Water make-up system based on reuse of desalinated water tanks
The water replenishment system addresses the challenge of integrating new and old desalinated water tanks by using specific piping configurations with conductivity meters and check valves, enhancing safety and reducing costs and construction complexity.
Patent Information
- Application Number
- JP2024002677U
- Authority / Receiving Office
- JP · JP
- Patent Type
- Utility models
- Current Assignee / Owner
- Priority Date
- 2023-10-31
- Filing Date
- 2024-08-09
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2034-08-09
AI Technical Summary
The challenge of constructing new desalinated water tanks in existing thermal power plants is complicated by limited space and the need to reuse old tanks, leading to high costs and operational risks due to the complexity of integrating new and old systems.
A water replenishment system is designed to reuse desalinated water tanks by connecting new and old tanks with specific piping configurations, including conductivity meters and check valves, ensuring safe operation and maintenance, and reducing the number of construction changes.
This system simplifies construction, reduces costs by approximately 884,000 yuan, ensures safe operation by preventing water supply disruptions, and shortens the production cycle.
Smart Images

Figure 0003248665000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to the field of water make-up systems, in particular to water make-up systems based on the reuse of desalinated water tanks. [Background technology]
[0002] At present, equal-capacity replacement of old thermal power plants has become a new trend, and more and more power plants are joining the ranks of those applying for equal-capacity replacement. Generally, new power plants select new sites to ensure sufficient floor space for new generating equipment. However, equal-capacity replacement projects generally require the selection of construction sites within the original plant area, taking into account many factors such as environmental pollution and original set reuse projects, which brings great challenges to the construction of new sets, especially original set reuse and renovation projects.
[0003] For example, in the process of reusing and renovating the boiler water make-up system of an equal-capacity coal-electricity replacement project, according to the original documents, the original three 1000m 3 The desalinated water tank was dismantled and two 3000m 3 It is necessary to expand the desalinated water tank to a desalinated water tank. However, in the original design, the complexity of the structure was not fully taken into account, and the construction space was narrow, so it was necessary to build a new 3,000-ton desalinated water tank at the location of the original two 1,000-ton desalinated water tanks, and the old desalinated water tanks could not be stopped because they needed to supply desalinated water to the old set in the factory, which resulted in construction difficulties, costs exceeding the standard, and the project progress could not be continued.
[0004] Therefore, in order to comprehensively utilize new and old desalinated water tanks and reduce the difficulty of construction, it is urgent to establish a water supply system by reusing desalinated water tanks. Summary of the Invention
[0005] The objective of the present invention is to provide a water replenishment system based on the reuse of desalinated water tanks, which makes comprehensive use of new and old desalinated water tanks and reduces the difficulty of construction, in order to overcome the deficiencies of the prior art.
[0006] The object of the present invention can be achieved by the following technical solutions.
[0007] A water make-up system based on a recycled desalinated water tank, comprising a new desalinated water tank, an old desalinated water tank, a water supply pipeline, a regenerative pump drain pipeline, and a desalinated water pump drain pipeline, the water tank capacity of the new desalinated water tank being greater than the water tank capacity of the old desalinated water tank, the water supply inlets of the new desalinated water tank and the old desalinated water tank both being connected to the water supply pipeline, and the new desalinated water tank and the old desalinated water tank both being provided with two drains which are respectively connected to the regenerative pump drain pipeline and the desalinated water pump drain pipeline.
[0008] Furthermore, the water inlet and outlet of the new desalinated water tank and the old desalinated water tank are both located at the bottom of the water tank.
[0009] Furthermore, the number of the old desalinated water tanks is multiple, the water supply pipeline includes a mixed bed type drainage main pipe, a new desalinated water tank supply pipe, and an old desalinated water tank supply main pipe, the mixed bed type drainage main pipe is divided into two branches connected to the new desalinated water tank supply pipe and the old desalinated water tank supply main pipe, respectively, and the old desalinated water tank supply main pipe is divided into a plurality of branches connected to the water supply ports of each old desalinated water tank.
[0010] Furthermore, a conductivity meter is provided in both the new desalinated water tank water supply pipe and the old desalinated water tank water supply main pipe, and a check valve is further provided in the new desalinated water tank water supply pipe.
[0011] Further, the regenerative pump drainage pipeline includes a regenerative pump drainage main pipe, a new regenerative pump drainage pipe, and an old regenerative pump drainage pipe, the regenerative pump drainage main pipe is divided into two branches connected to the new regenerative pump drainage pipe and the old regenerative pump drainage pipe, respectively, and the old regenerative pump drainage pipe is divided into a plurality of branches connected to the drain outlets of each old desalinated water tank, respectively.
[0012] Further, the new regenerative pump drain pipe and the old regenerative pump drain pipe are both provided with a conductivity meter, the old regenerative pump drain pipe is further provided with a check valve, and each branch of the old regenerative pump drain pipe connected to the old desalinated water tank is provided with a manual valve.
[0013] Further, the desalinated water pump drainage pipeline includes a desalinated water pump drainage main pipe, a new desalinated water pump drainage pipe, and an old desalinated water pump drainage pipe, the desalinated water pump drainage main pipe is connected to two branches connected to the new desalinated water pump drainage pipe and the old desalinated water pump drainage pipe, respectively, and the old desalinated water pump drainage pipe is divided into a plurality of branches connected to the drain outlets of each old desalinated water tank, respectively.
[0014] Furthermore, both the new desalinated water pump discharge pipe and the old desalinated water pump discharge pipe are provided with a conductivity meter, and the old desalinated water pump discharge pipe is further provided with a check valve.
[0015] Furthermore, the water tank capacity of the new desalinated water tank is 3,000 tons, the number of old desalinated water tanks is three, and the water tank capacity of the old desalinated water tanks is 1,000 tons.
[0016] Additionally, the overflow channel of the old desalinated water tank communicates with the recovery pool.
[0017] Compared with the prior art, the present invention can fully realize the functions of the two large desalinated water tanks in the original design by modifying the new desalinated water tank and the old desalinated water tank, and at the same time has the following advantages:
[0018] (1) The new desalinated water tank and the modified design of the old desalinated water tank make it easier to inspect and maintain the water tanks, prevent the dangerous situation of one water tank being unable to supply desalinated water due to a malfunction of the other water tank while the other tank is being repaired, and ensure the safe operation of the set.
[0019] (2) Since the construction area is a reuse and renovation area, many old equipment are still in use, and this solution solves many problems that may affect the power generation of a new set of the same capacity, such as small construction space, high construction difficulty, and long construction period.
[0020] (3) This solution significantly shortens the production cycle, saves costs significantly, and avoids resource waste. The total cost reduction effect is calculated to be about 884,000 RMB. [Brief description of the drawings]
[0021] [Figure 1] FIG. 1 is a schematic diagram of a desalinated water tank design provided by the background art of the present invention. [Diagram 2] FIG. 2 is a structural schematic diagram of a water make-up system based on recycling of desalinated water tanks provided by an embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0022] In order to make the objectives, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be described clearly and completely below with reference to the drawings in the embodiments of the present invention, and obviously, the described embodiments are only some but not all embodiments of the present invention. The assemblies of the embodiments of the present invention as generally described herein and illustrated in the drawings can be arranged and designed in a wide variety of different configurations.
[0023] Therefore, the following detailed description of the embodiments of the present invention provided by the accompanying drawings is not intended to limit the scope of the claims of the present invention, but merely represents specific embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by those skilled in the art without creative work belong to the protection scope of the present invention.
[0024] It should be noted that like symbols and letters represent like items in the following drawings, so that once an item is defined in one drawing, it need not be further defined or explained in the subsequent drawings.
[0025] In describing the present invention, as necessary for explanation, any orientations or positions indicated by the terms "center," "top," "bottom," "left," "right," "vertical," "horizontal," "inside," "outside," etc. are based on the orientations or positions shown in the accompanying drawings or are normal orientations or positions during use of the products of the invention, and are used only to explain and simplify the description of the present invention, and do not indicate or imply that the devices or elements referred to have a particular orientation or must be constructed and operated in a particular direction, and therefore should not be construed as limitations on the present invention.
[0026] Example 1 As shown in FIG. 2, this embodiment provides a water replenishment system based on the reuse of desalinated water tanks, including a new desalinated water tank 1, an old desalinated water tank 2, a water supply pipeline 3, a regeneration-only pump drain pipeline 4, and a desalinated water pump drain pipeline 5, in which the water tank capacity of the new desalinated water tank 1 is greater than the water tank capacity of the old desalinated water tank 2, the water supply ports of the new desalinated water tank 1 and the old desalinated water tank 2 are both connected to the water supply pipeline 3, and the new desalinated water tank 1 and the old desalinated water tank 2 are both provided with two drain ports, which are respectively connected to the regeneration-only pump drain pipeline 4 and the desalinated water pump drain pipeline 5.
[0027] The inlet and outlet of the new desalinated water tank 1 and the old desalinated water tank 2 are both located at the bottom of the water tank, and as a result, the new desalinated water tank 1 and the old desalinated water tank 2 have the same "low inlet, low outlet" arrangement.
[0028] Preferably, there are multiple old desalinated water tanks 2, and the water supply pipeline 3 includes a mixed bed drainage main pipe 301, a new desalinated water tank water supply pipe 302, and an old desalinated water tank water supply main pipe 303, the mixed bed drainage main pipe 301 being divided into two branches connected to the new desalinated water tank water supply pipe 302 and the old desalinated water tank water supply main pipe 303, respectively, and the old desalinated water tank water supply main pipe 303 being divided into multiple branches connected to the water supply ports of each old desalinated water tank 2, respectively.
[0029] A conductivity meter 6 is provided in both the new desalinated water tank water supply pipe 302 and the old desalinated water tank water supply main pipe 303, and a check valve 7 is further provided in the new desalinated water tank water supply pipe 302.
[0030] The regenerative pump drainage pipeline 4 includes a regenerative pump drainage main pipe 401, a new regenerative pump drainage pipe 402, and an old regenerative pump drainage pipe 403, and the regenerative pump drainage main pipe 401 is divided into two branches connected to the new regenerative pump drainage pipe 402 and the old regenerative pump drainage pipe 403, respectively, and the old regenerative pump drainage pipe 403 is divided into multiple branches connected to the drain outlets of each old desalinated water tank 2, respectively.
[0031] A conductivity meter 6 is provided in both the new regenerative pump drain pipe 402 and the old regenerative pump drain pipe 403, a check valve 7 is further provided in the old regenerative pump drain pipe 403, and a manual valve 8 is provided in each branch of the old regenerative pump drain pipe 403 connected to the old desalinated water tank 2.
[0032] The drainage from the new desalinated water tank 1 flows into two paths, one to the desalinated water pump and the other to the dedicated regeneration pump, and the drainage from the old desalinated water tank 2 flows into only one path, i.e. to the desalinated water pump. For the drainage from the old desalinated water tank 2, additional piping must be added to flow to the dedicated regeneration pump, and a manual valve 8 must be added.
[0033] The desalinated water pump drainage pipeline 5 includes a desalinated water pump drainage main pipe 501, a new desalinated water pump drainage pipe 502, and an old desalinated water pump drainage pipe 503, and the desalinated water pump drainage main pipe 501 is connected to two branches connected to the new desalinated water pump drainage pipe 502 and the old desalinated water pump drainage pipe 503, respectively, and the old desalinated water pump drainage pipe 503 is split into multiple branches connected to the drain outlets of each old desalinated water tank 2, respectively.
[0034] A conductivity meter 6 is provided in both the new desalinated water pump drain pipe 502 and the old desalinated water pump drain pipe 503, and a check valve 7 is further provided in the old desalinated water pump drain pipe 503.
[0035] There is a liquid level difference between the new desalinated water tank and the old desalinated water tank 2. In order to ensure the reliability of operation, one check valve 7 is added to the two drainage parent pipes and the new desalinated water tank water supply pipe 302 to prevent the high new water tank from pouring water into the old water tank. The local liquid level gauges of the three old desalinated water tanks 2 need to be replaced and arranged in the same way as the new water tanks, and the electronic liquid level gauges need to be correctly calibrated.
[0036] The new and old desalinated water tanks need to be switched and operated periodically, and two sets of conductivity meters 6 need to be added to the drainage parent pipes of the new and old desalinated water tanks 2, so that it is convenient to observe whether the water quality of the water tanks meets the water replenishment requirements of the sets.
[0037] A specific example of the above-mentioned solution provided by this embodiment is as follows.
[0038] The water tank capacity of the new desalinated water tank 1 is 3,000 tons, the number of the old desalinated water tanks 2 is three, and the water tank capacity of the old desalinated water tanks 2 is 1,000 tons.
[0039] The three original 1,000-tonne desalinated water tanks were arranged in a "high inlet, low outlet" configuration and equipped with water mist sprinklers, and the new design will involve reconnecting the water supply pipes from the original desalinated water tanks so that the new 3,000-tonne desalinated water tank will have the same "low inlet, low outlet" configuration.
[0040] The drainage from the new water tank flows into two paths, one to the desalinated water pump and the other to the dedicated regeneration pump, and the drainage from the old water tank flows into only one path, i.e. to the desalinated water pump. For the drainage from the old water tank, additional piping must be provided to flow to the dedicated regeneration pump, and a manual valve 8 must be added.
[0041] There is a liquid level difference between the new water tank and the old water tank. In order to ensure the reliability of operation, one check valve7 should be added to each of the two drainage parent pipes and the new 3,000-ton desalinated water tank supply pipe to prevent the high new water tank from pouring water into the old water tank. The local liquid level gauges of the three 3,000-ton desalinated water tanks should be replaced and arranged in the same way as the new water tanks. The electronic liquid level gauges should be correctly calibrated.
[0042] The new and old desalinated water tanks need to be switched and operated periodically, and two sets of conductivity meters 6 need to be added to the drainage parent pipes of the new and old desalinated water tanks 2, so that it is convenient to observe whether the water quality of the water tanks meets the water replenishment requirements of the sets.
[0043] The corrosion protection and floating roof of the new and old water tanks will be arranged in the same way as the new water tank.
[0044] Overflow channels from the original three 1,000 tonne desalinated water tanks need to be introduced into the recovery pool.
[0045] Recalculate the diameter of the overflow pipes for the original three 1,000 ton desalinated water tanks.
[0046] With one major change and three minor changes, this solution can fully achieve the function of the two large desalinated water tanks of the original design, and at the same time has the following advantages:
[0047] 1.The design of one major change and three minor changes makes it easier to inspect and maintain the water tanks, preventing the dangerous situation of one water tank being unable to supply desalinated water due to a malfunction of the other water tank while the other tank is being repaired, and ensuring the safe operation of the set.
[0048] 2. Since the construction area is a reuse and renovation area, many old equipment are still in use. This solution solves many problems that may affect the power generation of new sets of the same capacity, such as small construction space, high construction difficulty, and long construction period.
[0049] 3. This solution can greatly shorten the production cycle, greatly save costs, and avoid resource waste. The total cost reduction effect is calculated to be about 884,000 RMB.
[0050] The solution will provide new inspiration for future equivalent capacity replacement projects of other power plants.
[0051] The above describes the preferred specific embodiments of the present invention in detail. It should be understood that those skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, based on the concept of the present invention and the prior art, all technical solutions that those skilled in the art can obtain through logical analysis, reasoning or limited experiments should be within the scope of protection defined by the claims. [Explanation of symbols]
[0052] 1. New desalinated water tank, 2. Old desalinated water tank, 3. Water supply pipeline, 301. Mixed bed drainage main pipe, 302. New desalinated water tank supply pipe, 303. Old desalinated water tank supply main pipe, 4. Regeneration-only pump drainage pipeline, 401. Regeneration-only pump drainage main pipe, 402. Regeneration-only pump drainage pipe, 403. Old regeneration-only pump drainage pipe, 5. Desalinated water pump drain pipeline, 501. Desalinated water pump drainage main pipe, 503. New desalinated water pump drain pipe, 503. Old desalinated water pump drain pipe, 6. Conductivity meter, 7. Check valve, 8. Manual valve.
Claims
1. A water replenishment system based on the reuse of a desalinated water tank, comprising a new desalinated water tank (1), an old desalinated water tank (2), a water supply line (3), a regeneration-only pump drain line (4), and a desalinated water pump drain line (5), wherein the water tank capacity of the new desalinated water tank (1) is greater than the water tank capacity of the old desalinated water tank (2), the water supply inlets of the new desalinated water tank (1) and the old desalinated water tank (2) are both connected to the water supply line (3), and the new desalinated water tank (1) and the old desalinated water tank (2) are each provided with two drains, which are respectively connected to the regeneration-only pump drain line (4) and the desalinated water pump drain line (5).
2. The water replenishment system based on recycling of desalinated water tanks as described in claim 1, characterized in that the water inlet and the water outlet of the new desalinated water tank (1) and the old desalinated water tank (2) are both located at the bottom of the water tank.
3. 2. The water replenishment system based on reuse of desalinated water tanks according to claim 1, characterized in that the number of the old desalinated water tanks (2) is plural, the water supply pipeline (3) includes a mixed bed discharge main pipe (301), a new desalinated water tank water supply pipe (302) and an old desalinated water tank water supply main pipe (303), the mixed bed discharge main pipe (301) is divided into two branches connected to the new desalinated water tank water supply pipe (302) and the old desalinated water tank water supply main pipe (303), respectively, and the old desalinated water tank water supply main pipe (303) is divided into a plurality of branches connected to the water supply ports of each old desalinated water tank (2), respectively.
4. 4. The water replenishment system based on the reuse of a desalinated water tank according to claim 3, characterized in that both the new desalinated water tank water supply pipe (302) and the old desalinated water tank water supply main pipe (303) are provided with a conductivity meter (6), and the new desalinated water tank water supply pipe (302) is further provided with a check valve (7).
5. The water replenishment system based on the reuse of desalinated water tanks according to claim 3, characterized in that the regeneration-only pump drainage pipeline (4) includes a regeneration-only pump drainage main pipe (401), a new regeneration-only pump drainage pipe (402), and an old regeneration-only pump drainage pipe (403), the regeneration-only pump drainage main pipe (401) being divided into two branches connected to the new regeneration-only pump drainage pipe (402) and the old regeneration-only pump drainage pipe (403), respectively, and the old regeneration-only pump drainage pipe (403) being divided into a plurality of branches connected to the drain outlets of each old desalinated water tank (2), respectively.
6. 6. The water replenishment system based on the reuse of a desalinated water tank according to claim 5, characterized in that the new regenerative pump drain pipe (402) and the old regenerative pump drain pipe (403) are both provided with a conductivity meter (6), the old regenerative pump drain pipe (403) is further provided with a check valve (7), and each branch of the old regenerative pump drain pipe (403) connected to the old desalinated water tank (2) is provided with a manual valve (8).
7. 4. The water replenishment system based on reuse of desalinated water tanks according to claim 3, characterized in that the desalinated water pump drain pipeline (5) includes a desalinated water pump drain main pipe (501), a new desalinated water pump drain pipe (502) and an old desalinated water pump drain pipe (503), the desalinated water pump drain main pipe (501) is connected to two branches connected to the new desalinated water pump drain pipe (502) and the old desalinated water pump drain pipe (503) respectively, and the old desalinated water pump drain pipe (503) is split into multiple branches connected to the drains of each old desalinated water tank (2), respectively.
8. The water replenishment system based on the reuse of a desalinated water tank as described in claim 7, characterized in that both the new desalinated water pump drain pipe (502) and the old desalinated water pump drain pipe (503) are provided with a conductivity meter (6), and the old desalinated water pump drain pipe (503) is further provided with a check valve (7).
9. 2. A water replenishment system based on reuse of desalinated water tanks as described in claim 1, characterized in that the water tank capacity of the new desalinated water tank (1) is 3,000 tons, the number of old desalinated water tanks (2) is three, and the water tank capacity of the old desalinated water tanks (2) is 1,000 tons.
10. 2. A water replenishment system based on recycling of desalinated water tanks according to claim 1, characterized in that the overflow water channel of the old desalinated water tank (2) communicates with a recovery pool.