Method for scheduling production in a continuous galvanizing line - Patents.com

The method optimizes galvanizing line scheduling by evaluating coil transitions with weighting factors and line constraints, addressing quality and productivity issues in continuous galvanizing lines.

JP7555407B2Active Publication Date: 2024-09-24ARCELORMITTAL SA
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2022527116
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2019-11-12
Filing Date
2020-11-06
Publication Date
2024-09-24
Estimated Expiration
2040-11-06

AI Technical Summary

Technical Problem

Existing methods for scheduling production in continuous galvanizing lines face challenges in maintaining product quality and line productivity due to variations in steel strip characteristics, leading to defects, scrap, and operational complexity, with existing software failing to adapt to variations in product mix and often resulting in inefficiencies.

Method used

A method and electronic scheduling device that evaluates the impact of transitioning between unplated coils on product quality by considering multiple characteristics, specifications, and process parameters, assigning weighting factors, and calculating scores to optimize the production schedule, taking into account line constraints, using algorithms to select the optimal sequence.

Benefits of technology

Improves product quality during transitions between coils, reduces scrap, and enhances line productivity by optimizing the scheduling process, minimizing defects and operational complexity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007555407000004
    Figure 0007555407000004
  • Figure 0007555407000003
    Figure 0007555407000003
  • Figure 0007555407000002
    Figure 0007555407000002
Patent Text Reader

Abstract

The present invention relates to a method for setting a production schedule for a plurality of galvanized coils of metal strip on a continuous galvanizing line, the method comprising the steps of: evaluating, for each possible combination of two galvanized coils, the impact on the quality of the galvanized coil of a transition from a first galvanized coil to a second galvanized coil; assigning to each possible combination of galvanized coils a weight factor that depends on the result of the previous step and takes into account line constraints; calculating the result of the previous step by calculating, for several possible schedules of the plurality of galvanized coils, a score that depends on the sum of the weight factors associated with the combinations of galvanized coils involved in a given schedule; and selecting the schedule with the best score.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for scheduling the production of galvanized coils in a continuous galvanizing line, the scheduling method being preferably implemented by an electronic scheduling device.

[0002] The invention also relates to a computer program comprising software instructions which, when executed by a processor, implements a scheduling method as described above.

[0003] The invention also relates to an electronic scheduling device for scheduling the production of galvanized coils in a continuous galvanizing line.

[0004] The invention also relates to an installation for supplying galvanized coils, the installation comprising a continuous galvanizing line for producing galvanized coils and an electronic scheduling device as described above. [Background technology]

[0005] Galvanizing lines are known to coat the surface of steel strip with a layer of zinc or zinc alloy. Generally, a coil of steel is unrolled at the line entrance, annealed in a furnace, immersed in a bath of molten zinc, and recoiled. To make the process continuous, the rear end of each coil is bonded to the leading end of the following coil. From the line's point of view, the raw material is a composite strip with characteristics such as width, thickness, cross-section, grade, etc. that vary along the entire length of the strip.

[0006] Similarly, the finished product is a composite strip with final properties such as zinc thickness, roughness, temporary protection, etc. varying along the entire length of the strip.

[0007] It is therefore necessary to regularly adjust the process parameters of the galvanizing line to take into account the changing characteristics of the steel strip and to meet the technical specifications of this section of steel strip.

[0008] As the new targets for process parameters take some time to be reached, lengths of steel strip may deviate from technical specifications and as a result must be scrapped or sold as a second selection. Lengths of steel strip may also show defects such as zinc overcoating, oil stains, surface defects, etc.

[0009] Also, differences between two successive coils can create difficulties: for example, it can be difficult to weld two coils of very different grades, the wider tip of the coil can collide with elements of the line, and it can be difficult to accommodate tension when the cross sections of the two coils are very different.

[0010] In the worst case, the difference between two successive coils is so significant that the strip may break, especially in the annealing furnace, and the line must then be stopped until the furnace has cooled before the steel strip can be removed. The furnace must then be heated again before production can resume.

[0011] By carefully selecting the sequence in which the bare coils are galvanized, transitions can be selected that limit the length of strip that is discarded, the occurrence and severity of defects, and the occurrence of strip breaks.

[0012] Manually scheduling production based on operator expertise is known, but still requires the periodic use of transition coils, i.e. small coils that are inserted without a customer order between two coils to make them compatible with each other, which reduces the productivity of the line and increases the complexity of its operation.

[0013] It is also known to use commercial software whose goal is to find a sequence of coils that makes the transitions as smooth as possible depending on several product variables (width, thickness, amount of galvanization, etc.). Each kind of transition depending on a given product variable gets an arbitrary penalty or bonus. For example, the greater the difference in the amount of galvanization between two coils, the greater the penalty. All penalties and bonuses are added up and the overall score has to be minimized. Unfortunately, smoothing transitions depending on one product variable is often incompatible with smoothing transitions depending on another product variable, and transitions depending on a given product variable may affect several steps of the process differently. Also, the penalty / bonus approach does not adapt to the variations in the product mix. Summary of the Invention [Problem to be solved by the invention]

[0014] It is therefore an object of the present invention to remedy the above-mentioned shortcomings of the prior art by providing a method for scheduling the production of multiple galvanized coils, which improves the quality of the strip processed at the transition between the coils, increases line productivity and reduces operational complexity. [Means for solving the problem]

[0015] For this purpose, a first subject of the invention is a method for setting a production schedule for a plurality of galvanized coils of metal strip on a continuous galvanizing line comprising an annealing furnace, a zinc pot and a wiping machine, the method comprising the steps of: - collecting a number of characteristics defining each ungalvanized coil to be galvanized, a number of specifications to be met for each galvanized coil, a number of process parameters and a number of line constraints required to meet the specifications for each galvanized coil; - For each possible combination of two uncoated coils, at least the following two sets of parameters: Temperature T of the metal strip in the annealing furnace Pand adjusting the speed S, Adjustment of the wiping medium pressure P and the distance D of the wiping machine from the metal strip at the zinc pot outlet evaluating the effect of a transition from the first ungalvanized coil to the second ungalvanized coil on the quality of the galvanized coil; - assigning to each possible combination of uncoated coils a weighting factor that depends on the result of the previous step and takes into account the line constraints; - calculating the result of the previous step by calculating, for several possible schedules of the plurality of raw coils, a score that depends on the sum of weighting factors associated with the combination of raw coils involved in a given schedule, and by selecting the schedule having the best score. The present invention comprises a method comprising:

[0016] The method according to the invention may also have the optional features listed below, taken individually or in combination: - a plurality of properties defining each uncoated coil include thickness, steel grade, mechanical properties, width, and hardness; - several specifications to be met for each galvanized coil, including the amount of galvanization, the amount of galvanization tolerance, the execution of temper rolling, and the stretch to be reached during temper rolling; - several process parameters required to meet the specifications of each galvanized coil, including target temperature in the annealing furnace, temperature tolerance in the annealing furnace, line speed, line speed tolerance in the annealing furnace, wiping pressure P, wiping distance D, and temper rolling tension and load; - Multiple line constraints include maximum capacity of the line and transitions that are not allowed by the line operator; In the collection step, data is collected manually, obtained from an existing database, or calculated; - the collecting step includes a modeling sub-step in which at least some of the plurality of process parameters are calculated from empirical and / or physical and / or statistical laws or formulas; a weighting factor is associated with the effect on product quality of a transition from a first uncoated coil to a second uncoated coil for a set of parameters; - for each possible combination of two uncoated coils, the band temperature and speed adjustments in the annealing furnace are associated with a weighting factor that depends on the difference in temperature tolerances of the two coils and / or the difference in speed tolerances of the two coils; the weighting factor assigned to each possible combination of uncoated coils is the sum of the weighting coefficients associated with the parameter sets; - the continuous galvanizing line further includes temper rolling, and the effect of the transition from the first uncoated coil to the second uncoated coil on the product quality is determined by the tension T of the temper rolling S and further evaluated with respect to the adjustment of the load F; - For each possible combination of two uncoated coils, the temper rolling tension T S and the adjustment of the load F is associated with a weighting factor that depends on the line speed and the time it takes to transition from one tension to another and / or from one pressure to another; - the continuous galvanizing line further comprises an entry accumulator, and the impact of the transition from the first uncoated coil to the second uncoated coil on the product quality is further evaluated with respect to adjusting the tension in the entry accumulator and / or the annealing furnace; - the continuous galvanizing line further includes a tension leveller, and the effect of the transition from the first ungalvanized coil to the second ungalvanized coil on product quality is further evaluated with respect to adjusting the tension at the tension leveller; - the continuous galvanizing line comprises a galvannealing furnace and the effect of the transition from the first ungalvanized coil to the second ungalvanized coil on the product quality is further evaluated with regard to the adjustment of the heating power in the galvannealing furnace; - the continuous galvanizing line further comprises an oiler configured to apply oil to the galvanized coil, and the impact of the transition from the first galvanized coil to the second galvanized coil on the product quality is further evaluated with respect to adjusting the oil quality and / or oil properties in the oiler; - the continuous galvanizing line further comprises a chemical treatment section configured to apply a passivation coating to the galvanized coil, and an impact of the transition from the first ungalvanized coil to the second ungalvanized coil on product quality is further evaluated with respect to passivation process adjustments; - the score calculated for a given schedule of a number of blank coils is the sum of the weighting factors associated with the combination of blank coils that make up that schedule, - the score calculated for a given schedule of a plurality of raw coils includes a sequence weight term in addition to the sum of the weight factors associated with the combinations of raw coils that make up that schedule; - The method is displaying the schedule with the best score and modifying it manually or automatically; Steps for calculating the score of the revised schedule Further includes:

[0017] A second subject of the invention consists of a computer program comprising software instructions which, when executed by a processor, implements the method according to the invention.

[0018] A third subject of the invention is an electronic scheduling device for setting the production schedule of a plurality of galvanized coils of metal strip on a continuous galvanizing line including an annealing furnace, a zinc pot and a wiping machine, the electronic monitoring device comprising: - an acquisition module configured to collect a plurality of characteristics defining each ungalvanized coil to be galvanized, a plurality of specifications to be met for each galvanized coil, a plurality of process parameters necessary to meet the specifications for each galvanized coil, and a plurality of line constraints; - For each possible combination of two uncoated coils, at least the following two sets of parameters: Temperature T of the metal strip in the annealing furnace P and adjusting the speed S, Adjustment of the wiping medium pressure P and the distance D of the wiping machine from the metal strip at the zinc pot outlet To evaluate the effect of transitioning from a first uncoated coil to a second uncoated coil on product quality, and an assignment module configured to assign a weighting factor to each possible combination of uncoated coils depending on the results of the impact assessment and taking into account the line constraints. a calculation module configured to calculate the result obtained in the allocation module by calculating, for several possible schedules of a plurality of raw coils, a score that depends on the sum of weighting factors associated with the combination of raw coils involved in a given schedule and by selecting the schedule having the optimal score The present invention comprises an electronic scheduling device including:

[0019] An electronic scheduling device according to the present invention may optionally include a validation module configured to provide a view of the selected schedule in the calculation module and to allow validation or manual or automatic adjustment of the selected modules.

[0020] A fourth subject of the invention is an installation for supplying a plurality of galvanized coils, comprising: - Continuous galvanizing lines for producing multiple galvanized coils, - Electronic scheduling device for setting production schedules for multiple galvanized coils Including, The electronic scheduling device comprises an installation, the electronic scheduling device being an electronic scheduling device according to the invention.

[0021] The invention will be better understood from the following description, given purely for illustrative purposes and not intended to be in any way limiting, with reference to the following figures, in which: [Brief description of the drawings]

[0022] [Figure 1] FIG. 1 is a schematic diagram illustrating an electronic scheduling device. [Diagram 2] A method for scheduling the production of a plurality of galvanized coils in a continuous galvanizing line according to the present invention, the scheduling method being implemented by the electronic scheduling device of FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0023] The continuous galvanizing line according to the present invention comprises at least an annealing furnace, a zinc pot and a wiping machine. By "zinc pot" is meant a bath of molten metallic elements such as zinc, aluminum, silicon, magnesium, etc. Depending on the configuration of the bath, it is possible to produce, for example, galvanized steel, steel coated with a zinc alloy containing 5 wt.% aluminum (Galfan®), steel coated with a zinc alloy containing 55 wt.% aluminum, about 1.5 wt.% silicon, the remainder consisting of zinc and unavoidable impurities resulting from processing (Aluzinc®, Galvalume®), steel coated with an aluminum alloy containing 8 wt.% to 11 wt.% silicon and 2 wt.% to 4 wt.% iron, the remainder consisting of aluminum and unavoidable impurities resulting from processing (Alusi®), steel coated with a layer of aluminum (Alupur®), and steel coated with a zinc alloy containing 0.5% to 20% aluminum, 0.5% to 10% magnesium, the remainder consisting of zinc and unavoidable impurities resulting from processing. The remainder of this description will refer only to zinc, with the understanding that other elements may also be part of the metallic coating applied to the steel strip, and even zinc may not be included.

[0024] The continuous galvanizing line may additionally include at least one of the following devices: a welder, an entry accumulator, a cooling tower, a temper rolling section, an oiler, a side trimmer, a chemical treatment section, a galvannealing furnace.

[0025] The first step 100 of the method involves collecting a number of characteristics defining each ungalvanized coil used to produce each galvanized coil, a number of specifications to be met for each galvanized coil, a number of process parameters required to meet each galvanized coil specification, and a number of line constraints, collectively referred to as representative data.

[0026] For ungalvanized coil, the properties collected are the intrinsic properties of the steel strip processed in the galvanizing line. Examples of intrinsic properties include steel grade, steel substrate chemistry, steel substrate mechanical properties, strip width, strip cross section, strip thickness, strip length, coil weight, steel hardness, among others.

[0027] According to one preferred embodiment, the properties that define each uncoated coil include thickness, steel grade, mechanical properties, width, and hardness.

[0028] For galvanized coil, the specifications are inter alia the mechanical properties of the galvanized coil, the amount of galvanization applied, the galvanization amount tolerance, the surface appearance of the galvanization, the temper rolling practice, the elongation to be reached during temper rolling, the elongation tolerance in temper rolling, the roughness after temper rolling, the roughness tolerance in temper rolling, the chemical treatment practice after temper rolling, the flatness target in the galvanized steel strip, the flatness tolerance in the tension leveller machine, the type of oil, the type of passivation, the heat treatment practice after temper rolling, the iron content in the heat treated galvanization, and the level of quality required by the customer.

[0029] According to one preferred embodiment, several specifications to be met for each galvanized coil include the zinc weight, the zinc weight tolerance, the temper rolling run, and the stretch to be achieved during temper rolling.

[0030] Examples of process parameters required to meet specifications are, among others, the thermal cycle in the annealing furnace, the target temperature and temperature tolerance in the annealing furnace, the target speed and speed tolerance in the annealing furnace, the wiping pressure, the wiping distance, the line speed, the temper rolling load, the temper rolling tension, and the heating power target and heating tolerance in the galvannealing furnace.

[0031] According to a preferred embodiment, the process parameters required to meet the specifications of each galvanized coil include the target temperature in the annealing furnace, the temperature tolerance in the annealing furnace, the line speed, the line speed tolerance in the annealing furnace, the wiping pressure P, the wiping distance D, and the temper rolling tension and load.

[0032] Line constraints may include, among others, maximum line capabilities, such as welding capacity of the welding machine, length of the entry strip accumulator, maximum line speed, maximum line acceleration, length of the annealing furnace, maximum furnace tube temperature, maximum rate of change of wiping pressure of the wiping machine, maximum rate of change of wiping distance of the wiping machine, maximum rate of adjustment of the skin pass rolling load, maximum allowed change in strip width, thickness and / or cross section specified by the line manufacturer, obligation to group all coils of an order, obligation to group certain coils to avoid undesirable settings and disallowed transitions in the annealing furnace, etc. Disallowed transitions are transitions that are too difficult for any reason and that the line operator has decided to prohibit. Examples of transitions that are not permitted are, inter alia, transitions where the coating weight ranges do not overlap, transitions where the speed ranges do not overlap, transitions where the annealing tolerances do not overlap, transitions where the second coil is more than 250 mm wider than the first coil and both are less than 1 mm thick, transitions between two steel grades that are not weldable to each other, transitions where the load surge applied in temper rolling exceeds 200 T, width expansion for products used as visible automotive parts, i.e. transitions to wider coils, transitions that cannot be made without a transition coil.

[0033] In a first step of the method, representative data, i.e., a number of characteristics / specifications / process parameters / line constraints, can be manually collected or obtained or even calculated from an existing database. In particular, the process parameters required to meet a given specification can be obtained from an existing database, so as not to be obtained anew from scratch every time a new number of green coils needs to be scheduled. The process parameters can be pre-defined in the form of values ​​or ranges or in the form of empirical and / or physical and / or statistical laws or formulas linking the process parameters to the specifications and / or green product properties. Preferably, in a first step, a number of process parameters related to the specifications of the green coils to be scheduled are selected from among all pre-defined process parameters. Similarly, the line constraints are preferably obtained from an existing database. Preferably, the line constraints are obtained by selecting an operating mode, which is a pre-defined combination of line constraints for the type of galvanized coils to be produced during the schedule, e.g., galvanneal (GA) product, galvanized (GI) product, galvalume (GU) product, automotive exposed exterior (EXP), dual phase (DP) product, hot rolled (HR) initial product, etc.

[0034] According to one embodiment, the first step includes a modeling sub-step 101 where at least some of the process parameters are calculated using empirical and / or physical and / or statistical laws or formulas linking the process parameters to specifications and / or green product characteristics. Preferably, a target speed for each coil is calculated accordingly.

[0035] In a second step 110 of the method, for each possible combination of two uncoated coils, the impact on product quality of transitioning from a first uncoated coil to a second uncoated coil is evaluated for a selected set of process parameters. A weighting factor is associated with each selected set of parameters upon evaluation of a given combination of two uncoated coils. It should be noted that when referring to "each possible combination of two uncoated coils," for two coils A and B, combination AB is different from combination BA.

[0036] The inventors conducted extensive research studies to evaluate which process parameters, out of the dozens of available ones, affect product quality when transitioning from one coil to a subsequent coil.

[0037] When transitioning from one coil to another, it may be necessary to adapt the thermal cycle of the annealing furnace. During this adjustment, parts of the strip inside the furnace and parts introduced into the furnace may reach peak metal temperatures outside the target range. These parts may then have to be discarded. Depending on the thickness of the coils involved in the transition, there are several possibilities for the transition between the two coils: - Both coils are thicker than the critical thickness for the annealing furnace, defined as the strip thickness that will cause the line to run at its maximum strip speed and the furnace to run at its maximum tube temperature for a given annealing cycle. The line will then run at its maximum tube temperature and the line speed must be adjusted to manage the transition.

[0038] - Both coils are thinner than the critical thickness. In that case, the line must run at full speed and adapt the tube temperature to manage the transition.

[0039] - One coil is thicker than the critical thickness and the second coil is thinner than the critical thickness. Both line speed and tube temperature must then be adapted to manage the transition.

[0040] In the step of evaluating the effect of the transition, the difference in thickness and / or steel grade and / or mechanical properties and / or width of each possible combination of the two uncoated coils is evaluated by measuring the band temperature T P and / or trigger an evaluation of how an adjustment in speed S affects product quality. The temperature and / or speed adjustments may be associated with a weighting factor that may depend on the difference in temperature tolerances of the two coils and / or the difference in speed tolerances of the two coils.

[0041] According to one embodiment, an assessment of how adjusting the temperature and / or speed within the annealing furnace affects product quality is obtained by numerical simulation from a numerical model of the annealing furnace.

[0042] When transferring from one coil to another, it may be necessary to adapt the wiping conditions at the zinc pot outlet. During this adjustment, the part of the strip passing through the wiper may be under- or over-coated. In that case, the part may have to be discarded or the coil reworked. Depending on the line constraints in terms of quality control, there are several possibilities for the transfer between the two coils: - Transition type 1: The wiping medium pressure P and the distance D between the wiper and the steel strip are controlled so that the target minimum coating weight of both coils is met. When transitioning to a higher coating weight range, it indicates overcoating of the trailing end of the first coil. When transitioning to a lower coating weight range, it indicates overcoating of the leading end of the next coil. At best, this transition type results in overconsumption of zinc. Furthermore, when the coating weight ranges of the two coils do not overlap, a part of either the first or the second coil is out of specification and therefore needs to be scrapped or the coils reworked.

[0043] - Transition type 2: The wiping machine pressure P and distance D are regularly adapted at the tip of the second coil. This transition type causes an overconsumption of zinc when transitioning to a smaller coverage area and in some cases the tip of the second coil goes out of specification. The tip of the second coil may have to be scrapped. This transition type also causes an undercoating of zinc when transitioning to a larger coverage area. Therefore the tip of the second coil has to be scrapped or the coil has to be reworked.

[0044] - Similarly, if two coils need to be processed at different line speeds, especially due to differences in thickness and / or steel grade and / or mechanical properties and / or width, the portion of the steel strip passing through the wiping machine during the wiping adjustment may be out of specification as a result of the speed adjustment.

[0045] In the step of evaluating the impact of the transition, differences in the coating rate and / or line speed for each combination of the two uncoated coils trigger an evaluation of how adjustments to the pressure P of the wiping medium and the distance D of the wiper from the strip at the zinc pot outlet affect product quality, and weighting factors can be associated with adjustments to the pressure P and distance D.

[0046] Depending on the line constraints, the weighting factor may depend, among other things, on one of the following: - the difference between the minimum coating weight tolerance of the second coil and the coating weight target of the first coil, or - the difference between the coating weight target of the first coil and the maximum coating weight tolerance of the second coil, or - Ratio ((Minimum weight tolerance of second coil - Target weight of first coil) / (Target weight of second coil - Target weight of first coil)), or - Ratio ((1st coil coating weight target - 2nd coil maximum coating weight tolerance) / (2nd coil coating weight target - 1st coil coating weight target)).

[0047] When transitioning from one coil to another, the temper roll may be opened or closed, or the tension and load of the temper roll may need to be adapted. During this adjustment, the portion of the steel strip going through the temper roll may deviate from the stretch specification and / or may wrinkle and / or may show earing or even break. In that case, this portion needs to be scrapped or the coil reworked.

[0048] In one variant of the invention, in the step of evaluating the influence of the transition, the difference in the steel grade and / or the mechanical properties and / or the hardness and / or the elongation target of each combination of two uncoated coils or the absence of temper rolling for one of the two coils is determined by the tension T S and load F, triggering an evaluation of how adjustments to tension and load F affect product quality, and weighting factors may be associated with adjustments to tension and load.

[0049] Depending on the line constraints, the weighting factors may depend, among other things: - Line speed and the time required to transition from one tension to another and / or from one pressure to another. A person skilled in the art who knows the operating ranges of each product variable and the capabilities of the temper mill can easily estimate this transition time. - Or the probability that some part of the coil will be out of specification. This probability can be easily estimated by a person skilled in the art who knows the average time it takes to transition from one tension to another and / or from one pressure to another.

[0050] When joining two coils of different widths in the entry section of a galvanizing line, a notch is optionally made after the weld to inform the side streamers of the width change. If the width difference is large, a double notch is made which takes more time to achieve. If the additional time required to do this exceeds the remaining time of the strip deposition in the entry looper, the line must be stopped and the portion of the strip located between the annealing furnace and the temper rolling must be discarded.

[0051] In one variant of the invention, in the step of evaluating the effect of the transition, the difference in width of each combination of two ungalvanized coils triggers an evaluation of how the notch formation time affects the product quality. The notch formation time is associated with a weighting factor that may depend on the probability that the time required to weld and notch the two coils exceeds the time of strip deposition in the entry looper. This probability can be easily calculated by a person skilled in the art, knowing the average times required for welding and notching on the galvanizing line under consideration.

[0052] After the trailing end of the first coil is welded to the leading end of the second coil, the two coils are driven together through various devices on the line. Each device has a set strip tension, so it may not accommodate both the tension requirements of the first coil and the second coil, both of which depend on the cross-section of the coils. If the difference in cross-section of the two coils is significant, the appropriate tension for one of the coils may be significantly too high for the other coil, resulting in strip breakage.

[0053] In one variant of the invention, in the step of evaluating the effect of the transition, the difference in the cross section of each combination of two uncoated coils triggers an evaluation of how an adjustment of the strip tension in the entry accumulator affects the product quality, and a weighting factor is associated with the adjustment of the strip tension in the entry accumulator. This weighting factor may for example depend on the probability of a break in the entry accumulator. A person skilled in the art, knowing the maximum solicitation applicable to both coils and the weld, can easily calculate this probability.

[0054] Similarly, the adjustment of the strip tension in the annealing furnace may be associated with a weighting factor that may depend, for example, on the probability of breakage in the annealing furnace.

[0055] At the exit of the temper mill, the strip can optionally pass through a tension leveller to improve its flatness. When transitioning from one coil to another, the tension leveller may be opened or closed, or the tension in the tension leveller may need to be adapted. During this adjustment, the portion of the strip passing through the tension leveller may deviate from the stretch specification and / or show loose edges. In that case, the portion must be scrapped or the coil reworked.

[0056] In one variant of the invention, in the step of evaluating the impact of the transition, the thickness and / or steel grade of each combination of the two uncoated coils, or the absence of tension leveling of the first coil, triggers an evaluation of how adjustments to the tension in the tension leveller affect the product quality, with a weighting factor associated with the tension adjustments.

[0057] Depending on the line constraints, the weighting factor may depend on: - Line speed and the time it takes to transition from one tension to another. A person skilled in the art who knows the operating ranges of each product variable and the capabilities of the tension leveler can easily calculate this transition time.

[0058] - Or the probability that some of the coils will be out of specification. A person skilled in the art who knows the average time it takes to transition from one tension to another can easily calculate this probability.

[0059] The metal coating applied to the strip may optionally be annealed to obtain a galvannealed coating. When moving from one coil to another, the heating power of the galvannealing furnace may need to be adapted, especially due to changes in chemistry or changes in line speed resulting from differences in thickness and / or steel grade and / or mechanical properties and / or width. During this adjustment, the part of the strip passing the galvannealing surface may show a shiny surface or powdering.

[0060] In one variant of the invention, in the step of evaluating the effect of the transition, differences in the line speed and / or the chemistry of the steel substrate for each combination of the two uncoated coils, or the need for galvannealing of one of the two coils, trigger an evaluation of how an adjustment of the heating power in the galvannealing furnace affects the product quality, and a weighting factor is associated with the heating power adjustment, which may for example depend on the ability of the line to detect defects either at the exit of the furnace or only at the end of the line.

[0061] At the exit of the line, the strip may optionally be oiled in an oiler to improve the corrosion resistance and drawability of the strip. When transitioning from one coil to another, the oiler may be turned on or off, or the type of oil and / or the amount of oil may need to be changed. During this adjustment, a part of the strip may receive particularly too much oil, which may lead to the coil collapsing in the yard. In that case, the coil must be reworked. It is also possible that a part of the strip is left dry without being oiled. In that case, that part must be discarded.

[0062] In one variant of the invention, in the step of evaluating the effect of the migration, differences in the oil properties or oil coverage of each combination of two uncoated coils, or the need to oil one of the two coils, trigger an evaluation of how an adjustment of the oil quality and / or oil properties affects the product quality, to which a weighting factor is associated, which may for example depend on the probability of causing this defect.

[0063] At the exit of the line, the strip may be optionally passivated in a chemical treatment section to improve the corrosion resistance of the strip and the drawability of the strip. When transitioning from one coil to another, the chemical treatment section may be turned on and off noticeably. During this operation, a portion of the strip may not receive the proper amount of passivation coverage or may become passivated instead of remaining dry. In that case, that portion must be discarded.

[0064] In one variant of the invention, in the step of evaluating the impact of the transition, the need for passivation of one of the two coils triggers an evaluation of how a passivation process adjustment affects the product quality, to which a weighting factor is associated, which may for example depend on the probability of causing this defect.

[0065] The above principles can be adapted for each galvanizing line depending in particular on the layout of the galvanizing line, the products it processes, or the specific constraints of the line, so that the relevant process parameter sets and the corresponding characteristics on which they depend are selected before the first step of the scheduling method.

[0066] However, it has been observed that all galvanizing lines have in common that the evaluation of the impact of the transition from the first ungalvanized coil to the second ungalvanized coil on product quality is performed with respect to a set of process parameters that includes at least the following set: - temperature T of the metal strip in the annealing furnace P and adjusting the speed S, - Adjustment of the pressure P of the wiping medium and the distance D of the wiping machine from the metal strip at the outlet of the zinc pot.

[0067] After the effect of the transition between two uncoated coils has been evaluated with respect to the defined parameter sets and a weighting factor has been associated with each parameter set, the combination of these two coils is associated with a weighting factor that depends on the weighting factor associated with each parameter set, taking into account the line constraints related to the transition under consideration, i.e. the weighting factor is adjusted if the transition between the two coils violates at least one of the line constraints.

[0068] Preferably, a transition that respects all the line constraints is associated with a weighting factor that is the sum of the individual weighting coefficients. According to another variant, a transition that respects all the line constraints is associated with a weighting factor in the form of a matrix of the individual weighting coefficients.

[0069] A transition that violates at least one of the line constraints, in particular a disallowed transition, is associated with a penalty, preferably based on the severity of the violation. Preferably, such a transition is associated with a penalty in the form of a value added to the sum of the individual weighting factors or in the form of a quadratic weighting factor. The penalty may be the sum of the individual penalties depending on the severity of each violation. According to another variant, such a transition is associated with a penalty in the form of a matrix of the individual penalties.

[0070] The term "weighting factor" should be understood to include possible combinations of weighting factors and secondary weighting factors, and possible combinations of matrices of individual weighting coefficients and matrices of individual penalties.

[0071] After a weight factor has been assigned to each possible combination of raw coils, the result is calculated to obtain an optimized schedule for the multiple raw coils under consideration. In general terms, this calculation is performed by calculating, for the maximum possible number of possible schedules of raw coils in a certain time, a score that depends on the sum of the weight factors associated with the combinations involved in the schedule, and selecting an optimal score, which can be the minimum or maximum score depending on how the weight coefficients relate to the product quality. Preferably, the optimal score is the minimum score. Since there may be a huge number of possible schedules and the time to reach a conclusion is limited, the solution may be approximated. In other words, the algorithm may select the schedule with the lowest score among the schedules considered. The calculation is preferably performed based on an algorithm developed or configured to solve the famous Traveling Salesman Problem. In this case, the cities visited by the salesman are the coils to be scheduled and the distance between each pair of cities is the weight factor associated with each pair of coils. Numerous algorithms have been developed to solve this problem, such as the Held-Karp algorithm, the branch and bound algorithm, and can be used within the scope of the present invention. Heuristic and metaheuristic algorithms can also be used that aim to generate an approximate solution that is good enough to solve the problem at hand within a reasonable time frame. Examples of such algorithms are nearest neighbor algorithms, Match twice and stitch (MTS), Christofides' algorithm, Pairwise exchange, Lin-Kernighan heuristics, variable-opt method, optimized Markov chains, Tabu search algorithm, ant colony optimization, etc.

[0072] In this calculation, the algorithm preferably does not select as the next candidate in the sequence being constructed an uncoated coil whose weight factor with the last coil in the sequence being constructed includes a penalty. If this is not feasible, the algorithm preferably selects an uncoated coil whose weight factor with the last coil in the sequence being constructed has the lowest penalty. Similarly, the algorithm preferably does not select a schedule that includes disallowed transitions unless it is not possible to schedule multiple uncoated coils without disallowed transitions and therefore without transition coils.

[0073] According to one embodiment, the score is the sum of the weighting factors associated with the combinations that make up the schedule.

[0074] According to another embodiment, the score includes, in addition to the sum of the weighting factors, a sequence weighting term which relates to the entire sequence or a partial sequence and which can be calculated only after the schedule is known or during the creation of the schedule.

[0075] According to one embodiment, the score includes a sequence weight term related to possible build-up on the rolls immersed in the zinc pot. In case of transition to wider coils, i.e. width expansion, possible build-up on the pot rolls may cause a line defect. In that case, a certain length of steel strip must be scrapped or sold as a secondary selection. The probability of causing this defect depends on the number of narrower coils that are immersed in the zinc pot before the width expansion. Thus, for a schedule including width expansion, each transition to a wider coil is associated with a weight term that may depend on the number of narrower coils that are immersed in the zinc pot before the width expansion, and the corresponding sequence weight term is the sum of the weight terms associated with the transitions to the wider coils.

[0076] According to one embodiment, the score includes a sequence weight term related to possible scratches on the temper rolls. When transitioning to a wider coil, possible scratches on the rolls caused by the edge of the previous coil may cause a line defect. In that case, a certain length of steel strip must be scrapped or sold as a secondary selection. The probability of causing this defect depends on the number of narrower coils that are temper rolled before the width expansion. Thus, for a schedule that includes width expansion, each transition to a wider coil is associated with a weight term that may depend on the number of narrower coils that are temper rolled before the width expansion, and the corresponding sequence weight term is the sum of the weight terms associated with the transitions to the wider coils.

[0077] According to one embodiment, the score includes a sequence weight term related to possible scratches on the passivated rolls in the chemical treatment section. When transitioning to a wider coil, possible scratches on the rolls caused by the edge of the previous coil may cause a line defect. In that case, a certain length of steel strip must be scrapped or sold as a secondary selection. The probability of causing this defect depends on the number of narrower coils that are passivated before the width expansion. Thus, for a schedule that includes width expansion, each transition to a wider coil is associated with a weight term that may depend on the number of narrower coils that are passivated before the width expansion, and the corresponding sequence weight term is the sum of the weight terms associated with the transitions to the wider coils.

[0078] After the algorithm is finished, the schedule with the lowest score among the schedules considered by the algorithm is presented to the line operator for verification or adjustment. This adjustment is optional and is made by the line operator based on the line operator's expertise. Adjustments to the schedule may include replacing two coils or inserting a transition coil or an available coil in inventory between two coils that are incompatible with each other and awaiting scheduling. This may be done manually or automatically at the request of the operator. If a coil is replaced, the score of the modified schedule may be recalculated so that the positive impact of the replacement on product quality may be evaluated.

[0079] As shown in FIG. 1, the scheduling method is preferably implemented by an electronic scheduling device 1 .

[0080] The electronic scheduling device 1 includes an acquisition module 2 configured to collect a plurality of characteristics defining each ungalvanized coil to be galvanized, a plurality of specifications to be met for each galvanized coil, a plurality of process parameters required to meet the specifications for each galvanized coil, and a plurality of line constraints, collectively referred to as representative data.

[0081] According to one embodiment, the acquisition module 2 includes a modeling sub-module 3 configured to calculate at least a portion of the plurality of parameters from empirical and / or physical and / or statistical laws or equations linking the process parameters to specifications and / or unplated product characteristics.

[0082] The term "modeling" refers to the use of empirical and / or physical and / or statistical laws or formulas to determine parameters. It may also refer to numerical simulation, such as running a simulation on a computer.

[0083] The electronic scheduling device 1 further comprises an allocation module 4 configured to evaluate, for each possible combination of two ungated coils, the impact on product quality of a transition from a first ungated coil to a second ungated coil with respect to a selected set of parameters, and to assign to each possible combination of ungated coils a weighting factor that depends on the result of the impact assessment and takes into account line constraints.

[0084] The electronic scheduling device 1 further comprises a calculation module 5 configured to calculate the results obtained in the allocation module and to select the schedule having the lowest score among the considered schedules.

[0085] In a preferred embodiment, the electronic scheduling device 1 includes a validation module 6 configured to provide a view of the schedule selected in the calculation module and to allow validation or adjustment of the proposed schedule. If a coil is replaced, the score of the modified schedule may be recalculated in the calculation module 5 so that the positive impact of the replacement on product quality can be evaluated.

[0086] 1, the electronic scheduling device 1 includes a processing unit 7 formed, for example, of a memory 8 and a processor 9 coupled to the memory. The electronic monitoring device may also include a display screen 10 and input / output means 11, such as a keyboard and a mouse, each connected to the processing unit.

[0087] In this embodiment, the acquisition module 2, the allocation module 4, the calculation module 5 and in a preferred embodiment the validation module 6 are realised, i.e. implemented, for example, each as software executable by a processor or group of processors (hereafter referred to as processor) 9. The memory 8 of the processing unit 7 stores the acquisition software configured to collect a number of characteristics defining each ungalvanised coil to be galvanised, a number of specifications to be met for each galvanised coil, a number of process parameters necessary to meet the specifications of each galvanised coil and a number of line constraints; and for each possible combination of two ungalvanised coils, at least two sets of parameters: - band temperature T of the strip in the annealing furnace P and adjusting the speed S, - Adjustment of the wiping medium pressure P and the wiping machine distance D with the strip at the zinc pot outlet and an allocation software configured to evaluate the impact of the transition from a first to a second uncoated coil on the product quality and to assign to each possible combination of uncoated coils a weighting factor that depends on the outcome of the impact assessment and that takes into account the line constraints; and a calculation software configured to calculate the result obtained in the allocation module by calculating, for a number of possible schedules of uncoated coils, a score that depends on the sum of the weighting factors associated with the combinations of uncoated coils involved in the given schedule and selecting the schedule with the best score. In a preferred embodiment, the memory 8 of the processing unit 7 is adapted to store a validation software configured to provide a view of the schedule selected in the calculation module and to enable validation of the selected schedule or manual adjustment thereof.

[0088] The processor 9 of the processing unit 7 is then configured to execute the acquisition software, the allocation software, the calculation software and, in a preferred embodiment, the verification software.

[0089] When the electronic scheduling device 1 is in the form of one or more software programs, i.e. computer programs, they can also be recorded on a computer-readable medium. A computer-readable medium is, for example, a medium that can store electronic instructions and can be coupled to a bus of a computer system. For example, the readable medium is an optical disk, a magneto-optical disk, a ROM memory, a RAM memory, any kind of non-volatile memory (e.g. EPROM, EEPROM, Flash, NVRAM), a magnetic card or an optical card. In that case, the computer program with the software instructions is stored on the readable medium.

[0090] The operation of the electronic scheduling device 1 according to the invention will now be described with reference to FIG. 2, which represents a flow chart of a method according to the invention for scheduling the production of a plurality of galvanized coils on a continuous galvanizing line.

[0091] First, in step 100, the electronic scheduling device 1, via its acquisition module 2, acquires a number of characteristics defining each ungalvanized coil to be galvanized, a number of specifications to be met for each galvanized coil, a number of process parameters required to meet the specifications of each galvanized coil, and a number of line constraints.

[0092] In a preferred embodiment, the process parameters required to meet the given specifications are stored in an existing database accessible by the acquisition module or pre-set in the acquisition module, so that they do not have to be newly acquired from scratch every time a new plurality of galvanized coils has to be scheduled. The process parameters can be stored or pre-set in the form of values ​​or ranges, or in the form of empirical and / or physical and / or statistical laws or formulas linking the process parameters to the specifications and / or the galvanized product characteristics. Preferably, the acquisition module selects from among all the pre-set process parameters the process parameters that relate to the specifications of the plurality of galvanized coils to be scheduled. Similarly, the line constraints are preferably stored in an existing database accessible by the acquisition module or pre-set in the acquisition module. More preferably, the line constraints are stored in the form of a pre-set combination of line constraints that relate to the type of galvanized coils to be produced during the schedule, called the operating mode.

[0093] Optionally, in modeling substep 101, the Acquisition Module 2, through its Modeling Submodule 3, calculates or models at least a portion of the plurality of process parameters from empirical and / or physical and / or statistical laws or equations linking the process parameters to specifications and / or unplated product characteristics.

[0094] In a next step 110, the electronic scheduling device 1, via its allocation module 4, evaluates, for each possible combination of two unclad coils, the impact on the product quality of a transition from a first unclad coil to a second unclad coil with respect to at least two sets of parameters: Band temperature T of the metal strip in the annealing furnace P and adjusting the speed S, Adjustment of the wiping medium pressure P and the distance D of the wiping machine from the metal strip at the zinc pot outlet.

[0095] As previously mentioned, for each possible combination of two uncoated coils, a weighting factor is associated with each parameter set that depends on the collected characteristics.

[0096] Optionally, in step 110, the allocation module 4 may evaluate the impact on product quality of the transition from the first uncoated coil to the second uncoated coil with respect to other parameter sets.

[0097] In a next step 120, the electronic scheduling device 1, through its allocation module 4, assigns to each possible combination of uncoated coils a weighting factor that depends on the result of the previous step 110 and takes into account the line constraints.

[0098] As previously mentioned, each possible combination of uncoated coils is associated with a weighting factor that depends on the weighting coefficients associated with each parameter set.

[0099] In a next step 130, the electronic scheduling device 1, through its calculation module 5, calculates the results obtained in the allocation module 4 for several possible schedules of raw coils, in particular for the possible schedules of the maximum possible number of raw coils in a certain time, by calculating a score that depends on the sum of the weighting factors associated with the combinations involved in said schedules, and by selecting the schedule with the lowest score among the schedules considered. The number of possible schedules can be a given number, possibly entered into the scheduling device, or it may simply be the result of the time given to the calculation module to display the selected schedule. This calculation is usually performed for several hundred possible schedules.

[0100] As previously mentioned, the calculations are preferably based on algorithms developed for solving the Traveling Salesman Problem, or algorithms adapted therefrom.

[0101] Optionally, in a next step 140, the electronic scheduling device 1, via its validation module 6, displays the schedule selected in the calculation module for validation or adjustment of the proposed schedule. If the schedule is validated as valid by the line operator, the scheduling method ends.

[0102] Otherwise, the schedule is modified, either manually or automatically, and the scheduling method proceeds to the next step 150, where the electronic scheduling device 1, via its calculation module 5, calculates a score for the modified schedule so that the positive impact of the modifications on product quality can be evaluated. After the score has been recalculated, the scheduling method returns to step 140, where the electronic scheduling device 1, via its verification module 6, displays the schedule originally selected in the calculation module and the modified schedule. The line operator can either verify that one of the two schedules is reasonable, or make additional manual adjustments to the modified schedule.

[0103] The invention has been described above for the scheduling of individual coils. However, the method also covers setting production schedules for a number of orders, each of which includes a number of coils. According to one variant, all the coils of each order are the same. In that case, each order is identified as a general coil. The "multiple galvanized coils of metal strip" defined above therefore consists of all the general coils. The combination of the general coils is taken into account when evaluating and calculating the effect of the transition from one coil to another. According to another variant, not all the coils of each order are the same. In that case, each order can be defined by its first coil and its last coil. The "multiple galvanized coils of metal strip" defined above can therefore consist of all the first and last coils of each order. In that case, only the combination of the last coil of the first order with the first coil of the second order is possible and is taken into account when evaluating and calculating the effect of the transition from one coil to another.

[0104] Comparative simulations have been carried out which show that the method according to the invention improves the quality of the processed strip at the transition between the coils.

[0105] The simulation is based on sequences of ungalvanized coils scheduled and processed on three existing galvanizing lines. The sequences scheduled according to the prior art (i.e. by associating an arbitrary penalty or bonus to each type of transition according to a given product variable) gave rise to a quality loss, which was measured and quantified. The same sequences were rescheduled using the method according to the invention. To facilitate comparison with the quality loss obtained using prior art scheduling, the results of the calculations were converted to quality loss.

[0106] Table 1 details the parameter sets selected for each of the three galvanizing lines.

[0107] Table 2 details the results obtained for both the prior art scheduling ("reference quality loss") and the scheduling according to the invention ("optimized quality loss"). The improvement factor is defined as the ratio between the reference quality loss and the optimized quality loss.

[0108] For all three galvanizing lines, sequence weight terms related to zinc deposition on the rolls immersed in the zinc pot and scratches on the temper rolls were considered.

[0109] For line 3, a sequence weight term related to scratches on the passivated roll was also considered.

[0110] As is evident from the results detailed in Table 2, the scheduling method according to the present invention significantly reduces the quality loss.

[0111] [Table 1]

[0112] [Table 2]

Claims

1. 1. A method for scheduling the production of a plurality of galvanized coils of metal strip on a continuous galvanizing line including an annealing furnace, a zinc pot, and a wiping machine, comprising: collecting (100) a number of characteristics defining each ungalvanized coil to be galvanized, a number of specifications to be met for each galvanized coil, a number of process parameters required to meet the number of specifications for each galvanized coil based on the number of characteristics, and a number of line constraints for each galvanized coil to be produced; For each possible combination of two uncoated coils, at least two of the process parameters are selected from the following sets: The temperature T of the metal strip in the annealing furnace P and adjusting the speed S; Adjustment of the pressure P of the wiping medium and the distance D of the wiper from the metal strip at the outlet of the zinc pot evaluating the impact of the transition from the first ungalvanized coil to the second ungalvanized coil on the quality of the galvanized coil (110); Associating a weighting factor for each parameter set with the effect on the product quality of the transition from a first uncoated coil to a second uncoated coil, and assigning (120) to each possible combination of uncoated coils a weighting factor depending on the result of the previous step (110) and taking into account said line constraints, based on a sum or a matrix of weighting factors associated with at least two parameter sets; A step (130) of calculating the result of the previous step (120) by calculating, for several possible schedules of the plurality of blank coils, a score that depends on the sum of the weighting factors associated with the combination of blank coils involved in a given schedule, and by selecting the schedule having the best score among the scores calculated for said several possible schedules. A method comprising:

2. 2. The method of claim 1, wherein the plurality of characteristics defining each uncoated coil includes thickness, steel grade, mechanical properties, width, and hardness.

3. 3. The method of claim 1 or 2, wherein the multiple specifications to be met for each galvanized coil include the amount of zinc, the amount of zinc tolerance, the performance of temper rolling, and the elongation to be achieved during temper rolling.

4. 4. The method according to any one of claims 1 to 3, wherein the plurality of process parameters required to meet the specifications of each galvanized coil include target temperature in the annealing furnace, temperature tolerance in the annealing furnace, line speed, line speed tolerance in the annealing furnace, wiping pressure P, wiping distance D, and temper rolling tension and load.

5. The method of claim 1 , wherein the plurality of line constraints includes a maximum capacity of the line and transitions that are not allowed by the line operator.

6. 6. The method of claim 1, wherein in the collecting step, the data is collected manually, obtained from an existing database, or calculated.

7. 7. The method according to claim 1, wherein the collecting step comprises a modelling sub-step, in which at least a part of the plurality of process parameters is calculated from empirical and / or physical and / or statistical laws or formulas.

8. 2. The method of claim 1, wherein for each possible pair of two unplated coils, adjustments to the band temperature and speed in the annealing furnace are associated with a weighting factor based on the difference in temperature tolerance of the two coils and / or the difference in speed tolerance of the two coils.

9. 2. The method of claim 1, wherein the weighting factor assigned to each possible combination of uncoated coils is a sum of weighting coefficients associated with the parameter sets.

10. The continuous galvanizing line further includes a temper rolling, and the effect of the transition from the first uncoated coil to the second uncoated coil on the product quality is determined by the tension T of the temper rolling. S and adjusting the load F.

11. For each possible combination of two uncoated coils, the temper rolling tension T S and the adjustment of the load F is associated with a weighting factor that depends on the line speed and the time it takes to transition from one tension to another and / or from one pressure to another.

12. 12. The method of any one of claims 1 to 11, wherein the continuous galvanizing line further comprises an entry accumulator, and the impact of the transition from the first ungalvanized coil to the second ungalvanized coil on product quality is further evaluated with respect to adjusting the tension in the entry accumulator and / or the annealing furnace.

13. 13. The method of any one of claims 1 to 12, wherein the continuous galvanizing line further comprises a tension leveller, and the impact of the transition from the first ungalvanized coil to the second ungalvanized coil on product quality is further evaluated with respect to adjusting the tension in the tension leveller.

14. 14. The method according to any one of claims 1 to 13, wherein the continuous galvanizing line further comprises a galvannealing furnace, and the impact of the transition from the first ungalvanized coil to the second ungalvanized coil on the product quality is further evaluated with respect to adjusting the heating power in the galvannealing furnace.

15. 15. The method of any one of claims 1 to 14, wherein the continuous galvanizing line further comprises an oiler configured to apply oil to the galvanized coil, and the impact of the transition from the first ungalvanized coil to the second ungalvanized coil on the product quality is further evaluated with respect to adjusting the oil quality and / or oil properties in the oiler.

16. 16. The method of claim 1, wherein the score calculated for a given schedule of a plurality of uncoated coils is the sum of weighting factors associated with the combination of uncoated coils that make up the schedule.

17. 16. The method of claim 1, wherein the score calculated for a given schedule of a plurality of uncoated coils includes a sequence weight term in addition to the sum of weight factors associated with combinations of the uncoated coils that make up the schedule.

18. Displaying the schedule with the best score and manually or automatically modifying it (140); Calculating the score of the revised schedule (150) 18. The method of any one of claims 1 to 17, further comprising:

19. A computer program comprising software instructions which, when executed by a processor, performs the method of any one of claims 1 to 18.

20. An electronic scheduling device (1) for setting a production schedule for a plurality of galvanized coils of metal strip on a continuous galvanizing line including an annealing furnace, a zinc pot, and a wiping machine, the electronic monitoring device comprising: an acquisition module (2) configured to collect a number of characteristics defining each ungalvanized coil to be galvanized, a number of specifications to be met for each galvanized coil, a number of process parameters necessary to meet the number of specifications for each galvanized coil based on the number of characteristics, and a number of line constraints for each galvanized coil to be produced; For each possible combination of two uncoated coils, at least two of the process parameters are selected from the following sets: Temperature T of the metal strip in the annealing furnace P and adjusting the speed S; Adjustment of the pressure P of the wiping medium and the distance D of the wiper from the metal strip at the outlet of the zinc pot To evaluate the effect of transitioning from the first uncoated coil to the second uncoated coil on product quality, an allocation module (4) configured to associate a weighting factor with the impact on the product quality of the transition from the first uncoated coil to the second uncoated coil for each parameter set and to assign to each possible combination of uncoated coils a weighting factor depending on the outcome of the impact assessment and taking into account said line constraints, based on a sum or a matrix of weighting factors associated with the at least two parameter sets; a calculation module (5) configured to calculate the results obtained in the allocation module by calculating, for several possible schedules of the plurality of blank coils, a score that depends on the sum of weighting factors associated with the combination of blank coils involved in a given schedule, and by selecting the schedule having the best score among the scores calculated for said several possible schedules; 1. An electronic scheduling device comprising:

21. 21. The electronic scheduling device of claim 20, further comprising a validation module (6) configured to provide a view of the selected schedule in the calculation module and to allow validation or manual or automatic adjustment of the selected schedule.

22. 1. An apparatus for supplying a plurality of galvanized coils, comprising: Continuous galvanizing lines for producing multiple galvanized coils, An electronic scheduling device for setting production schedules for multiple galvanized coils 22. An installation comprising: an electronic scheduling device according to claim 20,

Citation Information

Patent Citations

  • Coordinating and dispatching method for steel coils of multiple production lines in iron and steel enterprise cold rolling area

    CN104376424A

  • Preparation of production planning

    JP1997183044A

  • Production schedule creation device and production schedule creation method

    JP2013008268A

  • Device and method for mill pacing, and operation method

    JP2014028394A

  • Method for operating a continuous annealing line for the processing of a rolled good

    US20140175713A1