Apparatus and method for determining power procurement amount

The power procurement amount determination device addresses uncertainties in electricity trading market prices by adjusting procurement amounts, ensuring cost-effective power procurement and enhanced profitability for retailers.

JP7551368B2Active Publication Date: 2024-09-17HITACHI LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2020120704
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-07-14
Publication Date
2024-09-17
Estimated Expiration
2040-07-14

AI Technical Summary

Technical Problem

Existing power procurement systems fail to account for uncertainties in electricity trading market unit prices, leading to increased costs when prices unexpectedly rise, affecting the profitability of electricity retailers.

Method used

A power procurement amount determination device that adjusts procurement amounts based on initial values and prediction errors of both bilateral transactions and electricity trading market prices, allowing for cost-effective procurement even when market prices fluctuate.

Benefits of technology

This approach enables electricity retailers to procure power at a lower cost and improve profit expectations by mitigating risks associated with unexpected price increases in the electricity trading market.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007551368000026
    Figure 0007551368000026
  • Figure 0007551368000021
    Figure 0007551368000021
  • Figure 0007551368000012
    Figure 0007551368000012
Patent Text Reader

Abstract

To provide a power procurement amount determining apparatus and a method thereof which can more improve an expectation value of a profit of a power retailer than a conventional manner even if a power unit price in a power transaction market is unexpectedly raised.SOLUTION: A power procurement amount determining apparatus sets an initial value of a power procurement amount procured by a first power procurement method in a target period of time, calculates an adjustment amount of the power procurement amount for the target period of time, and, based on the calculated adjustment amount and the initial value of the power procurement amount, determines the power procurement amount in the time period. The adjustment amount of the power procurement amount is calculated based on first error information representing a prediction error in a predicted value of power demand in the target period of time, a first power unit price predetermined for a case when power is procured in the time period by the first power procurement method, a second power unit price predicted when power is procured by a second power procurement method different from the first power procurement method, and second error information representing a prediction error for the second unit price.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to an apparatus and method for determining an amount of power procurement, and is suitable for use in, for example, an apparatus and method for determining an amount of power procurement for an electricity retailer. [Background technology]

[0002] Conventionally, electricity retailers determine the amount of electricity to be procured for each 30-minute time slot based on electricity demand forecasts, and procure electricity for each time slot according to the results of the determination. In this case, there are two methods for electricity retailers to procure electricity: the first method, in which electricity is procured directly from electricity wholesalers through bilateral transactions, and the second method, in which electricity is procured from the electricity trading market.

[0003] Generally, in the first electricity procurement method, an electricity purchase and sale contract (bilateral trading contract) is concluded prior to trading in the electricity trading market, so that the amount of electricity to be traded can be adjusted taking into account uncertainties such as errors in electricity demand forecasts and forecast errors in the trading price of electricity in the electricity trading market.

[0004] For example, if the bilateral trading price for a certain time period is cheaper than the electricity price in the energy trading market and there is a possibility that actual electricity consumption by consumers will be greater than the forecasted electricity demand, then by procuring more electricity through bilateral trading than the forecasted electricity demand, the amount of electricity to be procured later in the energy trading market and the imbalance settlement amount can be reduced, allowing the electricity retailer to earn greater profits.

[0005] As a technology related to electricity procurement, Patent Document 1 discloses a method for determining the amount of electricity to be procured from the day-ahead market and the intraday trading market so as to minimize the expected value of the total procurement cost, including the imbalance settlement amount of the electricity retailer. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] JP 2019-46467 A Summary of the Invention [Problem to be solved by the invention]

[0007] Incidentally, in Patent Document 1, the expected total procurement cost is calculated using the expected bid amounts for both the day-ahead market and the intraday trading market. However, since the uncertainty of the bid amounts in the electricity trading market is not taken into consideration, there is a problem in that the procurement cost of electricity increases if the contract price unexpectedly rises.

[0008] The present invention has been made in consideration of the above points, and aims to propose an electricity procurement quantity determination device and method that can improve electricity retailers' expected profits more than before, even if the unit price of electricity in the electricity trading market unexpectedly rises. [Means for solving the problem]

[0009] In order to solve the above problem, in the present invention, a power procurement amount determination device that determines the amount of power procurement for each time period in the future is configured to: Procuring electricity through bilateral transactions The power procurement amount determination unit is provided with a procurement amount initial value setting unit that sets an initial value of the power procurement amount to be procured by a first power procurement method, and a power procurement amount determination unit that calculates an adjustment amount of the power procurement amount for the target time period and determines the power procurement amount for the target time period based on the calculated adjustment amount and the initial value of the power procurement amount, and the power procurement amount determination unit determines first error information representing a prediction error of a predicted value of power demand in the target time period, a predetermined first power unit price when power is procured by the first power procurement method in the time period, and a predetermined power unit price for the target time period. Procuring electricity from the power trading market The adjustment amount of the power procurement amount is calculated based on a second power unit price predicted when power is procured using a second power procurement method and second error information representing a prediction error of the second power unit price.

[0010] In the present invention, in a power procurement amount determination method executed by a power procurement amount determination device that determines a power procurement amount for each time period in the future, Procuring electricity through bilateral transactions The method includes a first step of setting an initial value of the amount of power procurement to be procured by a first power procurement method, and a second step of calculating an adjustment amount of the amount of power procurement for the time period of interest, and determining the amount of power procurement for the time period of interest based on the calculated adjustment amount and the initial value of the amount of power procurement, and in the second step, first error information representing a prediction error of a predicted value of power demand in the time period of interest, a predetermined first unit price of power when power is procured by the first power procurement method in the time period of interest, and a second step of determining the amount of power procurement for the time period of interest. Procuring electricity from the power trading market The adjustment amount of the power procurement amount is calculated based on a second power unit price predicted when power is procured using a second power procurement method and second error information representing a prediction error of the second power unit price.

[0011] According to the power procurement amount determination device and method of the present invention, the power procurement amount can be determined taking into account the uncertainty factor of the second power unit price, so that even if the power unit price using the second power procurement method unexpectedly rises, power can be procured cheaply using the first power procurement method. Effect of the Invention

[0012] According to the present invention, it is possible to realize an apparatus and method for determining the amount of electricity procurement that can improve the expected profit of an electricity retailer more than ever before, even if the unit price of electricity in the electricity trading market rises unexpectedly. [Brief description of the drawings]

[0013] [Figure 1] 1 is a block diagram illustrating a schematic hardware configuration of an electric power procurement amount determination device according to an embodiment of the present invention. [Diagram 2] 1 is a diagram illustrating the function of the power procurement amount determination device. [Diagram 3] 2 is a block diagram showing a logical configuration of the power procurement amount determination device. [Figure 4]1 is a table showing an example of the configuration of an electricity demand forecast value database. [Diagram 5] 13 is a table showing an example of the configuration of a relative transaction unit price database. [Figure 6] 1 is a diagram showing an example of the configuration of a predicted market unit price database. [Figure 7] 13 is a table showing an example of the configuration of an adjustment allowable range database. [Figure 8] FIG. 13 is a diagram showing an example of the configuration of a target period, etc. setting screen. [Figure 9] FIG. 13 is a diagram showing an example of the configuration of a relative procurement amount display screen. [Figure 10] 13 is a flowchart showing a processing procedure for a relative procurement amount initial value setting process; [Figure 11] 13 is a flowchart showing a processing procedure for a price difference calculation process. [Figure 12] 13 is a flowchart showing a processing procedure for a demand forecast error-based adjustment amount calculation process. [Figure 13] 13 is a graph illustrating a demand forecast error-based adjustment amount calculation process. [Figure 14] 13 is a flowchart showing a processing procedure for a predicted market unit price error-based adjustment amount calculation process. [Figure 15] 13 is a flowchart showing a processing routine for relative procurement amount determination processing. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] An embodiment of the present invention will now be described in detail with reference to the drawings.

[0015] (1) Configuration of the Power Procurement Amount Determination Device According to the Present Embodiment In Fig. 1, reference numeral 1 denotes an overall power procurement amount determination device according to this embodiment. This power procurement amount determination device 1 is a computer device having a function for determining, for example, the amount of power that an electricity retailer should procure in a bilateral transaction for each 30-minute time slot (hereinafter, this will be referred to as the "relative power procurement amount for each time slot"), and is configured with a CPU (Central Processing Unit) 2, a storage device 3, an input device 4, an output device 5, etc.

[0016] The CPU 2 is a processor that controls the overall operation of the power procurement quantity determination apparatus 1. The storage device 3 is composed of a semiconductor memory, a hard disk drive, etc., and is used to store necessary information temporarily and for the long term. The CPU 2 executes programs stored in the storage device 3, thereby executing various processes of the power procurement quantity determination apparatus 1 as a whole, as described below.

[0017] The input device 4 is made up of a keyboard, a mouse, etc., and is used by the user to input necessary information and commands. The output device 5 is made up of a display device such as a liquid crystal display or an organic EL (Electro Luminescence) display, and is used to display various screens and necessary information.

[0018] In the power procurement decision device 1 having the above-mentioned configuration, the "relative power procurement amount for each time period" is determined by taking into consideration the magnitude relationship between the power unit price in bilateral trading for each time period predetermined in the bilateral trading contract (hereinafter referred to as the bilateral trading unit price) and the power unit price predicted for the same time period in the power trading market (hereinafter referred to as the predicted market unit price), as well as the prediction error in power demand and the prediction error in the predicted market unit price.

[0019] In practice, as shown in Figure 2, when the relative transaction price for a target time period (hereinafter referred to as the target time period) is cheaper than the predicted market price, the power procurement decision device 1 determines the relative power procurement amount for the target time period to be the power obtained by adding, as an adjustment amount, the power consumption that is likely to increase during the target time period, which is calculated based on the prediction error of the power demand, to the power demand forecast value for the target time period ("STEP 1" in the upper left and upper right columns of Figure 2).

[0020] However, in consideration of the risk that the actual electricity price in the target time period in the electricity trading market will be cheaper than the relative trading price, the power calculated based on the forecast market price prediction accuracy is subtracted from the adjustment amount in "STEP 1" to determine the final adjustment amount, and this adjustment amount is added to the electricity demand forecast value to determine the final relative electricity procurement amount. At this time, if the forecast market price prediction accuracy is high, the amount of power to be subtracted from the adjustment amount is reduced ("STEP 2" in the upper left column of Figure 2), and if the forecast market price prediction accuracy is low, the amount of power to be subtracted from the adjustment amount is increased ("STEP 2" in the upper right column of Figure 2).

[0021] In addition, if the forecast market price for the target time period is cheaper than the relative transaction price, the relative power procurement amount is determined so that it is less than the power demand forecast value ("STEP 1" in the lower left and lower right columns of Figure 2). In this case, the relative power procurement amount may be set to zero.

[0022] However, in this case, taking into consideration the risk that the actual electricity unit price in the target time period in the electricity trading market will be higher than the relative trading unit price, the power calculated based on the forecast market unit price's prediction accuracy is added to the "STEP 1" adjustment amount to determine the final adjustment amount, and the adjustment amount is added to the electricity demand forecast value to determine the final relative electricity procurement amount. In this case, if the prediction accuracy of the forecast market unit price is high, the adjustment amount is reduced ("STEP 2" in the lower left column of Figure 2), and if the prediction accuracy of the forecast market unit price is low, the adjustment amount is increased ("STEP 2" in the lower right column of Figure 2).

[0023] In this way, it is possible to procure the required amount of electricity cheaply while reducing the risk of fluctuations in the predicted market unit price.

[0024] (2) Logical configuration of the power procurement amount determination device Fig. 3 shows the logical configuration of the power procurement amount determination device 1. As shown in Fig. 3, the power procurement amount determination device 1 is configured to include a power demand forecast value database 10, a relative transaction unit price database 11, a forecast market unit price database 12, an adjustment allowable range database 13, a target period etc. setting unit 14, a relative procurement amount initial value setting unit 15, a price difference calculation unit 16, a demand forecast error-based adjustment amount calculation unit 17, a forecast market unit price error-based adjustment amount calculation unit 18, a relative procurement amount determination unit 19, and a relative procurement amount output unit 20.

[0025] The power demand forecast value database 10 is a database that stores forecast values ​​of future power demand (kWh) for each time slot, and is created in advance by a user based on past power demand and weather forecasts for each time slot. As shown in Fig. 4, this power demand forecast value database 10 has a table structure with a date column 10A, a time slot column 10B, a forecasted power demand amount column 10C, and a standard deviation σ1 column 10D. In the power demand forecast value database 10, one row corresponds to one time slot on one date.

[0026] The date column 10A stores the date of the corresponding date, and the time column 10B stores the corresponding time period of the corresponding date. The predicted power demand column 10C stores the power demand predicted for the corresponding time period of the corresponding date (hereinafter, this will be called the predicted power demand). The standard deviation σ1 column 10D stores the standard deviation of the prediction error as the prediction accuracy of the predicted power demand relative to the actual power demand (hereinafter, this will be called the actual power demand) for the same time period on the same date in the past.

[0027] Therefore, in the example of Figure 4, the predicted electricity demand for the time period "10:00-10:30" on "2020 / 04 / 01" is "3,600" (kWh), and the standard deviation of the predicted electricity demand against the actual electricity demand is "230".

[0028] The relative transaction unit price database 11 is a database that stores the electricity unit prices (hereinafter referred to as relative transaction unit prices) in relative transactions for each date and time period that are determined between an electricity retailer and an electricity wholesaler, and is created in advance by a user. As shown in Fig. 5, the relative transaction unit price database 11 has a table structure with a date column 11A, a time period column 11B, and a relative transaction unit price column 11C. In the relative transaction unit price database 11, one row corresponds to a relative transaction unit price for one time period on one date.

[0029] The date field 11A stores the date of the corresponding date, and the time field 11B stores the time period corresponding to the corresponding date. The relative transaction price field 11C stores the relative transaction price for the corresponding time period on the corresponding date. Therefore, in the example of Figure 5, the relative transaction price for the time period "10:00-10:30" on "2020 / 04 / 01" is shown to be "12.5" (yen / kWh).

[0030] The forecast market unit price database 12 is a database that stores forecast values ​​of electricity unit prices when procuring electricity from the electricity trading market (hereinafter, this is referred to as forecast market unit prices), and is created in advance by a user based on actual past contracted unit prices, etc. As shown in Fig. 6, this forecast market unit price database 12 is configured with a date column 12A, a time period column 12B, a forecast market unit price column 12C, and a standard deviation σ2 column 12D. In the forecast market unit price database, one row corresponds to one time period on one date.

[0031] The date field 12A stores the date of the corresponding date, and the time field 12B stores the time period corresponding to the corresponding date. The predicted market price field 12C stores the predicted market price for the corresponding time period on the corresponding date. The standard deviation σ2 field 12D stores the standard deviation of the prediction error as the prediction accuracy of the predicted market price for the electricity price actually traded for the same time period on the same date in the past (hereinafter, this is called the actual market price).

[0032] Therefore, in the example of Figure 6, the predicted market price for the time period "10:00-10:30" on "2020 / 04 / 01" is "14.1" (yen / kWh), and the standard deviation of the predicted market price relative to the actual market price is "2.0".

[0033] The allowable adjustment range database 13 is a database that stores the adjustable range of power consumption that can be adjusted by controlling the consumer's power equipment by demand response or the like (hereinafter, this is referred to as the consumer's power consumption adjustment allowable range), and is created in advance by a user. As shown in Fig. 7, this allowable adjustment range database 13 is configured with a date column 13A, a time period column 13B, a positive direction adjustment maximum value column 13C, and a negative direction adjustment maximum value column 13D. In the allowable adjustment range database 13, one row corresponds to the consumer's power consumption adjustment allowable range in one time period on one date.

[0034] The date field 13A stores the date of the corresponding date, and the time field 13B stores the corresponding time field of the corresponding date. The + direction adjustment maximum value field 13C stores the upper limit of the consumer power consumption adjustment allowable range in the corresponding time field of the corresponding date, and the + direction adjustment maximum value field 13C stores the lower limit of the consumer power consumption adjustment allowable range in the corresponding time field of the corresponding date.

[0035] Therefore, in the example of Figure 7, it is shown that the upper limit value of the consumer power consumption adjustment allowable range for the time period "10:00-10:30" on "2020 / 04 / 01" is "500" (kWh) and the lower limit value is "-50" (kWh).

[0036] The purpose of providing this adjustment allowable range database 7 is to limit the adjustment amount of the power procurement amount according to the potential of the power consumption of the consumer devices, because if more power than the demand forecast value is procured, and the excess power cannot be consumed by the consumer devices, the excess power will be wasted, and on the other hand, if less power than the demand forecast value is procured, and the power consumption of the consumer devices cannot be reduced in proportion to the reduction in the procurement amount, this will ultimately lead to an imbalance. Details will be described later.

[0037] On the other hand, the target period etc. setting unit 14, the relative procurement quantity initial value setting unit 15, the price difference calculation unit 16, the demand forecast error based adjustment quantity calculation unit 17, the forecast market unit price error based adjustment quantity calculation unit 18, the relative procurement quantity determination unit 19 and the relative procurement quantity output unit 20 are each functional units embodied by the CPU 2 (Figure 1) of the power procurement quantity determination device 1 executing corresponding programs (not shown) stored in the memory device 3 (Figure 2).

[0038] Of these, the target period etc. setting unit 14 has a function of displaying a target period etc. setting screen 30 as shown in FIG. 8 on the output device 5 (FIG. 1) in response to a predetermined operational input via the input device 4 (FIG. 1).

[0039] This target period etc. setting screen 30 is a screen for the user to set the period (hereinafter referred to as the target period) for which the power procurement quantity determination device 1 should determine the amount of power procurement through bilateral trading and various setting values, and is configured with a target period designation area 31, a first parameter designation area 32, a second parameter designation area 33, and a decision button 34.

[0040] In the target period designation area 31, the start date and time zone of the target period and the end date and time zone of the target period can be designated by a pull-down menu. Fig. 8 shows an example in which the time zone from "00:00-00:30" on "2020 / 04 / 01" to "23:30-24:00" on "2020 / 04 / 07" is designated as the target period.

[0041] In the first parameter specification area 32, the value of a first parameter C1 used when determining the amount of adjustment of power procurement based on the demand forecast error can be specified by inputting it into a text box 32A, and in the second parameter specification area 33, the value of a second parameter C2 used when determining the amount of adjustment of power procurement based on the error of the predicted market unit price can be specified by inputting it into a text box 33A. The meanings of these first and second parameters C1 and C2 will be described later. The first and second parameters C1 and C2 are set to values ​​that are somewhat determined by empirical rules.

[0042] Then, on the target period etc. setting screen 30, the target period and the first and second parameters C1, C2 can be set by specifying the target period and the first and second parameters C1, C2 as described above and then clicking the confirm button 34. Then, when the target period and the first and second parameters C1, C2 are set in this manner, the target period etc. setting unit 14 notifies the relative procurement quantity initial value setting unit 15, the price difference calculation unit 16, the demand forecast error-based adjustment quantity calculation unit 17, the forecast market unit price error-based adjustment quantity calculation unit 18, and the relative procurement quantity determination unit 19 of necessary information out of this information.

[0043] The relative procurement amount initial value setting unit 15 has a function of setting an initial value of the amount of power to be procured through bilateral trading in each time slot of the target period set by the user (hereinafter referred to as the relative procurement amount initial value) to the relative procurement amount determination unit 19 described below. In practice, the relative procurement amount initial value setting unit 15 acquires the power demand forecast values ​​for each time slot of the target period notified by the target period etc. setting unit 14 from the power demand forecast value database 10 (Fig. 4), and sets the acquired power demand forecast values ​​as the initial value of the relative procurement amount for that time slot. Note that this "setting" is performed by storing the power demand forecast values ​​in a specified area in the storage device 3 (Fig. 1).

[0044] The price difference calculation unit 16 also has a function of calculating the difference between the relative transaction unit price and the market transaction unit price for each time slot of the target period notified by the target period setting unit 14. In practice, the price difference calculation unit 16 obtains the relative transaction unit price for that time slot from the relative transaction unit price database 11 (FIG. 5) for each time slot of the target period, and obtains the predicted market unit price for that time slot from the predicted market unit price database 12 (FIG. 6), and calculates the difference between them. The price difference calculation unit 16 then sets the difference between the relative transaction unit price and the market transaction unit price for each time slot of the target period calculated in this way in the relative procurement amount determination unit 19. This "setting" is performed by storing the difference in question in a specified area in the storage device 3.

[0045] The demand forecast error-based adjustment amount calculation unit 17 has a function of calculating an adjustment amount of the power procurement amount according to the magnitude of the demand forecast error for each time period of the target period. Specifically, the demand forecast error-based adjustment amount calculation unit 17 acquires the standard deviation σ1 of the demand forecast error for each time period of the target period from the power demand forecast value database 10, and calculates the adjustment amount of the power procurement based on the demand forecast error (hereinafter, this is called the demand forecast error-based adjustment amount) by multiplying the acquired standard deviation σ1 by the first parameter C1 notified by the target period setting unit 14. Then, the demand forecast error-based adjustment amount calculation unit 17 sets the demand forecast error-based adjustment amount for each time period of the target period calculated in this way in the relative procurement amount determination unit 19. Note that this "setting" is performed by storing the demand forecast error-based adjustment amount in a predetermined area in the storage device 3.

[0046] The forecast market unit price error-based adjustment amount calculation unit 18 also has a function of calculating an adjustment amount of the power procurement amount according to the error of the market forecast unit price in each time slot of the target period. Specifically, the forecast market unit price error-based adjustment amount calculation unit 18 acquires the standard deviation σ2 of the error of the forecast market unit price in each time slot of the target period from the forecast market unit price database 12, and calculates the adjustment amount of the power procurement based on the error of the forecast market unit price (hereinafter, this is called the forecast market unit price error-based adjustment amount) by multiplying the acquired standard deviation σ2 by the second parameter C2 notified by the target period setting unit 14. Then, the forecast market unit price error-based adjustment amount calculation unit 18 sets the forecast market unit price error-based adjustment amount in each time slot of the target period calculated in this way in the relative procurement amount determination unit. Note that this "setting" is performed by storing the forecast market unit price error-based adjustment amount in a predetermined area in the storage device 3.

[0047] The relative procurement amount determination unit 19 has a function of determining a relative procurement amount for each time slot in the target period. In practice, the relative procurement amount determination unit 19 calculates, for each time slot in the target period, the difference between the demand forecast error-based adjustment amount set by the demand forecast error-based adjustment amount calculation unit 17 and the forecast market unit price error-based adjustment amount set by the forecast market unit price error-based adjustment amount calculation unit 18, and calculates the difference plus the relative procurement amount initial value set by the relative procurement amount initial value setting unit 15 as the relative procurement amount for that time slot.

[0048] However, if the difference between the demand forecast error-based adjustment amount and the forecast market unit price error-based adjustment amount is greater than the maximum + direction adjustment amount for that time period stored in the adjustment tolerance range database 13, the relative procurement quantity determination unit 19 calculates the relative procurement quantity for that time period as the value obtained by adding the maximum + direction adjustment amount to the initial value of the relative procurement quantity.

[0049] In addition, if the difference between the demand forecast error-based adjustment amount and the forecast market unit price error-based adjustment amount is greater than the maximum negative adjustment amount for that time period stored in the adjustment tolerance range database 13, the relative procurement quantity determination unit 19 calculates the relative procurement quantity for that time period by adding the maximum negative adjustment amount to the initial value of the relative procurement quantity.

[0050] The relative procurement amount determination unit 19 then outputs the relative procurement amount for each time period in the target period calculated in this manner to the relative procurement amount output unit 20.

[0051] The relative procurement amount output unit 20 has a function of displaying a relative procurement amount display screen 40 as shown in Fig. 9 on the output device 5 (Fig. 1) based on the relative procurement amount for each time period in the target period provided by the relative procurement amount determination unit 19. This relative procurement amount display screen 40 is a screen for displaying the relative procurement amount for each time period in the target period determined by the relative procurement amount determination unit 19, and displays plane coordinates 41, with the amount of power on the vertical axis and time on the horizontal axis, in a coordinate display area 42.

[0052] The relative procurement amount for each time period is displayed as a bar graph G1 on the plane coordinate system 41, and the demand forecast value for each time period is displayed as a line graph G2. In the example of Fig. 9, the bar graph G1 of the relative procurement amount for all time periods within the target period and the line graph G2 representing the demand forecast value can be displayed by sliding the slider 43 left and right. Thus, the user refers to this relative procurement amount display screen 40 to determine the relative procurement amount for each time period in the target period.

[0053] Figure 9 shows that for the time period "06:00-20:30" on "2020 / 04 / 01", it is planned to procure more electricity through bilateral transactions than the demand forecast value, and for the other time periods on that day, it is planned to procure less electricity through bilateral transactions than the demand forecast value.

[0054] (3) Specific processing contents of each functional unit Next, we will explain the specific processing content of each process executed by the main functional units among the functional units of the power procurement amount determination apparatus 1. In the following explanation, each process is explained as being performed by a functional unit ("unit"), but it goes without saying that in reality, the CPU 2 (FIG. 1) executes that process based on a program corresponding to that functional unit.

[0055] (3-1) Processing of the relative procurement amount initial value setting part Fig. 10 shows the processing steps of a relative procurement amount initial value setting process executed by the relative procurement amount initial value setting unit 15. Following the processing steps shown in Fig. 10, the relative procurement amount initial value setting unit 15 sets the predicted power demand value for each time period of the target period stored in the power demand forecast value database 10 (Fig. 4) as the relative procurement amount initial value for that time period in the relative procurement amount determination unit 19.

[0056] In practice, when the relative procurement quantity initial value setting unit 15 is notified of the target period set by the user by the target period etc. setting unit 14, it starts the relative procurement quantity initial value setting process shown in Figure 10 and first recognizes the setting value of the target period notified by the target period etc. setting unit 14 (S1).

[0057] Next, the relative procurement quantity initial value setting unit 15 selects one date that has not been processed after step S3 from among the dates included in the target period (S2), and selects one time period within that date (hereinafter, in the explanation of Figure 10, this will be referred to as the selected date) included in the target period for which step S4 onwards has not been processed (S3).

[0058] Next, the relative procurement amount initial value setting unit 15 obtains the demand forecast value for the time period selected in step S3 on the selected date (hereinafter, in the explanation of Figure 10, this time period will be referred to as the selected time period) from the electricity demand forecast value database 10 (S4), and stores the obtained demand forecast value in a specified area in the memory device 3 (Figure 1) as the relative procurement amount initial value for the selected time period on the selected date (S5).

[0059] Furthermore, relative procurement amount initial value setting unit 15 judges whether or not the processing of step S4 and subsequent steps has been completed for all time periods included in the target period among the time periods within the selected date (S6). If the relative procurement amount initial value setting unit 15 obtains a negative result in this judgment, it returns to step S3, and thereafter repeats the processing of steps S3 to S6 while sequentially switching the time period selected in step S3 to other time periods for which step S4 and subsequent steps have not been processed.

[0060] Then, when the relative procurement quantity initial value setting unit 15 obtains a positive result in step S6 by completing setting the relative procurement quantity initial values ​​in the relative procurement quantity determination unit 19 for all time periods within the selected date that are included in the target period, it determines whether or not the processing from step S3 onwards has been executed for all dates included in the target period (S7).

[0061] If the relative procurement amount initial value setting unit 15 obtains a negative result in this determination, it returns to step S2, and thereafter repeats the processing of steps S2 to S7 while sequentially switching the date selected in step S2 to other applicable dates that have not been processed in steps S3 and after.

[0062] Then, when the relative procurement quantity initial value setting unit 15 obtains a positive result in step S7 by completing setting the relative procurement quantity initial values ​​in the relative procurement quantity determination unit for all time periods on all dates included in the target period, it terminates this relative procurement quantity initial value setting process.

[0063] (3-2) Price difference calculation process Fig. 11 shows the procedure of the price difference calculation process executed by the price difference calculation unit 16. The price difference calculation unit 16 sequentially calculates the difference between the relative transaction price and the market transaction price for each time period of the target period according to the procedure shown in Fig. 11.

[0064] In practice, when the price difference calculation unit 16 is notified of the target period set by the user by the target period setting unit 14, it starts the price difference calculation process shown in Fig. 11. Then, the price difference calculation unit 16 first selects one date that has not been processed after step S11 from among the dates included in the target period notified by the target period setting unit 14 (S10), and selects one time period that has not been processed after step S12 from among the time periods within that date included in the target period (hereinafter, this will be referred to as the selected date in the explanation of Fig. 11) (S11).

[0065] Next, the price difference calculation unit 16 obtains the relative transaction price for the time period selected in step S11 on the selected date (hereinafter, in the explanation of FIG. 11, this time period will be referred to as the selected time period) from the relative transaction price database 11 (FIG. 5) (S12), and also obtains the predicted market price for the selected time period on the selected date from the predicted market price database 12 (FIG. 6) (S13).

[0066] Next, the price difference calculation unit 16 calculates the price difference D(d, t) between the relative transaction price obtained in step S12 and the predicted market price obtained in step S13, and stores the calculated price difference D(d, t) in a specified area in the storage device 3 (S14).

[0067] Furthermore, the price difference calculation unit 16 judges whether or not the process from step S12 onwards has been completed for all time periods within the selected date that are included in the target period (S15). If the price difference calculation unit 16 obtains a negative result in this judgment, it returns to step S11, and thereafter repeats the process from step S11 to step S15 while sequentially switching the time period selected in step S11 to other time periods that have not been processed from step S12 onwards.

[0068] Then, when the price difference calculation unit 16 obtains a positive result in step S15 by completing calculation of the price difference D(d, t) between the relative transaction price and the predicted market price for all time periods within the selected date that are included in the target period, it determines whether or not the processing from step S11 onwards has been executed for all dates included in the target period (S16).

[0069] If the price difference calculation unit 16 obtains a negative result in this determination, it returns to step S10, and thereafter repeats the processes of steps S10 to S16 while sequentially switching the date selected in step S10 to other applicable dates that have not been processed in steps S11 and after.

[0070] Then, when the price difference calculation unit 16 obtains a positive result in step S16 by completing calculation of the price difference D(d, t) between the relative transaction price and the predicted market price for all time periods on all dates included in the target period, it terminates the price difference calculation process.

[0071] (3-3) Demand forecast error-based adjustment calculation process On the other hand, Fig. 12 shows the procedure of the demand forecast error-based adjustment amount calculation process executed by the demand forecast error-based adjustment amount calculation unit 17. The demand forecast error-based adjustment amount calculation unit 17 calculates the adjustment amount of the power procurement amount through bilateral trading according to the magnitude of the error in the power demand forecast, according to the procedure shown in Fig. 12.

[0072] In practice, when the demand forecast error-based adjustment amount calculation unit 17 is notified of the target period set by the user and the setting values ​​of the first and second parameters C1 and C2 from the target period etc. setting unit 14, it starts the demand forecast error-based adjustment amount calculation process shown in Figure 12 and first obtains the setting value of the first parameter C1 given at that time from the target period etc. setting unit 14 (S20).

[0073] Next, the demand forecast error-based adjustment amount calculation unit 17 selects one date that has not been processed after step S22 from among the dates included in the target period notified by the target period setting unit 14 (S21), and selects one time period that has not been processed after step S23 from among the time periods within that date included in the target period (hereinafter, in the explanation of Figure 12, this date will be referred to as the selected date) (S22).

[0074] Next, the demand forecast error-based adjustment amount calculation unit 17 acquires the standard deviation σ1 of the time period selected in step S22 (hereinafter, in the explanation of FIG. 12, this time period will be referred to as the selected time period) from the power demand forecast value database 10 (FIG. 4) (S23). In the example of FIG. 4, for example, when the selected date is "2020 / 04 / 01" and the selected time period is "10:00-10:30", the demand forecast error-based adjustment amount calculation unit 17 acquires "230" (kWh) as the standard deviation σ1 through this step S23.

[0075] After that, the demand forecast error-based adjustment amount calculation unit 17 calculates the demand forecast error-based adjustment amount by the following equation:

number

[0076] FIG. 13 shows the relationship between the adjustment amount dWh1(d,t) stored in this manner in a specified area of ​​the storage device 3 and the standard deviation σ1 of the forecast error in the power demand forecast. As is clear from equation (1), the adjustment amount dWh1(d,t) of the amount of power procurement through bilateral trading is determined to a value proportional to the standard deviation σ1 of the error in the power demand forecast. In FIG. 13, the horizontal axis represents the standard deviation σ1 of the demand forecast, with the error decreasing closer to the origin and increasing farther from the origin. The vertical axis represents the adjustment amount dWh1(d,t), with the value approaching 0 closer to the origin and increasing farther from the origin.

[0077] Furthermore, the demand forecast error-based adjustment amount calculation unit 17 judges whether or not the processing of step S23 and subsequent steps has been completed for all time periods included in the target period among the time periods in the selected date (S26). If the demand forecast error-based adjustment amount calculation unit 17 obtains a negative result in this judgment, it returns to step S22, and thereafter repeats the processing of steps S22 to S26 while sequentially switching the time period selected in step S22 to other time periods not yet processed in step S23 and subsequent steps.

[0078] Then, when the demand forecast error-based adjustment amount calculation unit 17 obtains a positive result in step S26 by completing calculation of the adjustment amount dWh1(d,t) for all time periods within the selected date that fall within the target period, it determines whether or not the processing from step S22 onwards has been performed for all dates included in the target period (S27).

[0079] If the demand forecast error-based adjustment amount calculation unit 17 obtains a negative result in this judgment, it returns to step S21, and then repeats the processing of steps S21 to S27 while sequentially switching the two dates selected in step S12 to other applicable dates that have not been processed in step S22 and after.

[0080] Then, when the demand forecast error-based adjustment amount calculation unit 17 eventually obtains a positive result in step S27 by completing calculation of the adjustment amount dWh1(d,t) for all time periods on all dates included in the target period, it terminates this demand forecast error-based adjustment amount calculation process.

[0081] (3-4) Calculation of the adjustment amount based on the predicted market unit price error On the other hand, Fig. 14 shows the procedure of a forecast market unit price error-based adjustment amount calculation process executed by the forecast market unit price error-based adjustment amount calculation unit 18. The forecast market unit price error-based adjustment amount calculation unit 18 calculates the adjustment amount of the power procurement amount through bilateral trading according to the magnitude of the error in the forecast market unit price, according to the procedure shown in Fig. 14.

[0082] In practice, when the forecast market unit price error-based adjustment amount calculation unit 18 is notified of the target period set by the user and the setting values ​​of the first and second parameters C1 and C2 from the target period etc. setting unit 14, it starts the forecast market unit price error-based adjustment amount calculation process shown in FIG. 14 and first obtains the setting value of the second parameter C2 given at that time from the target period etc. setting unit 14 (S30).

[0083] Next, the forecast market unit price error-based adjustment amount calculation unit 18 selects one date that has not been processed after step S32 from among the dates included in the target period notified by the target period setting unit 14 (S31), and selects one time period that has not been processed after step S33 from among the time periods within that date included in the target period (hereinafter, in the explanation of Figure 14, this date will be referred to as the selected date) (S32).

[0084] Next, the forecast market unit price error-based adjustment amount calculation unit 18 acquires the standard deviation σ2 of the time period selected in step S32 (hereinafter, in the description of FIG. 14, this time period will be referred to as the selected time period) from the forecast market unit price database 12 (FIG. 6) (S33). In the case of the example of FIG. 6, for example, when the selected date is "2020 / 04 / 01" and the selected time period is "10:00-10:30", the forecast market unit price error-based adjustment amount calculation unit 18 acquires "2.0" as the standard deviation σ2.

[0085] Furthermore, the forecast market unit price error-based adjustment amount calculation unit 18 calculates the following formula:

number

[0086] The relationship between the adjustment amount dWh2(d,t) stored in this manner in a specified area of ​​the memory device 3 and the standard deviation σ2 of the error in the predicted market unit price is the same as the relationship between the adjustment amount dWh1(d,t) described above in relation to Figure 13 and the electricity demand forecast value, and as is clear from equation (2), the adjustment amount dWh1(d,t) of the electricity procurement amount through bilateral trading is determined to a value proportional to the standard deviation σ2 of the error in the predicted market unit price.

[0087] After that, the forecast market unit price error-based adjustment amount calculation unit 18 judges whether or not the processing of step S33 and the following steps has been completed for all the time periods included in the target period among the time periods in the selected date (S36). If the forecast market unit price error-based adjustment amount calculation unit 18 obtains a negative result in this judgment, it returns to step S32, and thereafter repeats the processing of steps S32 to S36 while sequentially switching the time period selected in step S32 to other time periods that have not been processed in step S33 and the following steps.

[0088] Then, when the predicted market unit price error-based adjustment amount calculation unit 18 obtains a positive result in step S36 by eventually completing calculation of the adjustment amount dWh2(d,t) for all time periods within the selected date that are included in the target period, it determines whether or not the processing from step S32 onwards has been performed for all dates included in the target period (S37).

[0089] If the forecast market unit price error-based adjustment amount calculation unit 18 obtains a negative result in this judgment, it returns to step S31, and thereafter repeats the processing of steps S31 to S37 while sequentially switching the date selected in step S31 to other applicable dates that have not been processed in steps S32 and after.

[0090] Then, when the forecast market unit price error-based adjustment amount calculation unit 18 eventually obtains a positive result in step S37 by completing calculation of the adjustment amount dWh2(d, t) for all time periods on all dates included in the target period, it terminates this forecast market unit price error-based adjustment amount calculation process.

[0091] (3-5) Relative Procurement Quantity Determination Process Fig. 15 shows the processing steps of the relative procurement amount determination process executed by the relative procurement amount determination unit 19. The relative procurement amount determination unit 19 determines the power procurement amount in a relative transaction for each time period on each date included in the target period, according to the processing steps shown in Fig. 15.

[0092] In practice, the relative procurement quantity determination unit 19 starts the relative procurement quantity determination process shown in Figure 15 when the relative procurement quantity initial value setting unit 15, the price difference calculation unit 16, the demand forecast error based adjustment amount setting unit 17, and the forecast market unit price error based adjustment amount calculation unit 18 each complete the corresponding process among the processes described above with reference to Figures 10 to 14.

[0093] The relative procurement quantity determination unit 19 first selects one date that has not been processed after step S41 from among the dates included in the target period notified by the target period setting unit 14 (S40), and then selects one time period that has not been processed after step S42 from among the time periods within that date included in the target period (hereinafter, in the explanation of Figure 15, this date will be referred to as the selected date) (S41).

[0094] Next, the relative procurement amount determination unit 19 acquires the power demand forecast value Wh0(d,t) for the time period selected in step S41 on the selected date (hereinafter, in the description of FIG. 15, this time period will be referred to as the selected time period) by reading it from the corresponding predetermined area in the storage device 3 (S42). For example, if the selected date and time is "2020 / 04 / 01" and the selected time period is "10:00-10:30," in the example of FIG 4, the relative procurement amount determination unit 19 acquires "3600" (kWh) as the power demand forecast value Wh0(d,t).

[0095] The relative procurement quantity determination unit 19 also obtains the price difference D(d, t) between the relative transaction price and the predicted market price for the selected time period on the selected date, and the adjustment amounts dWh1(d, t) and dWh2(d, t) of the electricity procurement quantity due to relative transactions for the selected time period by reading them out from the corresponding specified areas of the storage device 3 (S43 to S45).

[0096] For example, if the selected date and time is "2020 / 04 / 01" and the selected time period is "10:00-10:30", in the examples of Figures 4 to 6, the relative procurement quantity determination unit 19 will obtain "-2.1" (yen / kWh) as the price difference D(d,t), "690" (kWh) as the adjustment amount dWh1(d,t) in response to the error in the electricity demand forecast, and "300" (kWh) as the adjustment amount dWh2(d,t) in response to the error in the predicted market price.

[0097] Furthermore, the relative procurement amount determination unit 19 reads out and acquires the + direction adjustment amount maximum value dWh_pm(d,t), which is the upper limit of the adjustment allowable range for the selected time period on the selected date, and the - direction adjustment amount maximum value dWh_mm(d,t), which is the lower limit of the adjustment allowable range, from the adjustment allowable range database 13 (FIG. 7) (S46). For example, when the selected date and time is "2020 / 04 / 01" and the selected time period is "10:00-10:30", in the example of FIG. 7, the relative procurement amount determination unit 19 acquires "500" (kWh) as the + direction adjustment amount maximum value dWh_pm(d,t) and "-50" (kWh) as the - direction adjustment amount maximum value dWh_mm(d,t).

[0098] Then, the relative procurement amount determination unit 19 calculates the following equation based on the price difference D(d,t), the adjustment amounts dWh1(d,t) and dWh2(d,t), the positive direction adjustment amount maximum value dWh_pm(d,t) and the negative direction adjustment amount maximum value dWh_mm(d,t) obtained in steps S42 to S46 as described above.

number

number

[0099] Therefore, in the above example, the adjustment amount dWh(d,t) for the time period "10:00-10:31" on "2020 / 04 / 01" is calculated using the following formula:

number

[0100] Thereafter, the relative procurement amount determination unit 19 calculates, based on the power demand forecast value Wh0(d,t) for the selected time period on the selected date acquired in step S42 and the adjustment amount dWh(d,t) calculated in steps S44 and S45, the following equation:

number

[0101] Therefore, in the above example, the relative procurement amount Wh(d,t) for the time period "10:00-10:31" on "2020 / 04 / 01" is calculated using the following formula:

number

[0102] Thereafter, the relative procurement amount determination unit 19 judges whether or not the processing from step S42 onwards has been completed for all time slots included in the target period among the time slots in the selected date (S49). If the relative procurement amount determination unit 19 obtains a negative result in this judgment, it returns to step S41, and thereafter repeats the processing from step S41 to step S49 while sequentially switching the time slot selected in step S41 to other time slots for which step S42 onwards has not been processed.

[0103] Then, when the relative procurement quantity determination unit 19 obtains a positive result in step S49 by completing the determination of the relative procurement quantity Wh(d,t) for all time periods within the selected date that fall within the target period, it determines whether or not the processing from step S41 onwards has been performed for all dates included in the target period (S50).

[0104] If the relative procurement amount determination unit 19 obtains a negative result in this determination, it returns to step S40, and thereafter repeats the processes of steps S40 to S50 while sequentially switching the date selected in step S40 to other applicable dates that have not been processed in steps S41 and after.

[0105] Then, when the relative procurement amount determination unit 19 eventually obtains a positive result in step S50 by completing the determination of the relative procurement amounts Wh(d,t) for all time periods on all dates included in the target period, it terminates this relative procurement amount determination process.

[0106] (4) Effects of this embodiment As described above, in the power procurement amount determination device 1 of this embodiment, the relative power procurement amount for each time period is determined based on the magnitude relationship between the relative trading price predetermined in the relative trading contract and the predicted market price predicted for the same time period, the forecast error in the power demand, and the forecast error in the predicted market price.

[0107] Therefore, the power procurement amount determination device 1 can determine the power procurement amount while considering the uncertainty of the predicted market unit price, so that power can be procured cheaply through bilateral trading even if the power unit price in the power trading market rises sharply. As a result, the expected profit value of the power retailer can be improved more than before.

[0108] (5) Other embodiments In the above-described embodiment, the power procurement quantity determination device has been described as holding information such as power demand forecast values, relative transaction price, and predicted market price in advance. However, the present invention is not limited to this. The power procurement quantity determination device 1 may not hold the power demand forecast value database 10, the relative transaction price database 11, and the predicted market price database 12, and may instead acquire the necessary information from outside in real time.

[0109] In the above embodiment, the first and second parameters C1, C2 are specified by the user on the target period setting screen 30. However, the present invention is not limited to this, and the values ​​of the first and second parameters C1, C2 may be fixedly set as default values.

[0110] Furthermore, in the above-described embodiment, the power procurement quantity determination unit calculates an adjustment amount of power procurement quantity for a target time period, and determines the power procurement quantity for the target time period based on the calculated adjustment amount and the initial value of the power procurement quantity, is described as being configured by a price difference calculation unit 16, a demand forecast error-based adjustment amount calculation unit 17, a forecast market unit price error-based adjustment amount calculation unit 18, and a relative procurement quantity determination unit 19. However, the present invention is not limited to this, and such a power procurement quantity determination unit may be configured by a single functional unit. [Industrial Applicability]

[0111] The present invention can be widely applied to power procurement amount determination devices of various configurations that determine the amount of power procurement for each time period in the future. [Explanation of symbols]

[0112] 1...electricity procurement decision device, 2...CPU, 3...memory device, 10...electricity demand forecast value database, 11...relative transaction unit price database, 12...forecasted market unit price database, 13...adjustment tolerance range database, 14...target period etc. setting section, 15...relative adjustment amount initial value setting section, 16...price difference calculation section, 17...demand forecast error based adjustment amount calculation section, 18...forecasted market unit price error based adjustment amount calculation section, 19...relative procurement amount determination section, 20...relative procurement amount output section, 30...target period etc. setting screen, 40...relative procurement amount display screen.

Claims

1. In a power procurement amount determination device that determines a future power procurement amount for each time period, a procurement amount initial value setting unit that sets an initial value of the amount of electricity procurement to be procured by a first electricity procurement method for procur- ing electricity through bilateral trading during the target time period; a power procurement amount determination unit that calculates an adjustment amount of the power procurement amount for the target time period, and determines the power procurement amount for the target time period based on the calculated adjustment amount and an initial value of the power procurement amount; Equipped with The power procurement amount determination unit, The adjustment amount of the power procurement amount is calculated based on first error information representing a prediction error of a predicted value of power demand in the target time period, a predetermined first power unit price when power is procured by the first power procurement method in the target time period, a second power unit price predicted when power is procured by a second power procurement method for procured from a power trading market in the target time period, and second error information representing a prediction error of the second power unit price. An electric power procurement amount determination device comprising:

2. The power procurement amount determination unit, The adjustment amount of the power procurement amount in the target time period is dWh(d,t), the difference between the first power unit price and the second power unit price in the time period is D(d,t), the standard deviation of the prediction error of the predicted value of the power demand is σ1, the standard deviation of the prediction error of the second power unit price in the time period is σ2, and C1 and C2 are each a predetermined constant, and the following formula is used. [0080] however, [0097] The adjustment amount of the power procurement amount in the target time period is calculated by 2. The power procurement amount determination device according to claim 1 .

3. The power procurement amount determination unit, When the calculated adjustment amount of the power procurement amount deviates from a predetermined allowable range of the adjustment amount for the target time period, the adjustment amount is changed to a value within the allowable range.

2. The power procurement amount determination device according to claim 1 .

4. The tolerance range is: This is the range of power consumption that can be adjusted by controlling the consumer's power equipment.

4. The power procurement amount determination device according to claim 3.

5. The procurement amount initial value setting unit is A predicted value of the power demand in the target time period is set as the initial value of the power procurement amount.

2. The power procurement amount determination device according to claim 1 .

6. The power procurement amount determination unit, a price difference calculation unit that calculates a difference between the first and second electricity unit prices in the target time period; a demand forecast error-based adjustment amount calculation unit that calculates a first adjustment amount based on the first error information; a predicted market price error-based adjustment amount calculation unit that calculates a second adjustment amount based on the second error information; a procurement amount determination unit that calculates an adjustment amount of the electricity procurement amount for the target time period based on the difference between the first and second electricity unit prices calculated by the price difference calculation unit, the first adjustment amount calculated by the demand forecast error based adjustment amount calculation unit, and the second adjustment amount calculated by the forecast market unit price error based adjustment amount calculation unit; The power procurement amount determination device according to claim 1, further comprising:

7. A power procurement amount determination method executed by a power procurement amount determination device that determines a power procurement amount for each time period in the future, comprising: a first step of setting an initial value of the amount of electricity to be procured by a first electricity procurement method for procuring electricity through bilateral trading during the target time period; a second step of calculating an adjustment amount of the power procurement amount for the target time period, and determining the power procurement amount for the target time period based on the calculated adjustment amount and an initial value of the power procurement amount; Equipped with In the second step, The adjustment amount of the power procurement amount is calculated based on first error information representing a prediction error of a predicted value of power demand in the target time period, a predetermined first power unit price when power is procured by the first power procurement method in the target time period, a second power unit price predicted when power is procured by a second power procurement method for procured from a power trading market in the target time period, and second error information representing a prediction error of the second power unit price. A method for determining an amount of electricity procurement comprising:

8. In the second step, The adjustment amount of the power procurement amount in the target time period is dWh(d,t), the difference between the first power unit price and the second power unit price in the time period is D(d,t), the standard deviation of the prediction error of the predicted value of the power demand is σ1, the standard deviation of the prediction error of the second power unit price in the time period is σ2, and C1 and C2 are each a predetermined constant, and the following formula is used. [0010] however, ##EQU00011## The adjustment amount of the power procurement amount in the target time period is calculated by The method for determining an amount of power procurement according to claim 7.

9. In the second step, When the calculated adjustment amount of the power procurement amount deviates from a predetermined allowable range of the adjustment amount for the target time period, the adjustment amount is changed to a value within the allowable range. The method for determining an amount of power procurement according to claim 7.

10. The tolerance range is: This is the range of power consumption that can be adjusted by controlling the consumer's power equipment. The method for determining an amount of power procurement according to claim 9 .

11. In the first step, A predicted value of the power demand in the target time period is set as the initial value of the power procurement amount. The method for determining an amount of power procurement according to claim 7.

12. The second step includes: a first calculation step of calculating a difference between the first and second unit prices of electricity in the target time period, a first adjustment amount based on the first error information, and a second adjustment amount based on the second error information; a second calculation step of calculating an adjustment amount of the power procurement amount for the target time period based on the calculated difference between the first and second power unit prices and the first and second adjustment amounts; Equipped The method for determining an amount of power procurement according to claim 7.

Citation Information

Patent Citations

  • Device and method for power transaction support, or application apparatus

    JP2016207070A

  • Power demand management supporting system, power demand management supporting method, and power demand management supporting program

    JP2017182698A

  • Power transaction support device and power transaction support method

    JP2019046467A