Power system power flow prediction system and power flow prediction method

The power flow prediction system uses machine learning to integrate customer and power plant data with topographical information for precise power flow and equipment demand forecasting, addressing the challenges of complex load currents and outdated forecasting methods.

JP7552373B2Active Publication Date: 2024-09-18THE CHUGOKU ELECTRIC POWER CO INC
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2021006433
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-01-19
Publication Date
2024-09-18
Estimated Expiration
2041-01-19

AI Technical Summary

Technical Problem

Existing power flow prediction systems struggle to accurately predict power flow in distribution lines due to the increasing complexity of load currents from consumer-side generation, such as solar power, and reliance on outdated growth rate forecasts, making it difficult to determine the need for equipment upgrades.

Method used

A power flow prediction system using machine learning models that incorporate customer contract information, power plant data, topographical information, and historical power flow data to generate accurate predictions by reflecting predicted differences in explanatory variables, allowing for precise estimation of future power flows and equipment demands.

Benefits of technology

Enables accurate prediction of power flow and equipment demands, facilitating informed decisions on equipment expansion or replacement, reducing reliance on experience-based judgments and improving operational efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007552373000013
    Figure 0007552373000013
  • Figure 0007552373000007
    Figure 0007552373000007
  • Figure 0007552373000004
    Figure 0007552373000004
Patent Text Reader

Abstract

To accurately predict a power flow of a power system and appropriately predict demand for power facilities.SOLUTION: For a prediction model learned based on learning data with consumer contract information, a consumer power history, power plant information, a power plant supply power history, and terrain information as explanatory variables and a distribution line power flow history, a distribution line demand history, and a transformer demand history as objective variables, a power flow prediction system inputs, into the prediction model, explanatory variables obtained by reflecting prediction differences, which are information items on the differences between the explanatory variables already known and explanatory variables predicted for a future time point, on the explanatory variables already known to generate the objective variables, and automatically estimates a predicted power flow on a prediction target day in relation to a distribution line.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a power system power flow prediction system and a power flow prediction method. [Background technology]

[0002] Conventionally, various mechanisms for accurately predicting power demand have been proposed for the purpose of, for example, formulating an appropriate operation plan for a power generation facility.

[0003] For example, Patent Document 1 describes an electricity demand forecasting system configured for the purpose of accurately forecasting electricity demand on a forecast target date even if the electricity demand pattern changes temporarily. The electricity demand forecasting system generates multiple trained models for predicting electricity demand by performing machine learning using learning data corresponding to different periods, which are learning data in which actual electricity data, which is the actual electricity demand, is associated with actual fluctuation factor data, which is the actual fluctuation factor data that is the cause of fluctuations in the electricity demand amount, and selects one of the multiple trained models as a forecasting model for predicting electricity demand on the forecast target date according to the forecast target date for predicting electricity demand, and predicts electricity demand on the forecast target date using the selected forecasting model.

[0004] Furthermore, Patent Document 2 describes a method for correcting a power demand forecast value by a forecast model, in which the output of the forecast model is corrected by a correction neuron trained using the output of the forecast model for a certain period prior to the forecast target date, actual values ​​of power demand, etc. In the above method, a day on which the reduction rate of power demand from the base date is equal to or greater than a certain value is selected as a learning date for the correction neuron, the learning period of the correction neuron is changed according to the change characteristics of the power demand, and when extrapolation occurs, the power demand is corrected by combining with other correction methods.

[0005] Patent Document 3 describes an electricity demand forecasting system that forecasts electricity demand of consumers whose electricity usage records are unknown. The electricity demand forecasting system accumulates existing consumer data in a learning database that associates consumer attribute data with identification data of an electricity demand pattern to which the consumer's electricity usage records belong, builds an electricity demand forecasting model based on the learning database that outputs pattern prediction data indicating which of a plurality of electricity demand patterns the consumer will use electricity in response to input of the consumer's attribute data, inputs attribute data of a new consumer into the electricity demand forecasting model to obtain the consumer's pattern prediction data, and outputs a prediction result indicating which of a plurality of electricity demand patterns the new consumer will use electricity in based on the pattern prediction data. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] JP 2019-204458 A [Patent Document 2] Japanese Patent Application Publication No. 10-224990 [Patent Document 3] JP 2020-35090 A Summary of the Invention [Problem to be solved by the invention]

[0007] Electric power companies are systematically updating power facilities for the purposes of replacing equipment that has deteriorated over time, taking measures against risks such as disasters and accidents, strengthening facilities, making facilities smarter, reducing operating costs, etc. When updating power facilities, they forecast the demand for electricity (general demand, high voltage demand, etc.) for each distribution line individually (usually only forecasting the downstream flow from power plants to consumers) and determine whether or not the power facilities need to be expanded or replaced.

[0008] In recent years, the current flowing through the distribution line includes not only the load current but also the power generation current from the power generation equipment on the consumer side, such as the photovoltaic power generation equipment, and it is becoming difficult to know the exact load current from the actual measurement value of the distribution line. In addition, the future growth of demand is usually predicted based on the growth rate of the past few years and the experience of the person in charge, so it may not necessarily reflect the actual increase in demand, and it is becoming difficult to appropriately predict the required amount of power equipment. In addition, the growth of demand is, for example, uniformly increased based on the growth rate of the past few years, so it may not necessarily accurately reflect the actual increase in demand. In addition, there are an increasing number of cases where the generation current from renewable energy exceeds the facility capacity, and when updating the power equipment, it is required to accurately predict the growth of the generation current.

[0009] The power demand forecasting system described in Patent Document 1 is configured for the purpose of forecasting the power demand of a facility on a forecast target date using a forecasting model that has learned from past weather records and power demand as learning data, and formulating an operation plan for the facility's operating equipment (air conditioners, etc.), thereby contributing to energy conservation, but does not disclose a technology for forecasting the current flow of each distribution line, which is information required for planned renewal of power equipment such as distribution lines and transformers. Furthermore, Patent Document 2 merely describes a technology for correcting the predicted value of power demand, and Patent Document 3 merely describes a technology for forecasting the power demand of customers whose power usage records are unknown, and neither of these documents discloses a technology for forecasting the current flow of each distribution line.

[0010] The present invention has been made in consideration of the above background, and aims to provide a power system power flow prediction system and a power flow prediction method that are capable of accurately predicting the power flows of each distribution line that makes up a power system and appropriately predicting the demand for power equipment. [Means for solving the problem]

[0011] To achieve the above object, one of the present inventions is a method for predicting the power flow of a distribution line that supplies power to a consumer. Current Forecast1. A system comprising: The system is configured using one or more information processing devices having a processor and a storage device, the power distribution line power flow history including information on a history of power flows through the distribution line; a learning data generation unit that generates learning data using the customer contract information, the customer power history, the power plant information, the power plant supply power history, and the topography information as explanatory variables, and using the distribution line power flow history as a response variable; a prediction model learning unit that learns a prediction model, which is a machine learning model that takes the explanatory variables as input and outputs the response variable, based on the learning data; and a prediction processing unit that generates the response variable by inputting explanatory variables obtained by reflecting a prediction difference, which is information on the difference between the known explanatory variables and the explanatory variables predicted for a future point in time, into the known explanatory variables, into the prediction model.

[0012] In this way, the power flow prediction system of the present invention generates explanatory variables by inputting explanatory variables obtained by reflecting a prediction difference, which is information on the difference between a known explanatory variable and an explanatory variable predicted for a future time point, into a prediction model trained based on learning data with customer contract information, customer power history, power plant information, power plant supply history, and topographical information as explanatory variables, and distribution line power flow history as a response variable, into the prediction model, and automatically estimates the power flow (including reverse power flow, the same applies below) predicted on the prediction target date for the distribution line, so that the power flow for each distribution line can be predicted efficiently. In addition, the prediction model is generated by taking into account power plant information, power plant supply history, and topographical information of the area where the distribution line is located, so that the power flow for each distribution line can be predicted more accurately than a simple prediction such as a growth rate for the past few years or a prediction based on the experience of the person in charge. Then, the user can accurately predict the demand for the power facility based on the predicted power flow for each distribution line.

[0013] Another aspect of the present invention is a method for predicting the power flow of a distribution line that supplies power to a consumer. Current Forecast 1. A system comprising: The system is configured using one or more information processing devices having a processor and a storage device, a storage unit that stores customer contract information including information on a customer's contract for power usage, a customer power history including a customer's power usage history, power plant information including information on a power supply contract from a power plant to a power distribution line, a power plant supply power history including information on a power plant's supply history to a power distribution line, topography information including information on the topography of an area where a power distribution line is located, a power distribution line power flow history including information on a history of power flow through the power distribution line, a power distribution line demand history including information on a history of demand on the power distribution line, and a power equipment demand history including information on a history of demand for a power equipment connected to the power distribution line; and , the distribution line demand history, and a learning data generation unit that generates learning data using the power equipment demand history as a response variable, a prediction model learning unit that learns a prediction model, which is a machine learning model that takes the explanatory variables as input and outputs the response variable based on the learning data, and a prediction processing unit that inputs explanatory variables obtained by reflecting a prediction difference, which is information on the difference between the known explanatory variables and the explanatory variables predicted for a future point in time, into the known explanatory variables, to input the explanatory variables into the prediction model to generate the response variable.

[0014] In this way, the power flow prediction system of the present invention generates explanatory variables by inputting explanatory variables obtained by reflecting, into a prediction model learned based on learning data with customer contract information, customer power history, power plant information, power plant supply power history, and topographical information as explanatory variables, and distribution line power flow history, distribution line demand history, and transformer demand history as objective variables, a prediction difference, which is information on the difference between a known explanatory variable and an explanatory variable predicted for a future time point, into the known explanatory variables, and automatically estimates the power flow predicted for the prediction target day for the distribution line, so that it is possible to efficiently predict the power flow for each distribution line and future demand for power equipment (distribution lines, transformers, etc.). In addition, since the prediction model is generated by taking into account power plant information, power plant supply power history, and topographical information of the area where the distribution line is located, it is possible to accurately predict the power flow for each distribution line and the demand for power equipment compared to simple predictions such as growth rates over the past few years or predictions based on the experience of the person in charge.

[0015] Another aspect of the present invention is the power flow prediction system, further comprising a user interface that presents the objective variables generated by the prediction processing unit to a user.

[0016] In this way, the current prediction system of the present invention is provided with a user interface that presents the response variables generated by the prediction processing unit to the user, allowing the user to easily refer to the response variables generated by the prediction processing unit.

[0017] Another aspect of the present invention is the power current prediction system, wherein the topographical information includes information acquired from image data of an aerial photograph taken of an area in which the power distribution line is located.

[0018] In this way, the current prediction system of the present invention contains information obtained from image data of aerial photographs taken of areas where power distribution lines are located, so it is possible to reflect various features obtained from the aerial photographs in the prediction model and generate target variables with high accuracy.

[0019] Other problems and solutions disclosed in the present application will be made clear in the detailed description and drawings. Effect of the Invention

[0020] According to the present invention, it is possible to accurately predict the power flow of each distribution line constituting a power system, and to appropriately predict the demand for power equipment. [Brief description of the drawings]

[0021] [Figure 1] FIG. 1 is a diagram showing main functions of a tidal current prediction system. [Diagram 2] 1 is an example of hardware of an information processing device used to realize a tidal current prediction system. [Diagram 3] 4 is an example of customer contract information. [Figure 4] 1 is an example of a consumer power history. [Diagram 5] 1 is an example of power plant information. [Figure 6] 1 is an example of a power plant supply history. [Figure 7] This is an example of geographical information. [Figure 8] 1 is an example of a distribution line power flow history. [Figure 9] 13 is a flowchart illustrating a prediction model learning process. [Figure 10] 13 is a flowchart illustrating a power facility demand forecasting process. [Figure 11] 13 is an example of a prediction result display screen. [Figure 12] FIG. 11 is a diagram showing main functions of a current prediction system according to a second embodiment. [Figure 13] 1 is an example of a distribution line demand history. [Figure 14] 1 is an example of a transformer demand history. [Figure 15] 13 is a flowchart illustrating a prediction model learning process according to a second embodiment. [Figure 16] 13 is a flowchart illustrating a power facility demand forecasting process according to a second embodiment. [Figure 17] 13 is an example of a prediction result presentation screen according to the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0022] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, an embodiment of the present invention will be described. In the following description, the same or similar components will be denoted by the same reference numerals, and the description thereof will be omitted.

[0023] [First embodiment] 1 shows main functions of a system for predicting power flows in an electric power system (hereinafter referred to as "power flow prediction system 1"), which is an information processing system described as a first embodiment. Power flow prediction system 1 predicts power flows (including reverse power flows; the same applies below) in distribution lines that make up the electric power system, thereby supporting work related to demand prediction for electric power equipment when planned renewal of electric power equipment is carried out for the purposes of replacing power equipment due to deterioration over time, strengthening power equipment (distribution lines, transformers, etc.), making power equipment smarter, reducing operating costs, and taking measures against risks such as disasters and accidents.

[0024] The power flow prediction system 1 uses a machine learning model (prediction model 120 described later) to predict the power flow (demand for electricity (general demand, high voltage demand, etc.)) for each distribution line constituting the power system, and predicts the demand for various power equipment used together with the distribution line (future required amount of power equipment) based on the predicted power flow for each distribution line. This makes it possible, for example, to properly grasp the demand for power equipment without relying on the experience of a person in charge, and to efficiently and properly determine whether or not the power equipment needs to be expanded / replenished or replaced. In this embodiment, power distribution lines and transformers are taken as examples of power equipment, but the type of power equipment is not necessarily limited.

[0025] As shown in the figure, the power flow prediction system 1 has the functions of a memory unit 110, a consumer information management unit 125, a power plant information management unit 130, a topographical information management unit 135, an equipment information management unit 140, a learning data generation unit 150, a prediction model learning unit 155, a prediction processing unit 160, and a prediction result presentation unit 170.

[0026] Of the above functions, the memory unit 110 stores customer contract information 111, customer power history 112, power plant information 113, power plant supply power history 114, topographical information 115, distribution line power flow history 116, learning data 119, and a prediction model 120.

[0027] The consumer contract information 111 includes information (hereinafter referred to as "consumer contract information") on the contract of a person (hereinafter referred to as "consumer") who has entered into an electricity contract with an electricity supplier (which is assumed to be an electric power company in this example). The consumer contract information 111 is provided, for example, from a master database managed by the electric power company in which customer management information and the like are managed.

[0028] The consumer power history 112 includes time-series information on the power usage history of each consumer (hereinafter referred to as "consumer power history"). The consumer power history 112 is provided from a database that manages data read from power measuring devices such as smart meters and power meters (power meters), which are managed by, for example, a power company or the like.

[0029] The power plant information 113 includes information about power plants that supply power to the distribution lines (hereinafter referred to as "power plant information"). The power plants include not only power plants operated by power companies, but also information about power plants that have power supply contracts with power companies for the supply of power to the distribution lines (power plants operated by retail electricity suppliers, etc.). The power plant information 113 is provided, for example, from a database that manages information about power plants, which is managed by the power company, etc.

[0030] The power plant supply power history 114 includes time-series information on the history of power generation at each power plant (hereinafter referred to as "power plant supply power history"). The above information is provided from a database that manages information on each power plant, for example, managed by a power company or the like.

[0031] The topographical information 115 includes image data of aerial photographs taken by an airplane, a drone, etc. of the area where each distribution line is located, and time-series information (hereinafter referred to as "topographical information") on the topography (the condition of residential land (area, number of buildings (general houses, factories, etc.), etc.), the traffic condition (development status of roads and railways, number of waterways, etc.), the condition of farmland and forests (area of ​​unused farmland, etc.)) obtained from the aerial photographs. Note that the topographical information includes, for example, information that will be a factor (parameter) that will have a significant impact on future increases and decreases in load power and increases and decreases in supply power (for example, an increase in the load power of a distribution line due to the construction of houses and factories, or an increase in the power supply to a distribution line due to the construction of a power plant using unused farmland, etc.).

[0032] The distribution line power flow history 116 includes time-series information on the power flow of each distribution line (hereinafter referred to as "distribution line power flow history"). The information is provided from a database in which information obtained from a power meter (power hour meter) attached to power facilities (distribution line, transformer, etc.) managed by, for example, an electric power company or the like is managed. The power flow of each distribution line is calculated based on, for example, actual measurements of power (power consumption (load power)) obtained from a power meter (smart meter, mechanical power meter, power conditioner, etc.) of a consumer connected to each distribution line, weather information obtained from the Internet, etc., or power generation estimated from the power generation situation of a nearby power plant (the ratio between the maximum rated power and the generated power, etc.). In addition, the power supplied to the distribution line from a power plant using renewable energy (photovoltaic power plant, wind power plant, etc.) is calculated using, for example, information measured at the power plant.

[0033] The distribution line demand history 117 includes time-series information (hereinafter referred to as "distribution line demand history") on the history of demand for the distribution line as a power facility (such as the current installation status of the distribution line, and the history of past expansion / reduction and replacement of the distribution line). The above information is provided, for example, from a database that manages information on power facilities, which is managed by a power company or the like.

[0034] The transformer demand history 118 includes time-series information (hereinafter referred to as "transformer demand history") on the history of demand for transformers (such as distribution transformers), which are electric power facilities used together with electric power distribution lines (such as the current installation status of the transformer and the history of past additions, reductions, and replacements of transformers). The above information is provided, for example, from a database that manages information on electric power facilities, which is managed by an electric power company or the like.

[0035] The learning data 119 is data used for learning (machine learning) of the prediction model 120. The learning data 119 is generated based on information acquired from customer contract information 111, customer power history 112, power plant information 113, power plant supply power history 114, topographical information 115, and power distribution line power flow history 116.

[0036] The prediction model 120 is a machine learning model configured to output information indicating the flow of a power distribution line by inputting consumer contract information, consumer power history, power plant information, power plant supply power history, and topographical information as explanatory variables, which reflect information newly acquired (or newly set) after learning of the prediction model 120. The prediction model 120 is realized by, for example, gradient boosting (GBDT (Gradient Boosting Decision Tree)) or deep learning (DNN (Deep Neural Network)). However, the method of realizing the prediction model 120 is not necessarily limited. In this embodiment, topographical information is included in the explanatory variables, but topographical information does not necessarily have to be included in the explanatory variables.

[0037] The prediction result 121 includes information generated by the prediction processing unit 160 that indicates the prediction result regarding the demand of the power distribution line and the demand of the transformer.

[0038] Of the functions shown in Fig. 1, the consumer information management unit 125 manages (acquires and updates information) consumer contract information 111 and consumer power history 112. Furthermore, the power plant information management unit 130 manages (acquires and updates information) power plant information 113 and power plant supply power history 114. Furthermore, the topographical information management unit 135 manages (acquires and updates information) topographical information 115. Furthermore, the equipment information management unit 140 manages (acquires and updates information) distribution line power flow history 116.

[0039] The learning data generation unit 150 generates learning data 119 by combining information obtained from customer contract information 111, customer power history 112, power plant information 113, power plant supply power history 114, and topographical information 115 (customer contract information, customer power history, power plant information, power plant supply power history, and topographical information) as explanatory variables and information obtained from distribution line flow history 116 (distribution line flow history) as a target variable.

[0040] The prediction model learning unit 155 learns the prediction model 120 based on the learning data 119 generated by the learning data generating unit 150 .

[0041] The prediction processing unit 160 inputs explanatory variables (customer contract information, customer power history, power plant information, power plant supply power history, and topographical information) at the future date and time to be predicted (hereinafter referred to as the "prediction target date and time") into the prediction model 120, and generates a target variable (distribution line power flow history) at the prediction target date and time as a prediction result 121.

[0042] The prediction result presentation unit 170 provides a user interface for presenting the prediction result 121 to the user.

[0043] FIG. 2 shows an example of hardware of an information processing device used to realize the tidal current prediction system 1. The illustrated information processing device 10 includes a processor 11, a main storage device 12, an auxiliary storage device 13, an input device 14, an output device 15, and a communication device 16. The illustrated information processing device 10 may be realized, in whole or in part, by using virtual information processing resources provided by a virtualization technology or a process space separation technology, such as a virtual server provided by a cloud system. In addition, all or in part of the functions provided by the information processing device 10 may be realized by a service provided by a cloud system via an API (Application Programming Interface), for example. In addition, all or in part of the functions provided by the information processing device 10 may be realized by using, for example, Software as a Service (SaaS), Platform as a Service (PaaS), Infrastructure as a Service (IaaS), or the like. In addition, the tidal current prediction system 1 may be configured by using a plurality of information processing devices 10 connected to each other so as to be able to communicate with each other.

[0044] In the figure, the processor 11 is configured using, for example, a CPU (Central Processing Unit), an MPU (Micro Processing Unit), a GPU (Graphics Processing Unit), an FPGA (Field Programmable Gate Array), an ASIC (Application Specific Integrated Circuit), an AI (Artificial Intelligence) chip, etc.

[0045] The main memory device 12 is a device that stores programs and data, and is, for example, a Read Only Memory (ROM), a Random Access Memory (RAM), or a non-volatile memory (Non Volatile RAM (NVRAM)).

[0046] The auxiliary storage device 13 is, for example, an SSD (Solid State Drive), a hard disk drive, an optical storage device (CD (Compact Disc), DVD (Digital Versatile Disc), etc.), a storage system, an IC card, a read / write device for a recording medium such as an SD card or an optical recording medium, a storage area of ​​a cloud server, etc. Programs and data can be read into the auxiliary storage device 13 via a recording medium reader or a communication device 16. The programs and data stored (memorized) in the auxiliary storage device 13 are read into the main storage device 12 as needed.

[0047] The input device 14 is an interface that accepts input from the outside, and is, for example, a keyboard, a mouse, a touch panel, a card reader, a pen-input tablet, a voice input device, or the like.

[0048] The output device 15 is an interface that outputs various information such as the process progress and the process result. The output device 15 is, for example, a display device (liquid crystal monitor, LCD (Liquid Crystal Display), graphic card, etc.) that visualizes the above-mentioned various information, a device that converts the above-mentioned various information into voice (voice output device (speaker, etc.)), and a device that converts the above-mentioned various information into text (printer, etc.). For example, the information processing device 10 may be configured to input and output information to and from other devices via the communication device 16.

[0049] The input device 14 and the output device 15 constitute a user interface for receiving information from the user and presenting information.

[0050] The communication device 16 is a device that realizes communication with other devices. The communication device 16 is a wired or wireless communication interface that realizes communication with other devices via a communication network such as the Internet, and is, for example, a NIC (Network Interface Card), a wireless communication module, a USB module, etc. The communication device 16 also communicates with an information processing system such as a power distribution control system that controls a smart meter installed in a consumer's home.

[0051] The information processing device 10 may be implemented with, for example, an operating system, a file system, a DBMS (DataBase Management System) (relational database, NoSQL, etc.), a KVS (Key-Value Store), etc.

[0052] Each of the above-mentioned functions of the tidal current prediction system 1 is realized by the processor 11 of the information processing device 10 reading and executing a program stored in the main memory device 12, or by the hardware (FPGA, ASIC, AI chip, etc.) that constitutes the tidal current prediction system 1. The tidal current prediction system 1 stores the various types of information (data) described above, for example, as a table in a database or a file managed by a file system.

[0053] 3 shows an example of the customer contract information 111. The illustrated customer contract information 111 is composed of multiple entries (records) each having the items of a customer ID 1111, a contract content 1112, and an application start date and time 1113. One entry of the customer contract information 111 corresponds to one electricity usage contract of one customer.

[0054] Of the above items, a consumer ID that is an identifier for a consumer is set in the consumer ID 1111. The details of the electricity usage contract concluded between the power company and the consumer (contract type, contract current, contract capacity, contract power, contract load equipment, usage location, contract name, etc.) are set in the contract details 1112. The application start date and time 1113 is set to the application start date and time of the electricity usage contract. Note that the consumer contract information 111 also manages information on past electricity usage contracts whose contract periods have already expired.

[0055] 4 shows an example of the consumer power history 112. The illustrated consumer power history 112 includes a plurality of entries (records) each having the following items: consumer ID 1121, power distribution line ID 1122, period 1123, and power usage amount 1124. One entry of the consumer power history 112 corresponds to a certain period of one consumer.

[0056] Of the above items, the consumer ID described above is set in the consumer ID 1121. The power distribution line ID 1122 is set to a power distribution line ID that is an identifier of the power distribution line to which the consumer (consumer's home) is connected. The period 1123 is set to a period during which the amount of power usage was measured. The amount of power usage 1124 is set to the actual amount of power usage by the consumer during the period.

[0057] 5 shows an example of power plant information 113. The illustrated power plant information 113 is made up of multiple entries (records) having the following items: power plant ID 1131, supply information 1132, and application start date and time 1133. One entry of the power plant information 113 corresponds to one power plant of one consumer.

[0058] Of the above items, the power plant ID, which is the identifier of the power plant, is set in the power plant ID 1131. Information on the power supplied from the power plant (such as the maximum supplyable power) and the contents of the supply contract in cases where the power plant is managed by a party other than a power company are set in the supply information 1132. The application start date and time 1133 is set to the application start date and time of the information of the entry. Note that the power plant information 113 also manages information on power plants that are no longer supplying power but have supplied power in the past.

[0059] 6 shows an example of the power plant supply power history 114. The illustrated power plant supply power history 114 includes a plurality of entries (records) each having the fields of a power plant ID 1141, a period 1142, and an amount of supplied power 1143. One entry of the power plant supply power history 114 corresponds to a certain period of one power plant.

[0060] Of the above items, the above-mentioned power plant ID is set in the power plant ID 1141. The period during which the amount of supplied power was measured is set in the period 1142. The actual amount of supplied power from the power plant during the period (period 1142) is set in the supplied power amount 1134.

[0061] 7 shows an example of the geographical information 115. The illustrated geographical information 115 includes a plurality of entries (records) each having an area ID 1151, an image ID 1152, a photographing date and time 1153, and a group of features 1154. One entry of the geographical information 115 corresponds to image data of one aerial photograph.

[0062] Of the above items, an area ID that is an identifier for each area under the jurisdiction of the electric power company is set in the area ID 1151. An image ID that is an identifier for image data of an aerial photograph taken of the area is set in the image ID 1152. The date and time of photographing the aerial photograph of the image data is set in the photographing date and time 1153. One or more feature amounts extracted from the image data are set in the feature amount group 1154. The feature amounts may be set by a human system, or, for example, feature amounts automatically extracted by an information processing device using a predetermined feature amount extraction method (such as a filter method, a wrapper method, or an embedded method) may be used.

[0063] 8 shows an example of the power distribution line power flow history 116. The illustrated power distribution line power flow history 116 includes a plurality of entries (records) each having the items of a power distribution line ID 1161, a period 1162, and power flow information 1163. One entry of the power distribution line power flow history 116 corresponds to a certain period of one power distribution line.

[0064] Of the above items, the above-mentioned distribution line ID is set in the power distribution line ID 1161. The period during which the power flow of the power distribution line was measured is set in the period 1162. Information on the power flow measured during the period (active power, reactive power, apparent power, etc.) is set in the power flow information 1163.

[0065] Next, the main processes performed by the current prediction system 1 will be described.

[0066] 9 is a flowchart explaining the process (hereinafter referred to as "prediction model learning process S900") that the current prediction system 1 performs when learning the prediction model 120. Note that the timing at which the prediction model learning process S900 is executed is not necessarily limited, but the current prediction system 1 executes the prediction model learning process S900 when, for example, an actual measurement value of a combination of the explanatory variables and the objective variables described above is acquired, or an instruction is received from a user.

[0067] As shown in the figure, first, the learning data generation unit 150 generates learning data 119 by combining explanatory variables (consumer contract information, consumer power history, power plant information, power plant supply power history, and topographical information) acquired from consumer contract information 111, consumer power history 112, power plant information 113, power plant supply power history 114, and topographical information 115 with objective variables (distribution line power flow history) acquired from distribution line power flow history 116, distribution line demand history 117, and transformer demand history 118 (S1111). Note that, when it is necessary to take a chronological correspondence, the learning data generation unit 150 combines the explanatory variables and the objective variables while taking a chronological correspondence based on time information (date and time and period) included in each information, and generates the learning data 119.

[0068] Next, the prediction model learning unit 155 learns the prediction model 120 based on the learning data 119 (S912).

[0069] The prediction model learning unit 155 may verify the prediction accuracy of the learned prediction model 120. In this case, for example, the learning data 119 is divided into data for learning and data for verification, and the prediction model 120 is learned using the data for learning, and the prediction model 120 is verified using the data for verification.

[0070] FIG. 10 is a flowchart explaining the process (hereinafter referred to as “power equipment demand forecasting process S1000”) in which the power flow forecasting system 1 inputs explanatory variables into the forecasting model 120 to obtain a dependent variable and presents the obtained dependent variable to the user.

[0071] First, the prediction processing unit 160 acquires the date and time (prediction target date and time) at which the objective variables (power distribution line current, power distribution line demand, transformer demand) are to be predicted, and the prediction differences of the explanatory variables at the prediction target date and time (prediction difference 111a of consumer contract information, prediction difference 112a of power plant information, prediction difference 113a of consumer power, prediction difference 114a of power plant supply power, prediction difference of topographical information) (S1011). Note that the prediction differences may be values ​​obtained, for example, by a simulation using an information processing device, or may be received from a user via a user interface.

[0072] Next, the prediction processing unit 160 generates explanatory variables for the prediction date and time by reflecting the received prediction difference in the contents of known (existing) customer contract information 111, known customer power history 112, known power plant information 113, known power plant supply power history 114, and known topographical information 115 (S1012).

[0073] Next, the prediction processing unit 160 generates a prediction result 121 by inputting the generated explanatory variables to the prediction model 120 (S1013).

[0074] Next, the prediction result presenting unit 170 presents the contents of the generated prediction result 121 to the user (S1014).

[0075] 11 is an example of a screen (hereinafter referred to as a "prediction result presentation screen 1100") that is displayed when presenting the contents of the prediction result 121 to the user. As shown in the figure, the prediction result presentation screen 1100 has a display field 1101 for the prediction target date and a display field 1102 for the prediction result.

[0076] Among these, the prediction target date display field 1101 displays the prediction target date acquired in S1011 of FIG. 10. The prediction result display field 1102 displays the contents of the prediction result 121. In this example, the prediction result display field 1102 displays a table showing the contents of the prediction result 121. As shown in the figure, the above table has items of a distribution line ID 11021 and a maximum power flow (reverse power flow) value 11022. One row of the above table corresponds to one distribution line. Among the above items, the distribution line ID 11021 is set to the above-mentioned distribution line ID. The power flow (reverse power flow) maximum value 11022 is set to the power flow predicted for the distribution line on the prediction target date (in this example, the maximum value on the prediction target date).

[0077] Furthermore, the prediction result presentation screen 1100 (or a screen generated separately) may be provided with a function (user interface) for accepting the user's specification of the year and month, and the maximum value of the current (reverse current) and the load curve, etc. for the accepted period may be displayed.

[0078] As described above, the power flow prediction system 1 of the first embodiment generates explanatory variables by inputting explanatory variables obtained by reflecting a prediction difference, which is information on the difference between a known explanatory variable and an explanatory variable predicted for a future time point, into a prediction model learned based on learning data with consumer contract information, consumer power history, power plant information, power plant supply history, and topographical information as explanatory variables and a distribution line power flow history as a response variable, into the prediction model, and automatically estimates the power flow predicted for the prediction target date for the distribution line, so that the power flow for each distribution line can be predicted efficiently. In addition, the prediction model is generated by taking into account power plant information, power plant supply history, and topographical information of the area where the distribution line is located, so that the power flow for each distribution line can be predicted more accurately than a simple prediction such as a growth rate for the past few years or a prediction based on the experience of the person in charge. Then, the user can accurately predict the demand for the power facility based on the predicted power flow for each distribution line.

[0079] [Second embodiment]

[0080] Figure 12 shows the main functions of a tidal current prediction system 1 described as the second embodiment. The tidal current prediction system 1 of the second embodiment includes many similar elements to the tidal current prediction system 1 of the first embodiment, so the following description will focus on the differences from the first embodiment. The tidal current prediction system 1 described as the second embodiment is realized, for example, using an information processing device 10 illustrated in Figure 2.

[0081] As shown in the figure, the memory unit 110 of the power flow prediction system 1 of the second embodiment stores a power distribution line demand history 117 and a transformer demand history 118 in addition to the information stored in the memory unit 110 of the power flow prediction system 1 of the first embodiment.

[0082] Furthermore, the facility information management unit 140 of the power flow prediction system 1 of the second embodiment manages (acquires and updates information about) the power distribution line demand history 117 and the transformer demand history 118 in addition to the power distribution line power flow history 116.

[0083] The learning data generation unit 150 of the power flow prediction system 1 of the second embodiment generates learning data 119 by combining information obtained from customer contract information 111, customer power history 112, power plant information 113, power plant supply power history 114, and topography information 115 (customer contract information, customer power history, power plant information, power plant supply power history, and topography information) as explanatory variables and information obtained from distribution line power flow history 116, distribution line demand history 117, and transformer demand history 118 (distribution line power flow history, distribution line demand history, and transformer demand history) as objective variables.

[0084] The prediction processing unit 160 of the power flow prediction system 1 of the second embodiment inputs explanatory variables (customer contract information, customer power history, power plant information, power plant supply power history, and topographical information) at the future date and time to be predicted (prediction target date and time) to the prediction model 120, and generates target variables (distribution line power flow history, distribution line demand, and transformer demand) at the prediction target date and time as a prediction result 121.

[0085] 13 shows an example of the power distribution line demand history 117. The illustrated power distribution line demand history 117 includes a plurality of entries (records) each having the items of a power distribution line ID 1171, a period 1172, power distribution line specification information 1173, and a section ID 1174. One entry of the power distribution line demand history 117 corresponds to one power distribution line that was installed (or is currently installed) during a certain period.

[0086] Of the above items, the distribution line ID described above is set in the power distribution line ID 1171. The period during which the power distribution line was installed (or the date and time of installation) is set in the period 1172. Information on the power distribution line (type, specifications, length, etc.) is set in the power distribution line specification information 1173. A section ID that is an identifier indicating the section in which the power distribution line is installed is set in the section ID 1174.

[0087] 14 shows an example of the transformer demand history 118. The illustrated transformer demand history 118 includes a plurality of entries (records) having each of the following items: transformer ID 1181, period 1182, transformer specification information 1183, and power distribution line ID 1184. One entry in the transformer demand history 118 corresponds to one transformer system that was installed (or is currently installed) during a certain period.

[0088] Of the above items, a transformer ID that is an identifier of the transformer is set in transformer ID 1181. A period during which the transformer was installed (or the date and time of installation) is set in period 1182. Information on the transformer (type, specifications, capacity, etc.) is set in transformer specification information 1183. A distribution line ID of the distribution line in which the transformer is installed is set in distribution line ID 1184.

[0089] 15 is a flowchart explaining the process (hereinafter referred to as "prediction model learning process S1500") that the current prediction system 1 of the second embodiment performs when learning the prediction model 120. Note that the timing at which the prediction model learning process S1500 is executed is not necessarily limited, but the current prediction system 1 executes the prediction model learning process S1500 when, for example, an actual measurement value of a combination of the explanatory variables and the objective variables described above is acquired, or an instruction is received from a user.

[0090] As shown in the figure, first, the learning data generation unit 150 generates learning data 119 by combining explanatory variables (consumer contract information, consumer power history, power plant information, power plant supply power history, and topographical information) acquired from consumer contract information 111, consumer power history 112, power plant information 113, power plant supply power history 114, and topographical information 115 with objective variables (distribution line power flow history, distribution line demand history, and transformer demand history) acquired from distribution line power flow history 116, distribution line demand history 117, and transformer demand history 118 (S1511). Note that, when it is necessary to take a chronological correspondence, the learning data generation unit 150 combines the explanatory variables and the objective variables while taking a chronological correspondence based on time information (date and time and period) included in each information, and generates the learning data 119.

[0091] Next, the prediction model learning unit 155 learns the prediction model 120 based on the learning data 119 (S1512).

[0092] The prediction model learning unit 155 may verify the prediction accuracy of the learned prediction model 120. In this case, for example, the learning data 119 is divided into data for learning and data for verification, and the prediction model 120 is learned using the data for learning, and the prediction model 120 is verified using the data for verification.

[0093] FIG. 16 is a flowchart explaining the process (hereinafter referred to as “power equipment demand forecasting process S1600”) in which the power flow forecasting system 1 of the second embodiment inputs explanatory variables into the forecasting model 120 to obtain a dependent variable and presents the obtained dependent variable to the user.

[0094] First, the prediction processing unit 160 acquires the date and time (prediction date and time) at which the objective variables (power distribution line current, power distribution line demand, transformer demand) are to be predicted, and the prediction differences of the explanatory variables at the prediction date and time (prediction difference 111a of consumer contract information, prediction difference 112a of power plant information, prediction difference 113a of consumer power, prediction difference 114a of power plant supply power, and prediction difference of topographical information) (S1611). Note that the prediction differences may be values ​​obtained by, for example, simulation using an information processing device, or may be received from a user via a user interface.

[0095] Next, the prediction processing unit 160 generates explanatory variables for the prediction date and time by reflecting the received prediction difference in the contents of known (existing) customer contract information 111, known customer power history 112, known power plant information 113, known power plant supply power history 114, and known topographical information 115 (S1612).

[0096] Next, the prediction processing unit 160 generates a prediction result 121 by inputting the generated explanatory variables to the prediction model 120 (S1613).

[0097] Next, the prediction result presenting unit 170 presents the contents of the generated prediction result 121 to the user (S1614).

[0098] 17 is an example of a screen (hereinafter referred to as a "prediction result presentation screen 1700") displayed when presenting the contents of the prediction result 121 to the user. As shown in the figure, the prediction result presentation screen 1700 has a display field 1711 for the prediction target date and a display field 1712 for the prediction result.

[0099] Of these, the prediction target date display field 1711 displays the prediction target date acquired in S1611 of Fig. 16. The prediction result display field 1712 displays the contents of the prediction result 121. In this example, the prediction result display field 1712 displays a table showing the contents of the prediction result 121. As shown in the figure, the above table has items of distribution line ID 17121, transformer ID 17122, maximum power flow (reverse power flow) value 17123, required distribution line specifications 17124, and required transformer specifications 17125. One row in the above table corresponds to one distribution line.

[0100] Of the above items, the distribution line ID 17121 is set to the above-mentioned distribution line ID. The transformer ID 17122 is set to the transformer ID of one or more transformers connected to the distribution line. The maximum power flow (reverse power flow) value 17123 is set to the maximum power flow predicted for the distribution line on the prediction target day. The required distribution line specifications 17124 are set to the required distribution line specifications that are specifications that the distribution line should satisfy in order to handle the power flow. The required transformer specifications 17125 are set to the required transformer specifications that are specifications that a transformer connected to the distribution line should satisfy in order to handle the power flow.

[0101] Furthermore, the prediction result presentation screen 1700 (or a screen generated separately) may be provided with a function (user interface) for accepting the user's specification of the year and month, and the maximum value of the current (reverse current) and the load curve, etc. for the accepted period may be displayed.

[0102] As described above, the power flow prediction system 1 of the second embodiment generates explanatory variables by inputting explanatory variables obtained by reflecting a prediction difference, which is information on the difference between a known explanatory variable and an explanatory variable predicted for a future time point, into a prediction model learned based on learning data with consumer contract information, consumer power history, power plant information, power plant supply power history, and topographical information as explanatory variables, and distribution line power flow history, distribution line demand history, and transformer demand history as objective variables, and automatically estimates the power flow predicted for the prediction target day for the distribution line, so that it is possible to efficiently predict the power flow for each distribution line and future demand for power equipment (distribution line, transformer). In addition, since the prediction model is generated by taking into account power plant information, power plant supply power history, and topographical information of the area where the distribution line is located, it is possible to accurately predict the power flow for each distribution line and the demand for power equipment compared to simple predictions such as growth rates over the past few years and predictions based on the experience of the person in charge.

[0103] Although the embodiment of the present invention has been described above in detail, the above description is for the purpose of facilitating understanding of the present invention and does not limit the present invention. The present invention may be modified or improved without departing from the spirit thereof, and the present invention naturally includes equivalents thereof. For example, the above embodiment has been described in detail to explain the present invention in an easily understandable manner, and is not necessarily limited to those having all of the configurations described. In addition, it is possible to add, delete, or replace part of the configuration of the above embodiment with other configurations. [Explanation of symbols]

[0104] 1 Tidal current prediction system 110 Storage section 111 Consumer contract information 112 Customer Power History 113 Power Plant Information 114 Power Plant Supply History 115 Topographic information 116 Distribution Line Power Flow History 117 Distribution Line Demand History 118 Transformer Demand History 119 Training Data 120 Predictive Models 121 Prediction Results 125 Consumer Information Management Department 130 Power Plant Information Management Department 135 Geographic Information Management Department 140 Equipment Information Management Department 150 Learning Data Generation Unit 155 Prediction Model Learning Unit 160 Prediction processing unit 170 Prediction result presentation section

Claims

1. A power flow prediction system for predicting a power flow in a power distribution line that supplies power to a consumer, comprising: The system is configured using one or more information processing devices having a processor and a storage device, Customer contract information, including information regarding a customer's contract for the use of electricity; Customer power history, including the customer's power usage history; Power plant information, including information about contracts for the supply of electricity from the power plant to the grid; a power plant supply history including information regarding the history of supply of electricity from the power plant to the distribution line; topographical information, including information regarding the topography of the area in which the distribution line is located; a distribution line power flow history, comprising information regarding the history of power flows through the distribution line; A storage unit that stores the a learning data generation unit that generates learning data using the customer contract information, the customer power history, the power plant information, the power plant supply power history, and the topographical information as explanatory variables and the distribution line power flow history as a target variable; a prediction model learning unit that learns a prediction model, which is a machine learning model that receives the explanatory variables as input and outputs the objective variables, based on the learning data; a prediction processing unit that generates the objective variable by inputting explanatory variables obtained by reflecting a prediction difference, which is information on a difference between the known explanatory variables and the explanatory variables predicted for a future time point, into the known explanatory variables, into the prediction model; A power system flow prediction system equipped with:

2. A power flow prediction system for predicting a power flow in a power distribution line that supplies power to a consumer, comprising: The system is configured using one or more information processing devices having a processor and a storage device, Customer contract information, including information regarding a customer's contract for the use of electricity; Customer power history, including the customer's power usage history; Power plant information, including information about contracts for the supply of electricity from the power plant to the grid; a power plant supply history including information regarding the history of supply of electricity from the power plant to the distribution line; topographical information, including information regarding the topography of the area in which the distribution line is located; a distribution line power flow history, comprising information regarding the history of power flows through the distribution line; A distribution line demand history, the demand history including information regarding the history of demand on the distribution line; and Electric power equipment demand history including information regarding the history of demand for electric power equipment connected to the distribution line; A storage unit that stores the a learning data generation unit that generates learning data using the customer contract information, the customer power history, the power plant information, the power plant supply power history, and the topographical information as explanatory variables, and using the distribution line power flow history, the distribution line demand history, and the power facility demand history as objective variables; a prediction model learning unit that learns a prediction model, which is a machine learning model that receives the explanatory variables as input and outputs the objective variables, based on the learning data; a prediction processing unit that generates the objective variable by inputting explanatory variables obtained by reflecting a prediction difference, which is information on a difference between the known explanatory variables and the explanatory variables predicted for a future time point, into the known explanatory variables, into the prediction model; A power system flow prediction system equipped with:

3. The power system flow prediction system according to claim 2, The power equipment is a distribution line and a transformer used with the distribution line, Power system flow prediction system.

4. A power system flow forecasting system according to any one of claims 1 to 3, A power system power flow prediction system comprising a user interface that presents the objective variable generated by the prediction processing unit to a user.

5. A power system flow forecasting system according to any one of claims 1 to 3, The topographical information includes information obtained from image data of an aerial photograph taken of an area where the power distribution line is located. Power system flow prediction system.

6. A method for predicting a power flow in a power distribution line that supplies power to a consumer, comprising: An information processing device, Customer contract information, including information regarding a customer's contract for the use of electricity; Customer power history, including the customer's power usage history; Power plant information, including information about contracts for the supply of electricity from the power plant to the grid; a power plant supply history including information regarding the history of supply of electricity from the power plant to the distribution line; topographical information, including information regarding the topography of the area in which the distribution line is located; a distribution line power flow history, comprising information regarding the history of power flows through the distribution line; storing the A step of generating learning data using the customer contract information, the customer power history, the power plant information, the power plant supply power history, and the topographical information as explanatory variables and the distribution line power flow history as a target variable; A step of learning a prediction model, which is a machine learning model that inputs the explanatory variables and outputs the objective variables, based on the learning data; and A step of inputting explanatory variables obtained by reflecting a prediction difference, which is information of a difference between the known explanatory variables and the explanatory variables predicted for a future time point, into the known explanatory variables, to generate the objective variables; A method for predicting power flow in a power system.

7. A method for predicting a power flow in a power distribution line that supplies power to a consumer, comprising: An information processing device, Customer contract information, including information regarding a customer's contract for the use of electricity; Customer power history, including the customer's power usage history; Power plant information, including information about contracts for the supply of electricity from the power plant to the grid; a power plant supply history including information regarding the history of supply of electricity from the power plant to the distribution line; topographical information, including information regarding the topography of the area in which the distribution line is located; a distribution line power flow history, comprising information regarding the history of power flows through the distribution line; A distribution line demand history, the demand history including information regarding the history of demand on the distribution line; and Electric power equipment demand history including information regarding the history of demand for electric power equipment connected to the distribution line; storing the A step of generating learning data using the customer contract information, the customer power history, the power plant information, the power plant supply power history, and the topographical information as explanatory variables, and the distribution line power flow history, the distribution line demand history, and the power facility demand history as objective variables; A step of learning a prediction model, which is a machine learning model that inputs the explanatory variables and outputs the objective variables, based on the learning data; and A step of inputting explanatory variables obtained by reflecting a prediction difference, which is information of a difference between the known explanatory variables and the explanatory variables predicted for a future time point, into the known explanatory variables, to generate the objective variables; A method for predicting power flow in a power system.

Citation Information

Patent Citations

  • Method for correcting predicted value of electric power demand

    JP1998224990A

  • Tidal current value estimation method and device for power system

    JP2018038170A

  • Power management system and power management method

    JP2019126157A

  • Electric power demand prediction system, learning device, and electric power demand prediction method

    JP2019204458A

  • Tidal-current fluctuation monitoring device, tidal-current fluctuation monitoring method, and power system stability predicting method

    JP2020031481A