Precast concrete slab connection structure and half-precast concrete slab equipped with said connection structure
The connecting structure for precast plates with notches and reinforcing bar groups improves shear reinforcement and interface strength, addressing the limitations of existing technologies by enhancing workability and reducing construction time and costs.
Patent Information
- Application Number
- JP2020170420
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-10-08
- Publication Date
- 2024-09-27
- Estimated Expiration
- 2040-10-08
AI Technical Summary
Existing technologies for joining precast concrete members lack sufficient reinforcement configurations to enhance shear reinforcement effect and interface shear strength, especially at the joints, which is crucial for improving workability and construction efficiency in composite structures.
A connecting structure for precast plates involving notches, reinforcing bar groups, and cast-in-place concrete sections, where reinforcing bars are folded back into hooks and corrugated shapes to form a strong, interconnected structure.
Enhances shear reinforcement and interface shear strength, improving workability and construction efficiency while reducing material costs and shortening the construction period.
Smart Images

Figure 0007557133000017 
Figure 0007557133000004 
Figure 0007557133000023
Abstract
Description
[Technical field]
[0001] The present invention relates to a connecting structure for precast concrete slabs and a half-precast concrete slab equipped with said connecting structure. [Background technology]
[0002] In concrete composite structures and buildings with reinforcing bars, such as reinforced concrete structures, it is known that multiple concrete members are connected to form plate members and wall members. In this case, measures must be taken in the design to prevent shear failure at the joints (boundaries) between multiple concrete members. In recent years, from the standpoint of workability and shortening construction time, a technology has become common in which so-called precast concrete members (also simply called precast members) are used to form plate members and wall members by combining them with cast-in-place concrete, in which members prefabricated in a factory or the like are brought to the site and assembled to existing members.
[0003] For example, Patent Document 1 discloses a technique for constructing a bridge structure using a precast concrete deck, and describes the use of a precast concrete deck with the upper part of the truss bar protruding from the top surface. Patent Document 2, for example, discloses a joint structure for joining adjacent half-precast decks using loop-type joint bars, and discloses a configuration in which reinforcing bars are assembled inside the loop of the loop-type joint bar. Patent Document 3, for example, discloses a technique for constructing a composite girder by overlapping half-precast concrete sections with hook-shaped reinforcing bars in a loop shape and inserting multiple reinforcing bars into the loop to connect them, and discloses a technique for constructing a composite girder using such a configuration.
[0004] According to the techniques disclosed in Patent Documents 1 to 3 and the like, it is possible to join precast concrete members together simply and efficiently, making it possible to easily construct structures such as bridges and girders. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] Japanese Patent Application Publication No. 10-252015 [Patent Document 2] JP 2000-282610 A [Patent Document 3] JP 2010-101072 A Summary of the Invention [Problem to be solved by the invention]
[0006] The above Patent Documents 1 to 3 disclose that precast members are joined together using joints such as loop-type joint bars, and that truss bars or the like are protruding from the upper part of the main part of the precast member to improve the strength when combined with cast-in-place concrete, thereby forming a strong structure. However, although it is required to ensure the strength and toughness of the joints, which are the joints, when joining precast members together, it cannot be said that sufficient reinforcement configurations are disclosed. In other words, when multiple concrete members (for example, cast-in-place concrete and precast members) are generally joined to form floor members or wall members, it is required to ensure the shear reinforcement effect, but no technology has been considered so far for improving the shear reinforcement effect at the joints and their vicinity or the shear slip resistance of the interface when joining multiple concrete members.
[0007] In addition, when constructing composite concrete structures or buildings, it is common to combine precast members and cast-in-place concrete to improve workability and shorten construction times. In such cases, it is desirable to simultaneously improve workability and strength and toughness at the joints between multiple concrete members.
[0008] In view of the above circumstances, the object of the present invention is to provide a precast slab connecting structure and a half-precast concrete slab equipped with said connecting structure, which is used in composite structures constructed by combining cast-in-place concrete and precast members, and is formed by joining multiple precast slabs, and which can achieve both a shear reinforcement effect at the joint (joint section), improved shear slip resistance at the interface, and improved workability. [Means for solving the problem]
[0009] In order to achieve the above object, according to the present invention, there is provided a half precast concrete slab having a substructure made of a plurality of precast slabs and a superstructure made of a cast-in-place concrete portion, the half precast concrete slabs being connected together to form a precast slab connection structure, the precast slabs being provided with a first reinforcing bar group and , below the first group of rebars, a second group of reinforcing bars extending in an intersecting direction is embedded, and a notch is formed at the end of at least one of the adjacent precast slabs, which forms a groove at the joint between the adjacent precast slabs, and a groove-filling concrete section is poured into the groove as part of the superstructure using cast-in-place concrete, and the superstructure is composed of the groove-filling concrete section and a main concrete section located above it, and the end of the first group of reinforcing bars protrudes toward the groove and has a shape folded back in a hook shape toward the inside of the precast slab member, The second group of reinforcing bars is also disposed inside the precast slab below the groove, A connecting structure for precast slabs is provided, characterized in that the precast slabs are provided with a group of shear reinforcement bars in the groove portion so as to span the inside of the precast slab, the groove-filling concrete portion, and the main concrete portion.
[0010] The cast-in-place concrete section as the superstructure is constructed by embedding a third group of reinforcing bars and a fourth group of reinforcing bars extending in a direction intersecting the third group of reinforcing bars within it, and one end of the shear reinforcement bar group may be anchored to one or both of the first group of reinforcing bars and the second group of reinforcing bars within the precast plate, and the other end of the shear reinforcement bar group may be anchored to one or both of the third group of reinforcing bars and the fourth group of reinforcing bars.
[0011] The group of shear reinforcement bars may be corrugated steel bars that are continuously provided across the entire precast slab, including the cutout portion, when viewed in a plan view.
[0012] The shear reinforcement group may be made up of a plurality of reinforcing bars that are folded back at both ends to face each other and have a generally C-shaped cross section.
[0013] In the precast slab, the spacing between the second reinforcing bars buried below the cutout may be configured to be narrower than the spacing between the second reinforcing bars buried in a portion where the cutout is not provided.
[0014] According to another aspect of the present invention, there is provided a half-precast concrete slab, characterized in that the lower structure comprises multiple precast slabs connected by the precast slab connecting structure described above, and the upper structure comprises a cast-in-place concrete section. Effect of the Invention
[0015] According to the present invention, in a composite structure constructed by combining cast-in-place concrete and precast members, and in a connecting structure formed by joining multiple precast panels, it is possible to achieve both a shear reinforcement effect at the joint (joint section) and improved shear slip resistance at the interface, as well as improved workability. [Brief description of the drawings]
[0016] [Figure 1] FIG. 2 is a schematic explanatory diagram showing a connection structure of a precast slab according to an embodiment of the present invention. [Diagram 2] FIG. 2 is a schematic explanatory diagram of the first precast panel. [Diagram 3] FIG. 2 is a schematic explanatory diagram showing a method for constructing a half precast concrete slab according to an embodiment of the present invention. [Figure 4] FIG. 2 is a schematic explanatory diagram showing a method for constructing a half precast concrete slab according to an embodiment of the present invention. [Diagram 5] FIG. 2 is a schematic explanatory diagram showing a method for constructing a half precast concrete slab according to an embodiment of the present invention. [Figure 6] FIG. 2 is a schematic explanatory diagram showing a method for constructing a half precast concrete slab according to an embodiment of the present invention. [Figure 7] FIG. 2 is a schematic explanatory diagram showing a method for constructing a half precast concrete slab according to an embodiment of the present invention. [Figure 8] FIG. 2 is a schematic explanatory diagram showing a method for constructing a half precast concrete slab according to an embodiment of the present invention. [Figure 9] FIG. 2 is a schematic explanatory diagram showing a method for constructing a half precast concrete slab according to an embodiment of the present invention. [Figure 10] FIG. 2 is a schematic explanatory diagram showing a method for constructing a half precast concrete slab according to an embodiment of the present invention. [Figure 11] FIG. 2 is a schematic explanatory diagram showing a method for constructing a half precast concrete slab according to an embodiment of the present invention. [Figure 12] FIG. 4 is a schematic explanatory diagram showing an example of the positional relationship between opposing first reinforcing bar groups. [Figure 13] FIG. 4 is a schematic explanatory diagram showing a method for constructing a half precast concrete slab according to a first modified example of the present invention. [Figure 14] FIG. 4 is a schematic explanatory diagram showing a method for constructing a half precast concrete slab according to a first modified example of the present invention. [Figure 15] FIG. 4 is a schematic explanatory diagram showing a method for constructing a half precast concrete slab according to a first modified example of the present invention. [Figure 16]FIG. 4 is a schematic explanatory diagram showing a method for constructing a half precast concrete slab according to a first modified example of the present invention. [Figure 17] FIG. 4 is a schematic explanatory diagram showing a method for constructing a half precast concrete slab according to a first modified example of the present invention. [Figure 18] FIG. 4 is a schematic explanatory diagram showing a method for constructing a half precast concrete slab according to a first modified example of the present invention. [Figure 19] FIG. 4 is a schematic explanatory diagram showing a method for constructing a half precast concrete slab according to a first modified example of the present invention. [Figure 20] FIG. 4 is a schematic explanatory diagram showing a method for constructing a half precast concrete slab according to a first modified example of the present invention. [Figure 21] FIG. 4 is a schematic explanatory diagram showing a method for constructing a half precast concrete slab according to a first modified example of the present invention. [Figure 22] FIG. 4 is a schematic explanatory diagram showing a method for constructing a half precast concrete slab according to a first modified example of the present invention. [Diagram 23] 3 is a schematic explanatory diagram showing the shape of a shear reinforcement bar group 30. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0017] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In this specification and the drawings, components having substantially the same functional configuration may be given the same reference numerals to avoid repetitive explanation. In addition, in this specification, for the purpose of explanation, some illustrations of the reinforcement structure and reinforcement arrangement may be omitted, or reinforcement inside a member that is not normally visible may be illustrated.
[0018] (Precast slab connection structure according to an embodiment of the present invention) Fig. 1 is a schematic explanatory diagram showing a precast slab connecting structure 1 (hereinafter also simply referred to as connecting structure 1) according to an embodiment of the present invention, and is a top view of the connecting structure 1. As shown in Fig. 1, the connecting structure 1 is formed by combining a plurality of precast slabs 10 in a space surrounded by a plurality of bases 5 (for example, arranged in four places on all four sides) and beam members 6 provided to connect the bases 5 together. In other words, the connecting structure 1 is a structure formed by joining adjacent precast slabs 10 together.
[0019] In this embodiment, the precast slabs 10 are of two types, a first precast slab 10a constituting the end of the connecting structure 1 and a second precast slab 10b constituting the center, and the connecting structure 1 is constituted by combining them. The first precast slab 10a and the second precast slab 10b may have different cross-sectional shapes. For example, the first precast slab 10a may have a notch 12 at at least one end of the member in the width direction. In this embodiment, the first precast slab 10a has the notch 12 formed as a so-called upper surface notch so that the upper surface height of the notch 12 is lower than the upper surface height of the other parts. That is, by providing the notch 12, a groove is formed at the joint when adjacent precast slabs 10 are joined together. In this specification, when the precast slab 10 is rectangular in plan view, the "member width direction" is the direction parallel to the short side, and the "member longitudinal direction" is the direction parallel to the long side.
[0020] FIG. 2 is a schematic diagram of the first precast slab 10a, and is a top view of the first precast slab 10a. As shown in FIG. 2, a first reinforcing bar group 20 extending parallel to the member width direction and a second reinforcing bar group 24 extending parallel to the member longitudinal direction and intersecting / orthogonal to the first reinforcing bar group 20 are embedded inside the first precast slab 10a. One end of the first reinforcing bar group 20 in the member width direction protrudes into the cutout portion 12 and has a hook-shaped (U-shaped) shape folded back toward the inside of the member. The other end of the first reinforcing bar group 20 in the member width direction also protrudes in the same manner and may have a hook-shaped folded back shape.
[0021] Here, in the configuration of the first reinforcing bar group 20, reinforcing bars with different protruding lengths may be alternately arranged as shown in Fig. 2 to avoid a lug joint, thereby making the joint between adjacent precast panels 10 more reliably rigid. In addition, in the configuration of the second reinforcing bar group 24, the spacing between the multiple reinforcing bars constituting the second reinforcing bar group 24 may be changed depending on the location, as shown in Fig. 2. For example, in the first precast panel 10a, the spacing between the reinforcing bars of the second reinforcing bar group 24 buried below the cutout 12 may be narrower than the spacing between the reinforcing bars buried in a portion where the cutout 12 is not provided.
[0022] The first precast slab 10a is provided with shear reinforcement bars 30 whose lower ends are anchored to the second rebar group 24 inside the member and whose upper ends protrude upward so as to be exposed from the upper surface of the first precast slab 10a. The shear reinforcement bars 30 are provided at least on the upper surface of the cutout 12, and may be provided over the entire upper surface of the first precast slab 10a. In this embodiment, the shear reinforcement bars 30 are illustrated and described as corrugated rebars extending in the width direction of the member, which are provided over the entire first precast slab 10a, straddling the connecting structure 1 as the substructure and the cast-in-place concrete as the superstructure. Here, the lower ends of the shear reinforcement bars 30 may be anchored to one or both of the first rebar group 20 and the second rebar group 24.
[0023] Also in the second precast panel 10b shown in FIG. 1, the first reinforcing bar group 20, the second reinforcing bar group 24, and the shear reinforcement bar group 30 may be provided, similarly to the first precast panel 10a.
[0024] Here, the number and arrangement of the rebars that make up each rebar group can be designed arbitrarily, but as will be described later, when constructing a half-precast concrete slab by combining the connecting structure 1 as the lower structure with a superstructure made of cast-in-place concrete, from the standpoint of maintaining and improving its strength and toughness, it is preferable that the rebars are arranged at equal intervals and the number is designed to be equal to or greater than a specified number according to the dimensions of the component.
[0025] A half precast concrete slab, which is a slab member or wall member used in buildings, is constructed by constructing the connecting structure 1 configured as shown in Fig. 1 as the lower structure and casting cast-in-place concrete as the upper structure. At that time, the surface of the precast slab 10 may be roughened (roughened) at the interface between the precast slab 10 and the cast-in-place concrete part 55 described later to improve the adhesive force between them. In the following, a method for constructing the half precast concrete slab 50 according to this embodiment by using the connecting structure 1 as the lower structure and constructing cast-in-place concrete as the upper structure will be described.
[0026] (Composition and construction method of half-precast concrete slab) 3 to 12 are schematic explanatory diagrams showing a method for constructing a half precast concrete slab 50 according to an embodiment of the present invention. First, as shown in FIG. 3, bases 5 are arranged in four locations on all four sides. The bases 5 may be existing or may be constructed on-site. Next, as shown in FIG. 4, a plurality of beam members 6 are arranged to connect the bases 5 together. Reinforcement bars 7 may be provided on the upper surfaces of the beam members 6 to connect the beam members 6 to the connecting structure 1. The beam members 6 may be cast and constructed on-site, or precast members may be used.
[0027] 5, a first precast plate 10a is placed on both side ends of the space surrounded by the beam member 6. At this time, the first reinforcing bar group 20 and the second reinforcing bar group 24 of the first precast plate 10a and the reinforcing bar group 7 on the upper surface of the beam member 6 are placed at the same height level without interfering with each other.
[0028] Next, as shown in Fig. 6, the second precast plate 10b is placed in a space surrounded on all four sides by the beam member 6 at a position sandwiched between the first precast plates 10a on both sides. At this time, in the places where the first reinforcing bar groups 20 of the first precast plate 10a and the first reinforcing bar groups 20 of the second precast plate 10b overlap in a plan view (i.e., the notches 12), the first reinforcing bar groups 20 are placed at the same height level without interfering with each other. In addition, at this time, it is preferable that the ends of the first reinforcing bar groups 20 having a hook-shaped folded shape are positioned to form a so-called lap joint.
[0029] Fig. 12 is a schematic explanatory diagram showing an example of the positional relationship between opposing first reinforcing bar groups 20, and is a schematic diagram enlarging a part of the cutout portion 12. As shown in Fig. 12, when the first reinforcing bar group 20 is configured by alternately arranging reinforcing bars with different protruding lengths, the ends of opposing first reinforcing bar groups 20 may overlap to form a so-called lap joint. By configuring the reinforcing bars as shown in Fig. 12, the positions of adjacent lap joints are shifted from each other, so that stress concentration can be avoided and a strong rigid structure can be realized by the lap joints.
[0030] 7, a first cast-in-place concrete section 41 is poured around the cutout 12 and the connecting structure 1 (the upper part of the base 5 and the beam member 6). At this time, the upper ends of the shear reinforcement bars 30 and the upper ends of the reinforcing bars 7 are not entirely embedded in the first cast-in-place concrete section 41, but are left protruding upward from the upper surface. This first cast-in-place concrete section 41 is part of a cast-in-place concrete section 55 as the superstructure, which will be described later, and is poured as a groove-filling concrete section that fills the groove formed by the formation of the cutout 12.
[0031] As shown in Fig. 8, a third group of reinforcing bars 43 extending in a direction along the member width direction of the precast slab 10 is arranged at the top of the connecting structure 1. As shown in Fig. 9, a fourth group of reinforcing bars 45 extending parallel to the member longitudinal direction and intersecting / orthogonal to the third group of reinforcing bars 43 is arranged. The third group of reinforcing bars 43 and the fourth group of reinforcing bars 45 are embedded in a second cast-in-place concrete section 49 described later. From the viewpoint of making the reinforcing bar arrangement configuration stronger, it is preferable that the upper end of the shear reinforcement bar group 30 is anchored to one or both of the third group of reinforcing bars 43 and the fourth group of reinforcing bars 45.
[0032] Next, as shown in FIG. 10, a beam reinforcement bar 48 extending in a direction along the beam member 6 is arranged above the beam member 6. Then, as shown in FIG. 11, a second cast-in-place concrete section 49 is poured as a main concrete section on the entire upper surface of the precast slab 10 and the first cast-in-place concrete section 41 so as to cover the connecting structure 1. FIG. 11 shows an explanatory diagram in which the reinforcing bar arrangement inside the second cast-in-place concrete section 49 is visible as (a), and shows an explanatory diagram in which the reinforcing bar arrangement inside the second cast-in-place concrete section 49 is not visible as (b). As shown in FIG. 11(b), by pouring the second cast-in-place concrete section 49, all the exposed reinforcing bars are buried inside it. In the construction method according to the present embodiment, pouring of cast-in-place concrete may be performed by a general method, and although not shown, formwork, partial formwork, etc. may be used as appropriate.
[0033] As described above, by the construction method described with reference to Figures 3 to 11, a half precast concrete slab 50 as shown in Figure 11 is constructed. The half precast concrete slab 50 according to this embodiment is composed of a connecting structure 1 as a substructure, and a cast-in-place concrete section 55 as a superstructure consisting of a first cast-in-place concrete section 41 which is a groove-filling concrete section, and a second cast-in-place concrete section 49 which is a main concrete section.
[0034] In this embodiment, when constructing the cast-in-place concrete section 55, the casting of the first cast-in-place concrete section 41 and the casting of the second cast-in-place concrete section 49 are performed in two stages. However, the casting method of the cast-in-place concrete section in the present invention is not particularly limited, and may be performed in one stage, or in two stages as in this embodiment. However, by performing the casting in two stages as in this embodiment, the cutout section 12 and the periphery of the slab (periphery of the connecting structure) can be rigidly connected by casting the first cast-in-place concrete section 41, and the slab structure can be a four-sided fixed slab when the second cast-in-place concrete section 49 is subsequently cast, thereby realizing stable construction.
[0035] (Action and effect) The connecting structure 1 according to the present embodiment and the half precast concrete slab 50 including the same provide various effects. First, in constructing the connecting structure 1, the first precast slab 10a having the notch 12 is used, and the shear reinforcement group 30 is exposed so as to include the upper surface of the notch 12. As a result, when the connecting structure 1 is constructed by joining the first precast slab 10a and the second precast slab 10b, and the connecting structure 1 is combined with the cast-in-place concrete section 55 to construct the half precast concrete slab 50, the shear reinforcement effect between the connecting structure 1 and the cast-in-place concrete section 55 and the shear slip resistance of the interface can be improved. In particular, the joint between the first precast slab 10a and the second precast slab 10b can ensure sufficient resistance and toughness compared to the conventional joint.
[0036] In addition, by using precast members for members with complicated reinforcement structures (precast panels 10a, 10b in this embodiment) and using cast-in-place concrete members for the other members, it is possible to reduce material costs and shorten the construction period, and further improve the work efficiency during construction and the transportability of the members. In other words, it is possible to construct a half precast concrete panel 50 that achieves both improved workability and improved strength and toughness.
[0037] Although an example of an embodiment of the present invention has been described above, the present invention is not limited to the illustrated embodiment. It is clear that a person skilled in the art can come up with various modified or revised examples within the scope of the ideas described in the claims, and it is understood that these also naturally belong to the technical scope of the present invention.
[0038] (First Modification of the Invention) In the above embodiment, the connecting structure 1 is described as being composed of two first precast slabs 10a at both ends and a second precast slab 10b in the center, but the configuration of the connecting structure 1 according to the present invention is not limited to this. In other words, the connecting structure 1 is composed of any number of precast slabs, which are joined together to construct the structure, and the number of precast slabs is not limited. Therefore, here, as a first modified example of the present invention, a case will be described in which the connecting structure 1 is constructed by combining three first precast slabs 10a and one second precast slab 10b, and a half precast concrete slab 50 is constructed.
[0039] 13 to 22 are schematic explanatory diagrams showing a method for constructing a half precast concrete slab 50a according to a first modified example of the present invention. In Fig. 13 to Fig. 22, components having the same functional configuration as those in the above embodiment are denoted by the same reference numerals, and their description will be omitted.
[0040] As shown in Figures 13 to 22 (particularly Figures 15 to 18), the connecting structure 1 according to this modified example is configured by arranging three first precast slabs 10a in a space surrounded on all four sides by beam members 6, and by arranging a second precast slab 10b in approximately the center thereof. Note that the construction method of the half precast concrete slabs 50a according to this modified example, such as the method of joining the precast slabs 10 together and the method of constructing the cast-in-place concrete section 55, is the same as in the above embodiment, and therefore description thereof will be omitted here.
[0041] In the configuration of the half precast concrete slab 50a in this modified example, a connecting structure 1 can be constructed using any number of precast slabs 10, making it possible to construct a half precast concrete slab 50a that is suitable for the dimensions of a concrete composite structure or building, while achieving both improved workability and improved strength and toughness.
[0042] (Second modified example of the present invention) The present invention is particularly useful when constructing a half precast concrete slab used in civil engineering, etc., with a finished member thickness of 500 to 1000 mm. Therefore, when constructing a half precast concrete slab with a finished member thickness of about 500 mm, for example, corrugated reinforcing bars may be used as the shear reinforcement bars 30 described in the above embodiment. However, when constructing a half precast concrete slab with a large thickness, for example, a finished member thickness of 1000 mm, if corrugated reinforcing bars as in the above embodiment are used as the shear reinforcement bars 30, the reinforcing bars may become dense and difficult to manufacture. In addition, the amount of reinforcing bars (reinforcing bar length) increases, which may complicate the structure and increase costs.
[0043] Therefore, as a second modified example of the present invention, a case where the shear reinforcement bars 30 provided in the precast slab 10 are reinforcing bars of a different shape will be illustrated and described. Fig. 23 is a schematic explanatory diagram regarding the shape of the shear reinforcement bars 30, where (a) is a schematic cross-sectional view showing the shape of the shear reinforcement bars 30 according to the above embodiment, and (b) is a schematic cross-sectional view showing the shape of the shear reinforcement bars 30a(30) according to the second modified example. Note that Fig. 23 shows a schematic cross-sectional view by enlarging the vicinity of the cutout 12 of the precast slab 10.
[0044] Fig. 23(a) shows the cross-sectional shape of the shear reinforcement bar group 30, which is the corrugated reinforcement bar described in the above embodiment. In this way, the corrugated reinforcement bar is composed of a single reinforcing bar extending across the entire width of the precast concrete slab 10. In the case of such a reinforcing bar configuration, if the thickness of the finished member (the entire thickness of the half precast concrete slab) becomes thick, it may become difficult to manufacture the corrugated reinforcement bar, or the amount of reinforcing bar may increase significantly, complicating the reinforcing bar arrangement configuration and raising concerns about increased costs, etc.
[0045] In this modification, as shown in Fig. 23(b), the shear reinforcement bar group 30a (30) is configured to include a plurality of reinforcing bars that are folded back in the same direction so that both ends (upper and lower ends) are butted against each other, and are substantially C-shaped in cross section. The shear reinforcement bar group 30a may have one end (lower end) of both ends folded back in a hook shape anchored to the second reinforcing bar group 24 and the other end (upper end) anchored to the fourth reinforcing bar group 45. By adopting such a reinforcing bar configuration, the effects and advantages described in the above embodiment can be obtained, and further, the shear reinforcement bar group 30a (30) can be easily manufactured, the amount of reinforcing bar can be reduced, and this is particularly useful when constructing a thick half precast concrete slab. [Industrial Applicability]
[0046] The present invention is applicable to a connecting structure for precast concrete slabs and a half-precast concrete slab equipped with said connecting structure. [Explanation of symbols]
[0047] 1…Connection structure 5…Foundation 6...Beam member 10a(10)…First precast plate 10b(10)…Second precast version 20…First rebar group 24…Second rebar group 30, 30a: Shear reinforcement bars 41...First cast-in-place concrete section (groove-filling concrete section) 43…Third rebar group 45…Fourth rebar group 48…Beam reinforcement 49…Second cast-in-place concrete section (main concrete section) 50...Half precast concrete slab 55…Cast-in-place concrete section
Claims
1. A half precast concrete slab has a substructure made of a plurality of precast slabs and an upper structure made of cast-in-place concrete, and the half precast concrete slabs are connected to each other to form a precast slab connection structure, A first group of reinforcing bars and a second group of reinforcing bars extending below the first group of reinforcing bars in a direction intersecting the first group of reinforcing bars are embedded inside the precast slab, At least one of the adjacent precast plates has a notch formed at its end, and a groove is formed at the joint between the adjacent precast plates by the notch, A groove filling concrete portion is poured into the groove portion as part of the superstructure by cast-in-place concrete, The upper structure is composed of the groove-filling concrete portion and a main concrete portion located above the groove-filling concrete portion, An end of the first reinforcing bar group protrudes toward the groove and has a hook-shaped shape folded back toward the inside of the precast plate member, The second group of reinforcing bars is also disposed inside the precast slab below the groove, A precast slab connecting structure, characterized in that a group of shear reinforcement bars is provided in the groove portion so as to span the inside of the precast slab, the groove-filling concrete portion, and the main concrete portion.
2. The cast-in-place concrete portion as the superstructure is configured by embedding a third group of reinforcing bars and a fourth group of reinforcing bars extending in a direction intersecting the third group of reinforcing bars therein, One end of the shear reinforcement bar group is anchored to one or both of the first reinforcing bar group and the second reinforcing bar group inside the precast slab, The precast slab connection structure according to claim 1 , wherein the other end of the shear reinforcement bar group is anchored to one or both of the third reinforcement bar group and the fourth reinforcement bar group.
3. The precast slab connection structure according to claim 1 or 2, characterized in that the shear reinforcement group is a corrugated steel bar that is continuously provided throughout the entire precast slab, including the cutout portion, when viewed in a plane.
4. The precast slab connection structure described in claim 1 or 2, characterized in that the shear reinforcement group consists of a plurality of steel bars having an approximately C-shaped cross-section, with both ends folded back toward each other.
5. A precast slab connection structure described in any one of claims 1 to 4, characterized in that in the precast slab, the spacing between the second reinforcing bars buried below the cutout is narrower than the spacing between the second reinforcing bars buried in a portion where the cutout is not provided.
6. A half precast concrete slab, characterized in that a substructure comprises a plurality of precast slabs connected by the precast slab connecting structure described in any one of claims 1 to 5, and a cast-in-place concrete section is provided as an upper structure.
Citation Information
Patent Citations
Precast concrete floor board for bridge structure and its jointing method
JP1998252015A
Half precast floor slab and joint structure for half precast floor slab
JP2000282610A
Precast concrete plate and floor structure
JP2002106098A
Flat plate construction method
JP2008115539A
Structure of composite beam, and construction method for composite beam
JP2010101072A
