Construction work monitoring system

The construction work monitoring system addresses the limitations of existing systems by capturing and analyzing construction site images and sounds to detect abnormalities, preventing accidents, and providing safety measures.

JP7556699B2Active Publication Date: 2024-09-26TOBISHIMA CONSTRUCT
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
JP2020078888
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-04-28
Publication Date
2024-09-26
Estimated Expiration
2040-04-28

AI Technical Summary

Technical Problem

Existing construction work monitoring systems fail to capture comprehensive images and sounds of construction activities at specific locations, leading to missed detection of abnormalities and inability to investigate accidents effectively.

Method used

A construction work monitoring system utilizing a hands-free device with a wearable line-of-sight camera and microphone, connected to a management server, captures and transmits images and sounds to detect abnormalities, allowing for the extraction of pre- and post-abnormality images/sounds, and provides safety measures through a head-mounted display.

Benefits of technology

Enables comprehensive monitoring of construction activities, identifying accident causes, preventing accidents, and providing safety measures, while clarifying responsibility and offering evidence for compensation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007556699000013
    Figure 0007556699000013
  • Figure 0007556699000011
    Figure 0007556699000011
  • Figure 0007556699000008
    Figure 0007556699000008
Patent Text Reader

Abstract

To provide a building work visualization system capable of acquiring a construction work image during construction work in a prescribed construction work place at a building site, and capable of acquiring construction work images before and after an abnormal image when detecting the abnormal image in the construction work place during construction work.SOLUTION: In a building work monitoring system 10, a hands-free device 13 transmits a construction work image captured by a wearable sight line camera to a management server 12 during construction work by a worker in a prescribed construction work place in a building site. When the management server 12 detects an abnormal image that is different from a normal image in the construction work image transmitted from the hands-free device 13, the management server extracts, with a point of time when the abnormal image has been detected as a reference point, a pre-construction work image at the time going back by a predetermined time from the reference point and a post-construction work image at the time after the lapse of a predetermined time from the reference point, from the construction work image; edits it into an abnormality-detected construction work image formed from the extracted pre-construction work image and the extracted post-construction work image; and stores the edited abnormality-detected construction work image.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a construction work monitoring system that monitors various construction works performed by workers at a construction site while visualizing the construction works. [Background technology]

[0002] A scaffolding construction safety monitoring system is disclosed that includes a monitoring robot that is self-propelled on the grounds around the construction site and takes pictures of scaffolding erected around the building structure, a judgment unit that analyzes the photographed images of the scaffolding to judge the danger of the construction of the scaffolding, and a communication unit that notifies the judgment result of the judgment unit to the construction workers of the scaffolding (see Patent Document 1). The monitoring robot in the scaffolding construction safety monitoring system runs along rails laid on the grounds around the construction site. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2019-31811 A Summary of the Invention [Problem to be solved by the invention]

[0004] In the scaffolding work safety monitoring system disclosed in the above-mentioned Patent Document 1, the monitoring robot photographs the scaffolding while traveling on rails laid on the grounds around the construction site, but it cannot photograph each construction work image at the construction site, and cannot obtain construction work images at the construction work site while the worker is working, and construction work sounds at the construction work site while the worker is working. Therefore, if an abnormal image or sound is detected at the construction work site while the worker is working, it is not possible to obtain construction work images before and after the abnormal image or sound. Furthermore, it is not possible to photograph each moving image while the worker is moving toward the construction work site or the specified transport work site at the construction site, and it is not possible to obtain moving images while the worker is moving and moving sounds while the worker is moving. Therefore, if an abnormal image or sound is detected while the worker is moving, it is not possible to obtain moving images before and after the abnormal image or sound. Furthermore, it is not possible to take pictures of each transport operation while a worker is transporting materials and equipment to a designated transport location at a construction site, and it is not possible to obtain images of the transport operation while the worker is transporting materials and equipment or sounds made while the worker is transporting materials and equipment. Therefore, if an abnormal image or sound is detected while a worker is transporting materials and equipment, it is not possible to obtain images of the transport operation before and after the abnormal image or sound.

[0005] The object of the present invention is to provide a construction work monitoring system that can acquire images of construction work being performed by workers at designated construction work locations at a construction site and sounds being made at the construction work location while the workers are working, and if an abnormal image or sound is detected at the construction work location during construction work, can acquire images of the construction work before and after the abnormal image or sound, and can investigate the cause of an accident at the construction work location based on the construction work images before and after the abnormal image or sound, and can devise safety measures for accidents at the construction work location.

[0006] Another object of the present invention is to provide a construction work monitoring system that can acquire moving images and moving sounds made by workers while they are moving toward a construction work location or a designated transportation work location on a construction site, and if an abnormal image or sound is detected during movement, can acquire moving images before and after the abnormal image or sound, and can investigate the cause of an accident that occurred during movement based on the moving images before and after the abnormal image or sound, and can devise safety measures for accidents that occur during movement.

[0007] Another object of the present invention is to provide a construction work monitoring system that can acquire images of transport work performed by workers transporting materials and equipment to a designated transport location at a construction site and sounds made by workers while they are transporting the materials and equipment, and if an abnormal image or sound is detected during transport work, can acquire images of the transport work before and after the abnormal image or sound, and can investigate the cause of an accident during transport work based on the images of the transport work performed before and after the abnormal image or sound, and can plan safety measures for accidents during transport work. [Means for solving the problem]

[0008] The premise of the present invention for solving the above-mentioned problems is a construction work monitoring system that monitors the construction work while visualizing various construction works performed by workers working on a construction site.

[0009] The present invention is characterized in that the construction work monitoring system is formed of a management server and a hands-free device that is worn by a worker and connected to the management server via a predetermined network so as to be able to communicate with the management server, the hands-free device is equipped with a wearable eye camera that takes images of the construction site within the worker's field of vision, and has a construction work image transmission means that transmits construction work images taken by the wearable eye camera to the management server via the network while the worker is working on a predetermined construction work location on the construction site, and when the management server detects an abnormal image that is different from a normal image among the construction work images transmitted from the hands-free device by the construction work image transmission means, the time when the abnormal image was detected is set as a reference point, and a pre-construction work image extraction means extracts a pre-construction work image that is a predetermined time back from the reference point and a post-construction work image that is a predetermined time forward from the reference point from the construction work images, an abnormality detection construction work image editing means edits at least one of the pre-construction work images and the post-construction work images extracted by the pre-construction work image extraction means into an abnormality detection construction work image, and an abnormality detection construction work image editing means hand Storing the abnormality detection construction work image edited by stages hand The purpose of the present invention is to have a stage.

[0010] In one example of the present invention, a hands-free device is equipped with a wearable microphone that picks up sounds at a construction site, and has a construction work sound transmission means that transmits construction work sounds picked up by the wearable microphone while a worker is performing construction work at a designated construction work location on the construction site to a management server via a network, and when the management server detects an abnormal sound that is different from normal sounds among the construction work sounds transmitted from the hands-free device by the construction work sound transmission means, a pre-construction work image extraction means uses the time when the abnormal sound was detected as a reference point, and extracts from the construction work images a pre-construction work image taken a predetermined time back from the reference point and a post-construction work image taken a predetermined time forward from the reference point.

[0011] In another example of the present invention, when the management server detects dangerous construction work from construction work images transmitted from the hands-free device by the construction work image transmitting means, the pre- and post-construction work image extraction means uses the time when the dangerous construction work was detected as a reference point, and extracts from the construction work images a pre-construction work image taken a predetermined time back from the reference point and a post-construction work image taken a predetermined time forward from the reference point.

[0012] In another example of the present invention, the hands-free device includes a head-mounted display and a wearable speaker, and when the management server detects an abnormal image from a construction work image, or detects an abnormal sound from a construction work sound, or detects dangerous construction work from a construction work image, the hands-free device includes a safety measures transmission means for transmitting construction work safety measures information and construction work safety measures audio to the hands-free device, and the hands-free device outputs the construction work safety measures information transmitted from the management server by the safety measures transmission means to the head-mounted display, and outputs the construction work safety measures audio transmitted from the management server by the safety measures transmission means from the wearable speaker.

[0013] In another example of the present invention, the management server includes an abnormality detection construction work past image transmitting means for transmitting to the hands-free device past images of abnormality detection construction work that occurred in construction work images that are the same or similar to the construction work images transmitted from the hands-free device by the construction work image transmitting means, or past images of abnormality detection construction work that occurred in construction work images that are the same or similar to the pre-construction work images and post-construction work images extracted by the pre- and post-construction work image extraction means, and the hands-free device includes an abnormality detection construction work past image output means for outputting the abnormality detection construction work past image transmitted from the management server by the abnormality detection construction work past image transmitting means to a head-mounted display.

[0014] Another example of the present invention is a hands-free device that includes a mobile image transmission means for transmitting mobile images captured by a wearable eye-line camera while a worker is moving at a construction site toward a designated construction work location or a designated transportation work location to a management server via a network, and when the management server detects an abnormal image that is different from normal images among the mobile images transmitted from the hands-free device by the mobile image transmission means, the management server includes a pre-movement image extraction means that uses the time when the abnormal image was detected as a reference point and extracts from the mobile images a pre-movement image that is a predetermined time back from the reference point and a post-movement image that is a predetermined time forward from the reference point, an abnormality detection moving image editing means that edits the pre-movement image and the post-movement image extracted by the pre-movement image extraction means into an abnormality detection moving image formed from at least one of the pre-movement image and the post-movement image extracted by the pre-movement image extraction means, and an abnormality detection moving image storage means that stores the abnormality detection moving image edited by the abnormality detection moving image editing means.

[0015] In another example of the present invention, a hands-free device includes a movement sound transmitting means that transmits movement sounds picked up by a wearable microphone while a worker is moving toward a designated construction work location or a designated transportation work location at a construction site to a management server via a network, and when the management server detects an abnormal sound that is different from normal sounds among the movement sounds transmitted from the hands-free device by the movement sound transmitting means, a pre-movement image extraction means uses the time when the abnormal sound was detected as a reference point and extracts from the movement images a pre-movement image taken a predetermined time back from the reference point and a post-movement image taken a predetermined time forward from the reference point.

[0016] In another example of the present invention, when the management server detects a dangerous movement behavior from a movement image transmitted from a hands-free device by a movement image transmitting means, the pre- and post-movement image extraction means uses the time when the dangerous movement behavior was detected as a reference point, and extracts from the movement image a pre-movement image that goes back a predetermined time from the reference point and a post-movement image that goes forward a predetermined time from the reference point.

[0017] In another example of the present invention, when the management server detects an abnormal image from a movement image, or detects an abnormal sound from a movement sound, or detects a dangerous movement behavior from a movement image, the safety measure transmission means transmits movement safety measure information and movement safety measure audio to the hands-free device, and the safety measure output means outputs the movement safety measure information transmitted from the management server by the safety measure transmission means to the head-mounted display, and outputs the movement safety measure audio transmitted from the management server by the safety measure transmission means from the wearable speaker.

[0018] In another example of the present invention, the management server includes an abnormality detection past movement image transmitting means for transmitting to the hands-free device a past abnormality detection movement image that occurred in a moving image that is the same or similar to the moving image transmitted from the hands-free device by the moving image transmitting means, or a past abnormality detection movement image that occurred in a moving image that is the same or similar to the pre-movement image and post-movement image extracted by the before-and-after movement image extraction means, and the hands-free device includes an abnormality detection past movement image output means for outputting the abnormality detection past movement image transmitted from the management server by the abnormality detection past movement image transmitting means to a head-mounted display.

[0019] Another example of the present invention is a hands-free device that includes a transport work image transmission means that transmits transport work images captured by a wearable eye-line camera while a worker is transporting materials and equipment to a designated transport location at a construction site to a management server via a network, and when the management server detects an abnormal image that is different from normal images among the transport work images transmitted from the hands-free device by the transport work image transmission means, the management server includes a pre- and post-transport work image extraction means that uses the time when the abnormal image was detected as a reference point and extracts from the transport work images a pre-transport work image that is a predetermined time back from the reference point and a post-transport work image that is a predetermined time forward from the reference point, an abnormality detection transport work image editing means that edits the pre- and post-transport work images extracted by the pre- and post-transport work image extraction means into an abnormality detection transport work image formed from at least one of the pre- and post-transport work images, and an abnormality detection transport work image storage means that stores the abnormality detection transport work image edited by the abnormality detection transport work image editing means.

[0020] In another example of the present invention, a hands-free device includes a transport work sound transmitting means that transmits transport work sounds picked up by a wearable microphone during transport work while a worker is transporting materials and equipment to a designated transport location at a construction site to a management server via a network, and when the management server detects an abnormal sound that is different from normal sounds among the transport work sounds transmitted from the hands-free device by the transport work sound transmitting means, a pre-transport work image extraction means uses the time when the abnormal sound was detected as a reference point, and extracts from the transport work image a pre-transport work image taken a predetermined time back from the reference point and a post-transport work image taken a predetermined time forward from the reference point.

[0021] In another example of the present invention, when the management server detects dangerous transportation work from transportation work images transmitted from a hands-free device by the transportation work image transmitting means, the pre- and post-transport work image extraction means uses the time when the dangerous transportation work was detected as a reference point, and extracts from the transportation work image a pre-transport work image taken a predetermined time back from the reference point and a post-transport work image taken a predetermined time forward from the reference point.

[0022] In another example of the present invention, when the management server detects an abnormal image from the transport work image, or detects an abnormal sound from the transport work sound, or detects dangerous transport work from the transport work image, the safety measures transmission means transmits transport work safety measures information and transport work safety measures audio to the hands-free device, and the safety measures output means outputs the transport work safety measures information transmitted from the management server by the safety measures transmission means to the head-mounted display, and outputs the transport work safety measures audio transmitted from the management server by the safety measures transmission means from the wearable speaker.

[0023] In another example of the present invention, the management server includes a past abnormality detection transport work image transmitting means for transmitting to the hands-free device past images of abnormality detection transport work that occurred in transport work images that are the same or similar to the transport work images transmitted from the hands-free device by the transport work image transmitting means, or past images of abnormality detection transport work that occurred in transport work images that are the same or similar to the pre-transport work images and post-transport work images extracted by the pre- and post-transport work image extraction means, and the hands-free device includes a past abnormality detection transport work image output means for outputting the past abnormality detection transport work images transmitted from the management server by the past abnormality detection transport work image transmitting means to a head-mounted display. Effect of the Invention

[0024] According to the construction work monitoring system of the present invention, the hands-free device transmits construction work images captured by the wearable eye-line camera while a worker is working at a specified construction work location on the construction site to a management server via a network, and if the management server detects an abnormal image different from normal images among the construction work images transmitted from the hands-free device, the time when the abnormal image was detected is set as a reference point, and a pre-construction work image taken a specified time back from the reference point and a post-construction work image taken a specified time forward from the reference point are extracted from the construction work images, and an abnormality-detected construction work image is formed from at least one of the extracted pre-construction work images and post-construction work images.The edited abnormality-detected construction work image is then stored.Therefore, the wearable eye-line camera of the hands-free device can be used to obtain construction work images of a worker working at a specified construction work location on the construction site, and if an abnormal image is detected from the construction work images during construction work, an abnormality-detected construction work image formed from at least one of the pre-construction work images and post-construction work images before and after the time when the abnormal image was detected (reference point) can be obtained. The construction work monitoring system can investigate the cause of accidents at construction sites based on anomaly detection construction work images acquired using anomaly images as a trigger, and can devise measures to prevent careless behavior by workers during construction work and safety measures for accidents, as well as prevent the occurrence and recurrence of careless behavior and accidents. The construction work visualization system can clarify responsibility when careless behavior occurs or an accident occurs by using the acquired anomaly detection construction work images, and the anomaly detection construction work images can be used as proof and evidence of an accident or as proof and evidence when claiming various types of compensation.

[0025] The construction work monitoring system has a hands-free device equipped with a wearable microphone that picks up sounds at a construction site, and transmits construction work sounds picked up by the wearable microphone while a worker is working at a designated construction work location on the construction site to a management server via a network, and if the management server detects an abnormal sound that is different from normal sounds among the construction work sounds transmitted from the hands-free device, the system sets the time when the abnormal sound was detected as a reference point and extracts from the construction work images a pre-construction image taken a predetermined time back from the reference point and a post-construction image taken a predetermined time forward from the reference point.The construction work monitoring system uses the wearable microphone of the hands-free device to acquire the construction work sounds while a worker is working at a designated construction work location on the construction site, and if an abnormal sound is detected from the construction work sounds during work, it can acquire an abnormality-detected construction work image formed from at least one of the pre-construction images and the post-construction images before and after the time when the abnormal sound was detected (reference point). The construction work monitoring system can investigate the cause of accidents during construction work based on the abnormality detection construction work images acquired using abnormal sounds as a trigger, and can devise measures to prevent careless behavior by workers during construction work and safety measures for accidents, as well as prevent the occurrence and recurrence of careless behavior and accidents. The construction work monitoring system can clarify responsibility when careless behavior occurs or an accident occurs using the acquired abnormality detection construction work images, and the abnormality detection construction work images can be used as proof and evidence of an accident or as proof and evidence when claiming various types of compensation.

[0026] When the management server detects dangerous construction work from the construction work images transmitted from the hands-free device, the construction work monitoring system extracts from the construction work images a pre-construction work image taken a predetermined time back from the reference point and a post-construction work image taken a predetermined time back from the reference point, when the construction work image detects dangerous construction work at a construction work site during construction work, and can obtain an abnormality detection construction work image formed from at least one of the pre-construction work image and the post-construction work image taken before and after the time (reference point) when the dangerous construction work is detected. The construction work monitoring system can pursue the cause of an accident in construction work based on the abnormality detection construction work image obtained by triggering dangerous construction work, and can plan measures to prevent careless behavior of workers in construction work and safety measures for accidents, as well as prevent the occurrence and recurrence of careless behavior and accidents. The construction work monitoring system can clarify the location of responsibility when careless behavior occurs or an accident occurs by the acquired abnormality detection construction work image, and can use the abnormality detection construction work image as proof and evidence of an accident or as proof and evidence when claiming various compensation.

[0027] The construction work monitoring system includes a hands-free device that includes a head-mounted display and a wearable speaker, and when the management server detects an abnormal image from a construction work image, or detects an abnormal sound from a construction work sound, transmits construction work safety measure information and construction work safety measure audio to the hands-free device, and the hands-free device outputs the construction work safety measure information transmitted from the management server to the head-mounted display and outputs the construction work safety measure audio transmitted from the management server from the wearable speaker. In this case, if dangerous construction work is detected from the construction work image, the hands-free device outputs construction work safety measure information to the head-mounted display and outputs construction work safety measure audio from the wearable speaker, so that the worker can see the construction work safety measure information output on the head-mounted display and hear the construction work safety measure audio output from the wearable speaker and become aware that the construction work being carried out is dangerous. By the worker stopping the dangerous construction work, it is possible to prevent accidents during construction work from occurring and to prevent accidents that occur during construction work from becoming serious accidents.

[0028] A construction work monitoring system in which a management server transmits to a hands-free device past images of construction work in which an abnormality was detected that occurred in construction work images that are the same as or similar to the construction work image transmitted from the hands-free device, or past images of construction work in which an abnormality was detected that occurred in construction work images that are the same as or similar to the extracted pre-construction work images and post-construction work images, and the hands-free device outputs the past images of construction work in which an abnormality was detected that occurred in construction work images that are the same as or similar to the extracted pre-construction work images and post-construction work images, and by outputting to the head-mounted display past images of construction work in which an abnormality was detected that occurred in construction work images that are the same as or similar to the construction work image, or past images of construction work in which an abnormality was detected that occurred in construction work images that are the same as or similar to the pre-construction work images and post-construction work images, workers can be made aware of careless behavior and careless accidents that have occurred in the past during construction work, and by referring to the past images of abnormality detection construction work, the occurrence and recurrence of careless behavior and careless accidents during construction work can be prevented.

[0029] The hands-free device transmits moving images taken by a wearable eye-line camera while a worker is moving toward a designated construction work location or a designated transportation work location at a construction site to a management server via a network, and if the management server detects an abnormal image different from normal images among the moving images transmitted from the hands-free device, the time when the abnormal image was detected is set as a reference point, and a pre-movement image that goes back a predetermined time from the reference point and a post-movement image that moves forward a predetermined time from the reference point are extracted from the moving images, and an abnormality detection moving image is formed from at least one of the extracted pre-movement and post-movement images, and the edited abnormality detection moving image is stored.The construction work monitoring system uses the wearable eye-line camera of the hands-free device to acquire moving images of a worker moving toward a designated construction work location or a designated transportation work location at a construction site, and if an abnormal image is detected from the moving images during movement, an abnormality detection moving image can be acquired formed from at least one of the pre-movement images and post-movement images before and after the time when the abnormal image was detected (reference point). The construction work monitoring system can investigate the cause of accidents during movement based on the abnormality detection moving images acquired using an abnormal image as a trigger, and can devise measures to prevent careless behavior of workers during movement and safety measures for accidents, as well as prevent the occurrence and recurrence of careless behavior and accidents. The construction work visualization system can clarify responsibility when careless behavior occurs or an accident occurs based on the acquired abnormality detection moving images, and the abnormality detection moving images can be used as proof and evidence of an accident or as proof and evidence when claiming various types of compensation.

[0030] A construction work monitoring system uses the wearable microphone of the hands-free device to capture the movement sounds picked up by a wearable microphone while a worker is moving toward a designated construction work location or a designated transportation work location at a construction site, and transmits the movement sounds picked up by the wearable microphone to a management server via a network.If the management server detects an abnormal sound that is different from normal sounds among the movement sounds transmitted from the hands-free device, the time when the abnormal sound was detected is set as a reference point, and a pre-movement image taken a predetermined time back from the reference point and a post-movement image taken a predetermined time forward from the reference point are extracted from the movement images.The construction work monitoring system uses the wearable microphone of the hands-free device to capture the movement sounds of a worker moving toward a designated construction work location or a designated transportation work location at a construction site, and if an abnormal sound is detected from the movement sounds, an abnormality-detected movement image can be captured formed from at least one of the pre-movement images and the post-movement images before and after the time when the abnormal sound was detected (reference point). The construction work monitoring system can investigate the cause of accidents during movement based on abnormality detection moving images acquired using abnormal sounds as a trigger, and can devise measures to prevent careless behavior by workers during movement and safety measures for accidents, as well as prevent the occurrence and recurrence of careless behavior and accidents. The construction work monitoring system can clarify responsibility when careless behavior occurs or an accident occurs based on the acquired abnormality detection moving images, and the abnormality detection moving images can be used as proof and evidence of an accident or as proof and evidence when claiming various types of compensation.

[0031] When the management server detects a dangerous movement from the moving image transmitted from the hands-free device, the construction work monitoring system extracts from the moving image a pre-movement image taken a predetermined time back from the reference point and a post-movement image taken a predetermined time back from the reference point, when the construction work monitoring system detects a dangerous movement in the moving image during movement, the construction work monitoring system can acquire an abnormality detection moving image formed from at least one of the pre-movement image and the post-movement image taken before and after the time (reference point) when the dangerous movement is detected. The construction work monitoring system can pursue the cause of an accident during movement based on the abnormality detection moving image acquired as a trigger of the dangerous movement, and can plan measures to prevent careless behavior of workers during movement and safety measures for accidents, as well as prevent the occurrence and recurrence of careless behavior and accidents. The construction work monitoring system can clarify the location of responsibility when careless behavior occurs or an accident occurs by the acquired abnormality detection moving image, and can use the abnormality detection moving image as proof and evidence of an accident or as proof and evidence when claiming various compensation.

[0032] In a construction work monitoring system in which, when the management server detects an abnormal image from a movement image, or detects an abnormal sound from a movement sound, or detects a dangerous movement behavior from a movement image, it transmits movement safety measure information and movement safety measure audio to a hands-free device, and the hands-free device outputs the movement safety measure information transmitted from the management server to a head-mounted display and outputs the movement safety measure audio transmitted from the management server from a wearable speaker, when the management server detects an abnormal image from a movement image, or detects an abnormal sound from the movement sound, or detects a dangerous movement behavior from a movement image, the hands-free device outputs movement safety measure information to the head-mounted display and outputs the movement safety measure audio from the wearable speaker. Therefore, by viewing the movement safety measure information output on the head-mounted display and listening to the movement safety measure audio output from the wearable speaker, a worker can know that the movement behavior during movement is a dangerous movement behavior, and by the worker stopping the dangerous movement behavior, it is possible to prevent the occurrence of an accident during movement and to prevent an accident that occurs during movement from leading to a serious accident.

[0033] A construction work monitoring system in which a management server transmits to a hands-free device past movement images in which an abnormality was detected in the same or similar moving image as the moving image transmitted from the hands-free device, or past movement images in which an abnormality was detected in the same or similar moving image as the extracted pre-movement image and post-movement image, and the hands-free device outputs the past movement images in which an abnormality was detected transmitted from the management server to a head-mounted display.By outputting to the head-mounted display past movement images in which an abnormality was detected in the same or similar moving image as the moving image, or past movement images in which an abnormality was detected in the same or similar moving image as the pre-movement image and post-movement image, a worker can be made aware of careless behavior or careless accidents that occurred during movement in the past, and by referring to the past movement images in which an abnormality was detected, the occurrence and recurrence of careless behavior or careless accidents during movement can be prevented.

[0034] The hands-free device transmits transport work images taken by a wearable eye-line camera while a worker is transporting materials and equipment to a designated transport location at a construction site to a management server via a network, and if the management server detects an abnormal image that is different from normal images among the transport work images transmitted from the hands-free device, the time when the abnormal image was detected is set as a reference point, and a pre-transport work image that goes back a specified time from the reference point and a post-transport work image that goes forward a specified time from the reference point are extracted from the transport work images, edited into an abnormality-detected transport work image formed from at least one of the extracted pre-transport work images and post-transport work images, and stores the edited abnormality-detected transport work image.The construction work monitoring system uses the wearable eye-line camera of the hands-free device to obtain transport work images while a worker is transporting materials and equipment to a designated transport location at a construction site, and if an abnormal image is detected from the transport work images, it can obtain an abnormality-detected transport work image formed from at least one of the pre-transport work images and post-transport work images before and after the time when the abnormal image was detected (reference point). The construction work monitoring system can investigate the cause of accidents during transport work based on the abnormality detection transport work images acquired using an abnormal image as a trigger, and can devise measures to prevent careless behavior by workers during transport work and safety measures for accidents, as well as prevent the occurrence and recurrence of careless behavior and accidents. The construction work visualization system can clarify where responsibility lies when careless behavior occurs or an accident occurs based on the acquired abnormality detection transport work images, and the abnormality detection transport work images can be used as proof and evidence of an accident or as proof and evidence when claiming various types of compensation.

[0035] A hands-free device transmits to a management server via a network the sounds of transport work picked up by a wearable microphone while a worker is transporting materials and equipment to a designated transport location at a construction site, and if the management server detects an abnormal sound that is different from normal sounds among the transport work sounds transmitted from the hands-free device, the time when the abnormal sound was detected is set as a reference point, and a pre-transport work image taken a predetermined time back from the reference point and a post-transport work image taken a predetermined time forward from the reference point are extracted from the transport work images.A construction work monitoring system can utilize the wearable microphone of the hands-free device to acquire the sounds of transport work while a worker is transporting materials and equipment to a designated transport location at a construction site, and if an abnormal sound is detected from the transport work sounds, can acquire an abnormality-detected transport work image formed from at least one of the pre-transport work images and the post-transport work images before and after the time when the abnormal sound was detected (reference point). The construction work monitoring system can investigate the cause of accidents during transport work based on the abnormality detection transport work images acquired using abnormal sounds as a trigger, and can devise measures to prevent careless behavior by workers during transport work and safety measures for accidents, as well as prevent the occurrence and recurrence of careless behavior and accidents. The construction work monitoring system can clarify responsibility when careless behavior occurs or an accident occurs based on the acquired abnormality detection transport work images, and the abnormality detection transport work images can be used as proof and evidence of an accident or as proof and evidence when claiming various types of compensation.

[0036] When the management server detects a dangerous transport work from the transport work image transmitted from the hands-free device, the construction work monitoring system extracts a pre-transport work image taken a predetermined time back from the reference point and a post-transport work image taken a predetermined time back from the reference point from the transport work image when the management server detects a dangerous transport work. When the construction work monitoring system detects a dangerous transport work in the transport work image at the transport work location during the transport work, it can acquire an abnormality detection transport work image formed from at least one of the pre-transport work image and the post-transport work image taken before and after the time (reference point) when the dangerous transport work was detected. The construction work monitoring system can pursue the cause of an accident in the transport work based on the abnormality detection transport work image acquired as a trigger of the dangerous transport work, and can plan measures to prevent the careless behavior of workers in the transport work and safety measures for accidents, as well as prevent the occurrence and recurrence of careless behavior and accidents. The construction work monitoring system can clarify the location of responsibility when a careless behavior occurs or an accident occurs by the acquired abnormality detection transport work image, and can use the abnormality detection transport work image as proof and evidence of an accident or as proof and evidence when claiming various compensation.

[0037] When a management server detects an abnormal image from a transport work image or detects an abnormal sound from a transport work sound, or detects dangerous transport work from a transport work image, the management server transmits transport work safety measure information and transport work safety measure audio to a hands-free device, and the hands-free device outputs the transport work safety measure information transmitted from the management server to a head-mounted display and outputs the transport work safety measure audio transmitted from the management server from a wearable speaker. If a dangerous transportation operation is detected, the hands-free device outputs transportation operation safety measure information to the head-mounted display and outputs transportation operation safety measure audio from the wearable speaker. By viewing the transportation operation safety measure information output on the head-mounted display and hearing the transportation operation safety measure audio output from the wearable speaker, the worker can learn that the transportation operation is dangerous. By the worker stopping the dangerous transportation operation, the occurrence of an accident during the transportation operation can be prevented and an accident that occurs during the transportation operation can be prevented from becoming a serious accident.

[0038] A construction work monitoring system in which a management server transmits to a hands-free device past images of transport work in which an abnormality was detected in the same or similar transport work images as the transport work image transmitted from the hands-free device, or past images of transport work in which an abnormality was detected in the same or similar transport work images as the extracted pre-transport work images and post-transport work images, and the hands-free device outputs the past images of transport work in which an abnormality was detected transmitted from the management server to a head-mounted display.By outputting to the head-mounted display past images of transport work in which an abnormality was detected in the same or similar transport work images as the transport work image, or past images of transport work in which an abnormality was detected in the same or similar transport work images as the pre-transport work images and post-transport work images, workers can be made aware of careless behavior and careless accidents that have occurred in the past during transport work, and by referring to the past images of transport work in which an abnormality was detected, the occurrence and recurrence of careless behavior and careless accidents during transport work can be prevented. [Brief description of the drawings]

[0039] [Figure 1] FIG. 1 is a configuration diagram of a construction work monitoring system shown as an example. [Diagram 2] FIG. 1 is a diagram showing an example of a hands-free device forming a construction work monitoring system. [Diagram 3] FIG. 1 is a front view of a worker wearing a hands-free device. [Figure 4] FIG. 1 is a side view of a worker wearing a hands-free device. [Diagram 5] FIG. 13 is a diagram showing an example of an anomaly detection construction work display screen output on a display of the management server. [Figure 6] FIG. 13 is a diagram showing an example of a construction work safety measure information display screen output to a head mounted display worn by a construction worker. [Figure 7] FIG. 13 is a diagram showing another example of a construction work safety measure information display screen output to a head mounted display worn by a site manager. [Figure 8] FIG. 13 is a diagram showing an example of a screen displaying past images of anomaly-detected construction work outputted to a head-mounted display worn by a construction worker and a site manager. [Figure 9] FIG. 13 is a diagram showing an example of an abnormality detected movement location display screen outputted on a display of the management server. [Figure 10] FIG. 13 is a diagram showing an example of a travel safety measure information display screen output to a head mounted display worn by a construction worker. [Figure 11] FIG. 13 is a diagram showing another example of a travel safety measure information display screen output to a head mounted display worn by a site manager. [Figure 12] FIG. 13 is a diagram showing an example of an abnormality detection movement past image display screen output to a head mounted display worn by a construction worker and a site manager. [Figure 13] FIG. 13 is a diagram showing an example of an abnormality detection transport operation display screen output on a display of the management server. [Figure 14] FIG. 13 is a diagram showing an example of a transportation work safety measure information display screen output to a head mounted display worn by a construction worker. [Figure 15] FIG. 13 is a diagram showing another example of a transportation work safety measure information display screen output to a head mounted display worn by a site manager. [Figure 16] FIG. 13 is a diagram showing an example of a display screen of past images of a transport operation when an abnormality is detected, output to a head-mounted display worn by a construction worker and a site manager. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0040] The construction work monitoring system according to the present invention will be described in detail below with reference to the attached drawings such as Fig. 1, which is a configuration diagram of a construction work monitoring system 10 shown as an example. Fig. 2 is a diagram showing an example of a hands-free device 13 forming the construction work monitoring system 10, and Fig. 3 is a front view of a worker 11 wearing the hands-free device 13. Fig. 4 is a side view of a worker 11 wearing the hands-free device 13. Figs. 1, 3, and 4 omit illustration of a controller 18. Fig. 1 shows one worker 11, but in an actual construction site, there are many workers 11 wearing (wearing) hands-free devices 13.

[0041] The construction work monitoring system 10 monitors construction work while visualizing various construction work performed by a worker 11 (wearer) working at a construction site. The construction work monitoring system 10 is composed of a management server 12 that stores and manages various data, and a hands-free device 13 (hands-free glasses) worn (carried) by the worker 11 (construction worker, site manager). The hands-free device 13 is composed of a wearable eye-line camera 14 and a head-mounted display 15 worn by the worker 11, a wearable microphone 16 and a wearable speaker 17 worn by the worker, and a controller 18 (data processing terminal) equipped with a communication function capable of communicating with the management server 12 and a smartphone 21 described below.

[0042] The management server 12, the hands-free device 13, and the smartphone 21 can communicate with each other and send and receive various data by using communication technology (mobile data communication) (network) using wireless communication standards such as Wi-Fi (wireless LAN) using multiple wireless LAN routers (access points) (not shown) installed at the construction site, and LTE, 4G (fourth generation mobile communication system), and 5G (fifth generation mobile communication system) using base stations (access points) (not shown). Note that any mobile communication standard (communication technology) developed in the future can be used as a mobile communication standard, and a composite communication system that integrates 1G to 4G communication systems and a wireless LAN communication system can also be used.

[0043] The worker 11 (wearer) includes not only construction workers who perform various construction work at the construction site, but also site managers such as site managers and site supervisors who instruct the construction workers at the construction site. Construction work performed at the construction site includes general construction work performed by the worker 11, the movement of the worker 11, and the transportation of materials and equipment performed by the worker 11. General construction work includes foundation work, framework work, exterior work, interior work, and equipment work. Construction workers include all construction workers involved in construction work, such as scaffolders, rebar workers, formwork carpenters, corner workers, roofers, architectural sheet metal workers, painters, unit bath workers, kitchen workers, sash makers, electricians, equipment workers, plumbers, light ceiling makers, carpenters, furniture makers, floor laying makers, wallpaper makers, Di-Noc makers, flooring makers, tile makers, board makers, handrail makers, stonemasons, sealers, house cleaning workers, plasterers, baseboard makers, repair workers, spraying workers, chipping workers, demolition workers, blacksmiths, and landscaping workers.

[0044] The management server 12 is a physical computer or cloud computing equipped with a central processing unit (CPU or MPU) and memory (main memory and cache memory), and has a built-in large-capacity storage area (large-capacity hard disk). Although not shown, input devices such as a keyboard and mouse, and output devices such as a display and printer are connected to the management server 12 via interfaces. The management server 12 may be installed in a data center contracted by the manager's company that undertakes the construction work, or in the manager's company or the management office of the construction site. Managers include site managers such as site managers and site supervisors, as well as all managers who manage the construction work of workers 11 (construction workers), such as supervising engineers, head office managers, designers, and architects.

[0045] As the cloud, Infrastructure as a Service (IaaS), Platform as a Service (PaaS), and Software as a Service (SaaS) can be used. By using cloud computing as the management server 12, IT resources can be used on demand from a cloud service platform via the Internet. The cloud is a virtual server that has a virtual CPU or virtual MPU (central processing unit), a virtual main memory, and a virtual cache memory (memory) and runs on an independent operating system (virtual OS), and a large-capacity virtual storage area is formed.

[0046] In the large-capacity storage area or large-capacity virtual storage area of ​​the management server 12 (physical server, virtual server), server identification information (server identifier) ​​for identifying the server 12, device identification information (device identifier) ​​for identifying each hands-free device 13 (controller), URL of each hands-free device 13 (controller), personal information (name, age, sex, personal identifier, password or ID number, department, email address, etc.) of the worker 11 (construction worker, site manager) who wears the hands-free device 13, mobile terminal identification information of the smartphone 21 (mobile terminal) owned by the worker 11, URL of the smartphone 21, and mobile (smartphone) phone number of the smartphone 21 are stored (stored). As the server identification information, the IP address, MAC address, URL, email address, cookie information, individual identification number, etc. of the management server 12 can be used, and the management server 12 can independently generate a unique identifier for identifying it, and the generated identifier can be used as the server identification information. The personal identification data is stored (stored) in a state associated with the device identification information (device identifier) ​​of the hands-free device 13.

[0047] The large-capacity storage area and large-capacity virtual storage area of ​​the management server 12 store (contain) each construction work image (each construction work location image) at each construction site currently under construction, the names of the construction work locations corresponding to those construction work images (floor, work section name, work site name, etc.), construction work safety measure images (construction work location safety measure images) for those construction work images, and construction work safety measure audio (construction work location safety measure audio) corresponding to those construction work safety measure images. The large-capacity storage area and large-capacity virtual storage area of ​​the management server 12 store (contain) each past construction work image (each construction work location image) at each past construction site, the names of the construction work locations corresponding to those past construction work images (floor, section name, work site name, etc.), and past anomaly-detected construction work images (anomaly-detected construction work location past images) corresponding to those past construction work images.

[0048] The management server 12 has a large capacity storage area and a large capacity virtual storage area that store (contain) each movement image (each movement location image) at each construction site currently under construction, the names of the movement locations corresponding to those movement images (floor, scaffolding name, work passage name, etc.), movement safety measure images (movement location safety measure images) for those movement images, and movement safety measure audio (movement location safety measure audio) corresponding to those movement safety measure images. The management server 12 has a large capacity storage area and a large capacity virtual storage area that store (contain) each past movement image (each movement location image) at each past construction site, the names of the movement locations corresponding to those past movement locations (movement location images) (floor, scaffolding name, work passage name, etc.), and past images of movement locations where abnormalities were detected corresponding to those past movement locations (movement location images).

[0049] The large-capacity storage area and large-capacity virtual storage area of ​​the management server 12 store (contain) each transport work image (each transport work location image) at each construction site currently under construction, the names of the transport work locations corresponding to those transport work images (floor, transport section name, transport work site name, etc.), transport work safety measure images (transport work location safety measure images) for those transport work images, and transport work safety measure audio (transport work location safety measure audio) corresponding to those transport work safety measure images. The large-capacity storage area and large-capacity virtual storage area of ​​the management server 12 store (contain) each past transport work image (each transport work location image) at each past construction site, the names of the transport work locations corresponding to those past transport work images (transport work images) (floor, transport section name, transport work site name, etc.), and past abnormality detection transport work past images corresponding to those past transport work images (transport work images).

[0050] To the management server 12, various servers such as a DNS server, a database file server, a Web server, a mail server, and a document server are connected, and these servers form a server group. The management server 12 itself has a DNS server function, a database server function, a Web server function, a mail server function, and a document server function, and may be divided by software according to each server function. The management server 12 can access any other server that has no access restrictions using the Internet, via a plurality of various DNS servers connected to the Internet. The management server 12 forms a network with other servers in a data center installed somewhere in the world via the Internet. The management server 12 transmits various data to the hands-free device 13 and the smartphone 21, and receives various data from the hands-free device 13 and the smartphone 21.

[0051] Wearable eye camera 14 and head mounted display 15 are integrally molded and detachably attached to glasses 19 (eyeglasses) using a mounting jig. Wearable eye camera 14 is placed at the eye level of worker 11 and captures an image (video) that is within the field of view of worker 11. Wearable eye camera 14 has a capture function and can capture not only videos but also still images. Wearable eye camera 14 is connected to controller 18 via a signal line and transmits the captured digital image (video or still image) to controller 18. Head mounted display 15 is placed at a position within the field of view of worker 11 and connected to controller 18 via a signal line. Head mounted display 15 projects predetermined data (information) transmitted from controller 18 into the field of view of worker 11. A virtual image projection type or a retinal projection type can be used for head mounted display 15.

[0052] Wearable microphone 16 and wearable speaker 17 are detachably attached to glasses 19 (spectacles) using an attachment jig. Wearable microphone 16 and wearable speaker 17 are connected to controller 18 via a signal line. Wearable microphone 16 collects (picks up) the voice of worker 11 at the construction site and sounds around worker 11 (sounds at the construction work location, sounds at the moving location, sounds at the transportation work location), converts the voice of worker 11 at the construction site and sounds around worker 11 into electrical signals, and transmits the converted electrical signals to controller 18. Wearable speaker 17 converts the electrical signals transmitted from controller 17 into sounds, and produces the converted sounds.

[0053] The controller 18 has a built-in computer equipped with a central processing unit (CPU or MPU) and memory (main memory and cache memory), a large-capacity hard disk, and a touch panel. The hard disk of the controller 18 stores (contains) the URL of the management server 12, server identification information (server identifier), device identification information (device identifier) ​​of the hands-free device 13 (controller) and the URL of the hands-free device 13 (controller), mobile terminal identification information of the smartphone 21 and the URL of the smartphone 21, and personal identification data of the worker who wears the hands-free device 13 (name, age, sex, personal identifier, password or ID number, department, email address, etc.).

[0054] The controller 18 transmits various data to the management server 12 and the smartphone 21 by using the communication function, and receives various data from the management server 12 and the smartphone 21. When the controller 18 transmits and receives various data to and from the management server 12 and the smartphone 21 via the Internet, the controller 18 has various server functions such as a DNS server function, a database server function, a Web server function, a mail server function, and a document server function. The controller 18 is stored in a pocket of the worker 11's work clothes.

[0055] A power switch (not shown) for turning the power supply on and off is provided on controller 18. Although not shown, touch panel 20 of controller 18 displays a main switch for turning hands-free device 13 on and off, a capture button for starting the capture function of wearable eye-level camera 14, a volume for adjusting the output (volume) of speaker 17, an image display ON / OFF button for displaying various images (safety measure images, risk level images, past images, blueprint images, work instruction images, etc.) transmitted from management server 12 on head-mounted display 15, a safety measure image display button, and a past image display button.

[0056] FIG. 5 is a diagram showing an example of an abnormality detection construction work display screen output (displayed) on the display of the management server 12, and FIG. 6 is a diagram showing an example of a construction work safety measure information display screen output (displayed) on the head mounted display 15 worn by the construction worker (worker 11). FIG. 7 is a diagram showing another example of a construction work safety measure information display screen output (displayed) on the head mounted display 15 worn by the site manager (worker 11). In FIG. 5 to FIG. 7, illustration of data displayed in each display area is omitted. In FIG. 5 to FIG. 7, a case where a construction work image of a specific worker 11 (construction worker) is taken by a hands-free device 13 worn by another worker 11 (construction worker or site manager) is illustrated. Note that a construction work image of a specific worker 11 (construction worker) who actually performs construction work may be taken by a hands-free device 13 worn by that worker 11 (construction worker).

[0057] When multiple workers 11 (construction workers and site managers) perform construction work at a construction site, they put on work clothes, hands-free devices 13, and helmets, and turn on the power switch of controller 18. When the power switch of controller 18 is turned on, controller 18 starts up and a main switch is displayed on touch panel 20 of controller 18. When the main switch is turned on, wearable eye camera 14, head mounted display 15, wearable microphone 16, and wearable speaker 17 start up, and a capture button, volume, and image display ON / OFF button are displayed on touch panel 20 along with the main switch. After turning on the main switch, these workers 11 head to the construction work site.

[0058] Each worker 11 (construction worker) who arrives at a construction work location on the construction site turns on the image display ON / OFF button and starts work. When the image display ON / OFF button is turned on, a safety measure information display button and a past image display button are displayed on the touch panel 20 of the controller 18. When the worker 11 starts work at the construction work location with the image display ON / OFF button turned on, the construction work location being worked on is photographed by the wearable eye camera 14 (construction work location photographing means). Furthermore, while the construction worker (worker 11) is working at a specified construction work location, sounds during the construction work (the voice of the construction worker (worker 11) working at the construction work and sounds around the construction worker (worker 11) working at the construction work (sounds at the construction work location)) are collected (picked up) by the wearable microphone 17 (construction work location sound collecting means).

[0059] Wearable eye-level camera 14 transmits (transfers) construction work images (construction work site images) (digital image data) of the construction work site during construction work, and wearable microphone 15 transmits (transfers) collected sounds (electrical signals) of workers 11 (construction workers) working at the construction work site to controller 18. Controller 18 (hands-free device 13) transmits the construction work images received from wearable eye-level camera 14 and device identification information (device identifier) ​​of hands-free device 13 to management server 12 by its communication function (network) (construction work image transmission means). Controller 18 (hands-free device 13) transmits the construction work sounds received from wearable microphone 16 and device identification information (device identifier) ​​of hands-free device 13 to management server 12 by its communication function (network) (construction work sound transmission means).

[0060] If the management server 12 detects an abnormal image that is different from a normal image among the construction work images while performing image recognition of the construction work image while receiving a construction work image transmitted from the hands-free device 13 (controller 18) by a construction work image transmitting means, or if it detects an abnormal sound that is different from a normal sound among the construction work sounds while receiving the construction work sounds transmitted from the hands-free device 13 (controller 18) by a construction work sound transmitting means, the management server 12 uses the time when at least one of the abnormal image and the abnormal sound was detected as a reference point, and extracts a pre-construction image (image before construction work area) (digital image data) that goes back a predetermined time from the reference point and a post-construction image (image after construction work area) (digital image data) that goes back a predetermined time from the reference point from the construction work image transmitted by the construction work image transmitting means (pre- and post-construction work image extraction means).

[0061] In the construction work monitoring system 10, either an abnormal image or an abnormal sound can be selected and set in the management server 12 as a trigger for extracting the before-construction work image (first construction work image) and the after-construction work image (second construction work image), or both an abnormal image and an abnormal sound can be selected and set in the management server 12. The predetermined time going back from the reference point can be set arbitrarily, for example, 3 seconds, 10 seconds, 30 seconds, 1 minute, 1 minute 30 seconds, etc. from the reference point. The predetermined time going backward from the reference point can be set arbitrarily, for example, 3 seconds, 10 seconds, 30 seconds, 1 minute, 1 minute 30 seconds, etc. from the reference point.

[0062] An example of a case where an abnormal image is detected is, for example, a sudden disturbance of the image (rapid fluctuation of the image, large vibration of the image, instantaneous expansion of the image, instantaneous contraction of the image, unnatural movement of the image, freezing of the image, etc.) and the image disturbance continues for several seconds (for example, 0.5 to 3 seconds). An example of a case where an abnormal sound is detected is detection of a scream or a call for rescue from the worker 11 (construction worker), detection of a sudden strange sound, collapse sound, explosion sound, collision sound, etc. at the construction work site, the moving place described later, or the transportation work site described later, detection of a loud sound or muffling sound at the construction work site, the moving place, or the transportation work site. The threshold values ​​of the abnormal images and abnormal sounds are stored (stored) in the large-capacity storage area or large-capacity virtual storage area of ​​the management server 12. When the abnormal images or abnormal sounds exceed the threshold values, the management server 12 determines that an abnormal image or abnormal sound has been detected.

[0063] In addition, while receiving the construction work image transmitted from the hands-free device 13 (controller 18) by the construction work image transmission means, the management server 12 performs image recognition on the construction work image, and if dangerous construction work is detected from the recognized construction work image (if the construction work image is judged to be a dangerous construction work image), the management server 12 uses the time when the dangerous construction work was detected (the time when the dangerous construction work image was judged to be a dangerous construction work image) as a reference point, and extracts a pre-construction work image (pre-construction work site image) (digital image data) that goes back a predetermined time from the reference point and a post-construction work image (post-construction work site image) (digital image data) that goes back a predetermined time from the reference point from the construction work image (construction work site image) transmitted by the construction work image transmission means (pre-construction work image extraction means). Examples of dangerous construction work include when a movement that is clearly different from normal construction work (jumping, various athletic movements, taking off a helmet, etc.) is detected, or when an inaction action (doing nothing) that is clearly different from normal construction work is detected.

[0064] The management server 12 uses the pre-construction work image (first construction work image) and post-construction work image (second construction work image) extracted by the pre-construction work and post-construction work image extraction means, and edits the construction work image transmitted from the hands-free device 13 (controller 18) by the construction work image transmission means into an anomaly-detecting construction work image (digital image data) formed from the pre-construction work image and the post-construction work image (anomaly-detecting construction work image editing means). The management server 12 stores the anomaly-detecting construction work image edited by the anomaly-detecting construction work image editing means (anomaly-detecting construction work image storage means). The management server 12 outputs (displays) the anomaly-detecting construction work display screen shown in FIG. 5 on the display (anomaly-detecting construction work display screen output means). The abnormality detection construction work display screen in Figure 5 outputs (displays) on the display an abnormality detection construction work image display area 5a which displays an abnormality detection construction work image (video or still image) stored by the abnormality detection construction work image storage means, an abnormality / danger detection date and time display area 5b which displays the date and time when an abnormal image, abnormal sound or dangerous construction work was detected, a personal information display area 5c which displays personal information of the construction worker (worker 11), and a worker image display area 5d which displays an image of the construction worker (worker 11).

[0065] The abnormality detection construction work image editing means can edit either the pre-construction work image (image before construction work location) or the post-construction work image (image after construction work location) into an abnormality detection construction work image (image of the abnormality detection construction work location). The abnormality detection construction work image storage means stores (stores) the abnormality detection construction work image (including the abnormal image or abnormal sound, the date and time of detection of dangerous construction work, and personal identification data of the construction worker (worker 11)) in a large-capacity storage area or a large-capacity virtual storage area in association with the device identification information (device identifier) ​​of the hands-free device 13.

[0066] The manager investigates the cause of the accident at the construction work site based on the acquired abnormality detection construction work image, and plans measures to prevent careless behavior of construction workers (workers 11) at the construction work site and construction work safety measures in the event of an accident. The planned construction work safety measures are stored (stored) in the large-capacity storage area or large-capacity virtual storage area of ​​the management server 12 in association with the device identification information (device identifier) ​​of the hands-free device 13 together with the abnormality detection construction work image (including abnormal images and sounds, date and time of detection of dangerous construction work, and personal identification data of the construction workers (workers 11)).

[0067] In the construction work monitoring system 10, when the management server 12 detects an abnormal image different from a normal image among the construction work images transmitted from the hands-free device 13 (controller 18), or when the management server 12 detects an abnormal sound different from a normal sound among the construction work sounds transmitted from the hands-free device 13 (controller 18), or when dangerous construction work is detected from the construction work images, the construction work monitoring system 10 sets the time when at least one of the abnormal image and the abnormal sound is detected as a reference point, or sets the time when the dangerous construction work is detected as a reference point, and extracts a pre-construction work image that is a predetermined time back from the reference point and a post-construction work image that is a predetermined time forward from the reference point from the construction work images, and performs a calculation from at least one of the extracted pre-construction work images and post-construction work images. The formed abnormality detection construction work image is edited and the edited abnormality detection construction work image is stored, so that by utilizing the wearable eye camera 14 and wearable microphone 16 of the hands-free device 13, construction work images during construction work by a construction worker (worker 11) and construction work sounds at the construction work location where the construction worker (worker 11) is working can be obtained during construction work at a specified construction work location at the construction site, and if an abnormal image, abnormal sound, or dangerous construction work is detected in the construction work image (construction work location image) during construction work, an abnormality detection construction work image formed from at least one of the pre-construction images and post-construction images before and after the abnormal image, abnormal sound, or dangerous construction work can be obtained.

[0068] The construction work monitoring system 10 can investigate the cause of accidents during construction work at construction work sites based on the acquired abnormality detection construction work images, and can devise measures to prevent careless behavior by construction workers (workers 11) during construction work and construction work safety measures in the event of accidents, as well as prevent the occurrence and recurrence of careless behavior and accidents. The construction work monitoring system 10 can clarify where responsibility lies when careless behavior occurs or an accident occurs by using the acquired abnormality detection construction work images, and the abnormality detection construction work images can be used as proof and evidence of an accident or as proof and evidence when claiming various types of compensation.

[0069] When a construction worker (worker 11) or a site manager (worker 11) at a construction work location where an abnormal image, an abnormal sound, or dangerous construction work has been detected wants to view the construction work safety measures at that construction work location, he or she taps a safety measure information display button on the touch panel 20 of the controller 18. When the safety measure information display button is tapped, the management server 12 performs image recognition on the construction work image transmitted from the hands-free device 13 (controller 18) by the construction work image transmission means, compares the construction work image transmitted from the hands-free device 13 and image-recognized with each construction work image stored in the large-capacity storage area or large-capacity virtual storage area, and identifies the construction work image corresponding to the image-recognized construction work image from among the construction work images stored in the large-capacity storage area or large-capacity virtual storage area (construction work image identification means).

[0070] Next, management server 12 extracts the anomaly-detected construction work image of the identified construction work image from the large-capacity storage area or large-capacity virtual storage area, extracts construction work safety measure information for the identified construction work image from the large-capacity storage area or large-capacity virtual storage area, and transmits the extracted anomaly-detected construction work image and construction work safety measure information to hands-free device 13 (controller 18) (safety measure transmission means). Furthermore, management server 12 extracts from the large-capacity storage area or large-capacity virtual storage area a construction work safety measure sound corresponding to the construction work safety measure information to be transmitted to hands-free device 13 (controller 18) by the safety measure transmission means, and transmits the extracted construction work safety measure sound to hands-free device 13 (safety measure transmission means).

[0071] The hands-free device 13 (controller 18) outputs (displays) the construction work safety measure information transmitted from the management server 12 by the safety measure transmission means on the head mounted display 15 (safety measure output means), and outputs (sounds) the construction work safety measure voice corresponding to the construction work safety measure information from the wearable speaker 17 (safety measure output means). The construction work safety measure information display screen of Fig. 6 is displayed on the head mounted display 15 worn by the construction worker (worker 11). As shown in Fig. 6, the construction work safety measure information display screen outputs (displays) the abnormality detection construction work image display area 6a, which displays the abnormality detection construction work image (video or still image) at the construction work place where the abnormal image, abnormal sound, or dangerous construction work is detected, the construction work place name display area 6b, which displays the construction work place name (floor, construction section name, construction work site name, etc.) where the abnormal image, abnormal sound, or dangerous construction work is detected, the construction work safety measure information display area 6c, which displays the construction work safety measure information (video or still image), the abnormality / danger detection date and time display area 6d, which displays the date and time of the abnormality / danger detection, and the worker / work date and time display area 6e, which displays the name of the construction worker (worker 11) (which may include other worker identification information) and the work date and time. The wearable speaker 17 outputs (sounds) the construction work safety measure sound corresponding to the construction work safety measure information. The construction work safety measure information display screen (construction work location image, construction work safety measure information, construction work safety measure audio, etc.) in Fig. 6 can be output (displayed) on the smartphone 21 carried by the construction worker (worker 11). Also, the management server 12 can output (display) the construction work safety measure information display screen in Fig. 6 and the construction work safety measure audio on a display (including a speaker) at any time.

[0072] The construction work safety measures information display screen of Fig. 7 is output (displayed) on the head mounted display 15 worn by the site manager (worker 11). On the construction work safety measures information display screen, as shown in Fig. 7, an abnormality detection construction work image display area 7a that displays an abnormality detection construction work image (video or still image) at a construction work location where an abnormal image, abnormal sound, or dangerous construction work is detected, a construction work location name display area 7b that displays the construction work location name (floor, construction section name, construction work site name, etc.) where an abnormal image, abnormal sound, or dangerous construction work is detected, a construction work safety measures information display area 7c that displays construction work safety measures information (video or still image), an abnormality / danger detection date and time display area 7d that displays the date and time of abnormality / danger detection, a worker information / work date and time display area 7e that displays personal information of the construction worker (worker 11) (name (which may include other worker identification information), work date and time, age, sex, identifier, email address, mobile phone number), and a worker image display area 7f that displays an image of the construction worker (worker 11) are output (displayed). A construction work safety measure sound corresponding to the construction work safety measure information is pronounced (output) from the wearable speaker 17. The construction work safety measure information display screen (construction work location image, construction work safety measure information, construction work safety measure sound, etc.) in Fig. 7 can be output (displayed) on the smartphone 21 carried by the site manager (worker 11). In addition, the management server 12 can output (display) the construction work safety measure information display screen in Fig. 7 and the construction work safety measure sound on a display (including a speaker) at any time.

[0073] The construction work safety measure information includes all the construction work safety measures required at the construction work site, such as "follow the procedures described in the manual when carrying out construction work," "install cones and barricades to secure a space for construction work," "cover the building with protective sheets or nets during construction work," "if you feel danger at the construction work site, immediately stop the work and confirm safety before resuming the work," and "if you feel danger, immediately contact other workers and the site manager and call for help." The construction work safety measure information includes construction work caution messages and construction work caution audio that call attention to the construction work. The construction worker (worker 11) and the site manager (worker 11) can learn about the safety measures at the construction work site where the construction work is performed by viewing the construction work safety measure information output to the head mounted display 15 and listening to the construction work safety measure audio output from the wearable speaker 17.

[0074] The construction work monitoring system 10 outputs (displays) construction work safety measure information for construction work images on a head mounted display 15 worn by the construction worker (worker 11), and outputs (sounds) construction work safety measure audio corresponding to the construction work safety measure information from a wearable speaker 17, so that the construction worker (worker 11) can view the construction work safety measure information transmitted from the management server 12 while keeping both hands free to ensure safety, and can hear the construction work safety measure audio corresponding to the construction work safety measure information transmitted from the management server 12 while keeping both hands free to ensure safety, and by the construction worker (worker 11) listening to the construction work safety measure audio while referring to the construction work safety measure information, it is possible to reliably prevent careless behavior and the occurrence and recurrence of careless accidents during construction work.

[0075] The construction work monitoring system 10 allows a construction worker (worker 11) to know that the construction work he or she is working on is dangerous by viewing the construction work safety measure information output (displayed) on the head-mounted display 15 and listening to the construction work safety measure audio output (pronounced) from the wearable speaker. By allowing the construction worker (worker 11) to stop the dangerous construction work, the occurrence of an accident during construction work can be prevented in advance, and an accident that occurs during construction work can be prevented from becoming a serious accident.

[0076] The construction work monitoring system 10 outputs (displays) on a head mounted display 15 worn by the site manager (worker 11) the construction work image at the construction work location where abnormal images, abnormal sounds, or dangerous construction work have been detected, the name of the construction work location where the abnormal images, abnormal sounds, or dangerous construction work have been detected, and personal information of the construction worker (worker 11) working at the construction work location in the construction work image, so that the site manager can know the construction work location where abnormal images, abnormal sounds, or dangerous construction work have been detected and the construction worker (worker 11) working at that construction work location, and can immediately dispatch rescue or emergency services.

[0077] The construction work monitoring system 10 outputs (displays) construction work safety measure information for construction work images on a head-mounted display 15 worn by the site manager (worker 11), and outputs (sounds) construction work safety measure audio corresponding to the construction work safety measure information from a wearable speaker 17. This enables the site manager (worker 11) to know the safety measures for construction work where an abnormal image, abnormal sound, or dangerous construction work is detected, and to give appropriate instructions to the construction worker (worker 11) working at that construction work site, thereby preventing accidents from occurring during construction work and preventing accidents that occur during construction work from becoming serious accidents.

[0078] Fig. 8 is a diagram showing an example of an anomaly detected construction work past image display screen output (displayed) on the head mounted display 15 worn by the construction worker (worker 11) and the site manager (worker 11). In Fig. 8, illustration of data displayed in each display area is omitted. To view the anomaly detected construction work past images, the construction worker (worker 11) and the site manager (worker 11) tap the past image display button on the touch panel 20 of the controller 18.

[0079] When the past image display button is tapped, the management server 12 performs image recognition on the construction work image transmitted from the hands-free device 13 (controller 18) by the construction work image transmission means, compares the image-recognized construction work image with each past construction work image stored in the large-capacity storage area or large-capacity virtual storage area, and identifies a past construction work image corresponding to the image-recognized construction work image (identical or similar to the image-recognized construction work image) from each past construction work location image stored in the large-capacity storage area or large-capacity virtual storage area (construction work past image identification means). Next, the management server 12 extracts from the large-capacity storage area or large-capacity virtual storage area past images of construction work that have detected an abnormality that occurred in the identified past construction work image, and transmits the extracted past abnormality-detected construction work images to the hands-free device 13 (controller 18) (abnormality-detected construction work past image transmission means).

[0080] Alternatively, the management server 12 performs image recognition on the construction work images corresponding to the pre-construction work images and post-construction work images extracted by the pre-construction work image extraction means at the construction work location where an abnormal image, an abnormal sound, or a dangerous construction work is detected, compares the image-recognized construction work image with each past construction work image stored in the large-capacity storage area or the large-capacity virtual storage area, and identifies the past construction work image corresponding to the image-recognized construction work image (the same as or similar to the image-recognized construction work image) from each past construction work image stored in the large-capacity storage area or the large-capacity virtual storage area (construction work past image identification means). Next, the management server 12 extracts from the large-capacity storage area or the large-capacity virtual storage area the past construction work images that have detected an abnormality that occurred in the identified past construction work images, and transmits the extracted past construction work images that have detected an abnormality to the hands-free device 13 (controller 18) (abnormality-detected construction work past image transmission means).

[0081] The hands-free device 13 (controller 18) outputs the abnormality detection construction work past image transmitted from the management server 12 by the abnormality detection construction work past image transmitting means to the head mounted display 15 (abnormality detection construction work past image output means). The head mounted display 15 displays the abnormality detection construction work past image display screen of FIG. 8. As shown in FIG. 8, the abnormality detection construction work past image display screen outputs (displays) an abnormality detection construction work past image display area 8a displaying the abnormality detection construction work past image (video or still image), an abnormality / danger detection date and time display area 8b displaying the date and time of detection of an abnormal image, abnormal sound, or dangerous construction work, a work date display area 8c displaying the work date of the construction work in which an abnormal image, abnormal sound, or dangerous construction work was detected, a worker information display area 8d displaying personal information of the construction worker (worker 11) (name (which may include other worker identification information), age, sex), and a worker image display area 8e displaying an image of the construction worker (worker 11).

[0082] The construction worker (worker 11) and the site manager (worker 11) can know the abnormality detection construction work past image display screen outputted to the head mounted display 15, and the abnormality and dangerous actions that occurred in the past during construction work at the construction work site where the abnormal image, abnormal sound, or dangerous construction work was detected, and the results thereof. The abnormality detection construction work past image display screen (abnormality detection construction work past image, personal information, etc.) in FIG. 8 can be outputted (displayed) on the touch panel of the smartphone 21 carried by the construction worker (worker 11) and the site manager (worker 11). In addition, the management server 12 can output (display) the abnormality detection construction work past image display screen in FIG. 8 on the display at any time.

[0083] The construction work monitoring system 10 outputs to the head-mounted display 15 past images of construction work where abnormalities have been detected that occurred in past construction work images corresponding to the construction work image (the same as or similar to the construction work image) and past images of construction work where abnormalities have been detected that occurred in past construction work images corresponding to the pre-construction work image and the post-construction work image (the same as or similar to the construction work image), thereby enabling construction workers (workers 11) and site managers (workers 11) to learn of careless behavior and careless accidents that have occurred in construction work in the past, and by referring to the past images of construction work where abnormalities have been detected, the occurrence and recurrence of careless behavior and careless accidents during construction work can be prevented.

[0084] FIG. 9 is a diagram showing an example of an abnormality detected moving location display screen output (displayed) on the display of the management server 12, and FIG. 10 is a diagram showing an example of a moving safety measure information display screen output (displayed) on the head mounted display 15 worn by the construction worker (worker 11). FIG. 11 is a diagram showing another example of a moving safety measure information display screen output (displayed) on the head mounted display 15 worn by the site manager (worker 11). In FIG. 9 to FIG. 11, illustration of data displayed in each display area is omitted. In FIG. 9 to FIG. 11, a case where a moving image of a specific worker 11 (construction worker) is captured by a hands-free device 13 worn by another worker 11 (construction worker or site manager) is illustrated. Note that a moving image of a specific worker 11 (construction worker) may be captured by a hands-free device 13 worn by the specific worker 11 (construction worker) during movement.

[0085] A worker 11 (construction worker and site manager) turns on the main switch of controller 18 and also turns on the image display ON / OFF button, and moves from a predetermined construction work location to another construction work location at the construction site, moves from the predetermined construction work location to a predetermined transport work location, or moves from the predetermined transport work location to a predetermined construction work location, or moves from the predetermined transport work location to another transport work location. While worker 11 (construction worker) is moving toward the predetermined construction work location or the predetermined transport work location, the moving location is photographed by wearable eye camera 14 (moving location photographing means). Furthermore, while worker 11 (construction worker) is moving toward the predetermined construction work location or the predetermined transport work location, sounds during the movement (the voice of worker 11 (construction worker) moving and sounds around worker 11 (construction worker) moving (sounds of the moving location) are collected (picked up) by wearable microphone 16 (moving location sound collecting means).

[0086] Wearable eye-line camera 14 transmits (transfers) to controller 18 images (digital image data) of the location where worker 11 (construction worker) moves, and wearable microphone 16 transmits (transfers) to controller 18 the collected sounds (electrical signals) of worker 11 (construction worker) moving at the location where worker 11 moves. Controller 18 (hands-free device 13) transmits the images (digital image data) of the location where worker 11 moves and device identification information (device identifier) ​​of hands-free device 13 received from wearable eye-line camera 14 to management server 12 by its communication function (network) (movement image transmission means), and transmits the sounds (electrical signals) during movement received from wearable microphone 16 and device identification information (device identifier) ​​of hands-free device 13 to management server 12 by its communication function (network) (movement sound transmission means).

[0087] When the management server 12 detects an abnormal image different from a normal image among the moving location images while performing image recognition of the moving location image while receiving the moving location image transmitted from the hands-free device 13 (controller 18) by the moving image transmission means, or detects an abnormal sound different from a normal sound among the sounds during movement while receiving the sounds during movement transmitted from the hands-free device 13 (controller 18) by the moving sound transmission means, the management server 12 extracts a pre-movement image (pre-movement location image) (digital image data) that goes back a predetermined time from the reference point from the moving location image transmitted by the moving image transmission means (pre-movement and post-movement image extraction means). Note that in the construction work monitoring system 10, as a trigger for extracting the pre-movement image and the post-movement image, either the abnormal image or the abnormal sound can be selected and set in the management server 12, or both the abnormal image and the abnormal sound can be selected and set in the management server 12.

[0088] In addition, while receiving the moving image (moving place image) transmitted from the hands-free device 13 (controller 18) by the moving image transmitting means, the management server 12 performs image recognition on the moving image, and if it detects a dangerous moving action from the recognized moving image (if it judges the moving image to be a dangerous moving action image), it uses the time when the dangerous moving action was detected (the time when it was judged to be a dangerous moving action image) as a reference point, and extracts a pre-movement image (pre-movement place image) (digital image data) that goes back a predetermined time from the reference point and a post-movement image (post-movement place image) (digital image data) that goes back a predetermined time from the reference point from the moving image (moving place image) transmitted by the moving image transmitting means (before and after movement image extraction means). Examples of detecting a dangerous moving action include detecting an action that is clearly different from a normal moving action (a jumping action, various athletic actions, an action of taking off a helmet, etc.), detecting an inaction action (an action of doing nothing) that is clearly different from a normal moving action, etc.

[0089] The management server 12 uses the pre-movement image (first moving image) and the post-movement image (second moving image) extracted by the pre- and post-movement image extraction means, and edits the moving image transmitted from the hands-free device 13 (controller 18) by the moving image transmission means into an abnormality detection moving image (abnormality detection moving location image) (digital image data) formed from the pre-movement image and the post-movement image (abnormality detection moving image editing means). The management server 12 stores the abnormality detection moving image edited by the abnormality detection moving image editing means (abnormality detection moving image storage means). The management server 12 outputs (displays) the abnormality detection moving display screen of Fig. 9 on the display (abnormality detection moving display screen output means). As shown in Figure 9, the abnormality detection movement display screen outputs (displays) on the display an abnormality detection movement image display area 9a which displays an abnormality detection movement image (video or still image) stored by the abnormality detection movement image storage means, an abnormality / danger detection date and time display area 9b which displays the date and time when an abnormal image, abnormal sound or dangerous movement behavior was detected, a personal information display area 9c which displays personal information of the construction worker (worker 11), and a worker image display area 9d which displays an image of the construction worker (worker 11).

[0090] The abnormality detection moving image editing means can edit either the pre-movement image (image before moving location) or the post-movement image (image after moving location) into an abnormality detection construction work image (image of abnormality detection construction work location). The abnormality detection moving image storage means stores (stores) the abnormality detection moving image (including abnormal images, abnormal sounds, date and time of detection of dangerous moving behavior, and personal identification data of the construction worker (worker 11)) in a large-capacity memory area or a large-capacity virtual memory area in association with the device identification information (device identifier) ​​of the hands-free device 13. The manager pursues the cause of the accident in the moving behavior (moving action) at the moving location based on the acquired abnormality detection moving image, and plans measures to prevent careless behavior of the construction worker (worker 11) at the moving location and measures to ensure the moving behavior safety of the accident. The proposed movement safety measures are stored (contained) in the large-capacity memory area or large-capacity virtual memory area of ​​the management server 12 in association with the device identification information (device identifier) ​​of the hands-free device 13 along with abnormality detection movement images (including abnormal images and sounds, the date and time when the dangerous movement behavior was detected, and personal identification data of the construction worker (worker 11)).

[0091] The manager investigates the cause of the accident in the movement action at the movement location based on the acquired abnormality detection movement image, and plans measures to prevent the careless behavior of the construction worker (worker 11) at the movement location and movement safety measures in the event of an accident. The planned movement safety measures are stored (stored) in the large-capacity storage area or large-capacity virtual storage area of ​​the management server 12 in association with the device identification information (device identifier) ​​of the hands-free device 13 together with the abnormality detection movement image (including abnormal images and abnormal sounds, the date and time of detection of the dangerous movement action, and personal identification data of the construction worker (worker 11)).

[0092] When the management server 12 detects an abnormal image different from a normal image among the moving images transmitted from the hands-free device 13 (controller 18), or when the management server 12 detects an abnormal sound different from a normal sound among sounds during movement transmitted from the hands-free device 13 (controller 18), or when a dangerous movement behavior is detected from the moving images, the construction work monitoring system 10 sets the time when at least one of the abnormal image and the abnormal sound is detected as a reference point, or sets the time when the dangerous movement behavior is detected as a reference point, and extracts a pre-movement image that is a predetermined time back from the reference point and a post-movement image that is a predetermined time forward from the reference point from the moving images, and stores the extracted pre-movement image and The images are edited into an abnormality detection moving image formed from at least one of the before-movement images and the after-movement images, and the edited abnormality detection moving image is stored. Therefore, by utilizing the wearable eye-line camera 14 and wearable microphone 16 of the hands-free device 13, moving images of the location where the construction worker (worker 11) is moving at the construction site and sounds made by the construction worker (worker 11) while he is moving can be obtained. If an abnormal image, abnormal sound, or dangerous moving behavior is detected at the location (moving image) during movement, an abnormality detection moving image formed from at least one of the before-movement images and after-movement images before and after the abnormal image, abnormal sound, or dangerous moving behavior can be obtained.

[0093] The construction work monitoring system 10 can investigate the cause of an accident at a moving location during movement based on the acquired abnormality detection moving images, and can devise measures to prevent careless behavior of construction workers (workers 11) at moving locations during movement and travel safety measures in the event of an accident, as well as prevent the occurrence and recurrence of careless behavior and accidents. The construction work monitoring system 10 can clarify responsibility when careless behavior occurs or an accident occurs by using the acquired abnormality detection moving images, and the abnormality detection moving images can be used as proof and evidence of an accident or as proof and evidence when claiming various types of compensation.

[0094] In order for a construction worker (worker 11) or site manager (worker 11) to view the movement safety measures at a movement location where an abnormal image, an abnormal sound, or a dangerous movement behavior has been detected, the construction worker (worker 11) taps a safety measure information display button on the touch panel 20 of the controller 18. When the safety measure information display button is tapped, the management server 12 performs image recognition on the movement image transmitted from the hands-free device 13 (controller 18) by the movement image transmission means, compares the image-recognized movement image transmitted from the hands-free device 13 with each movement image stored in the large-capacity storage area or the large-capacity virtual storage area, and identifies the movement image corresponding to the image-recognized movement image from among the movement images stored in the large-capacity storage area or the large-capacity virtual storage area (moving image identification means).

[0095] Next, the management server 12 extracts the abnormality-detecting moving image of the specified moving image from the large-capacity storage area or the large-capacity virtual storage area, extracts the moving safety measure information for the specified moving image from the large-capacity storage area or the large-capacity virtual storage area, and transmits the extracted abnormality-detecting moving image and moving safety measure information to the hands-free device 13 (controller 18) (safety measure transmission means). Furthermore, the management server 12 extracts the moving safety measure audio corresponding to the moving safety measure information to be transmitted to the hands-free device 13 (controller 18) by the safety measure transmission means from the large-capacity storage area or the large-capacity virtual storage area, and transmits the extracted moving safety measure audio to the hands-free device 13 (safety measure transmission means).

[0096] The hands-free device 13 (controller 18) outputs (displays) the travel safety measure information transmitted from the management server 12 by the safety measure transmission means on the head mounted display 15 (safety measure output means), and outputs (sounds) the travel safety measure sound corresponding to the travel safety measure information from the wearable speaker 17 (safety measure output means). The travel safety measure information display screen of Fig. 10 is displayed on the head mounted display 15 worn by the construction worker (worker 11). As shown in Fig. 10, the movement safety measure information display screen outputs (displays) an abnormality detection movement image display area 10a that displays an abnormality detection movement image (video or still image) at a movement location where an abnormal image, abnormal sound, or dangerous movement behavior is detected, a movement location name display area 10b that displays the movement location name (floor, movement section name, movement passage name, flow line name, etc.) where an abnormal image, abnormal sound, or dangerous movement behavior is detected, a movement safety measure information display area 10c that displays movement safety measure information (video or still image), an abnormality / danger detection date and time display area 10d that displays the date and time of abnormality / danger detection, and a worker / movement date and time display area 10e that displays the name of the construction worker (worker 11) (which may include other worker identification information) and the movement (work) date and time. A movement safety measure sound corresponding to the movement safety measure information is output (sounded) from the wearable speaker 17. 10 (movement image, movement safety measure information, movement safety measure audio, etc.) can be output (displayed) on the smartphone 21 carried by the site manager (worker 11). Also, the management server 12 can output (display) the movement safety measure information display screen and movement safety measure audio in FIG. 10 on a display (including a speaker) at any time.

[0097] The head mounted display 15 worn by the site manager (worker 11) displays the movement safety measure information display screen of Fig. 11. As shown in Fig. 11, the movement safety measure information display screen outputs (displays) an abnormality detection movement image display area 11a displaying an abnormality detection movement image (video or still image) at a movement location where an abnormal image, an abnormal sound, or a dangerous movement act was detected, a movement location name display area 11b displaying the movement location name (floor, movement section name, movement passage name, flow line name, etc.) where an abnormal image, an abnormal sound, or a dangerous movement act was detected, a movement safety measure information display area 11c displaying movement safety measure information (video or still image), an abnormality / danger detection date and time display area 11d displaying the date and time of abnormality / danger detection, a worker information / movement date and time display area 11e displaying personal information of the construction worker (worker 11) (name (which may include other worker identification information), movement (work) date and time, age, sex, identifier, email address, mobile phone number), and a worker image display area 11f displaying an image of the construction worker (worker 11). A travel safety measure sound corresponding to the travel safety measure information is pronounced (output) from the wearable speaker 17. The travel safety measure information display screen (travel image, travel safety measure information, travel safety measure sound, etc.) in Fig. 11 can be output (displayed) on the smartphone 21 carried by the site manager (worker 11). In addition, the management server 12 can output (display) the travel safety measure information display screen in Fig. 11 and the travel safety measure sound on a display (including a speaker) at any time.

[0098] The travel safety measure information includes all travel safety measures required at the travel location, such as "display travel lines to clarify the travel route," "if you feel it is dangerous at the travel location, immediately stop travel and check for safety before resuming travel," "when travelling to a high place, always wear a safety belt to prevent falling," and "hang nets at places where there is a risk of people falling or objects falling, such as near the edge of an opening or near stairs." The travel safety measure information includes travel caution messages and travel caution audio that call attention to travel. A construction worker (worker 11) or a site manager (worker 11) can learn about the safety measures at the travel location during travel by viewing the travel safety measure information output on the head mounted display 15 and listening to the travel safety measure audio output from the wearable speaker 17.

[0099] The construction work monitoring system 10 outputs (displays) travel safety measure information for a movement image on a head mounted display 15 worn by a construction worker (worker 11), and outputs (sounds) travel safety measure audio corresponding to the travel safety measure information from a wearable speaker 17, so that the construction worker (worker 11) can view the travel safety measure information transmitted from the management server 12 while ensuring safety with both hands in a state where both hands are free to use, and can hear the travel safety measure audio corresponding to the travel safety measure information transmitted from the management server 12 while ensuring safety with both hands in a state where both hands are free to use, and by the construction worker (worker 11) listening to the travel safety measure audio while referring to the travel safety measure information, it is possible to reliably prevent the occurrence and recurrence of careless behavior and careless accidents at moving locations during movement.

[0100] The construction work monitoring system 10 allows a construction worker (worker 11) to know that the act of moving (action) while moving is dangerous by viewing the movement safety measure information output (displayed) on the head-mounted display 15 and listening to the movement safety measure audio output (sounded) from the wearable speaker 17. By having the construction worker (worker 11) stop the dangerous movement, the occurrence of an accident at the moving location during the movement can be prevented in advance, and an accident that occurs at the moving location during the movement can be prevented from becoming a serious accident.

[0101] The construction work monitoring system 10 outputs (displays) on a head-mounted display 15 worn by the site manager (worker 11) the abnormality-detecting movement image at the movement location where abnormal images, abnormal sounds, or dangerous movement behavior were detected, the name of the movement location where abnormal images, abnormal sounds, or dangerous movement behavior were detected, and personal information of the construction worker (worker 11) moving between the movement locations, so that the site manager can know which construction worker (worker 11) is moving between the movement locations where abnormal images, abnormal sounds, or dangerous movement behavior were detected, and can immediately dispatch rescue or evacuation services. The construction work monitoring system 10 outputs (displays) movement safety measure information for movement images on a head-mounted display 15 worn by the site manager (worker 11), and outputs (sounds) movement safety measure audio corresponding to the movement safety measure information from a wearable speaker 17, allowing the site manager (worker 11) to know the safety measures at the movement location where an abnormal image, abnormal sound, or dangerous movement behavior is detected, and to give appropriate instructions to the construction worker (worker 11) moving between that movement location, thereby preventing the occurrence of accidents at the movement location during movement and preventing accidents that occur at the movement location from becoming serious accidents.

[0102] Fig. 12 is a diagram showing an example of an abnormality detection movement past image display screen output (displayed) on the head mounted display 15 worn by the construction worker (worker 11) and the site manager (worker 11). In Fig. 12, illustration of data displayed in each display area is omitted. To view the abnormality detection movement past image, the construction worker (worker 11) and the site manager (worker 11) tap the past image display button on the touch panel 20 of the controller 18.

[0103] When the past image display button is tapped, the management server 12 performs image recognition on the moving image transmitted from the hands-free device 13 (controller 18) by the moving image transmission means, compares the image-recognized moving image with each past moving image stored in the large-capacity storage area or the large-capacity virtual storage area, and identifies a past moving image corresponding to the image-recognized moving image (identical or similar to the image-recognized moving image) from each past moving location image stored in the large-capacity storage area or the large-capacity virtual storage area (movement past image identification means). Next, the management server 12 extracts a past abnormality detection moving past image that occurred in the identified past moving image from the large-capacity storage area or the large-capacity virtual storage area, and transmits the extracted past abnormality detection moving past image to the hands-free device 13 (controller 18) (abnormality detection moving past image transmission means).

[0104] Alternatively, the management server 12 performs image recognition on movement images corresponding to the pre-movement image and post-movement image extracted by the pre- and post-movement image extraction means at the movement location where an abnormal image, an abnormal sound, or a dangerous movement behavior is detected, compares the image-recognized movement image with each past movement image stored in the large-capacity storage area or the large-capacity virtual storage area, and identifies a past movement image corresponding to the image-recognized movement image (identical or similar to the image-recognized movement image) from each past movement image stored in the large-capacity storage area or the large-capacity virtual storage area (movement past image identification means). Next, the management server 12 extracts from the large-capacity storage area or the large-capacity virtual storage area a past image of a movement in which an abnormality occurred in the identified past movement image, and transmits the extracted past image of a movement in which an abnormality was detected to the hands-free device 13 (controller 18) (abnormality detection past movement image transmission means).

[0105] The hands-free device 13 (controller 18) outputs the abnormality detection past movement image transmitted from the management server 12 by the abnormality detection past movement image transmitting means to the head mounted display 15 (abnormality detection past movement image output means). The head mounted display 15 displays an abnormality detection past movement image display screen of FIG. 12. As shown in FIG. 12, the abnormality detection past movement image display screen outputs (displays) an abnormality detection past movement image display area 12a displaying an abnormality detection past movement image (video or still image), an abnormality / danger detection date and time display area 12b displaying the date and time of detection of an abnormal image, abnormal sound, or dangerous movement act, a movement date display area 12c displaying the movement date of the movement act (motion) that detected an abnormal image, abnormal sound, or dangerous movement act, a worker information display area 12d displaying personal information (name (which may include other worker identification information), age, sex, etc.) of the construction worker (worker 11), and a worker image display area 12e displaying an image of the construction worker (worker 11).

[0106] The construction worker (worker 11) and the site manager (worker 11) can know the abnormality detection past movement image display screen outputted to the head mounted display 15, and the results of the abnormality and dangerous behavior that occurred in the past at the moving location during the movement where the abnormal image, abnormal sound, or dangerous movement behavior was detected. The abnormality detection past movement image display screen (abnormality detection past movement image, personal information, etc.) in Fig. 12 can be outputted (displayed) on the touch panel of the smartphone 21 carried by the construction worker (worker 11) and the site manager (worker 11). In addition, the management server 12 can output (display) the abnormality detection past movement image display screen in Fig. 12 on the display at any time.

[0107] The construction work monitoring system 10 outputs to the head-mounted display 15 past movement images in which an abnormality was detected that occurred in a past moving image corresponding to the moving image (the same as or similar to the moving image) and past movement images in which an abnormality was detected that occurred in a past moving image corresponding to the pre-movement image and the post-movement image (the same as or similar to the moving image), thereby enabling the construction worker (worker 11) to know about careless behavior or careless accidents that occurred in the past at the moving location, and by referring to the past movement images in which an abnormality was detected, the occurrence and recurrence of careless behavior or careless accidents at the moving location can be prevented.

[0108] FIG. 13 is a diagram showing an example of an abnormality detection transport work display screen output (displayed) on the display of the management server 12, and FIG. 14 is a diagram showing an example of a transport work safety measure information display screen output (displayed) on the head mounted display 15 worn by the construction worker (worker 11). FIG. 15 is a diagram showing another example of a transport work safety measure information display screen output (displayed) on the head mounted display 15 worn by the site manager (worker 11). In FIGS. 13 to 15, illustration of data displayed in each display area is omitted. In FIGS. 13 to 15, a case where a transport work image of a specific worker 11 (construction worker) is photographed by a hands-free device 13 worn by another worker 11 (construction worker or site manager) is illustrated. Note that a transport work image of a specific worker 11 (construction worker) who actually performs transport work may be photographed by a hands-free device 13 worn by that worker 11 (construction worker).

[0109] A worker 11 (construction worker and site manager) turns on the main switch of controller 18 and also turns on the image display ON / OFF button, and performs transport work to transport materials and equipment to a transport location at the construction site. When a construction worker (worker 11) starts transport work at a specified transport location, the transport work location during transport is photographed by wearable eye-line camera 14 (transport work location photographing means). Furthermore, while the construction worker (worker 11) is performing transport work at the specified transport work location, sounds during the transport work (the voice of the construction worker (worker 11) during the transport work and sounds around the construction worker (worker 11) during the transport work (sounds at the transport work location)) are collected (picked up) by wearable microphone 17 (transport work location sound collecting means).

[0110] Wearable eye-level camera 14 transmits (transfers) a transport work image (transport work location image) (digital image data) of the transport work location during the transport work, and wearable microphone 15 transmits (transfers) to controller 18 the collected sound (electrical signal) of worker 11 (construction worker) at the transport work location during the transport work. Controller 18 (hands-free device 13) transmits the transport work image (digital image data) and device identification information (device identifier) ​​of hands-free device 13 received from wearable eye-level camera 14 to management server 12 by its communication function (network) (transport work image transmission means). Controller 18 (hands-free device 13) transmits the transport work sound (electrical signal) and device identification information (device identifier) ​​of hands-free device 13 received from wearable microphone 16 to management server 12 by its communication function (network) (transport work sound transmission means).

[0111] When the management server 12 detects an abnormal image that is different from a normal image among the transport work images while performing image recognition of the transport work image while receiving the transport work image transmitted from the hands-free device 13 (controller 18) by the transport work image transmitting means, or when it detects an abnormal sound that is different from a normal sound among the transport work sounds while receiving the transport work sounds transmitted from the hands-free device 13 (controller 18) by the transport work sound transmitting means, the management server 12 uses the time when at least one of the abnormal image and the abnormal sound was detected as a reference point, and extracts a pre-transport work image (pre-transport work location image) (digital image data) a predetermined time back from the reference point and a post-transport work image (post-transport work location image) (digital image data) a predetermined time forward from the reference point from the transport work image transmitted by the transport work image transmitting means (pre- and post-transport work image extraction means). Furthermore, in the construction work monitoring system 10, either an abnormal image or an abnormal sound can be selected and set in the management server 12 as a trigger for extracting the pre-transportation work images and the post-transportation work images, or both an abnormal image and an abnormal sound can be selected and set in the management server 12.

[0112] In addition, while receiving the transport work image transmitted from the hands-free device 13 (controller 18) by the transport work image transmitting means, the management server 12 performs image recognition on the transport work image, and if it detects a dangerous transport work from the image-recognized transport work image (if it judges the transport work image to be a dangerous transport work image), it uses the point at which the dangerous transport work was detected (the point at which it was judged to be a dangerous transport work image) as a reference point, and extracts a pre-transport work image (pre-transport work location image) (digital image data) a predetermined time back from the reference point and a post-transport work image (post-transport work location image) (digital image data) a predetermined time forward from the reference point from the transport work image (transport work location image) transmitted by the transport work image transmitting means (pre- and post-transport work image extraction means). Examples of cases in which dangerous transport operations are detected include when actions that are clearly different from normal transport operations (jumping, various athletic movements, taking off a helmet, etc.), when actions such as getting under the luggage (equipment) or shaking the luggage (equipment) excessively, or when actions such as transporting luggage (equipment) to a different location are detected, and when inaction actions (doing nothing) that are clearly different from normal transport operations are detected.

[0113] The management server 12 uses the before-transportation-work image (first transport work image) and the after-transportation-work image (first transport work image) extracted by the before-and-after transport work image extraction means, and edits the transport work image transmitted from the hands-free device 13 (controller 18) by the transport work image transmission means into an abnormality-detected transport work image (digital image data) formed from the before-transportation-work image and the after-transportation-work image (abnormality-detected transport work image editing means). The management server 12 stores the abnormality-detected transport work image edited by the abnormality-detected transport work image editing means (abnormality-detected transport work image storage means). The management server 12 outputs (displays) the abnormality-detected transport work display screen shown in Fig. 13 on the display (abnormality-detected transport work display screen output means). The abnormality detection transport work display screen in Figure 13 outputs (displays) on the display an abnormality detection transport work image display area 13a which displays an abnormality detection transport work image (video or still image) stored by the abnormality detection transport work image storage means, an abnormality / danger detection date and time display area 13b which displays the date and time when an abnormal image, abnormal sound, or dangerous transport work was detected, a personal information display area 13c which displays the personal information of the construction worker (worker 11), and a worker image display area 13d which displays an image of the construction worker (worker 11).

[0114] The abnormality detection transport work image editing means can edit the abnormality detection transport work image (abnormality detection transport work location image) formed from either the pre-transport work image (image before transport work location) or the post-transport work image (image after transport work location). The abnormality detection transport work image storage means stores (stores) the abnormality detection transport work image (including abnormal images and abnormal sounds, date and time of detection of dangerous transport work, and personal identification data of the construction worker (worker 11)) in a large-capacity storage area or a large-capacity virtual storage area in a state associated with device identification information (device identifier) ​​of the hands-free device 13.

[0115] The manager investigates the cause of the accident during the transport work at the transport work site based on the acquired abnormality detection transport work image, and proposes measures to prevent careless behavior of the construction worker (worker 11) at the transport work site and transport work safety measures in the event of an accident. The proposed transport work safety measures are stored (stored) in the large-capacity storage area or large-capacity virtual storage area of ​​the management server 12 in association with the device identification information (device identifier) ​​of the hands-free device 13 together with the abnormality detection transport work image (including abnormal images and abnormal sounds, the date and time of detection of dangerous transport work, and personal identification data of the construction worker (worker 11)).

[0116] In the construction work monitoring system 10, when the management server 12 detects an abnormal image different from a normal image among the transport work images transmitted from the hands-free device 13 (controller 18), or when the management server 12 detects an abnormal sound different from a normal sound among the transport work sounds transmitted from the hands-free device 13 (controller 18), or when a dangerous transport work is detected from the transport work images, the construction work monitoring system 10 sets the time when at least one of the abnormal image and the abnormal sound is detected as a reference point, or sets the time when the dangerous transport work is detected as a reference point, and extracts a pre-transport work image that is a predetermined time back from the reference point and a post-transport work image that is a predetermined time forward from the reference point from the transport work images, and forms a shape from at least one of the extracted pre-transport work images and post-transport work images. The edited abnormality detection transport work image is edited into an abnormality detection transport work image and the edited abnormality detection transport work image is stored. Therefore, by utilizing the wearable eye camera 14 and wearable microphone 16 of the hands-free device 13, transport work images during which a construction worker (worker 11) is performing transport work at a designated transport work location at a construction site and transport work sounds at the transport work location during which the construction worker (worker 11) is performing transport work can be obtained. If an abnormal image, abnormal sound, or dangerous transport work is detected in the transport work image (transport work location image) during transport work, an abnormality detection transport work image formed from at least one of the pre-transport work image and post-transport work image before and after the abnormal image, abnormal sound, or dangerous transport work can be obtained.

[0117] The construction work monitoring system 10 can investigate the cause of an accident during transport work at the transport work site based on the acquired abnormality detection transport work images, and can devise measures to prevent careless behavior of construction workers (workers 11) during transport work and transport work safety measures in the event of an accident, as well as prevent the occurrence and recurrence of careless behavior and accidents. The construction work monitoring system 10 can clarify where responsibility lies when careless behavior occurs or an accident occurs based on the acquired abnormality detection transport work images, and the abnormality detection transport work images can be used as proof and evidence of an accident or as proof and evidence when claiming various types of compensation.

[0118] In a transport work location where an abnormal image, an abnormal sound, or a dangerous transport work has been detected, a construction worker (worker 11) or a site manager (worker 11) can view transport work safety measures for that transport work location by tapping a safety measure information display button on the touch panel 20 of the controller 18. When the safety measure information display button is tapped, the management server 12 performs image recognition on the transport work image transmitted from the hands-free device 13 (controller 18) by the transport work image transmission means, compares the transport work image transmitted from the hands-free device 13 and image-recognized with each transport work image stored in the large-capacity storage area or the large-capacity virtual storage area, and identifies the transport work image corresponding to the image-recognized transport work image from among the transport work images stored in the large-capacity storage area or the large-capacity virtual storage area (transport work image identification means).

[0119] Next, the management server 12 extracts the abnormality detected transport work image of the identified transport work image from the large-capacity storage area or the large-capacity virtual storage area, extracts transport work safety measure information for the identified transport work image from the large-capacity storage area or the large-capacity virtual storage area, and transmits the extracted abnormality detected transport work image and transport work safety measure information to the hands-free device 13 (controller 18) (safety measure transmission means). Furthermore, the management server 12 extracts transport work safety measure audio corresponding to the transport work safety measure information to be transmitted to the hands-free device 13 (controller 18) by the safety measure transmission means from the large-capacity storage area or the large-capacity virtual storage area, and transmits the extracted transport work safety measure audio to the hands-free device 13 (safety measure transmission means).

[0120] The hands-free device 13 (controller 18) outputs (displays) the transportation work safety measure information transmitted from the management server 12 by the safety measure transmission means on the head mounted display 15 (safety measure output means), and outputs (sounds) the transportation work safety measure sound corresponding to the transportation work safety measure information from the wearable speaker 17 (safety measure output means). The transportation work safety measure information display screen of Fig. 14 is displayed on the head mounted display 15 worn by the construction worker (worker 11). As shown in Fig. 14, the construction work safety measure information display screen outputs (displays) an abnormality detection transfer work image display area 14a that displays an abnormality detection transfer work image (video or still image) at a transfer work location where an abnormal image, abnormal sound, or dangerous transfer work is detected, a transfer work location name display area 14b that displays the transfer work location name (floor, transfer section name, transfer work site name, etc.) where an abnormal image, abnormal sound, or dangerous transfer work is detected, a transfer work safety measure information display area 14c that displays transfer work safety measure information (video or still image), an abnormality / danger detection date and time display area 14d that displays the date and time of abnormality / danger detection, and a worker / transport date and time display area 14e that displays the name of the construction worker (worker 11) (which may include other worker identification information) and the transfer (work) date and time. A transfer work safety measure sound corresponding to the transfer work safety measure information is output (sounded) from the wearable speaker 17. 14 (image of the transport work location, transport work safety measure information, transport work safety measure audio, etc.) can be output (displayed) on the smartphone 21 carried by the construction worker (worker 11). Also, the management server 12 can output (display) the transport work safety measure information display screen and transport work safety measure audio in FIG. 14 on a display (including a speaker) at any time.

[0121] The transportation work safety measure information display screen of FIG. 15 is output (displayed) on the head mounted display 15 worn by the site manager (worker 11). As shown in FIG. 15, the transport work safety measures information display screen outputs (displays) an abnormality detection transport work image display area 15a which displays an abnormality detection transport work image (video or still image) at a transport work location where an abnormal image, abnormal sound, or dangerous transport work was detected, a transport work location name display area 15b which displays the name of the transport work location where an abnormal image, abnormal sound, or dangerous transport work was detected (floor, transport section name, transport work site name, etc.), a transport work safety measures information display area 15c which displays transport work safety measures information (video or still image), an abnormality / danger detection date and time display area 15d which displays the date and time of the abnormality / danger detection, a worker information / transport date and time display area 15e which displays personal information of the construction worker (worker 11) (name (which may include other worker-specific information), transport (work) date and time, age, gender, identifier, email address, mobile phone number), and a worker image display area 15f which displays an image of the construction worker (worker 11). A transport work safety measure sound corresponding to the transport work safety measure information is generated (output) from the wearable speaker 17. The transport work safety measure information display screen (transport work location image, transport work safety measure information, transport work safety measure sound, etc.) in Fig. 15 can be output (displayed) on the smartphone 21 carried by the site manager (worker 11). In addition, the management server 12 can output (display) the transport work safety measure information display screen in Fig. 15 and the transport work safety measure sound on a display (including a speaker) at any time.

[0122] The transport work safety measure information includes all transport work safety measures required at the transport work site, such as "follow the procedures described in the manual for transport work," "install cones and barricades to secure transport work space," "cover the building with netting during transport," "if you feel danger at the transport work site, immediately stop the work and confirm safety before resuming the transport work," "if you feel danger, immediately contact other workers and the site manager and call for help," and "when lifting the load with a crane, do not get under the load." The transport work safety measure information includes a transport work caution message and a transport work caution sound that call attention to the transport work. The construction worker (worker 11) and the site manager (worker 11) can learn about the safety measures at the transport work site where the transport work is performed by viewing the transport work safety measure information output on the head mounted display 15 and listening to the transport work safety measure sound output from the wearable speaker 17. The management server 12 can output each transport work image, transport work safety measure information corresponding to each transport work image, and transport work safety measure audio corresponding to each transport work image to a display (including a speaker) at any time.

[0123] The construction work monitoring system 10 outputs (displays) transport work safety measure information for the transport work image on the head mounted display 15 worn by the construction worker (worker 11), and outputs (sounds) transport work safety measure audio corresponding to the transport work safety measure information from the wearable speaker 17, so that the construction worker (worker 11) can view the transport work safety measure information transmitted from the management server 12 while keeping both hands free to ensure safety, and can hear the transport work safety measure audio corresponding to the transport work safety measure information transmitted from the management server 12 while keeping both hands free to ensure safety, and by the construction worker (worker 11) listening to the transport work safety measure audio while referring to the transport work safety measure information, it is possible to reliably prevent careless behavior and the occurrence and recurrence of careless accidents during transport work.

[0124] The construction work monitoring system 10 allows a construction worker (worker 11) to know that the transport work he or she is working on is dangerous transport work by viewing the transport work safety measure information output (displayed) on the head-mounted display 15 and hearing the transport work safety measure audio output (pronounced) from the wearable speaker.By this, the construction worker (worker 11) can stop the dangerous transport work, thereby preventing the occurrence of an accident during the transport work and preventing an accident that occurs during the transport work from becoming a serious accident.

[0125] The construction work monitoring system 10 outputs (displays) on a head-mounted display 15 worn by the site manager (worker 11) the abnormally detected transport work image at the transport work location where abnormal images, abnormal sounds, or dangerous transport work were detected, the name of the transport work location where abnormal images, abnormal sounds, or dangerous transport work were detected, and personal information of the construction worker (worker 11) working at the transport work location in the transport work image, so that the site manager can know the transport work location where abnormal images, abnormal sounds, or dangerous transport work were detected and the construction worker (worker 11) working at that transport work location, and can immediately dispatch rescue or evacuation services.

[0126] The construction work monitoring system 10 outputs (displays) transport work safety measure information for the transport work image on the head-mounted display 15 worn by the site manager (worker 11), and outputs (sounds) the transport work safety measure audio corresponding to the transport work safety measure information from the wearable speaker 17. This allows the site manager (worker 11) to know the safety measures for transport work when an abnormal image, abnormal sound, or dangerous transport work is detected, and to give appropriate instructions to the construction worker (worker 11) working at the transport work location, thereby preventing the occurrence of accidents during transport work and preventing accidents that occur during transport work from becoming serious accidents.

[0127] Fig. 16 is a diagram showing an example of an abnormality detection transport work past image display screen output (displayed) on the head mounted display 15 worn by the construction worker (worker 11) and the site manager (worker 11). In Fig. 16, illustration of data displayed in each display area is omitted. To view the abnormality detection transport work past images, the construction worker (worker 11) and the site manager (worker 11) tap the past image display button on the touch panel 20 of the controller 18.

[0128] When the past image display button is tapped, the management server 12 performs image recognition on the transport work image transmitted from the hands-free device 13 (controller 18) by the transport work image transmission means, compares the image-recognized transport work image with each past transport work image stored in the large-capacity storage area or large-capacity virtual storage area, and identifies a past transport work image corresponding to the image-recognized transport work image (identical or similar to the image-recognized transport work image) from each past transport work location image stored in the large-capacity storage area or large-capacity virtual storage area (transport work past image identification means). Next, the management server 12 extracts from the large-capacity storage area or large-capacity virtual storage area past images of transport work in which an abnormality has been detected that occurred in the identified past transport work image, and transmits the extracted past abnormality detection transport work image to the hands-free device 13 (controller 18) (abnormality detection transport work past image transmission means).

[0129] Alternatively, the management server 12 performs image recognition on the transport work images corresponding to the pre-transport work images and post-transport work images extracted by the transport work pre- and post-image extraction means at the transport work location where an abnormal image, abnormal sound, or dangerous transport work is detected, while comparing the image-recognized transport work image with each past transport work image stored in the large-capacity storage area or large-capacity virtual storage area, and identifies a past transport work image corresponding to the image-recognized transport work image (identical or similar to the image-recognized transport work image) from each past transport work image stored in the large-capacity storage area or large-capacity virtual storage area (transport work past image identification means). Next, the management server 12 extracts from the large-capacity storage area or large-capacity virtual storage area past images of transport work in which an abnormality has been detected that occurred in the identified past transport work image, and transmits the extracted past transport work images of abnormality detection to the hands-free device 13 (controller 18) (abnormality detection past transport work image transmission means).

[0130] The hands-free device 13 (controller 18) outputs the abnormality detection transport work past image transmitted from the management server 12 by the abnormality detection transport work past image transmitting means to the head mounted display 15 (abnormality detection transport work past image output means). The head mounted display 15 displays the abnormality detection transport work past image display screen of FIG. 16. As shown in FIG. 16, the abnormality detection transport work past image display screen outputs (displays) an abnormality detection transport work past image display area 16a displaying the abnormality detection transport work past image (moving image or still image), an abnormality / danger detection date and time display area 16b displaying the date and time of detection of an abnormal image, abnormal sound, or dangerous transport work, a work date display area 16c displaying the work date of the transport work in which an abnormal image, abnormal sound, or dangerous transport work was detected, a worker information display area 16d displaying personal information (name (which may include other worker identification information), age, and sex) of the construction worker (worker 11), and a worker image display area 16e displaying an image of the construction worker (worker 11).

[0131] The construction worker (worker 11) and the site manager (worker 11) can know the abnormality detection transport work past image display screen (abnormality detection transport work past image, personal information, etc.) of FIG. 16 that shows the abnormality detection transport work past image display screen and the results thereof by viewing the abnormality detection transport work past image display screen output on the head mounted display 15. The construction worker (worker 11) and the site manager (worker 11) can output (display) the abnormality detection transport work past image display screen of FIG. 16 that shows the abnormality detection transport work past image display screen and personal information, etc., on the touch panel of the smartphone 21 carried by the construction worker (worker 11) and the site manager (worker 11). The management server 12 can output (display) the abnormality detection transport work past image display screen of FIG. 16 on the display at any time.

[0132] The construction work monitoring system 10 outputs to the head-mounted display 15 past images of transport work in which an abnormality was detected that occurred in past transport work images corresponding to the transport work image (the same as or similar to the transport work image) and past images of transport work in which an abnormality was detected that occurred in past transport work images corresponding to the pre-transport work image and the post-transport work image (the same as or similar to the transport work image), thereby enabling construction workers (workers 11) and site managers (workers 11) to learn of careless behavior and careless accidents that occurred in transport work in the past, and by referring to the past images of transport work in which an abnormality was detected, the occurrence and recurrence of careless behavior and careless accidents during transport work can be prevented. [Explanation of symbols]

[0133] 10 Construction work monitoring system 11 Workers 12 Management Server 13 Hands-free devices 14. Wearable Eye-View Camera 15 Head-mounted display 16 Wearable Microphones 17. Wearable Speakers 18 Controller 19 Glasses 20 Touch Panel 21 Smartphone

Claims

1. A construction work monitoring system for visualizing various construction work performed by workers at a construction site and monitoring the construction work, the construction work monitoring system is formed from a management server and a hands-free device that is worn by the worker and is communicatively connected to the management server via a predetermined network, The hands-free device includes a wearable eye camera that captures an image of the construction site within the field of view of the worker, and a construction work image transmission means that transmits the construction work image captured by the wearable eye camera to the management server via the network while the worker is performing construction work at a predetermined construction work location on the construction site, The construction work monitoring system is characterized by having: when the management server detects an abnormal image different from normal images among the construction work images transmitted from the hands-free device by the construction work image transmitting means, the management server uses the time when the abnormal image was detected as a reference point and extracts from the construction work images a pre-construction work image that goes back a predetermined time from the reference point and a post-construction work image that is a predetermined time forward from the reference point; an abnormality-detected construction work image editing means that edits the pre-construction work images and the post-construction work images extracted by the pre-construction work image extraction means into an abnormality-detected construction work image formed from at least one of the pre-construction work images and the post-construction work images extracted by the anomaly-detected construction work image editing means; and an abnormality-detected construction work image storage means that stores the anomaly-detected construction work image edited by the anomaly-detected construction work image editing means.

2. The construction work monitoring system of claim 1, wherein the hands-free device is equipped with a wearable microphone that picks up sounds at the construction site, and has a construction work sound transmission means that transmits construction work sounds picked up by the wearable microphone while the worker is performing construction work at a designated construction work location on the construction site to the management server via the network, and the pre- and post-construction work image extraction means, when the management server detects an abnormal sound that is different from normal sounds among the construction work sounds transmitted from the hands-free device by the construction work sound transmission means, sets the time when the abnormal sound was detected as a reference point, and extracts from the construction work images a pre-construction image taken a predetermined time back from the reference point and a post-construction image taken a predetermined time forward from the reference point.

3. The construction work monitoring system of claim 2, wherein when the management server detects dangerous construction work from the construction work images transmitted from the hands-free device by the construction work image transmitting means, the construction work before and after image extraction means uses the time when the dangerous construction work was detected as a reference point, and extracts from the construction work images a pre-construction work image taken a predetermined time back from the reference point and a post-construction work image taken a predetermined time forward from the reference point.

4. The construction work monitoring system of claim 3, wherein the hands-free device includes a head-mounted display and a wearable speaker, and when the management server detects the abnormal image from the construction work image, or detects the abnormal sound from the construction work sound, or detects the dangerous construction work from the construction work image, the hands-free device includes a safety measure transmission means for transmitting construction work safety measure information and construction work safety measure audio to the hands-free device, and the hands-free device includes a safety measure output means for outputting the construction work safety measure information transmitted from the management server by the safety measure transmission means to the head-mounted display, and outputting the construction work safety measure audio transmitted from the management server by the safety measure transmission means from a wearable speaker.

5. The construction work monitoring system described in claim 4, wherein the management server includes an abnormality detection construction work past image transmission means for transmitting to the hands-free device past images of abnormalities detected in construction work images that are the same or similar to the construction work images transmitted from the hands-free device by the construction work image transmission means, or past images of abnormalities detected in construction work images that are the same or similar to the pre-construction work images and post-construction work images extracted by the pre- and post-construction work image extraction means, and the hands-free device includes an abnormality detection construction work past image output means for outputting the abnormality detection construction work past images transmitted from the management server by the abnormality detection construction work past image transmission means to the head-mounted display.

6. The construction work monitoring system described in claim 4 or claim 5, wherein the hands-free device includes a mobile image transmission means for transmitting mobile images taken by the wearable eye-line camera while the worker is moving toward a designated construction work location or a designated transportation work location at the construction site to the management server via the network, and when the management server detects an abnormal image different from a normal image among the mobile images transmitted from the hands-free device by the mobile image transmission means, the management server includes a pre-movement image extracted from the hand-free device by the mobile image transmission means, the pre-movement image extracted from the hand-free device by the mobile image transmission means is used as a reference point at the time when the abnormal image was detected, and the post-movement image extracted from the hand-free device by the mobile image transmission means is extracted from the pre-movement image extracted from the hand-free device by the mobile image transmission means, and the post-movement image extracted from the pre-movement image extracted from the hand-free device by the mobile image transmission means is used as a reference point at which the management server extracts a pre-movement image that is a predetermined time back from the reference point and a post-movement image that is a predetermined time forward from the reference point.

7. The construction work monitoring system of claim 6, wherein the hands-free device includes a movement sound transmission means that transmits movement sounds picked up by the wearable microphone while the worker is moving toward a designated construction work location or a designated transportation work location at the construction site to the management server via the network, and the pre- and post-movement image extraction means, when the management server detects an abnormal sound that is different from normal sounds among the movement sounds transmitted from the hands-free device by the movement sound transmission means, sets the time when the abnormal sound was detected as a reference point, and extracts from the movement images a pre-movement image taken a predetermined time back from the reference point and a post-movement image taken a predetermined time forward from the reference point.

8. The construction work monitoring system described in claim 7, wherein when the management server detects a dangerous movement behavior from the movement images transmitted from the hands-free device by the movement image transmitting means, the before-and-after-movement image extraction means uses the time when the dangerous movement behavior was detected as a reference point, and extracts from the movement images a pre-movement image taken a predetermined time back from the reference point and a post-movement image taken a predetermined time forward from the reference point.

9. The construction work monitoring system described in claim 8, wherein when the management server detects the abnormal image from the movement image, or detects the abnormal sound from the movement sound, or detects the dangerous movement behavior from the movement image, the safety measure transmission means transmits movement safety measure information and movement safety measure audio to the hands-free device, and the safety measure output means outputs the movement safety measure information transmitted from the management server by the safety measure transmission means to the head-mounted display, and outputs the movement safety measure audio transmitted from the management server by the safety measure transmission means from a wearable speaker.

10. A construction work monitoring system as described in any one of claims 6 to 9, wherein the management server includes an abnormality detection past movement image transmitting means for transmitting to the hands-free device a past abnormality detection movement image that occurred in a moving image that is the same as or similar to the moving image transmitted from the hands-free device by the moving image transmitting means, or a past abnormality detection movement image that occurred in a moving image that is the same as or similar to the pre-movement image and the post-movement image extracted by the pre- and post-movement image extraction means, and the hands-free device includes an abnormality detection past movement image output means for outputting the abnormality detection past movement image transmitted from the management server by the abnormality detection past movement image transmitting means to the head-mounted display.

11. The construction work monitoring system described in any of claims 6 to 10, wherein the hands-free device includes a transport work image transmission means for transmitting transport work images taken by the wearable eye-line camera while the worker is transporting materials and equipment to a designated transport location at the construction site to the management server via the network, and when the management server detects an abnormal image different from a normal image among the transport work images transmitted from the hands-free device by the transport work image transmission means, the management server includes a pre-transport work image extraction means for extracting from the transport work images a pre-transport work image that is a predetermined time back from the reference point and a post-transport work image that is a predetermined time forward from the reference point, using the time when the abnormal image was detected as a reference point, an abnormality detection transport work image editing means for editing the pre-transport work image and the post-transport work image extracted by the pre-transport work image extraction means into an abnormality detection transport work image formed from at least one of the pre-transport work image and the post-transport work image extracted by the pre-transport work image extraction means, and an abnormality detection transport work image storage means for storing the abnormality detection transport work image edited by the abnormality detection transport work image editing means.

12. The construction work monitoring system described in claim 11, wherein the hands-free device includes a transportation work sound transmission means that transmits to the management server via the network the transportation work sounds picked up by the wearable microphone while the worker is transporting materials and equipment to a designated transport location at the construction site, and the pre- and post-transport work image extraction means, when the management server detects an abnormal sound that is different from normal sounds among the transportation work sounds transmitted from the hands-free device by the transportation work sound transmission means, sets the time when the abnormal sound was detected as a reference point, and extracts from the transportation work images a pre-transport work image taken a predetermined time back from the reference point and a post-transport work image taken a predetermined time forward from the reference point.

13. The construction work monitoring system described in claim 12, wherein when the management server detects dangerous transportation work from the transportation work images transmitted from the hands-free device by the transportation work image transmitting means, the pre- and post-transport work image extraction means uses the time when the dangerous transportation work was detected as a reference point, and extracts from the transportation work images a pre-transport work image taken a predetermined time back from the reference point and a post-transport work image taken a predetermined time forward from the reference point.

14. The construction work monitoring system described in claim 13, wherein when the management server detects the abnormal image from the transport work image, or the abnormal sound from the transport work sound, or the management server detects the dangerous transport work from the transport work image, the safety measures transmission means transmits transport work safety measures information and transport work safety measures audio to the hands-free device, and the safety measures output means outputs the transport work safety measures information transmitted from the management server by the safety measures transmission means to the head-mounted display, and outputs the transport work safety measures audio transmitted from the management server by the safety measures transmission means from a wearable speaker.

15. A construction work monitoring system as described in any one of claims 11 to 14, wherein the management server includes a past abnormality detection transport work image transmitting means for transmitting to the hands-free device past images of abnormality detection transport work that occurred in transport work images that are the same or similar to the transport work images transmitted from the hands-free device by the transport work image transmitting means, or past images of abnormality detection transport work that occurred in transport work images that are the same or similar to the before-transport work images and after-transport work images extracted by the before-and-after transport work image extraction means, and the hands-free device includes a past abnormality detection transport work image output means for outputting the past abnormality detection transport work images transmitted from the management server by the past abnormality detection transport work image transmitting means to the head-mounted display.

Citation Information

Patent Citations

  • Manufacturing shop presentation management system

    JP2003143594A

  • Monitoring device

    JP2007257261A

  • Confirmation work support system, server device, head-mounted display device, wearable terminal, confirmation work support method, and program

    JP2012007985A

  • Spectacle-type wearable terminal and data processing method therefor

    JP2017049869A

  • Information provision system and information provision method

    JP2017220109A