Information processing device, information processing method, and program
The information processing device improves power demand forecasting by deriving individual consumer demands and correcting for system variations, enhancing accuracy in predicting total power demand with renewable energy integration.
Patent Information
- Application Number
- JP2023037137
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2023-03-10
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2043-03-10
AI Technical Summary
Power transmission and distribution companies face challenges in accurately predicting power demand at a local level due to the integration of renewable energy sources, necessitating improved forecasting systems that account for system configurations and consumer-specific patterns.
An information processing device and method that derives predicted individual power demand for each consumer using smart meter data, considers past performance, weather, and system conditions, and calculates total power demand in a region, incorporating corrections for non-installation and power distribution losses.
Enhances power demand prediction accuracy by considering individual consumer patterns and system configurations, allowing for precise forecasting even with grid changes and renewable energy integration.
Smart Images

Figure 0007559118000001 
Figure 0007559118000002 
Figure 0007559118000003
Abstract
Description
[Technical field]
[0001] The present invention relates to an information processing device, an information processing method, and a program for forecasting demand for electricity. [Background technology]
[0002] Conventionally, general electricity transmission and distribution businesses such as electric power companies have made operation plans and issued output commands for generators (adjustable power sources) based on the expected demand for the entire area and the amount of power generated by renewable energy. Regarding electricity demand forecasts, documents such as Patent Document 1 are known, in which electricity demand forecast data is calculated for each of a plurality of customer groups based on forecast data of variable factors and a demand forecast model, and total electricity demand forecast data for electricity sellers is calculated based on the electricity demand forecast data calculated for each of a plurality of customer groups. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent Publication No. 2022-084328 Summary of the Invention [Problem to be solved by the invention]
[0004] In recent years, in order to promote the expansion of renewable energy, consideration has been given to systems for efficient use of grid facilities, and there is an increasing need for general electricity transmission and distribution companies to conduct power flow forecasts at the local level (city / town or smaller granularity).
[0005] The present invention has been made in consideration of the above points, and provides an information processing device, an information processing method, and a program that are capable of making appropriate predictions according to the system configuration at the time when prediction is desired. [Means for solving the problem]
[0006] [Concept 1] The information processing device according to the present invention comprises: a first derivation unit that derives a predicted individual power demand in each of the plurality of consumers by using information obtained by the power consumption measurement unit; a second derivation unit that derives a predicted total power demand in a predetermined area based on the predicted individual power demand derived by the first derivation unit; The present invention may also include:
[0007] [Concept 2] The information processing device according to concept 1 is The power consumption control system may further include an estimation unit that calculates an estimated power demand for a consumer that generates power using the power generation unit, using information obtained by the power consumption measurement unit and information regarding the amount of power generated in the consumer.
[0008] [Concept 3] In the information processing device according to concept 1 or 2, The first derivation unit may derive the predicted individual power demand by using a past performance value based on time or day of the week.
[0009] [Concept 4] In the information processing device according to concept 3, The first derivation unit may compare actual measured values for table creation with past actual measured values for table creation in a plurality of categories, select a category corresponding to the past actual measured values for table creation that have a small difference from the actual measured values for table creation, and derive a predicted individual power demand based on the actual measured values in that category.
[0010] [Concept 5] In the information processing device according to concept 4, The past measured value may include the most recent measured value, a measured value on the same day of the week, or an average of the measured values.
[0011] [Concept 6] In the information processing device according to concept 4 or 5, The table used by the first derivation unit has a plurality of blocks corresponding to days of the week and time periods, The first derivation unit may determine a category to apply to each block.
[0012] [Concept 7] In the information processing device according to any one of concepts 1 to 6, A value obtained by the power consumption measurement unit that exceeds the threshold value does not need to be used as information.
[0013] [Concept 8] In an information processing device according to any one of concepts 1 to 7, When no values are obtained by the power consumption measurement unit for a predetermined time period or longer on a certain day, the values measured by the power consumption measurement unit on that certain day do not need to be used as information.
[0014] [Concept 9] An information processing device according to any one of concepts 1 to 8, The power generation system may further include a complementary information generating unit that generates complementary information from a difference between a past actual total power demand and a past predicted total power demand in a predetermined area.
[0015] [Concept 10] In the information processing device according to concept 9, The second derivation unit may use the complementary information to derive a predicted total power demand in a predetermined area.
[0016] [Concept 11] In an information processing device according to any one of concepts 1 to 10, The second derivation unit may use the meteorological information to correct the sum of the predicted individual power demands derived by the first derivation unit, and derive the predicted total power demand in the predetermined area.
[0017] [Concept 12] In an information processing device according to any one of concepts 1 to 11, The second derivation unit may derive the predicted total power demand in the specified area by correcting the total value of the predicted individual power demand derived by the first derivation unit using the rate of non-installation of the power consumption measurement unit.
[0018] [Concept 13] The information processing method according to the present invention comprises: a step of deriving, by a first derivation unit, a predicted individual power demand in each of the plurality of consumers using information obtained by the power consumption measurement unit; deriving, by a second derivation unit, a predicted total power demand in a predetermined area based on the predicted individual power demand derived by the first derivation unit; The present invention may also include:
[0019] [Concept 14] The program according to the present invention comprises: A program to be installed on an information processing device, In the information processing device in which the program is installed, A first derivation function that derives a predicted individual power demand in each of a plurality of consumers by using information obtained by the power consumption measurement unit; A second derivation function of deriving a predicted total power demand in a predetermined area based on the predicted individual power demand derived by the first derivation unit; It may be possible to realize the following. Effect of the Invention
[0020] According to the present invention, it is possible to perform appropriate prediction according to the system configuration at the time when prediction is desired. [Brief description of the drawings]
[0021] [Figure 1] 1 is a schematic diagram showing a configuration of an information processing device according to an embodiment of the present invention; [Diagram 2] FIG. 13 is a diagram for explaining a manner in which, in the case of a consumer with PV (a consumer with photovoltaic power generation), "PV contract capacity x power generation per kW" is added back to data obtained from a smart meter (SM). [Diagram 3] FIG. 4 is a diagram for explaining a mode of generating a past actual total power demand from a system measurement value. [Figure 4]FIG. 13 is a diagram for explaining an aspect of comparing actual measured values for table creation with past actual measured values for table creation in a plurality of categories, and selecting a category corresponding to the past actual measured values for table creation that have a smaller difference from the actual measured values for table creation. [Diagram 5] A table showing predictions made based on the categories selected in Figure 4. [Figure 6] 6 is a diagram for explaining a mode of predicting Friday morning, daytime, and night in the table of FIG. 5. [Figure 7] A graph showing the results of demand forecasting according to the categories selected in the table in Figure 6. [Figure 8] FIG. 13 is a diagram for explaining a manner in which a prediction is made using learning data covering the same month from one year ago to three years ago. [Figure 9] FIG. 13 is a diagram for explaining a mode of making a prediction using learning data spanning one month to three months prior. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0022] Embodiment Hereinafter, an embodiment of an information processing device and an information processing method according to the present invention will be described. In this embodiment, a program that is installed in a computer such as a personal computer and enables the computer to execute the information processing method of this embodiment, and a recording medium on which the program is recorded, are also provided. In this embodiment, "or" is a concept that includes "and", and "A or B" is a concept that includes only A, only B, or both A and B.
[0023] The information processing device 100 of this embodiment may be installed anywhere, may be a server, or may be used in a cloud environment. The information processing device 100 of this embodiment may be composed of one device or may be composed of multiple devices. Furthermore, when the information processing device 100 is composed of multiple devices, the devices do not need to be installed in the same space such as the same room, but may be installed in different rooms, different buildings, different regions, etc. Furthermore, when the information processing device 100 is composed of multiple devices, some of them may be owned and / or managed by one institution, and the rest may be owned and / or managed by another institution.
[0024] The information processing device 100 may be capable of communicating with one or more user terminals 200 (see FIG. 1). The user terminal 200 may be a smartphone, a tablet, a personal computer, or the like. The user terminal 200 may have an input unit 220 and a display unit 210. Since a smartphone or a tablet has a touch panel, the touch panel has the functions of both the input unit 220 and the display unit 210. Information output from the output unit 80 of the information processing device 100 can be displayed on the display unit 210. It may be possible to log in from the user terminal 200 using identification information such as an ID and a password, and to check information linked to the user's identification information on the display unit 210.
[0025] As shown in FIG. 1, the information processing device 100 of the present embodiment may include a first derivation unit 10 that derives a predicted individual power demand for each of a plurality of consumers using information obtained by a power consumption measurement unit such as a smart meter 120, and a second derivation unit 20 that derives a predicted total power demand in a predetermined area based on the predicted individual power demand derived by the first derivation unit 10. When this aspect is adopted, in order to predict the demand by location at the local level of the power system, it is possible to assume and accumulate individual demands using data from a power consumption measurement unit such as a smart meter 120. When deriving a predicted total power demand in a predetermined area, if system switching or the like is not performed, it is possible to predict the predicted total power demand in the predetermined area from past performance or the like. On the other hand, if system switching or the like is performed, the demand connected to a specific power transmission facility may change significantly. In that case, it becomes difficult to predict demand based on past performance. In this respect, it is beneficial to create a demand estimate value for each consumer, which is the smallest unit that constitutes the demand of the power system, as in the present embodiment, in that it is possible to accumulate an appropriate demand according to the system configuration at the time of prediction. In addition, the power flow performance measured in the system is a value obtained by adding up many demands, and individual trends cannot be analyzed. In this regard, when creating demand forecast values for each consumer, which is the smallest unit, it is possible to take into account the circumstances of each individual consumer and reflect them in the forecast, which is expected to improve the accuracy of the forecast.
[0026] In the present embodiment, the smart meter 120 is used as an example of a power consumption measurement unit, but the device is not limited to the smart meter 120 as long as it is a device capable of measuring power consumption. Information from the power consumption measurement unit may be directly transmitted from the power consumption measurement unit to the information processing device 100, or may be transmitted to the information processing device 100 via an external device (not shown) such as a smart meter management server.
[0027] Some consumers may generate power using a power generation unit 110 such as a solar power generator. For consumers that generate power using the power generation unit 110 in this way, an estimation unit 30 may be provided that calculates an estimated power demand using information obtained by the smart meter 120 and information on the amount of power generated at the consumer. By using such an estimation unit 30, it is possible to derive a predicted individual power demand using the true demand at each consumer.
[0028] As an example, in the case of a consumer with PV (a consumer with photovoltaic power generation), "PV contract capacity x power generation per kW" may be added back to the data obtained from the smart meter 120 (see FIG. 2). The "power generation per kW" is a maximum value of "1", and may be predicted by the estimation unit 30 using data such as the amount of solar radiation in the area where the consumer is located and a PV power generation forecast separately performed by a general power transmission and distribution company. The estimation unit 30 may calculate the estimated power demand using an estimation model stored in the storage unit 60. This estimation model may be a model generated by machine learning, or may be a model generated from statistical data. When a model generated by machine learning is used, a model generated by machine learning may be generated using the actual amount of power generated in the past and meteorological information such as the amount of solar radiation at that time, and the like, and the model may be stored in the storage unit 60. In addition, when the actual amount of power generation of the power generation resource can be obtained from the smart meter 120, the actual amount of power generation may be used to derive the true demand of the consumer.
[0029] The first derivation unit 10 may derive the predicted individual power demand amount using past actual values based on time or day of the week. The reference day demand on which the estimated demand value is based may be changed for each consumer according to the day of the week or time period. When this mode is adopted, the specific business days and business hours of commercial and industrial consumers can be reflected, so that the prediction accuracy can be improved. For example, if a certain hospital does not provide medical treatment in the afternoon, the fact that the demand for power in the afternoon at that hospital is reduced can be incorporated into the prediction.
[0030] The first derivation unit 10 may compare the actual measured values for table creation with past actual measured values for table creation in a plurality of categories, select a category corresponding to the past actual measured values for table creation that have a small difference from the actual measured values for table creation (see Figs. 4 and 5), and derive a predicted individual power demand based on the actual measured values in the category. An appropriate reference date may be set for each consumer according to the day of the week and time period, and the demand on that day may be used as the estimated demand value for that consumer. When such a mode of acquiring the demand on the reference date is adopted, it is very beneficial in that the load on the information processing device 100 is light, and therefore a calculation speed that can withstand practical operation can be achieved.
[0031] When a general power transmission and distribution business operator such as an electric power company supplies power, if a large error occurs in the power demand forecast, it is important to be able to investigate the cause in consideration of social responsibility. In this regard, when a general power transmission and distribution business operator uses the information processing device 100 of this embodiment, it is beneficial in that, for example, the cause of a large error can be clarified and made explainable. In this regard, when a machine learning method is adopted, the calculation process becomes a black box, but by adopting this embodiment, the calculation process can be clarified, and the cause of the error can be analyzed and clearly explained. It should be noted that the present invention does not assume that only general power transmission and distribution business operators are users, but also assumes that electricity retailers will use it.
[0032] The table used by the first derivation unit 10 may have multiple blocks corresponding to the day of the week and the time period, and the first derivation unit 10 may determine the category to be applied to each block (see FIG. 5). In particular, business and industrial consumers have a large demand scale and a single consumer has a large impact on the prediction accuracy, but on the other hand, their demand volume is strongly characterized by being linked to the business day and time and corresponding to the day of the week and the time period. For this reason, it is expected that the prediction accuracy will be improved by setting a day with the same characteristics as the reference date. The past actual measurement value may include the most recent actual measurement value, the actual measurement value of the same day of the week, or the average of the actual measurement values. Examples of the most recent actual measurement value include the day before, the day before the weekday or holiday (Friday if the prediction target day is Monday, Monday if the prediction target day is Tuesday, etc.).
[0033] The first derivation unit 10, for example, obtains data up to N months before the prediction target date and calculates the absolute error between the actual measured value at each date and time and the reference date demand (step 1, see FIG. 4). Next, the mean absolute error (MAE) for each day of the week and time period is calculated, and the pattern with the smallest MAE is set as the reference date (step 2). At this time, the granularity of the time period may be freely set from the input unit 220. Note that special days (Golden Week, Obon, New Year's holidays) may be excluded at the above step 1 stage because the demand trends are different. FIG. 5 shows an example of this embodiment, and shows a reference date table for each day of the week for a certain consumer. For the certain consumer, the first derivation unit 10 may derive the predicted individual power demand in the morning, daytime, and night of the prediction target date using the reference date table (step 3, see FIG. 6 and FIG. 7).
[0034] More specifically, in FIG. 4, the "actual measurement value" is shown in the second column from the left, and the past actual measurement values for table creation such as "one day ago", "the day before a weekday or holiday", "one week ago", and "the average of the past three days" are shown in frames in 30-minute units in the third column from the left. The first derivation unit 10 compares the "actual measurement value" with the past actual measurement values for table creation such as "one day ago", "the day before a weekday or holiday", "one week ago", and "the average of the past three days", selects the past actual measurement value for table creation with the smallest difference (absolute value of the difference), and uses that category for prediction. FIG. 5 shows an example, in which, for example, data from "one week ago" is used for Monday morning and daytime, and data from "the past three days" is used for Monday night. FIG. 7 is a graph showing the results of prediction based on the categories shown in FIG. 6. In this case, prediction is performed at "points" in 30-minute units, and a graph like that in FIG. 7 may be generated by connecting the "points" obtained by the prediction with a smooth curve. In this embodiment, the explanation is given using a 30-minute frame, but this is merely an example, and the length of the frame may be changed appropriately from, for example, an administrator terminal. Note that the administrator terminal in this embodiment is a concept included in the user terminal 200.
[0035] The accuracy of prediction can be improved by taking into consideration the estimated power demand calculated by the estimation unit 30 described above, deriving the true demand, and then determining the category to be applied to each block (time period) (such as "1 day before," "the day before each weekday or holiday," "1 week before," "average of the past 3 days," etc.).
[0036] 5 and 6, the prediction target day is divided into three time periods (8 hours each), namely, morning, daytime, and night, but the width of the time period can be freely set, and an appropriate granularity such as every hour or every three hours may be set by the input unit 220. Then, the second derivation unit 20 may derive the predicted total power demand in a predetermined area using the predicted individual power demand derived in this manner. The reference date table may be updated periodically, or every week, month, etc.
[0037] The predetermined area targeted for the forecasted total power demand may be appropriately input from the input unit 220, or information stored in the storage unit 60 may be read out. When the predetermined area stored in the storage unit 60 is changed by input from the input unit 220, the changed predetermined area may be stored in the storage unit 60 as the latest information. Such information may be stored in the storage unit 60 in association with the user's identification information.
[0038] When the first derivation unit 10 selects a category, the weather may be taken into consideration. For example, if it was sunny two days ago and rainy one day ago, and the prediction target day is sunny, the actual measurement value two days ago may be used instead of the actual measurement value one day ago. As the actual measurement value of the same day of the week, for example, the actual measurement value of the same day of the week one week ago may be used. In this case, the weather may also be taken into consideration. For example, if it was cloudy on the same day of the week two weeks ago and rainy on the same day of the week one week ago, and the prediction target day is cloudy, the actual measurement value of the same day of the week two weeks ago may be used instead of the actual measurement value of the same day of the week one week ago. The table and information on the weather may be stored in the storage unit 60, and the first derivation unit 10 may read the table and information on the weather from the storage unit 60 to perform demand prediction. As the average of the actual measurement values, the average value of the past five days or the average value of the past month may be used. In recent years, it is expected that there will be times when electricity demand patterns of consumers will change significantly due to the spread of EVs and storage batteries, energy-saving efforts, etc., so it is desirable to refer to the closest possible date so that such changes can be reflected promptly.
[0039] The forecast target date for the demand forecast is typically the day following the day for which the forecast is being made or the same day. If the forecast target date is the same day, the forecast for the afternoon may be made in the morning.
[0040] When the first derivation unit 10 derives the predicted individual power demand, the value obtained by the smart meter 120 exceeding the threshold value does not need to be used as information. By adopting such an embodiment, it is possible to remove abnormal values when making a prediction, and to improve the accuracy of the prediction. The threshold value may be stored in the storage unit 60 corresponding to each individual consumer.
[0041] The contract capacity may be used to calculate the threshold. For example, the threshold using the contract capacity may be "contract capacity x α1 + α2". α1 and α2 may be set from the input unit 220, or information associated with each consumer may be read from the storage unit 60 and used. Typically, α1 is a number greater than "1". In consumers with large contract capacity, values exceeding the contract capacity may be measured in actual contracts with large load fluctuations or negotiated contracts in which the contract capacity is determined based on load equipment, etc. The larger the contract capacity, the larger the difference, so the contract capacity x α1 is taken into consideration as a margin. Typically, α2 is a number greater than "0". In consumers with small contract capacity, values slightly exceeding the contract capacity may be measured due to the resolution of the smart meter 120 (for example, 0.1 kW increments, etc.), so +α2 is taken into consideration as a margin.
[0042] In the case where no value is obtained by the smart meter 120 for a predetermined time period or more on a certain day, the first derivation unit 10 may not use the measured value of the smart meter 120 on that certain day as information when deriving the predicted individual power demand. In the case where such an embodiment is adopted, cases where the information obtained as actual measured values is small and it is considered that the accuracy will decrease if used in the prediction can be excluded from the basis of the prediction, and the accuracy of the prediction can be improved. As an example, if the number of consecutive missing frames is less than α3 frames, linear complementation may be performed using the measurement values before and after the frames. On the other hand, if a missing frame occurs at α3 or more, the measurement value of the day including the missing frame may be excluded from the calculation of the reference day demand. Here, the "frame" means a frame of data related to the power consumption obtained by the smart meter 120, and means the power consumption obtained by the smart meter 120 every predetermined time (for example, every 30 minutes). α3 may be set from the input unit 220, or information associated with each consumer may be read from the storage unit 60 and used.
[0043] A complementary information generating unit 40 may be provided that generates complementary information from the difference between the past actual total power demand and the past predicted total power demand in a predetermined area (see FIG. 1). The past actual total power demand is not an accumulation of data from the smart meter 120, but is an actual total demand. Although it is possible to use a grid measurement value as a method for acquiring the actual total demand, the grid measurement value is a value that is a mixture of the true demand and the amount of power generated by PV and the like. Therefore, as shown in FIG. 3, the power generation performance of all power generation resources may be acquired from the smart meter 120 and the like, and the power generation performance may be added back to the grid measurement value to calculate the past actual total power demand. In addition, the estimation unit 30 may calculate the power generation performance of all power generation resources using the estimation model stored in the storage unit 60. Since there are consumers who do not have the smart meter 120 installed, and meters are not installed on street lights and the like in the first place, and there are also distribution losses, etc., the actual total demand is used in this embodiment. The past predicted total power demand may be calculated by summing up the past predicted individual power demands (estimated power demands for consumers having the power generating unit 110) and dividing the sum by the installation rate of the smart meter 120. For example, when the installation rate of the smart meter 120 is 0.8, the past predicted total power demand may be calculated by summing up the past predicted individual power demands (estimated power demands for consumers having the power generating unit 110) and dividing the sum by 0.8. Then, the complementary information generating unit 40 may generate complementary information from the difference between this past predicted total power demand and the past actual total power demand.
[0044] The second derivation unit 20 may use the complementary information obtained in this manner to derive the predicted total power demand in a predetermined area.
[0045] As described above, the first derivation unit 10 may take the weather into consideration when selecting a category. However, different from such an embodiment (which may be used instead of or in combination with such an embodiment), the second derivation unit 20 may use meteorological information to correct the forecasted individual power demand derived by the first derivation unit 10, and derive the forecasted total power demand in a predetermined area. In this case, as a difference correction for the weather conditions, a correction may be made by a regression equation using past data for the same season. In the embodiment shown in FIG. 8, a prediction is made using learning data for the same month from one year ago to three years ago.
[0046] The following formula 1 may be used for the prediction, for example. Here, x is a value after the correction shown in FIG. 2 is performed, and is a value obtained by accumulating the true demand amount of each consumer. By inputting past actual measured values into y1, x, and ΔT in formula 1, the complementary information generating unit 40 can calculate a1 and a2 as the learning results. Then, the complementary information generating unit 40 can use a1 and a2 to calculate a value y1 that takes into account the weather information on the prediction date. (Formula 1)y1=x+a1×ΔT+a2 x: The accumulated value of the true demand based on the smart meter 120 on the reference date ΔT: Predicted temperature on the forecast date - Weighted average temperature on the reference date The "weighted average temperature on the reference date" is a value calculated by calculating the reference date temperature based on the reference date set for each consumer (if the reference date is one day ago, the temperature of the same frame one day ago is calculated; if the reference date is the average of the past three days, the average temperature of the same frame for the past three days is calculated, etc.), and using the magnitude of each consumer's demand on the reference date to calculate a weighted average.
[0047] Other explanatory variable terms such as weather and time series information may be added to Equation 1 as necessary. In this example, temperature information is used, but information such as humidity and weather may also be added as appropriate. Also, in this example, data from the same past month is used, but this may be modified as appropriate, such as by including data from the N months before and after the same past month.
[0048] In this manner, by adopting a configuration in which the second derivation unit 20 uses meteorological information to correct the predicted individual power demand derived by the first derivation unit 10 and derives the predicted total power demand in a specified area, it is possible to predict the total power demand, which is beneficial in that it can improve the prediction accuracy.
[0049] Furthermore, the following formula 2 may be used to correct the non-installation of the smart meter (SM) 120 and the distribution loss. When correcting the non-installation of the smart meter 120 and the distribution loss, it is useful to use relatively recent data. For this reason, for example, learning data from several months ago (learning data from one month ago to three months ago in the embodiment shown in FIG. 9) may be used to make a prediction. a3 is, for example, the inverse of the installation rate of the smart meter 120. a4 is, for example, a value added to compensate for the distribution loss. By inputting past actual measured values (y1 may be a value predicted using a past actual value) into y1 and y2 in formula 2 and inputting already acquired information into a3, the complementary information generating unit 40 can calculate a4 as a learning result. Then, the complementary information generating unit 40 can calculate a value y2 taking into account the non-installation of the smart meter 120 and the distribution loss on the prediction date using this a4 and y1 predicted by the above formula 1. (Formula 2)y2=a3×y1+a4 y1: predicted value calculated by formula 1 y2: True demand actual value on the forecast date
[0050] By adopting such an embodiment, it is possible to predict the total power demand while taking into account the non-installation of smart meters (SM) 120 and power distribution losses, which is beneficial in that it is possible to further improve the prediction accuracy.
[0051] In the above, the embodiment in which the predicted total power demand is output using the value obtained by accumulating the true demand of each consumer (the value after the correction shown in FIG. 2) has been described. However, the predicted total power demand may be output using the system measurement value (the value obtained by mixing the true demand and the power generation amount such as PV) as it is without adopting such an embodiment. In this case, the predicted total power demand may be output by appropriately converting the system measurement value, for example, by applying it to a predetermined model or substituting it into a predetermined formula. In addition, when the predicted total power demand is derived using the value obtained by accumulating the true demand of each consumer (the value after the correction shown in FIG. 2) the second derivation unit 20 may derive the amount of power predicted to be required to be supplied by subtracting the predicted amount of power generated in each consumer (the total amount of power generated) from the derived predicted total power demand (the total amount of true demand). The predicted amount of power generated in the consumer may be estimated by the estimation unit 30.
[0052] Each element of the first derivation unit 10, the second derivation unit 20, the estimation unit 30, the complementary information generation unit 40, the output unit 80, etc. of the present embodiment may be realized by one or more IC chips or electronic modules, etc., or may be realized by a circuit configuration. The information processing device 100 has a processor, and various functions of the first derivation unit 10, the second derivation unit 20, the estimation unit 30, the complementary information generation unit 40, the output unit 80, etc. of the information processing device 100 of the present embodiment may be realized by the processor executing a program.
[0053] The above description of the embodiment and the disclosure of the drawings are merely examples for explaining the invention described in the claims, and the invention described in the claims is not limited by the above description of the embodiment or the disclosure of the drawings. [Explanation of symbols]
[0054] 10 First derivation part 20 Second derivation part 30 Guessing part 40 Complementary information generation section 100 Information processing device 110 Power generation section 120 Smart meter (an example of a power consumption measuring unit)
Claims
1. a first derivation unit that derives a predicted individual power demand in each of the plurality of consumers by using information obtained by the power consumption measurement unit; a second derivation unit that derives a predicted total power demand in a predetermined area based on the predicted individual power demand derived by the first derivation unit; Equipped with The first derivation unit compares the actual measured value with past measured values in multiple categories based on time or day of the week, selects a category corresponding to the past measured value that has a small difference from the actual measured value, and derives a predicted individual power demand based on the actual measured value in that category.
2. a first derivation unit that derives a predicted individual power demand in each of the plurality of consumers by using information obtained by the power consumption measurement unit; a second derivation unit that derives a predicted total power demand in a predetermined area based on the predicted individual power demand derived by the first derivation unit; Equipped with The first derivation unit compares actual measured values for table creation with past actual measured values for table creation in multiple categories based on time or day of the week, selects a category corresponding to the past actual measured values for table creation that have a small difference from the actual measured values for table creation, and derives a predicted individual power demand based on the actual measured values in that category.
3. A first derivation unit that derives a predicted individual power demand for each of a plurality of consumers using information obtained by the power consumption measurement unit; a second derivation unit that derives a predicted total power demand in a predetermined area based on the predicted individual power demand derived by the first derivation unit; a complementary information generating unit that generates complementary information based on a difference between a past actual total power demand and a past predicted total power demand in a predetermined area; An information processing device comprising:
4. A first derivation unit that derives a predicted individual power demand for each of a plurality of consumers using information obtained by the power consumption measurement unit; a second derivation unit that derives a predicted total power demand in a predetermined area based on the predicted individual power demand derived by the first derivation unit; Equipped with The second derivation unit modifies the total value of the predicted individual power demand derived by the first derivation unit using the meteorological information, and derives the predicted total power demand in the specified area.
5. A first derivation unit that derives a predicted individual power demand for each of a plurality of consumers using information obtained by the power consumption measurement unit; a second derivation unit that derives a predicted total power demand in a predetermined area based on the predicted individual power demand derived by the first derivation unit; Equipped with The second derivation unit modifies the total value of the predicted individual power demand derived by the first derivation unit using the non-installation rate of the power consumption measurement unit, and derives the predicted total power demand in the specified area.
6. The information processing device according to claim 1 , further comprising an estimation unit that calculates an estimated power demand for a consumer that generates power using a power generation unit, using information obtained by the power consumption measurement unit and information regarding the amount of power generated in the consumer.
7. The information processing device according to claim 3 , wherein the first derivation unit derives the predicted individual power demand by using a past performance value based on a time or a day of the week.
8. The information processing device according to claim 1 , wherein the past measured value includes a most recent measured value, a measured value on the same day of the week, or an average of the measured values.
9. The table used by the first derivation unit has a plurality of blocks corresponding to days of the week and time periods, The information processing apparatus according to claim 2 , wherein the first derivation unit determines a category to be applied to each block.
10. The information processing apparatus according to claim 1 , wherein a value obtained by the power consumption measuring unit that exceeds a threshold value is not used as information.
11. 6. The information processing device according to claim 1, wherein if no value is obtained by the power consumption measurement unit for a predetermined time period or more on a certain day, the measured value by the power consumption measurement unit on that certain day is not used as information.
12. The information processing device according to claim 3 , wherein the second derivation unit derives a predicted total power demand in a predetermined area by using the complementary information.
13. a step of deriving, by a first derivation unit, a predicted individual power demand in each of the plurality of consumers using information obtained by the power consumption measurement unit; deriving, by a second derivation unit, a predicted total power demand in a predetermined area based on the predicted individual power demand derived by the first derivation unit; Equipped with In the step of deriving the predicted individual power demand, An information processing method in which the first derivation unit compares the actual measured value with past measured values in multiple categories based on time or day of the week, selects a category corresponding to the past measured value that has a small difference from the actual measured value, and derives a predicted individual electricity demand based on the actual measured value in that category.
14. A program to be installed on an information processing device, In the information processing device in which the program is installed, A first derivation function that derives a predicted individual power demand in each of a plurality of consumers by using information obtained by the power consumption measurement unit; A second derivation function of deriving a predicted total power demand in a predetermined area based on the predicted individual power demand derived by the first derivation unit; Realize this, The first derivation function is a program that compares actual measured values with past measured values in multiple categories based on time or day of the week, selects a category corresponding to the past measured value that has a small difference from the actual measured value, and derives a predicted individual electricity demand based on the actual measured value in that category.
Citation Information
Patent Citations
Energy supply management system
JP2012191774A
Power demand prediction device and power demand prediction program
JP2017121133A
Prediction apparatus and prediction method
JP2018156540A
Power demand prediction system and power demand prediction method
JP2022084328A