. In this case, the computer reads the program from the recording medium, transfers it to an internal recording device or an external recording device, records it, and executes it. Also, the program may be pre-recorded in a recording device (recording medium) such as a magnetic disk, an optical disk, a magneto-optical disk, etc., and provided to the computer via a communication line from the recording device.

[0072] As described above, the embodiments of the present invention have been explained, but the present invention is not limited to these above-described embodiments. Also, the effects described in the embodiments of the present invention are merely an enumeration of the most preferable effects resulting from the present invention, and the effects according to the present invention are not limited to those described in the embodiments of the present invention.

Explanation of Reference Numerals

[0073] 1 Business management computer, 10 Reception unit, 11 Acquisition unit, 12 Extraction unit, 13 Registration unit, 14 Creation unit, 100 Pre-start data, 110 Breakdown sheet, 120 Process table, 130 Execution budget sheet, 200 Work daily report, 300 Management database, 400 Business management summary table, 410 Output summary table, 420 Monthly expense summary table, 430 Budget-actual comparison table, 440 Employee-by-employee on-site attendance record

Claims

1. A business management computer for managing a business, comprising: a reception unit that receives input of pre-start data of the business; an acquisition unit that acquires a work report of the business created by a worker; an extraction unit that extracts work data input into the work report; a registration unit that registers the extracted work data for each extraction item; a creation unit that creates a business management summary table of the business based on the received pre-start data and the registered work data; A business management computer comprising the above.

2. The pre-start data includes an itemized statement, a process sheet, and an execution budget document, The business management summary table is a production volume summary table, a monthly expense summary table, a budget actual performance comparison table, and / or an employee-by-employee on-site attendance record. The business management computer according to Claim 1.

3. The business is a construction project. The business management computer according to Claim 1.

4. A business management method executed by a business management computer for managing a business, comprising: a step of receiving input of pre-start data of the business; a step of acquiring a work report of the business created by a worker; a step of extracting work data input into the work report; a step of registering the extracted work data for each extraction item; a step of creating a business management summary table of the business based on the received pre-start data and the registered work data; A business management method comprising the above.

5. A computer-readable program for causing a computer to: execute a step of receiving input of pre-start data of a business; execute a step of acquiring a work report of the business created by a worker; execute a step of extracting work data input into the work report; execute a step of registering the extracted work data for each extraction item; execute a step of creating a business management summary table of the business based on the received pre-start data and the registered work data; ​

Citation Information

Patent Citations

  • Performance management apparatus, performance management method and performance management program

    JP2022027251A

  • Construction ledger creation system and construction ledger creation method

    JP2023078750A

  • Construction management support device, construction management support program and storage medium

    JP2022013452A