Battery management system and battery management method

The battery management system optimizes battery replacements by selecting batteries for replacement based on deterioration and charge capacity, addressing the inefficiencies in existing systems and reducing costs through strategic replacement strategies.

JP7556314B2Active Publication Date: 2024-09-26TOYOTA JIDOSHA KK
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2021048299
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-03-23
Publication Date
2024-09-26
Estimated Expiration
2041-03-23

AI Technical Summary

Technical Problem

The challenge of efficiently managing and reducing the cost and effort associated with replacing batteries in a battery management system, particularly when reusing used batteries, is exacerbated by the varying performance of batteries and the time-consuming nature of battery replacements.

Method used

A battery management system and method that includes a server for controlling the charging and discharging of batteries in response to demand response requests, strategically selecting batteries for replacement based on their degree of deterioration and full charge capacity, and prioritizing batteries that are estimated to deteriorate soon, thereby reducing the frequency and cost of replacements.

Benefits of technology

This approach reduces the effort and cost of battery replacements by minimizing the number of replacements needed and maximizing the recoverable full charge capacity, enhancing the system's operational efficiency and compensation from the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007556314000001
    Figure 0007556314000001
  • Figure 0007556314000006
    Figure 0007556314000006
  • Figure 0007556314000002
    Figure 0007556314000002
Patent Text Reader

Abstract

To reduce labor and costs for battery replacement in a battery management system.SOLUTION: A battery cellar 2 comprises: a storage unit 21 for storing a plurality of secondhand batteries; power conversion devices (AC / DC converter 22 and DC / DC converter 23) that are electrically connected between a power system and the plurality of secondhand batteries stored in the storage unit 21; and a server 20 for controlling operation of the power conversion devices according to a demand response request from the power system 5 to charge / discharge the plurality of secondhand batteries. When selecting, as a replacement target, one or more of the plurality of secondhand batteries whose deterioration degree has reached a reference value, the server 20 selects, in addition to the one or more secondhand batteries, a secondhand battery having a deterioration degree that has not yet reached the reference value but is estimated to reach the reference value within a predetermined period as a replacement target secondhand battery.SELECTED DRAWING: Figure 8
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a battery management system and a battery management method. [Background technology]

[0002] Japanese Patent Laid-Open Publication No. 2018-205873 (Patent Document 1) describes encouraging users of electric vehicles that have storage batteries that are compatible with a power storage system to replace the storage batteries. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2018-205873 A Summary of the Invention [Problem to be solved by the invention]

[0004] In recent years, the use of vehicles equipped with battery packs for driving has been rapidly increasing. As a result, the number of used batteries collected when these vehicles are replaced or dismantled is increasing. From the perspective of promoting the Sustainable Development Goals (SDGs), it is desirable to reuse used batteries by manufacturing new battery packs using collected used batteries. The inventors have noticed that the following problems may arise when reusing used batteries.

[0005] Batteries are stored at logistics centers and other locations while waiting to be used. Proper storage of batteries is costly. In addition, it may take a certain amount of time (storage period) from when collected batteries are stored until they are released for their next use. Therefore, it is desirable to make effective use of the storage period of batteries.

[0006] Therefore, it is conceivable to store and manage multiple batteries in a warehouse, and charge and discharge the multiple batteries in response to demand response requests from the power grid. This allows the battery manager to receive payment from the power grid manager (typically a power company).

[0007] While the performance of new batteries is controlled to be approximately uniform, there is a large variation in the performance (degree of deterioration) of batteries. Furthermore, when a battery is charged and discharged as described above, the deterioration of the battery progresses accordingly. Therefore, it is necessary to replace some of the deteriorated batteries among the multiple batteries stored in the storage facility with other batteries that are less deteriorated. However, replacing batteries requires time and costs.

[0008] The present disclosure has been made to solve the above-mentioned problems, and an object of the present disclosure is to reduce the effort and cost of battery replacement in a battery management system and a battery management method. [Means for solving the problem]

[0009] (1) A battery management system according to an aspect of the present disclosure includes a storage facility for storing a plurality of batteries, a power conversion device electrically connected between the plurality of batteries stored in the storage facility and a power grid, and a server for charging and discharging the plurality of batteries by controlling the operation of the power conversion device in response to a demand response request from the power grid. When replacing some of the plurality of batteries whose deterioration level has reached a reference value, the server selects, in addition to the some of the batteries, batteries whose deterioration level has not reached the reference value but whose deterioration level is estimated to reach the reference value within a predetermined period as batteries to be replaced.

[0010] (2) The portion of the batteries includes batteries whose full charge capacity is below a reference amount. When replacing a portion of the batteries, the server selects, in addition to the portion of the batteries, batteries whose full charge capacity exceeds the reference amount at that time but is estimated to fall below the reference amount within a specified period of time as batteries to be replaced.

[0011] In the above configurations (1) and (2), even batteries whose degradation level has not yet reached the reference value at that time but whose degradation level is estimated to reach the reference value within a predetermined period of time are selected as batteries to be replaced. In other words, when replacing some of the batteries whose degradation level has reached the reference value, batteries that will need to be replaced in the near future are also replaced at the same time. This reduces the number of times batteries need to be replaced. This reduces the effort and cost involved in replacing batteries.

[0012] (3) If the number of batteries whose full charge capacity is estimated to fall below a reference amount within a specified period is greater than a specified amount, the server selects batteries with smaller full charge capacities as batteries to be replaced in preference to batteries with larger full charge capacities.

[0013] (4) If the number of batteries whose full charge capacity is estimated to fall below a reference amount within a specified period is greater than a specified amount, the server selects batteries to be replaced in ascending order of full charge capacity.

[0014] In the above configurations (3) and (4), the battery with the smallest full charge capacity is replaced first, which increases the recovery of the full charge capacity before and after replacement, thereby increasing the compensation obtained from the power system manager for charging and discharging the battery.

[0015] (5) A battery management method according to another aspect of the present disclosure is a battery management method using a server. This management method includes first and second steps. The first step is a step in which the server charges and discharges a plurality of batteries stored in a storehouse in response to a demand response request from a power grid. The second step is a step in which the server selects some of the plurality of batteries whose degree of deterioration has reached a reference value as batteries to be replaced. The selection step (second step) includes a step in which the server selects, in addition to the some of the batteries, batteries whose degree of deterioration has not reached the reference value but whose degree of deterioration is estimated to reach the reference value within a predetermined period as batteries to be replaced.

[0016] According to the method (5) above, like the configuration (1) above, the effort and cost of replacing the battery can be reduced. Effect of the Invention

[0017] According to the present disclosure, the effort and cost of replacing batteries can be reduced. [Brief description of the drawings]

[0018] [Figure 1] FIG. 2 is a diagram showing one aspect of logistics of a battery pack according to the present embodiment. [Diagram 2] FIG. 1 is a diagram showing an example of how used batteries are stored in a storage unit. [Diagram 3] 1 is a flowchart showing an overview of a process for reusing used batteries. [Figure 4] FIG. 2 is a system configuration diagram showing the electrical configuration of a battery cellar. [Diagram 5] FIG. 4 is a diagram illustrating an example of a data structure of battery data. [Figure 6] FIG. 13 is a diagram for explaining a manner of replacing a used battery according to a comparative example. [Figure 7] 1A and 1B are diagrams for explaining a manner of replacing a used battery in the present embodiment. [Figure 8] 5 is a flowchart showing a first example of a processing procedure related to replacement of a used battery in the present embodiment. [Figure 9] 10 is a flowchart showing a second example of a processing procedure related to replacement of a used battery in the present embodiment. [Figure 10] FIG. 2 is a functional block diagram of a server related to deterioration evaluation of a used battery. [Figure 11] FIG. 2 is a functional block diagram of a server related to power adjustment between a battery cellar and a power grid. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] In the present disclosure and the embodiments, charging and discharging a battery means at least one of charging and discharging a battery. In other words, charging and discharging a battery is not limited to both charging and discharging a battery, but may be only charging a battery or only discharging a battery.

[0020] In the present disclosure and embodiments, the battery pack includes a plurality of modules (also called blocks or stacks). The plurality of modules may be connected in series or in parallel with each other. Each of the plurality of modules includes a plurality of cells (single cells).

[0021] Generally, the "reuse" of assembled batteries can be broadly divided into reuse, rebuilding, and material recycling. In the case of reuse, collected assembled batteries undergo the necessary shipping inspection and are shipped as-is as reused products. In the case of rebuilding, collected assembled batteries are first disassembled into modules. Then, from among the disassembled modules, usable modules (which may be usable after performance recovery) are combined to manufacture a new assembled battery. The newly manufactured assembled battery undergoes shipping inspection and is shipped as a rebuilt product. In contrast, in material recycling, recyclable materials (resources) are extracted from each cell. Collected assembled batteries are not used as other assembled batteries.

[0022] In the embodiment described below, a battery pack collected from a vehicle is once disassembled into modules. Various processes are then carried out on a module-by-module basis. In other words, in the following, a reusable used battery means a module that can be rebuilt. However, disassembly into modules is not essential. Depending on the configuration of the battery pack or the degree of deterioration of the battery pack, it may be possible to reuse the battery pack without disassembly into modules.

[0023] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the drawings. In the drawings, the same or corresponding parts are denoted by the same reference characters, and the description thereof will not be repeated.

[0024] [Embodiment Mode] <Battery logistics model> Fig. 1 is a diagram showing one aspect of logistics of a battery pack in this embodiment. Hereinafter, the aspect of logistics shown in Fig. 1 will be referred to as a "battery logistics model". The battery logistics model 100 includes a collector 1, a battery seller 2, a buyer 3, a recycling plant 4, a power grid 5, and a distributed energy resource (DER) 6.

[0025] The recovery company 1 recovers used battery packs (used batteries 9) from multiple vehicles. The recovery company 1 may be a vehicle sales store (dealer) or a vehicle dismantler. In this example, identification information (battery ID) is assigned to each used battery 9 (see FIG. 5). Therefore, in the battery logistics model 100, the battery ID is used to identify the used battery 9, and data on the used battery 9 (such as battery data described below) can be managed, and the distribution route of the used battery 9 can be tracked.

[0026] The battery cellar 2 is a facility for appropriately managing used batteries 9 collected by the collection company 1, like a wine cellar where wine bottles are stored under temperature and humidity control. In the example shown in FIG. 1, the battery cellar 2 is installed at a logistics base near a port. The battery cellar 2 includes a server 20 that manages data related to the used batteries 9, and multiple storage units 21. The battery cellar 2 corresponds to the "battery management system" according to the present disclosure. The storage units 21 correspond to the "storage facility" according to the present disclosure. The batteries stored in the battery cellar 2 are not limited to used batteries, and may include new batteries.

[0027] FIG. 2 is a diagram showing an example of how used batteries 9 are stored in a storage unit 21. As shown in FIG. 2, a plurality of storage units 21 are arranged inside the building of the battery cellar 2. Each of the plurality of storage units 21 is configured to store many used batteries 9. Although details will be described later, in this embodiment, the battery cellar 2 performs a deterioration evaluation test on each of the used batteries 9 stored in the storage unit 21. Then, based on the results of the deterioration evaluation test, the battery cellar 2 judges whether each used battery 9 is reusable or not reusable (whether it is suitable or not for reuse).

[0028] Returning to Fig. 1, buyers 3 sell used batteries 9 that have been determined to be reusable by the battery seller 2. Buyers 3 may include dealers 31 that sell used batteries 9 for use in vehicles, and users 32 that use the batteries as stationary batteries in factories, buildings, etc. Buyers 3 may also include dealers 33 that sell used batteries 9 as supplies (replacement parts for maintenance and repair).

[0029] The recycling factory 4 performs material recycling on the used batteries 9 that have been determined by the battery seller 2 to be non-reusable, in order to regenerate them as raw materials for other products.

[0030] The power system 5 is a power network constructed by power plants, power transmission and distribution facilities, etc. In this embodiment, the power company serves as both the power generation business operator and the power transmission and distribution business operator. The power company corresponds to a general power transmission and distribution business operator and also corresponds to the manager of the power system 5, and maintains and manages the power system 5. The power system 5 is provided with a business operator server 50. The business operator server 50 belongs to the power company and manages the power supply and demand of the power system 5. The server 20 and the business operator server 50 are configured to be capable of two-way communication.

[0031] The DER 6 is a relatively small-scale power facility that is installed at the logistics base (or the surrounding area) where the battery cellar 2 is installed and is capable of receiving and sending power to and from the battery cellar 2. The DER 6 includes, for example, a power generation type DER and a power storage type DER.

[0032] The power generation type DER may include a variable natural power source and a generator. The variable natural power source is a power generation facility whose power output varies depending on weather conditions. Although a solar power generation facility (solar panels) is illustrated in FIG. 1, the variable natural power source may include a wind power generation facility instead of or in addition to the solar power generation facility. On the other hand, the generator is a power generation facility that is not dependent on weather conditions. The generator may include a steam turbine generator, a gas turbine generator, a diesel engine generator, a gas engine generator, a biomass generator, a stationary fuel cell, and the like. The generator may include a cogeneration system that utilizes heat generated during power generation.

[0033] The energy storage type DER may include a power storage system and a heat storage system. The power storage system is a stationary energy storage device that stores electricity generated by natural variable power sources. The power storage system may be a power-to-gas device that uses electricity to produce gaseous fuels (hydrogen, methane, etc.). The heat storage system includes a heat storage tank installed between the heat source and the load, and is configured to temporarily store the liquid medium in the heat storage tank in a warm state. By using the heat storage system, the generation and consumption of heat can be shifted in time. Therefore, for example, it is possible to store the heat generated by consuming electricity to operate a heat source machine at night in the heat storage tank, and consume the heat during the day for air conditioning.

[0034] In this way, the used batteries 9 collected by the collector 1 are stored in the battery cellar 2 while waiting to be shipped to the buyer 3 or recycling factory 4. However, proper storage of the used batteries 9 using the battery cellar 2 requires maintenance costs (running costs). Furthermore, it may take a certain amount of time from when the collected used batteries 9 are received until they are shipped to the buyer 3 or recycling factory 4. Therefore, it is desirable to make effective use of the storage period of the used batteries 9 in the battery cellar 2.

[0035] In this embodiment, the battery cellar 2 functions as a virtual power plant (VPP) in addition to being a storage location for used batteries 9. This allows the opportunity for charging and discharging the used batteries 9 to serve both as a degradation evaluation of the used batteries 9 to determine the reuse mode of the used batteries 9 and as an adjustment of the power supply and demand balance of the power system 5 using the used batteries 9. As a result, in the battery cellar 2, the storage of the used batteries 9, the degradation evaluation of the used batteries 9, and the adjustment of the power supply and demand balance using the used batteries 9 are performed in a "trinity."

[0036] <Recycling process for used batteries> 3 is a flow chart showing an outline of the work process for reusing used batteries 9. First, used batteries 9 collected by a collection company 1 are delivered to a battery seller 2 (S1).

[0037] In this embodiment, the server 20 performs a deterioration evaluation test (performance inspection) on each of the used batteries 9 while they are stored in the storage unit 21 (S2). The server 20 evaluates the degree of deterioration of each used battery 9 based on electrical characteristics such as full charge capacity and internal resistance (e.g., AC impedance). Then, the server 20 determines whether each used battery 9 is reusable or non-reusable according to the results of the deterioration evaluation test (S3).

[0038] In this embodiment, used batteries 9 are ranked according to the results of the degradation evaluation test (more specifically, the measurement results of the full charge capacity). For example, as shown in FIG. 2, used batteries 9 that can be rebuilt are ranked into four stages, S rank, A rank, B rank, and C rank, in descending order of full charge capacity. This makes it possible to set the buying and selling price of used batteries 9 in association with the rank, and to guarantee the quality of used batteries 9 according to the rank. Therefore, used batteries 9 that have passed through the battery seller 2 can be smoothly distributed in the market. Note that used batteries 9 whose full charge capacity is below a specified value are ranked lower than C rank (denoted as Re) and are sent for material recycling.

[0039] If it is determined that the used battery 9 can be reused (YES in S3), the work process proceeds to a performance recovery process (S4). In the performance recovery process, a process (performance recovery process) is carried out to recover the performance of the used battery 9. For example, the full charge capacity of the used battery 9 can be recovered by overcharging the used battery 9. However, the performance recovery process may be omitted. Also, while the performance recovery process may be carried out on used batteries 9 that have a large degree of degradation (largely degraded performance) as a result of the degradation evaluation test, the performance recovery process may not be carried out on used batteries 9 that have a small degree of degradation (not much performance degradation).

[0040] Next, a new assembled battery is manufactured (rebuilt) using the used batteries 9 whose performance has been restored by the performance recovery process (S5). The used batteries 9 used to rebuild the assembled battery are basically used batteries 9 whose performance has been restored by the performance recovery process, but may include used batteries 9 whose performance recovery process has been omitted, or may include new batteries (new modules). The assembled battery is then sold and shipped to the sales destination 3 (S6).

[0041] If it is determined as not reusable as a result of the degradation evaluation test (NO in S3), the used battery 9 is transported to a recycling factory 4 (S7). In the recycling factory 4, the used battery 9 is dismantled and recycled.

[0042] In this way, the used batteries 9 are stored in the battery cellar 2 until they are collected by the collector 1 and delivered to the buyer 3 or the recycle plant 4, and a deterioration evaluation test is performed during that time. When measuring electrical characteristics such as the full charge capacity of the used batteries 9 in the deterioration evaluation test, the used batteries 9 are charged and discharged. In this embodiment, the charging and discharging uses power exchanged between the battery cellar 2 (and DER 6) and the power grid 5. This allows the battery cellar 2 to function as a VPP (or one of the DERs) and contribute to load leveling of the power grid 5. More specifically, during a time period when there is a surplus of supply relative to demand in the power grid 5, the battery cellar 2 absorbs the power surplus by charging the surplus power to the used batteries 9. On the other hand, when there is a shortage of supply relative to demand in the power grid 5, the battery cellar 2 alleviates the power shortage by discharging the shortage of power from the used batteries 9.

[0043] However, the battery seller 2 does not have to be configured to contribute to both absorbing surplus power and alleviating power shortages in the power grid 5. The battery seller 2 may be configured to contribute to only one of absorbing surplus power and alleviating power shortages. For example, the battery seller 2 can charge the used batteries 9 with surplus power in the power grid 5, while discharging the used batteries 9 to destinations that do not include the power grid 5. The used batteries 9 may be discharged only to the DER 6, for example.

[0044] <Battery cellar system configuration> Fig. 4 is a system configuration diagram showing the electrical configuration of the battery cellar 2. The battery cellar 2 comprises, for example, a storage unit 21, an AC / DC converter 22, a DC / DC converter 23, and a server 20. Note that due to space limitations, only one storage unit 21 is shown in Fig. 4, but as shown in Fig. 2, a typical battery cellar 2 comprises multiple storage units 21.

[0045] The storage unit 21 stores a plurality of used batteries 9. In Fig. 4, the plurality of used batteries 9 are connected in parallel to each other, but this is merely an example, and the connection manner of the plurality of used batteries 9 is not particularly limited. The plurality of used batteries 9 may be connected in series, or may be a combination of series and parallel connections. The storage unit 21 includes a voltage sensor 211, a current sensor 212, and a relay 213.

[0046] The voltage sensor 211 detects the voltage VB of the used battery 9 and outputs the detected value to the server 20. The current sensor 212 detects the current IB charged to and discharged from the used battery and outputs the detected value to the server 20. If temperature is used to evaluate the deterioration of the used battery 9, the storage unit 21 may further include a temperature sensor (not shown). Each sensor may be a sensor attached to the used battery 9.

[0047] The relay 213 includes, for example, a first relay electrically connected to the positive electrode side of the second-hand battery 9; The relay 213 is electrically connected to the negative electrode side of the used battery 9. The battery 9 and the power grid 5 are configured to be electrically connected or disconnected. By this, any used battery 9 can be electrically separated even during charging / discharging of other used batteries 9, The battery 9 can be removed from the storage unit 21 。

[0048] The AC / DC converter 22 is electrically connected between the power system 5 and the DC / DC converter 23. The AC / DC converter 22 is configured to be capable of performing bidirectional power conversion operations for charging and discharging the used batteries 9 stored in the storage unit in accordance with a control command (charge / discharge command) from the server 20. More specifically, the AC / DC converter 22 converts AC power supplied from the power system 5 into DC power for charging the used batteries 9. The AC / DC converter 22 also converts DC power discharged from the used batteries 9 into AC power for supplying to the power system 5.

[0049] The DC / DC converter 23 is electrically connected between the AC / DC converter 22 and the storage unit 21, and is also electrically connected between the DER 6 and the storage unit 21. Like the AC / DC converter 22, the DC / DC converter 23 is configured to be capable of performing bidirectional power conversion operations in accordance with a control command (charge / discharge command) from the server 20. The DC / DC converter 23 can charge the used battery 9 with DC power from the AC / DC converter 22 and / or the DER 6, and can discharge the DC power stored in the used battery 9 to the AC / DC converter 22 and / or the DER 6. The AC / DC converter 22 and the DC / DC converter 23 correspond to the "power conversion device" according to the present disclosure.

[0050] The server 20 includes a processor such as a CPU (Central Processing Unit), memories such as a ROM (Read Only Memory) and a RAM (Random Access Memory), and input / output ports (none of which are shown) through which various signals are input and output. The server 20 executes various controls based on signals received from each sensor and programs and maps stored in the memory. The server 20 includes a battery data storage unit 201, a deterioration evaluation unit 202, a power adjustment unit 203, a timing adjustment unit 204, and a display unit 205.

[0051] The battery data storage unit 201 stores battery data used for managing the used batteries 9 in the battery seller 2 .

[0052] 5 is a diagram showing an example of the data structure of the battery data. The battery data is stored, for example, in a map format. The battery data includes, as parameters, for example, identification information (battery ID) for identifying the used battery 9, the model number of the used battery 9, the manufacturing date, the current SOC (State Of Charge), the full charge capacity, the internal resistance, the rank, the degradation evaluation date and time (the most recent date and time when the degradation evaluation test was performed), the storage location (identification information of the storage unit in which the used battery 9 is stored), and the necessity of replacement (whether or not the battery is selected as a battery requiring replacement). The battery data may include parameters other than those mentioned above (such as an index ΣD indicating the bias of the salt concentration distribution in the electrolyte of the used battery 9).

[0053] 4 again, the deterioration evaluation unit 202 performs a deterioration evaluation test on the used battery 9 based on the voltage VB and current IB detected by the voltage sensor 211 and the current sensor 212, respectively, during charging and discharging of the used battery 9. An example of this evaluation method will be described with reference to Fig. 10. The deterioration evaluation unit 202 ranks the used battery 9 based on the results of the deterioration evaluation test.

[0054] The power adjustment unit 203 adjusts power between the battery cellar 2 (and DER 6) and the power grid 5. More specifically, the server 20 selects, from among a plurality of used batteries 9, a used battery 9 to be charged or discharged in response to a demand response (DR) request from the business operator server 50 (see FIG. 1). The power adjustment unit 203 outputs commands to the relay 213, the AC / DC converter 22, and the DC / DC converter 23 so that the selected used battery 9 is charged or discharged. An example of this control method will be described with reference to FIG. 11.

[0055] The timing adjustment unit 204 adjusts the timing of the deterioration evaluation test of the used battery 9 by the deterioration evaluation unit 202 and the timing of the power adjustment between the battery cellar 2 and the power grid 5 by the power adjustment unit 203. More specifically, the timing adjustment unit 204 adjusts the timing so that the deterioration evaluation test of the used battery 9 is performed in accordance with the timing of DR of the battery cellar 2 in response to a DR request from the business operator server 50. Note that what is performed in accordance with the DR of the battery cellar 2 is not limited to the deterioration evaluation test of the used battery 9, and a performance recovery process (see S4 in FIG. 3) may be performed in addition to the deterioration evaluation test.

[0056] The display unit 205 displays battery data (see FIG. 5) in response to operations by the manager of the battery cellar 2 (which may be a worker working in the battery cellar 2). The display unit 205 also displays the progress and results of the deterioration evaluation test performed by the deterioration evaluation unit 202, allowing the manager to understand the status of the deterioration evaluation test. Furthermore, the display unit 205 displays the status of the used batteries 9 selected by the power adjustment unit 203 and being charged / discharged, allowing the manager to understand the status of power adjustment between the battery cellar 2 and the power grid 5.

[0057] <Replacement of used batteries> While the performance of new batteries is managed to be approximately uniform, the degree of deterioration of used batteries 9 varies greatly. Furthermore, when the battery cellar 2 functions as a VPP, the deterioration of the used batteries 9 progresses as the batteries 9 are charged and discharged. Therefore, it is desirable to replace some of the deteriorated used batteries 9 (for example, used batteries 9 that have deteriorated enough to be sent for material recycling) among the multiple used batteries stored in the storage unit 21 of the battery cellar 2 with other used batteries that are less deteriorated. However, replacing used batteries 9 requires effort and cost.

[0058] Therefore, in this embodiment, a configuration is adopted in which, by utilizing the opportunity to replace some of the deteriorated used batteries 9, used batteries that are not excessively deteriorated at that time but are estimated to deteriorate further in the near future are also replaced. In order to facilitate understanding of the manner in which used batteries are replaced as employed in this embodiment, first, a manner in which used batteries are replaced as a comparative example will be described.

[0059] FIG. 6 is a diagram for explaining the replacement of used batteries 9 according to a comparative example. In FIG. 6 and FIG. 7, the horizontal axis represents elapsed time, and the vertical axis represents the fully charged capacity of each used battery 9. For simplicity of explanation, in this example, an example will be described in which the number of used batteries 9 stored in the battery cellar 2 is three. These used batteries 9 will be referred to as the "first battery" to the "third battery." The first battery is the least deteriorated, followed by the second battery and then the third battery (they have the greatest fully charged capacity).

[0060] In this example, a deterioration evaluation test is periodically performed on the first to third batteries. A reference amount CX is set for the fully charged capacity of the first to third batteries. A used battery 9 of the first to third batteries whose fully charged capacity falls below the reference amount CX is determined to be a used battery in need of replacement. These batteries are also referred to below as "batteries in need of replacement." A battery in need of replacement corresponds to a "used battery to be replaced" in this disclosure.

[0061] In the Nth deterioration evaluation test, where N is a natural number, the full charge capacities of the first to third batteries all exceed the reference amount CX. Therefore, it is determined that there is no battery that needs to be replaced. In the subsequent (N+1)th deterioration evaluation test, the full charge capacities of the first and second batteries exceed the reference amount CX, while the full charge capacity of the third battery falls below the reference amount CX. Therefore, it is determined that the third battery needs to be replaced. In the (N+2)th deterioration evaluation test, the full charge capacity of the first battery exceeds the reference amount CX, while the full charge capacity of the second battery falls below the reference amount CX. Therefore, it is determined that the second battery needs to be replaced. Thus, in the comparative example, the third battery is replaced after the (N+1)th deterioration evaluation test, and the second battery is replaced after the (N+2)th deterioration evaluation test. That is, the used battery 9 is replaced twice.

[0062] FIG. 7 is a diagram for explaining the manner of replacing a used battery 9 in this embodiment. In this embodiment, in addition to the reference amount CX, a reference amount CY larger than the reference amount CX is set for the full charge capacity of the first to third batteries. The reference amount CY can be set higher than the reference amount CX by the amount of decrease in the full charge capacity that occurs during the interval between performance of the degradation evaluation test, for example. Then, if the full charge capacity is in the range between the reference amount CX and the reference amount CY as a result of performing a degradation evaluation test at a certain point in time, it can be estimated that the full charge capacity will be below the reference amount CX when the next degradation evaluation test is performed.

[0063] In the Nth deterioration evaluation test, the full charge capacity of the first battery and the second battery both exceed the reference amount CY. The full charge capacity of the third battery exceeds the reference amount CX but falls below the reference amount CY. In this way, if there are no used batteries that fall below the reference amount CX, it is determined that there are no batteries that need to be replaced.

[0064] In the (N+1)th deterioration evaluation test, the full charge capacity of the first battery exceeds the reference amount CY. The full charge capacity of the second battery exceeds the reference amount CX but falls below the reference amount CY. The full charge capacity of the third battery falls below the reference amount CX. In this case, the third battery is determined to be a battery in need of replacement, as in the comparative example. In addition, in this embodiment, the second battery is also determined to be a battery in need of replacement. This is because the full charge capacity of the second battery is below the reference amount CY and is therefore estimated to fall below the reference amount CX in the near future (for example, when the next deterioration evaluation test is performed).

[0065] In the (N+2)th deterioration evaluation test, the full charge capacity of the first battery exceeds the reference amount CX (and in this example, the reference amount CY as well). Therefore, it is determined that no battery needs to be replaced.

[0066] As described above, in the comparative example, the replacement of the third battery and the replacement of the second battery are performed separately, so the used battery 9 is replaced a total of two times. In contrast to this, in the present embodiment, the second battery is also replaced at the same time that the third battery is replaced (early replacement). As a result, the used battery 9 only needs to be replaced once, and the number of times that the used battery 9 is replaced can be reduced compared to the comparative example. This reduces the effort and cost involved in replacing the used batteries.

[0067] <Used battery replacement flow> 8 is a flowchart showing a first example of a processing procedure for replacing a used battery 9 in this embodiment. This flowchart (and other flowcharts described later) are called from a main routine (not shown) and executed when a predetermined condition is met. Each step is realized by software processing by the server 20, but may also be realized by hardware (electrical circuitry) arranged in the server 20. Hereinafter, step is abbreviated as S.

[0068] In S11, the server 20 judges whether a predetermined time has come to consider replacing the used batteries 9. The frequency at which replacement of the used batteries 9 should be considered may be, for example, once a day, once a week, or once a month. If the time to consider replacing the used batteries 9 has not come (NO in S11), the subsequent processing is skipped and the processing returns to the main routine.

[0069] When it is time to consider replacing the used batteries 9 (YES in S11), the server 20 acquires the results of a degradation evaluation test (full charge capacity C) carried out in a separate flow for each of the multiple used batteries 9 stored in the battery cellar 2 (S12).

[0070] In S13, the server 20 determines whether or not there is a used battery 9 whose full charge capacity C is less than the reference amount CX among the multiple used batteries 9 stored in the battery cellar 2. If there is no used battery 9 whose full charge capacity C is less than the reference amount CX (NO in S13), the server 20 determines that there is no battery that needs to be replaced (S17).

[0071] If there is a used battery 9 whose full charge capacity C is less than the reference amount CX (YES in S13), the server 20 further determines whether there is a used battery 9 whose full charge capacity C is less than the reference amount CY other than the used batteries 9 whose full charge capacity C is less than the reference amount CX (S14).If there is no used battery 9 whose full charge capacity C is less than the reference amount CY other than the used batteries 9 whose full charge capacity C is less than the reference amount CX (NO in S14), the server 20 selects only the used batteries 9 whose full charge capacity C is less than the reference amount CX as batteries requiring replacement (S16).

[0072] On the other hand, if there is a used battery 9 whose full charge capacity C is less than the reference amount CY (YES in S14), that is, if there is both a used battery 9 whose full charge capacity C is less than the reference amount CX and a used battery 9 whose full charge capacity C is equal to or greater than the reference amount CX and less than the reference amount CY, the server 20 selects both of the used batteries 9 as batteries requiring replacement (S15). When the processing of S15 to S17 is completed, the server 20 returns the processing to the main routine.

[0073] 6 to 8, an example has been described in which the degree of deterioration of the used battery 9 is evaluated based on the full charge capacity. However, the degree of deterioration of the used battery 9 may be evaluated based on other indices, for example, internal resistance.

[0074] In the actual operation of the battery seller 2, there is an upper limit to the number of used batteries 9 that can be exchanged in one exchange opportunity. This upper limit can be determined, for example, according to the number of workers who exchange the used batteries 9 or the length of work time. When the number of used batteries 9 that are desirable to be exchanged exceeds the upper limit, it is required to determine which used batteries 9 to select as batteries requiring replacement.

[0075] Fig. 9 is a flowchart showing a second example of a processing procedure related to replacement of a used battery 9 in the present embodiment. The processing of S21 to S24 is similar to the processing of S11 to S14 in the flowchart shown in Fig. 8. Moreover, the processing when NO is determined in S23 and the processing when NO is determined in S24 are similar to the processing of S17 and S16 in the above flowchart, respectively. Therefore, detailed description will not be repeated.

[0076] If there are both used batteries 9 whose full charge capacity C is less than the reference amount CX and used batteries 9 whose full charge capacity C is equal to or greater than the reference amount CX and less than the reference amount CY (YES in S24), the server 20 advances the process to S25.

[0077] In S25, the server 20 determines whether the quantity of used batteries 9 that satisfy the conditions for determining YES in S23 and S24, i.e., the total quantity of the quantity of used batteries 9 whose full charge capacity C is less than the reference amount CX and the quantity of used batteries 9 whose full charge capacity C is equal to or greater than the reference amount CX and less than the reference amount CY, exceeds an upper limit. If the total quantity is equal to or less than the upper limit (NO in S25), the server 20 selects all used batteries 9 whose full charge capacity C is less than the reference amount CX and all used batteries 9 whose full charge capacity C is equal to or greater than the reference amount CX and less than the reference amount CY as batteries requiring replacement (S27).

[0078] On the other hand, if the total quantity exceeds the upper limit (YES in S25), the server 20 selects all used batteries 9 whose full charge capacity C is less than the reference amount CX as batteries requiring replacement, and also selects used batteries 9 whose full charge capacity C is equal to or greater than the reference amount CX and less than the reference amount CY as batteries requiring replacement, so long as the used batteries to be replaced do not exceed the upper limit (S26). More specifically, the server 20 assigns a higher priority to used batteries 9 with smaller full charge capacities for selection as batteries requiring replacement. For example, the server 20 can select a quantity of used batteries 9 that does not exceed the upper limit from among used batteries 9 arranged in ascending order of full charge capacity.

[0079] By preferentially replacing used batteries 9 with small full charge capacities in this way, the amount of full charge capacity recovered by the replacement (the difference between the full charge capacity after replacement and the full charge capacity before replacement) of the used batteries increases. This increases the amount of power that the battery cellar 2 can charge and discharge when functioning as a VPP, making it possible to increase the compensation obtained from the power company. This makes it possible to increase the operating profit of the battery cellar 2.

[0080] <Deterioration evaluation> 10 is a functional block diagram of the server 20 (deterioration evaluation unit 202) related to the deterioration evaluation of a used battery 9. In the following, for simplicity of explanation, the description focuses on one used battery 9. However, in reality, when there are multiple used batteries 9 for which deterioration evaluation has not been performed, the same process may be executed simultaneously for those used batteries 9. The deterioration evaluation unit 202 includes a current integration unit 71, an OCV (Open Circuit Voltage) calculation unit 72, an SOC change amount calculation unit 73, a full charge capacity calculation unit 74, and a ranking unit 75.

[0081] The current integrator 71 calculates an integrated value (integrated current amount) ΔAh (unit: Ah) of the current charged and discharged to the used battery 9 from when the start condition of the current integration is satisfied until the end condition is satisfied, based on the current IB detected by the current sensor 212. In this embodiment, as described above, the used battery 9 is charged and discharged in response to a DR request from the business entity server 50, and the current flowing during the DR is integrated. More specifically, when an upward DR (a request for an increase in power demand) is performed, the used battery 9 is charged to increase the power demand of the battery cellar 2, and the charging current at that time is integrated. On the other hand, when a downward DR is performed, the used battery 9 is discharged to reduce the power demand of the battery cellar 2, and the discharging current at that time is integrated. The current integrator 71 outputs the calculated integrated current amount ΔAh to the full charge capacity calculator 74.

[0082] The OCV calculation unit 72 calculates the OCV of the used battery 9 at the start of current integration and the OCV of the used battery 9 at the end of current integration. The OCV can be calculated, for example, according to the following formula (1). OCV = VB - ΔVp - IB × R (1)

[0083] In formula (1), the internal resistance of the used battery 9 is written as R, and the polarization voltage is written as Vp. At the start of current integration (immediately before the start of charging and discharging), the current IB=0. If the used battery 9 is left without being charged or discharged before the start of current integration, the polarization voltage Vp can be approximated as 0. Therefore, the OCV at the start of current integration can be calculated based on the voltage VB detected by the voltage sensor 211. On the other hand, the internal resistance R can be determined from the relationship between the voltage VB and the current IB (Ohm's law). If the used battery 9 is charged or discharged at a constant current, the polarization voltage Vp can also be determined from the current IB detected by the current sensor 212 by measuring the relationship between the current and the polarization voltage Vp in advance. Therefore, the OCV of the used battery 9 at the end of current integration can also be calculated based on the voltage VB and the current IB. The OCV calculation unit 72 outputs the two calculated OCVs to the SOC change amount calculation unit 73.

[0084] The SOC change amount calculation unit 73 calculates the SOC change amount ΔSOC of the used battery 9 from the start of current integration to the end of current integration based on the two OCVs. The SOC change amount calculation unit 73 has in advance a characteristic curve (OCV-SOC curve) that indicates the SOC dependency of the OCV. Therefore, by referring to the OCV-SOC curve, the SOC change amount calculation unit 73 can read out the SOC corresponding to the OCV at the start of current integration and the SOC corresponding to the OCV at the end of current integration, and calculate the difference between these SOCs as ΔSOC. The SOC change amount calculation unit 73 outputs the calculated ΔSOC to the full charge capacity calculation unit 74.

[0085] The full charge capacity calculation unit 74 calculates the full charge capacity C of the used battery 9 based on ΔAh from the current integration unit 71 and ΔSOC from the SOC change amount calculation unit 73. In detail, the full charge capacity C of the used battery 9 can be calculated according to the following formula (2) in which the ratio of ΔAh to ΔSOC is equal to the ratio of the full charge capacity C to ΔSOC=100%. Since the full charge capacity C0 in the initial state is known from the specifications of the used battery 9, the full charge capacity calculation unit 74 may further calculate the capacity maintenance rate Q from the full charge capacity C (Q=C / C0). The full charge capacity calculation unit 74 outputs the calculated full charge capacity C to the ranking unit 75. C = ΔAh / ΔSOC × 100 (2)

[0086] The ranking unit 75 ranks the used batteries 9 according to the full charge capacity C. The ranking unit 75 can record the date and time of ranking in the battery data (see FIG. 5) as the degradation assessment date and time.

[0087] The rank of the used battery 9 is displayed on the display unit 205 together with the battery ID, storage location, etc. of the used battery 9. This allows a worker working in the battery cellar 2 to take out from the storage location a used battery 9 of a rank that meets the request of the buyer 3 when a request for purchase of a used battery 9 is received from the buyer 3. By taking out used batteries to be sold from the storage unit 21 as appropriate, it is possible to prevent the storage unit 21 from becoming full.

[0088] The above method of calculating the full charge capacity C is merely an example. Any method can be used to calculate the full charge capacity C, as long as it uses the voltage VB and current IB detected as the used battery 9 is charged and discharged. The ranking unit 75 may determine the rank of the used battery 9 based on other characteristics (such as the internal resistance of the used battery 9 and an index ΣD indicating the bias of the electrolyte concentration in a lithium-ion battery) instead of or in addition to the full charge capacity C. The ranking unit 75 may determine the rank of the used battery 9 according to the length of time the used battery 9 has been charged and discharged and / or the number of times the used battery 9 has been charged and discharged. The ranking unit 75 may determine the rank of the used battery 9 according to the elapsed time since the used battery 9 was manufactured, although the accuracy may be somewhat reduced. The ranking unit 75 may also determine the rank of the used battery 9 by combining the above elements (such as the full charge capacity C, the internal resistance R, the index ΣD, the charge and discharge time, the number of times the used battery 9 has been charged and discharged, and the elapsed time since the used battery 9 was manufactured).

[0089] <Power adjustment> 11 is a functional block diagram of the server 20 (power adjustment unit 203) related to power adjustment between the battery cellar 2 and the power grid 5. In this example, for ease of understanding, a situation will be described assuming that the DER 6 is a power generation type DER (particularly a naturally fluctuating power source such as a solar power generation facility). The power adjustment unit 203 includes an overall adjustment amount calculation unit 81, a DER adjustment amount calculation unit 82, a battery cellar adjustment amount calculation unit 83, a used battery selection unit 84, a conversion operation unit 85, and a command generation unit 86.

[0090] The total adjustment amount calculation unit 81 receives a DR request from the business operator server 50 and calculates the total amount of power that requires power adjustment during a predetermined period (e.g., 30 minutes) using the battery cell 2 and the DER 6. This amount of power is hereinafter referred to as the total adjustment amount, and is also written as kWh (total). The total adjustment amount calculation unit 81 outputs the calculated kWh (total) to the battery cell adjustment amount calculation unit 83.

[0091] The DER adjustment amount calculation unit 82 acquires the operating state of each DER 6 (more specifically, the expected amount of power generated by each DER 6 during a predetermined period) by communicating with that DER 6. Hereinafter, this amount of power will be referred to as the DER adjustment amount, and will also be written as kWh(DER). The DER adjustment amount calculation unit 82 outputs the acquired kWh(DER) to the battery cellar adjustment amount calculation unit 83.

[0092] The battery cell adjustment amount calculation unit 83 calculates the amount of power that requires power adjustment using the battery cell 2 based on the kWh(total) from the total adjustment amount calculation unit 81 and the kWh(DER) from the DER adjustment amount calculation unit 82. This amount of power is hereinafter referred to as the battery cell adjustment amount, and is also written as kWh(bat). The battery cell adjustment amount calculation unit 83 can calculate, for example, the difference between the above two amounts of power, ΔkWh=kWh(total)-kWh(DER), as the battery cell adjustment amount kWh(bat). The battery cell adjustment amount calculation unit 83 outputs the calculated kWh(bat) to the used battery selection unit 84.

[0093] The used battery selection unit 84 grasps the amount of power that can be charged and discharged for each of the many used batteries 9 stored in the multiple storage units 21 (see battery data in FIG. 5). The used battery selection unit 84 selects used batteries to be used for power adjustment from the many used batteries 9 based on kWh(bat) from the battery cellar adjustment amount calculation unit 83. If kWh(bat)>0, the power shortage of the power system 5 is compensated for by discharging from the battery cellar 2. Therefore, the used battery selection unit 84 selects a quantity of used batteries 9 that can discharge an amount of power equal to or greater than kWh(bat). On the other hand, if kWh(bat)<0, the surplus power of the power system 5 is absorbed by charging to the battery cellar 2. Therefore, the used battery selection unit 84 selects a quantity of used batteries 9 that can charge an amount of power equal to or greater than kWh(bat) (absolute value). When selecting used batteries 9, used batteries 9 with a low demand rank are preferentially charged and discharged, while used batteries 9 with a high demand rank are prevented from being charged and discharged as much as possible. 8 to 10, the details of this process have been described in detail, and therefore will not be described repeatedly here. The used battery selection unit 84 outputs to the conversion calculation unit 85 the selected used batteries 9 and the amount of power allocated to each selected used battery 9 (the amount of power adjusted by each used battery 9).

[0094] The conversion calculation unit 85 calculates the power to be charged and discharged for each used battery 9 selected by the used battery selection unit 84. More specifically, the conversion calculation unit 85 converts the amount of power (unit: kWh) to be adjusted by each used battery 9 into power (unit: kW) using the remaining time of power adjustment. As an example, if the power adjustment amount allocated to a certain used battery 9 is 10 kWh and the remaining time of power adjustment is 15 minutes, it can be calculated as 10 kWh × (60 minutes / 15 minutes) = 40 kW. The conversion calculation unit 85 outputs the power to be charged and discharged for each used battery 9 to the command generation unit 86.

[0095] The command generating unit 86 generates charge / discharge commands to the AC / DC converter 22 and the DC / DC converter 23, and also generates an opening / closing command to the relay 213, based on the calculation result by the conversion calculation unit 85. More specifically, the command generating unit 86 also generates an opening / closing command such that the selected used batteries 9 are electrically connected to the DC / DC converter 23, while the unselected used batteries 9 are electrically disconnected from the DC / DC converter 23. The command generating unit 86 generates a charge / discharge command such that the total power allocated to the selected used batteries 9 is charged or discharged.

[0096] Note that the power adjustment method shown in FIG. 11 is merely an example, and is described below for the sake of clarity. In this example, it is assumed that the DER6 is a power generation type DER, particularly a naturally variable power source whose power generation amount cannot be controlled. Therefore, the battery cell adjustment amount calculation unit 83 calculates the battery cell adjustment amount kWh(bat) based on the difference kWh(total)-kWh(DER) obtained by subtracting the DER adjustment amount kWh(DER) from the total adjustment amount kWh(total). That is, in this example, after the DER adjustment amount kWh(DER) is determined, the final power adjustment is performed by the battery cell adjustment amount kWh(bat). However, for example, when the DER6 includes a storage type DER, the battery cell adjustment amount calculation unit 83 may distribute the total adjustment amount kWh(total) to the DER adjustment amount kWh(DER) and the battery cell adjustment amount kWh(bat), and perform power adjustment using both the DER adjustment amount kWh(DER) and the battery cell adjustment amount kWh(bat).

[0097] As described above, in this embodiment, the degree of deterioration of each used battery 9 is evaluated while it is stored in the storage unit 21. This allows the storage period of the used batteries 9 to be used effectively in terms of time. Furthermore, the charging and discharging of the used batteries 9 for evaluating the degree of deterioration of the used batteries 9 is basically performed in response to a DR request from the business entity server 50. Furthermore, when the number of used batteries 9 is large, a large amount of power is charged and discharged, and this large amount of power is exchanged between the battery cellar 2 and the power system 5 in response to the DR request from the business entity server 50. This allows the operating company of the battery cellar 2 to receive a compensation (incentive) from the power company, and the compensation can be used as the running cost of the battery cellar 2. Alternatively, the operating company of the battery cellar 2 can recover a part of the initial investment (initial cost) of the battery cellar 2. This allows the storage period of the used batteries 9 to be used effectively in terms of money.

[0098] In addition, in this embodiment, when some of the used batteries 9 with advanced degradation are replaced, the used batteries 9 that are estimated to deteriorate in the near future are replaced early. This reduces the number of replacements of the used batteries 9 compared to when early replacement is not performed. This reduces the effort and cost of replacing the used batteries 9.

[0099] Furthermore, in this embodiment, for used batteries 9 that are estimated to deteriorate in the near future, the used batteries 9 are replaced preferentially in ascending order of full charge capacity. In this way, the full charge capacity of the used batteries 9 is largely restored following replacement. Therefore, when the battery cellar 2 is made to function as a VPP, the amount of power that the battery cellar 2 can charge and discharge increases. This makes it possible to increase the compensation from the power company.

[0100] The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present disclosure is defined by the claims, not by the description of the embodiments described above, and is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]

[0101] 100 Battery logistics model, 1 Collection company, 2 Battery cellar, 3 Sales destination, 31, 33 Retailer, 32 User, 4 Recycling plant, 5 Power system, 50 Business server, 6 Distributed energy resource (DER), 9 Used battery, 20 Server, 201 Battery data storage unit, 202 Degradation evaluation unit, 203 Power adjustment unit, 204 Timing adjustment unit, 205 Display unit, 21 Storage unit, 211 Voltage sensor, 212 Current sensor, 213 Relay, 22 AC / DC converter, 23 DC / DC converter, 71 Current integration unit, 72 OCV calculation unit, 73 SOC change amount calculation unit, 74 Full charge capacity calculation unit, 75 Ranking unit, 81 Overall adjustment amount calculation unit, 82 Adjustment amount calculation unit, 83 Battery cellar adjustment amount calculation unit, 84 Used battery selection unit, 85 Conversion calculation unit, 86 Command generation unit.

Claims

1. A storage unit for storing a plurality of batteries; a power conversion device electrically connected between the plurality of batteries stored in the storage facility and a power system; a server that controls an operation of the power conversion device in response to a demand response request from the power grid to charge and discharge the plurality of batteries; when selecting a portion of the batteries among the plurality of batteries whose degree of deterioration has reached a reference value as batteries to be replaced, the server also selects, in addition to the portion of the batteries, batteries whose degree of deterioration has not reached the reference value but whose degree of deterioration is estimated to reach the reference value within a predetermined period as the batteries to be replaced; the portion of batteries includes a battery whose full charge capacity is below a reference amount, The server, When replacing the part of the batteries, in addition to the part of the batteries, batteries whose full charge capacity exceeds the reference amount at that time but whose full charge capacity is estimated to fall below the reference amount within the specified period are also selected as the batteries to be replaced, A battery management system that, when the number of batteries whose full charge capacity is estimated to fall below the reference amount within the specified period is greater than a specified amount, selects batteries with smaller full charge capacities as batteries to be replaced in preference to batteries with larger full charge capacities.

2. 2. The battery management system according to claim 1, wherein when the number of batteries whose full charge capacity is estimated to fall below the reference amount within the specified period is greater than the specified amount, the server selects the batteries to be replaced in order of the batteries with the smallest full charge capacity.

3. A battery management method using a server, comprising: A step in which the server charges and discharges the plurality of batteries stored in the storage facility in response to a demand response request from a power grid; The server selects, as batteries to be replaced, a part of the batteries among the plurality of batteries whose degree of deterioration has reached a reference value; the selecting step includes a step of the server selecting, in addition to the part of the batteries, batteries whose degree of deterioration has not reached the reference value but whose degree of deterioration is estimated to reach the reference value within a predetermined period as the batteries to be replaced; the portion of batteries includes a battery whose full charge capacity is below a reference amount, The selecting step includes: When replacing the part of the batteries, in addition to the part of the batteries, selecting batteries whose full charge capacity exceeds the reference amount at that time but whose full charge capacity is estimated to fall below the reference amount within the predetermined period as the batteries to be replaced; and if the number of batteries whose full charge capacity is estimated to fall below the reference amount within the specified period is greater than a specified amount, selecting batteries with smaller full charge capacities as the batteries to be replaced in preference to batteries with larger full charge capacities.

Citation Information

Patent Citations

  • Battery system

    JP2013211944A

  • Power management method, power management system, power management apparatus and program

    JP2015186290A

  • Procurement support device, procurement support system, procurement support method and program

    JP2018205873A

  • Secondary battery degradation determination device and degradation determination method

    WO2011125213A1