Power management device and power management program

The power management device addresses the limitations of existing systems by intelligently allocating power supplies during outages, enhancing disaster relief efforts and maintaining critical operations.

JP7555831B2Active Publication Date: 2024-09-25KYUSHU ELECTRIC POWER CO INC
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2021004276
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-01-14
Publication Date
2024-09-25
Estimated Expiration
2041-01-14

AI Technical Summary

Technical Problem

Existing power management systems, such as those described in Patent Document 1, are limited in their ability to supply power to areas where they are not normally used during disasters, and may fail to function as essential devices like printers, hindering critical operations.

Method used

A power management device that receives occurrence information about power outages, stores power supply information, and calculates which devices can be utilized in affected areas, transmitting this information to administrators to efficiently allocate and manage power supplies.

Benefits of technology

Enables efficient disaster relief by identifying available power sources, ensuring necessary power is supplied to disaster areas, and managing power usage to minimize inconvenience to victims.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007555831000001
    Figure 0007555831000001
  • Figure 0007555831000002
    Figure 0007555831000002
  • Figure 0007555831000003
    Figure 0007555831000003
Patent Text Reader

Abstract

To provide a power supply management device or the like for appropriately selecting and using a usable power supply device when a power system stops by managing the daily use state of the power supply device.SOLUTION: A power management device includes a disaster information receiving unit 23 that receives disaster information indicating that an extraordinary state has occurred, for example, when the extraordinary state in which a disaster occurs and the power system stops, a power supply information storage unit 22 that stores power information about a power supply 12, an extraction calculation unit 24 that extracts the power supply device 12 capable of supplying power to a target area where the power system has stopped from the power supply information storage unit 22 on the basis of a preset condition when the disaster information receiving unit 23 receives the disaster information, and an output control unit 26 that transmits the result information calculated by the extraction calculation unit 24 to a local government management device 14 of the local government that manages the target area.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a power supply management device that manages information about a power supply device that is required when a power grid is stopped. [Background technology]

[0002] In recent years, disasters have become more frequent, and there are many cases where the power supply from the power grid is stopped. On the other hand, relatively large-capacity portable power supply devices that use secondary batteries etc. have become widespread, and it is now possible to live daily life for a few hours to a few days using only the power from the power supply device without relying on power from the power grid.

[0003] Technologies have been disclosed for using the power of such secondary batteries to supply power in the event of a disaster. For example, the technology shown in Patent Document 1 includes a battery, a means of transportation that moves using the power supplied from the battery, a providing means for providing a service by moving with the means of transportation, a control means for controlling the means of transportation to stop supplying power from the battery to the means of transportation when the means of transportation transitions to a disaster mode, and an output means that operates when the means of transportation transitions to the disaster mode and outputs the power of the battery to an external device. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2018-93567 A Summary of the Invention [Problem to be solved by the invention]

[0005] The technology shown in Patent Document 1 is a service providing device that functions as a self-propelled printer in normal mode and prioritizes supplying power to the surrounding area in disaster mode. However, because the device can only supply power in its normal usage area, if a disaster occurs in an area where the device is not being used, it has the problem that it is difficult to use the device's power for disaster purposes.

[0006] Furthermore, even if the service providing device functions as an extremely important self-propelled printer in the event of a disaster that causes little direct damage, the function as the printer will stop, resulting in the problem that extremely important printing cannot be performed.

[0007] The present invention provides a power management device and a power management program for managing the daily usage status of power supplies, thereby appropriately selecting and using an available power supply device in the event of a power grid outage. [Means for solving the problem]

[0008] The power management device of the present invention comprises an occurrence information receiving means for receiving occurrence information indicating the occurrence of an extraordinary condition in which the power system is stopped, when the extraordinary condition occurs; a power information storage means for storing power information relating to power supplies; an extraction calculation means for, when the occurrence information receiving means receives the occurrence information, extracting from the power information storage means the power supplies that can supply power to a target area where the power system has been stopped based on preset conditions; and a transmission means for transmitting result information calculated by the extraction calculation means to an administrator who manages the target area.

[0009] In this way, in the power management device of the present invention, power information related to power supplies is stored in a power information storage means, and in the event of a power grid outage, power supplies that can supply power to the target area where the power grid has stopped are extracted from the power information storage means based on preset conditions, and the resulting information is sent to the administrator who manages the target area where the power grid has stopped.Therefore, even in the event that a disaster occurs and grid power is stopped, the number of surplus power supplies that can be supplied to the affected area and the number of out-of-operation power supplies can be communicated to the administrator of the local government, etc., thereby enabling the administrator to carry out disaster relief efficiently and enabling disaster victims to receive as much power supply as possible.

[0010] In the power management device of the present invention, if necessary, the extraction calculation means extracts the power supply device as a target power supply device that can be supplied to the target area when the information on the operating rate of the power supply device contained in the power information is below a predetermined rate.

[0011] In this way, in the power management device of the present invention, when the information on the operating rate of a power supply device included in the power information is below a predetermined rate, it is extracted as a target power supply device that can be supplied to the target area, thereby achieving the effect of making it possible to select and supply only power supplies with low operating rates and low importance under normal circumstances, while allowing necessary power supplies to be used as usual.

[0012] The power management device according to the present invention may, as necessary, comprise setting information calculation means for changing the preset conditions in response to the generated information received by the generated information receiving means.

[0013] In this way, the power supply management device of the present invention is equipped with a setting information calculation means that changes the pre-set conditions in accordance with the generated information received by the generated information receiving means, so that in cases of high urgency, such as when human life is at stake, it is possible to respond by enabling even power supplies with a high operating rate to be supplied to the target area, thereby achieving the effect of being able to appropriately manage power supplies in accordance with the content of the generated information.

[0014] The power management device of the present invention is, as necessary, provided with a monitoring means for extracting the power supply devices that require charging based on battery remaining capacity information indicating the remaining battery capacity contained in the power supply information, and the transmission means transmits the information about the power supply devices extracted by the monitoring means to the administrator.

[0015] In this way, the power management device of the present invention is equipped with a monitoring means for extracting the power supply devices that require charging based on battery remaining amount information that indicates the remaining battery amount contained in the power supply information, and the transmission means transmits the information about the power supply devices extracted by the monitoring means to the manager, so that it is possible to grasp the usage status of power supply devices in use in the target area and perform charging management, etc., which has the effect of making the work of the local government, etc. that is the manager, more efficient in the event of a disaster, in particular, and reducing the possibility of disaster victims suffering inconvenience due to power shortages, etc.

[0016] The power management device of the present invention is equipped, as necessary, with a necessary information receiving means for receiving necessary information regarding the capacity of the power supply equipment required in the target area, which information is transmitted from an administrator device used by the administrator, and an arrangement calculation means for calculating a method of arranging the target power supply equipment to be supplied to the target area based on the power information and the necessary information.

[0017] In this way, the power management device of the present invention receives necessary information regarding the capacity of the power supply required in the target area sent from the administrator, and calculates a method of arranging the target power supply to be supplied to the target area based on the power information and necessary information, thereby reducing the labor and time required for transporting and delivering the power supply, and making it possible to efficiently arrange power supply for the target area. [Brief description of the drawings]

[0018] [Figure 1] 1 is a system configuration diagram of a power management system using a power management device according to a first embodiment. [Diagram 2]1 is a functional block diagram showing a configuration of a power management device according to a first embodiment. [Diagram 3] 4 is a flowchart showing the operation of the power management device according to the first embodiment. [Figure 4] FIG. 11 is a functional block diagram showing a configuration of a power management device according to a second embodiment. [Diagram 5] 10 is a flowchart showing the operation of a power management device according to a second embodiment. [Figure 6] FIG. 13 is a functional block diagram showing a configuration of a power management device according to a third embodiment. [Figure 7] 10 is a flowchart showing the operation of a power management device according to a third embodiment. [Figure 8] FIG. 13 is a functional block diagram showing a configuration of a power management device according to a fourth embodiment. [Figure 9] 13 is a flowchart showing the operation of a power management device according to a fourth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] (First embodiment of the present invention) The power management device according to the present embodiment will be described with reference to Figs. 1 to 3. The power management device according to the present embodiment stores the normal usage state of a portable power supply device using, for example, a secondary battery, and when a disaster occurs and the grid power is stopped, information on surplus power supplies outside the disaster area is provided to the local government of the disaster area, thereby helping the evacuees in their lives. Note that the present device can be applied when the grid power is stopped other than when a disaster occurs, including, for example, a long-term power outage caused by a cause other than a disaster or a power outage caused by the failure of a power facility. In the following description, an example will be described in which, when the grid power is stopped due to a disaster, a power supply device is temporarily supplied to the local government as a relief.

[0020] 1 is a system configuration diagram of a power management system using a power management device according to this embodiment. The power management system 1 includes power devices 12 (12a to 12z) used by users 2 (2a to 2z), a power management device 13 used by a power manager 3, capable of wireless communication with each power device 12, and managing power information related to the usage information of each power device 12, and a local government management device 14 (14a to 14z) used by a local government 4 (4a to 4z) that manages each region. Each device is connected to the Internet 11, for example, to enable information communication between them.

[0021] The user 2 is, for example, a contractor who performs construction work in enclosed spaces such as underground or in tunnels, or at night, or in mountainous or remote areas where it is difficult to secure electricity, and uses a portable power supply device 2 that runs on a secondary battery that does not emit exhaust gas or noise, in order to avoid exhaust fumes from generators that use diesel or gasoline as fuel, and to avoid noise at night. Such a user 2 uses many power supply devices 2 in his daily work, and information on the usage status of each power supply device 2 is collected and centrally managed by the power supply manager 3 in the power supply management device 13.

[0022] The power supply manager 3 is, for example, a company that manufactured and sold the power supply devices 2, and is able to manage information transmitted from each power supply device 2 regarding its usage status using a power supply management device 13. When a disaster or the like occurs in a certain area and the grid power is stopped, information on power supply devices 2 that can be provided to the disaster area in areas other than the disaster area is extracted based on their usage status. The extracted information on the power supply devices 2 is transmitted to a municipality management device 14a used by a municipality 4 that manages the disaster area (assuming that a disaster has occurred in an area managed by the municipality 4a).

[0023] The local government 4a where the disaster occurred refers to the information on the power supply devices 2 received by the local government management device 14a and manages the power supply devices 2 provided by the users 2. Specifically, the local government 4a decides how many power supply devices 2 to distribute to where in the disaster area, and manages the replacement of the power supply devices 2 when they run out of charge.

[0024] 1, the power supply device 12 used by the user 2 may be one that has been transferred from the power supply manager 3, or may be one that has been supplied to the user 2 via a leasing company. When the power supply device 2 is supplied via a leasing company, the power supply manager 3 obtains information about the leasing party from the leasing company and stores it in the power supply management device 13.

[0025] 2 is a functional block diagram showing the configuration of the power management device 13 according to this embodiment. Here, the power management device 13 includes a CPU, RAM, ROM, a hard disk, a communication I / F, and an input / output I / F, and the operating system and various programs stored in the ROM or hard disk are read into the RAM as necessary, and each program is executed by the CPU. Communication between devices is performed via the communication I / F, and input operations and output displays by the power manager 3 are performed via the input / output I / F.

[0026] In FIG. 2, the power management device 13 includes a power information receiving unit 21 that constantly receives power information regarding the usage status of the power supply devices 12 transmitted from the multiple power supply devices 12a to 12z in use on a regular or irregular basis; a power information storage unit 22 that stores and memorizes the information received by the power information receiving unit 21 for each of the power supply devices 12a to 12z; a disaster information receiving unit 23 that receives information regarding the disaster including the operating status of the power system; an extraction calculation unit 24 that extracts power supply devices 12 that can be provided to disaster-stricken areas based on the information regarding the disaster received by the disaster information receiving unit 23 and the information regarding the usage status of the power stored in the power information storage unit 22; a setting information storage unit 25 that stores setting information that has been input in advance as a judgment criterion when the extraction calculation unit 24 extracts the power supply devices 12; and an output control unit 26 that transmits information regarding the power supply devices 12 extracted by the extraction calculation unit 24 to the local government management device 14.

[0027] Information regarding the usage status of the power supply devices 12a to 12z is received on a daily basis by the power supply information receiving unit 21, and the operating time, continuous operating time, operating rate, load state, charge / discharge state, component deterioration state, location of use, storage location, user, purpose of use, years of use, and / or maintenance status, etc., are managed for each power supply device 12 in the power supply information storage unit 22.

[0028] The disaster information receiving unit 23 receives various information on the scale and damage situation when a disaster occurs. The received information includes information on the area and scale where the power grid has stopped and electricity cannot be used. In addition, information on the damage situation in the affected area may be received from the local government management device 14a managed by the affected local government 4a.

[0029] The extraction calculation unit 24, triggered by the receipt of disaster information by the disaster information receiving unit 23, extracts information on the power supply devices 12 that can be provided to the disaster-stricken area from the power supply information storage unit 22. At this time, a set value that is a criterion for selecting the power supply device 12 to be extracted is read from the setting information storage unit 25. Specifically, for example, set values ​​such as a predetermined operation rate, the number of times used at important bases, operation time, whether it is a main / backup power source, whether it is registered in advance for use in the event of a disaster, the period of use, and the degree of urgency are stored in the setting information storage unit 25, and the extraction calculation unit 24 reads them to select the power supply device 12 to be extracted.

[0030] Based on the information in the power supply information storage unit 22 and the information in the setting information storage unit 25, the extraction calculation unit 24 extracts, for example, power supply devices 12 whose operating rate is normally below a predetermined value, power supply devices 12 that are rarely used at important bases, power supply devices 12 that are not normally operated as backup power sources, power supply devices 12 that are registered in advance as being available in the event of a disaster, etc. In addition, for example, power supply devices 12 that have a fixed period of use (used only during a certain season or during a certain month or week) and power supply devices 12 that are used irregularly but are unused for a certain period of time may also be extracted. In other words, power supply devices 12 that are in a state of use with low urgency in areas other than the disaster area are extracted.

[0031] Information about the extracted power supply devices 12 is transmitted to the local government management device 14a, the local government 4a examines the information, and the necessary power supply devices 12 are transported and provided to the local government 4a in the disaster area.

[0032] In addition, when the power supply device 12 is supplied to the user 2 via a leasing company, information on the user of the power supply device 2 under lease (information on the leasing party) may be provided by the leasing company and stored in the power supply information storage unit 22. In this case, an arrangement may be made such that, in return for the leasing company providing the information, the information in the power supply information storage unit 22 is made viewable.

[0033] Next, the operation of the power management device according to this embodiment will be described. FIG. 3 is a flowchart showing the operation of the power management device according to this embodiment. First, the power information receiving unit 21 constantly receives power information related to the usage state of the power supply device 12 (S1), and stores it in the power information storage unit 22 (S2). The disaster information receiving unit 23 judges whether or not it has received disaster information (S3), and if it has not received disaster information, that is, if no disaster has occurred, it returns to S1 and continues to collect information as usual. If the disaster information receiving unit 23 has received disaster information, the extraction calculation unit 24 extracts the power supply device 12 that can be provided to the disaster area based on the information in the power information storage unit 22 (S4). The information of the extracted power supply device 12 is transmitted to the local government management device 14a of the local government 4a that has jurisdiction over the disaster-affected area (S5), and the process ends.

[0034] In this way, in the power management device 13 of this embodiment, even in the event of a disaster or the like causing grid power to be cut off, the number of surplus power supply devices 12 that can be supplied to the disaster-stricken area and the number of out-of-operation power supply devices 12 can be communicated to the administrator of the local government, etc., enabling the administrator to carry out disaster relief efficiently and enabling disaster victims to receive as much power supply as possible.

[0035] In addition, when the information on the operating rate of a power supply device 12 included in the power supply information is below a predetermined rate, the power supply device 12 is extracted as a power supply device that can be supplied to the disaster-stricken area. This makes it possible to select and supply only power supply devices 12 that have low operating rates and are less important under normal circumstances, while allowing the necessary power supply devices 12 to be used as usual.

[0036] (Second embodiment of the present invention) The power management device according to this embodiment will be described with reference to Fig. 4 and Fig. 5. The power management device according to this embodiment sets criteria for determining whether a power supply device can be provided to a disaster-stricken area, depending on the type and scale of the disaster, for example. Note that in this embodiment, descriptions that overlap with those in the first embodiment will be omitted.

[0037] Fig. 4 is a functional block diagram showing the configuration of a power management device according to this embodiment. The difference between the configuration of Fig. 4 and the configuration of Fig. 2 in the first embodiment is that the power management device includes a setting information calculation unit 27 that updates the setting information stored in the setting information storage unit 25 based on the disaster information received by the disaster information receiving unit 23.

[0038] The disaster information received by the disaster information receiving unit 23 includes information on the type of disaster (e.g., earthquake, tsunami, eruption, typhoon, flood, heavy rain, etc.), its scale, occurrence time, occurrence area, and damage status. The way in which the damage spreads and the method of relief vary depending on these parameters. For example, in the case of a large-scale disaster requiring a lot of relief, the setting information is updated so that as many power supply devices 12 as possible can be provided, and in the case of a small-scale disaster, the setting information is updated so that a power supply device sufficient for minimum relief can be provided.

[0039] The setting information may be configured to calculate the required amount of power from the power supply device 12 using a learning function such as AI based on the damage status of the power system in past disaster situations. Also, the setting information may be updated over time according to the expansion of the damage. For example, appropriate setting information may be calculated based on the type, scale, and damage status of the disaster according to the expansion and contraction periods of the damage.

[0040] Fig. 5 is a flowchart showing the operation of the power management device according to this embodiment. What is different from Fig. 3 in the first embodiment is that when the disaster information receiving unit 23 receives disaster information in step S3, the setting information calculation unit 27 includes a process (S4) for updating the setting information stored in the setting information storage unit 25. After the setting information is updated, the extraction calculation unit 24 extracts the power supply devices 12 that can be provided to the disaster area based on the information in the power supply information storage unit 22 (S5), as in the case of Fig. 3, and transmits the extracted power supply devices 12 to the local government management device 14a of the local government 4a that has jurisdiction over the disaster area (S6), and the process ends.

[0041] In this way, in the power management device of this embodiment, the pre-set configuration information is changed in response to disaster information. Therefore, in cases of high urgency, such as when human lives are at stake, it is possible to respond by enabling even power supply devices 12 with high operating rates to supply power to the target area, and power supply devices 12 can be appropriately managed in response to the content of the disaster information.

[0042] (Third embodiment of the present invention) The power management device according to this embodiment will be described with reference to Fig. 6 and Fig. 7. The power management device according to this embodiment efficiently arranges for the power supply device 12 to be sent to a disaster area when it has been decided to provide the power supply device 12 to the disaster area in the event of a disaster, for example. Note that in this embodiment, explanations that overlap with the above-mentioned embodiments will be omitted.

[0043] Fig. 6 is a functional block diagram showing the configuration of a power management device according to this embodiment. The difference between the configuration of Fig. 2 in the first embodiment in Fig. 6 is that it includes an arrangement calculation unit 28 that receives information on the required power supply device 12 (information on the wattage required for the rescue requested by the local government 4a and its area) transmitted from the local government management device 14a, reads information on the power supply device 12 extracted by the extraction calculation unit 24 from the power information storage unit 22, and calculates an efficient arrangement method.

[0044] The power supply devices 12 are not necessarily stored in one place, and are likely to be used in various locations. Therefore, it is more efficient to send the power supply devices 12 directly from their usage points to the nearest disaster area, rather than to collect the power supply devices 12 that can be provided to the disaster area in one place and send them to the disaster area, as this requires less time and manpower. The arrangement calculation unit 28 generates arrangement information for the power supply devices 12 so as to match the request information transmitted from the local government management device 14a as much as possible. For example, arrangement information is generated indicating how many power supply devices 12 are to be arranged for which disaster area. When creating the arrangement information, if there are sufficient power supply devices 12 that can be provided in response to the request from the local government 4a, arrangements are made so that they can be transported efficiently to the required locations. Specifically, for example, the arrangement calculation unit 28 may calculate a route that allows the arrangement means to travel most efficiently (shortest distance or shortest time) or a route that allows the power supply devices 12 to be transported preferentially from areas with the greatest damage. In addition, specific means of arrangement include delivery vehicles owned by transportation companies, mobile vehicles owned by public transportation agencies, taxis, and private cars of volunteers and disaster victims, and it is desirable for their transport capacity and location information to be registered in the system.

[0045] In addition, if the number of power supply devices 12 that can be provided to meet the request from the local government 4a is insufficient, the arrangement information is generated by allocating the power supply devices 12 (electricity amount) according to the number of disaster victims in a manner that avoids unfairness as much as possible. These calculations may be performed by an AI with a learning function, etc.

[0046] FIG. 7 is a flowchart showing the operation of the power management device according to this embodiment. Here, only the part of the arrangement process after the amount of power required for each disaster area is grasped by the local government 4a is shown, and the other processes are the same as those of the above-mentioned embodiments. First, the arrangement calculation unit 28 receives request information on the power supply device 2 required for rescue transmitted from the local government management device 14a (S1). The arrangement calculation unit 28 reads information on the power supply device 12 extracted by the extraction calculation unit 24 from the power supply information storage unit 22 (S2). Based on the request information received from the local government management device 14a and information on the usage state of the power supply device 12 read from the power supply information storage unit 22, arrangement information for arranging the power supply device 12 to be provided to the disaster area is generated (S3). As described above, the arrangement information includes route information for making the transportation of the power supply device 12 more efficient. The arrangement information is output (S4) and the process is terminated. The arrangement information may be transmitted to the arrangement means by communication, or may be output to a display or paper and handed over.

[0047] In this way, the power management device according to this embodiment makes it possible to make arrangements for power supply devices 12 after a disaster or the like occurs as efficiently as possible and deliver them to disaster victims or the like.

[0048] (Fourth embodiment of the present invention) The power management device according to this embodiment will be described with reference to Fig. 8 and Fig. 9. The power management device according to this embodiment manages (mainly manages charging and discharging) the power supply device 12 while it is provided to the disaster area. Note that in this embodiment, descriptions that overlap with the above-mentioned embodiments will be omitted.

[0049] Fig. 8 is a functional block diagram showing the configuration of the power management device according to this embodiment. The difference between the configuration of Fig. 2 in the first embodiment in Fig. 8 is that, among the information received by the power information receiving unit 21, information on the usage state of the power supply device 12 that was not provided to the disaster area is stored in the power information storage unit 22, and information on the usage state of the power supply device 12 that was provided to the disaster area is stored in the disaster power information storage unit 22a. In addition, a monitoring unit 29 is provided that monitors the charging and discharging state of the power supply device 12 used in the disaster area based on the information stored in the disaster power information storage unit 22a, and information on the power supply device 12 that needs to be charged is transmitted to the local government management device 14a via the output control unit 26.

[0050] Since it is difficult to charge the power supply devices 12 in disaster areas, the power supply devices 12 that need to be charged must be transported to an area where the grid power is normal and charged there. By transmitting information about the power supply devices 12 that need to be charged from the power management device 13 to the local government management device 14a, it becomes possible for the local government 4a to efficiently manage the charging and discharging of the power supply devices 12.

[0051] Next, the operation of the power management device according to this embodiment will be described. FIG. 9 is a flowchart showing the operation of the power management device according to this embodiment. First, the power information receiving unit 21 receives information on the usage state of the power supply device 12 provided to the disaster area (S1), and stores it in the disaster power supply information storage unit 22a (S2). The monitoring unit 29 monitors the information in the disaster power supply information storage unit 22a, and extracts the power supply device 12 that is likely to require charging (S3). At this time, the power supply device 12 that requires charging is extracted taking into consideration the time required for recovery of the power supply device 12 and the presence or absence of a substitute power supply device 12 (including the amount of power that can be immediately supplied, etc.). The output control unit 26 transmits information on the extracted power supply device 12 to the local government management device 14a (S4), and the process ends.

[0052] In this way, the power management device of this embodiment is equipped with a monitoring unit 29 that extracts power supply devices 12 that require charging based on remaining battery power information indicating the remaining battery power contained in the power information transmitted from the power supply devices 12, and the information on the power supply devices 12 extracted by the monitoring unit 29 is transmitted to the municipal management device 14a. Therefore, it becomes possible to grasp the usage status of power supply devices 12 that are in use in target areas such as disaster areas and perform charging management, etc., which not only makes the work of municipalities etc. more efficient, but also reduces the possibility that disaster victims will be inconvenienced by power shortages, etc.

[0053] In the power management system according to the present invention, the name of the company of the user 2 may be written on the power supply device 12. This enables the user 2 to highlight his or her contribution to society.

[0054] In addition, in each of the above embodiments, the configurations of Figures 2, 4, 6 and 8 can be combined as appropriate, and for example, a configuration may be provided that includes both the setting information calculation unit 27 shown in Figure 4 and the disaster power supply information storage unit 22a in Figure 8.

[0055] Furthermore, in the above explanation, local governments and local government management devices were used as examples of rescuers, but the power management system of the present invention is not limited to these and can be applied to any individual or organization that manages victims in the event of a power grid outage. [Explanation of symbols]

[0056] 1 Power Management System 2(2a~2z) User 3 Power Manager 4(4a~4z) Municipality 11. Internet 12(12a~12z) Power supply 13 Power management device 14(14a~14z) Municipal management equipment 21 Power supply information receiver 22 Power information storage section 22a Disaster power supply information storage unit 23 Disaster Information Receiving Department 24 Extraction calculation section 25 Setting information storage section 26 Output control section 27 Setting information calculation section 28 Ordering calculation unit 29 Monitoring Department

Claims

1. an occurrence information receiving means for receiving occurrence information indicating the occurrence of an extraordinary state in which the power grid is stopped when the extraordinary state occurs; a power supply information storage means for storing power supply information relating to the power supply device; an extraction calculation means for extracting, when the generation information receiving means receives the generation information, from the power supply information storage means on the basis of a preset condition, the power supply device capable of supplying power to the target area where the power grid has been stopped; a transmitting means for transmitting result information calculated by the extracting and calculating means to a manager who manages the target area, The power management device is characterized in that the extraction calculation means extracts the power supply device as a target power supply device that can supply power to the target area when information on the operating rate of the power supply device included in the power supply information is below a predetermined rate.

2. An occurrence information receiving means for receiving occurrence information indicating the occurrence of an extraordinary condition in which the power grid is stopped when the extraordinary condition occurs; a power supply information storage means for storing power supply information relating to the power supply device; an extraction calculation means for extracting, when the generation information receiving means receives the generation information, from the power supply information storage means on the basis of a preset condition, the power supply device capable of supplying power to the target area where the power grid has been stopped; a transmitting means for transmitting result information calculated by the extracting and calculating means to a manager who manages the target area; a setting information calculation means for changing the preset condition in response to the occurrence information received by the occurrence information receiving means.

3. An occurrence information receiving means for receiving occurrence information indicating the occurrence of an extraordinary state in which the power grid is stopped when the extraordinary state occurs; a power supply information storage means for storing power supply information relating to the power supply device; an extraction calculation means for extracting, when the generation information receiving means receives the generation information, from the power supply information storage means on the basis of a preset condition, the power supply device capable of supplying power to the target area where the power grid has been stopped; a transmitting means for transmitting result information calculated by the extracting and calculating means to a manager who manages the target area; a monitoring means for extracting the power supply device that needs charging based on remaining battery amount information indicating a remaining battery amount included in the power supply information; The power management device, wherein the transmission means transmits the information on the power supply device extracted by the monitoring means to the administrator.

4. 4. The power management device according to claim 1, a necessary information receiving means for receiving necessary information regarding a capacity of the power supply device required in the target area, the necessary information being transmitted from an administrator device used by the administrator; and an arrangement calculation means for calculating an arrangement method for a target power supply device to be supplied to the target area based on the power supply information and the necessary information.

5. An occurrence information receiving means for receiving occurrence information indicating the occurrence of an extraordinary state in which the power grid is stopped when the extraordinary state occurs; a power supply information storage means for storing power supply information relating to the power supply device; an extraction calculation means for extracting, when the generation information receiving means receives the generation information, from the power supply information storage means, the power supply device capable of supplying power to the target area where the power grid has been stopped, based on a preset condition; a computer that functions as a transmitting means for transmitting result information calculated by the extracting and calculating means to a manager who manages the target area; The power management program is characterized in that the extraction calculation means extracts the power supply device as a target power supply device that can be supplied to the target area when information on the operating rate of the power supply device included in the power supply information is below a predetermined rate.

6. an occurrence information receiving means for receiving occurrence information indicating the occurrence of an extraordinary state in which the power grid is stopped when the extraordinary state occurs; a power supply information storage means for storing power supply information relating to the power supply device; an extraction calculation means for extracting, when the generation information receiving means receives the generation information, from the power supply information storage means, the power supply device capable of supplying power to the target area where the power grid has been stopped, based on a preset condition; a transmitting means for transmitting result information calculated by the extracting and calculating means to a manager who manages the target area; A power supply management program that causes a computer to function as setting information calculation means for changing the preset conditions in response to the generation information received by the generation information receiving means.

7. An occurrence information receiving means for receiving occurrence information indicating the occurrence of an extraordinary state in which the power grid is stopped when the extraordinary state occurs; a power supply information storage means for storing power supply information relating to the power supply device; an extraction calculation means for extracting, when the generation information receiving means receives the generation information, from the power supply information storage means, the power supply device capable of supplying power to the target area where the power grid has been stopped, based on a preset condition; a transmitting means for transmitting result information calculated by the extracting and calculating means to a manager who manages the target area; making the computer function as a monitoring means for extracting the power supply device that needs charging based on remaining battery amount information indicating a remaining battery amount included in the power supply information; The power supply management program, wherein the transmitting means transmits the information on the power supply device extracted by the monitoring means to the administrator.

Citation Information

Patent Citations

  • Regional energy management method

    JP2013118722A

  • Disaster time power supply system

    JP2017112806A

  • Service provision device

    JP2018093567A

  • Information processing device, on-vehicle system, and vehicle allocation system

    JP2020114051A

  • Portable modular power system

    US20140210401A1