Charging system, charging method, and program

The charging system efficiently manages storage battery charging in multiple mobile objects by setting schedules based on usage patterns and adjusting for power availability, addressing the challenge of battery depletion in shared electric vehicles.

JP7554989B2Active Publication Date: 2024-09-24PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
JP2019203586
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2019-11-08
Publication Date
2024-09-24
Estimated Expiration
2039-11-08

AI Technical Summary

Technical Problem

Existing systems struggle to efficiently manage the charging of storage batteries in a plurality of mobile objects, such as electric vehicles, especially in car sharing and rental services, where scheduling and power management are complex and often lead to battery depletion during usage.

Method used

A charging system and method that includes an acquisition unit to gather usage schedules and a determination unit to set charging schedules based on the chargeable periods of multiple mobile objects, ensuring sufficient power is available for their operation, with the ability to adjust schedules if no matching object is found and to prioritize charging based on priority and power sources.

Benefits of technology

This approach allows for easy management of storage battery charging across multiple mobile objects, ensuring they are ready for use when needed, optimizing power usage, and reducing the risk of battery depletion during scheduled usage periods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007554989000014
    Figure 0007554989000014
  • Figure 0007554989000003
    Figure 0007554989000003
  • Figure 0007554989000001
    Figure 0007554989000001
Patent Text Reader

Abstract

To provide a charging system, charging method, and program that enable charging of storage batteries of a plurality of mobile bodies to be managed easily.SOLUTION: The charging system includes an acquisition unit 231 and a determination unit 233. The acquisition unit 231 acquires a use schedule of a plurality of mobile bodies 100 including storage batteries 110 to be used as power sources. The determination unit 233 determines a charging schedule of the plurality of mobile bodies 100 for ensuring the amount of power consumption based on the use schedule of the plurality of mobile bodies 100 based on a charging possible period of each of the plurality of mobile bodies 100 obtained from the use schedule.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a charging system, a charging method, and a program, and more particularly to a charging system, a charging method, and a program that determine a charging schedule for a plurality of mobile objects. [Background technology]

[0002] Patent Document 1 discloses an operation system for a car sharing service that temporarily lends out electric vehicles (mobile objects) according to the user's wishes. The operation system has a function of accepting reservations from users and a function of allocating electric vehicles to the reservations. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2018-18250 A Summary of the Invention [Problem to be solved by the invention]

[0004] An object of the present invention is to provide a charging system, a charging method, and a program that can easily manage the charging of storage batteries of multiple mobile objects. [Means for solving the problem]

[0005] A charging system according to an aspect of the present disclosure includes an acquisition unit, a determination unit, and a judgment unit. The acquisition unit acquires usage schedules of a plurality of mobile objects each having a storage battery used as a power source. The determination unit determines a charging schedule for the plurality of mobile objects based on a chargeable period of each of the plurality of mobile objects obtained from the usage schedule, so as to ensure an amount of power usage based on the usage schedule of the plurality of mobile objects. The judgment unit selects, from among the plurality of mobile objects, Includes the required period of use of the vehicleand determining whether there is a mobile object that meets the user's request. When the determining unit determines that there is no mobile object that meets the user's request based on the charging schedule and determines that there is a mobile object that meets the user's request if the charging schedule is changed, the deciding unit changes the charging schedule.

[0006] A charging method according to one aspect of the present disclosure includes an acquisition step, a decision step, a judgment step, and a change step. The acquisition step is a step of acquiring usage schedules of a plurality of mobile bodies each having a storage battery used as a power source. The decision step is a step of deciding a charging schedule for the plurality of mobile bodies based on a chargeable period of each of the plurality of mobile bodies obtained from the usage schedule, for ensuring an amount of power usage based on the usage schedule of the plurality of mobile bodies. The judgment step is a step of selecting, from among the plurality of mobile bodies, Includes the required period of use of the vehicle The change step is a step of determining whether or not there is a mobile object that meets the user's request. The change step is a step of changing the charging schedule when it is determined in the determination step that there is no mobile object that meets the user's request based on the charging schedule and it is determined that there is a mobile object that meets the user's request if the charging schedule is changed.

[0007] A charging program according to one embodiment of the present disclosure is a program for causing one or more processors to execute the charging method. Effect of the Invention

[0008] According to an aspect of the present disclosure, there is an advantage in that the charging of storage batteries of multiple mobile objects can be easily managed. [Brief description of the drawings]

[0009] [Figure 1] FIG. 1 is a block diagram of a management system according to an embodiment. [Diagram 2]FIG. 2 is a sequence diagram of the operation of the management system of the above embodiment. [Diagram 3] FIG. 3 is a block diagram of a charge management system included in the management system of the above embodiment. [Figure 4] FIG. 4 is a block diagram of a usage management system included in the management system of the above embodiment. [Diagram 5] FIG. 5 is a block diagram of a terminal device included in the management system of the above embodiment. [Figure 6] FIG. 6 is a block diagram of a power supply system included in the management system of the above embodiment. [Figure 7] FIG. 7 is an explanatory diagram of an example of a usage schedule of the management system of the above embodiment. [Figure 8] FIG. 8 is an explanatory diagram of an example of a charging schedule of the management system of the above embodiment. [Figure 9] FIG. 9 is an explanatory diagram of an example of a usage schedule of the management system of the above embodiment. [Figure 10] FIG. 10 is an explanatory diagram of an example of a charging schedule of the management system of the above embodiment. [Figure 11] FIG. 11 is an explanatory diagram of an example of a usage schedule of the management system of the above embodiment. [Figure 12] FIG. 12 is an explanatory diagram of an example of a charging schedule of the management system of the above embodiment. [Figure 13] FIG. 13 is an explanatory diagram of an example of a usage schedule of the management system of the above embodiment. [Figure 14] FIG. 14 is an explanatory diagram of an example of a charging schedule of the management system of the above embodiment. [Figure 15] FIG. 15 is a flowchart of the operation of the charge management system. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0010] (1) Implementation form (1-1) Overview FIG. 1 shows a management system 10 according to an embodiment. The management system 10 is a system that manages the use of one or more mobile objects 100 by one or more users. In particular, in this embodiment, it is assumed that the management system 10 is a system that manages the use of multiple mobile objects 100 (100A to 100D) by multiple users. The management system 10 manages the mobile objects 100 so that the users can use the mobile objects 100 that meet their requirements (demands, wishes). Note that the term "use" here may include use that does not require payment of a fee and use that requires payment of a fee. For example, when multiple mobile objects 100 are owned by a company and a user who is an employee of the company uses the mobile objects 100, payment of a fee is not required. On the other hand, when a company grants a user who is not an employee of the company permission to use the mobile objects 100, that is, when the company lends out the mobile objects 100, the user who is not an employee of the company pays a fee for the use of the mobile objects 100.

[0011] In this embodiment, the moving body 100 has a storage battery 110 used as a power source of the moving body 100 (see FIG. 1). The storage battery (battery) 110 is used to drive a drive device (e.g., a motor) of the moving body 100. As an example, the moving body 100 is an electric vehicle that runs using electric energy stored in the storage battery 110. Examples of electric vehicles include an electric vehicle that runs by the output of an electric motor, and a plug-in hybrid vehicle that runs by combining the output of an engine and the output of an electric motor. In other words, the electric vehicle may mean an electric vehicle (a vehicle that uses electricity as all or part of its power source). The moving body 100 is not limited to an electric vehicle, and may be a senior car, a two-wheeled vehicle (electric motorcycle), a three-wheeled vehicle, or an electric bicycle. In the following, for ease of understanding, the moving body 100 is assumed to be an electric vehicle, and the moving body 100 is referred to as an electric vehicle 100 as necessary.

[0012] The management system 10 may be applied to, for example, a car sharing service or a rental car service. In particular, in this embodiment, the management system 10 may be used to provide a service in which a vehicle owned by a corporation such as a company is rented out to a user. In this case, the user is not limited to a person (employee, etc.) belonging to the corporation, but may also include a person who does not belong to the corporation. In other words, the management system 10 may also be applied to a service in which a vehicle that is not scheduled to be used by a person (employee, etc.) belonging to the corporation is rented out to a person who does not belong to the corporation.

[0013] 1 , the management system 10 includes a charging management system 20, a usage management system 30, a power supply system 40, and a terminal device 50. The charging management system 20, the usage management system 30, the power supply system 40, and the terminal device 50 can be connected to a communication network 60.

[0014] The terminal device 50 is a device through which the user issues requests regarding the use of the electric vehicle 100 to the mobility management system 11 .

[0015] The usage management system 30 is a system that manages the use of one or more electric vehicles 100 by one or more users. As an example, in response to a request from a user, the usage management system 30 selects an electric vehicle 100 that matches the user's request from among the multiple electric vehicles 100, and allocates the electric vehicle 100 to the user. Specifically, the usage management system 30 determines a usage schedule for the multiple electric vehicles 100 based on the user's request, and allocates the electric vehicles 100 to the users by referring to the usage schedule.

[0016] The charge management system 20 is a system that manages the charging of one or more electric vehicles 100 by the power supply system 40. As an example, the charge management system 20 appropriately controls the charging of one or more electric vehicles 100 to reduce the possibility that the remaining charge of the storage battery 110 of the electric vehicles 100 will be insufficient when needed. Specifically, the charge management system 20 determines a charging schedule for the multiple electric vehicles 100 by referring to the usage schedule provided by the usage management system 30, and controls the power supply system 40 in accordance with the charging schedule.

[0017] The power supply system 40 includes one or more chargers 41 (41A to 41D) used to charge the electric vehicles 100. Each charger 41 is capable of charging the electric vehicles 100 using power from a power source such as a commercial AC power source or a distributed power source (solar cell, storage battery, fuel cell, wind power generator, etc.). In the power supply system 40, each charger 41 charges the electric vehicles 100 according to instructions from the charging management system 20, and thus the one or more electric vehicles 100 are charged according to the charging schedule.

[0018] The charging management system 20 and the usage management system 30 are connected to a communication network 60 to form a mobile object management system 11. The mobile object management system 11 manages schedule information including a usage schedule and a charging schedule for one or more electric vehicles 100, and allocates to users electric vehicles 100 that meet their requests based on the schedule information and requests from the users.

[0019] FIG. 2 shows an example of the operation of the management system 10. The user makes a request for use of the electric vehicle 100 using the terminal device 50 (M11). The request from the user is sent to the usage management system 30, and the usage management system 30 provides request information to the charging management system 20 in accordance with the request from the user (M12). The request information includes, as an example, a requested period for use of the electric vehicle 100. The charging management system 20 generates determination information based on the available power amount of the storage battery 110 during the requested period of the electric vehicle 100, which is obtained from the usage schedules for the multiple electric vehicles 100 and the request information (S11). The determination information is information for determining whether or not there is an electric vehicle 100 that can be used during the requested period among the multiple electric vehicles 100. The charging management system 20 provides the determination information to the usage management system 30 (M13). The usage management system 30 refers to the request from the user and the determination information to determine whether or not the electric vehicle 100 can be used (i.e., determines whether or not there is an electric vehicle 100 that matches the user's request) (S12). Then, if there is an electric vehicle 100 that is available for use, the usage management system 30 transmits information about the available electric vehicle 100 to the terminal device 50 and presents the available electric vehicle 100 to the user (M14). When the user selects an electric vehicle 100 that the user wishes to use from the available electric vehicles 100 at the terminal device 50, information about the electric vehicle 100 selected by the user is transmitted to the usage management system 30 (M15). In response to this, the usage management system 30 confirms the use of the electric vehicle 100 selected by the user, and notifies the terminal device 50 and the charging management system 20 that the use of the electric vehicle 100 has been confirmed (M16, M17). Then, the usage management system 30 updates the usage schedule for the multiple electric vehicles 100 (S13). Furthermore, the charging management system 20 updates the charging schedule for the multiple electric vehicles 100 (S14).

[0020] In this manner, the management system 10 of this embodiment allocates electric vehicles 100 to users. In the management system 10, the charging management system 20 has a function as a charging system that determines a charging schedule for charging the multiple electric vehicles 100 by the power supply system 40. This function as a charging system is realized by the acquisition unit 231 and the determination unit 233 (see FIG. 3). That is, the charging system includes the acquisition unit 231 and the determination unit 233. The acquisition unit 231 acquires a usage schedule for the multiple electric vehicles 100 that are equipped with the storage battery 110 used as a power source. The determination unit 233 determines a charging schedule for the multiple electric vehicles 100 for ensuring the amount of power usage based on the usage schedule of the multiple electric vehicles 100, based on the chargeable period of each of the multiple electric vehicles 100 obtained from the usage schedule.

[0021] According to such a charging system, a charging schedule can be determined based on the usage schedule of the multiple electric vehicles 100. Then, by charging the multiple electric vehicles 100 according to the charging schedule, it becomes possible to operate the multiple electric vehicles 100 according to the usage schedule. Therefore, the charging of the storage batteries 110 of the multiple electric vehicles 100 can be easily managed.

[0022] (1-2) Details The management system 10 of the present embodiment will be described in more detail below. As shown in Fig. 1, the management system 10 includes a charging management system 20, a usage management system 30, a power supply system 40, and a terminal device 50. The charging management system 20, the usage management system 30, the power supply system 40, and the terminal device 50 can be connected to a communication network 60. In particular, the charging management system 20 and the usage management system 30 are connected to the communication network 60 to form a mobile object management system 11.

[0023] The communication network 60 may include the Internet. The communication network 60 may be composed of a plurality of networks conforming to different communication protocols, rather than a network conforming to a single communication protocol. The communication protocol may be selected from various well-known wired and wireless communication standards. Although simplified in FIG. 1, the communication network 60 may include data communication devices such as repeater hubs, switching hubs, bridges, gateways, and routers.

[0024] The terminal device 50 is used to input information to the mobile object management system 11 and to display information from the mobile object management system 11. As shown in Fig. 5, the terminal device 50 includes an input / output unit 51, a communication unit 52, and a processing unit 53. The terminal device 50 may be realized by a desktop computer, a laptop computer, or a mobile terminal (such as a smartphone, a tablet terminal, or a wearable terminal). In this embodiment, the terminal device 50 is a smartphone.

[0025] The input / output unit 51 includes an input device for operating the terminal device 50. The input device may include, for example, a keyboard, a mouse, a trackball, a touchpad, etc. The input / output unit 51 also includes an image display device for displaying information. The image display device may include a thin display device such as a liquid crystal display or an organic EL display.

[0026] The communication unit 52 is a communication interface. The communication unit 52 is connectable to a communication network 60 and has a function of performing communication through the communication network 60. The communication unit 52 complies with a predetermined communication protocol. The predetermined communication protocol can be selected from various well-known wired and wireless communication standards.

[0027] The processing unit 53 is configured to control the entire terminal device 50, that is, to control the input / output unit 51 and the communication unit 52. The processing unit 53 has a function of transmitting information input by a user from the communication unit 52 to the mobile management system 11 through the communication network 60 in response to the operation of the input / output unit 51 described above. The processing unit 53 also has a function of presenting information from the mobile management system 11 received by the communication unit 52 through the communication network 60 to the user through the input / output unit 51. The processing unit 53 can be realized, for example, by a computer system including one or more processors (microprocessors) and one or more memories. That is, the one or more processors function as the processing unit 53 by executing one or more (computer) programs (applications) stored in one or more memories. Here, the programs are pre-recorded in the memory of the processing unit 53, but may be provided through an electric communication line such as the Internet, or recorded in a non-transitory recording medium such as a memory card.

[0028] The power supply system 40 is a system for charging the storage battery 110 used as a power source for the electric vehicle 100. The power supply system 40 is installed in a facility 400, as shown in Fig. 1. The facility 400 may include a parking lot 410 for the electric vehicle 100 and a building 420 attached to the parking lot 410. Examples of the facility 400 include residential buildings (e.g., detached houses, apartment buildings) and non-residential buildings (e.g., factories, commercial facilities, amusement facilities, hospitals, offices, buildings).

[0029] As shown in FIG. 6, the power supply system 40 includes a plurality of chargers 41 (41A to 41D) used for charging the electric vehicle 100, a power supply facility 42, a plurality of current sensors 43, a gateway 44, and a management device 45.

[0030] The charger 41 is connected to a power supply facility 42. The charger 41 can charge the storage battery 110 of the electric vehicle 100 connected to the charger 41 with power obtained from the power supply facility 42. Broadly speaking, two types of charging facilities, normal charging and rapid charging, are available for the charger 41. In this embodiment, a normal charging facility that receives a supply of single-phase AC of 200V (or 100V) and charges the storage battery 110 is used for the charger 41. In addition, normal charging modes are classified into "Mode 1", "Mode 2" and "Mode 3" according to the charging control method (IEC61851-1). "Mode 1" is a method in which power is supplied to the vehicle from a charging facility that does not have a control circuit. "Mode 2" is a method in which a control circuit is built into a charging cable. "Mode 3" is a method in which a control circuit is built into the charging facility. The charger 41 adopts the "Mode 3" method. Note that the charger 41 can adopt a conventionally known configuration, and will not be described in detail in this embodiment.

[0031] The power supply equipment 42 is connected to the power system 200 and can obtain power from the commercial AC power supply 210. The power supply equipment 42 is also connected to the distributed power supply 300 and can feed power to the distributed power supply 300 or receive power from the distributed power supply 300. The distributed power supply 300 is an AC power supply or a DC power supply. An example of the AC power supply is an AC power generation system such as a wind power generation system. An example of the DC power supply is a solar cell, a fuel cell, and a secondary battery (storage battery). An example of the secondary battery is a nickel-metal hydride battery and a lithium-ion battery. The power supply equipment 42 can distribute the power received from the commercial AC power supply 210 or the distributed power supply 300 to each charger 41. Note that the power supply equipment 42 can adopt a conventionally known configuration, and therefore will not be described in detail in this embodiment.

[0032] The multiple current sensors 43 include a first current sensor 431 and multiple second current sensors 432A to 432D. The first current sensor 431 is installed on an electric path between the power system 200 and the power supply equipment 42, and can measure the current supplied from the power system 200 to the power supply equipment 42. The second current sensors 431A to 431D are installed on an electric path between the power supply equipment 42 and the chargers 41A to 41D, and can measure the current supplied from the power supply equipment 42 to the chargers 41A to 41D. Note that the current sensor 43 can employ a conventionally known configuration, and therefore will not be described in detail in this embodiment.

[0033] The management device 45 can control the multiple chargers 41. Specifically, as shown in FIG. 6, the management device 45 is connected to a gateway 44 and communicates with the multiple chargers 41 and the multiple current sensors 43 via the gateway 44. This allows the management device 45 to control each charger 41 and acquire the operation status of the power supply system 40. In this embodiment, the operation status of the power supply system 40 is represented by the result of current measurement by the multiple current sensors 43 (a first current sensor 431 and multiple second current sensors 432A to 432D). The management device 45 controls each charger 41 according to an instruction from the charging management system 20. This allows the electric vehicle 100 to be charged according to the charging schedule.

[0034] The usage management system 30 is a system that manages the use of one or more electric vehicles 100 by one or more users. In this embodiment, the usage management system 30 determines a usage schedule for the multiple electric vehicles 100, and manages the use of the electric vehicles 100 by referring to the usage schedule. FIG. 7 shows an example of the usage schedule. In FIG. 7, the usage schedule shows the planned usage period of the multiple (four in this case) electric vehicles 100A to 100D within a designated period. In FIG. 7, the designated period is one day. Note that the designated period does not have to be one day, and may be one week, one month, one year, or the like, and may be set appropriately according to the operational status of the management system 10. The planned usage period is a period during which the user of the electric vehicle 100 is planned to use the electric vehicle 100. The planned usage period is a period during which the user owns the electric vehicle 100. In other words, the planned usage period is a period during which the user has exclusive rights to use the electric vehicle 100. Thus, the user can freely use the electric vehicle 100 within the scope of a predetermined contract during the planned usage period. For example, during the planned use period, the user may travel using the electric vehicle 100, or park the electric vehicle 100 in a parking lot to eat or shop. In FIG. 7, a planned use period U11 from 08:00 to 12:00 and a planned use period U12 from 14:00 to 18:00 are set for the moving body 100A. A planned use period U21 from 08:00 to 10:00 and a planned use period U22 from 16:00 to 18:00 are set for the moving body 100B. A planned use period U31 from 08:00 to 12:00 and a planned use period U32 from 14:00 to 16:00 are set for the moving body 100C. A planned use period U41 from 08:00 to 18:00 is set for the moving body 100D. The usage management system 30 also holds planned usage amounts for each planned use period included in the usage schedule. The planned usage amount corresponds to the amount of decrease in the remaining charge of the storage battery 110 due to the use of the electric vehicle 100 during the planned usage period. Note that the planned usage amount does not necessarily have to be the amount of power required to move the electric vehicle 100 at a predetermined speed during the planned usage period, and can be set in consideration of various conditions such as attribute information of the electric vehicle 100.For example, the attribute information of the electric vehicle 100 may include at least one of the type, purpose, initial position, destination, planned travel distance, planned number of people traveling, and usage mode. As an example, if the purpose of the attribute information of the electric vehicle 100 is shopping, the planned usage amount may be set to 50% of the amount of power required to move the electric vehicle 100 at a predetermined speed during the planned usage period.

[0035] 4, the usage management system 30 includes a communication unit 31, a storage unit 32, and a processing unit 33. The usage management system 30 may be realized by a server.

[0036] The communication unit 31 is a communication interface. The communication unit 31 is connectable to a communication network 60 and has a function of performing communication through the communication network 60. The communication unit 31 complies with a predetermined communication protocol. The predetermined communication protocol can be selected from various well-known wired and wireless communication standards.

[0037] The storage unit 32 is used to store information used by the processing unit 33. As an example, a usage schedule is stored in the storage unit 32. In addition to the usage schedule, the storage unit 32 also stores the planned usage amount for each planned usage period included in the usage schedule. The storage unit 32 includes one or more storage devices. The storage device is, for example, a RAM (Random Access Memory) or an EEPROM (Electrically Erasable Programmable Read Only Memory).

[0038] The processing unit 33 is a control circuit that controls the operation of the usage management system 30. The processing unit 33 can be realized, for example, by a computer system including one or more processors (microprocessors) and one or more memories. In other words, the one or more processors execute one or more (computer) programs (applications) stored in one or more memories to function as the processing unit 33. Here, the programs are pre-recorded in the memory of the processing unit 33, but they may also be provided via a telecommunications line such as the Internet, or recorded on a non-transitory recording medium such as a memory card.

[0039] As shown in Fig. 4, the processing unit 33 includes a receiving unit 331, a determining unit 332, a notifying unit 333, and an updating unit 334. In Fig. 4, the receiving unit 331, the determining unit 332, the notifying unit 333, and the updating unit 334 do not indicate actual configurations, but indicate functions realized by the processing unit 33. The receiving unit 331, the determining unit 332, the notifying unit 333, and the updating unit 334 will be described later.

[0040] The charging management system 20 is a system that manages the charging of one or more electric vehicles 100. In this embodiment, the charging management system 20 uses the power supply system 40 to charge the multiple electric vehicles 100. The electric vehicles 100 are basically charged outside of the planned use period. Therefore, the charging management system 20 determines the charging schedule by referring to the usage schedule generated by the usage management system 30. The charging management system 20 controls the charging of the electric vehicles 100 according to the determined charging schedule. FIG. 8 shows an example of a charging schedule determined by referring to the usage schedule of FIG. 7. Note that FIG. 8 also shows the usage schedule. In FIG. 8, the charging schedule shows the planned charging periods within a designated period for multiple (four in this case) electric vehicles 100A to 100D. In FIG. 8, the designated period is one day. Note that the designated period does not have to be one day, and may be one week, one month, one year, or the like, and can be set appropriately according to the operating status of the management system 10. The planned charging period is a period during which charging of the electric vehicles 100 is scheduled. The planned charging period is set so as not to overlap with the planned use period in the specified period. In Fig. 8, for the moving body 100A, a planned charging period C11 of 00:00 to 02:00, a planned charging period C12 of 12:00 to 14:00, and a planned charging period C13 of 20:00 to 00:00 are set. For the moving body 100B, a planned charging period C21 of 00:00 to 04:00, a planned charging period C22 of 10:00 to 16:00, a planned charging period C23 of 18:00 to 20:00, and a planned charging period C24 of 22:00 to 00:00 are set. For the moving body 100C, a scheduled charging period C31 from 00:00 to 06:00, a scheduled charging period C32 from 12:00 to 14:00, and a scheduled charging period C33 from 16:00 to 22:00 are set. For the moving body 100D, a scheduled charging period C41 from 02:00 to 08:00, and a scheduled charging period C42 from 18:00 to 00:00 are set.

[0041] 3, the charging management system 20 includes a communication unit 21, a storage unit 22, and a processing unit 23. The charging management system 20 may be realized by a server.

[0042] The communication unit 21 is a communication interface. The communication unit 21 is connectable to a communication network 60 and has a function of performing communication through the communication network 60. The communication unit 21 complies with a predetermined communication protocol. The predetermined communication protocol can be selected from various well-known wired and wireless communication standards.

[0043] The storage unit 22 is used to store information used by the processing unit 23. As an example, a charging schedule is stored in the storage unit 22. In addition, a usage schedule acquired from the usage management system 30 is stored in the storage unit 22. The storage unit 22 includes one or more storage devices. The storage device is, for example, a RAM (Random Access Memory) or an EEPROM (Electrically Erasable Programmable Read Only Memory).

[0044] The processing unit 23 is a control circuit that controls the operation of the charging management system 20. The processing unit 23 can be realized by, for example, a computer system including one or more processors (microprocessors) and one or more memories. That is, the one or more processors execute one or more (computer) programs (applications) stored in one or more memories to function as the processing unit 23. Here, the programs are pre-recorded in the memory of the processing unit 23, but may be provided via an electric communication line such as the Internet or by being recorded on a non-transitory recording medium such as a memory card.

[0045] As shown in Fig. 3, the processing unit 23 includes an acquisition unit 231, a presentation unit 232, a decision unit 233, a control unit 234, and a notification unit 235. In Fig. 3, the acquisition unit 231, the presentation unit 232, the decision unit 233, the control unit 234, and the notification unit 235 do not indicate actual configurations, but indicate functions realized by the processing unit 23.

[0046] The following describes the acquisition unit 231, the presentation unit 232, the decision unit 233, the control unit 234, and the notification unit 235 of the charging management system 20, and the reception unit 331, the determination unit 332, the notification unit 333, and the update unit 334 of the usage management system 30. As shown in Fig. 2, the charging management system 20 and the usage management system 30 transmit and receive information to each other. Therefore, the following description will be given in accordance with the flow of operations of the charging management system 20 and the usage management system 30, with priority given to ease of understanding.

[0047] The reception unit 331 of the usage management system 30 receives a user request regarding the moving body 100 from the terminal device 50. The user request regarding the electric vehicle 100 includes at least a requested period for use of the electric vehicle 100. The requested period is a period during which the user requests use of the electric vehicle 100. The user request regarding the electric vehicle 100 may include attribute information of the user and attribute information of the electric vehicle 100. The attribute information of the user may be information regarding whether or not the user belongs to a corporation. In addition, the attribute information of the electric vehicle 100 may include at least one of the type, purpose, initial position, destination, planned travel distance, planned number of people traveling, and usage mode.

[0048] The determination unit 332 of the usage management system 30 determines whether there is an electric vehicle 100 that matches the user's request regarding the electric vehicle 100. In this embodiment, the determination unit 332 selects an electric vehicle 100 that matches the user's request from the multiple electric vehicles 100. When selecting an electric vehicle 100 that matches the user's request from the multiple electric vehicles 100, the determination unit 332 refers to determination information obtained from the charging management system 20. The determination unit 332 provides request information to the charging management system 20 in order to obtain the determination information from the charging management system 20. The request information includes a requested period of use of the electric vehicle 100. In this embodiment, the request information includes a required amount of power required to use the electric vehicle 100 for the requested period. Here, the user's request regarding the electric vehicle 100 may include user attribute information and attribute information of the electric vehicle 100. The attribute information of the electric vehicle 100 may include at least one of the type, purpose, initial position, destination, planned travel distance, planned number of people to travel, and usage mode. Examples of the type include the model of the electric vehicle 100 and the type of the electric vehicle 100 (normal vehicle, light vehicle, etc.). Examples of the use include travel, shopping, pick-up and drop-off, delivery, etc. An example of the initial position is a location where the electric vehicle 100 is located at the start of the planned use period. This location may be a charging location for the electric vehicle 100. An example of the destination is a location where the user visits using the electric vehicle 100. For example, when the user uses the electric vehicle 100 for shopping, the destination is a store visited by the user. Also, when the user uses the electric vehicle 100 for travel, the destination is a tourist spot or accommodation facility visited by the user. The planned travel distance is the distance that the user plans to travel by the electric vehicle 100. For example, the distance required for a round trip between the initial position and the destination is the planned travel distance. The planned number of people is the number of people planned to travel by the electric vehicle 100. As an example, the planned number of people is the number of people planned to ride the electric vehicle 100. The usage mode is the usage mode of the electric vehicle 100. Here, the assumed usage patterns include use by company employees (use within business) and use by non-company employees (use outside business, car sharing, rental cars).

[0049] The determination unit 332 may obtain the required amount of power from the attribute information of the electric vehicle 100. For example, if the attribute information of the electric vehicle 100 includes a planned travel distance, it is possible to estimate the required amount of power from the planned travel distance. The planned travel distance may also be estimated from the initial position or the destination. For example, the type of electric vehicle 100 and the number of people planned to travel may affect the power consumption of the electric vehicle 100. The power consumption may affect the required amount of power. Therefore, the required amount of power may be changed according to the type of the moving body (electric vehicle 100). The required amount of power may also be changed according to the purpose of the moving body (electric vehicle 100). Examples of the purpose of the electric vehicle 100 include travel and shopping. Since travel is expected to involve travel over a longer distance than shopping, the required amount of power may be set to be larger when the purpose is travel than when the purpose is shopping. The request information may also include attribute information of the user and attribute information of the electric vehicle 100 included in the user's request regarding the electric vehicle 100. In other words, the required amount of power does not necessarily have to be the amount of power required to operate (run) the electric vehicle 100 for the requested period, but can be set taking into consideration various conditions such as the attribute information of the electric vehicle 100.

[0050] The acquisition unit 231 of the charging management system 20 acquires request information including a requested period for use of the electric vehicles 100 from a usage management system 30 that manages the use of multiple electric vehicles 100 each equipped with a storage battery 110 used as a power source. In this embodiment, a determination unit 332 of the usage management system 30 transmits the request information to the charging management system 20, and the acquisition unit 231 of the charging management system 20 receives the request information via the communication network 60. In addition, the acquisition unit 231 acquires a usage schedule for the electric vehicles 100 from the usage management system 30. At this time, the acquisition unit 231 also acquires from the usage management system 30 a planned usage amount for the planned usage period included in the usage schedule.

[0051] The presentation unit 232 of the charging management system 20 presents the determination information to the usage management system 30. The determination information is information for determining whether the electric vehicle 100 is usable in the request period. The presentation unit 232 generates the determination information based on the available energy of the storage battery 110 in the request period of the electric vehicle 100. In this embodiment, the determination information includes basic information. The basic information includes information indicating the available energy (first available energy) of the electric vehicle 100 in the request period. The determination information also includes impact information as necessary. The impact information is information that indicates the impact on the use of the electric vehicle 100 in one or more planned use periods when the available energy (first available energy) of the storage battery 110 in the request period is secured. In particular, the impact information includes information indicating the available energy (second available energy) of the storage battery 110 in one or more planned use periods when the available energy (first available energy) of the storage battery 110 in the request period is secured. In this way, the presentation unit 232 can present the determination information to the usage management system 30 by including the basic information and the impact information.

[0052] The determination unit 332 of the usage management system 30 uses the determination information obtained from the presentation unit 232 of the charging management system 20 to determine whether there is an electric vehicle 100 that matches the user's request for the electric vehicle 100. The determination unit 332 selects the electric vehicle 100 whose available power amount (first available power amount) is equal to or greater than the required power amount required to use the electric vehicle 100 during the requested period, as a candidate for the mobile body (electric vehicle) 100 that can be used during the requested period. However, even if the first available power amount is equal to or greater than the required power amount, if the second available power amount is less than the planned usage amount, it is better not to allow the electric vehicle 100 to be used during the requested period. Therefore, the determination unit 332 excludes the mobile body (electric vehicle) 100 whose second available power amount in the planned usage period after the requested period is less than the planned usage amount from the candidates for the mobile body (electric vehicle) 100 that can be used during the request period. In addition, even if the mobile body (electric vehicle) 100 has a second available power amount less than the planned usage amount in the planned usage period after the requested period, the determination unit 332 may determine the mobile body (electric vehicle) 100 as a candidate for the mobile body (electric vehicle) 100 that can be used in the requested period, with an accompanying condition presented to the user. The accompanying condition is that the user agrees that the second available power amount of the mobile body 100 will be less than the planned usage amount. This can also be said to be that the user agrees to charge the mobile body 100 by himself. In this case, the usage management system 30 can present a discount on the fee required for using the mobile body 100 as a merit for the user agreeing that the second available power amount of the mobile body 100 is less than the planned usage amount.

[0053] In this manner, in this embodiment, the determination unit 332 selects a moving body (electric vehicle) 100 that can be used during the request period as an electric vehicle 100 that matches the user's request for the electric vehicle 100, based on the determination information.

[0054] The notification unit 333 of the usage management system 30 transmits notification information to the terminal device 50 for notifying the user of the electric vehicle 100 selected by the determination unit 332 that matches the user's request. As a result, the terminal device 50 presents the information of the electric vehicle 100 selected by the determination unit 332 that matches the user's request to the user via the input / output unit 51. The user can use the input / output unit 51 to select a desired electric vehicle 100 from the electric vehicles 100 presented on the input / output unit 51. The terminal device 50 transmits information of the electric vehicle 100 selected by the user to the usage management system 30. Note that if there is no electric vehicle 100 that matches the user's request, a notification may be given to the effect that there is no electric vehicle 100 that matches the user's request.

[0055] The update unit 334 of the usage management system 30 receives information on the electric vehicle 100 selected by the user from the terminal device 50. The update unit 334 notifies the terminal device 50 and the charging management system 20 that the planned usage period is confirmed for the electric vehicle 100 selected by the user. The update unit 334 changes the usage schedule and sets the period corresponding to the requested period as the planned usage period for the electric vehicle 100 selected by the user. In this way, the update unit 334 changes (updates) the usage schedule in accordance with the user's request. Furthermore, the update unit 334 sets the amount of power required for the requested period as the planned usage amount for the planned usage period for the period corresponding to the requested period.

[0056] The determination unit 233 of the charging management system 20 has a function of determining a charging schedule. Specifically, the determination unit 233 determines a charging schedule for the multiple electric vehicles 100 for ensuring the amount of power usage based on the usage schedules of the multiple electric vehicles 100, based on the chargeable periods of each of the multiple electric vehicles 100 obtained from the usage schedules. Here, the usage schedule is obtained from the usage management system 30 by the acquisition unit 321, as described above. That is, the charging management system 20 obtains the usage schedule from the usage management system 30 by the acquisition unit 321.

[0057] The process of determining the charging schedule will be described in more detail below. When the acquisition unit 321 acquires a usage schedule, the determination unit 233 extracts a chargeable period for each of the multiple electric vehicles 100 from the usage schedule. A chargeable period is a period during which the storage battery 110 of the electric vehicle 100 can be charged. In this embodiment, a period that does not overlap with a planned usage period is extracted as the chargeable period for each electric vehicle 100. For example, in the case of the usage schedule shown in Fig. 7, the periods 00:00 to 08:00, 12:00 to 14:00, and 18:00 to 00:00 do not overlap with any of the planned usage periods U11 and U12 for the electric vehicle 100A, and are therefore extracted as the chargeable period. For electric vehicle 100B, the periods 00:00 to 08:00, 10:00 to 16:00, and 18:00 to 00:00 do not overlap with either of planned use periods U21 and U22, and are therefore extracted as chargeable periods. For electric vehicle 100C, the periods 00:00 to 08:00, 12:00 to 14:00, and 16:00 to 00:00 do not overlap with either of planned use periods U31 and U32, and are therefore extracted as chargeable periods. For electric vehicle 100D, the periods 00:00 to 08:00 and 18:00 to 00:00 do not overlap with planned use period U41, and are therefore extracted as chargeable periods.

[0058] In determining the charging schedule, the determination unit 233 sets the planned charging period in the chargeable period so that the remaining amount of the storage battery 110 is equal to or greater than the planned usage amount in the planned usage period for each of the electric vehicles 100. Here, the planned usage amount is acquired from the usage management system 30 by the acquisition unit 321 as described above. That is, the charging management system 20 acquires the planned usage amount for the planned usage period from the usage management system 30 by the acquisition unit 321. As an example, it is assumed that the planned usage amount for the electric vehicle 100A in the planned usage period U11 is 40% and the planned usage amount for the planned usage period U12 is 40%. It is assumed that the planned usage amount for the electric vehicle 100B in the planned usage period U21 is 20% and the planned usage amount for the planned usage period U22 is 20%. It is assumed that the planned usage amount for the electric vehicle 100C in the planned usage period U31 is 40% and the planned usage amount for the planned usage period U32 is 20%. For the electric vehicle 100D, it is assumed that the planned usage amount during the planned usage period U41 is 100%.

[0059] The planned charging period is a period during which the storage battery 110 is charged (a period during which the storage battery 110 is planned to be charged). The length of the planned charging period may vary depending on the planned charging amount of the storage battery 110 and the performance of the charger 41 used to charge the storage battery 110 of the electric vehicle 100. The planned charging amount corresponds to an increase in the remaining amount of the storage battery 110 due to charging of the electric vehicle 100. The planned usage amount during the planned usage period is acquired from the usage management system 30 by the acquisition unit 231. Note that in this embodiment, the planned usage amount is expressed based on the remaining amount (remaining capacity) of the storage battery 110. Also, in this embodiment, the remaining amount (remaining capacity) of the storage battery 110 is expressed by SOC (State of Charge). However, the remaining amount of the storage battery 110 may be expressed by an index other than SOC. The remaining amount of the storage battery 110 may be expressed using a well-known unit as a unit of the remaining amount of the storage battery 110, and for example, watt-hours (Wh), ampere-hours (Ah), etc. can be used. Furthermore, the remaining capacity of the storage battery 110 may be expressed by an index corresponding to the remaining capacity of the storage battery 110. An example of such an index is the distance (km) that can be traveled based on the remaining capacity of the storage battery 110. By expressing the remaining capacity of the storage battery 110 based on the distance that can be traveled, the user can easily grasp to what extent the electric vehicle 100 can be used.

[0060] In the electric vehicle 100A, in order for the remaining amount of the storage battery 110 to be equal to or greater than the planned usage amount during the planned usage periods U11 and U12, the remaining amount of the storage battery 110 at 08:00 needs to be 40% or more, and the remaining amount of the storage battery 110 at 14:00 needs to be 40% or more. In the electric vehicle 100B, in order for the remaining amount of the storage battery 110 to be equal to or greater than the planned usage amount during the planned usage periods U21 and U22, the remaining amount of the storage battery 110 at 08:00 needs to be 20% or more, and the remaining amount of the storage battery 110 at 16:00 needs to be 20% or more. In the electric vehicle 100C, in order for the remaining amount of the storage battery 110 to be equal to or greater than the planned usage amount during the planned usage periods U31 and U32, the remaining amount of the storage battery 110 at 08:00 needs to be 40% or more, and the remaining amount of the storage battery 110 at 14:00 needs to be 20% or more. In the electric vehicle 100D, in order for the remaining charge of the storage battery 110 to be equal to or greater than the planned usage amount during the planned usage period U41, the remaining charge of the storage battery 110 at 08:00 needs to be 100% or greater.

[0061] When determining the planned charging amount, the determination unit 233 uses the remaining capacity of the storage battery 110 at the reference time for each of the electric vehicles 100. That is, the determination unit 233 determines the charging schedule based on the remaining capacity of the storage battery 110 at the reference time for each of the electric vehicles 100. In this embodiment, the reference time is the start time of the usage schedule (the start time of the designated period). In the example of FIG. 7, 00:00 on the right side is the start time of the usage schedule and is used as the reference time. As an example, it is assumed that the remaining capacity of the storage battery 110 at the reference time of the electric vehicle 100A is 80%, the remaining capacity of the storage battery 110 at the reference time of the electric vehicle 100B is 0%, the remaining capacity of the storage battery 110 at the reference time of the electric vehicle 100C is 20%, and the remaining capacity of the storage battery 110 at the reference time of the electric vehicle 100D is 40%. Note that the reference time is not limited to the above example, and may be a time point at which the remaining capacity of the storage battery 110 of the electric vehicle 100 can be acquired. In other words, the reference time may be a timing at which the actual remaining amount of the storage battery 110 can be obtained by directly detecting the remaining amount of the storage battery 110 using the current sensor 43 or the like, or by sending the remaining amount of the storage battery 110 calculated within the electric vehicle 100 to the charging management system 20 via the communication network 60. Examples of the time at which the remaining amount of the storage battery 110 of the electric vehicle 100 can be obtained include the start and end of use of the electric vehicle 100 before the chargeable period, and the start and end of charging of the electric vehicle 100 before the planned use period. Thus, the reference time may be selected from one of the start and end of use of the electric vehicle 100 before the chargeable period, one of the start and end of charging of the electric vehicle 100 before the planned use period, a regular time, a predetermined time within a predetermined period, or the like, or may be set in advance.

[0062] In the electric vehicle 100A, the remaining charge of the storage battery 110 at 00:00 is 80%, and the scheduled usage amount in the scheduled usage period U11 is 40%, so it is not necessarily required to set the scheduled charging period in the chargeable period from 00:00 to 08:00. However, since the scheduled usage period U12 follows the scheduled usage period U11, it is preferable to charge the storage battery 110. As an example, as shown in FIG. 8, in the chargeable period from 00:00 to 08:00, a scheduled charging period C11 with a scheduled charging amount of 20% may be set from 00:00 to 02:00 so that the remaining charge of the storage battery 110 is 100% at 08:00. In this case, the remaining charge of the storage battery 110 at the end of the scheduled usage period U11 (12:00) is 60%, and the scheduled usage amount in the scheduled usage period U12 is 40%, so it is not necessarily required to set the scheduled charging period in the chargeable period from 12:00 to 14:00. 8, a planned charging period C12 with a planned charging amount of 20% or more may be set in a chargeable period from 12:00 to 14:00. In this case, the remaining amount of the storage battery 110 at the end (18:00) of the planned usage period U12 will be 40%. A planned charging period C13 with a planned charging amount of 40% may be set from 20:00 to 00:00 in the chargeable period from 18:00 to 00:00 so that the remaining amount of the storage battery 110 at 00:00 the next day will be a predetermined value (e.g., 80%).

[0063] In the electric vehicle 100B, the remaining charge of the storage battery 110 at 00:00 is 0%, and the scheduled usage amount in the scheduled use period U21 is 20%, so it is necessary to set a scheduled charging period with a scheduled charging amount of 20% or more in the chargeable period from 00:00 to 08:00. As an example, as shown in FIG. 8, a scheduled charging period C21 with a scheduled charging amount of 40% may be set from 00:00 to 04:00. In this case, since the remaining charge of the storage battery 110 is 20% at the end (10:00) of the scheduled use period U21, and the scheduled usage amount in the scheduled use period U22 is 20%, it is not necessarily necessary to set the scheduled charging period in the chargeable period from 10:00 to 16:00. Here, as an example, as shown in FIG. 8, a scheduled charging period C22 with a scheduled charging amount of 60% or more may be set from 10:00 to 16:00. In this case, the remaining charge of the storage battery 110 at the end (18:00) of the planned use period U22 will be 40%. In order that the remaining charge of the storage battery 110 at 00:00 the next day will be a predetermined value (e.g., 80%), a planned charging period C23 with a planned charging amount of 20% from 18:00 to 20:00 and a planned charging period C24 with a planned charging amount of 20% from 22:00 to 00:00 can be set in the chargeable period from 18:00 to 00:00.

[0064] In the electric vehicle 100C, the remaining charge of the storage battery 110 at 00:00 is 20%, and the scheduled usage amount in the scheduled usage period U31 is 40%, so it is necessary to set a scheduled charging period with a scheduled charging amount of 20% or more in the chargeable period from 00:00 to 08:00. As an example, as shown in FIG. 8, a scheduled charging period C31 with a scheduled charging amount of 60% may be set from 00:00 to 06:00. In this case, since the remaining charge of the storage battery 110 is 20% at the end (12:00) of the scheduled usage period U31, and the scheduled usage amount in the scheduled usage period U32 is 20%, it is not necessarily necessary to set a scheduled charging period in the chargeable period from 12:00 to 14:00. Here, as an example, as shown in FIG. 8, a scheduled charging period C32 with a scheduled charging amount of 20% may be set from 12:00 to 14:00. In this case, the remaining charge of the storage battery 110 at the end of the planned usage period U32 (16:00) will be 20%. In order to make the remaining charge of the storage battery 110 a predetermined value (e.g., 80%) at 00:00 the next day, a planned charging period C33 with a planned charging amount of 60% can be set from 16:00 to 22:00 in the chargeable period from 16:00 to 00:00.

[0065] In the electric vehicle 100D, the remaining charge of the storage battery 110 at 00:00 is 40%, and the scheduled usage amount in the scheduled use period U41 is 100%, so a scheduled charging period in which the scheduled charging amount is 60% may be set in the chargeable period from 00:00 to 08:00. Here, as shown in FIG. 8, a scheduled charging period C41 in which the scheduled charging amount is 60% may be set from 02:00 to 02:00. In this case, the remaining charge of the storage battery 110 at the end of the scheduled use period U41 (18:00) is 0%. In order that the remaining charge of the storage battery 110 at 00:00 the next day will be a predetermined value (for example, 60%), a scheduled charging period C42 in which the scheduled charging amount is 60% may be set from 18:00 to 00:00 in the chargeable period from 18:00 to 00:00.

[0066] In this embodiment, the determination unit 233 determines the charging schedule so that the total power used to charge the multiple electric vehicles 100 does not exceed a threshold. For example, in FIG. 8, the planned charging periods C11, C21, and C31 overlap from 00:00 to 02:00, but the total value of the power used to charge the electric vehicles 100A to 100C is adjusted so that it does not exceed the threshold. Similarly, the planned charging periods C13, C33, and C42 overlap from 20:00 to 22:00, but the total value of the power used to charge the electric vehicles 100A, 100C, and 100D is adjusted so that it does not exceed the threshold. In this way, the total power used to charge the multiple electric vehicles 100 is adjusted throughout the entire charging schedule so that it does not exceed the threshold.

[0067] In the present embodiment, the power supply system 40 can charge the electric vehicles 100 using a plurality of power sources including the commercial AC power source 210 and the distributed power source 300. That is, a plurality of power sources can be used to charge the electric vehicles 100. In this case, the threshold is set so that the power from a specific power source among the plurality of power sources is equal to or less than a specified value. In the present embodiment, the specific power source is the commercial AC power source 210. The specified value can be an upper limit value of the power from the commercial AC power source 210 that can be used to charge the electric vehicles 100. The upper limit value can be set, for example, based on the contracted power of the power rate plan of the electric utility company. For example, in the facility 400, an upper limit value of the power that can be used to charge the electric vehicles 100 can be set so that the power from the commercial AC power source 210 does not exceed the contracted power. Thus, by setting a threshold value, it is possible to prevent the power from the commercial AC power source 210 from exceeding the contracted power due to the charging of the plurality of electric vehicles 100. The threshold value and the specified value may be changed depending on the time period. As an example, the threshold value and the specified value can be set lower in the daytime time period than in the late night time period.

[0068] Furthermore, the determination unit 233 may determine the charging schedule so that power is supplied according to the priority order of the electric vehicles 100. That is, the electric vehicles 100 with higher priority may be preferentially charged. Furthermore, the determination unit 233 may determine the charging schedule so that the charging speed is changed according to the priority order of the multiple moving bodies (electric vehicles 100). That is, the electric vehicles 100 with higher priority may be set to have a larger charging amount per unit time. For example, the electric vehicles 100 with higher priority may be charged by a charger for rapid charging, and the electric vehicles 100 with lower priority may be charged by a charger for normal charging. Here, the priority order may be set based on at least one of the usage mode of each of the multiple electric vehicles 100, the frequency of use of each of the multiple electric vehicles 100, and the remaining capacity of the storage battery 110 of each of the multiple electric vehicles 100. The usage mode is obtained from attribute information of the electric vehicles 100. As described above, the usage mode is assumed to be a mode of use by employees of a company (use within business) and a mode of use by people other than employees of a company (use outside business, car sharing, rental car). For example, a high priority may be set for use within business, and a low priority may be set for use outside business. The frequency of use may be, for example, the number of times the electric vehicle 100 has been used within a certain period of time. The frequency of use may be determined by the usage management system 30 from the usage history of each electric vehicle 100. For example, the higher the frequency of use, the higher the priority may be set, and the lower the frequency of use, the lower the priority may be set. The remaining capacity of the storage battery 110 may be acquired from each electric vehicle 100. For example, the lower the remaining capacity of the storage battery 110, the higher the priority may be set, and the higher the remaining capacity of the storage battery 110, the lower the priority may be set. The priority of the electric vehicles 100 may be changed as appropriate.

[0069] When the determination unit 233 of the charge management system 20 is notified by the update unit 334 that the planned use period is to be confirmed for the electric vehicle 100 selected by the user, the determination unit 233 determines a charging schedule in accordance with a change in the usage schedule in accordance with the confirmation of the planned use period. In other words, the charging schedule is reset in order to reduce the possibility that the remaining capacity of the storage battery 110 of the electric vehicle 100 will be insufficient when needed due to the addition of a new planned use period to the usage schedule. As an example, the charging schedule may be changed so as to compensate for the decrease in the remaining capacity of the storage battery 110 at the end of the usage schedule. In this way, the determination unit 233 changes (updates) the charging schedule in accordance with the change (update) of the usage schedule.

[0070] For example, FIG. 9 shows an example in which the update unit 334 has changed the usage schedule for the requested period of 12:00 to 14:00. In FIG. 9, the update unit 334 changes the usage schedule to set the period corresponding to the requested period (12:00 to 14:00) as the planned usage period U13 for the electric vehicle 100A selected by the user. The planned amount of usage in the planned usage period U13 is, for example, 20%. When the determination unit 233 of the charge management system 20 is notified by the update unit 334 that the planned usage period is to be finalized for the electric vehicle 100A selected by the user, the determination unit 233 determines a charging schedule in accordance with the change in the usage schedule in accordance with the finalization of the planned usage period U13. Here, the determination unit 233 changes the charging schedule so as to compensate for a decrease in the remaining amount of the storage battery 110 of the electric vehicle 100A at the end of the usage schedule. 10, for electric vehicle 100A, planned charging period C13 from 20:00 to 00:00 is changed to planned charging period C14 from 18:00 to 00:00. In conjunction with this change, planned charging period C23 for electric vehicle 100B is cancelled. In this example, electric vehicle 100A has a higher priority than electric vehicle 100B, and this is the result of prioritising charging of electric vehicle 100A over electric vehicle 100B.

[0071] For example, FIG. 11 shows an example in which the update unit 334 changes the use schedule for the requested period of 12:00 to 14:00, as in FIG. 9. In FIG. 11, the update unit 334 changes the use schedule and sets the period corresponding to the requested period (12:00 to 14:00) as the planned use period U33 for the electric vehicle 100C selected by the user. Then, when the determination unit 233 of the charge management system 20 is notified by the update unit 334 that the planned use period is confirmed for the electric vehicle 100C selected by the user, the determination unit 233 determines a charging schedule according to the change in the use schedule in accordance with the confirmation of the planned use period U33. Here, the determination unit 233 changes the charging schedule so as to compensate for a decrease in the remaining capacity of the storage battery 110 of the electric vehicle 100C at the end of the use schedule. As an example, as shown in FIG. 12, for the electric vehicle 100C, the planned charging period C33 is changed from the period of 16:00 to 22:00 to the period of 16:00 to 00:00. Due to this change, planned charging period C24 is cancelled for electric vehicle 100B. In this example, electric vehicle 100C has a higher priority than electric vehicle 100B, and this is the result of prioritizing charging of electric vehicle 100C over electric vehicle 100B.

[0072] For example, FIG. 13 shows an example in which the update unit 334 changes the use schedule for the requested period of 12:00 to 14:00, as in FIG. 9 and FIG. 11. In FIG. 13, the update unit 334 changes the use schedule and sets the period corresponding to the requested period (12:00 to 14:00) as the planned use period U23 for the electric vehicle 100B selected by the user. Then, when the determination unit 233 of the charge management system 20 is notified by the update unit 334 that the planned use period is confirmed for the electric vehicle 100B selected by the user, the determination unit 233 determines the charging schedule according to the change in the use schedule in accordance with the confirmation of the planned use period U23. Here, the determination unit 233 changes the charging schedule so as to compensate for the decrease in the remaining amount of the storage battery 110 of the electric vehicle 100B at the end of the use schedule. As an example, as shown in FIG. 14, for the electric vehicle 100B, the planned charging periods C23 and C24 are changed to a planned charging period C25 (18:00 to 00:00) including these periods. Due to this change, for electric vehicle 100C, planned charging period C33 is changed to planned charging period C35 (16:00 to 20:00) which is shorter than planned charging period C33. This is because, in this example, electric vehicle 100B has a higher priority than electric vehicle 100C, and charging of electric vehicle 100B is prioritized over electric vehicle 100C.

[0073] The control unit 234 of the charge management system 20 controls the power supply system 40. More specifically, the control unit 234 executes control of the power supply system 40 in accordance with a charging schedule. That is, the control unit 234 controls charging of at least one of the storage batteries 110 of the multiple electric vehicles 100 in accordance with the charging schedule. Specifically, the control unit 234 causes the corresponding charger 41 to charge the electric vehicle 100 in each planned charging period of the charging schedule. In this way, the power supply system 40 executes charging of the electric vehicle 100 in accordance with the charging schedule.

[0074] The notification unit 235 notifies the user of information related to the charging of the electric vehicle 100. For example, the notification unit 235 transmits the information related to the charging of the electric vehicle 100 to the usage management system 30 via the communication network 60. The usage management system 30 can execute processing according to the information related to the charging of the electric vehicle 100 sent from the notification unit 235. Here, the information related to the charging of the electric vehicle 100 includes information on an electric vehicle 100 that cannot be operated according to a charging schedule among the multiple electric vehicles 100. As an example, the notification unit 235 may determine whether the electric vehicle 100 can be charged according to the charging schedule based on the operating state of the power supply system 40 and the charging schedule. For example, if the operating state of the power supply system 40 is an abnormal state in which power is not being supplied during the planned charging period of the charging schedule, the notification unit 235 determines that the electric vehicle 100 cannot be charged according to the charging schedule. In this case, the usage management system 30 may notify the user through the terminal device 50 that the electric vehicle 100 cannot be charged according to the charging schedule.

[0075] (1-3) Summary As described above, the charging system includes the acquisition unit 231 and the determination unit 233. The acquisition unit 231 acquires usage schedules of the multiple moving bodies 100 that are equipped with the storage batteries 110 used as power sources. The determination unit 233 determines charging schedules for the multiple moving bodies 100 for ensuring the amount of power usage based on the usage schedules of the multiple moving bodies 100, based on the chargeable periods of each of the multiple moving bodies 100 obtained from the usage schedules. The charging system makes it easy to manage the charging of the storage batteries 110 of the multiple moving bodies 100.

[0076] In other words, the charging system executes a method (charging method) as shown in Fig. 15. The charging method includes an acquisition step S31 and a determination step S32. The acquisition step S31 is a step of acquiring a usage schedule of a plurality of moving bodies 100 equipped with a storage battery 110 used as a power source. The determination step S33 is a step of determining a charging schedule for the plurality of moving bodies 100 based on the chargeable period of each of the plurality of moving bodies 100 obtained from the usage schedule, in order to ensure the amount of power usage based on the usage schedule of the plurality of moving bodies 100. According to the charging method, like the charging system, it is possible to easily manage the charging of the storage battery 110 of the plurality of moving bodies 100.

[0077] The charging system is realized by utilizing a computer system. In other words, a method executed by the charging system (charging method) can be realized by the computer system executing a program. This program is a computer program for causing one or more processors to execute the charging method. According to such a program, like the charging system, it is possible to easily manage the charging of the storage batteries 110 of the multiple mobile objects 100.

[0078] (2) Variations The embodiments of the present disclosure are not limited to the above-mentioned embodiments. The above-mentioned embodiments can be modified in various ways depending on the design, etc., as long as the object of the present disclosure can be achieved. Below, modified examples of the above-mentioned embodiments are listed. The modified examples described below can be applied in appropriate combination.

[0079] In one modified example, the determination unit 233 may redetermine the charging schedule in response to a request from the usage management system 30. For example, when the determination unit 332 determines that there is no electric vehicle 100 that matches the user's request for the electric vehicle 100, the determination unit 332 may request the determination unit 233 to redetermine the charging schedule. In this case, the determination unit 233 may determine the charging schedule again from a usage schedule in which a requested period corresponding to the user's request is provisionally set as a planned usage period. This allows the determination unit 332 to determine that there is an electric vehicle 100 that matches the user's request for the electric vehicle 100 if the planned usage amount can be secured in the planned usage period included in the usage schedule.

[0080] In one modified example, a period may be set during the chargeable period during which charging of the storage battery 110 of the electric vehicle 100 is prioritized. In general, electricity rates tend to be lower during late night hours than during daytime hours. Therefore, when the chargeable period includes late night hours and daytime hours, the amount of power used to charge the storage battery 110 of the electric vehicle 100 during the late night hours may be set to be greater than the amount of power used during the daytime hours. For example, the determination unit 233 may set the planned charging amount during the planned charging period that belongs to the late night hours to be greater than the planned charging amount during the planned charging period that belongs to the daytime hours.

[0081] In one modified example, the determination unit 233 may determine the charge amount of the storage battery 110 of the multiple electric vehicles 100 based on the attribute information of each of the multiple electric vehicles 100. The charge amount may be, for example, the upper limit value of the remaining amount of the storage battery 110 of the electric vehicle 100 during the chargeable period. For example, the attribute information may include at least one of the type, purpose, initial position, destination, planned travel distance, number of people traveling, and usage mode, as described above. Examples of these attribute information are as described above. For example, when it is determined that the electric consumption of the electric vehicle 100 is relatively good based on the type included in the attribute information, the determination unit 233 may set the charge amount to be small. Furthermore, when it is determined that the required amount of power of the electric vehicle 100 is relatively small based on the purpose, initial position, destination, planned travel distance, and the like included in the attribute information, the determination unit 233 may set the charge amount to be small. Furthermore, when the number of people planning to travel included in the attribute information is large, the determination unit 233 may set the charge amount to be large. Furthermore, the determination unit 233 may set the charge amount to be high when the electric vehicle is used for business purposes and set the charge amount to be low when the electric vehicle is used outside of business purposes. By setting the charge amount in accordance with the attribute information of the electric vehicle 100 in this manner, the storage battery 110 of the electric vehicle 100 can be charged efficiently.

[0082] In one modified example, the notification unit 235 may notify the usage management system 30 of the charging location where the mobile object (electric vehicle 100) is to be placed at the end of the planned usage period included in the usage schedule. The charging location may be determined by the determination unit 233 based on the charging schedule. For example, in the power supply system 40, if the multiple chargers 41 include a charger 41 (41A) capable of rapid charging, the planned charging period may be set so that a specific electric vehicle 100 is rapidly charged by the charger 41A when the charging schedule is determined. In this case, the specific electric vehicle 100 is required to be placed at a location where it can be charged by the charger 41A at the start of the planned charging period. In this case, the notification unit 235 notifies the usage management system 30 of the charging location where the mobile object (electric vehicle 100) is to be placed at the end of the planned usage period included in the usage schedule. Then, the usage management system 30 may send guidance information to the terminal device 50 for placing the electric vehicle 100 at the charging location. This makes it possible to encourage the user to place the electric vehicle 100 at the charging location at the end of the planned usage period. Furthermore, the charging location may be determined so that the electric vehicle 100 is charged only by a specific power source among the multiple power sources. The specific power source may be, for example, a distributed power source 300 that uses only renewable energy. For example, in the power supply system 40, if the multiple chargers 41 include a specific charger 41 that can be charged only by power from the distributed power source 300 that uses renewable energy, the charging location may be set so that the specific electric vehicle 100 is charged by the specific charger 41 when the charging schedule is determined. Since the electric vehicle 100 that is charged only by renewable energy has an advantage in calculating carbon dioxide emissions, it is possible to increase the value of the electric vehicle 100.

[0083] In one modified example, when the determination unit 233 cannot set a charging schedule that can secure the amount of power usage based on the usage schedules of the multiple mobile bodies (electric vehicles) 100, the notification unit 235 may notify the usage management system 30 that the charging schedule cannot be set. This allows the usage management system 30 to review the usage schedule.

[0084] The charge management system 20 in the present disclosure includes, for example, a computer system. The computer system is mainly composed of a processor and a memory as hardware. The processor executes a program recorded in the memory of the computer system to realize the function of the charge management system 20 in the present disclosure. The program may be pre-recorded in the memory of the computer system, may be provided through an electric communication line, or may be provided by being recorded in a non-transitory recording medium such as a memory card, an optical disk, or a hard disk drive that can be read by the computer system. The processor of the computer system is composed of one or more electronic circuits including a semiconductor integrated circuit (IC) or a large-scale integrated circuit (LSI). The integrated circuits such as IC or LSI referred to here are called by different names depending on the degree of integration, and include integrated circuits called system LSI, VLSI (Very Large Scale Integration), or ULSI (Ultra Large Scale Integration). Furthermore, a field-programmable gate array (FPGA) that is programmed after the manufacture of the LSI, or a logic device that can reconfigure the connection relationship inside the LSI or reconfigure the circuit partition inside the LSI, can also be adopted as a processor. The electronic circuits may be integrated in one chip or distributed among multiple chips. The chips may be integrated in one device or distributed among multiple devices. The computer system referred to here includes a microcontroller having one or more processors and one or more memories. Thus, the microcontroller is also composed of one or more electronic circuits including a semiconductor integrated circuit or a large-scale integrated circuit.

[0085] Furthermore, it is not essential for the charging management system 20 that multiple functions are integrated into one housing, and the components of the charging management system 20 may be distributed across multiple housings. Furthermore, at least some of the functions of the charging management system 20, for example, some of the functions of the processing unit 23, may be realized by the cloud (cloud computing) or the like.

[0086] (3) Description A first aspect is a charging system (20) including an acquisition unit (231) and a determination unit (233). The acquisition unit (231) acquires usage schedules of a plurality of mobile objects (100) including a storage battery (110) used as a power source. The determination unit (233) determines charging schedules for the plurality of mobile objects (100) based on a chargeable period of each of the plurality of mobile objects (100) obtained from the usage schedules, for ensuring an amount of power usage based on the usage schedules of the plurality of mobile objects (100). According to this aspect, charging of the storage battery (110) of the plurality of mobile objects (100) can be easily managed.

[0087] A second aspect is a charging system (20) based on the first aspect. In the second aspect, the usage schedule includes planned usage periods of the multiple mobile objects (100). In each of the multiple mobile objects (100), a chargeable period is a period that does not overlap with the planned usage period. In determining the charging schedule, the determination unit (233) sets a planned charging period for charging the storage battery (110) in the chargeable period of each of the multiple mobile objects (100) so that the remaining amount of the storage battery (110) during the planned usage period is equal to or greater than the planned usage amount. According to this aspect, it is possible to easily manage the charging of the storage battery (110) of the multiple mobile objects (100).

[0088] A third aspect is a charging system (20) based on the first or second aspect. In the third aspect, the determination unit (233) determines the charging schedule such that a total of power used for charging the plurality of mobile objects (100) does not exceed a threshold. According to this aspect, an excessive increase in power consumption during charging of the storage batteries (110) of the plurality of mobile objects (100) can be suppressed.

[0089] A fourth aspect is a charging system (20) based on the third aspect. In the fourth aspect, a plurality of power sources (210, 300) are used to charge the plurality of mobile objects (100). The threshold value is set so that the power from a specific power source (210) among the plurality of power sources (210, 300) is equal to or less than a specified value. According to this aspect, an excessive increase in power consumption from a specific power source can be suppressed when charging the storage batteries (110) of the plurality of mobile objects (100).

[0090] A fifth aspect is a charging system (20) based on any one of the first to fourth aspects. In the fifth aspect, the determination unit (233) determines the charging schedule such that power is supplied according to the priority order of the multiple mobile objects (100). According to this aspect, charging of the storage batteries (110) of the multiple mobile objects (100) can be easily managed.

[0091] A sixth aspect is a charging system (20) based on any one of the first to fifth aspects. In the sixth aspect, the determination unit (233) determines the charging schedule such that a charging rate is changed according to a priority order of the plurality of mobile objects (100). According to this aspect, charging of the storage batteries (110) of the plurality of mobile objects (100) can be easily managed.

[0092] A seventh aspect is a charging system (20) based on the sixth aspect. In the seventh aspect, the priority order is set based on at least one of a usage mode of each of the plurality of mobile objects (100), a usage frequency of each of the plurality of mobile objects (100), and a remaining capacity of a storage battery (110) of each of the plurality of mobile objects (100). According to this aspect, it is possible to easily manage the charging of the storage battery (110) of the plurality of mobile objects (100).

[0093] An eighth aspect is a charging system (20) based on any one of the first to seventh aspects. In the eighth aspect, the determination unit (233) determines the charge amount of the storage battery (110) of the plurality of mobile objects (100) based on attribute information of each of the plurality of mobile objects (100). According to this aspect, it is possible to easily manage the charging of the storage battery (110) of the plurality of mobile objects (100).

[0094] A ninth aspect is a charging system (20) based on the eighth aspect. In the ninth aspect, the attribute information includes at least one of type, purpose, initial position, destination, planned travel distance, number of people traveling, and usage mode. According to this aspect, charging of the storage batteries (110) of the multiple moving objects (100) can be easily managed.

[0095] A tenth aspect is a charging system (20) based on any one of the first to ninth aspects. In the tenth aspect, the charging system (20) further includes a notification unit (235) that notifies a charging location where the moving body (100) is to be placed at the end of a planned use period included in the use schedule. According to this aspect, it is possible to appropriately charge the moving body (100).

[0096] An eleventh aspect is the charging system (20) based on the tenth aspect. In the eleventh aspect, the determination unit (233) determines the charging location based on the charging schedule. According to this aspect, it is possible to appropriately charge the moving object (100).

[0097] A twelfth aspect is a charging system (20) based on any one of the first to eleventh aspects. In the twelfth aspect, the determination unit (233) determines the charging schedule based on remaining capacity of the storage battery (110) at a reference time of each of the plurality of mobile objects (100). According to this aspect, it is possible to easily manage charging of the storage battery (110) of the plurality of mobile objects (100).

[0098] A thirteenth aspect is a charging system (20) based on any one of the first to twelfth aspects. In the thirteenth aspect, the charging system (20) further includes a control unit (234) that controls charging of at least one of the storage batteries (110) of the plurality of mobile objects (100) according to the charging schedule. According to this aspect, the charging of the storage batteries (110) of the plurality of mobile objects (100) can be easily managed.

[0099] A fourteenth aspect is a charging method including an acquisition step and a determination step. The acquisition step is a step of acquiring usage schedules of a plurality of mobile bodies (100) each having a storage battery (110) used as a power source. The determination step is a step of determining a charging schedule for the plurality of mobile bodies (100) based on a chargeable period of each of the plurality of mobile bodies (100) obtained from the usage schedule, in order to ensure an amount of power usage based on the usage schedule of the plurality of mobile bodies (100). According to this aspect, it is possible to easily manage charging of the storage battery (110) of the plurality of mobile bodies (100).

[0100] A fifteenth aspect is a program for causing one or more processors to execute the charging method of the fourteenth aspect. According to this aspect, charging of storage batteries (110) of a plurality of moving objects (100) can be easily managed.

[0101] A sixteenth aspect is a mobile object management system (11) including a charging system (20) according to any one of the first to thirteenth aspects, and a usage management system (30) that holds the usage schedule. According to this aspect, charging of the storage batteries (110) of a plurality of mobile objects (100) can be easily managed.

[0102] A seventeenth aspect is a management system (10) including a mobile object management system (11) according to the sixteenth aspect, and a power supply system (40) for charging a storage battery (110) of the mobile object (100) controlled by the mobile object management system (11). According to this aspect, the charging of the storage batteries (110) of a plurality of mobile objects (100) can be easily managed.

[0103] The second to thirteenth aspects can also be modified appropriately and applied to the fifteenth to seventeenth aspects. [Explanation of symbols]

[0104] 20 Charging management system (charging system) 231 Acquisition Department 233 Decision Section 234 Control Unit 235 Notification Department 100 Mobile vehicles (electric vehicles) 110 Battery 201 Commercial AC power supply (power supply) 300 Distributed power generation

Claims

1. An acquisition unit that acquires a usage schedule of a plurality of moving objects that are equipped with a storage battery used as a power source; a determination unit that determines a charging schedule for the plurality of moving bodies based on a chargeable period of each of the plurality of moving bodies obtained from the usage schedule, so as to ensure an amount of power usage based on the usage schedule of the plurality of moving bodies; a determination unit that determines whether or not there is a mobile object that matches a user's request including a requested period of use of the mobile object among the plurality of mobile objects; Equipped with When the determination unit determines that there is no moving body that meets the request of the user based on the charging schedule, and when the determination unit determines that there is a moving body that meets the request of the user if the charging schedule is changed, the determination unit changes the charging schedule. Charging system.

2. the usage schedule includes a planned usage period of the plurality of moving objects; a chargeable period for each of the plurality of moving objects is a period that does not overlap with the planned use period; and when determining the charging schedule, the determination unit sets a planned charging period for charging the storage battery within a chargeable period in each of the plurality of moving bodies such that a remaining amount of the storage battery during the planned use period is equal to or greater than a planned use amount. The charging system of claim 1.

3. Further comprising a notification unit that notifies a charging location where the mobile object is to be placed at the end of the planned use period included in the use schedule. The charging system according to claim 2 .

4. The determination unit determines the charging location based on the charging schedule. The charging system of claim 3.

5. The determination unit determines the charging schedule such that a total of power used for charging the plurality of mobile objects does not exceed a threshold. The charging system according to any one of claims 1 to 4.

6. A plurality of power sources are used to charge the plurality of moving objects, the threshold value is set so that the power from a specific power source among the plurality of power sources is equal to or less than a specified value; The charging system of claim 5.

7. The determination unit determines the charging schedule such that power is supplied according to a priority order of the plurality of moving objects. The charging system according to any one of claims 1 to 6.

8. The determination unit determines the charging schedule such that a charging rate is changed according to a priority of the plurality of moving objects. The charging system according to any one of claims 1 to 7.

9. The priority order is set based on at least one of a usage pattern of each of the plurality of moving bodies, a usage frequency of each of the plurality of moving bodies, and a remaining capacity of the storage battery of each of the plurality of moving bodies. The charging system of claim 8.

10. The determination unit determines the charge amount of the storage battery of the plurality of moving bodies based on attribute information of each of the plurality of moving bodies. The charging system according to any one of claims 1 to 9.

11. The attribute information includes at least one of type, purpose, initial location, destination, planned travel distance, number of people traveling, and usage mode. The charging system of claim 10.

12. the determination unit determines the charging schedule based on a remaining amount of the storage battery at a reference time for each of the plurality of moving objects. The charging system according to any one of claims 1 to 11.

13. a control unit that controls charging of at least one of the storage batteries of the plurality of mobile bodies according to the charging schedule; A charging system according to any one of claims 1 to 12.

14. An acquisition step of acquiring a usage schedule of a plurality of moving objects including a storage battery used as a power source; a determination step of determining a charging schedule for the plurality of moving bodies based on a chargeable period of each of the plurality of moving bodies obtained from the usage schedule, so as to ensure an amount of power usage based on the usage schedule of the plurality of moving bodies; a determining step of determining whether there is a mobile object among the plurality of mobile objects that matches a user's requirements including a required period of use of the mobile object; a change step of changing the charging schedule when it is determined in the determination step that there is no moving body that meets the request of the user based on the charging schedule and it is determined that there is a moving body that meets the request of the user if the charging schedule is changed; Including, Charging method.

15. causing one or more processors to execute the charging method of claim 14; program.

Citation Information

Patent Citations

  • Charge control system

    JP2012147651A

  • Charging station and charging method in charging station

    JP2013042579A

  • Charging system, charging device, and charging method

    JP2013048519A

  • Charge system

    JP2015089266A

  • Operation system of car sharing service

    JP2018018250A