Host management device, production control system, host management method, and host management program
The higher-level management device facilitates comprehensive data analysis by cross-referencing measurement data across production processes, addressing the limitations of conventional systems in identifying defect causes.
Patent Information
- Application Number
- JP2020178866
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-10-26
- Publication Date
- 2024-09-18
- Estimated Expiration
- 2040-10-26
AI Technical Summary
Conventional systems fail to consider the impact of defects in production processes on previous and subsequent steps, limiting comprehensive data analysis and root cause identification.
A higher-level management device that receives abnormal process information from lower-level control devices, identifies involved processes, and requests measurement data across the production line to facilitate cross-sectional data comparison and analysis.
Enables detailed data analysis by comparing measurement data from previous and subsequent processes, aiding in identifying the true cause of defects and improving process efficiency.
Smart Images

Figure 0007552249000005 
Figure 0007552249000004 
Figure 0007552249000006
Abstract
Description
[Technical field]
[0001] The present invention relates to a host management device that is connected via a network to a plurality of lower level control devices that control one or more of a plurality of processes in a production line that includes the plurality of processes for producing an object of production. [Background technology]
[0002] 2. Description of the Related Art Conventionally, in the field of FA (Factory Automation), attempts have been made to efficiently collect and manage data relating to production equipment and the like installed in factories and the like.
[0003] For example, Patent Document 1 discloses a device that judges whether a workpiece is non-defective or not in a production facility, and transmits only data corresponding to defects to a higher-level device.
[0004] Moreover, Patent Document 2 discloses a PLC (Programmable Logic Controller) that collects data in accordance with a predetermined collection rule on a production facility and transmits the data to a higher-level device.
[0005] Furthermore, Patent Document 3 discloses a device that determines whether or not a workpiece in a production facility exhibits a different behavior (hereinafter, referred to as an abnormality) from a normal production state. [Prior art documents] [Patent documents]
[0006] [Patent Document 1] Japanese Patent Application Publication No. 9-131648 [Patent Document 2] JP 2020-52441 A [Patent Document 3] JP 2018-97839 A Summary of the Invention [Problem to be solved by the invention]
[0007] However, in the above-mentioned conventional technology, when a defect occurs in a certain process of a certain production facility or when a certain condition is satisfied in the process, data of the process is only sent to a higher-level device. In other words, since only the data of the process is sent to the higher-level device, it cannot be said to be data related to the previous and next processes. Therefore, it is not possible to consider the case where the cause of the defect occurs before the process or the case where the defect of the process affects the subsequent process.
[0008] One aspect of the present invention aims to realize more detailed data analysis by transmitting data including data from the preceding and following processes to a host device when a defect or abnormality occurs in a certain process. [Means for solving the problem]
[0009] In order to solve the above problems, an upper management device according to one embodiment of the present invention is an upper management device connected via a network to a plurality of lower control devices which control one or more of the processes in a production line including a plurality of processes for producing a production object, and includes a receiving unit which receives abnormal process information from one of the lower control devices regarding a process in which an abnormality has occurred when an abnormality is detected in the lower control device, an identification unit which identifies a contributing process which is involved in the production object that was being produced in the abnormal process from among the processes included in the production line based on the abnormal process information, a command unit which requests the plurality of lower control devices to transmit measurement data related to the contributing process, and a memory control unit which controls the storage of the abnormal process information and the measurement data in a memory unit.
[0010] According to the above configuration, it is possible to identify the process involved in the production object where the abnormality occurred, and to request the lower-level control device controlling the process involved to transmit measurement data. In other words, in addition to the measurement data of the lower-level control device where the abnormality occurred, it is also possible to obtain measurement data of other lower-level control devices on the production line, so that it is possible to provide data for cross-sectional comparison and analysis of measurement data of processes including the previous and next processes.
[0011] The identification unit may refer to a required time table showing the order of the processes included in the production line and the required time for each of the processes, and identify the involved process based on the abnormal process information using process information and implementation time information, and the command unit may transmit the process information and implementation time information to multiple lower-level control devices.
[0012] According to the above configuration, it is possible to receive abnormal process information related to the abnormality from the lower-level control device where the abnormality occurred, identify the implementation time of each involved process involved in the abnormality-occurring process, and issue a command to the lower-level control device to transmit implementation time information at the implementation time. Therefore, if the process where the abnormality occurred can be identified, it is possible to identify the process and implementation time of the involved process, and it is possible to obtain measurement data to be used for comparing the abnormality.
[0013] Each of the production objects produced on the production line may be assigned an identification information, and the command unit may transmit the identification information of the production objects that were produced during the abnormality process to a plurality of the lower-level control devices.
[0014] According to the above configuration, since identification information is attached to the production objects, it is possible to identify the measurement data relating to the production object in which an abnormality has occurred from the measurement data relating to multiple production objects, and to obtain the measurement data to be used for comparison.
[0015] The command unit may request each of the lower-level control devices to transmit the measurement data related to the involved processing from one lower-level control device so that the reception timing of the measurement data related to the involved processing from another lower-level control device is different.
[0016] According to the above configuration, the transmission timing of the measurement data can be shifted for each lower level control device, thereby reducing the communication load on the network.
[0017] The identification unit may identify the contributing process upstream of the abnormality occurrence process.
[0018] According to the above configuration, the control device upstream of the process where the abnormality occurred can be targeted as the involved process, which makes it easier to investigate the cause of the abnormality in the process where the abnormality occurred.
[0019] The identification unit may identify the contributing process downstream of the abnormality occurrence process.
[0020] According to the above configuration, the control device downstream of the abnormality-occurring process can be targeted as the involved process, which makes it easier to identify other abnormalities caused by the abnormality in the abnormality-occurring process.
[0021] A production control system according to one aspect of the present invention includes the upper management device, and a plurality of the lower control devices connected to the upper management device via a network.
[0022] A host management method according to one embodiment of the present invention is a host management method for a host management device connected via a network to a plurality of lower control devices which control one or more of the processes in a production line including a plurality of processes for producing a production object, and includes the following steps: a receiving step of receiving abnormal process information from one of the lower control devices regarding a process in which an abnormality has occurred when an abnormality is detected in the lower control device; an identifying step of identifying a contributing process which is involved in the production object that was being produced in the abnormal process from among the processes included in the production line based on the abnormal process information; a command step of requesting the plurality of lower control devices to transmit measurement data related to the contributing process; and a storage control step of controlling the storage of the abnormal process information and the measurement data in a memory unit.
[0023] The upper level management device according to each aspect of the present invention may be realized by a computer. In this case, the upper level management device control receiving program, specific program, command program, and memory control program of the upper level management device, which realizes the upper level management device on a computer by causing the computer to operate as each part (software element) of the upper level management device, and the computer-readable recording medium on which they are recorded, also fall within the scope of the present invention. Effect of the Invention
[0024] According to one aspect of the present invention, a host management device is provided that can compare measurement data in participating processes before and after the occurrence of an abnormality. [Brief description of the drawings]
[0025] [Figure 1] 1 is a block diagram showing a configuration of a main part of a production line according to a first embodiment. [Diagram 2] 1 is a block diagram showing a configuration of a main part of a control system according to a first embodiment. [Diagram 3] 13 is an example of a required time table. [Figure 4] FIG. 4 is a schematic diagram illustrating an example of an abnormality determination process. [Diagram 5] 11 is a flowchart of advance preparations for acquiring measurement data in the control system. [Figure 6] 10 is a flowchart showing a process for acquiring measurement data in the control system. [Figure 7] 13 is an example of a measurement data narrowing-down process according to the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0026] [Embodiment 1] Hereinafter, an embodiment according to one aspect of the present invention (hereinafter, also referred to as "the present embodiment") will be described with reference to the drawings. In the drawings, the same or corresponding parts are designated by the same reference characters and their description will not be repeated.
[0027] § 1. Examples of Application FIG. 1 is a block diagram showing the configuration of the main parts of a production line 70 according to the first embodiment. The production line 70 is a line that processes workpieces (production objects) through steps A1, A2, A3, B1, B2, B3, C1, C2, and C3 to produce products. Workpieces pass through each step one by one and are processed. For example, as shown in FIG. 1, the fifth workpiece is being produced in step B2, and the fifth workpiece continues production by moving to step B3, where the fourth workpiece is currently being produced, and production is completed when step C3 is finished, completing the production and the product.
[0028] During the production of process B2, if an abnormality occurs in the production of the workpiece that differs from normal production, the workpiece No. 5 itself may become a defective product in process B2, but it may also become a defective product in a later process. Also, the true cause of the defective product in process B2 is not necessarily in process B2, and there may be a cause in the previous process.
[0029] In this way, when an abnormality different from normal production occurs, the cause of the defective product can be identified and the process can be improved by checking the measurement data including the previous and next processes. Therefore, in this application, a host management device 10 is realized that, when an abnormality different from normal production is detected, obtains information on the previous and next processes related to the work as measurement data.
[0030] §2. Example configuration FIG. 2 is a block diagram showing a configuration of a main part of the control system 1 according to the first embodiment.
[0031] (Control System 1) The control system 1 (production control system) comprises a host management device 10, an upstream lower-level control device 41, an abnormality source lower-level control device 42, and a downstream lower-level control device 43. The upstream lower-level control device 41, the abnormality source lower-level control device 42, and the downstream lower-level control device 43 are collectively referred to as a lower-level control device 40. The lower-level control devices 40 have common functions, and in FIG. 2, the upstream lower-level control device 41 is shown as a representative.
[0032] The control system 1 connects a host management device 10 and a lower level control device 40 via a network.
[0033] (Production Line) The control system 1 is a system that comprehensively controls a production line 70. The production line 70 is made up of a plurality of devices 60. Each device 60 processes a plurality of processes 50. Each device includes one or more lower-level control devices 40.
[0034] When an abnormality occurs, the process 50 is roughly divided into an abnormality occurring process 51 where the process where the abnormality occurred was performed, an upstream process 52 where the process was performed before the abnormality occurred, and a downstream process 53 where the process was performed after the abnormality occurred. There is one abnormality occurring process 51, but there may be multiple upstream processes 52 and downstream processes 53, or there may be none.
[0035] 1, a production line 70 has three devices 60: an upstream device 61, an abnormality source device 62, and a downstream device 63. The upstream device 61 is controlled by the upstream lower control device 41, and processes steps A1, A2, and A3, which are upstream processes 52. The abnormality source device 62 is controlled by the abnormality source lower control device 42, and processes step B1, which is upstream process 52, step B2, which is abnormality occurrence process 51, and step B3, which is downstream process 53. The downstream device 63 is controlled by the downstream lower control device 43, and processes C1, C2, and C3, which are downstream processes 53.
[0036] Of course, the number of devices 60 constituting the production line 70 is not limited to three. Also, each device 60 (hereinafter, the upstream device 61, the abnormality source device 62, and the downstream device 63 will be collectively referred to as device 60) processes three steps 50, but the number is not limited to three.
[0037] In this embodiment, for the sake of explanation, it is assumed that the abnormality source lower control device 42 detects that an abnormality has occurred in process B2 processed by the abnormality source device 62 (process B2 is the abnormality occurrence process 51), but this is not limited to this and an abnormality may occur in any process.
[0038] The production line 70 is assumed to be a production line in which workpieces (production objects) are processed sequentially.
[0039] (Upper management device 10) The upper management device 10 is a control device that manages multiple lower control devices 40, and performs processing to acquire and store measurement data related to a workpiece in which an abnormality has occurred, which is acquired by the lower control devices 40. The upper management device 10 includes a control unit 20 and a storage unit 30.
[0040] The control unit 20 comprehensively controls each unit of the host management device 10. The control unit 20 includes a receiving unit 21, an identifying unit 22, a command unit 23, and a memory control unit 24. The memory unit 30 stores data and programs used by the host management device 10. The memory unit 30 does not have to be included in the host management device 10, and may be stored on the cloud. The memory unit 30 stores a required time table 31 and a database 32.
[0041] The receiving unit 21 receives abnormal process information from one of the lower control devices 40 (abnormality source lower control device 42) when an abnormality is detected in the lower control device 40 during production of a workpiece. The receiving unit 21 outputs the received abnormal process information to the identifying unit 22. The abnormal process information includes process information that can identify the abnormality occurrence process 51 and implementation time information that is the abnormality occurrence time.
[0042] The identification unit 22 refers to the required time table 31 (described in detail later) based on the input abnormal process information, and identifies the contributing processes involved in the workpiece being produced in the abnormal process 51 from among the processes 50 included in the production line 70. Information on the identified contributing processes is output to the command unit 23.
[0043] The identifying unit 22 may identify an upstream process 52 and a downstream process 53 of the abnormality occurrence process 51 as the contributing processes.
[0044] Based on the input information on the involved processes, the command unit 23 requests the transmission of measurement data related to the involved processes from the multiple lower-level control devices 40. When transmitting, the command unit 23 may transmit the process information of the target process 50 together with the execution time information (time information for processing the work).
[0045] Furthermore, the command unit 23 may transmit measurement data transmission commands with a time lag to two or more lower-level control devices 40. For example, it is possible to repeat control such as transmitting a transmission command to one lower-level control device 40, receiving measurement data from the lower-level control device 40, and then transmitting a transmission command to another lower-level control device 40.
[0046] This makes it possible to make the timing of receiving the measurement data related to the involved processing from one lower-level control device different from the timing of receiving the measurement data related to the involved processing from another lower-level control device, thereby reducing the network load.
[0047] The command unit 23 may simultaneously send measurement data transmission commands to multiple downstream lower control devices 40. This is because the processing in the downstream process 53 is incomplete when an abnormality occurs, and so the measurement data is sent after the processing of each process 50 is completed without intentionally setting a time difference. In other words, as a result, the timing of receiving the measurement data from each lower control device in the upper management device 10 will differ, and the network load can be reduced.
[0048] The memory control unit 24 controls the storage of the measurement data and abnormal process information received from the lower level control device 40 in the memory unit 30 .
[0049] The required time table 31 is a setting that the lower control device 40 stores in the memory unit 30 via the upper management device 10, and is a table that stores the required time for each process 50 of each lower control device 40 and the processing order of the processes 50 in the production line 70.
[0050] Fig. 3 is an example of the required time table 31. As shown in Fig. 3, the required time table 31 may also store information for identifying the lower-level control device 40 that manages the process 50 (PLC name) in addition to the process name.
[0051] The database 32 is a database that stores measurement data during the production of a workpiece measured by the low-level control device 40. Any data may be stored as the measurement data.
[0052] (Lower control device 40) The lower control device 40 controls the production of workpieces in multiple processes 50, and notifies the upper management device 10 if an abnormality occurs during the production of the workpiece. Furthermore, the lower control device 40 transmits measurement data during the production of the workpiece to the upper management device based on a command from the upper management device 10. The lower control device 40 comprises an abnormality determination unit 81, a ring buffer 82, a command receiving unit 83, a condition determination unit 84, and a data transmitting unit 85. Each lower control device 40 has the same functions.
[0053] The abnormality determination unit 81 determines an abnormality that occurs in the process 50 controlled by the low-level control device 40. The term "abnormality" does not refer to an abnormality that occurs in the equipment controlled by the low-level control device 40, but is a concept that refers to the production of a workpiece under a production condition that differs from the normal production condition. Furthermore, a workpiece that exhibits an abnormality does not necessarily become a defective product in the pass / fail product determination that determines whether the workpiece satisfies the functions as a product based on the predetermined standards for each process 50.
[0054] When the abnormality determination unit 81 determines an abnormality, it notifies the upper management device 10 of the abnormality process information, which is information on the abnormality. The abnormality process information includes the time when the abnormality occurred and information on the process where the abnormality occurred. The abnormality process information does not need to include measurement data at the time when the abnormality occurred. Details of the abnormality determination process will be described later.
[0055] The ring buffer 82 is a buffer that temporarily stores the measurement data of a predetermined number of workpieces, and temporarily stores the data regardless of whether the production status of the workpieces is abnormal or not. The measurement data temporarily stored in the ring buffer 82 is transmitted to the upper management device 10 via the data transmission unit 85 based on the judgment result of the condition judgment unit 84. The ring buffer 82 temporarily stores a certain number of measurement data, but overwrites and saves the oldest measurement data with new measurement data.
[0056] The specified number temporarily stored in ring buffer 82 is a surplus number of workpieces produced until a workpiece has passed through the production line when production line 70 is operating at a normal takt time.
[0057] The command receiving unit 83 has a function of receiving commands from the command unit 23. The command receiving unit 83 outputs to the condition determining unit 84 that a command to transmit measurement data has been received from the higher-level management device 10. The command receiving unit 83 may output to the condition determining unit 84 the process information and implementation time information that have been received together with the command.
[0058] The condition determination unit 84 determines whether or not there is corresponding measurement data based on a command from a higher-level management device. If the process information is a downstream process 53 of the process where the abnormality occurred, it may not yet be involved in the production of the workpiece, so the transmission of the measurement data is held until the corresponding measurement data is acquired (until the condition is met). If there is corresponding measurement data, the condition determination unit 84 outputs the corresponding measurement data to the data transmission unit 85.
[0059] The data transmission unit 85 transmits the input measurement data to the storage control unit 24 of the host management device 10 .
[0060] In this embodiment, the lower level control device 40 may be configured with a PLC, or may use a general-purpose computer.
[0061] (Abnormality determination process) The lower control device 40 may perform the abnormality determination through the following process. Fig. 4 is a schematic diagram showing an example of the abnormality determination process. As shown in Fig. 4, the lower control device 40 performs a plurality of processes (processes 401 to 405) on the measurement data to determine whether an abnormality has occurred.
[0062] Process 401 is a process for acquiring collected data, which is data related to the production of the workpiece. The collected data may be so-called raw data, such as measurement data from various sensors and operation status output data from various operating devices. More specifically, the collected data may include the torque value of the drive unit of the operating device in the corresponding process, the measured value of the position of the workpiece gripper of the workpiece or the operating device, and the measured value of the moving speed of the workpiece gripper of the workpiece or the operating device. The collected data in this process is high-speed sampled data, and is a large volume of data. Therefore, since it is difficult to keep storing all the collected data in the storage device in the lower control device 40, it is common to temporarily store the collected data in the ring buffer 82 and transmit and store only the necessary data in the upper management device 10.
[0063] Process 402 is a process for dividing continuous collected data into collected data for each produced workpiece. That is, it is a task for determining a period for collected data that is associated with a unique number or identification information within the low-level control device 40. Specifically, when the collected data is temporarily stored in a ring buffer in chronological order, it is possible to temporarily store the identification information of the workpiece together and perform a process for dividing the data based on the period of the same identification information.
[0064] Process 403 calculates feature data, which is a statistical value, for the collected data for each workpiece. In other words, a feature that represents a large amount of collected data involved in the production of a certain workpiece is derived. Statistical values used for feature data include the average, maximum, minimum, mode, and standard deviation, and multiple feature values may be defined for one workpiece.
[0065] In process 404, at least one of the feature data is weighted and summed to calculate an anomaly score. An anomaly detection algorithm may be used to determine the feature data and the weighting used to calculate the anomaly score.
[0066] Isolation Forest is an example of an anomaly detection algorithm. Isolation Forest is a method that repeatedly divides a multidimensional space until the number of data in one space falls below a specified value, and determines that the fewer the divisions, the rarer the data is and therefore anomalous. The selection and weighting of feature data are determined so that anomalous data found by Isolation Forest can be considered anomalous.
[0067] In process 405, the calculated anomaly score is used to determine whether or not there is an anomaly, using a predetermined threshold value. By using the anomaly score for anomaly determination, rather than using the collected data and feature amount data as is, it is possible to perform a multidimensional comparison using multiple feature amounts in one dimension. Therefore, it is possible to perform anomaly determination under complex conditions, compared to when the collected data and feature amount data are used as is for anomaly determination.
[0068] The measurement data temporarily stored in the ring buffer 82 may be collected data or feature data. In addition, feature data is small in volume, so storing all of it in the upper management device 10 does not strain the capacity of the database 32, and so all of it may be stored. Storing all of it has the advantage that changes in the feature amounts over time can be analyzed.
[0069] Furthermore, the abnormality determination process is not limited to the processes 401 to 405, and abnormality determination may be performed by various methods that a person skilled in the art can imagine. For example, abnormality may be determined based on the relationship between measurement data and a predetermined threshold value.
[0070] §3. Example of operation (Pre-set) FIG. 5 is a flowchart of advance preparations for acquiring measurement data in the control system 1.
[0071] In S11, in the upper management device 10, the administrator sets the required time for each process 50 and the process order in the required time table 31. In addition, in S12, in the lower control device 40, the administrator sets the abnormality determination conditions for the abnormality determination unit 81. In addition, in S13, the administrator sets how the measurement data (collected variables) is to be temporarily stored in the ring buffer 82 of the lower control device 40. Additionally, a method for defining the feature amount and anomaly score of the measurement data is set.
[0072] (Processing flow when an abnormality occurs) Fig. 6 is a flowchart showing the process of acquiring measurement data in the control system 1. Fig. 6 is described assuming that an abnormality occurs in step B2 (abnormality occurrence step 51) of the abnormality-source lower-level control device 42, but the lower-level control device 40 that determines the abnormality is not limited to the abnormality-source lower-level control device 42 and may be another lower-level control device 40.
[0073] In S21, the abnormality determination section 81 in the abnormality-source low-level control device 42 determines whether or not an abnormality has occurred.
[0074] If the result of the determination is that there is no abnormality (No in S21), the process returns to S21 and is repeated. During this time, the ring buffer 82 always temporarily stores the measurement data.
[0075] If the result of the determination is that an abnormality has occurred (Yes in S21), the process proceeds to S22. In S22, the abnormality determination unit 81 outputs to the upper management device 10 that an abnormality has occurred in the abnormality-source low-level control device 42.
[0076] In S23, the receiving unit 21 receives a notification that an abnormality has occurred in the abnormality-source low-level control device 42. At this time, the upper level management device 10 also receives the abnormal process information and recognizes the time of the abnormality and the process 51 in which the abnormality occurred.
[0077] In S24, the identification unit 22 identifies the involved process based on the abnormal process information. Specifically, for the process preceding the abnormal process 51, the identification unit 22 identifies the execution time when the workpiece is produced in each process, taking into consideration the process order of the production line and the required time from the abnormality occurrence time, and sets the execution time information.
[0078] For example, an example is shown in the required time table 31 in Fig. 3. The fault-source low-level control device 42 determines that a certain workpiece has an abnormality in process B2 at time 10:00:45 (period 10:00:40 to 10:00:50), and notifies the host management device 10 that the abnormality has occurred (S21, S22). The receiving unit 21 of the host management device 10 recognizes that the abnormality has occurred in the fault-source low-level control device 42 (S23). The identifying unit 22 of the host management device 10 identifies the upstream process 52 and downstream process 53 for process B2 by the following process (S24).
[0079] The required time table 31 is used to identify the period during which the work passes through each process. That is, a certain work passes through process A1 0 to 10 seconds after production starts. The work passes through process A2 10 to 20 seconds after production starts. The work passes through process A3 20 to 30 seconds after production starts. The work passes through process B1 30 to 40 seconds after production starts. The work passes through process B2 40 to 50 seconds after production starts. The work passes through process B3 50 to 60 seconds after production starts. The work passes through process C1 60 to 70 seconds after production starts. The work passes through process C2 70 to 80 seconds after production starts. The work passes through process C3 80 to 90 seconds after production starts.
[0080] Considering the workpiece passing period from the start of production in process B2, which is 10:00:45 when an abnormality was detected in process B2, it is found that the production of the workpiece started at time 10:00:00. That is, in the upstream lower-level control device 41, the workpiece passes during a period of 0 to 30 seconds after the start of production, so the period 10:00:00 to 10:00:30 is identified as the workpiece passing period. In the abnormality source lower-level control device 42, the workpiece passes during a period of 30 to 60 seconds after the start of production, so the period 10:00:30 to 10:01:00 is identified as the workpiece passing period. In the downstream lower-level control device 43, the workpiece passes during a period of 60 to 90 seconds after the start of production, so the period 10:01:00 to 10:01:30 is identified as the workpiece passing period.
[0081] (Acquisition of measurement data for the upstream lower control device 41) Through steps S31 to S35, the upstream lower control device 41 acquires the measurement data.
[0082] In S31, the command unit 23 issues a query to the upstream lower-level control device 41 to acquire measurement data of the involved process in the upstream lower-level control device 41. The query may include execution time information.
[0083] When issuing a query, if the processes 50 corresponding to a plurality of participating processes are included in one lower-level control device 40, a query for acquiring measurement data collectively may be issued. In the above-mentioned example, the upper level management device 10 issues a query for acquiring measurement data from the upstream lower-level control device 41 for the period 10:00:00 to 10:00:30.
[0084] In S32, the command receiving unit 83 of the upstream subordinate control device 41 receives the query.
[0085] In S33, the condition determination unit 84 of the upstream lower control device 41 processes the query and checks whether measurement data that meets the query conditions is temporarily stored in the ring buffer 82. In the first embodiment, since the period for transmitting the measurement data is specified as the query, the condition determination unit 84 checks whether the time of the measurement data is data for the specified period.
[0086] If the relevant data is not temporarily stored in the ring buffer 82 (No in S33), the process of S33 is repeated until the query can be processed (until the relevant data is temporarily stored in the ring buffer 82).
[0087] If the corresponding data is temporarily stored in the ring buffer 82 (Yes in S33), the query has been processed, and the process proceeds to S34. Note that since the upstream lower control device 41 controls the upstream process 52 with respect to the abnormality occurrence process 51, data that meets the query conditions has already been temporarily stored in the ring buffer 82 at the time of the abnormality occurrence. Therefore, the process of S33 is carried out without waiting.
[0088] In S34, the data transmission unit 85 of the upstream lower-level control device 41 transmits to the memory control unit 24 the measurement data that meets the query conditions.
[0089] In S35, the storage control unit 24 stores the received measurement data in the database 32. At this time, in addition to the measurement data, abnormal process information is stored in association with the measurement data.
[0090] (Acquisition of measurement data for fault source low-level control device 42) Through steps S41 to S45, the measurement data is obtained from the fault-source low-level control device 42. In the above example, the upper management device 10 obtains the measurement data from the fault-source low-level control device 42 during the period 10:00:30 to 10:01:00.
[0091] S41 to S45 correspond to S31 to S35, respectively, and the same processes are performed except that the process of the upstream lower-level control device 41 is replaced by the fault-source lower-level control device 42.
[0092] Since the fault source low-level control device 42 may include an upstream process 52 and a downstream process 53 of the fault occurrence process 51, in S43 it may wait for data that meets the query conditions to be temporarily stored in the ring buffer 82.
[0093] (Acquisition of measurement data for downstream lower control device 43) Through steps S51 to S55, the measurement data is obtained from the downstream lower control device 43. In the above example, the upper level management device 10 obtains the measurement data from the downstream lower control device 43 for the period 10:01:00 to 10:01:30.
[0094] S51 to S55 correspond to S31 to S35, respectively, and the same processes are performed except that the processes of the upstream lower control device 41 are replaced by the downstream lower control device 43.
[0095] Since the downstream control device 43 includes the downstream process 53 of the abnormality occurrence process 51, it becomes necessary to wait in S53 until data that meets the query conditions is temporarily stored in the ring buffer 82.
[0096] § 4. Actions and Effects When an abnormality occurs in a lower control device 40, the lower control device 40 notifies the upper management device 10 of the abnormality. When the upper management device 10 receives the abnormality notification, it identifies the involved process based on the abnormal process information included in the notification. The upper management device 10 issues a query to the lower control device 40 including the identified involved process, instructing it to transmit measurement data. The lower control device 40 transmits the relevant measurement data based on the query from the measurement data temporarily stored in the ring buffer 82 to the upper management device 10. The upper management device 10 stores the received measurement data in the memory unit 30.
[0097] Therefore, the upper level management device 10 can recognize that an abnormality has occurred in the lower level control device 40, and can also obtain measurement data from the processing involved prior to the process in which the abnormality occurred and which was involved in the work in question in which the abnormality occurred.
[0098] Therefore, when measurement data of the upstream process 52 is acquired as the contributing process, it becomes easy to investigate the true cause of the abnormality in the abnormality occurrence process 51 from the process preceding the abnormality occurrence process 51. Also, when measurement data of the downstream process 53 is acquired as the contributing process, there are cases where an abnormality occurs in the abnormality occurrence process 51 but the product does not actually become defective. Even in this case, the product may become defective in the downstream process 53, and it becomes easy to investigate the possibility that the true cause of the defective product is the abnormality in the abnormality occurrence process 51.
[0099] In other words, it is possible to compare and investigate not only the measurement data of the process where the abnormality occurred, but also the measurement data of the upstream process 52 and downstream process 53 of the process where the abnormality occurred. As a result, it becomes easier to identify the true cause of the defective product based on the abnormality, and to take measures.
[0100] [Modifications] Identification information may be given to the work. The identification information is information that makes it possible to identify each work to be produced. An example of the identification information may be a serial number. The identification information does not have to be actually given to the work itself as a barcode or the like, and may be held as data (so-called shift data) that is transferred between the lower-level control devices 40.
[0101] By assigning identification information to the work, in a query to acquire measurement data in the command unit 23, the identification information to be acquired can be specified, rather than specifying the period for acquiring measurement data from the ring buffer 82 of the lower-level control device 40.
[0102] For example, if the equipment is stopped due to an emergency stop or if a specific process takes longer than usual, production will not be performed according to the processing time of each process in the required time table. In this case, in the case of a query that specifies a period based on the required time table, it may be impossible to obtain measurement data for an appropriate period. However, in the case of a query that specifies identification information, the condition determination unit 84 checks the identification information and processes the query, so that even if the equipment is stopped due to an emergency stop or the like, measurement data for an appropriate period can be selected, output to the data transmission unit 85, and stored in the database 32.
[0103] In addition, in embodiment 1, we considered a case where the workpieces pass through and are processed sequentially in a production line, but in the modified example, this is not limited to this because identification information is assigned, and the modified example can also be applied to a production line where the order of the workpieces is reversed.
[0104] [Embodiment 2] Another embodiment of the present invention will be described below with reference to Fig. 7. Fig. 7 shows an example of measurement data narrowing down process according to the second embodiment.
[0105] The command unit 23 in the first embodiment compiles the involved processes for each lower-level control device 40, and issues a query to the upper-level management device 10 to transmit the period from the start of processing to the end of processing in the lower-level control device 40 in which the workpiece that caused the abnormality is the target. That is, as shown in table 501 in Fig. 7, a query is issued to obtain measurement data other than that of the workpiece that caused the abnormality.
[0106] On the other hand, in the second embodiment, the command unit 23 can issue a query to further narrow down the workpieces by using the identification information for the measurement data for the above-mentioned period, and to acquire the measurement data as shown in Table 502. In other words, it is possible to issue a query that does not acquire the measurement data of the workpieces other than the one that has caused the abnormality, and the data is not stored in the database 32, thereby preventing the database capacity from being strained.
[0107] Furthermore, in the command unit 23 according to the second embodiment, it is possible to search for measurement data to be acquired from the measurement data temporarily stored in the ring buffer 82 in two stages, that is, the period and the identification information. Therefore, even if the production volume is very large compared to the size of the identification information and the identification information overflows, it is possible to select the identification information by the period.
[0108] For example, there is a jig that transports workpieces on a production line, and the jig itself is given identification information, but the workpieces are not given identification information. Even in a system in which the jig is reused, it becomes possible to uniquely determine the measurement data of the workpiece.
[0109] [Software implementation example] The control blocks of the upper management device 10 (particularly the receiving unit 21, the identification unit 22, the command unit 23, and the memory control unit 24) may be realized by a logic circuit (hardware) formed in an integrated circuit (IC chip) or the like, or may be realized by software.
[0110] In the latter case, the upper management device 10 includes a computer that executes instructions of a program, which is software that realizes each function. The computer includes, for example, one or more processors, and a computer-readable recording medium that stores the program. The object of the present invention is achieved by the processor reading the program from the recording medium and executing it in the computer. The processor may be, for example, a CPU (Central Processing Unit). The recording medium may be a "non-transient tangible medium", such as a ROM (Read Only Memory), a tape, a disk, a card, a semiconductor memory, a programmable logic circuit, or the like. The computer may further include a RAM (Random Access Memory) that expands the program. The program may be supplied to the computer via any transmission medium (such as a communication network or a broadcast wave) that can transmit the program. Note that one aspect of the present invention may also be realized in the form of a data signal embedded in a carrier wave, in which the program is embodied by electronic transmission.
[0111] [Additional Notes] The present invention is not limited to the above-described embodiments, and various modifications are possible within the scope of the claims. Embodiments obtained by appropriately combining the technical means disclosed in different embodiments are also included in the technical scope of the present invention. [Explanation of symbols]
[0112] 1. Control system (production control system) 10 Upper management device 20 Control section 21 Receiving section 22 Specific section 23 Command Department 24 Memory control unit 30 Storage section 31 Travel Time Table 32 Database 40 Lower level control device 41 Upstream and downstream control devices 42 Abnormal source lower control device 43 Downstream control device 50 steps 51 Abnormal Process 52 Upstream process 53 Downstream process 60 equipment 61 Upstream equipment 62 Abnormal source device 63 Downstream equipment 70 production lines 81 Abnormality determination section 82 Ring Buffer 83 Command receiving unit 84 Condition judgment section 85 Data transmission unit 401,402,403,404,405 Processing 501,502 tables
Claims
1. In a production line including a plurality of processes for producing a production object, a host management device is connected via a network to a plurality of lower level control devices that control two or more of the processes, a receiving unit that receives abnormal process information related to an abnormal process when an abnormality is detected in one of the lower control devices; an identification unit that identifies a process involved in the production object that was being produced in the abnormal process from among the processes included in the production line based on the abnormal process information; A command unit that requests the plurality of lower level control devices to transmit measurement data related to the participation process; a storage control unit that controls storage of the abnormal process information and the measurement data in a storage unit, Identification information is attached to each of the production objects produced in the production line, the identification unit refers to a required time table indicating the order of the processes included in the production line and the required time of each of the processes, and identifies the involved process by process information and implementation time information based on the abnormal process information; The command unit includes: transmitting the process information, the execution time information, and first identification information of the production object that was produced in the abnormality occurrence process to the plurality of lower level control devices; requesting the plurality of lower level control devices to transmit only the measurement data associated with the first identification information among the measurement data associated with each of the identification information related to the participation process; Upper management device.
2. The upper level management device of claim 1, wherein the command unit requests each of the lower level control devices to send the measurement data related to the involved processing from one of the lower level control devices so that the reception timing of the measurement data related to the involved processing from another lower level control device is different.
3. The host management device according to claim 1 , wherein the identification unit identifies the involved process upstream of the abnormality-occurring process.
4. The host management device according to claim 1 , wherein the identification unit identifies the involved process downstream of the abnormality occurrence process.
5. A host management device according to any one of claims 1 to 4, A production control system comprising: a plurality of the lower control devices connected to the upper management device via a network.
6. A method for managing a host management device connected via a network to a plurality of lower control devices that control two or more of the processes in a production line including a plurality of processes for producing a production object, comprising: a receiving step of receiving abnormal process information relating to an abnormal process when an abnormality is detected in one of the lower control devices from the lower control device; a step of identifying a process involved in the production object that was being produced in the process where the abnormality occurred, from among the processes included in the production line, based on the abnormal process information; a command step of requesting a plurality of the lower-level control devices to transmit measurement data related to the participation process; A storage control step of controlling storage of the abnormal process information and the measurement data in a storage unit, Identification information is attached to each of the production objects produced in the production line, In the identifying step, a required time table showing the order of the processes included in the production line and the required time of each of the processes is referred to, and the involved process is identified by process information and implementation time information based on the abnormal process information; In the command step, transmitting the process information, the execution time information, and first identification information of the production object that was produced in the abnormality occurrence process to the plurality of lower level control devices; requesting the plurality of lower level control devices to transmit only the measurement data associated with the first identification information among the measurement data associated with each of the identification information related to the participation process; Upper management method.
7. 2. A host management program for causing a computer to function as the host management device according to claim 1, the host management program causing a computer to function as said receiving section, said identifying section, said command section and said memory control section.
Citation Information
Patent Citations
Monitoring device
JP1997131648A
Display system, display device, and control method for display system
JP2017191189A
Control device, control program and control method
JP2018097839A
Master device, control method, information processing program, and recording medium of master device
JP2020052441A
Trace data acquisition system, trace data acquisition method, and program
JP2020123230A