Self-delivery system and self-delivery method
The self-consignment system with power adjustment and management devices addresses power output imbalances by limiting distributed power sources and using real-time adjustments, enhancing system stability and cost-effectiveness.
Patent Information
- Application Number
- JP2021526870
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2019-06-19
- Filing Date
- 2020-06-18
- Publication Date
- 2024-09-27
- Estimated Expiration
- 2040-06-18
AI Technical Summary
Existing self-consignment systems face challenges in managing power output from distributed power sources to ensure it does not exceed thresholds at demand facilities, leading to potential imbalances and increased costs.
A self-consignment system and method that includes a power adjustment device to limit power output from distributed power sources to below their rated capacity, coupled with a power management system that monitors and adjusts power input to align with planned values, using communication protocols and machine learning for real-time adjustments.
This approach stabilizes power system imbalances by reducing the deviation of actual output from planned values, thereby optimizing power transmission and reducing penalties while maintaining system efficiency.
Smart Images

Figure 0007557464000005 
Figure 0007557464000013 
Figure 0007557464000007
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a self-delivery system and a self-delivery method. [Background technology]
[0002] Conventionally, a mechanism (hereinafter referred to as a self-transport system) has been known in which electricity output from a power generation facility belonging to a first entity is transmitted to a demand facility belonging to the first entity via a power grid managed by a second entity different from the first entity.
[0003] For example, in a self-wheeling system, a technique has been proposed for increasing the power output from a power generation facility so that the amount of power per unit time (e.g., 30 minutes) at a demand facility does not exceed a threshold (e.g., Patent Document 1). Alternatively, in a self-wheeling system, a technique has been proposed for accommodating power between two or more facilities so as to minimize costs such as power purchase costs, wheeling costs, and self-power generation costs (e.g., Patent Document 2). [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2017-163780 A [Patent Document 2] JP 2017-211836 A Summary of the Invention
[0005] A first feature is a self-dispatch system that transmits electricity output from a power generation facility belonging to a first entity to a demand facility belonging to the first entity via a power grid managed by a second entity different from the first entity, wherein the power generation facility has a distributed power source and a power adjustment device that adjusts the power input from the distributed power source, and the power adjustment device outputs the power input from the distributed power source at a limited power that is limited to a value smaller than the rated output power of the distributed power source.
[0006] A second feature is summarized as a self-dispatch method for transmitting power output from a power generation facility belonging to a first entity to a demand facility belonging to the first entity via a power grid managed by a second entity different from the first entity, wherein the power generation facility has a distributed power source and a power adjustment device that adjusts the power input from the distributed power source, and the method includes a step of the power adjustment device outputting the power input from the distributed power source at a limited power that is limited to a value smaller than the rated output power of the distributed power source. [Brief description of the drawings]
[0007] [Figure 1] FIG. 1 is a diagram showing a self-delivery system 100 according to an embodiment. [Diagram 2] FIG. 2 is a diagram showing a power management server 500 according to the embodiment. [Diagram 3] FIG. 3 is a diagram showing a power management server 600 according to the embodiment. [Figure 4] FIG. 4 is a diagram for explaining the output plan value according to the embodiment. [Diagram 5] FIG. 5 is a diagram for explaining a total demand planned value according to the embodiment. [Figure 6] FIG. 6 is a diagram for explaining a total planned value of total demand according to the embodiment. [Figure 7] FIG. 7 is a diagram for explaining a total planned value of total demand according to the embodiment. [Figure 8] FIG. 8 is a diagram showing a self-consignment method according to an embodiment. [Figure 9] FIG. 9 is a diagram showing a self-consignment method according to an embodiment. [Figure 10] FIG. 10 is a diagram for explaining the restriction relaxation according to the first modification. [Figure 11] FIG. 11 is a diagram for explaining the restriction relaxation according to the second modification. [Figure 12] FIG. 12 is a diagram showing a self-delivery system 100 according to the third modified example. [Figure 13] FIG. 13 is a diagram showing a self-consignment method according to the third modified example. [Figure 14] FIG. 14 is a diagram showing a self-consignment method according to the third modified example. [Figure 15] FIG. 15 is a diagram for explaining the fourth modification. [Figure 16] FIG. 16 is a diagram for explaining the fourth modification. [Figure 17] FIG. 17 is a diagram for explaining the fourth modification. [Figure 18] FIG. 18 is a diagram showing a self-consignment method according to the fourth modified example. [Figure 19] FIG. 19 is a diagram for explaining the fifth modification. [Figure 20] FIG. 20 is a diagram for explaining the fifth modification. [Figure 21] FIG. 21 is a diagram for explaining the fifth modification. [Figure 22] FIG. 22 is a diagram showing a self-consignment method according to the fifth modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0008] Hereinafter, the embodiments will be described with reference to the drawings. In the following description of the drawings, the same or similar parts are denoted by the same or similar reference numerals. However, the drawings are schematic.
[0009] [Embodiment] (Self-delivery system) A self-dispatch system according to an embodiment will be described below. As shown in Fig. 1, the self-dispatch system 100 includes a power generation facility 200, a demand facility 300, a facility 400, a power management server 500, a power management server 600, and a third-party server 700. The self-dispatch system may be simply called a power system.
[0010] Here, the power generation facility 200 and the demand facility 300 belong to a first entity. Although not limited to this, the first entity is an entity having two or more facilities in geographically separate locations. For example, the first entity is a company having a large production base, or a company (e.g., a railroad company) that operates a large commercial facility. The power generation facility 200 and the demand facility 300 are connected by a power system 20 managed by a second entity different from the first entity. For example, the second entity is an entity such as a power company that manages a bulk power system (power system 20 in FIG. 1), and may be a power generation company or a power transmission and distribution company. The second entity may be an electricity retailer. Furthermore, the power generation facility 200, the demand facility 300, the facility 400, the power management server 500, the power management server 600, and the third-party server 700 are connected by a network 30. Although not limited to this, the network 30 may include the Internet network or a mobile communication network. The network 30 may include a VPN (Virtual Private Network).
[0011] The power generation facility 200 is a facility belonging to a first entity. The power generation facility 200 is connected to a power system 20 via a power line 21. The power line 21 may be a power line managed by the first entity, or may be a part of the power system 20.
[0012] In FIG. 1, a power generation facility 200A and a power generation facility 200B are illustrated as examples of the power generation facility 200. The power generation facility 200A and the power generation facility 200B may be provided at locations geographically separated from each other. The power generation facility 200A includes a distributed power source 210A, a PCS 220A, and an EMS 230A. The power generation facility 200B includes a distributed power source 210B, a PCS 220B, and an EMS 230B. Since the power generation facility 200A and the power generation facility 200B have the same configuration, the power generation facility 200 will be described below without distinguishing between the power generation facility 200A and the power generation facility 200B.
[0013] The power generation facility 200 includes a distributed power source 210, a power conditioning system (PCS) 220, and an energy management system (EMS) 230. The distributed power source 210 is a device that outputs power. The distributed power source 210 may be a device that outputs power by utilizing renewable energy. For example, the distributed power source 210 may be a solar cell device. The PCS 220 is a power conditioning device that converts DC power output from the distributed power source 210 into AC power. The EMS 230 manages the power of the power generation facility 200. The EMS 230 may be provided by a cloud service. The EMS 230 has at least a function of communicating with a power management server 500.
[0014] Here, the power generation facility 200 may have a smart meter that measures the power output from the power generation facility 200. The smart meter may have a function of communicating with the power management server 500.
[0015] The demand facility 300 is a facility belonging to the first entity, similar to the power generation facility 200. The demand facility 300 is connected to the power system 20 via a power line 22. The power line 22 may be a power line managed by the first entity, or may be a part of the power system 20.
[0016] The demand facility 300 has a load 310 and an EMS 320. The load 310 consumes power supplied from the power grid 20. For example, if the demand facility 300 is a production base, the load 310 may include production equipment. If the demand facility 300 is a commercial facility, the load 310 may include an air conditioner, lighting equipment, and the like. The EMS 320 manages the power of the demand facility 300. The EMS 320 may be provided by a cloud service. The EMS 320 has at least a function of communicating with the power management server 600.
[0017] Here, the demand facility 300 may have a smart meter that measures the power supplied to the demand facility 300 from the power system 20. The smart meter may have a function of communicating with the power management server 600.
[0018] The facility 400 is a facility managed by the power management server 600. The facility 400 belongs to an entity different from the first entity described above. The facility 400 has a load that consumes power supplied from the power system 20. For example, the load may include an air conditioner, lighting equipment, and the like.
[0019] Here, the facility 400 may have a smart meter that measures the power supplied to the facility 400 from the power grid 20. The smart meter may have a function of communicating with the power management server 600.
[0020] The power management server 500 may manage the distributed power sources 210 provided in the power generation facility 200, or may manage the PCS 220 provided in the power generation facility 200. The entity that manages the power management server 500 may be different from the first entity and the second entity. For example, the power management server 500 may be a maintenance server that monitors the operating state of the distributed power sources 210. Details of the power management server 500 will be described later (see FIG. 2).
[0021] The power management server 600 manages the demand facility 300 and the facility 400 (hereinafter, sometimes referred to as a group of facilities). An entity that manages the power management server 600 may be different from the first entity and the second entity. Such an entity may be a retailer or a business such as a resource aggregator. Such an entity may be a power generation business or a power transmission and distribution business. Details of the power management server 600 will be described later (see FIG. 3).
[0022] The third-party server 700 is a server that checks various matters related to self-consignment. Self-consignment is a mechanism for transmitting power output from the power generation facility 200 to the demand facility 300 via the power grid 20. The entity that manages the third-party server 700 may be different from the first entity and the second entity. For example, such an entity may be the Agency for Cross-regional Coordination of Transmission Operators. The third-party server 700 may be an electricity transmission and distribution business operator or an electricity retail business operator. For example, the third-party server 700 checks the following points.
[0023] First, the third-party server 700 may confirm the difference between the output plan value of the power output from the power generation facility 200 (here, synonymous with the power transmitted by self-transmission) and the output actual value of the power output from the power generation facility 200. The output plan value and the output actual value are aggregated for each unit time (e.g., 30 minutes). If the difference between the output plan value and the output actual value exceeds the allowable threshold, a penalty may be imposed on the first entity. If the difference between the output plan value and the output actual value does not exceed the allowable threshold, an incentive may be provided to the first entity. The penalty and incentive may be monetary.
[0024] Secondly, the third-party server 700 may confirm the difference between a total demand planned value of power supplied from the power system 20 to the group of facilities managed by the power management server 600 and a total demand actual value of power supplied from the power system 20 to the group of facilities. The total demand planned value and the total demand actual value are aggregated for each unit time (e.g., 30 minutes). If the difference between the total demand planned value and the total demand actual value exceeds an allowable threshold, a penalty may be imposed on the entity managing the power management server 600. If the difference between the total demand planned value and the total demand actual value does not exceed an allowable threshold, an incentive may be given to the entity managing the power management server 600. The penalty and incentive may be monetary.
[0025] Thirdly, the third-party server 700 may confirm the difference between a total procurement plan value procured from the power system 20 for the group of facilities managed by the power management server 600 and a total procurement actual value of power procured from the power system 20 for the group of facilities. The total procurement plan value and the total procurement actual value are aggregated for each unit time (e.g., 30 minutes). If the difference between the total procurement plan value and the total procurement actual value exceeds an allowable threshold, a penalty may be imposed on the entity managing the power management server 600. If the difference between the total procurement plan value and the total procurement actual value does not exceed an allowable threshold, an incentive may be given to the entity managing the power management server 600. The penalty and incentive may be monetary.
[0026] Here, the total procurement planned value is a value obtained by subtracting the output planned value from the total demand planned value. The total procurement actual value is a value obtained by subtracting the output actual value from the total demand actual value. The total procurement planned value may be a value corrected taking into account the transmission loss from the power generation facility 200 to the demand facility 300. Alternatively, the output planned value may be a value corrected taking into account the transmission loss from the power generation facility 200 to the demand facility 300. Similarly, the total procurement actual value may be a value corrected taking into account the transmission loss from the power generation facility 200 to the demand facility 300. Alternatively, the output actual value may be a value corrected taking into account the transmission loss from the power generation facility 200 to the demand facility 300. Taking into account the transmission loss means subtracting a value equivalent to the transmission loss from the planned value or the actual value.
[0027] Fourth, the third-party server 700 may check the difference between the procurement plan value and the procurement actual value for the demand facility 300. The procurement plan value and the procurement actual value are aggregated for each unit time (e.g., 30 minutes). If the difference between the procurement plan value and the procurement actual value exceeds an acceptable threshold, a penalty may be imposed on the first entity. If the difference between the procurement plan value and the procurement actual value does not exceed an acceptable threshold, an incentive may be provided to the first entity. The penalty and incentive may be monetary.
[0028] Here, the procurement plan value is a value obtained by subtracting the output plan value from the demand plan value of the power supplied from the power system 20 to the demand facility 300. The procurement actual value is a value obtained by subtracting the output actual value from the demand actual value of the power supplied from the power system 20 to the demand facility 300.
[0029] Although not particularly limited, communication within the power generation facility 200 may be performed according to a first protocol. As the first protocol, a protocol conforming to ECHONET Lite, SEP (Smart Energy Profile) 2.0, KNX, or a unique dedicated protocol may be used. Communication between the power generation facility 200 and the power management server 500 may be performed according to a second protocol different from the first protocol. As the second protocol, a protocol conforming to Open ADR (Automated Demand Response) or a unique dedicated protocol may be used.
[0030] Communications within the demand facility 300 may be performed according to a first protocol. As the first protocol, a protocol conforming to ECHONET Lite, SEP2.0, KNX, or a unique dedicated protocol may be used. Communications between the demand facility 300 and the power management server 600 may be performed according to a second protocol different from the first protocol. As the second protocol, a protocol conforming to Open ADR, or a unique dedicated protocol may be used.
[0031] Communications between the power management server 500 and the power management server 600, communications between the power management server 500 and the third party server 700, and communications between the power management server 600 and the third party server 700 may be performed according to a second protocol.
[0032] (Power Management Server) The power management server according to the embodiment will be described below. As shown in FIG.
[0033] The communication unit 510 is configured by a communication module. The communication module may be a wireless communication module conforming to a standard such as IEEE802.11a / b / g / n, ZigBee, Wi-SUN, LTE, or 5G, or may be a wired communication module conforming to a standard such as IEEE802.3.
[0034] The communication unit 510 receives the output plan value aggregated for each unit time from the power generation facility 200. The output plan value may be an output plan value for a predetermined period. The predetermined period may be one day, one week, one month, or one year. For example, when the predetermined period is one day, the communication unit 510 receives the output plan value for the nth day at any timing before the n-1th day.
[0035] The communication unit 510 may receive the output performance value aggregated for each unit time from the power generation facility 200. The output performance value may be an output performance value for a predetermined period. The predetermined period may be one day, one week, one month, or one year. For example, when the predetermined period is one day, the communication unit 510 receives the output performance value for the nth day at any timing on or after the n+1th day.
[0036] The communication unit 510 may receive, from the power generation facility 200, an output measurement value of the electric power output from the power generation facility 200. In such a case, the output performance value is obtained by tallying up the output measurement value for each unit time. The communication unit 510 may receive the output measurement value at a time interval shorter than the unit time (for example, one minute).
[0037] The communication unit 510 transmits the output plan value aggregated for each unit time to the third-party server 700. The communication unit 510 transmits the output plan value aggregated for each unit time to the power management server 600. For example, when the predetermined period is one day, the communication unit 510 transmits the output plan value for the nth day at any timing before the n-1th day.
[0038] The communication unit 510 transmits the output result value aggregated for each unit time to the third-party server 700. The communication unit 510 may transmit the output result value aggregated for each unit time to the power management server 600. For example, when the specified period is one day, the communication unit 510 transmits the output result value for the nth day at any timing on or after the n+1th day.
[0039] The communication unit 510 may receive the operating state of the distributed power source 210 from the power generation facility 200. The operating state may include at least one of the output power of the distributed power source 210 and the output power of the PCS 220. The operating state may include information indicating whether the distributed power source 210 is operating normally or not, and may include information indicating whether the PCS 220 is operating normally or not.
[0040] The management unit 520 is configured by a memory such as a nonvolatile memory and / or a storage medium such as a hard disc drive (HDD), and stores various information.
[0041] The management unit 520 manages the planned output value and the actual output value. The management unit 520 may manage the measured output value and the expected output value. The management unit 520 may manage the operating state of the dispersed power sources 210.
[0042] The control unit 530 may include at least one processor. The at least one processor may be configured by a single integrated circuit (IC), or may be configured by a plurality of circuits (such as integrated circuits and / or discrete circuits) communicatively connected to each other.
[0043] The control unit 530 controls the elements constituting the power management server 500. For example, the control unit 530 instructs the communication unit 510 to transmit the output plan value and the output result value. When the output expected value of the power output from the power generation facility 200 deviates from the output plan value, the control unit 530 may perform control to bring the output expected value closer to the output plan value. Such control may include control to increase or decrease the output power of the PCS 220. The control unit 530 may estimate the output expected value based on the transition of the output measurement value in a unit time. The control unit 530 may estimate the output expected value by linear prediction of the output measurement value. The control unit 530 may estimate the output expected value by machine learning of the correlation between the output measurement value and the attribute. The attribute may include a time period, a day of the week, a season, and weather (solar radiation, temperature, humidity, etc.).
[0044] (Power Management Server) The power management server according to the embodiment will be described below. As shown in FIG.
[0045] The communication unit 610 is configured by a communication module. The communication module may be a wireless communication module conforming to a standard such as IEEE802.11a / b / g / n, ZigBee, Wi-SUN, LTE, or 5G, or may be a wired communication module conforming to a standard such as IEEE802.3.
[0046] The communication unit 610 may receive, from each of the facilities (demand facilities 300 and facilities 400) included in the facility group, a demand plan value for power to be supplied from the power grid to each of the facilities. The demand plan value may be aggregated for each unit time. The demand plan value may be a demand plan value for a predetermined period. The predetermined period may be one day, one week, one month, or one year. For example, when the predetermined period is one day, the communication unit 610 receives the demand plan value for the nth day at any timing before the n-1th day.
[0047] The communication unit 610 receives, from each of the facilities in the group of facilities, a demand result value for power supplied from the power grid to each of the facilities included in the group of facilities. The demand result value may be aggregated for each unit time. The demand result value may be a demand result value for a predetermined period. The predetermined period may be one day, one week, one month, or one year. For example, when the predetermined period is one day, the communication unit 610 receives the demand result value for the nth day at any timing on or after the n+1th day.
[0048] The communication unit 610 transmits the total procurement plan value for the group of facilities, aggregated for each unit time, to the third-party server 700. The total procurement plan value may be a total procurement plan value for a predetermined period. The predetermined period may be one day, one week, one month, or one year. For example, when the predetermined period is one day, the communication unit 610 transmits the total procurement plan value for the nth day at any time before the n-1th day.
[0049] The communication unit 610 transmits the total procurement performance value of the group of facilities, tallied for each unit time, to the third-party server 700. For example, if the specified period is one day, the total procurement plan value may be a total procurement plan value covering the specified period. The specified period may be one day, one week, one month, or one year. For example, if the specified period is one day, the communication unit 610 transmits the total procurement performance value for the nth day at any time on or after the n+1th day.
[0050] The communication unit 610 transmits the procurement plan value of the demand facility 300, which is aggregated for each unit time, to the third-party server 700. For example, if the predetermined period is one day, the communication unit 610 transmits the procurement plan value for the nth day at any timing before the n-1th day.
[0051] The communication unit 610 transmits the procurement performance value of the demand facility 300, which is tallied for each unit time, to the third-party server 700. For example, when the predetermined period is one day, the communication unit 610 transmits the procurement performance value for the nth day at any timing on or after the n+1th day.
[0052] The communication unit 610 may transmit the total demand plan value of the group of facilities, which is aggregated for each unit time, to the third-party server 700. For example, when the predetermined period is one day, the communication unit 610 transmits the total demand plan value for the nth day at any timing before the n-1th day.
[0053] The communication unit 610 may transmit the total demand result value of the group of facilities, which is tallied for each unit time, to the third-party server 700. For example, when the predetermined period is one day, the communication unit 610 transmits the total demand result value for the nth day at any timing on or after the n+1th day.
[0054] The communication unit 510 may receive the operating state of the load 310 from the demand facility 300. The communication unit 510 may receive the operating state of a load provided in the facility 400 from the facility 400. The operating state may include the load 310 and the power consumption of the load. The operating state may include information indicating whether the distributed power source 210 is operating normally.
[0055] The management unit 620 is configured by a memory such as a nonvolatile memory and / or a storage medium such as a hard disc drive (HDD), and stores various information.
[0056] The management unit 620 manages a total procurement plan value and a total procurement actual value for the group of facilities. The management unit 620 may manage a procurement plan value and a procurement actual value for the demand facility 300. The management unit 620 may manage a total demand plan value and a total demand actual value for the group of facilities. The management unit 620 may manage a demand plan value and a demand actual value for the demand facility 300. The management unit 620 may manage the operating state of the load 310, or may manage the operating state of the load provided in the facility 400.
[0057] The control unit 630 may include at least one processor. The at least one processor may be configured by a single integrated circuit (IC), or may be configured by a plurality of circuits (such as integrated circuits and / or discrete circuits) communicatively connected to each other.
[0058] The control unit 630 controls the elements that constitute the power management server 600. For example, the control unit 630 instructs the communication unit 510 to transmit a total procurement plan value and a total procurement actual value for a group of facilities. The control unit 630 may instruct the communication unit 510 to transmit a procurement plan value and a procurement actual value for a demand facility 300. The control unit 630 may instruct the communication unit 510 to transmit a total demand plan value and a total demand actual value.
[0059] When the total demand forecast value of the power supplied from the power system 20 to the group of facilities deviates from the total demand plan value, the control unit 630 may perform control to bring the total demand forecast value closer to the total demand plan value. Such control may include control to increase or decrease the power consumption of the load installed in the facility 400. The control unit 630 may estimate the total demand forecast value based on the transition of the total demand measurement value in unit time. The control unit 630 may estimate the total demand forecast value by linear prediction of the total demand measurement value. The control unit 630 may estimate the total demand forecast value by machine learning of the correlation between the total demand measurement value and attributes. The attributes may include a time period, a day of the week, and a season.
[0060] Similarly, the control unit 630 may instruct the communication unit 510 to transmit the demand plan value and the demand actual value. When the demand forecast value of the power supplied from the power system 20 to the demand facility 300 deviates from the demand plan value, the control unit 630 may perform control to bring the demand forecast value closer to the demand plan value. Such control may include control to increase or decrease the power consumption of the load 310. The control unit 630 may estimate the demand forecast value based on the transition of the demand measurement value in the unit time. The control unit 630 may estimate the demand forecast value by linear prediction of the demand measurement value. The control unit 630 may estimate the demand forecast value by machine learning of the correlation between the demand measurement value and the attribute. The attribute may include a time period, a day of the week, and a season.
[0061] (Planned output value) The output plan value according to the embodiment will be described below. Here, a solar cell device will be taken as an example of the distributed power source 210. In FIG. PVrepresents the rated output power (maximum power generation) of the solar cell device, and C PCS represents the rated output power (maximum output power) of the PCS220.
[0062] In such a case, the PSC220 is designed to reduce the rated output power of the solar cell device C PV The power limit C is limited to less than R and configured to output power input from the solar cell device.
[0063] Therefore, as shown in FIG. 4, the power that can be output from the solar cell device during unit time N+1 to unit time N+6 is limited to the limit power C R Even if it is assumed that the output plan value of unit time N+1 to unit time N+6 is larger than the limit power C R This is a planned value limited by. With this configuration, it is possible to reduce the possibility that the output actual value of the power output from the power generation facility 200 deviates from the output plan value in unit time N+1 to unit time N+6. In other words, priority is given to reducing the possibility that the output actual value deviates from the output plan value at the expense of the power that can be output from the solar cell device.
[0064] Here, the rated output power of the PCS220, C PCS is the limit power C R may be the same as the limit power C R It may be larger than.
[0065] (Total demand plan value) The total demand planned value according to the embodiment will be described below. In Fig. 5, the total demand planned value of the power supplied from the power system 20 to the demand facility 300 is shown.
[0066] As shown in Fig. 5, the total demand planned value includes a planned value of power to be covered by self-dispatch (hereinafter referred to as the dispatch planned value) and a planned value of power to be procured from the power system 20 for the demand facility 300 (the procurement planned value described above). The dispatch planned value is the same as the output planned value described in Fig. 4. Note that the dispatch planned value may be a value corrected by taking into account the transmission loss from the power generation facility 200 to the demand facility 300, similar to the procurement planned value or the output planned value described above. Taking into account the transmission loss means subtracting a value equivalent to the transmission loss from the planned value or the actual value.
[0067] Therefore, assuming a case in which self-dispatch is performed according to the output plan value, the procurement plan value of the power that the power management server 600 procures from the power system 20 for the demand facility 300 is the total demand plan value minus the dispatch plan value.
[0068] (Total planned value) A total planned demand value according to the embodiment will be described below. In Fig. 6, a total planned demand value of the power to be supplied from the power system 20 to the group of facilities is shown.
[0069] As shown in Fig. 6, the total demand planned value includes a planned value of power to be covered by self-dispatch (dispatch planned value), a planned value of power to be procured from the power system 20 for the demand facility 300 (procurement planned value (demand facility 300) in Fig. 6), and a planned value of power to be procured from the power system 20 for the facility 400 (procurement planned value (facility 400) in Fig. 6). The dispatch planned value is the same as the output planned value described in Fig. 4.
[0070] Therefore, as shown in Figure 7, assuming a case where self-dispatch is performed according to the output plan value, the total procurement plan value of the electricity that the power management server 600 procures from the power system 20 for the facility group is the value obtained by subtracting the dispatch plan value from the total demand total plan value.
[0071] (Self-consignment method) First, in the self-consignment method according to the embodiment, a flow of notifying the third-party server 700 of a planned value will be described.
[0072] As shown in FIG. 8, the power generation facility 200 transmits the output plan value (see FIG. 4) to the power management server 500 in step S11.
[0073] In step S12 , the power management server 500 transmits the output plan value received from the power generation facility 200 to the third-party server 700 .
[0074] In step S13, the third-party server 700 manages the output plan values received from the power management server 500.
[0075] In step S14, the demand facility 300 transmits the total demand plan value (see FIG. 5) to the power management server 600.
[0076] In step S15, the facility 400 transmits the total planned demand value to the power management server 600. Through such processing, the power management server 600 can acquire the total planned demand value (see FIG. 6).
[0077] In step S16 , the power management server 600 receives the output plan value from the power management server 500 .
[0078] In step S17, the power management server 600 manages the total procurement plan value (see FIG. 7).
[0079] In step S18, the power management server 600 transmits the total procurement plan value to the third-party server 700. The power management server 600 may transmit the procurement plan value for the demand facility 300 to the third-party server 700.
[0080] In step S19, the third-party server 700 manages the total procurement plan value received from the power management server 600. The third-party server 700 may manage the procurement plan value for the demand facility 300.
[0081] Secondly, in the self-consignment method according to the embodiment, a flow of notifying the third-party server 700 of the performance value will be described.
[0082] As shown in FIG. 9, the power generation facility 200 transmits an output result value to the power management server 500 in step S31.
[0083] In step S32, the power management server 500 transmits the output result value received from the power generation facility 200 to the third-party server 700.
[0084] In step S33, the demand facility 300 transmits the total demand actual value to the power management server 600.
[0085] In step S34, the facility 400 transmits the total demand actual value to the power management server 600.
[0086] In step S35, the power management server 600 transmits the total demand result value to the third-party server 700. The power management server 600 may transmit the demand result value for the demand facility 300 to the third-party server 700.
[0087] In step S36, the third-party server 700 may check the difference between the output plan value and the output actual value. The third-party server 700 may check the difference between the total demand plan value and the total demand actual value. The third-party server 700 may check the difference between the total procurement plan value and the total procurement actual value for a group of facilities. The third-party server 700 may check the difference between the procurement plan value and the procurement actual value for a demand facility 300.
[0088] Here, the total procurement plan value is specified by the information received from power management server 600 in step S18. The total procurement actual value is specified by the output actual value received from power management server 500 in step S32 and the total demand actual value received from power management server 600 in step S35. The procurement actual value is specified by the output actual value received from power management server 500 in step S32 and the demand actual value received from power management server 600 in step S35.
[0089] (Action and Effects) In the embodiment, the PSC 220 outputs the power input from the distributed power source 210 with a limited power that is limited to a value smaller than the rated output power of the distributed power source 210. With such a configuration, the power that can be output from the distributed power source 210 is sacrificed, but it is possible to reduce the possibility that the actual output value deviates from the planned output value. As a result, it is possible to stabilize the imbalance in the power system 20.
[0090] In the embodiment, the power management server 500 transmits the output plan value to the power management server 600. With this configuration, the power management server 600 can grasp the total procurement plan value (or procurement plan value), which is the difference between the total demand plan value (or demand plan value) and the output plan value, and can report the total procurement plan value (or procurement plan value) to the third-party server 700. Therefore, it is possible to appropriately manage the imbalance of the power system 20 while taking into account the influence of self-consignment.
[0091] [Change Example 1] Modification 1 of the embodiment will be described below. Differences from the embodiment will be mainly described below.
[0092] In the first modification, as in the case of FIG. 4 described above, a solar cell device will be described as an example of the distributed power source 210. Furthermore, the rated output power C PCS is the limiting power C R We will now explain the case where
[0093] For example, when focusing on one unit time, assume that one unit time is represented by six time intervals and the current time t is between time interval #3 and time interval #4. The measured output value and the predicted output value at the current time t are as shown in FIG.
[0094] The output measurement value is a measurement value of the power output from the PCS 220 before the current time t (i.e., time intervals #1 to #3), and can be measured by the power generation facility 200. The output prediction value is a prediction value of the power output from the PCS 220 after the current time t (i.e., time intervals #4 to #6), and can be predicted by the power management server 500.
[0095] The predicted output value may be calculated by linear prediction of the measured output value or by machine learning of correlations between the measured output value and the attributes. The sum of the measured output value and the predicted output value is the expected output value in unit time.
[0096] In the case shown in FIG. 10, the measured output value is below the planned output value before the current time t, and the predicted output value is predicted to exceed the planned output value after the current time t. In such a case, the output of the power input from the solar cell device is limited to the limit power C R If the limiting process continues, the expected output value per unit time will fall below the planned output value.
[0097] Therefore, when the expected output value is smaller than the planned output value, the power management server 500 relaxes the limit on the power output from the PCS 220. Furthermore, it is preferable that the power management server 500 relaxes the limit on the power output from the PCS 220 so that the expected output value approaches the planned output value. In other words, it is preferable that the power management server 500 relaxes the limit on the power output from the PCS 220 within a range in which the expected output value does not exceed the planned output value.
[0098] Here, the relaxation of the restriction may be lifting the restriction, or may be increasing the power restriction in stages.
[0099] In such a case, the power management server 500 determines the limit power C to be applied to the entire time interval from the current time t onward. R may be notified to the PCS 220, and the limit power CR may be notified to the PCS 220.
[0100] Here, the planned value and actual value refer to values acquired every unit time (e.g., 30 minutes), and the measured value and predicted value refer to values acquired every time interval shorter than the unit time (e.g., 1 minute). This also applies to the following explanation.
[0101] (Action and Effects) In the first modification, when the expected output value is smaller than the planned output value, the power management server 500 relaxes the restriction on the power output from the PCS 220. With this configuration, in the case of one power generation facility 200, it is possible to further reduce the possibility that the actual output value deviates from the planned output value.
[0102] [Change Example 2] Modification 1 of the embodiment will be described below. Differences from Modification 1 will be mainly described below.
[0103] In the first modification, a case where the limit on the power output from the PCS 220 for one power generation facility 200 is relaxed is exemplified. In contrast, in the second modification, a case where the limit on the power output from the PCS 220 for two power generation facilities 200 is relaxed will be described. As described above, the relaxation of the limit may be the lifting of the limit. Alternatively, the relaxation of the limit may be a stepwise increase in the limited power.
[0104] For example, when focusing on one unit time, assume that one unit time is represented by six time intervals, and the current time t is between time interval #1 and time interval #2. The measured output value and the predicted output value at the current time t are as shown in FIG.
[0105] In the case shown in FIG. 11, the power generation facility 200A (an example of a first power generation facility) is in a state where the measured output value and the predicted output value are below the planned output value over the entire unit time. On the other hand, the power generation facility 200B (an example of a second power generation facility) is in a state where the measured output value is predicted to exceed the planned output value after the current time t. In such a case, the output of the power input from the solar cell device of the power generation facility 200B is limited to the limit power C R If the process of limiting the output continues, the expected output value per unit time of the power generation facility 200A and the power generation facility 200B as a whole will fall below the planned output value.
[0106] Therefore, when the expected output value of the power generation facility 200A and the power generation facility 200B as a whole is smaller than the planned output value, the power management server 500 relaxes the restriction on the power output from the PCS 220 of the power generation facility 200B. Furthermore, it is preferable that the power management server 500 relaxes the restriction on the power output from the PCS 220 of the power generation facility 200B so that the expected output value of the power generation facility 200A and the power generation facility 200B as a whole approaches the planned output value. In other words, it is preferable that the power management server 500 relaxes the restriction on the power output from the PCS 220 of the power generation facility 200B to the extent that the expected output value of the power generation facility 200A and the power generation facility 200B as a whole does not exceed the planned output value.
[0107] In such a case, the power management server 500 determines the limit power C to be applied to the entire time interval from the current time t onward. R may be notified to the PCS 220 of the power generation facility 200B, and the limit power C R may be notified to the PCS 220 of the power generation facility 200B.
[0108] (Action and Effects) In the second modification, when the expected output value is smaller than the planned output value, the power management server 500 relaxes the restriction on the power output from the PCS 220. With this configuration, when two or more power generation facilities 200 are targeted, it is possible to further reduce the possibility that the actual output value deviates from the planned output value.
[0109] [Change Example 3] The following describes a third modification of the embodiment. The following mainly describes the differences from the embodiment. In the third modification, the power output from the PCS 220 is limited to the limited power C R This also applies to the following modified examples.
[0110] In the third modification, a case will be illustrated in which an auxiliary power supply is provided in the self-delivery system 100. The auxiliary power supply may be a power supply that can be controlled by the power management server 500, or may be a power supply that can be controlled by the power management server 600.
[0111] As shown in Fig. 12, power generation facility 200 has a power storage device 240 and a PCS 250 in addition to the configuration shown in Fig. 1. Demand facility 300 has a power storage device 340 and a PCS 350 in addition to the configuration shown in Fig. 1. The other configuration is similar to that shown in Fig. 1, so the description thereof will be omitted.
[0112] The power storage device 240 is a device that accumulates power, and is an example of an auxiliary power supply that can be controlled by the power management server 500. The PCS 250 converts DC power output from the power storage device 240 into AC power, or converts AC power supplied from the power system 20 into DC power.
[0113] The power storage device 340 is a device that accumulates power, and is an example of an auxiliary power supply that can be controlled by the power management server 600. The PCS 350 converts the DC power output from the power storage device 240 into AC power, or converts the AC power supplied from the power system 20 into DC power.
[0114] In such a case, when the expected output value deviates from the planned output value, the power management server 500 controls the power storage device 240 (or the PCS 250) so as to bring the expected output value closer to the planned output value.
[0115] 13, in step S51, the power management server 500 receives output measurement values at time intervals shorter than the unit time from the power generation facility 200. The power management server 500 continues to receive the output measurement values.
[0116] In step S52, the power management server 500 determines whether the expected output value deviates from the planned output value. Here, the explanation will be continued assuming that the expected output value deviates from the planned output value.
[0117] In step S53, the power management server 500 transmits a charge / discharge instruction for the power storage device 240 to the power generation facility 200. Specifically, when the expected output value is below the planned output value, the power management server 500 transmits a discharge instruction for the power storage device 240 to the power generation facility 200. When the expected output value is above the planned output value, the power management server 500 transmits a charge instruction for the power storage device 240 to the power generation facility 200.
[0118] Similarly, when the expected demand value deviates from the planned demand value, the power management server 600 controls the power storage device 340 (or the PCS 350) so as to bring the expected demand value closer to the planned demand value.
[0119] 14, in step S61, the power management server 600 receives demand measurement values at time intervals shorter than the unit time from the demand facility 300. The power management server 600 continues to receive the demand measurement values.
[0120] In step S62, the power management server 600 determines whether the expected demand value deviates from the planned demand value. Here, the explanation will be continued assuming that the expected demand value deviates from the planned demand value.
[0121] In step S63, the power management server 600 transmits a charge / discharge instruction for the power storage device 340 to the demand facility 300. Specifically, when the expected demand value is lower than the planned demand value, the power management server 600 transmits a charge instruction for the power storage device 340 to the demand facility 300. When the expected demand value is higher than the planned demand value, the power management server 600 transmits a discharge instruction for the power storage device 340 to the demand facility 300.
[0122] Here, the process of bringing the demand forecast value closer to the demand plan value has been described for the demand facility 300. However, Modification Example 3 is not limited to this. A process of bringing the total demand forecast value closer to the total demand plan value may be performed for a group of facilities.
[0123] [Change Example 4] The fourth modification of the embodiment will be described below, focusing mainly on the differences from the third modification.
[0124] In a fourth modification, when the expected output value deviates from the planned output value, the power management server 500 transmits a message indicating that the expected output value deviates from the planned output value (hereinafter, an adjustment request) to the power management server 600. The adjustment request may include the difference between the expected output value and the planned output value (i.e., an adjustment request amount).
[0125] For example, when focusing on one unit time, assume that one unit time is represented by six time intervals, and the current time t is between time interval #3 and time interval #4. At the current time t, the measured output value and the predicted output value are as shown in Fig. 15, and at the current time t, the measured demand value and the predicted demand value are as shown in Fig. 16.
[0126] In the case shown in FIG. 15, the measured output value is below the planned output value in time intervals #1 and #2, and the predicted output value is predicted to be below the planned output value in time intervals #4 to #6. The expected output value is below the planned output value over the entire unit time. On the other hand, in the case shown in FIG. 16, the measured demand value is below the planned demand value in time interval #1, and the measured demand value exceeds the planned demand value in time interval #3. The predicted demand value is predicted to be below the planned demand value in time interval #5, and the measured demand value is predicted to exceed the planned demand value in time interval #6. However, it is assumed that the expected demand value coincides with the planned demand value over the entire unit time. In other words, the procurement expected value, which is the difference between the expected output value and the expected demand value, deviates from the procurement expected value.
[0127] In such a case, the power management server 500 transmits the above-mentioned adjustment request to the power management server 600. The power management server 600 controls the power storage device 340 (or the PCS 350) so as to bring the procurement forecast value closer to the procurement plan value, as shown in Fig. 18. That is, since the demand forecast value matches the demand plan value, the power management server 600 instructs the power storage device 340 to discharge power equivalent to the difference between the output forecast value and the output plan value.
[0128] (Self-consignment method) The self-consignment method according to the fourth modified example will be described below.
[0129] 18, in step S71, the power management server 500 receives output measurement values at time intervals shorter than the unit time from the power generation facility 200. The power management server 500 continues to receive the output measurement values.
[0130] In step S72, the power management server 500 determines whether the expected output value deviates from the planned output value. Here, the explanation will be continued assuming that the expected output value deviates from the planned output value.
[0131] In step S73, the power management server 500 transmits an adjustment request to the power management server 600. The adjustment request may include an adjustment request amount (a difference between an expected output value and an output plan value).
[0132] In step S74, the power management server 600 transmits an instruction to charge / discharge the power storage device 340 to the demand facility 300. Specifically, when the procurement forecast value is lower than the procurement plan value, the power management server 600 transmits an instruction to charge the power storage device 340 to the demand facility 300. When the procurement forecast value is higher than the procurement plan value, the power management server 600 transmits an instruction to discharge the power storage device 340 to the demand facility 300.
[0133] The process of step S75 may be performed when the power management server 600 is capable of controlling the power storage device 240. In such a case, the power management server 600 may control the power storage device 240 and the power storage device 340 so that the procurement forecast value approaches the procurement plan value as a total of steps S74 and S75.
[0134] In the fourth modified example, a process for bringing the procurement forecast value closer to the procurement plan value has been described for the demand facility 300. However, the fourth modified example is not limited to this. A process for bringing the total procurement forecast value closer to the total procurement plan value may be performed for a group of facilities.
[0135] Furthermore, the power management server 500 may transmit an adjustment request to the power management server 600 when the expected output value deviates from the planned output value and the expected output value cannot be made to coincide with the planned output value. That is, the power management server 500 may transmit an adjustment request to the power management server 600 when the expected output value cannot be made to coincide with the planned output value even after controlling the charging and discharging of the power storage device 240.
[0136] (Action and Effects) In the fourth modification, when the expected output value deviates from the planned output value, the power management server 500 transmits an adjustment request to the power management server 600, and the power management server 600 controls the auxiliary power source so that the expected procurement value approaches the planned procurement value. With this configuration, although the expected demand value deviates from the planned demand value, the expected procurement value approaches the planned procurement value, and therefore the imbalance in the power system 20 is maintained.
[0137] [Change Example 5] The fifth modification of the embodiment will be described below, focusing mainly on the differences from the third modification.
[0138] In the fifth modification, when the demand forecast value deviates from the demand plan value, the power management server 500 transmits a message indicating that the demand forecast value deviates from the demand plan value (hereinafter, an adjustment request) to the power management server 600. The adjustment request may include the difference between the demand forecast value and the demand plan value (i.e., an adjustment request amount).
[0139] For example, when focusing on one unit time, assume a case where one unit time is represented by six time intervals and the current time t is between time interval #3 and time interval #4. At the current time t, the demand measurement value and the demand forecast value are as shown in Fig. 19, and at the current time t, the output measurement value and the output forecast value are as shown in Fig. 20.
[0140] In the case shown in FIG. 19, the demand measurement value exceeds the demand plan value in time intervals #1 and #2, and the demand forecast value is predicted to exceed the demand plan value in time intervals #4 to #6. Therefore, the demand forecast value exceeds the demand plan value over the entire unit time. On the other hand, in the case shown in FIG. 20, the output measurement value exceeds the output plan value in time intervals #1 to #2, and the output forecast value is predicted to exceed the output plan value in time intervals #4 to #6. Therefore, the output forecast value exceeds the output plan value over the entire unit time. However, the procurement forecast value, which is the difference between the demand forecast value and the output forecast value, is greater than the procurement plan value, which is the difference between the demand plan value and the output plan value.
[0141] In such a case, the power management server 600 transmits the above-mentioned adjustment request to the power management server 600. The power management server 500 controls the power storage device 240 (or the PCS 250) so as to bring the procurement forecast value closer to the procurement plan value, as shown in Fig. 21. That is, the power management server 500 instructs the power storage device 240 to discharge power equivalent to the difference between the excess of the demand forecast value over the demand plan value and the excess of the output forecast value over the output plan value.
[0142] (Self-consignment method) The self-consignment method according to the fifth modified example will be described below.
[0143] 22, in step S81, the power management server 600 receives demand measurement values at time intervals shorter than the unit time from the demand facility 300. The power management server 600 continues to receive the demand measurement values.
[0144] In step S82, the power management server 600 determines whether the demand forecast value deviates from the demand plan value. Here, the explanation will be continued assuming that the demand forecast value deviates from the demand plan value.
[0145] In step S83, the power management server 600 transmits an adjustment request to the power management server 500. The adjustment request may include an adjustment request amount (the difference between the expected demand value and the planned demand value).
[0146] In step S84, the power management server 500 transmits an instruction to charge / discharge the power storage device 240 to the power generation facility 200. Specifically, when the procurement forecast value is lower than the procurement plan value, the power management server 500 transmits an instruction to charge the power storage device 240 to the power generation facility 200. When the procurement forecast value is higher than the procurement plan value, the power management server 500 transmits an instruction to discharge the power storage device 240 to the power generation facility 200.
[0147] The process of step S85 may be performed when the power management server 500 is capable of controlling the power storage device 340. In such a case, the power management server 500 may control the power storage device 240 and the power storage device 340 so that the procurement forecast value approaches the procurement plan value as a total of steps S84 and S85.
[0148] In the fifth modification, a process for bringing the procurement forecast value closer to the procurement plan value has been described for the demand facility 300. However, the fifth modification is not limited to this. A process for bringing the total procurement forecast value closer to the total procurement plan value may be performed for a group of facilities.
[0149] Furthermore, the power management server 600 may transmit an adjustment request to the power source management server 500 when the expected demand value deviates from the planned demand value and the expected demand value cannot be made to coincide with the planned demand value. That is, the power management server 600 may transmit an adjustment request to the power source management server 500 when the expected demand value cannot be made to coincide with the planned demand value even after controlling the charging and discharging of the power storage device 340.
[0150] (Action and Effects) In the fifth modification, when the expected demand value deviates from the planned demand value, the power management server 500 transmits an adjustment request to the power management server 600, and the power management server 600 controls the auxiliary power source so that the expected procurement value approaches the planned procurement value. With this configuration, although the expected output value deviates from the planned output value, the expected procurement value approaches the planned procurement value, and therefore the imbalance of the power system 20 is maintained.
[0151] [Change Example 6] The sixth modification of the embodiment will be described below, focusing mainly on the differences from the fourth and fifth modifications.
[0152] In the sixth modification, the power management server 500 and the power management server 600 may negotiate to bring the procurement forecast value closer to the procurement plan value by transmitting an adjustment request to each other.
[0153] [Change Example 7] The seventh modification of the embodiment will be described below. Differences from the embodiment will be mainly described below.
[0154] In the seventh modified example, the output planned value includes a first output planned value having a first real-time property and a second output planned value having a second real-time property higher than the first real-time property. For example, the first real-time property means that the time until the first planned value included in the first output planned value is a first time interval (e.g., 6 hours) based on the transmission timing of the first output planned value. The second real-time property means that the time until the first planned value included in the second output planned value is a second time interval (e.g., 1 hour) that is shorter than the first time interval, based on the transmission timing of the second output planned value.
[0155] In such a case, the power management server 500 transmits the first output plan value to both the third party server 700 and the power management server 600. On the other hand, when the power management server 600 is responding to power demand fluctuations having the second real-time property, the power management server 500 does not transmit the second output plan value to the third party server 700, but transmits the second output plan value to the power management server 600. Note that when the power management server 600 is not responding to power demand fluctuations having the second real-time property, the power management server 500 does not transmit the second output plan value to both the third party server 700 and the power management server 600.
[0156] [Other embodiments] Although the present disclosure has been described by the above-mentioned embodiments, the description and drawings forming a part of this disclosure should not be understood as limiting this disclosure. Various alternative embodiments, examples and operating techniques will become apparent to those skilled in the art from this disclosure.
[0157] In the embodiment, the case where the distributed power source 210 is a solar cell device has been mainly described. However, the embodiment is not limited to this. The distributed power source 210 may be a distributed power source whose output power may vary depending on the external environment (e.g., weather, temperature, humidity, etc.). The distributed power source 210 may be a distributed power source that outputs power by renewable energy. The distributed power source 210 may be a wind power generation device or a geothermal power generation device.
[0158] In the embodiment, the power management server 500 receives the output plan value from the power generation facility 200. However, the embodiment is not limited to this. The power management server 500 may formulate the output plan value by itself. For example, the power management server 500 may formulate the output plan value based on the output performance value for the last few days. The power management server 500 may formulate the output plan value by machine learning of the correlation between the output power of the power generation facility 200 and the attribute. Although not particularly limited, the attribute may be a parameter that affects the output power of the distributed power source 210 (for example, a time period, a day of the week, a season, weather, temperature, humidity, etc.).
[0159] In the embodiment, the power management server 600 receives the demand plan value from the demand facility 300. However, the embodiment is not limited thereto. The power management server 600 may formulate the demand plan value (total demand plan value) by itself. For example, the power management server 600 may formulate the demand plan value (total demand plan value) based on the demand actual value (total demand actual value) for the most recent few days. The power management server 600 may formulate the demand plan value by machine learning of the correlation between the demand power of the demand facility 300 and the attributes. Although not particularly limited, the attributes may be parameters (time period, day of the week, season, etc.) that affect the demand power of the demand facility 300.
[0160] Although not specifically mentioned in the embodiment, the power management server 500 may acquire an output performance value by integrating output measurement values. The power management server 600 may acquire a demand performance value (total demand performance value) by integrating demand measurement values.
[0161] Although not specifically mentioned in the embodiments, the above-mentioned machine learning may include so-called deep learning. Furthermore, the machine learning may be performed using AI (Artificial Intelligence).
[0162] In the embodiment, the power management server 500 relaxes the limit of the power output from the PCS 220 when the expected output value is smaller than the planned output value. However, the embodiment is not limited to this. The power management server 500 strengthens the limit of the power output from the PCS 220 when the expected output value is larger than the planned output value. The strengthening of the limit may be a setting of a limit. Alternatively, the strengthening of the limit may be a stepwise reduction of the limited power.
[0163] Although not specifically mentioned in the embodiment, the power generation facility 200 may have a load. In such a case, the output planned value may be the difference between the planned value of the output power of the PCS 220 and the planned value of the demand power of the load. Similarly, the output actual value may be the difference between the actual value of the output power of the PCS 220 and the actual value of the demand power of the load.
[0164] Although not specifically mentioned in the embodiment, the demand facility 300 may have a distributed power source. In such a case, the demand plan value may be the difference between the planned value of the output power of the distributed power source and the planned value of the demand power of the load 310. Similarly, the demand actual value may be the difference between the actual value of the output power of the distributed power source and the actual value of the demand power of the load 310.
[0165] In the embodiment, the power storage device 240 and the power storage device 340 are exemplified as the auxiliary power sources provided in the self-wheeling system 100. However, the embodiment is not limited to this. The auxiliary power sources do not have to be provided in the power generation facility 200 and the demand facility 300. The auxiliary power sources may be a fuel cell device, a biomass power generation device, a geothermal power generation device, a solar cell device, a wind power generation device, or the like.
[0166] In the embodiment, the PCS 220 and the PCS 250 are provided separately. However, the embodiment is not limited thereto. The PCS 220 and the PCS 250 may be configured by one multi-DC link PCS.
[0167] Although not specifically mentioned in the embodiment, power may be instantaneous power (kW) or may be the accumulated power amount (kWh) for a certain period (e.g., 30 minutes). For example, planned values and actual values may be expressed as accumulated power amount (kWh). Measured values and predicted values may be expressed as instantaneous power (kW). However, measured values and predicted values may also be expressed as accumulated power amount (kWh) by integrating them over time.
[0168] The entire contents of Japanese Patent Application No. 2019-113932 (filed on June 19, 2019) are incorporated by reference into this specification.
Claims
1. A self-wheeling system that performs self-wheeling to transmit electric power output from a power generation facility belonging to a first entity to a demand facility belonging to the first entity via an electric power system managed by a second entity different from the first entity, The power generation facility includes a distributed power source and a power adjustment device that adjusts power input from the distributed power source, the power adjustment device outputs power input from the distributed power source at a limited power level that is lower than a rated output power of the distributed power source; a power supply management server for managing the power generation facility; A self-delivery system in which the power management server relaxes the restriction on the power output from the power adjustment device when the expected output value of the power output from the power generation facility to the power system for the purpose of self-delivery is smaller than the output planned value during a unit time in which the difference between the actual output value of the power output from the power generation facility to the power system for the purpose of self-delivery and the output planned value of the power output from the power generation facility to the power system for the purpose of self-delivery should be confirmed.
2. The self-delivery system according to claim 1 , wherein the limited power is less than a rated output power of the power conditioning device.
3. A self-delivery system as described in claim 1, wherein the output planned value is formulated based on the limited power.
4. The self-delivery system according to claim 1 , wherein the power management server relaxes a restriction on the power output from the power regulating device so that the output expected value approaches the output planned value within the unit time.
5. the power management server manages a first power generation facility and a second power generation facility as the power generation facilities, The self-delivery system of claim 1, wherein the power management server relaxes the restriction on the power output from the power adjustment device provided in the second power generation facility when the expected output value of the power output from the first power generation facility to the power system for the purpose of the self-delivery is smaller than the planned output value of the power output from the first power generation facility to the power system for the purpose of the self-delivery.
6. A self-dispatch method for transmitting electric power output from a power generation facility belonging to a first entity to a demand facility belonging to the first entity via an electric power system managed by a second entity different from the first entity, the method comprising: The power generation facility includes a distributed power source and a power adjustment device that adjusts power input from the distributed power source, a step of the power adjustment device outputting power input from the distributed power source at a limited power level that is lower than a rated output power of the distributed power source; a step of relaxing the restriction on the power output from the power adjustment device when a predicted output value of power output from the power generation facility to the power system for the purpose of self-delivery is smaller than the planned output value during a unit time in which a power management server managing the power generation facility should confirm a difference between an actual output value of power output from the power generation facility to the power system for the purpose of self-delivery and a planned output value of power output from the power generation facility to the power system for the purpose of self-delivery.
Citation Information
Patent Citations
Power storage system for renewable energy
JP2012075224A
Self consignment support apparatus and self consignment system
JP2017163780A
Power supply system
JP2017204949A
Electric power consignment control system
JP2017211836A