Information processing device, power supply system operation method and program
The information processing device addresses the risk of unrecovered investment in power supply systems by forecasting income and expenditure, calculating actual amounts, and determining compensation, ensuring financial stability for facility owners.
Patent Information
- Application Number
- JP2020198083
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-11-30
- Publication Date
- 2024-09-26
- Estimated Expiration
- 2040-11-30
AI Technical Summary
The introduction of power supply systems to complex facilities with multiple power supply destinations is risky due to uncertainties in recovering initial investment costs, as simulations may not accurately predict profitability, leading to potential financial losses.
An information processing device that forecasts income and expenditure, acquires guarantee information, calculates actual amounts, and determines compensation based on predetermined conditions to mitigate risks by ensuring compensation for potential losses.
Reduces the financial risks associated with introducing power supply systems by providing a mechanism for compensation when actual income falls short of predicted income, thereby making such systems more attractive to facility owners.
Smart Images

Figure 0007556274000005 
Figure 0007556274000001 
Figure 0007556274000002
Abstract
Description
[Technical field]
[0001] The present invention relates to an information processing device used together with a power supply system that supplies power to a complex facility including a plurality of power supply destinations, and to an operation method and program for the power supply system. [Background technology]
[0002] It has been known that in a power supply system that supplies power to a complex facility including a plurality of power supply destinations, power is procured in a lump sum at a low price from a power company through a high-voltage lump sum power receiving contract, and the power is distributed to each power supply destination within the facility, thereby reducing the electricity bill for the entire complex facility (for example, Patent Document 1). In recent years, a power supply system has also been proposed that achieves a reduction in electricity bills by procuring power through a low-voltage lump sum power receiving contract (for example, Patent Document 2). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2002-118961 A [Patent Document 2] JP 2017-17779 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, in order to introduce and operate such a power supply system, initial investment and running costs (hereinafter, collectively referred to as introduction costs) are incurred. Even if a reduction in electricity charges is achieved through bulk power reception, it is unclear at the time of introducing the system whether the revenues gained from the reduction in electricity charges will be enough to recover the introduction costs.
[0005] Although it is possible to carry out simulations in advance under various conditions, the results do not necessarily match the simulations, so when introducing a bulk power receiving and supply system, owners of complex facilities run the risk of not being able to recoup their investment. This has led to the problem of the slow spread of such power supply systems.
[0006] The present invention has been made in consideration of the above-described circumstances, and aims to reduce the risks involved in introducing a power supply system that supplies power to a complex facility including a plurality of power supply destinations. [Means for solving the problem]
[0007] In order to achieve the above object, the present invention employs the following configuration: That is, an information processing device used together with a power supply system that supplies power to a complex facility including a plurality of power supply destinations, an income / expenditure forecast information acquisition unit that acquires information on an income / expenditure forecast in the case where the power supply system is introduced into the complex facility, the information being predicted based on a predicted expenditure amount required for introducing and operating the power supply system into the complex facility and a predicted income amount to be obtained by introducing and operating the power supply system into the complex facility; a compensation information acquisition unit that acquires information on a predetermined compensation content for the income and expenditure forecast, the compensation content information being determined in advance based on information on the income and expenditure forecast; Calculate an actual income / expense amount, which is the actual value of the total income / expense amount since the introduction of the power supply system, based on the accumulated expenditure amount generated by introducing and operating the power supply system in the complex facility and the accumulated income amount generated by introducing and operating the power supply system in the complex facility. An actual income / expenditure calculation unit; a compensation calculation unit that, when a predetermined period of time has elapsed since the power supply system is introduced into the complex, determines whether or not a compensation will be generated to compensate for at least a portion of the difference between the income and expenditure forecast and the actual income and expenditure at the time the predetermined period has elapsed, and the amount of the compensation, based on the income and expenditure forecast information, the total income and expenditure amount, and the predetermined guarantee content; The present invention relates to an information processing device.
[0008] Here, the "predetermined guarantee" may be, for example, that if the cumulative profit falls below the cumulative cost even at the break-even point in the simulation performed when the complex is introduced, the owner of the complex is compensated for the negative amount. The complex is not limited to commercial facilities, but also includes buildings consisting of the same type of facilities such as residences and offices, and facilities where multiple buildings are gathered. According to this, even if the profit does not increase according to the income and expenditure simulation performed in advance after the power supply system is introduced, the compensation amount based on the contents of the simulation can be calculated, and the owner of the facility (hereinafter also referred to as the owner) can receive the compensation amount based on this. This makes it possible to reduce the risk when the facility owner introduces the power supply system.
[0009] The income / expenditure forecast information includes information on the time when a forecast break-even point will occur, at which the forecast income amount will be equal to or greater than the forecast expenditure amount, The time when the predetermined period has elapsed is the time when the predicted break-even point will arrive, The compensation calculation unit may determine that, if the actual balance becomes negative after the specified period has elapsed, the compensation to be paid will be equal to or less than the negative amount.
[0010] This makes it easier for owners to plan when introducing a power supply system, since compensation will be incurred if the break-even point according to the simulation is actually negative.
[0011] In addition, the specified coverage may include adding an insurance premium corresponding to the conditions for the compensation to be paid and / or the amount of the compensation to the expenses necessary to install and operate the power supply system in the complex facility.
[0012] The insurance premium, which is a condition for receiving compensation, is an expense for the owner in addition to the cost of installing the system; however, by doing so, it is possible to calculate income and expenditures that include the insurance premium, thereby reducing the burden on the owner.
[0013] In addition, the specified guarantee content may include, as a condition for the payment of the compensation, that the average occupancy rate of the multiple power supply destinations after the power supply system is introduced into the complex is equal to or higher than a specified percentage.
[0014] By doing this, it is possible to prevent compensation from being incurred in situations where the prerequisites for the occurrence and determination of the amount of compensation, which is based on an income / expenditure simulation, are lost, such as when the occupancy rate of the complex becomes far lower than predicted by the simulation.
[0015] In the present invention, the power supply system further comprises: The power generation facility is capable of supplying power to the plurality of power supply destinations and is capable of being connected to a power grid; The actual balance calculated by the actual balance calculation unit may include, as income, an amount of surplus electricity generated by the power generation facility and sold to an electric power company.
[0016] According to such a configuration, the power supply system having the power generation facility can be applied to a bulk power receiving business in which profits are generated by selling electricity to a power company.
[0017] The power supply system further comprises: A management device is provided for calculating a rebate fee to be received by the owner of the complex, When the compensation calculation unit determines the occurrence and amount of the compensation, the compensation amount may be added to the refund fee.
[0018] Here, the rebate fee may be, for example, an amount obtained by subtracting a predetermined cost from the electricity fee collected from the plurality of power supply destinations. With this configuration, the owner can easily receive the compensation.
[0019] The information processing device may also serve as the management device in the power supply system. In this way, the present invention can be applied to the power supply system without adding any new configuration, which is efficient.
[0020] The present invention can also be understood as the following method. That is, a method for operating a power supply system that supplies power to a complex facility including a plurality of power supply destinations, comprising the steps of: an income / expense forecast information acquisition step in which, in an information processing device used together with the power supply system, information on a revenue / expense forecast in the case of introducing the power supply system into the complex is acquired, the revenue / expense forecast information being predicted based on a predicted expenditure amount required for introducing and operating the power supply system into the complex and a predicted income amount to be obtained by introducing and operating the power supply system into the complex; a compensation information acquisition step of acquiring, in the information processing device, information on a predetermined compensation content for the income and expenditure forecast, the compensation content being determined in advance based on information on the income and expenditure forecast; an actual balance calculation step of calculating, in the information processing device, an actual balance, which is an actual value of the total balance since the introduction of the power supply system, based on an accumulated expenditure amount generated by introducing and operating the power supply system in the complex and an accumulated income amount generated by introducing and operating the power supply system in the complex; The method for operating an electric power supply system is characterized by having a compensation calculation step in which, in the information processing device, when a predetermined period of time has elapsed since the electric power supply system is introduced into the complex, based on the income / expense forecast, the actual income / expense amount, and the specified guarantee content, it is determined whether or not a compensation will be generated to compensate for at least a portion of the difference between the income / expense forecast and the actual income / expense amount at the time the specified period of time has elapsed, and the amount of the compensation.
[0021] The income / expenditure forecast information includes information on the time when a forecast break-even point will occur, at which the forecast income amount will be equal to or greater than the forecast expenditure amount, The time when the predetermined period has elapsed is the time when the predicted break-even point will arrive, The compensation calculation step may determine that, if the actual balance becomes negative after the specified period of time has elapsed, the compensation to be paid will be equal to or less than the amount of the negative balance.
[0022] The power supply system further comprises: The power generation facility is capable of supplying power to the plurality of power supply destinations and is capable of being connected to a power grid; The actual income / expenditure amount calculated in the actual income / expenditure amount calculation step may include, as income, an amount of surplus electricity generated by the power generation facility and sold to an electric power company.
[0023] The power supply system further comprises: A management device is provided for calculating a rebate fee to be paid to an owner of the complex; The method may further include a step of adding the compensation amount to the refund fee when the occurrence of the compensation and the amount thereof are determined in the compensation calculation step.
[0024] Furthermore, the present invention can also be understood as a program for causing a computer to execute the above-described method, or a computer-readable recording medium on which such a program is non-transiently recorded.
[0025] The present invention can be achieved by combining the above-described configurations and processes as long as no technical contradiction occurs. Effect of the Invention
[0026] According to the present invention, it is possible to reduce the risks involved in introducing a power supply system that supplies power to a complex facility including a plurality of power supply destinations. [Brief description of the drawings]
[0027] [Figure 1] 1 is a block diagram showing a schematic configuration of a power supply system in an application example of the present invention. [Diagram 2] 1 is a block diagram showing a schematic configuration of a compensation calculation device in an application example of the present invention. [Diagram 3] FIG. 11 is an explanatory diagram relating to a revenue and expenditure forecast performed prior to the introduction of a power supply system in an application example of the present invention. [Figure 4] 1 is a block diagram showing a schematic configuration of a power supply system according to a first embodiment. [Diagram 5] 1 is a block diagram showing the flow of services and fees performed using the power supply system in the first embodiment. FIG. [Figure 6] 2 is a block diagram showing a schematic configuration of a management device according to the first embodiment. FIG. [Figure 7] 4 is a flowchart showing a process flow of a control method of the management device in the first embodiment. [Figure 8] 4 is a flowchart showing a process flow of a control method of the management device in the first embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0028] <Application Examples> An application example of the present invention will be described below with reference to the drawings. Fig. 1 shows a block diagram of a power supply system 90 to which the present invention can be applied. In Fig. 1, solid lines connecting each block indicate power lines, and dashed lines connecting each block indicate communication lines (including wireless communication). It is assumed that the power supply system 90 according to this application example is applied to an apartment building 91. In this case, the apartment building 91 is an example of a complex facility including multiple power supply destinations.
[0029] 1, the power supply system 90 is electrically connected to a power grid 98. The power grid 98 may be a so-called retail electricity supplier or a general electricity supplier. A facility meter 94 is provided at the connection between the power supply system 90 and the power grid 98, and it is possible to measure the power supplied from the power grid 98 to the power supply system 90.
[0030] In addition, the power supply destinations of the power supply system 90 are assumed to be private areas 96a, 96b, 96c, etc. The private areas 96a, 96b, 96c, etc. are, for example, each room (hereinafter, also referred to as a resident) in an apartment building 91. More specifically, The loads in 96a, 96b, 96c... are electrical appliances and the like (not shown) in each room of the apartment building 91. In addition to the private areas 96a, 96b, 96c..., the apartment building 91 also has a common area 97. This common area 97 is a common portion of the apartment building 91, and possible loads in the common area 97 include, for example, lighting in a hallway or entrance. The private areas 96a, 96b, 96c... and the common area 97 are each equipped with individual meters 95a, 95b, 95c..., 95d, making it possible to measure the power consumed in the private areas 96a, 96b, 96c... and the common area 97.
[0031] Furthermore, the power supply system 90 has a management device 92 configured outside the apartment building 91 to be able to communicate with the system within the apartment building 91. More specifically, this management device 92 may be a server device provided on the cloud by a management company that is the operating entity of the power supply system 90. However, as long as the management device 92 is capable of sending and receiving information between the system within the apartment building 91 in the power supply system 90, it may be connected by wired communication and does not necessarily have to be provided on the cloud.
[0032] The power supply system 90 also includes a compensation calculation device 93 configured to be able to communicate with the management device 92. FIG. 2 is a block diagram showing a schematic configuration of the compensation calculation device 93. The compensation calculation device 93 can be configured, for example, by a general-purpose computer, and includes the functional modules of an income / expense forecast information acquisition unit 931, a guarantee information acquisition unit 932, an actual income / expense calculation unit 933, and a compensation calculation unit 934. In addition, although not shown, various input means such as a mouse and a keyboard, output means such as a display, storage means such as a RAM and a HDD, communication means, etc. may also be included. The compensation calculation device 93 corresponds to the information processing device in the present invention.
[0033] The income / expenditure forecast information acquisition unit 931 is a functional module that acquires and holds the results of income / expenditure forecasts (hereinafter, also referred to as simulations) made prior to the introduction of the power supply system 90 in the apartment building 91. The simulation, for example, calculates the predicted expenditure (cost) for the introduction and operation of the system and the predicted income (profit) obtained by the introduction of the system based on various conditions, and predicts how long it will take to turn a profit after the introduction of the system based on these. FIG. 3 shows an image of the simulation. In the figure, the horizontal axis indicates the time axis, for example, the number of years that have passed since the introduction of the power supply system 90, and the vertical axis indicates the cumulative value of the total amount of costs and profits generated by the introduction of the power supply system 90. Also, P in the figure indicates the break-even point at which the cumulative profit exceeds the cumulative cost.
[0034] The guarantee information acquisition unit 932 is a functional module that acquires and holds information on the specific guarantee content that is determined in advance based on the above simulation results. The specific guarantee content may be, for example, that the owner of the apartment building (hereinafter also referred to as the owner) pays insurance premiums to the manager of the power supply system (for example, a person entrusted with the introduction and operation of the power supply system by the owner), and in exchange, when the cumulative profit falls below the cumulative cost even at the time of the break-even point P in the simulation, a part or all of the negative amount is compensated.
[0035] The actual income / expense calculation unit 933 is a functional module that acquires the accumulated costs and accumulated profits due to the introduction of the power supply system 90 from the management device 92, and calculates the accumulated actual amount of income / expenses since the introduction of the power supply system.
[0036] The compensation calculation unit 934 is a functional module that determines, when a predetermined period of time has elapsed since the introduction of the power supply system 90, whether or not a compensation will be generated to compensate for at least a part of the difference between the simulation result and the actual amount of the balance after the predetermined period of time has elapsed, and the amount of the compensation, based on the simulation result, the predetermined guarantee content, and the accumulated actual amount of the balance. The time when a predetermined period of time has elapsed may be, for example, the time of the break-even point P described above.
[0037] Traditionally, the owner of an apartment complex would install a power supply system for a bulk power receiving business, and through a bulk power receiving contract, purchase the electricity consumed by the entire apartment complex at low cost, while collecting electricity fees with a certain margin added to them from each resident, thereby generating revenue. This is a business model that allows the owner to recover the installation costs of the power supply system and generate further revenue.
[0038] However, introducing an electricity supply system for a bulk electricity receiving business entails a number of risks.In other words, after the introduction of the system, it is possible that the occupancy rate of the housing complex will fall below expectations, or that residents will fail to pay their electricity bills, making it difficult to predict whether (or when) the revenue from introducing the electricity supply system will exceed the introduction costs and become profitable.
[0039] In contrast, in this application example, by using the compensation calculation device 93, if the actual income and expenditure amount for the simulation result is negative after a certain period of time has passed since the system was introduced, it is possible to compensate the owner for at least a part of the negative amount. This makes it possible to reduce the risk of introducing a power supply system.
[0040] In the above-described application example, the power supply system 90 is configured to procure the electricity used in the apartment building 91 only from the power grid 98. However, the present invention can also be applied to a power supply system equipped with other power procurement means, such as a distributed power source.
[0041] <Embodiment 1> (System Configuration) Hereinafter, an embodiment of the present invention will be described in more detail with reference to the drawings. FIG. 4 shows a block diagram of a power supply system 1 according to this embodiment. In FIG. 4, solid lines connecting each block indicate power lines, and dashed lines connecting each block indicate communication lines (including wireless communication). It is assumed that the power supply system 1 according to this application example is applied to an apartment house 1a. In this case, the apartment house 1a is an example of a complex facility including multiple power supply destinations. It is also assumed that the system is equipped with distributed power sources such as solar cells, wind power generators, and so-called V2H (Vehicle to Home) power sources and storage batteries.
[0042] In Fig. 4, the power supply system 1 is electrically connected to the grids 3a and 3b. When the power supplied by the distributed power sources is less than the power consumption of the multiple power supply destinations and there is a power shortage, it is possible to purchase power from the grid 3a, for example. When the power supplied by the distributed power sources is more than the power consumption of the multiple power supply destinations, it is possible to sell the surplus power to the grid 3b, for example. The grids 3a and 3b may be so-called retail electricity suppliers or general electricity suppliers. The grids 3a and 3b may be different electricity suppliers or may be the same electricity supplier.
[0043] Furthermore, the power supply system 1 has a management device 2 outside the apartment building 1a that is configured to be able to communicate with the system in the apartment building 1a. In this application example, wireless communication is possible between the system in the apartment building 1a and the management device 2 via an LTE router 6. More specifically, this management device 2 may be a server device provided on the cloud by a management company that is the operating entity of the power supply system 1. However, the management device 2 may be connected by wired communication and does not necessarily have to be provided on the cloud as long as it is possible to send and receive information between the management device 2 and the system in the apartment building 1a in the power supply system 1.
[0044] In addition, the power supply system 1 supplies power to the exclusive use units 12a, 12b, and 12c. The private areas 12a, 12b, 12c... are assumed to be the same as the private areas 12a, 12b, 12c..., for example, as the individual rooms (hereinafter also referred to as residents) in the apartment building 1a. More specifically, the loads in the private areas 12a, 12b, 12c... are the electrical appliances (not shown) in the individual rooms of the apartment building 1a. The apartment building 1a also has a common area 13 in addition to the private areas 12a, 12b, 12c..., which are common areas in the apartment building 1a. The common area 13 is a common area in the apartment building 1a, and the loads in the common area 13 may be, for example, lighting 13a in the hallway or entrance, or a specific load distribution board 13b that automatically supplies power to electrical appliances that have been connected in advance during a power outage or the like. The exclusive units 12a, 12b, 12c... and the common unit 13 are provided with smart meters 11a, 11b, 11c..., 11d, respectively, so that the power consumed in the exclusive units 12a, 12b, 12c... and the common unit 13 can be measured.
[0045] The power supply system 1 is also provided with a storage battery 14 and a solar cell 15 as distributed power sources. The storage battery 14 is connected to a storage battery power conditioner 16 including a bidirectional DC / DC converter for raising and lowering the charge / discharge voltage, and a DC / AC converter for converting the voltage related to the charge / discharge of the storage battery into DC / AC. The power output from the storage battery power conditioner 16 is measured by a smart meter 11e. On the other hand, the solar cell 15 is connected to a solar cell power conditioner 17 including a DC / DC converter for adjusting the power generation voltage of the solar cell 15, a control circuit for performing MPPT control using a hill-climbing method, and a DC / AC converter for converting the output voltage of the solar cell 15 into DC / AC. The solar cell power conditioner 17 is also electrically connected to the storage battery power conditioner 16, and the power generated by the solar cell 15 can be directly charged to the storage battery 14. In this embodiment, a distributed power source in which the storage battery 14 and the solar cell 15 are integrated may be used.
[0046] FIG. 5 shows a block diagram illustrating the flow of services and fees performed using the power supply system 1 in the first embodiment. FIG. 5 is a block diagram illustrating the operation of the power supply system 1. In the figure, white arrows indicate the flow of services, and hatched arrows indicate the flow of money. First, the flow of services will be described. As a premise of the block diagram of FIG. 5, the equipment owner 23, who is the owner of the apartment building 1a, entrusts a bulk power receiving contract (power trading control contract) to the management company 21, which is the operator of the management device 2 in FIG. 4. In other words, the equipment owner 23 requests the management company 21 to collectively manage the power supply to the residents 22 and the common areas of the apartment building 1a and collect the electricity charges.
[0047] The management company 21 supplies power to each resident 22 using power from distributed power sources. Each resident 22 pays the management company 21 an electricity fee according to the power he or she has consumed. If the power supplied from the distributed power sources is less than the power consumed by the resident 22, the management company 21 procures the shortfall in power from the electric utility 20. In that case, the management company 21 pays a power purchase fee for the power purchased to the electric utility 20. In other words, the management company 21 supplies power to each resident 22 by combining the power procured from the electric utility and the power from the distributed power sources.
[0048] As described above, the resident 22 pays the management company 21 an electricity fee according to the amount of power supplied, and the electricity fee unit price (yen / kWh) at this time can be freely determined by the management company 21, but may be an amount lower than the general electricity fee unit price (yen / kWh) that the resident 22 previously paid to the electric utility 20. In addition, the management company 21 pays the facility owner 23, as a self-consumption rebate, an amount obtained by deducting the power purchase fee for the power procured from the electric utility 20 and the operation fee for the power supply system 1, including the operating cost of the management device 2, from the total electricity fee paid by the resident 22 (total electricity fee).
[0049] Returning now to the explanation of FIG. 4, in the power supply system 1 shown in FIG. 4, the storage battery power conditioner 16 and the solar cell power conditioner 17 are connected to a second distribution board 10 for distributed power sources. The second distribution board 10 is connected to a first distribution board 9 that distributes power to each of the exclusive areas 12a, 12b, 12c, etc. and the common area 13. The first distribution board 9 is connected to the grids 3a and 3b via parent smart meters 4a and 4b. The first distribution board 9 is also connected to each of the exclusive areas 12a, 12b, 12c, etc. and the common area 13 (their outlets) via smart meters 11a, 11b, 11c, etc., 11d, and 11e.
[0050] As a result, the power generated by the solar cell 15 and the power discharged from the storage battery 14 can be supplied to each of the exclusive units 12a, 12b, 12c, etc. and the common unit 13. At that time, if the power consumed by the loads in each of the exclusive units 12a, 12b, 12c, etc. and the common unit 13 is greater than the power supplied by the distributed power sources of the storage battery 14 and the solar cell 15, the shortage is replenished by purchasing power from the grid 3a. Also, if the power consumed by the loads in each of the exclusive units 12a, 12b, 12c, etc. and the common unit 13 is less than the power supplied by the distributed power sources of the storage battery 14 and the solar cell 15, the surplus can be sold to the grid 3b.
[0051] Information on the power consumption in the private units 12a, 12b, 12c, and the common unit 13 measured by the smart meters 11a, 11b, 11c, and 11d, and information on the input / output power of the storage battery power conditioner 16 measured by the smart meter 11e are provided to a VPP (Virtual Power Plant) controller 5 as a control device via the gateway 8c and the hub 7. Information on the output power of the solar battery power conditioner 17 is provided to the VPP controller 5 via the gateway 8a and the hub 7. The amount of power purchased from the grid 3a and the amount of surplus power sold to the grid 3b measured by the parent smart meters 4a and 4b are also provided to the VPP controller 5. Information on the state of MPPT control in the solar battery power conditioner 17, information on the terminal current value, voltage value, etc. of the solar battery 15, and information on the amount of power stored in the storage battery 14 are also provided to the VPP controller 5 via the gateways 8a and 8b and the hub 7.
[0052] The VPP controller 5 controls the input / output power of the battery power conditioner 16, the amount of power purchased from the grid 3a, and the amount of surplus power sold to the grid 3b, based on the owner's power management policy, the power trading market price, the power consumption in each of the exclusive areas 12a, 12b, 12c, etc. and the common area 13, the amount of power generated by the solar cells 15, the amount of power stored in the storage battery 14, etc.
[0053] Similarly, information on the power consumption in the exclusive units 12a, 12b, 12c, and the common unit 13 measured by the smart meters 11a, 11b, 11c, . . . 11d, and 11e, and information on the input / output power from the storage battery power conditioner 16 are also provided to the management device 2 via the gateway 8c, the hub 7, and the LTE router 6. Similarly, the amount of power purchased from the system 3a and the amount of surplus power sold to the system 3b measured by the parent smart meters 4a and 4b are also provided to the management device 2. Furthermore, information on the state of MPPT control in the solar cell power conditioner 17, the terminal current and voltage value of the solar cell 15, and information on the amount of power stored in the storage battery 14 are also provided to the management device 2 via the gateways 8a and 8b, the hub 7, and the LTE router 6. Note that in the embodiment, information on the amount of power purchased from the system 3a and the amount of surplus power sold to the system 3b may be obtained from billing information from the power company, rather than being provided to the management device 2 from the smart meters.
[0054] Fig. 6 is a block diagram showing detailed functions of the management device 2. As shown in Fig. 6, the management device 2 includes the functional modules of an electricity fee calculation unit 201, a rebate fee calculation unit 202, an electricity purchase fee calculation unit 203, a balance forecast information acquisition unit 204, a compensation information acquisition unit 205, an actual balance calculation unit 206, and a compensation calculation unit 207. Note that the hardware configuration of the management device 2 is the same as that of a general server device, and therefore a description thereof will be omitted here.
[0055] The electricity fee calculation unit 201 calculates the electricity fees to be imposed on the exclusive use units 12a, 12b, 12c, etc., based on information on the power consumption in the exclusive use units 12a, 12b, 12c, etc., and the common area 13. It is a functional module.
[0056] The rebate fee calculation unit 202 is a functional module that calculates a rebate fee to be rebated to the owner by the management company that operates the management device 2. The power purchase fee calculation unit 203 is a functional module that calculates a power purchase fee to be paid to the electric utility related to the grid 3a based on the amount of power purchased from the grid 3a, or stores the amount of the power purchase fee billed by the electric utility.
[0057] The functional modules of the income / expense forecast information acquisition unit 204, the compensation information acquisition unit 205, the actual income / expense calculation unit 206, and the compensation calculation unit 207 perform the same functions as the functional modules of the income / expense forecast information acquisition unit 931, the compensation information acquisition unit 932, the actual income / expense calculation unit 933, and the compensation calculation unit 934 in the above-mentioned application example, so that a description thereof will be omitted here. That is, in this embodiment, the management device 2 is configured to also function as the compensation calculation device 93 in the application example, and can be said to correspond to the information processing device in the present invention.
[0058] (Management device processing) Next, a part of the flow of the process performed by the management device 2 in this embodiment will be described with reference to Fig. 7 and Fig. 8. Note that the series of process flows can also be regarded as an operation method of the power supply system executed by the management device 2 to reduce the risk of non-recovery of the investment of the equipment owner 23.
[0059] 7 and 8 are flow charts for explaining the flow of processing performed in the management device 2. In the management device 2, first, the income / expenses prediction information acquisition unit 204 acquires information on the results of an income / expenses simulation performed prior to the introduction of the power supply system 1 (S101). Specifically, for example, the information may be acquired via a communication means from another database (not shown), or the user may be asked to input information via an input means. Here, the information on the simulation results may include information on the predicted time when the break-even point will arrive.
[0060] Next, the guarantee information acquisition unit 205 acquires information on the guarantee content agreed upon between the facility owner 23 and the management company 21 when the power supply system 1 is introduced (S102). The guarantee content may specifically include the amount of insurance premium paid by the facility owner 23 to the management company 21 (or deducted from the return fee to the owner), the amount of compensation (or a percentage of the negative amount, etc.), and the conditions for the compensation to be paid (for example, the average occupancy rate of the facility is higher than a predetermined value, etc.). The management device 2 then acquires information on the initial cost incurred when introducing the system (capital investment) (S103). Specifically, for example, the information may be acquired from another database (not shown) via a communication means, or the user may be asked to input information via an input means.
[0061] After the process of step S103 is completed, the process of loop L1 described below is repeatedly executed for each month. In loop L1, first, the electricity charge calculation unit 201 calculates the electricity charge for each resident 22 (S104). More specifically, the electricity charge is calculated by multiplying the amount of power consumed by each resident 22 by the electricity rate unit price (yen / kWh). Then, a billing process is performed for each resident 22 (S105).
[0062] Next, the management device 2 performs income management (S106). More specifically, it is confirmed whether or not the electricity charges for the relevant month from each resident 22 have been completed, and if there is unpaid electricity, a reminder process is performed. Furthermore, the electricity purchase fee calculation unit 203 of the management device 2 acquires information on the electricity purchase fee (S107). More specifically, the amount billed by the electricity utility 20 stored in the electricity purchase fee calculation unit 203 may be referenced, or the electricity purchase fee may be calculated from the amount of electricity purchased from the electricity utility 20. The income calculated in step S106 is then The amount of return to the facility owner 23 is calculated from the amount and the power purchase fee calculated in step S107 (S108).
[0063] Next, the actual income / expense calculation unit 206 calculates the accumulated actual amount of income / expense since the introduction of the power supply system 1 (S109). Specifically, the total amount of income / expense since the introduction of the system may be calculated from the initial cost information acquired in step S103, the accumulated amount of return to the equipment owner 23 calculated in step S108, and the like.
[0064] Next, the compensation calculation unit 207 judges whether or not a predetermined period of time has passed since the introduction of the power supply system 1 (S110). Here, the predetermined period of time can be, for example, the period until the time determined to be the break-even point P in the simulation arrives. If it is judged in step S110 that the predetermined period of time has not passed, the process proceeds to step S115, where the payment process of the refund amount calculated in step S108 is performed, and the process in the loop L1 ends.
[0065] On the other hand, if it is determined in step S110 that the predetermined period has elapsed, the process proceeds to a process of determining whether the compensation has already been paid (S111). If it is determined that the compensation has already been paid, the process proceeds to step S115, where the refund amount calculated in step S108 is paid, and the process in loop L1 ends.
[0066] On the other hand, if it is determined in step S111 that the compensation has not yet been paid, a process is then performed to determine whether or not a predetermined compensation condition is met (S112). Here, the predetermined compensation condition may be, for example, whether the accumulated expenditure exceeds the accumulated income at the time of the month (i.e., whether the balance is negative) or whether the average occupancy rate of the facility is equal to or higher than a predetermined value. If it is determined in step S112 that the predetermined compensation condition is not met, the process proceeds to step S115, where the refund amount calculated in step S108 is paid, and the process in loop L1 is terminated.
[0067] On the other hand, if it is determined in step S112 that the predetermined compensation condition is met, the process proceeds to calculation of the compensation amount (S113). The compensation amount is calculated using the income / expense simulation result obtained in step S101, the information on the coverage obtained in step S102, and the cumulative actual amount of income / expense calculated in step S109.
[0068] Then, the compensation amount calculated in step S113 is added to the refund amount calculated in step S108 (S114), and the refund amount is paid (S115), terminating the processing in the loop.
[0069] According to the present embodiment described above, it is possible to reduce the risks involved in introducing a power supply system, even if the system is equipped with distributed power sources that require a large initial investment. This lowers the barrier for owners to introduce a power supply system, and allows management companies to improve the success rate of lump-sum power receiving contracts.
[0070] (others) In this embodiment, it is desirable to reduce the amount of power procured from the grid and increase the self-consumption rate (%) to lower the electricity bill. For this purpose, the following measures can be considered. (1) Charging with cheap electricity at night reduces the amount of electricity purchased during the day By using cheap late-night electricity to keep the charge rate of the storage battery 14 as high as possible, it is possible to prevent a shortage of power supply from the distributed power source in relation to the power consumption in the exclusive areas 12a, 12b, 12c, etc. and the common area 13. (2) Reducing electricity procurement costs by combining solar power generation with overnight charging power for storage batteries When the power generated by the solar cell 15 is surplus, the storage battery 14 is charged as much as possible, and the charging rate of the storage battery 14 is increased as much as possible. (3) Peak shaving of power sold through photovoltaic power generation, demand forecasting, and battery storage control Based on data such as date, day of the week, sunrise time, sunset time, temperature, humidity, and weather forecasts obtained from a server, power consumption in the exclusive areas 12a, 12b, 12c, etc. and the common area 13 is predicted for each predetermined time from the current time. The charging rate of the storage battery 14 is controlled to minimize the shortage of power supplied by the distributed power sources relative to the predicted power consumption, and the maximum amount of purchased power is reduced to cut peak power. This allows the maximum power consumption in the basic contract with the electric power supplier 20 to be set low, and the basic fee paid to the electric power supplier 20 to be reduced.
[0071] In this embodiment, it is desirable to increase the amount of private power consumption. To achieve this, the following measures can be considered. (1) Reducing power consumption by controlling home appliances For example, power consumption in the private areas 12a, 12b, 12c, etc. and common area 13 can be reduced by controlling the operation of the air conditioner in common area 13 or by using a low power consumption hot water supply system that uses a natural refrigerant heat pump hot water heater. (2) Increasing self-consumption electricity by combining solar power generation, wind power generation, so-called V2H power sources, storage batteries, etc. In addition to the above, when there is a surplus of power generated by the solar cell 15 or the like, the storage battery 14 is charged as much as possible, and the charging rate of the storage battery 14 is increased as much as possible. By reducing the amount of power sold to the grid 3b and increasing the amount of self-power consumption, profitability is improved.
[0072] In this embodiment, it is also desirable to prevent a decrease in the amount of private power consumption. To achieve this, the following measures can be considered. (1) Detect and predict failures with a remote monitoring system The management company 21 detects a fault in the power supply system 1 using a remote monitoring system. Alternatively, the management company 21 predicts a fault from a change in the detected value of each smart meter 11a, 11b, 11c, . . . 11d, 11e. This prevents a decrease in the power supply from the distributed power sources and a decrease in the amount of self-power consumption.
[0073] In this embodiment, it is important to reduce the basic contract fee with the electric power company 20. To achieve this, the following measures are considered. (1) Peak cutting through photovoltaic power generation, demand forecasting, and battery storage control Power consumption in the private areas 12a, 12b, 12c, etc. and the common area 13 is predicted for each specified time from the present time based on data such as date, day of the week, sunrise time, sunset time, temperature, and humidity, as well as weather forecasts obtained from a server. The maximum value of purchased power is reduced and peak cut is performed by controlling the charging rate of the storage battery 14 so as to minimize the shortage of power generated by the distributed power source relative to this predicted power consumption. This allows the maximum power consumption in the basic contract with the electric power supplier to be set low, reducing the basic fee. (2) Vary the capacity of the smart meter depending on the time By changing the settings of the smart meters 11a, 11b, 11c...11d, and 11e, the contract capacity can be changed flexibly. Therefore, power demand is forecasted, the amount of power to be procured is predicted, and the capacity of each of the smart meters 11a, 11b, 11c...11d, and 11e is changed depending on time. This allows a contract with the electric power supplier 20 to always be made with the minimum required capacity, making it possible to reduce the basic fee.
[0074] In addition, the following variations in the operation of the power supply system 1 are possible: . (1) Extending equipment life A plurality of storage batteries 14 are used, thereby reducing the number of times each storage battery 14 is charged and discharged, and the charge and discharge rate. (2) Detecting interruption information of the parent smart meters 4a and 4b and the smart meters 11a, 11b, ..., 11e and determining the location of the fault (overcurrent, leakage current) (3) In the event of a power outage, the capacity of the smart meters 11a, 11b, ... 11e is automatically changed so that each resident 22 uses an independent power source. (4) Obtaining schedule information of the resident 22, predicting demand from the information, and performing control to increase self-consumption. (5) Inferring equipment failures or changes in occupancy from abnormal changes (discontinuous changes) in power consumption
[0075] In the above embodiment, an apartment house 1a is exemplified as a complex facility having multiple power supply destinations, but the complex facility to which the present invention is applied is not limited to an apartment house. For example, a shared office, an industrial park, etc. are also applicable. In the above embodiment, a solar cell is exemplified as an example of a distributed power source, but the distributed power source to which the present invention is applied is not limited to a solar cell, and includes other power sources such as a wind power generation device, a geothermal power generation device, and a biomass power generation device.
[0076] In the following, the components of the present invention will be described with reference to the reference numerals in the drawings in order to make it possible to compare the components of the present invention with the configurations of the embodiments. <Invention 1> An information processing device (2; 93) used together with a power supply system (1; 90) that supplies power to a complex facility (1a; 91) including a plurality of power supply destinations (12; 96), an income / expense forecast information acquisition unit (204; 931) for acquiring information on income / expense forecasts in the case where the power supply system is introduced into the complex, the information being predicted based on a predicted expenditure amount required for introducing and operating the power supply system into the complex and a predicted income amount to be obtained by introducing and operating the power supply system into the complex; A guarantee information acquisition unit (205; 932) for acquiring information on a specific guarantee content for the income and expenditure forecast, the information being determined in advance based on information on the income and expenditure forecast; an actual income / expense calculation unit (206; 933) for calculating an actual income / expense amount, which is an actual value of the total income / expense amount since the introduction of the power supply system, based on an accumulated expenditure amount generated by introducing and operating the power supply system in the complex facility and an accumulated income amount generated by introducing and operating the power supply system in the complex facility; a compensation calculation unit (207; 934) for determining whether or not a compensation is to be generated to compensate for at least a part of the difference between the income and expenditure forecast and the actual income and expenditure at the time a predetermined period has elapsed since the power supply system was introduced into the complex, and the amount of the compensation, based on the income and expenditure forecast information, the total income and expenditure amount, and the specified guarantee content; An information processing device comprising: <Invention 2> A method for operating a power supply system that supplies power to a complex facility including a plurality of power supply destinations, comprising: an income / expense forecast information acquisition step (S101) for acquiring, in an information processing device used together with the power supply system, information on an income / expense forecast in the case where the power supply system is introduced into the complex, the income / expense forecast information being predicted based on a predicted expenditure amount required for introducing and operating the power supply system into the complex and a predicted income amount to be obtained by introducing and operating the power supply system into the complex; A compensation information acquisition step (S102) of acquiring, in the information processing device, information on a predetermined compensation content for the income and expenditure forecast, which is determined in advance based on information on the income and expenditure forecast; In the information processing device, the power supply system is introduced into the complex and operated. and an actual income / expense calculation step (S109) for calculating an actual income / expense amount, which is an actual value of the total income / expense amount since the introduction of the power supply system, based on the accumulated expenditure amount generated by the introduction of the power supply system into the complex facility and the accumulated income amount generated by the introduction and operation of the power supply system into the complex facility. a compensation calculation step (S114) in which, in the information processing device, when a predetermined period of time has elapsed since the power supply system is introduced into the complex, based on the income and expenditure forecast information, the total income and expenditure amount, and the predetermined guarantee content, it is determined whether or not a compensation amount will be generated to compensate for at least a part of the difference between the income and expenditure forecast and the actual income and expenditure amount when the predetermined period of time has elapsed, and the amount of the compensation amount; A method for operating a power supply system, comprising: [Explanation of symbols]
[0077] 1. Power supply system 1a...Apartment housing 2...Management device 3a, 3b...Strain 4a, 4b Parent smart meter 5...VPP controller 6. LTE router 7. Hub 8a, 8b, 8c... Gateway 9. First distribution board 10 Second distribution board 11a, 11b, 11c, 11d, 11e...Smart meter 12a, 12b, 12c: Private area 13...Common area 14... Storage battery 15. Solar Cell 16... Battery Power Conditioner 17 Solar power conditioner
Claims
1. An information processing device used together with a power supply system that supplies power to a complex facility including a plurality of power supply destinations, an income / expenditure forecast information acquisition unit that acquires information on an income / expenditure forecast in the case where the power supply system is introduced into the complex facility, the information being predicted based on a predicted expenditure amount required for introducing and operating the power supply system into the complex facility and a predicted income amount to be obtained by introducing and operating the power supply system into the complex facility; a compensation information acquisition unit that acquires information on a predetermined compensation content for the income and expenditure forecast, the compensation content information being determined in advance based on information on the income and expenditure forecast; an actual income / expense calculation unit that calculates an actual income / expense amount, which is an actual value of the total income / expense amount since the introduction of the power supply system, based on an accumulated expenditure amount generated by introducing and operating the power supply system in the complex facility and an accumulated income amount generated by introducing and operating the power supply system in the complex facility; a compensation calculation unit that determines, when a predetermined period of time has elapsed since the power supply system is introduced into the complex, whether or not a compensation will be generated to compensate for at least a portion of the difference between the income and expenditure forecast and the actual income and expenditure amount when the predetermined period of time has elapsed, and the amount of the compensation, based on the income and expenditure forecast, the actual income and expenditure amount, and the predetermined guarantee content; Equipped with The predicted revenue amount includes an electricity fee to be paid from each of the plurality of power supply destinations; The specified guarantee includes, as a condition for the occurrence of the compensation, that an average occupancy rate of the plurality of power supply destinations after the power supply system is introduced into the complex is equal to or greater than a specified rate. An information processing device comprising:
2. The income / expenditure forecast information includes information on a time when a predicted break-even point will occur, at which the predicted income amount will be equal to or greater than the predicted expenditure amount; The time when the predetermined period has elapsed is the time when the predicted break-even point will arrive, The compensation calculation unit detects that the actual balance is negative after the predetermined period has elapsed. If the amount of the negative balance is less than the amount of the negative balance, the compensation amount will be determined to be equal to or less than the amount of the negative balance.
2. The information processing device according to claim 1.
3. The specified coverage includes adding an insurance premium according to the conditions for the occurrence of the compensation and / or the amount of the compensation to the expenditures necessary for introducing and operating the power supply system in the complex facility.
3. The information processing device according to claim 1, wherein the information processing device is a computer.
4. The power supply system includes: The power generation facility is capable of supplying power to the plurality of power supply destinations and is capable of being connected to a power grid; The actual income / expense amount calculated by the actual income / expense amount calculation unit is an amount in which the amount of surplus electricity generated by the power generation facility is sold to an electric power company is included as income. The information processing device according to claim 1 ,
5. The power supply system includes: A management device is provided for calculating a rebate fee to be received by the owner of the complex, When the compensation calculation unit determines the occurrence and amount of the compensation, the amount of the compensation is added to the refund fee. The information processing device according to claim 1 ,
6. The power supply system also serves as the management device.
6. The information processing device according to claim 5.
7. A method for operating a power supply system that supplies power to a complex facility including a plurality of power supply destinations, comprising: an income / expense forecast information acquisition step in which, in an information processing device used together with the power supply system, information on a revenue / expense forecast in the case of introducing the power supply system into the complex is acquired, the revenue / expense forecast information being predicted based on a predicted expenditure amount required for introducing and operating the power supply system into the complex and a predicted income amount to be obtained by introducing and operating the power supply system into the complex; a compensation information acquisition step of acquiring, in the information processing device, information on a predetermined compensation content for the income and expenditure forecast, the information being determined in advance based on information on the income and expenditure forecast; an actual balance calculation step of calculating, in the information processing device, an actual balance, which is an actual value of the total balance since the introduction of the power supply system, based on an accumulated expenditure amount generated by introducing and operating the power supply system in the complex and an accumulated income amount generated by introducing and operating the power supply system in the complex; a compensation calculation step in which, in the information processing device, when a predetermined period of time has elapsed since the power supply system is introduced into the complex, based on the income / expenditure forecast, the actual income / expenditure amount, and the predetermined guarantee content, it is determined whether or not a compensation will be generated to compensate for at least a part of the difference between the income / expenditure forecast and the actual income / expenditure amount when the predetermined period of time has elapsed, and the amount of the compensation; It has The predicted revenue amount includes an electricity fee to be paid from each of the plurality of power supply destinations; The specified guarantee includes, as a condition for the occurrence of the compensation, that an average occupancy rate of the plurality of power supply destinations after the power supply system is introduced into the complex is equal to or greater than a specified rate. A method for operating a power supply system comprising:
8. The income / expenditure forecast information includes information on a time when a predicted break-even point will occur, at which the predicted income amount will be equal to or greater than the predicted expenditure amount; The time when the predetermined period has elapsed is the time when the predicted break-even point will arrive, In the compensation calculation step, when the actual balance becomes negative after the predetermined period of time has elapsed, it is determined that the compensation amount equal to or less than the negative amount will be generated. The method for operating a power supply system according to claim 7 .
9. The specified coverage includes adding an insurance premium according to the conditions for the occurrence of the compensation and / or the amount of the compensation to the expenditures necessary for introducing and operating the power supply system in the complex facility.
9. A method for operating a power supply system according to claim 7 or 8.
10. The power supply system includes: The power generation facility is capable of supplying power to the plurality of power supply destinations and is capable of being connected to a power grid; The actual income / expenditure amount calculated in the actual income / expenditure amount calculation step is an amount of revenue including an amount of surplus electricity generated by the power generation facility sold to an electric power company. A method for operating a power supply system according to any one of claims 7 to 9.
11. The power supply system includes: A management device is provided for calculating a rebate fee to be received by the owner of the complex, When the occurrence of the compensation and the amount of the compensation are determined in the compensation calculation step, the method further includes a step of adding the amount of the compensation to the refund fee. A method for operating a power supply system according to any one of claims 7 to 10.
12. A program for causing an information processing device to execute each step of the method for operating a power supply system according to any one of claims 7 to 11.
Citation Information
Patent Citations
Electric power load management system
JP2002118961A
Energy saving system with bond insurance and equipment expense paying method
JP2002366760A
Operational management system of photovoltaic power generation facilities
JP2012234335A
Power supply system, power supply control device, power supply method and program
JP2013143814A
Power supply system and power supply method
JP2017017779A