Power generation system, monitoring device, and method for monitoring a power generation system
The power generation system addresses instability during self-sustaining operations by using a monitoring device to display operating tolerance ranges, allowing operators to adjust generator output and load power, thereby ensuring stable and continuous power supply.
Patent Information
- Application Number
- JP2024098590
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2024-06-19
- Publication Date
- 2024-09-24
- Estimated Expiration
- 2044-06-19
AI Technical Summary
Existing power generation systems face instability during self-sustaining operations due to changes in frequency and power output that can lead to generators being overloaded or underloaded, causing potential equipment failure and operational disruptions.
A power generation system with multiple generators connected to a power grid, featuring a circuit breaker and a monitoring device that displays a graph showing an operating tolerance range on a monitor, allowing operators to adjust generator output and load power to prevent overload or underload by switching to a self-sustaining state.
Enables stable operation during self-sustaining conditions by providing real-time visual feedback to operators, reducing the risk of generator failure and ensuring continuous power supply to critical loads.
Smart Images

Figure 0007555513000001
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a power generation system, a monitoring device, and a method for monitoring a power generation system. [Background technology]
[0002] Patent Document 1 discloses a distributed power supply system in which a plurality of generators are interconnected with a grid or operated independently. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2009-81942 A Summary of the Invention [Problem to be solved by the invention]
[0004] The present disclosure provides a power generation system, a monitoring device, and a method for monitoring a power generation system that enable stable operation during stand-alone operation. [Means for solving the problem]
[0005] [1] A power generation system comprising: two or more generators connected to an electric power grid and operating in parallel; a circuit breaker that switches between an interconnected operation state in which the electric power grid and the two or more generators are connected and an independent operation state in which the electric power grid and the two or more generators are cut off; and a display control unit that displays a graph including a first axis and a second axis on a monitor in the interconnected operation state, wherein the first axis represents a physical quantity related to the power generation output of a target generator that is any one of the two or more generators, and the second axis represents the power consumption of a critical load to which power is supplied from the two or more generators in the independent operation state, and the display control unit displays on the second axis of the graph an operational tolerance range that represents a range within which it is expected that the operation of the two or more generators will not be impaired after being switched to the independent operation state.
[0006] [2] The power generation system described in [1] above, wherein the display control unit displays the graph on the monitor so that the acceptable operating range changes over time depending on the operating status of at least one of the two or more generators.
[0007] [3] The power generation system described in [2] above, further comprising an operating status acquisition unit that acquires a rotational speed or a frequency of any one of the two or more generators from a power generation control unit that controls the generator as at least a part of the operating status, and the display control unit displays the graph on the monitor so that the acceptable operating range changes over time depending on the rotational speed or the frequency acquired by the operating status acquisition unit.
[0008] [4] The power generation system according to any one of [1] to [3] above, wherein the display control unit displays, within the graph, an operating point including the current value of the power consumption of the important load and the current value of the physical quantity together with the allowable operating range.
[0009] [5] The power generation system according to [4] above, further comprising a warning notification unit that issues a warning to a user based on a comparison result between the operating point and the allowable operating range.
[0010] [6] A power generation system according to any one of [1] to [5] above, wherein a portion of the allowable operating range is defined by a first boundary line representing the boundary as to whether or not at least one of the two or more generators is overloaded.
[0011] [7] A power generation system according to any one of [1] to [5] above, wherein a portion of the allowable operating range is defined by a second boundary line representing the boundary between whether or not at least one of the two or more generators is lightly loaded.
[0012] [8] The power generation system described in [6] or [7] above, wherein the first axis represents the power generation output of the generator, the permissible operating range represents a range on both the first axis and the second axis of the graph within which it is assumed that operation of the two or more generators will not be impaired after being switched to the independent operation state, and the range of the permissible operating range related to the first axis is defined by at least one of a third boundary line representing the minimum output that the target generator can generate and a fourth boundary line representing the maximum output that the target generator can generate.
[0013] [9] The two or more generators include a first generator and a second generator, and the power generation system further includes a first power generation control unit that controls the first generator according to an isochronous characteristic in the independent operation state, and a second power generation control unit that controls the second generator according to a droop characteristic in the independent operation state. The power generation system described in any one of [1] to [8] above.
[0014]
[10] The two or more generators include a first generator and a second generator, and the power generation system further includes a first power generation control unit that controls the first generator according to a droop characteristic in the independent operation state, and a second power generation control unit that controls the second generator according to a droop characteristic in the independent operation state. The power generation system described in any one of [1] to [8] above.
[0015]
[11] A monitoring device provided in a power generation system including two or more generators connected to a power grid and operating in parallel, and a circuit breaker that switches between an interconnected operation state in which the power grid and the two or more generators are connected and an independent operation state in which the power grid and the two or more generators are cut off, the monitoring device further comprising a display control unit that displays a graph including a first axis and a second axis on a monitor in the interconnected operation state, the first axis representing a physical quantity related to the power generation output of a target generator which is any one of the two or more generators, and the second axis representing the power consumption of an important load to which power is supplied from the two or more generators in the independent operation state, and the display control unit displays on the second axis of the graph an operating tolerance range which represents a range within which it is expected that the operation of the two or more generators will not be hindered after being switched to the independent operation state.
[0016]
[12] A method for monitoring a power generation system including two or more generators connected to a power grid and operating in parallel, and a circuit breaker for switching between an interconnected operation state in which the power grid and the two or more generators are connected and an independent operation state in which the power grid and the two or more generators are cut off, the method including a display step of displaying on a monitor a graph including a first axis and a second axis in the interconnected operation state, the first axis representing a physical quantity related to the power generation output of a target generator which is any one of the two or more generators, and the second axis representing the power consumption of a critical load to which power is supplied from the two or more generators in the independent operation state, and the display step of displaying on the second axis of the graph an operational tolerance range which represents a range within which it is assumed that the operation of the two or more generators will not be hindered after being switched to the independent operation state. Effect of the Invention
[0017] According to the present disclosure, a power generation system, a monitoring device, and a monitoring method for a power generation system are provided that are capable of achieving stable operation during stand-alone operation. [Brief description of the drawings]
[0018] [Figure 1]FIG. 1 is a schematic diagram showing an example of a power generation system. [Diagram 2] Fig. 2(a) is a schematic diagram showing an example of the flow of power during grid-connected operation, and Fig. 2(b) is a schematic diagram showing an example of the flow of power during independent operation. [Diagram 3] Fig. 3(a) is a graph for explaining the droop characteristic, and Fig. 3(b) is a graph for explaining the isochronous characteristic. [Figure 4] FIG. 4 is a diagram for explaining the outputs from the two generators during independent operation. [Diagram 5] Fig. 5(a) is a diagram showing an example of outputs from two generators when connected to the grid, and Fig. 5(b) is a diagram for explaining problems that may occur when transitioning to isolated operation. [Figure 6] FIG. 6 is a diagram for explaining an example of a method for avoiding the problem. [Figure 7] FIG. 7 is a schematic diagram illustrating an example of a functional configuration of the upper control device. [Figure 8] 8(a) and 8(b) are diagrams showing examples of graphs that the display control unit displays on the monitor. [Figure 9] FIG. 9 is a schematic diagram illustrating an example of a hardware configuration of the upper control device. [Figure 10] FIG. 10 is a flowchart showing an example of a series of processes executed by the upper level control device during grid interconnection. [Figure 11] 11(a) and 11(b) are diagrams showing examples of graphs that the display control unit displays on the monitor. [Figure 12] 12(a) and 12(b) are diagrams showing examples of graphs that the display control unit displays on the monitor. [Figure 13] FIG. 13 is a diagram for explaining outputs from two generators during independent operation. [Figure 14] Fig. 14(a) is a diagram showing an example of outputs from two generators when connected to the grid, and Fig. 14(b) is a diagram for explaining problems that may occur when transitioning to isolated operation. [Figure 15]Fig. 15(a) is a diagram showing an example of a graph displayed on a monitor by a display control unit, and Fig. 15(b) is a diagram for explaining the calculation of the boundary portion of the permissible operating range. [Figure 16] FIG. 16 is a diagram showing an example of a graph that the display control unit displays on the monitor. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0019] Hereinafter, an embodiment will be described with reference to the drawings. In the description, the same elements or elements having the same functions are denoted by the same reference numerals, and duplicated description will be omitted.
[0020] [Power generation system] FIG. 1 shows a schematic diagram of a power generation system according to an embodiment. The power generation system 1 shown in FIG. 1 is a system that generates power by being connected to a power grid. The power generation system 1 is installed, for example, in a customer facility such as a factory, or in a power plant. The power generation system 1 includes two or more generators that operate in parallel. In the following, the contents of the present disclosure will be described using an example in which the power generation system 1 includes two generators (two generators) that operate in parallel. In addition, in the following description, "generator" refers to equipment including a prime mover (generator in the broad sense).
[0021] The power generation system 1 includes a generator 10A and a generator 10B as two or more generators. The generator 10A and the generator 10B are installed on a premises (for example, in a facility such as a factory). The generators 10A and 10B can be connected in parallel to each other to generate power. The generators 10A and 10B are connected to a power system 200 to generate power and supply the power to a load 100. Each of the generators 10A and 10B is connected to, for example, one of a gas turbine and a steam turbine, or both of a gas turbine and a steam turbine. The power generation method (i.e., the type of prime mover connected) may be different between the generators 10A and 10B. The output of at least one of the generators 10A and 10B may be adjustable by an operator.
[0022] The power system 200 is, for example, a commercial power system provided by a power company. In one example, the power system 200 can supply AC power (AC voltage) with a rated frequency of 50 Hz or 60 Hz to consumer facilities.
[0023] The load 100 consumes power within the premises where the power generation system 1 is installed. The load 100 includes two or more load devices. Specific examples of the load devices include, but are not limited to, a motor, a heater, a cooler, and a light. The load 100 may be classified into an important load 110 and a general load 120. For example, the operator of the power generation system 1 may classify the load 100 into the important load 110 and the general load 120 by switching the connection destination of the load devices included in the load 100. Alternatively, the important load 110 and the general load 120 may be connected separately in advance at the time of construction. Each of the important load 110 and the general load 120 includes one or more load devices. The power (power consumption) required by the important load 110 and the general load 120 varies depending on the usage status of the devices included in these loads. Note that the load 100 may be composed of only the important load 110 without the general load 120.
[0024] Fig. 2(a) shows a schematic diagram of the flow of power when the generators 10A and 10B operate in a manner interconnected with the power system 200. Fig. 2(b) shows a schematic diagram of the flow of power when the generators 10A and 10B operate without being interconnected with the power system 200. In the present disclosure, the state in which the generators 10A and 10B operate in a manner interconnected with the power system 200 is referred to as a "grid-connected operation state," and the state in which the generators 10A and 10B operate without being interconnected with the power system 200 is referred to as a "standalone operation state."
[0025] The power generation system 1 includes a circuit breaker 20. The circuit breaker 20 is a device that connects or disconnects a power system 200 and two or more generators (the generators 10A and 10B). That is, the circuit breaker 20 switches between a state in which the power system 200 and the generators 10A and 10B are connected (grid-connected operation state) and a state in which the power system 200 and the generators 10A and 10B are disconnected (independent operation state). For example, when the circuit breaker 20 is in an on state, the generators 10A and 10B are connected to the power system 200, and when the circuit breaker 20 is in an off state, the generators 10A and 10B are disconnected from the power system 200.
[0026] In the interconnected operation state, the generators 10A and 10B operate in parallel with the power system 200. In this case, for example, as shown in FIG. 2(a), the generators 10A and 10B supply power to the important loads 110 and the general loads 120. When the power generation outputs of the generators 10A and 10B are less than the power required by the important loads 110 and the general loads 120, the power system 200 also supplies power to the important loads 110 and the general loads 120. That is, power is purchased from the power system 200. When the power generation outputs of the generators 10A and 10B exceed the power required by the important loads 110 and the general loads 120, the surplus power generation outputs of the generators 10A and 10B are supplied to the power system 200. That is, power is sold to the power system 200.
[0027] In the isolated operation state, for example, as shown in Fig. 2(b), power is not supplied from the generators 10A and 10B to the general load 120, and the generators 10A and 10B supply power to the important load 110. It can be said that the important load 110 is a load to which power is supplied from the generators 10A and 10B in the isolated operation state. The power consumption (load power) of the important load 110 may be adjustable by an operator by stopping some of the load devices included in the important load 110, changing the operating conditions of the load devices, or the like.
[0028] Returning to FIG. 1, the power generation system 1 includes a protective relay 22. The protective relay 22 is a device that causes the circuit breaker 20 to cut off between the power system 200 and the generators 10A and 10B so as to switch from the interconnected operation state to the independent operation state when an abnormality occurs in the power system 200. By providing the protective relay 22 and the circuit breaker 20, when an abnormality such as a power outage or a momentary voltage drop occurs in the power system 200, the power generation system 1 shifts (transitions) from the interconnected operation state to the independent operation state. In the independent operation state, power supply from the generators 10A and 10B to the important load 110 continues, so that even if an accident occurs in the power system 200, the important load 110 can continue to operate.
[0029] The power generation system 1 includes a control device 12A and a rotation speed measurement unit 14A. The control device 12A (first power generation control unit) is connected to the generator 10A (first generator) and controls the generator 10A. The rotation speed measurement unit 14A is an instrument that measures the rotation speed (number of rotations per unit time) of the generator 10A and outputs the measured rotation speed to the control device 12A. The rotation speed of the generator 10A and the frequency of the power generated by the generator 10A are basically proportional to each other (unless an extreme system accident or an abnormality of the generator occurs). Hereinafter, the frequency of the power generated by the generator 10A is simply referred to as the "frequency of the generator 10A". The rotation speed measurement unit 14A may measure the frequency of the generator 10A as information indicating the rotation speed of the generator 10A. The control device 12A may also convert the rotation speed obtained from the rotation speed measurement unit 14A into the frequency of the generator 10A.
[0030] The power generation system 1 includes a control device 12B and a rotation speed measurement unit 14B. The control device 12B (second power generation control unit) is connected to the generator 10B (second generator) and is a device that controls the generator 10B. The rotation speed measurement unit 14B is a device that measures the rotation speed (number of rotations per unit time) of the generator 10B and outputs the measured rotation speed to the control device 12B. The rotation speed of the generator 10B and the frequency of the power generated by the generator 10B are basically proportional to each other (unless an extreme system accident or an abnormality of the generator occurs). Hereinafter, the frequency of the power generated by the generator 10B is simply referred to as the "frequency of the generator 10B". The rotation speed measurement unit 14B may measure the frequency of the generator 10B as information indicating the rotation speed of the generator 10B. In addition, the control device 12B may convert the rotation speed obtained from the rotation speed measurement unit 14B into the frequency of the generator 10B.
[0031] Each of the above-mentioned control devices 12A and 12B is also called a “governor” or a “speed governor.” The control devices 12A and 12B check the connection state of the circuit breaker 20, and when the circuit breaker 20 is in the on state, they control the generators 10A and 10B in the grid-connected operation control mode, and when the circuit breaker 20 is in the off state, they control the generators 10A and 10B in the isolated operation control mode.
[0032] In the grid-connected operation control mode, the control device 12A controls the generator 10A according to the droop characteristic, and the control device 12B controls the generator 10B according to the droop characteristic. The droop characteristic is a characteristic in which the frequency is determined according to the power generation output, as shown by "line Ld" in FIG. 3(a). The droop characteristic (line Ld) is set so that the frequency decreases as the power generation output increases. In the droop characteristic, the rotation speed may be used instead of the frequency. Furthermore, the control device 12A and the control device 12B may control the generators by internally converting the rotation speed and the frequency. In the grid-connected operation control mode, the frequency of the power supplied to the load 100 is determined by the power system 200. Therefore, the power generation output of each of the generators 10A and 10B is determined according to the frequency determined by the power system 200. The frequency of the power supplied from the power system 200 varies within a range close to the rated frequency (for example, 60 Hz). Each of the control devices 12A and 12B adjusts the input (e.g., the amount of fuel or steam input) to the prime mover of the generator to be controlled so that the power output from the generator to be controlled becomes a target value of the power output determined by the frequency and droop characteristics of the power system 200. The droop rate (slope of line Ld) of the droop characteristics is determined in advance by, for example, the manufacturer of the generator. The operator may be able to change the speed setting value L0 in the droop characteristics (the upper and lower positions of line Ld on the graph representing the droop characteristics).
[0033] In the independent operation control mode, the control method of any one of the two or more generators may be switched from a method using droop characteristics (hereinafter referred to as "droop control") to a method using isochronous characteristics (hereinafter referred to as "isochronous control"). In one example, in the independent operation control mode, the control device 12A may control the generator 10A according to the isochronous characteristics, and the control device 12B may control the generator 10B according to the droop characteristics. The isochronous characteristics are characteristics (constant frequency characteristics) that keep the frequency constant regardless of the power generation output, as shown by the "line La" in FIG. 3(b). In the isochronous characteristics, the rotation speed may be used instead of the frequency. Furthermore, the control device 12A and the control device 12B may control the generators by internally converting the rotation speed and the frequency. When the control according to the isochronous characteristics is performed, the power generation output from the generator is determined by the load (power consumption of the load) connected to the generator. The frequency in the isochronous characteristics is set to, for example, the same value as the rated frequency of the power system 200. The controller 12A adjusts the input (eg, the amount of fuel or steam input) to the generator 10A so that the frequency in the generator 10A becomes the set value of the frequency in the isochronous characteristic.
[0034] As shown in FIG. 1, the power generation system 1 includes a power measurement unit 16A, a power measurement unit 16B, a power measurement unit 40, a frequency measurement unit 18, and a monitoring device 50. The power measurement unit 16A is a device that measures the power generation output from the generator 10A, and outputs the measured power generation output to the control device 12A. The power measurement unit 16B is a device that measures the power generation output from the generator 10B, and outputs the measured power generation output to the control device 12B. The power measurement unit 16A and the power measurement unit 16B may output the measured power generation output to the monitoring device 50. In addition, the control device 12A and the control device 12B may output the received power generation output to the monitoring device 50. The power measurement unit 40 is a device that measures the power supplied to the important load 110. The power measured by the power measurement unit 40 corresponds to the power consumed by the important load 110. The power measurement unit 40 outputs the measured power to the monitoring device 50. The frequency measurement unit 18 is a device that measures the frequency of the power system 200 or the frequency of the power supplied from the generators 10A and 10B.
[0035] The monitoring device 50 is provided above the control devices 12A and 12B, and is a device that monitors the power generation system 1. The monitoring device 50 may be, for example, a part of a plant control device that controls the entire power generation facility including the power generation system 1. The control device 12A may output the measurement result of the rotation speed obtained from the rotation speed measurement unit 14A, or the result of converting the measurement result into a frequency, to the monitoring device 50. The control device 12B may output the measurement result of the rotation speed obtained from the rotation speed measurement unit 14B, or the result of converting the measurement result into a frequency, to the monitoring device 50. The frequency measurement unit 18 outputs the measurement result of the frequency to the monitoring device 50. Details of the monitoring device 50 will be described later.
[0036] Here, in order to facilitate understanding of the contents of the present disclosure, the contents of the control of the generators 10A and 10B will be further described with reference to Figs. 4 to 6. As described above, in the independent operation state (independent operation control mode), the generators 10A and 10B operate in parallel while being disconnected from the power system 200, and power is supplied from the generators 10A and 10B to the important load 110. Also, as shown in Fig. 4, the control device 12A controls the generator 10A according to the isochronous characteristic, and the control device 12B controls the generator 10B according to the droop characteristic. Hereinafter, the parallel operation performed by the generators 10A and 10B while being disconnected from the power system 200 may be referred to as "parallel independent operation".
[0037] Since the generators 10A and 10B are electrically connected in parallel, the frequency of the power output between the generators 10A and 10B is the same. Since the generator 10A is subjected to isochronous control, the frequency of the power output in parallel independent operation is determined by the generator 10A. That is, the frequency of the power output in parallel independent operation is the set frequency fs in the isochronous control for the generator 10A. Since the generator 10B is subjected to droop control, the power output of the generator 10B is an output determined by the set frequency fs (the frequency in the generator 10A). The set frequency fs is set to, for example, 50 Hz or 60 Hz, but the actual frequency of the generator 10A is a value that deviates from 50 Hz or 60 Hz due to an error (change in error over a long period of time).
[0038] In FIG. 4, the power generation output from generator 10A is indicated by "x1," and the power generation output from generator 10B is indicated by "x2." In generator 10B, the power generation output is determined by the frequency, which is the set frequency fs, so the power generation output x2 from generator 10B is substantially fixed (constant). On the other hand, the power generation output x1 from generator 10A is variable because it does not depend on the frequency. In this case, the sum of the power generation output x1 and the power generation output x2 matches the load power of important load 110, so the power generation output x1 changes in response to fluctuations in the load power of important load 110 while the power generation output x2 is kept constant.
[0039] A generator has a range of power output that can be operated (hereinafter referred to as "operable range"). For example, if the power required by the load (output from the generator) becomes too large, the generator may become overloaded and trip, i.e., may break down and stop. Even if the generator does not stop, the output power may become unstable and the equipment included in the load may stop. Conversely, if the power required by the load (output from the generator) is too small, the generator may become lightly loaded, causing an abnormality in the control of the generator, and the device that operates the generator may become thermally and mechanically strained due to its structure, causing a trip. For example, in the case of a steam turbine generator, when the load becomes light, the exhaust temperature from the steam turbine increases, and thermal strain may occur. In this disclosure, "light load" means that the load becomes light enough to cause a problem in the operation of the generator.
[0040] In FIG. 4, the region of power generation output where the generator is lightly loaded (hereinafter referred to as the "light load region") is indicated by "R1", and the region of power generation output where the generator is overloaded (hereinafter referred to as the "overload region") is indicated by "R2". The region between the light load region R1 and the overload region R2 is the operable range. In the grid-connected operation control mode, since the power shortage can be supplied from the power system 200, the generators 10A and 10B are controlled by the control devices 12A and 12B or adjusted by the operator so as to operate within the operable range.
[0041] On the other hand, when switching from the grid-connected operation control mode to the isolated operation control mode, the factors that determine the frequency of the output power change, and so the frequency may change. When the frequency changes, the output from the generator changes accordingly. As a result, the output of the generator may fall outside the operable range. In other words, the generator may be lightly loaded or overloaded. The change in the output from the generator occurs instantaneously or within a short time after switching to the isolated operation control mode.
[0042] FIG. 5(a) illustrates the relationship between the frequency and the power output of each generator in the grid-connected operation control mode. In FIG. 5(a), "fc" represents the frequency in the power system 200. This frequency fc is adjusted by the power company, but it always fluctuates with respect to a rated frequency such as 50 Hz or 60 Hz. The generator 10A outputs a power output w1 corresponding to the frequency fc according to the line Lda representing the droop characteristic. The generator 10B outputs a power output w2 corresponding to the frequency fc according to the line Ldb representing the droop characteristic.
[0043] FIG. 5(b) illustrates the relationship between the frequency and the power generation output of each generator when the operation state shown in FIG. 5(a) is shifted to the independent operation control mode. When the operation state is shifted to the independent operation control mode, the frequency of each generator changes to the set frequency fs on the line Laa representing the isochronous characteristic used for controlling the generator 10A. In the example shown in FIG. 5(a) and FIG. 5(b), the frequency fc (variable value) is smaller than the set frequency fs (constant value). In this case, the frequency of each generator increases with the shift to the independent operation control mode. Accordingly, the power generation output from the generator 10B decreases from the power generation output w2 to the power generation output x2.
[0044] Assuming that the sum of the power generation output w1 and the power generation output w2 is approximately equal to the load power of the important load 110, the power generation output from the generator 10A may increase from the power generation output w1 to the power generation output x1 due to a decrease in the power generation output of the generator 10B. In this case, the power generation output from the generator 10A may deviate from the operable range, and the generator 10A may become overloaded. Unlike the example shown in FIG. 5(b), depending on the frequency fc and the load power of the important load 110, the generator 10A may become lightly loaded when transitioning to the isolated operation control mode.
[0045] During grid-connection in the grid-connected operation control mode, if it is possible to know whether the power generation output of the generator 10A will deviate from the operable range if the mode is switched to the isolated operation control mode in the current state, it becomes possible to take measures during grid-connection. An example of such a measure will be described with reference to Fig. 6. In Fig. 6, "before change" means before the measure is taken, and "after change" means after the measure is taken.
[0046] In the grid-connected operation control mode (before the change), the generator 10B is controlled according to the droop characteristic represented by the line Ldb0, and generates power with a power output according to the frequency fc in the power grid 200. If it is assumed that the control mode is shifted to the independent operation mode in this state, the frequency becomes the set frequency fs, and the power output from the generator 10B drops to x20. Accordingly, depending on the current power consumption (load power) of the important load 110, the power output x10 from the generator 10A may enter the overload region R2.
[0047] Therefore, as a countermeasure against the above, a line representing the droop characteristics in the droop control of generator 10B may be moved upward during grid-connection, and generator 10B may be controlled according to line Ldb1. When this countermeasure is taken, the power generation output of generator 10B when the control mode is assumed to be switched to the isolated operation control mode increases from x20 before the change to x21. Therefore, the power generation output of generator 10A when the control mode is assumed to be switched to the isolated operation control mode decreases from x10 before the change to x11, and does not deviate from the operable range.
[0048] As the above-mentioned measure, the power consumption of the important load 110 may be adjusted instead of or in addition to the power generation output of the generator 10B. For example, in order to reduce the power consumption of the important load 110, a measure may be taken to remove some of the devices included in the important load 110 from the targets to which power is supplied in the independent operation control mode, and if the power generation system 1 is installed in a production facility, a measure may be taken to reduce the production volume. The important load 110 in the present disclosure is a load to which power is supplied from the generators 10A and 10B in the independent operation state when no measure is taken to remove the important load 110 from the targets to which power is supplied in the independent operation.
[0049] In the above countermeasures, it is necessary to constantly make changes (adjustments) during grid interconnection, and it is necessary to know the extent of the changes from the operating state before the change. In the example shown in FIG. 5(b), it is necessary to know at least the extent to which the power generation output of the generator 10B will be when the control mode is switched to the independent operation control mode. In addition, in the adjustment of the load equipment included in the important load 110, there are many parts that require manual response, such as adjustment of operation timing and contact with the relevant production equipment. When adjusting the power generation output, for example, in a back pressure turbine that uses used steam in a production facility, etc., it may be necessary to reduce the amount of steam supplied to the production facility, and adjustment may also be required based on human judgment. For the above reasons, a system that visually displays what kind of adjustment is required and to what extent. That is, if it is possible to judge or understand from visual information whether the power generation output of the generator 10A will deviate from the operable range when the control mode is switched to the independent operation control mode in the current state during grid interconnection in the grid interconnection control mode, measures can be taken during grid interconnection. The above-mentioned monitoring device 50 is configured to provide a user, such as an operator, with visual information for determining or understanding whether the power generation output of the generator 10A deviates from the operable range.
[0050] Returning to FIG. 1, the power generation system 1 includes a monitor 52. The monitor 52 is connected to the monitoring device 50. The monitor 52 is an output device for displaying information to a user of the monitoring device 50. The monitor 52 may be any device capable of displaying information, and may be, for example, a liquid crystal display. The monitor 52 may be an input / output device that displays information to the user of the monitoring device 50 and has a touch panel, buttons, or the like to receive input from the user.
[0051] The monitoring device 50 will be described in detail with reference to Figures 7 to 9. The monitoring device 50 is configured to display a graph on a monitor 52 as information for grasping whether the power generation output of the generator 10A deviates from the operable range in the interconnected operation state (interconnected operation control mode).
[0052] 7 shows an example of the functional configuration of the monitoring device 50. The monitoring device 50 has, as functional components (hereinafter referred to as "functional blocks"), a driving status acquisition unit 62, a display control unit 66, and an alarm notification unit 68. The processes executed by these functional blocks correspond to the processes executed by the monitoring device 50.
[0053] The operating status acquisition unit 62 acquires various operating statuses of the power generation system 1. The operating statuses of the power generation system 1 include the operating statuses of the generators 10A and 10B. The operating status acquisition unit 62 may repeatedly acquire various operating statuses at a predetermined cycle (at each predetermined cycle). In one example, the operating status acquisition unit 62 acquires power measurement results from each of the power measurement units 16A, 16B, and 40.
[0054] The operating status acquisition unit 62 may acquire the rotation speed or frequency of the generator 10A (for example, the rotation speed measured by the rotation speed measurement unit 14A) from the control device 12A as the operating status of the generator 10A. The operating status acquisition unit 62 may acquire the rotation speed or frequency of the generator 10B (for example, the rotation speed measured by the rotation speed measurement unit 14B) from the control device 12B as the operating status of the generator 10B. The operating status acquisition unit 62 may acquire the frequency (for example, the frequency of the power system 200) from the frequency measurement unit 18.
[0055] In the grid-connected operation state, the display control unit 66 displays a graph including a first axis and a second axis (hereinafter referred to as "graph Gr") on the monitor 52. The graph Gr may be a two-dimensional graph consisting of the first axis and the second axis (see FIG. 8(a)). The first axis represents a physical quantity related to the power generation output of a target generator, which is any one of two or more generators included in the power generation system 1. The second axis represents the power consumption of an important load 110 to which power is supplied from the two or more generators in the grid-connected operation state (hereinafter referred to as "important load power").
[0056] FIG. 8(a) shows an example of a graph Gr displayed on the monitor 52. Note that the monitor 52 is omitted from the diagram showing the graph Gr. The first axis of the graph Gr is, for example, the horizontal axis (x-axis) and represents the power generation output of the generator 10B as a physical quantity related to the power generation output of the target generator. Note that the physical quantity related to the power generation output includes the power generation output itself. The second axis of the graph Gr is, for example, the vertical axis (y-axis) and represents important load power (power required by the important load 110).
[0057] The display control unit 66 displays the permissible operation range PA on the graph Gr. The permissible operation range PA illustrated in FIG. 8(a) means a range in which the operation of the generator 10A is assumed not to be hindered even if the current state is switched to the independent operation state when the current value of the power generation output of the generator 10B and the current value of the important load power (power consumption of the important load 110) are within the permissible operation range PA. The display control unit 66 displays, at least on the second axis of the graph Gr, a range in which the operation of the above two or more generators is assumed not to be hindered after switching to the independent operation state as the permissible operation range PA. For example, on the vertical axis of the graph Gr, the range in which the generator 10A is assumed to operate without hindrance after switching to the independent operation state (when switching to the independent operation control mode) is displayed as the permissible operation range PA. In the example illustrated in FIG. 8(a), the area with many dots is the permissible operation range PA.
[0058] The display control unit 66 may display the graph Gr on the monitor 52 so that the allowable operation range PA changes over time depending on the operating status of at least one of the generators 10A and 10B (for example, the generator 10A). For example, when the operating status acquisition unit 62 acquires the rotation speed of the generator 10A from the control device 12A as the operating status, the display control unit 66 displays the graph Gr on the monitor 52 so that the allowable operation range PA changes over time depending on the rotation speed of the generator 10A. When the operating status acquisition unit 62 acquires the frequency of the generator 10A from the control device 12A as the operating status, the display control unit 66 displays the graph Gr on the monitor 52 so that the allowable operation range PA changes over time depending on the frequency of the generator 10A.
[0059] In the example shown in FIG. 8(a), a portion of the permissible operation range PA is defined by a boundary line y1 (first boundary line) that indicates the boundary as to whether or not the generator 10A will be overloaded when transitioning to the independent operation control mode. That is, a portion of the permissible operation range PA is demarcated by the boundary line y1. The boundary line y1 is calculated, for example, by the functions (functions with x as a variable) shown in the following formulas (1) to (3). In formulas (1) to (3), "x" is the power generation output [kW] of the generator 10B. In formula (3), "min[i,j]" means a function that outputs the smaller of i and j.
number
[0060] In the example shown in Fig. 8(a), another part of the permissible operation range PA is defined by a boundary line y2 (second boundary line) that indicates the boundary of whether the generator 10A will be lightly loaded or not when transitioning to the independent operation control mode. In the graph Gr, the boundary line y1 is located above the boundary line y2. The boundary line y2 is calculated, for example, by the function shown in the following equation (4). Pbi(x) in equation (4) is expressed by equation (2).
number
[0061] In the formulas (1) to (4), the various variables are described separately as set values and measured values as follows: <Setting value> ·Ta: Rated output of generator 10A [kW] Tac: Minimum output of generator 10A [kW] Ka: The likelihood of output relative to the rated output to respond to load fluctuations during islanded operation Tb: Rated output of generator 10B [kW] · Nas: Rated rotation speed of the main shaft when the generator 10A is self-sustaining [% rpm], or frequency setting value when the generator 10A is self-sustaining [% Hz] Db: Droop rate in droop control of generator 10B [%] <Measurement value> ·Na: Current rotation speed of the main shaft of generator 10A [% rpm], or current frequency of generator 10A [% Hz]
[0062] In the graph Gr shown in Fig. 8(a), if a point (operating point OP described later) formed by a combination of the current value of the power generation output of the generator 10B and the current value of the important load power is located above the boundary line y1, it means that the generator 10A will be overloaded when transitioning to the isolated operation control mode. Also, if a point (operating point OP described later) formed by a combination of the current value of the power generation output of the generator 10B and the current value of the important load power is located below the boundary line y2, it means that the generator 10A will be lightly loaded when transitioning to the isolated operation control mode.
[0063] When the allowable operation range PA (boundary of the allowable operation range PA) is calculated using the formulas (1) to (4), the function "Pbi(t)" includes the measured value "Na". Therefore, the allowable operation range PA changes over time according to the above Na (the current rotation speed or frequency of the generator 10A). If there is no fluctuation in Na during a certain period, the allowable operation range PA does not change either. Na may be information obtained from the control device 12A. For example, the allowable operation range PA may be calculated using a frequency recognized by the control device 12A when controlling the generator 10A. Na may be obtained from a source other than the control device 12A, and may be, for example, a frequency obtained from the frequency measurement unit 18.
[0064] The display control unit 66 may display an operating point OP including the current value of the important load power (power consumption of the important load 110) and the current value of the power generation output of the generator 10B together with the permissible operating range PA within the graph Gr. The operating point OP may be a point consisting of the current value of the important load power and the current value of the power generation output of the generator 10B. If the coordinates on the graph Gr are expressed as (x coordinate, y coordinate), the operating point OP can be expressed as OP=(Pb, Pi). "Pb" and "Pi" are both measured values and have the following meanings. Pb: Current power output of generator 10B [kW] Pi: Current power consumption of important load 110 [kW] "Pi" can be said to be the power consumption of the load that the generators 10A and 10B will shoulder (supply power to) when the generators 10A and 10B transition to an independent operation state while maintaining the current state.
[0065] The warning notification unit 68 issues a warning to the user based on the comparison result between the operating point OP and the permissible operating range PA. For example, the warning notification unit 68 issues a warning to the user when the operating point OP is out of the permissible operating range PA, and does not issue a warning to the user when the operating point OP is within the permissible operating range PA. Any method may be used to issue a warning by the warning notification unit 68, but for example, the warning notification unit 68 displays information indicating a warning on the monitor 52. In one example, the warning notification unit 68 displays a message 58 indicating a warning on the monitor 52 as shown in FIG. 8(b).
[0066] Instead of or in addition to the message 58 indicating the warning, the warning notification unit 68 may change the color or blink as information indicating the warning in a part of an area such as the operating point OP on the screen of the monitor 52. Instead of or in addition to a display on the monitor 52, the warning notification unit 68 may notify the user of the warning by other notification means (e.g., sound) than the monitor 52.
[0067] FIG. 9 shows an example of a hardware configuration of the monitoring device 50. The monitoring device 50 is configured by a computer such as a PLC (Programmable Logic Controller). The monitoring device 50 has, for example, a circuit 80. The circuit 80 has a processor 81, a memory 82, a storage 83, an input / output port 84, a communication port 85, and a timer 86. The storage 83 is configured by one or more non-volatile memory devices such as a flash memory or a hard disk. The storage 83 stores a program that causes the monitoring device 50 to display the graph Gr on the monitor 52. For example, the storage 83 stores a program that causes the monitoring device 50 to configure the above-mentioned functional blocks.
[0068] The memory 82 is composed of one or more volatile memory devices such as a random access memory. The memory 82 temporarily stores a program loaded from the storage 83. The processor 81 is composed of one or more arithmetic devices such as a CPU (Central Processing Unit) or a GPU (Graphics Processing Unit). The processor 81 executes the program loaded in the memory 82 to configure each functional block such as the driving condition acquisition unit 62 described above in the monitoring device 50. The calculation results by the processor 81 are temporarily stored in the memory 82.
[0069] The input / output port 84 inputs and outputs electrical signals between the power measuring units 16A, 16B, 40, the protective relay 22, the monitor 52, etc., in accordance with commands from the processor 81. The communication port 85 communicates with the control units 12A and 12B wirelessly, via wire, or via a network line in response to requests from the processor 81. The timer 86 measures elapsed time, for example, by counting reference pulses at a constant period. Note that the circuit 80 is not necessarily limited to one that configures each functional block, such as the operating status acquisition unit 62, described above, by a program. For example, at least some of the functional blocks of the circuit 80 may be configured by an integrated circuit in which logic circuits are integrated.
[0070] The monitoring device 50 may be configured by multiple computers. When the monitoring device 50 is configured by multiple computers, each functional block may be realized by an individual computer. Alternatively, each functional block may be realized by a combination of two or more computers. In these cases, the multiple computers may cooperate to perform monitoring of the power generation system 1 while being connected to each other so as to be able to communicate with each other. The monitoring device 50 and at least one of the control device 12A and the control device 12B may be configured by one computer (one circuit).
[0071] [Method of monitoring power generation systems] Next, a description will be given of a monitoring method for the power generation system 1. This monitoring method includes at least a display step. The display step is a step of displaying, on the monitor 52, a graph Gr including a first axis and a second axis in a grid-connected operation state.
[0072] In the monitoring method for the power generation system 1, the monitoring device 50 executes a series of processes related to the display step. Fig. 10 shows the series of processes executed by the monitoring device 50. The series of processes will be described using an example in which, when transitioning to the independent operation control mode, the generator 10A is controlled according to the isochronous characteristic, and the control of the generator 10B is maintained according to the droop characteristic.
[0073] In the above series of processes, the monitoring device 50 executes step S11 in a state where the circuit breaker 20 is maintained in the on state and the generators 10A and 10B are controlled in the grid-connected operation control mode. In step S11, for example, the operation status acquisition unit 62 of the monitoring device 50 determines whether the open / close state of the circuit breaker 20 is the on state. The operation status acquisition unit 62 may acquire a signal indicating the state of the circuit breaker 20 from the circuit breaker 20, or may acquire information indicating the current control mode from the control device 12A and the control device 12B.
[0074] If it is determined in step S11 that the circuit breaker 20 is in the on state (step S11: YES), the process executed by the monitoring device 50 proceeds to step S12. In step S12, for example, the operation status acquisition unit 62 acquires information indicating the operation status of the generators 10A and 10B. In one example, the operation status acquisition unit 62 acquires the frequency of the generator 10A from the control device 12A as the information indicating the operation status. The operation status acquisition unit 62 may acquire the power generation output from the generator 10A from the power measurement unit 16A, and may acquire the power generation output from the generator 10B from the power measurement unit 16B. The operation status acquisition unit 62 may acquire the power supplied to the important load 110 (important load power) from the power measurement unit 40.
[0075] Next, the monitoring device 50 executes step S13. In step S13, for example, the display control unit 66 of the monitoring device 50 executes the calculation of the permissible operation range PA. In one example, the display control unit 66 calculates the boundary line y1 shown in the above-mentioned formula (1) and the boundary line y2 shown in the above-mentioned formula (4). In this case, the display control unit 66 uses the frequency of the generator 10A acquired in step S12 in the calculation of the boundary line y1 and the boundary line y2.
[0076] Next, the monitoring device 50 executes step S14. In step S14, for example, the display control unit 66 uses the result calculated in step S13 to display a graph Gr including the permissible operation range PA on the monitor 52. In one example, the display control unit 66 displays a two-dimensional (two-dimensional orthogonal coordinate system) graph Gr on the monitor 52, in which the horizontal axis represents the power generation output of the generator 10B and the vertical axis represents the important load power, and displays the permissible operation range PA with respect to the vertical axis. If the graph Gr including the permissible operation range PA is already displayed on the monitor 52, the display control unit 66 updates the drawing of the graph Gr on the monitor 52.
[0077] The display control unit 66 may use the information acquired in step S12 to display, in the graph Gr, an operating point OP indicating the current value of the power generation output of the generator 10B and the current value of the important load power, together with the permissible operation range PA.
[0078] Next, the monitoring device 50 executes step S15. In step S15, for example, the warning notification unit 68 of the monitoring device 50 compares the permissible driving range PA calculated in step S13 with the driving point OP obtained from a part of the information acquired in step S12. In one example, the warning notification unit 68 determines whether the driving point OP is outside the permissible driving range PA defined by the boundary line y1 and the boundary line y2. The warning notification unit 68 may determine that the driving point OP is outside the permissible driving range PA when the driving point OP is located above the boundary line y1 or below the boundary line y2 on the graph Gr.
[0079] If it is determined in step S15 that the operating point OP is outside the permissible operating range PA (step S15: YES), the process executed by the monitoring device 50 proceeds to step S16. In step S16, for example, the warning notification unit 68 issues a warning to the user indicating that the operating point OP is outside the permissible operating range PA. In one example, the warning notification unit 68 displays text information (message or guidance) on the monitor 52 indicating that the operating point OP deviates from the permissible operating range PA.
[0080] After step S16 is executed, or if it is determined in step S15 that the operating point OP is not outside the permissible operation range PA (step S15: NO), the process executed by the monitoring device 50 returns to step S11. As long as it is determined in step S11 that the circuit breaker 20 is in the on state, the monitoring device 50 repeats the series of processes from step S11 to step S15 (or step S16). In this case, the monitoring device 50 may repeat the series of processes from step S12 to step S15 at a predetermined cycle (at every predetermined cycle). As a result, the graph Gr changes over time according to the operating status of at least one of the generators 10A and 10B (for example, the generator 10A).
[0081] On the other hand, if it is determined in step S11 that the circuit breaker 20 is not in the ON state (step S11: NO), the process executed by the monitoring device 50 proceeds to step S17. In step S17, for example, the display control unit 66 displays information indicating that the power generation system 1 has switched to an independent operation state on the monitor 52. The process of step S17 is continued until it is determined in step S11 that the circuit breaker 20 is in the ON state. The series of processes described above by the monitoring device 50 may be continued until the power generation system 1 stops operating.
[0082] [Variations] The series of processes shown in Fig. 10 is an example and can be modified as appropriate. In the series of processes described above, the monitoring device 50 may execute one step and the next step in parallel, or may execute each step in an order different from that of the above example. The monitoring device 50 may execute steps with contents different from those of the above example. Instead of executing steps, all of the series of processes described above by the monitoring device 50 may be deployed in a logic circuit or an analog circuit, or may be executed by an interrupt.
[0083] As shown in Fig. 8(a), the display control unit 66 may display a boundary line y3 in addition to the boundary line y1 located on the upper side within the permissible operation range PA. The boundary line y3 means a line above which, if the operating point OP is located, there is a possibility that the generator 10A will trip due to a sudden load input exceeding the allowable capacity of the generator 10A when transitioning to independent operation, or the generator 10A will be overloaded. The boundary line y3 can also be said to be a limit value (limit line) that takes into account the capacity to which the generator 10A can stably transition when the load of the generator 10A increases after transitioning to independent operation.
[0084] The boundary line y3 is calculated, for example, by the function shown in the following equation (5) (a function with x as a variable).
number
number
[0085] The warning notification unit 68 may issue a warning to the user when the operating point OP is located above the boundary line y3 on the graph Gr. The warning notification unit 68 may issue a warning in a different manner depending on whether the operating point OP is above the boundary line y3 and below the boundary line y1 or above the boundary line y1.
[0086] Although not shown in the figure, the display control unit 66 may display the permissible driving range PA defined by the boundary line y3 shown in either equation (5) or equation (6) instead of the boundary line y1. In this case, the upper limit of the permissible driving range PA on the graph Gr is determined by the boundary line y3. The warning notification unit 68 may issue a warning when the operating point OP is located above the boundary line y3.
[0087] The permissible operating range PA may be defined by a boundary line y1 and a first axis (e.g., horizontal axis) as shown in Fig. 11(a). In this case, in the graph Gr, the lower limit of the permissible operating range PA is defined by the first axis. The warning notification unit 68 may determine whether the operating point OP is located within the permissible operating range PA only by determining whether the operating point OP exceeds the boundary line y1.
[0088] The permissible operation range PA may be a fixed range that does not change over time. Fig. 11(b) shows the permissible operation range PA calculated using a predicted value of the maximum change width of the frequency when transitioning to the independent operation control mode (worst value of the change width). The display control unit 66 may calculate the boundary line y1 using the functions (functions with x as a variable) shown in the following equations (7) to (9).
number
[0089] In formula (9), "Fs" means the rated frequency [Hz] in the power system 200. Also, ΔF1 is a predicted minimum value of the value obtained by subtracting the frequency of the generator 10A during isolated operation from the system frequency, or a predicted worst value in the decreasing direction (negative side) of the fluctuation range of the system frequency. However, in the calculation of ΔF1, it is assumed that the system frequency is smaller than the frequency of the generator 10A during isolated operation.
[0090] The display control unit 66 may calculate the boundary line y3 using a function shown in the following equation (10).
number
number
[0091] The display control unit 66 may calculate the boundary line y2 using the functions shown in the following equations (12) to (14).
number
[0092] In formula (14), ΔF2 is a predicted maximum value of a value obtained by subtracting the frequency of the generator 10A during isolated operation from the system frequency, or a predicted worst value in the increasing direction (positive side) of the fluctuation range of the system frequency. However, in the calculation of ΔF2, it is assumed that the system frequency is higher than the frequency of the generator 10A during isolated operation. ΔF1 and ΔF2 may be determined based on the management range of the frequency (system frequency) in the power system 200.
[0093] As shown in Fig. 12(a), the permissible driving range PA may be defined by a boundary line y2 without using the boundary line y1 with respect to the second axis. In the example shown in Fig. 12(a), the area above the boundary line y2 on the graph Gr is the permissible driving range PA. The warning notification unit 68 may determine whether the driving point OP is located within the permissible driving range PA only by determining whether the driving point OP is below the boundary line y2.
[0094] The permissible operation range PA in the various examples described above indicates a range with respect to the second axis (e.g., the vertical axis). Alternatively, the permissible operation range PA may represent a range in both the first and second axes of the graph Gr in which the operation of the generators 10A and 10B after switching to the independent operation state is not expected to be hindered. As shown in Fig. 12(b) , in the graph Gr, the permissible operation range PA may also be defined (divided) by two vertical lines extending along the vertical axis in addition to the boundary lines y1 and y2.
[0095] In the example shown in Fig. 12(b), boundary line x5 (third boundary line) is a line that represents the minimum power output that the generator 10B can generate. For example, if a steam turbine is connected to the generator 10B, x5 means the power output of the generator 10B when the flow rate of steam introduced into the steam turbine is minimum. In addition, if the generator 10B is controlled by droop control during independent operation, the change in output of the generator 10B due to the frequency change during the transition to independent operation, which is expressed by equation (3) or equation (9), may be taken into account.
[0096] The boundary line x6 (fourth boundary line) is a line that indicates the maximum output that the generator 10B can generate. For example, when a steam turbine is connected to the generator 10B, x6 means the power generation output of the generator 10B when the flow rate of steam introduced into the steam turbine is maximum (maximum flow rate that can be introduced). Alternatively, when the type of the power generation device including the generator 10B is a combined cycle type, x6 may mean the maximum power generation output of the generator 10B that is determined by limiting the flow rate of steam introduced from the gas turbine during independent operation. In this case, the fluctuation in the amount of steam generated due to the load fluctuation of the gas turbine accompanying the transition to the independent operation control mode may be taken into account. In addition, when the generator 10B is controlled by droop control during independent operation, the output change of the generator 10B due to the frequency change during the transition to independent operation, which is expressed by Equation (3) or Equation (14), may be taken into account.
[0097] 12(b), the permissible driving range PA is defined by the boundary line y1, the boundary line y2, the boundary line x5, and the boundary line x6. That is, the permissible driving range PA may be a range surrounded (closed) by the boundary line y1, the boundary line y2, the boundary line x5, and the boundary line x6. The warning notification unit 68 may also issue a warning when the operating point OP is to the left of the boundary line x5 or to the right of the boundary line x6.
[0098] 12(b), the permissible operating range PA may be defined by boundary line x5 and at least one of boundary line y1 and boundary line y2. Alternatively, the permissible operating range PA may be defined by boundary line x6 and at least one of boundary line y1 and boundary line y2. As described above, the range of the permissible operating range PA on the first axis (horizontal axis) may be defined by both boundary line x5 and boundary line x6, only boundary line x5, or only boundary line x6 (i.e., at least one of boundary line x5 and boundary line x6).
[0099] The display control unit 66 may use, on the horizontal axis of the graph Gr, the power generation output of the generator 10A controlled by isochronous control during independent operation, instead of the generator 10B controlled by droop control during independent operation.
[0100] In the isolated operation state (isolated operation control mode), the control device 12A may control the generator 10A according to the droop characteristics, and the control device 12B may control the generator 10B according to the droop characteristics, as shown in Fig. 13. That is, in both the grid-connected operation control mode and the isolated operation control mode, droop control may be performed on each of the generators 10A and 10B.
[0101] Even if the control methods of both the generators 10A and 10B are maintained at the droop control when the operation transitions to the independent operation state, the generators 10A and 10B are electrically connected in parallel, so that the frequencies of the power output from the generators 10A and 10B match. In this case, the outputs from the generators 10A and 10B are balanced so that the power output from the generators 10A and 10B satisfies the power required by the important load 110. The frequencies of the generators 10A and 10B are determined so that the sum (x1+x2) of the outputs from the generators 10A and 10B matches the power required by the important load 110. In the example shown in FIG. 13, the outputs from the generators 10A and 10B are balanced when the frequency of the generators 10A and 10B is "fx".
[0102] Similarly, even when droop control is performed on each of the generators 10A and 10B in the isolated operation control mode, the output of at least one of the generators 10A and 10B may fall outside the operable range due to a change in the factor that determines the frequency of the output power. That is, when transitioning from the grid-connected operation control mode to the isolated operation control mode, at least one of the generators 10A and 10B may become lightly loaded or overloaded.
[0103] Fig. 14(a) illustrates the relationship between the frequency and the power generation output of each generator in the grid-connected operation control mode. The operating state shown in Fig. 14(a) is the same as the operating state shown in Fig. 5(a). Fig. 14(b) illustrates the relationship between the frequency and the power generation output of each generator when the operating state shown in Fig. 14(a) is shifted to the independent operation control mode. When the mode is shifted to the independent operation control mode, the frequency of each generator changes to a frequency fx that balances the output according to the power required by the important load 110.
[0104] In the examples shown in FIG. 14(a) and FIG. 14(b), the frequency fc (fluctuation value) defined by the power system 200 is greater than the frequency fx (fluctuation value). That is, with the transition to the independent operation control mode, the frequency of each generator decreases. Accordingly, depending on the power required by the important load 110, the power output from the generator 10A increases from the power output w1 to the power output x1, and the power output from the generator 10B increases from the power output w2 to the power output x2. In this case, as shown in FIG. 14(b), the power output from the generator 10B may deviate from the operable range, and the generator 10B may become overloaded.
[0105] Depending on the frequency fc and the power required by the important load 110, the generator 10A may be overloaded instead of or in addition to the generator 10B. Alternatively, depending on the frequency fc and the power required by the important load 110, one of the generators 10A and 10B, or both of the generators 10A and 10B may be underloaded. As described above, when the droop control is continued in both the generators 10A and 10B during the independent operation, the question arises as to whether the output of each of the generators 10A and 10B falls within the operable range.
[0106] If it is possible to know whether the power generation output of each of the generators 10A and 10B will deviate from the operable range when the system is switched to the isolated operation control mode in the current state during system interconnection in the grid-connected operation control mode, it becomes possible to take measures during system interconnection. Examples of the above measures include moving the line representing the droop characteristic up or down (increasing or decreasing the speed setting value L0) and / or adjusting the power consumption of the important load 110. The monitoring device 50 displays the graph Gr on the monitor 52 as information that enables measures to be taken during system interconnection. In the above measures, the operator may be able to adjust the power generation output of the generator 10B, but may not be able to adjust the power generation output of the generator 10A.
[0107] The display control unit 66 may calculate boundary lines y1 and y2 as shown in Fig. 15(a) and display a graph Gr including the acceptable operating range PA on the monitor 52. The boundary line y1 may be calculated by the functions shown in the following equations (21) to (27).
number
[0108] Pbamax(x) shown in formula (21) represents the maximum output of the generators 10A and 10B in the isolated operation control mode. Fbamin(x) shown in formula (25) represents the frequency at which either the generator 10A or the generator 10B has the maximum output in the isolated operation control mode. Fbmin(x) shown in formula (26) represents the frequency when the generator 10B alone has the maximum output without considering the parallel isolated operation, and Famin shown in formula (27) represents the frequency when the generator 10A alone has the maximum output without considering the parallel isolated operation. Fp represents a measured value and is the current frequency (a frequency determined by the power from the power system 200). However, calculation may be performed using the rated frequency Fs (a constant value) instead of Fp. Da represents the droop rate [%] in the droop control for the generator 10A. In formula (25) and the like, max[i,j] represents a function that outputs the larger value of i and j.
[0109] The boundary line y2 may be calculated by the functions shown in the following equations (31) to (37).
number
[0110] Pbamin(x) shown in formula (31) represents the minimum output (minimum output) of the generators 10A and 10B in the isolated operation control mode. Fbamax(x) shown in formula (35) represents the frequency at the minimum output of the generators 10A and 10B in the isolated operation control mode. Fbmax(x) shown in formula (36) means the frequency when the generator 10B alone has the minimum output without considering parallel isolated operation, and Famax shown in formula (37) means the frequency when the generator 10A alone has the minimum output without considering parallel isolated operation. In formula (36), Tbmin is the allowable minimum output [kW] of the generator 10B, and in formula (37), Tamin is the allowable minimum output [kW] of the generator 10A.
[0111] The boundary line y1 shown in FIG. 15(a) can be decomposed into lines y11 and y12 shown in FIG. 15(b). Conversely, when FIG. 15(a) is explained based on FIG. 15(b), the boundary line y1 can also be considered as a line defined by lines y11 and y12. Specifically, the boundary line y1 is defined by the lower parts (the smaller vertical axis values) of lines y11 and y12 when observed on the graph Gr while changing the horizontal axis values. Similarly to the boundary line y1, the boundary line y2 shown in FIG. 15(a) can also be considered as a line defined by lines y21 and y22 shown in FIG. 15(b). Specifically, the boundary line y2 is defined by the upper parts (the larger vertical axis values) of lines y21 and y22 when observed on the graph Gr while changing the horizontal axis values.
[0112] The line y11 is calculated by the following equations (41) to (43).
number
number
[0113] The line y21 is calculated by the following equations (47) to (49).
number
number
[0114] The line y11 represents the boundary as to whether the generator 10A is overloaded or not when the control mode is switched to the independent operation mode. That is, when the operating point OP is located above the line y11 on the graph Gr, the generator 10A is overloaded when the control mode is switched to the independent operation mode in that state. The line y12 represents the boundary as to whether the generator 10B is overloaded or not when the control mode is switched to the independent operation mode in that state. That is, when the operating point OP is located above the line y12 on the graph Gr, the generator 10B is overloaded when the control mode is switched to the independent operation mode in that state. When the operating point OP is located above both the line y11 and the line y12 on the graph Gr, both the generators 10A and 10B are overloaded when the control mode is switched to the independent operation mode in that state. From the above, the boundary line y1 defined by the line y11 and the line y12 represents the boundary as to whether at least one of the generators 10A and 10B is overloaded or not.
[0115] The line y21 represents the boundary as to whether the generator 10A is lightly loaded or not when the system is switched to the independent operation control mode. That is, when the operating point OP is located below the line y21 on the graph Gr, the generator 10A is lightly loaded when the system is switched to the independent operation control mode in that state. The line y22 represents the boundary as to whether the generator 10B is lightly loaded or not when the system is switched to the independent operation control mode in that state. That is, when the operating point OP is located below the line y22 on the graph Gr, the generator 10B is lightly loaded when the system is switched to the independent operation control mode in that state. When the operating point OP is located below both the line y21 and the line y22 on the graph Gr, both the generators 10A and 10B are lightly loaded when the system is switched to the independent operation control mode in that state. From the above, the boundary line y2 defined by the line y21 and the line y22 represents the boundary as to whether at least one of the generators 10A and 10B is lightly loaded or not.
[0116] The display control unit 66 may display the boundary line y1 and the boundary line y2, and then display the permissible driving range PA, as shown in Fig. 15(a). The display control unit 66 may display the lines y11, y12, y21, and y22, and then display the permissible driving range PA, without displaying the boundary line y1 and the boundary line y2, as shown in Fig. 15(b).
[0117] Fig. 16 shows another example of the graph Gr that is displayed when droop control is performed on both the generators 10A and 10B during independent operation. The display control unit 66 may display the permissible operation range PA defined by the boundary line y1, the boundary line y2, the boundary line x5, and the boundary line x6, similarly to the example shown in Fig. 12.
[0118] The display control unit 66 may display the permissible operating range PA using the power generation output of generator 10A instead of the power generation output of generator 10B on the horizontal axis of the graph Gr shown in Figure 15(a), Figure 15(b), or Figure 16.
[0119] The display control unit 66 may not display the operating point OP on the graph Gr. In this case, the operator may determine whether or not the above-mentioned measures are necessary by grasping the current value of the power generation output of the generator 10B and the current value of the important load power, and comparing them with information obtained from the permissible operation range PA on the graph Gr. The display control unit 66 may calculate the boundary line that defines the permissible operation range PA by a calculation method different from the various examples described above.
[0120] The display control unit 66 may calculate a three-dimensional graph including a third axis representing a physical quantity related to the power generation output from the generator 10A (for example, the power generation output of the generator 10A itself) in addition to the first and second axes. In this case, the display control unit 66 may be capable of switching between displaying a two-dimensional graph consisting of the power generation output and important load power of the generator 10B and displaying a two-dimensional graph consisting of the power generation output and important load power of the generator 10A on the monitor 52. For example, a user instruction indicating an instruction to switch the display may be input to the monitoring device 50 by the user. In each of the two-dimensional graphs, the corresponding permissible operating range PA may be displayed.
[0121] Instead of switching the axes, the display control unit 66 may be capable of displaying a two-dimensional graph consisting of a first axis and a second axis for each of the multiple-stage values of the third axis (for example, values such as 1000, 2000, and 3000) on the monitor 52. The display control unit 66 may display two-dimensional graphs for each of the multiple-stage values of the third axis together on the monitor 52, or may be capable of switching the two-dimensional graph to be displayed in response to a user input.
[0122] As a physical quantity related to the power generation output representing the first axis, etc., a physical quantity having a certain corresponding relationship, such as a proportional relationship, with the power generation output may be used instead of the power generation output of the generator itself. As a physical quantity correlated with such power generation output, the opening degree of a valve provided in a flow path of fuel or working fluid (e.g., steam, etc.) introduced to the prime mover connected to the generator may be used, or the amount of introduced fuel or the flow rate of the working fluid may be used. In a back pressure turbine, the amount of exhaust steam may be used. In the droop characteristics used in droop control, the physical quantities exemplified above may also be used instead of the power generation output.
[0123] When the frequency of the generator 10B (or / and the generator 10A) is used to calculate the permissible operation range PA, the frequency may be output to the monitoring device 50 from a measuring means other than the control device 12B.
[0124] The warning notification unit 68 may issue a warning not only when the operating point OP deviates from the permissible operating range PA, but also when the operating point OP is located within the permissible operating range PA and approaches a predetermined amount to various boundary lines that define (divide) the permissible operating range PA.
[0125] Instead of the protective relay 22, the monitoring device 50 may be capable of outputting a signal to the circuit breaker 20 to instruct switching between an on state and an off state. Any component may execute switching of the state of the circuit breaker 20 as long as the circuit breaker 20 can disconnect the power system 200 from the two or more generators (e.g., the generators 10A and 10B) so that the power generation system 1 switches from an interconnected operation state to an independent operation state.
[0126] In one example among the various examples described above, at least a part of the matters described in the other examples may be combined.
[0127] [Summary of this disclosure] The power generation system (1) described above includes two or more generators (10A, 10B) that are connected to a power system (200) and operate in parallel, a circuit breaker (20) that switches between an interconnected operation state in which the power system (200) and the two or more generators (10A, 10B) are connected and an independent operation state in which the power system (200) and the two or more generators (10A, 10B) are disconnected, and a display control unit (66) that displays a graph (Gr) including a first axis and a second axis on a monitor (52) in the interconnected operation state. The first axis represents a physical quantity related to the power generation output of a target generator (10B) that is one of the two or more generators (10A, 10B), and the second axis represents the power consumption of an important load (110) to which power is supplied from the two or more generators (10A, 10B) in the independent operation state. The display control unit (66) displays, on the second axis of the graph (Gr), an allowable operation range (PA) that indicates a range within which it is assumed that the operation of the two or more generators (10A, 10B) will not be hindered after switching to the independent operation state.
[0128] As described above, when the system transitions from the grid-connected operation state to the independent operation state, the frequency may change because the factors that determine the frequency of the output power change accordingly. When the frequency changes, the output from at least one generator changes accordingly. As a result, the output of at least one generator may fall outside the above-mentioned operable range. In order to reduce this possibility, it is possible to adjust the power generation output based on empirical rules, or / and adjust the load power, or to create an operating state with a likelihood. However, in this case, it is possible that an uneconomically large power generation facility capacity is required, or that an uneconomical operating situation occurs. In addition, as another method, there is a method of instantaneous load shedding of low-importance loads after transitioning to the independent operation state, but in addition to causing damage due to unexpected equipment stoppage, if a transition to independent operation occurs due to a simple voltage sag in the first place, the load equipment that has been instantaneously shedding will experience a power outage rather than a voltage sag, and the damage will be amplified. Furthermore, after transitioning to the independent operation state, the supply of power to important loads continues, so even if measures are taken, it may not be enough.
[0129] In contrast, in the power generation system (1), before switching to the grid-connected operation state, i.e., the independent operation state, an allowable operation range (PA) is displayed on the monitor (52), which indicates a range within which the operation of the two or more generators (10A, 10B) is expected not to be hindered after switching to the independent operation state. Therefore, an operator or the like can determine or understand, from the allowable operation range (PA) displayed on the monitor (52), whether or not a problem will occur in the operation of the generators if the operation state is switched to the independent operation state in the current state. If a problem is likely to occur in the operation of the generators, the operator or the like can take measures (e.g., adjusting the droop characteristics and / or adjusting the important load power) before switching to the independent operation state. Therefore, the power generation system (1) can ensure stable operation during the independent operation.
[0130] The usefulness of the power generation system (1) can be explained in more detail below using specific examples. By understanding the relationship between the current operating state and the allowable operating range PA from the graph (Gr) above, the operator can choose to respond by changing the generator output or by adjusting the important load power. By clarifying the allowable operating range (PA), while human judgment is still involved in equipment operation (adjustments according to the load equipment status), it is possible to make maximum use of the power generation equipment capacity without relying on experience or likelihood. - The possibility of generators (power generating equipment including generators) becoming overloaded after transitioning to an isolated operation state can be reduced. When constructing a new power generation facility, by incorporating the adoption of the above-mentioned power generation system (1), it is possible to reduce the likelihood of the facility capacity and construct a new facility with an economical capacity. With the introduction of renewable energy, grid frequency has become unstable, and there is a possibility that the difference between the grid frequency and the frequency during independent operation may become large. In this case, the power output of the generator (10B) that is droop controlled during independent operation fluctuates greatly. However, by predicting the output with the power generation system (1), stable independent operation can be performed even when such fluctuations occur.
[0131] The display control unit (66) may display a graph (Gr) on the monitor (52) so that the permissible operation range (PA) changes over time according to the operating status of at least one of the two or more generators (10A, 10B). In this case, the operator can grasp the permissible operation range PA according to the actual status of the system including the two or more generators.
[0132] The power generation system (1) may further include an operating condition acquisition unit (62) that acquires, as at least a part of the operating condition, a rotation speed or a frequency of the generator (10A) from a power generation control unit (12A) that controls one of the two or more generators (10A, 10B). The display control unit (66) may display a graph (Gr) on the monitor (52) so that the permissible operation range (PA) changes over time according to the rotation speed or the frequency acquired by the operating condition acquisition unit (62). In this case, the permissible operation range PA reflects the rotation speed or the frequency recognized by the power generation control unit (12A) (for example, the difference from the rated frequency recognized by the control device 12A is reflected in the permissible operation range PA), so that the permissible operation range PA can be calculated with high accuracy.
[0133] The display control unit (66) may display, in the graph (Gr), an operating point (OP) including the current value of the power consumption of the important load (110) and the current values of the physical quantities, together with an allowable operating range (PA). In this case, by displaying both the allowable operating range PA and the operating point OP, an operator or the like can easily determine from the displayed contents whether or not measures are necessary.
[0134] The power generation system (1) may further include a warning notification unit (68) that issues a warning to a user based on a result of comparison between the operating point (OP) and the permissible operation range (PA). In this case, the warning is issued to an operator or the like as a user, so that the operator can more reliably recognize that measures are required.
[0135] A part of the allowable operation range (PA) may be defined by a first boundary line (y1) that indicates a boundary as to whether or not at least one of the two or more generators (10A, 10B) is overloaded. In this case, by grasping the relationship between the allowable operation range PA and the current values of the first axis and the second axis and taking measures in advance, it is possible to reduce the possibility that the generators will be overloaded when transitioning to the independent operation mode.
[0136] A part of the permissible operation range (PA) may be defined by a second boundary line (y2) that indicates the boundary as to whether or not at least one of the two or more generators (10A, 10B) is lightly loaded. In this case, by grasping the relationship between the permissible operation range PA and the current values of the first axis and the second axis and taking measures in advance, it is possible to reduce the possibility that the generators will be lightly loaded when transitioning to the independent operation mode.
[0137] The first axis may represent the power generation output of the generator (10B). The permissible operation range (PA) may represent a range in which the operation of the two or more generators (10A, 10B) after switching to the independent operation state is not affected on both the first axis and the second axis of the graph (Gr). The range of the permissible operation range (PA) related to the first axis may be defined by at least one of a third boundary line (x5) representing the minimum output that the target generator (10B) can generate and a fourth boundary line (x6) representing the maximum output that the target generator (10B) can generate. In this case, an operator or the like can easily grasp the relationship between the current value of the power generation output of the target generator (10B) and at least one of the minimum output and maximum output that can be generated, from the permissible operation range PA and the current value of the power generation output of the target generator (10B).
[0138] The two or more generators (10A, 10B) may include a first generator (10A) and a second generator (10B). The power generation system (1) may further include a first power generation control unit (12A) that controls the first generator (10A) according to an isochronous characteristic in an independent operation state, and a second power generation control unit (12B) that controls the second generator (10B) according to a droop characteristic in an independent operation state. In this case, as described above, when transitioning to the independent operation state, the generator (10A) may be overloaded or underloaded. However, by displaying the permissible operation range (PA), it is possible to urge an operator or the like to avoid such a possibility.
[0139] The two or more generators (10A, 10B) may include a first generator (10A) and a second generator (10B). The power generation system (1) may further include a first power generation control unit (12A) that controls the first generator (10A) according to the droop characteristic in the independent operation state, and a second power generation control unit (12B) that controls the second generator (10B) according to the droop characteristic in the independent operation state. In this case, as described above, when transitioning to the independent operation state, at least one of the two or more generators may be overloaded or underloaded. However, by displaying the permissible operation range (PA), it is possible to urge an operator or the like to avoid such a possibility.
[0140] The monitoring device (50) described above is a device provided in a power generation system (1) including two or more generators (10A, 10B) that are connected to a power system (200) and operate in parallel, and a circuit breaker (20) that switches between an interconnected operation state in which the power system (200) and the two or more generators (10A, 10B) are connected and an independent operation state in which the power system (200) and the two or more generators (10A, 10B) are disconnected. The monitoring device (50) includes a display control unit (66) that displays a graph (Gr) including a first axis and a second axis on a monitor (52) in the interconnected operation state. The first axis represents a physical quantity related to the power generation output of a target generator (10B), which is one of the two or more generators (10A, 10B), and the second axis represents the power consumption of an important load (110) to which power is supplied from the two or more generators (10A, 10B) in the independent operation state. The display control unit (66) displays, on the second axis of the graph (Gr), an allowable operation range (PA) indicating a range within which operation of the two or more generators (10A, 10B) is expected not to be hindered after switching to the independent operation state. Since the allowable operation range (PA) is displayed for this power generation device (50) in the same manner as for the power generation system (1), stable operation during independent operation can be achieved.
[0141] The monitoring method described above is a method for monitoring a power generation system (1) including two or more generators (10A, 10B) that are connected to a power system (200) and operate in parallel, and a circuit breaker (20) that switches between an interconnected operation state in which the power system (200) and the two or more generators (10A, 10B) are connected and an independent operation state in which the power system (200) and the two or more generators (10A, 10B) are disconnected. This monitoring method includes a display step of displaying a graph (Gr) including a first axis and a second axis on a monitor (52) in the interconnected operation state. The first axis represents a physical quantity related to the power generation output of a target generator (10B) that is one of the two or more generators (10A, 10B), and the second axis represents the power consumption of an important load (110) to which power is supplied from the two or more generators (10A, 10B) in the independent operation state. In the display step, an allowable operation range (PA) is displayed on the second axis of the graph (Gr), which indicates a range within which operation of the two or more generators (10A, 10B) is expected not to be hindered after switching to an independent operation state. Since the allowable operation range (PA) is displayed in the same manner as in the power generation system (1), this monitoring method makes it possible to ensure stable operation during independent operation. [Explanation of symbols]
[0142] 1...power generation system, 10A, 10B...generator, 12A, 12B...control device, 20...circuit breaker, 22...protective relay, 50...monitoring device, 52...monitor, 62...operation status acquisition unit, 66...display control unit, 68...alarm notification unit, Gr...graph, PA...operation tolerance range, OP...operating point, y1, y2, y3, x5, x6...boundary line, 110...important load, 200...power system.
Claims
1. Two or more generators connected to a power grid and operated in parallel; a circuit breaker that switches between an interconnected operation state in which the power grid and the two or more generators are connected and an isolated operation state in which the power grid and the two or more generators are disconnected; a display control unit that displays a graph including a first axis and a second axis on a monitor in the interconnected operation state, The first axis represents a physical quantity related to a power generation output of a target generator which is any one of the two or more generators, The second axis represents the power consumption of an important load to which power is supplied from the two or more generators in the isolated operation state; The display control unit displays an acceptable operating range on the second axis of the graph, representing the range in which it is expected that operation of the two or more generators will not be impaired after being switched to the independent operation state.
2. The power generation system according to claim 1 , wherein the display control unit displays the graph on the monitor such that the permissible operating range changes over time according to an operating state of at least one of the two or more power generators.
3. An operating condition acquisition unit that acquires a rotation speed or a frequency of one of the two or more generators from a power generation control unit that controls the one of the two or more generators as at least a part of the operating condition, The power generation system according to claim 2 , wherein the display control unit displays the graph on the monitor such that the permissible operating range changes over time according to the rotation speed or frequency acquired by the operating condition acquisition unit.
4. The power generation system according to claim 1 , wherein the display control unit displays, in the graph, an operating point including a current value of the power consumption of the important load and a current value of the physical quantity together with the permissible operating range.
5. The power generation system according to claim 4 , further comprising a warning notification unit that issues a warning to a user based on a result of comparison between the operating point and the allowable operation range.
6. The power generation system according to any one of claims 1 to 5, wherein a portion of the allowable operating range is defined by a first boundary line that represents a boundary as to whether or not at least one of the two or more generators is overloaded.
7. The power generation system according to any one of claims 1 to 5, wherein a portion of the allowable operating range is defined by a second boundary line that represents a boundary as to whether or not at least one of the two or more generators is at a light load.
8. The first axis represents the power output of the generator; The allowable operation range represents a range on both the first axis and the second axis of the graph in which it is assumed that operation of the two or more generators after being switched to the independent operation state will not be hindered, 7. The power generation system of claim 6, wherein the range of the allowable operating range relating to the first axis is defined by at least one of a third boundary line representing the minimum output that the target generator can generate and a fourth boundary line representing the maximum output that the target generator can generate.
9. The first axis represents the power output of the generator; The allowable operation range represents a range on both the first axis and the second axis of the graph in which it is assumed that operation of the two or more generators after being switched to the independent operation state will not be hindered, 8. The power generation system of claim 7, wherein the range of the allowable operating range relating to the first axis is defined by at least one of a third boundary line representing the minimum output that the target generator can generate and a fourth boundary line representing the maximum output that the target generator can generate.
10. The two or more generators include a first generator and a second generator, The power generation system includes: a first power generation control unit that controls the first power generator in accordance with an isochronous characteristic in the independent operation state; The power generation system according to any one of claims 1 to 5, further comprising a second power generation control unit that controls the second generator in accordance with a droop characteristic in the independent operation state.
11. The two or more generators include a first generator and a second generator, The power generation system includes: a first power generation control unit that controls the first generator in accordance with a droop characteristic in the independent operation state; The power generation system according to any one of claims 1 to 5, further comprising a second power generation control unit that controls the second generator in accordance with a droop characteristic in the independent operation state.
12. Two or more generators connected to a power grid and operated in parallel; a circuit breaker that switches between an interconnected operation state in which the power grid and the two or more generators are connected and an isolated operation state in which the power grid and the two or more generators are disconnected; A monitoring device provided in a power generation system comprising: a display control unit that displays a graph including a first axis and a second axis on a monitor in the interconnected operation state; The first axis represents a physical quantity related to a power generation output of a target generator which is any one of the two or more generators, The second axis represents the power consumption of an important load to which power is supplied from the two or more generators in the isolated operation state; The display control unit of the monitoring device displays an acceptable operating range on the second axis of the graph, which represents the range in which it is expected that operation of the two or more generators will not be impaired after being switched to the independent operation state.
13. Two or more generators connected to a power grid and operated in parallel; a circuit breaker that switches between an interconnected operation state in which the power grid and the two or more generators are connected and an isolated operation state in which the power grid and the two or more generators are disconnected; A method for monitoring a power generation system comprising: a display step of displaying a graph including a first axis and a second axis on a monitor in the interconnected operation state; The first axis represents a physical quantity related to a power generation output of a target generator which is any one of the two or more generators, The second axis represents the power consumption of an important load to which power is supplied from the two or more generators in the isolated operation state; A monitoring method for a power generation system, in which the display process displays an acceptable operating range on the second axis of the graph, representing the range within which it is expected that operation of the two or more generators will not be impaired after being switched to the independent operation state.
Citation Information
Patent Citations
Distributed power system
JP2009081942A
Providing device, providing method and providing program
JP2019176685A
Operation method of power generation facility
JP2020043647A
Power management device and power management method
JP2020078242A
Determination device, determination method, and computer program
JP2021052498A