Process Information Management System
The RFID-based process information management system addresses human error and inefficiencies by automating the association of processing object and process information, enhancing traceability and reducing operational man-hours.
Patent Information
- Application Number
- JP2020103724
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-06-16
- Publication Date
- 2024-10-02
- Estimated Expiration
- 2040-06-16
AI Technical Summary
Existing process information management systems face challenges in accurately managing part lot numbers and are prone to human errors during barcode reading and data entry, leading to inefficiencies in associating product and parts information.
A process information management system utilizing RFID tags for detecting and associating first, second, and third tag information to accurately track processing objects and processes, reducing human errors by automating the association of processing object identification with process-specific information.
The system effectively reduces human errors and workload while efficiently recording processing steps and object information, ensuring accurate traceability and reducing operational man-hours.
Smart Images

Figure 0007559364000001 
Figure 0007559364000002 
Figure 0007559364000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a process information management system, and can be applied to, for example, a process information management system that manages information regarding processing performed on a processing object in each process of producing and manufacturing a product. [Background technology]
[0002] For example, for products that require traceability, it is necessary to associate what parts are to be installed at the production planning stage, and also to associate what parts are installed during the actual manufacturing process.
[0003] In the actual manufacturing process, when associating a product with the parts used, for example, a human being may enter information such as part lot information into a management sheet, or a barcode containing part information such as part lot information may be attached to the part, and the information in that barcode may be read to associate it with the product (see Patent Document 1). [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2006-026843 A Summary of the Invention [Problem to be solved by the invention]
[0005] However, when linking product and part information at the production planning stage, it is not possible to accurately manage the lot numbers of parts actually used in the product. On the other hand, when linking product and part information during the manufacturing process, human errors such as mistakes in filling out management sheets and reading barcodes may occur. Also, reading barcode information requires bringing a reader close to a position where the barcode can be read.
[0006] Therefore, there is a demand for a process information management system that can reduce human error, lighten the workload, and efficiently associate and record information about the processing process performed on the object to be processed. [Means for solving the problem]
[0007] In order to solve such problems, Ming is , In a process information management system that manages a processing object in association with each piece of process specific information for a plurality of processing steps performed on the processing object, the system includes: (1) a first tag information receiving means having a predetermined detection range and receiving first tag information including the process specific information, for each work area of the processing step; (2) A second tag information receiving means having a predetermined detection range and receiving second tag information including processing object identification information attached to the processing object for identifying the processing object; (3) a process identification information detection means for detecting the first tag information based on the information received by the first tag information receiving means; (4) a processing object detection means for detecting the second tag information based on the information received by the second tag information receiving means; (5) and (6) a process information generating means for generating process information associating the second tag information with the first tag information when the first tag information is detected by the process identification information detecting means and the second tag information is detected by the processing object detecting means, and for recording process information in which the process identification information of each processing step is associated with the processing object identifying information included in the second tag information based on the process information acquired from the process information generating means for each work area. Process information manager step The present invention is characterized by comprising: Effect of the Invention
[0008] According to the present invention, it is possible to reduce human error, reduce the workload, and efficiently record the object to be processed and information relating to the processing step performed on the object to be processed in association with each other. [Brief description of the drawings]
[0009] [Figure 1] FIG. 2 is a diagram showing a configuration example of a work area according to an embodiment. [Diagram 2] 1 is an overall configuration diagram showing an example of the overall configuration of a process information management system according to an embodiment; [Diagram 3] 1 is an internal configuration diagram showing an internal configuration of a process information control device according to an embodiment; [Figure 4] 1 is an internal configuration diagram showing an internal configuration of a process information management device according to an embodiment; [Diagram 5] 4 is a configuration diagram illustrating a configuration of process information collected by a process information acquisition unit according to the embodiment. FIG. [Figure 6] 10 is a diagram showing the configuration of information in which first tag information and part information are associated with each other, and information in which third tag information and worker / equipment identification information are associated with each other according to the embodiment; FIG. [Figure 7] FIG. 2 is a configuration diagram showing a configuration of process management information according to the embodiment. [Figure 8] 4 is a flowchart showing a process in the process information forming apparatus according to the embodiment. [Figure 9] 4 is a flowchart showing a process in the process information management device according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] (A) Main embodiment DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, an embodiment of a process information management system according to the present invention will be described in detail with reference to the drawings.
[0011] (A-1) Configuration of the embodiment The process information management system according to the embodiment illustrates a case in which the process information management system of the present invention is applied to a traceability system for parts and the like in an automobile production process.
[0012] There are various production methods, such as a line production method, a cell production method, etc., and the process information management system of the embodiment is widely applicable to these various production methods. In this embodiment, for ease of explanation, an example of automobile production by a line production method will be described.
[0013] Here, "processing" refers to manipulating an object to be processed by a human being, a machine (including an industrial robot), a tool, a device, etc. For example, in the automobile production process, the concept of "processing" includes the attachment of various kinds of parts to the vehicle frame, the application of paint or the like to the vehicle body, the injection of oil or other liquids into the vehicle components (engine peripheral parts, etc.), and the injection of gas into the vehicle components (e.g. airbags, etc.).
[0014] At each process, workers perform the tasks specified for that process, either manually or using equipment, etc. Many of the parts, paints, and other materials used at each process are manufactured in advance by parts manufacturers, etc., and these parts are assembled to produce the finished product, the automobile.
[0015] (A-1-1) Overall composition FIG. 2 is a diagram showing an example of the overall configuration of a process information management system according to an embodiment.
[0016] In FIG. 2, at a site such as a manufacturing plant, work areas Ar1 to ArN (N is a positive integer) are divided according to the order of each process (process #1 to process #N) planned in advance, for example along a conveyer line.
[0017] A second wireless tag 2 that stores second tag information including identification information (hereinafter also referred to as "target identification information" or "vehicle identification information") that uniquely identifies the vehicle frame 20 is attached to the vehicle frame 20 to be processed. Then, the vehicle frame 20 with the second wireless tag 2 attached moves by the conveyor line from the work area Ar1 of the first process #1 toward the work area ArN of the final process #N.
[0018] The second wireless tag 2 may be fixedly attached to the vehicle frame 20 or may be detachably attached, and the second wireless tag 2 is attached to the vehicle frame 20 at least in the section from steps #1 to #N so as to enable identification of the vehicle frame 20. Therefore, before entering the first step #1, the second wireless tag 2 that stores the second tag information is attached to the vehicle frame 20.
[0019] After the final step #N, the second wireless tag 2 may be removed from the vehicle frame 20, or the second wireless tag 2 may remain attached to the vehicle frame 20 as it is.
[0020] In each of the work areas Ar1 to ArN, workers perform the process work specified for that process on the vehicle frame 20 to be processed, either manually or by using equipment, etc. Each of the processes #1 to #N performed in each of the work areas Ar1 to ArN is a process using parts (or members) 15 that should be managed by traceability.
[0021] Each work area Ar1 to ArN has a storage section 10 for storing parts (or components) 15 used in the process work of each process, and this storage section 10 is attached with a first wireless tag 1 that stores first tag information that specifies identification information assigned to the process to be performed on the vehicle frame 20.
[0022] A process information forming device 3, which will be described later, is disposed in each of the work areas Ar1 to ArN. The process information forming device 3 is assigned a unique management number, for example, using the device number or MAC address of the control unit, and when it detects second tag information from the second wireless tag 2 of the vehicle frame 20 transported by the conveyor line, it transmits to the process information management device 4 process information associated with the first tag information detected from the first wireless tag 1 of the storage unit 10 that stores the parts 15.
[0023] This makes it possible to associate the second tag information that identifies the vehicle frame 20 to be processed with the first tag information for tracking the parts (or components) 15 applied to the vehicle frame 20 in each process #1 to #N.
[0024] Furthermore, a third wireless tag 6 storing worker / equipment identification information (hereinafter also referred to as "third tag information") that uniquely identifies the worker, equipment, etc., working in each work area Ar1 to ArN may be attached to the worker, equipment, etc.
[0025] In this case, when detecting the second tag information identifying the vehicle frame 20, the process information forming device 3 may form process information in which, in addition to the first tag information for tracking the parts 15 used in each process #1 to #N, third tag information identifying workers, equipment, etc. is associated with the second tag information and the first tag information.
[0026] Furthermore, the process information may include a management number of the process information forming device 3 as information for identifying the work area.
[0027] (A-1-2) Composition of the object to be processed In the following, the configuration of a certain work area Arn (1≦n≦N) among the multiple work areas Ar1 to ArN will be illustrated to explain the configuration of the process information management system 9 of the embodiment.
[0028] FIG. 1 is a diagram showing an example of the configuration of a work area Arn according to an embodiment.
[0029] [Processing target (vehicle frame)] The vehicle frame 20 to be processed can be a basic component of a finished vehicle.
[0030] Here, the processing target is a basic component part to which parts are attached or assembled in each process. In this embodiment, the vehicle frame 20 is the target for attaching parts and attaching the vehicle body, so a case where the processing target is the vehicle frame 20 is exemplified, but when the product is different, anything that can become a basic component part in the manufacturing process of that product can be the processing target.
[0031] [Second radio tag] The second wireless tag 2 is an RFID (Radio Frequency Identifier) tag that is attached to the vehicle frame 20 and has a communication function.
[0032] The second wireless tag 2 is an RFID (Radio Frequency Identifier) tag having a communication function for storing second tag information (hereinafter also referred to as "target information") including at least identification information ("target identification information", "vehicle identification information") that uniquely identifies the vehicle frame 20, and is attached to the vehicle frame 20.
[0033] The second tag information has type information that identifies it as an object to be processed, and identification information that uniquely identifies the object to be processed (vehicle frame 20). The second tag information may be, for example, 20-digit alphanumeric information starting with "xxx," where "xxx" is tag type information indicating the type of tag information (i.e., information indicating that it is tag information related to the vehicle frame 20), and the subsequent information may be identification information that uniquely identifies the vehicle frame 20. This makes it possible for the process information forming device 3 to recognize the type of the received tag information and the identification information of the object to be processed (vehicle frame 20).
[0034] Here, when the vehicle frame 20 is transported by the conveyor line to the work area Arn of each process #n, the second wireless tag 2 of the vehicle frame 20 belongs to the communication range T2 of the second wireless tag antenna unit 32, wireless communication is started between the second wireless tag 2 and the second wireless tag antenna unit 32, and the second wireless tag 2 transmits second tag information including object identification information to the second wireless tag antenna unit 32. This allows the process information forming device 3 to obtain the second tag information and identify the processing object (vehicle frame 20) in the work area Arn of the process #n.
[0035] The position at which the second wireless tag 2 is attached to the vehicle frame 20 is not particularly limited, but it is desirable to attach the second wireless tag 2 to the vehicle frame 20 at a position where the second wireless tag 2 falls within the communication range T2 of the second wireless tag antenna unit 32 arranged in the work area Arn.
[0036] Here, for example, if a second wireless tag 2 in the 920 MHz band is attached to a vehicle frame 20 made of a metal material (conductive material), the radio waves may be reflected by the metal, resulting in a decrease in reading performance.
[0037] Therefore, in this embodiment, a "metal-compatible tag" that can be attached to a metal surface can be applied as the second wireless tag 2. There are various types of metal-compatible tags, and they are generally expensive, but the second wireless tag 2 of this embodiment may be a metal-compatible tag that is attached to the surface of a metal plate (conductive plate) and uses the properties of metal for communication to make the metal plate (conductive plate) function as an antenna unit.
[0038] By using such a metal compatible tag as the second wireless tag 2, the cost can be kept down and a part of the vehicle frame 20 can be utilized to prevent a decrease in reading performance.
[0039] (A-1-3) Detailed configuration of the storage section 10 [Parts (materials)] The parts 15 are components used in each process to form a finished automobile, and include, for example, various parts that constitute the product, liquids such as paint and oil, and gases such as gas. In other words, the parts 15 are attached, coated, injected, etc. onto the vehicle frame 20 in the work area Arn of each process #n. More specifically, examples of the parts 15 include an engine, a seat, tires, lamps, a handle, a harness, etc.
[0040] For example, part information related to part manufacturing, such as the lot number, serial number (product number), model number, part manufacturer, and manufacturing facility of part 15 manufactured by a part manufacturer, etc., is associated with first tag information assigned to part 15 and stored in process information management device 4, which will be described later.
[0041] In other words, the process information management device 4, which has information associating the first tag information with the part information, can identify the vehicle frame 20 based on the second tag information included in the process information received from the process information forming device 3, and can also identify the part information based on the first tag information, so can record the vehicle frame 20 in association with the part information of the part 15 used in the process.
[0042] [Containment section] The storage unit 10 stores the parts 15, and may be, for example, a box (case) for storing the parts 15, or a container for storing gas, liquid, etc. Each part 15 manufactured by a parts manufacturer is stored in the storage unit 10 by type of part 15, and arranged in each work area Arn.
[0043] Parts 15 of the same type and of the same lot manufactured under the same conditions by a parts manufacturer are stored in the storage unit 10. In the example of Fig. 1, the storage unit 10 is a case (box) that stores parts 15 of the same type and of the same lot, but when the parts 15 are liquid, gas, or the like, the storage unit 10 may be a container such as a cylinder or a can.
[0044] The container 10 containing the component 15 is placed in the work area Arn of process #n. Multiple containers 10 containing the same type of component 15 may be placed in the work area Arn. In other words, in addition to the container 10 containing the component 15 used in the process operation, one or more other containers 10 temporarily placed may be placed in the same work area Arn.
[0045] [First radio tag] The first wireless tag 1 is an RFID tag with a communication function that is attached to a process-related object that contains a part 15 used in a process operation.
[0046] Here, the "process-related object" is an object that identifiably contains the part 15 used in the process work, and may be, for example, a case or container that contains the part 15, or a package that packs the part 15. The "process-related object" may also be something that can be transported or replaced.
[0047] The first tag information is identification information assigned to a process. The first tag information may be, for example, alphanumeric information of up to 35 digits beginning with "yyy," where "yyy" is tag type information indicating the type of the tag information (i.e., information indicating that it is information related to a process), and the subsequent information may be process identification information that uniquely identifies the process. This allows the process information forming device 3 to recognize the type of received tag information and the process identification information of the process performed on the vehicle frame 20.
[0048] Here, when one storage section 10 used in a process operation is placed near the first wireless tag antenna section 31 and the first wireless tag 1 falls within the communication range T1 of the first wireless tag antenna section 31, communication begins between the first wireless tag 1 and the first wireless tag antenna section 31, and the first wireless tag 1 transmits first tag information to the first wireless tag antenna section 31. In this way, the process information forming device 3 can obtain the first tag information of the process performed on the vehicle frame 20 in the work area Arn of process #n.
[0049] Furthermore, when the work progresses in the work area and the storage unit 10 used in the process becomes empty and the worker uses the parts 15 in the next (different) storage unit 10, the worker places the different storage unit 10 near the first wireless tag antenna unit 31, and the first wireless tag 1 in the different storage unit 10 starts communication by being placed within the communication range T1 of the first wireless tag antenna unit 31. In this way, every time the storage unit 10 is replaced, it is placed so as to be within the communication range T1 of the first wireless tag antenna unit 31.
[0050] [Third radio tag] The third wireless tag 6 is an RFID tag with a communication function that is attached to a worker, equipment, machine (including an industrial robot) used in the work, etc. The third wireless tag 6 stores third tag information including identification information of the worker, the worker and equipment used in the work, etc.
[0051] The third tag information may be, for example, 16-digit alphanumeric information beginning with "zzz," where "zzz" is tag type information indicating the type of the tag information (i.e., information indicating that it is information about a worker, equipment, etc.), and the subsequent information may be worker / equipment, etc. identification information that uniquely identifies a worker, equipment, etc. This allows the process information forming device 3 to recognize the type of received tag information and the company / equipment, etc. identification information.
[0052] In addition, even when multiple workers perform process work, the worker identification information of each of the multiple workers can be associated with the target identification information. For example, when changing the model of the manufactured vehicle, the equipment, etc. prepared in the work area Arn may be changed. Even in this case, the changed equipment identification information is read and associated with the target identification information, so it can be applied to the change of equipment, etc.
[0053] (A-1-4) Detailed configuration of the process information forming device In FIG. 1, the process information forming device 3 has a first wireless tag antenna unit 31, a second wireless tag antenna unit 32, and a process information control device 33.
[0054] The process information forming device 3 acquires tag information from the first wireless tag 1 attached to the storage section 10 and the second wireless tag 2 attached to the vehicle frame 20 to be processed, forms process information in which at least the first tag information and the second tag information are associated with each other, and provides the process information to the process information management device 4. Note that the process information may be information in which the first tag information, the second tag information, and the third tag information are associated with each other.
[0055] [Antenna section for first and second wireless tags] The first wireless tag antenna section 31 and the second wireless tag antenna section 32 are antenna sections that capture radio waves emitted by the first wireless tag 1, the second wireless tag 2, and the third wireless tag 6, respectively.
[0056] In addition, the radio waves transmitted from the third radio tag 6 attached to a worker, equipment, etc. may be captured by either the antenna unit 31 for the first radio tag or the antenna unit 32 for the second radio tag, or a separate antenna unit may be provided to capture the radio waves from the third radio tag 6.
[0057] The first wireless tag antenna unit 31 captures radio waves transmitted from the first wireless tag 1 attached to the storage unit 10. The first wireless tag antenna unit 31 is installed so that an area including the arrangement position of the storage unit 10 in the work area Arn is set as a communication range T1. When the first wireless tag 1 attached to the storage unit 10 is present in the communication range T1, the first wireless tag antenna unit 31 captures radio waves transmitted from the first wireless tag 1, converts them into an electrical signal, and provides it to the process information control device 33. The first wireless tag antenna unit 31 can be one having directivity in a specific direction.
[0058] The first wireless tag antenna unit 31 may be connectable to the tag information reading unit 331 of the process information forming device 3 via a cable (e.g., a LAN cable, a USB cable, etc.), in which case the installation position of the first wireless tag antenna unit 31 can be adjusted appropriately.
[0059] The second wireless tag antenna unit 32 captures radio waves transmitted from the second wireless tag 2 attached to the vehicle frame 20. The second wireless tag antenna unit 32 is provided so that the area including the position of the vehicle frame 20 transported by the conveyor line in the work area Arn becomes a communication range T2. When the second wireless tag 2 of the vehicle frame 20 transported in the communication range T2 is present, the second wireless tag antenna unit 32 captures radio waves transmitted from the second wireless tag 2, converts the radio waves into an electric signal, and provides the electric signal to the process information control device 33. The second wireless tag antenna unit 32 may be one having directivity toward the vehicle frame 20 transported by the conveyor line. Similarly, the second wireless tag antenna unit 32 may be connectable to the tag information reading unit 331 via a cable.
[0060] FIG. 3 is an internal configuration diagram showing the internal configuration of the process information control device 33 according to the embodiment.
[0061] In FIG. 3, a process information control device 33 according to the embodiment includes a tag information reading unit 331, a control unit 333, and a wireless communication unit 334.
[0062] [Tag information reading section] The tag information reading unit 331 is an RFID reader (tag reader) that reads tag information based on signals from the first wireless tag antenna unit 31 and the second wireless tag antenna unit 32, and provides the read tag information to the control unit 333.
[0063] [Control Unit] The control unit 333 is a processing unit or device that controls the functions of the process information control device 33. For example, a PLC (Programmable Logic Controller) or the like can be applied to the control unit 333, and for example, a device having a CPU, ROM, RAM, EEPROM, etc. can be applied. The CPU may execute a processing program stored in the ROM to realize the functions of the control unit 333. In this case, the processing program causes the CPU (computer) to function as each processing unit of the control unit 333 in FIG. 3.
[0064] As shown in FIG. 3, the control unit 333 includes an information acquisition unit 71, a storage unit 72, and a process information generation unit 73.
[0065] [Information acquisition department] The information acquiring unit 71 acquires tag information from the tag information reading unit 331, and upon detecting the second tag information, instructs the process information generating unit 73 to generate process information including at least the second tag information and the first tag information.
[0066] [Process specific information detection unit] The process specification information detection unit 711 analyzes the tag information from the tag information reading unit 331 to detect the first tag information and the third tag information.
[0067] For example, when the process identification information detection unit 711 analyzes the tag information and determines that the tag information is alphanumeric information of up to 35 digits beginning with "yyy", it determines that the tag information is the first tag information. On the other hand, when the process identification information detection unit 711 determines that the tag information is alphanumeric information of 16 digits beginning with "zzz", it determines that the tag information is the third tag information.
[0068] Here, it is considered that the storage unit 10 will remain in the same position in the work area Arn until it is replaced. Therefore, until the storage unit 10 is replaced, the process identification information detection unit 711 will continue to detect the first tag information having the same content for a relatively long predetermined time (hereinafter, also referred to as the “first tag information reading time” and the “process identification information detection time”), and therefore the same first tag information may be stored in the storage unit 72.
[0069] Furthermore, for example, when the container 10 is replaced and the process specification information detection unit 711 detects new first tag information, the new first tag information may be updated.
[0070] The process identification information detection time varies depending on the parts 15 specified in each process #n, process changes accompanying changes in vehicle model and specifications, and work content, so it may be set or changed in advance for each process #n. Also, since it may vary depending on the maturity of the worker for the process work, the continuous detection time of the first tag information may be recorded, and the process identification information detection time may be obtained by statistical analysis using the time (value) recorded as past history. More specifically, the process identification information detection time may be an average time for each vehicle model or specification of the vehicle frame 20 to be processed and for each worker.
[0071] [Target information detection section] The target information detection unit 712 analyzes the tag information from the tag information reading unit 331, and when it detects the second tag information, it instructs the process information generation unit 73 to generate process information including at least the second tag information and the first tag information.
[0072] For example, when the target information detection unit 712 analyzes the tag information and determines that the tag information is 20-digit alphanumeric information beginning with "xxx," it determines that the tag information is second tag information.
[0073] Here, since the vehicle frame 20 moves along the conveyor line, the second wireless tag 2 of the vehicle frame 20 belongs to the communication range T2 for a predetermined time based on the moving speed of the conveyor line (hereinafter also referred to as the "second tag information reading time" and the "target information detection time").
[0074] Therefore, during the target information detection time when the second wireless tag 2 is within the communication range T2, the target information detection unit 712 detects the second tag information. In other words, by detecting the second tag information, the target information detection unit 712 can identify that the second tag information is information related to the vehicle frame 20 to be processed.
[0075] Thereafter, when the next vehicle frame 20 is transported and the second wireless tag 2 of the next vehicle frame 20 falls within the communication range T2, the target information detection unit 712 detects the next second tag information, thereby detecting the second tag information of the vehicle frame 20 to be next processed.
[0076] When the object information detection unit 712 detects the second tag information, it provides at least the second tag information and the first tag information to the process information generation unit 73 .
[0077] In addition, when the first tag information cannot be detected when the second tag information is detected, a patrol lamp may be turned on or off, a warning sound may be sounded, etc., to inform a worker, etc. that the part is not properly linked to the vehicle frame 20.
[0078] [Process information generation department] When the second tag information (target information) is detected by the target information detection unit 712, the process information generation unit 73 generates process information including at least the second tag information and the first tag information, and provides the generated process information to the wireless communication unit 334.
[0079] Here, the "process information" is information indicating that, for each process, a process operation specified for that process has been performed on a processing object (for example, the vehicle frame 20).
[0080] In this embodiment, the "process information" is information including at least information associating second tag information that identifies the vehicle frame 20 with first tag information that identifies the process. The "process information" may also be information including the second tag information, the first tag information, and third tag information. Furthermore, the "process information" may also include "processing date and time information," a work area, and the like.
[0081] The "processing date and time information" is date and time information when a process operation is performed on the vehicle frame 20 to be processed. For example, the processing date and time information may be date and time information when the second wireless tag 2 of the vehicle frame 20 is detected by the object information detection unit 712, or date and time information when the process information is generated.
[0082] Conventionally, it has not been possible to link information about the parts 15 used for the vehicle frame 20. In contrast to this, according to this embodiment, it is possible to associate the second tag information for identifying the vehicle frame 20 with the first tag information for identifying the process. As described below, the process information management device 4 stores information about the parts associated with the first tag information assigned to the parts 15. Therefore, the process information management device 4 can associate information for identifying the vehicle frame 20 with the part information of the parts 15 used for the vehicle frame 20 in each process, and can record traceability information about the parts 15 used for the vehicle frame 20.
[0083] Furthermore, after detecting the second tag information, the process information generating unit 73 continues to detect the second tag information during the target information detection time, but in order to avoid transmitting the same process information, an exclusive process of the same process information may be performed. In other words, when a plurality of pieces of process information including the same target identification information are generated, the process information generating unit 73 may discard one of the process information (for example, the one with the later processing date and time information).
[0084] [Storage] The storage unit 72 stores the processing programs executed by the control unit 333, information required for creating process information, and the like.
[0085] [Wireless Communications Division] The wireless communication unit 334 wirelessly communicates with the wireless communication unit 402 of the process information management device 4, and transmits the process information generated by the process information generation unit 73 to the wireless communication unit 402.
[0086] Here, the wireless communication method between the wireless communication unit 334 of the process information forming device 3 and the wireless communication unit 402 of the process information management device 4 is not particularly limited, but for example, a wireless method using 920 MHz in the sub-gigahertz band, a private 5G (fifth generation mobile communication system) wireless system (local 5G system), or standardized technologies such as international standards IEEE802.15.4 and IEEE802.11 may be applied.
[0087] For example, if the wireless communication unit 402 is a parent unit that collects process information for each process #n from multiple wireless communication units 334, the wireless communication unit 334 in each work area Arn can be a child unit to the wireless communication unit 402 (parent unit).
[0088] For example, since each step #n is specified in a planned order, a predetermined unit time may be divided and time slots may be assigned to multiple wireless communication units 334, so that wireless communication may be performed between the wireless communication unit 402 and the multiple wireless communication units 334.
[0089] (A-1-5) Detailed configuration of the process information management device FIG. 4 is an internal configuration diagram showing the internal configuration of a process information management device 4 according to an embodiment.
[0090] In FIG. 4, the process information management device 4 includes a control unit 401 , a wireless communication unit 402 , and a storage unit 41 .
[0091] The process information management device 4 collects process information from the process information forming device 3 in the work area Arn of each process #n, and records and manages the process management information of the processing object (e.g., the vehicle frame 20) based on the collected process information of each process #n. A general-purpose server can be applied to the process information management device 4.
[0092] [Wireless Communications Division] The wireless communication unit 402 wirelessly communicates with the wireless communication unit 334 of the process information forming device 3 arranged in the work area Arn of each process #n, and receives process information of each process #n from the wireless communication unit 334 of each work area Arn.
[0093] [Control Unit] The control unit 401 is a processing unit or device that controls the functions of the process information management apparatus 4. For example, a device having a CPU, a ROM, a RAM, an EEPROM, etc. may be used as the control unit 401. The CPU may execute a processing program stored in the ROM to realize the functions of the control unit 401. In this case, the processing program causes the CPU (computer) to function as each processing unit of the control unit 401 in FIG. 4.
[0094] As shown in FIG. 4, the control unit 401 includes a process information acquisition unit 81, a process information integration unit 82, and a process management information recording unit 83.
[0095] [Process information acquisition department] The process information acquisition unit 81 acquires the process information of each process #n via the wireless communication unit 402 .
[0096] Since the process information acquisition unit 81 collects the process information obtained in the multiple work areas Ar1 to ArN, the collected process information may be temporarily stored in the storage unit 41.
[0097] FIG. 5 is a configuration diagram for explaining the configuration of the process information 52 collected by the process information acquisition unit 81 according to the embodiment.
[0098] In Figure 5, second tag information "xxx00001111" that identifies the vehicle frame 20, first tag information "yyy00001" for a certain process, third tag information "zzz00001" for the process, processing date and time information "yy:mm:dd:ss", and work area information "Ar1" are associated with each other.
[0099] In addition, the work area information "Ar1" is a unique management number of the process information forming device 3 that transmitted the process information 52, and the work area can be determined by registering it in correspondence with the work areas Ar1, Ar2, ... ArN assigned to each process information forming device 3.
[0100] This means that a process was carried out on the vehicle frame 20 with the second tag information "xxx00001111" at the processing date and time information "yy:mm:dd:ss" by the worker with the third tag information "zzz00001" in the work area information "Ar1", in which the first tag information "yyy00001" was assigned.
[0101] In this way, based on the process information collected from the process information forming device 3 located in the work area of each process, it is possible to obtain information relating to the process, processing date and time information, work area, worker, etc., performed on the vehicle frame 20 during actual production and manufacturing.
[0102] [Storage] The memory unit 41 stores collected process information 52 for each process #n, information 53 associating first tag information with part information, information 54 associating third tag information with worker / equipment identification information, process management information 51 for each target identification information, etc.
[0103] FIG. 6(A) is a diagram showing the configuration of information 53 that associates first tag information with part information according to an embodiment, and FIG. 6(B) is a diagram showing the configuration of information 54 that associates third tag information with worker / equipment identification information.
[0104] 6(A), information 53 is information that associates first tag information assigned to a process with part information of the part 15 used in the process. Examples of part information include, but are not limited to, items such as "part manufacturer," "part manufacturing facility," "part model number," "serial number," "part lot number," and "part expiration date," and this part information is associated with the first tag information.
[0105] As shown in FIG. 6(B), the information 54 associates the third tag information with the worker / device identification information.
[0106] [Process Information Integration Department] The process information integration unit 82 generates process management information for each target identification information using the process information of each process #n, information 53 that associates the first tag information with the part information, and information 54 that associates the third tag information with the worker / equipment identification information.
[0107] [Process Management Information Recording Department] The process control information recording unit 83 records (stores) the process control information generated by the process information integrating unit 82 in the storage unit 41.
[0108] FIG. 7 is a configuration diagram showing the configuration of the process management information 51 generated by the process information integrating unit 82 according to the embodiment.
[0109] As described above, the process information integration unit 82 generates process management information for each target identification information using the process information of each process #n, information 53 that associates the first tag information with part information, and information 54 that associates the third tag information with worker / equipment identification information.
[0110] As illustrated in FIG. 7, the process management information 51 includes items such as a “processing object ID” as object identification information, a “processed part name (processing process name)” indicating the process name and / or part name of each process #n, a “part number” for identifying the part 15 at each process #n, “processing date and time information”, “worker / equipment identification information” indicating worker identification information and / or equipment identification information, a “part manufacturer” indicating the manufacturer (manufacturer) of the part 15, a “part manufacturing facility” indicating the manufacturing facility for the part 15, “part model number”, “serial number (product number)”, “part lot number”, and “part expiration date”.
[0111] Here, the "process work information" is information that enables identification of the work area Arn of the process #n and enables identification of the process work that has been performed on the processing target (for example, the vehicle frame 20).
[0112] In addition, the process management information 51 is not limited to the items exemplified in FIG. 7, and when the first tag information includes other information related to the part 15, the other information may be linked to the target identification information.
[0113] 7, information arranged in each row (horizontal direction) indicates process information for each process #n. More specifically, for example, the process information for "Part A installation process" indicates that it has "Processed part name: Part A", "Part number: 2", "Processing date and time: (y (year): m (month): d (day): t (hour): m (minute))", "Worker / equipment identification information: A", "Part manufacturer: AAA", "Part manufacturing facility: Yokohama", "Part model number: 22-222", "Serial number (product number): 22-x-2222", "Part lot number: 2-22-222", "Part expiration date (y (year): m (month): d (day))", etc.
[0114] The process information integration unit 82 integrates the process information of each process #n using the object identification information (for example, "processing object ID: xxx0001111") as a key, and generates the process management information 51 illustrated in Fig. 7. At this time, the process information may be integrated in an order according to a process order defined in advance.
[0115] (A-2) Operation of the embodiment Next, a processing operation in the process information management system according to the embodiment will be described.
[0116] (A-2-1) Processing in the process information forming device 3 FIG. 8 is a flowchart showing the process in the process information forming apparatus 3 according to the embodiment.
[0117] For example, in the production process of automobiles, a second wireless tag 2 is attached to a vehicle frame 20, which is a basic component part of the production, and the vehicle frame 20 with the second wireless tag 2 attached is transported on a conveyor line.
[0118] Along the conveyor line, each of the work areas Ar1 to ArN for processes #1 to #N has a storage section 10 for storing parts 15 used in the process operation, and a first wireless tag 1 is attached to the storage section 10.
[0119] In addition, a process information forming device 3 is disposed in the work area Arn of each process #n, which reads the tag information (first tag information, second tag information) of the first wireless tag 1 and the second wireless tag 2 and forms process information.
[0120] [First tag information detection process] FIG. 8(A) is a flowchart showing a process in which the process information forming device 3 detects the first tag information of the first wireless tag 1 attached to the container 10 arranged in the work area Arn.
[0121] First, an operator places the storage unit 10 to be used in the process operation so that it falls within the communication range T1 of the first wireless tag antenna unit 31. In other words, the storage unit 10 is placed so that the first wireless tag 1 in the storage unit 10 falls within the communication range T1.
[0122] When the first wireless tag 1 falls within the communication range T1, the first wireless tag antenna unit 31 detects the radio waves from the first wireless tag 1 and wireless communication begins.
[0123] The radio waves carrying the first tag information stored in the first wireless tag 1 are captured by the first wireless tag antenna unit 31 , converted into an electrical signal, and provided to the tag information reading unit 331 .
[0124] The tag information reading unit 331 reads the received signal, and when the process identification information detection unit 711 detects the first tag information (S101 / YES), the first tag information is stored in the storage unit 72 (S102).
[0125] When the first wireless tag antenna unit 31 cannot detect the radio waves from the first wireless tag 1 and the first tag information is not detected (S101 / NO), detection of the first tag information is monitored.
[0126] Although FIG. 8A shows the detection process of the first tag information, the process flow shown in FIG. 8A can also be applied to the detection process of the third tag information.
[0127] [Process information generation process] Next, Figure 8 (B) is a flowchart showing a process in which the process information forming device 3 detects the second tag information of the second wireless tag 2 attached to the vehicle frame 20 transported by the conveyor line and generates process information.
[0128] When the vehicle frame 20 being transported by the conveyor line falls within the communication range T2 of the antenna unit 32 for the second wireless tag, the first wireless tag 1 of the vehicle frame 20 falls within the communication range T2, the antenna unit 32 for the second wireless tag detects the radio waves, and communication begins.
[0129] Then, the radio waves carrying the second tag information stored in the second wireless tag 2 are captured by the second wireless tag antenna unit 32, converted into an electrical signal, and provided to the tag information reading unit 331.
[0130] The tag information reading unit 331 reads the received signal, and when the target information detection unit 712 detects the second tag information (S103 / YES), the second tag information is provided to the process information generation unit 73.
[0131] When the second wireless tag antenna unit 32 cannot detect the radio waves from the second wireless tag 2 and the second tag information is not detected (S103 / NO), detection of the second tag information is monitored.
[0132] When the second tag information is detected, the process information generation unit 73 generates process information including the second tag information from the target information detection unit 712, the first tag information, the third tag information, and processing date and time information (S104).
[0133] The process information generated by the process information generation unit 73 is provided to the wireless communication unit 334, a signal including the process information is formed in the wireless communication unit 334, and the signal including the process information is transmitted to the wireless communication unit 402 of the process information management device 4 (S105).
[0134] The above-mentioned process information generation process is performed in the work area Arn of each process #n.
[0135] (A-2-2) Processing in the process information management device 4 FIG. 9 is a flowchart showing the process in the process information management device 4 according to the embodiment.
[0136] In the process information management device 4, a signal including process information from the process information forming device 3 arranged in the work area Arn of each process #n is received by the wireless communication unit 402, and the received signal is provided to the control unit 401.
[0137] In the control unit 401, the received signal is analyzed, and the process information included in the received signal is acquired in the process information acquisition unit 81 (S201).
[0138] In the process information integration unit 82, the process information integration unit 82 generates process management information for each target identification information using the process information of each process #n, information 53 that associates the first tag information with the part information, and information 54 that associates the third tag information with the worker / equipment identification information (S202).
[0139] The process control information recording unit 83 stores (records) the process control information for each piece of object identification information generated by the process information integrating unit 82 in the storage unit 41 (S203).
[0140] (A-3) Effects of the embodiment As described above, according to the first embodiment, by utilizing wireless tags, when the processing object arrives at the work area of each process, process information is created that automatically associates tag information identifying the processing object with tag information identifying the process to be performed on the processing object, thereby making it possible to track the parts used in the actual process.
[0141] By simply installing a process information forming device for each process of attaching parts to the vehicle frame, the first tag information and the second tag information can be linked when the vehicle frame arrives at the work area, thereby reducing operational errors (human errors) made by workers and reducing work hours because process information and process management information can be recorded (stored).
[0142] Furthermore, by incorporating a device that detects wireless tags (process information forming device) into a single package, even if the work area moves due to a process change, it can be easily accommodated because it is wireless.
[0143] Furthermore, in addition to the second tag information that identifies the object to be processed and the first tag information that identifies the process, it is also possible to associate third tag information that identifies the worker or the equipment used for the work, making it possible to link and track who performed the work or which equipment was used.
[0144] (B) Other embodiments Although various modified embodiments have been mentioned in the above-described embodiment, the present invention can also be applied to the following modified embodiments.
[0145] (B-1) In the above-described embodiment, an example was given of the application of the present invention to the automobile production process, but the present invention is not limited to automobile production and can be applied to the production of any product that is manufactured in multiple processes and in which process operations are carried out in multiple work areas.
[0146] (B-2) In the above embodiment, the present invention is applied to a system that employs a line production method, but the present invention can also be applied to other production methods. Specifically, the present invention can also be applied to a cell production method.
[0147] In the cell production system, for example, work-in-progress items to be processed are placed on a U-shaped line, and parts are assembled into the work-in-progress items to be processed to manufacture them. It is said that a relatively small number of workers are in charge of multiple processes. In other words, multiple process operations are carried out in one work area.
[0148] In this case, a single work area may be provided with storage compartments for a plurality of parts used in a plurality of processes, and a first wireless tag may be attached to each of the storage compartments. A single work area may be provided with one unit (one device) of process information forming device, and the process information forming device may be configured to be able to detect a plurality of first wireless tags. Even in this case, the process information forming device may generate and transmit process information in which second tag information including one piece of object identification information is associated with a plurality of pieces of first tag information performed in the work area.
[0149] Furthermore, it is not necessary to detect the processing object (i.e., detect the object identification information) for each process, and it is possible to detect the processing object (i.e., detect the object identification information) in one work area. In other words, in the cell production method, the period from when the processing object enters the work area to when the processing object leaves the work area is the period during which the process work is performed on the processing object in the work area. Therefore, the timing at which the process information is generated is not limited to when the processing object is detected (i.e., when the second tag information is detected), but may be when the processing object leaves the work area (when the same second tag information can no longer be detected) after the processing object's entry into the work area is detected (detection of the second tag information starts). [Explanation of symbols]
[0150] 9... process information management system, 1... first wireless tag, 2... second wireless tag, 10... storage section, 20... processing object (vehicle frame), 3...process information forming device, 31...first wireless tag antenna unit, 32...second wireless tag antenna unit, 33...process information control device, 331 and 332...tag information reading unit, 333...control unit, 334...wireless communication unit, 71...tag information acquisition unit, 711...process information identification information, 712...target information detection unit, 72...storage unit, 73...process information generation unit, 4...process information management device, 40...process information management server, 401...control unit, 402...wireless communication unit, 41...storage unit, 81...process information acquisition unit, 82...process information integration unit, 83...process information management information recording unit.
Claims
1. 1. A process information management system that manages a processing object and process specific information for each of a plurality of processing steps performed on the processing object in association with each other, For each of the work areas of the processing steps, a first tag information receiving means having a predetermined detection range and receiving first tag information including the process identification information; a second tag information receiving means for receiving second tag information including processing object identification information attached to the processing object and identifying the processing object, the second tag information receiving means having a predetermined detection range; a process specifying information detecting means for detecting the first tag information based on the information received by the first tag information receiving means; a processing object detection means for detecting the second tag information based on the information received by the second tag information receiving means; a process information generating means for generating process information in which the second tag information and the first tag information are associated with each other when the first tag information is detected by the process specifying information detecting means and the second tag information is detected by the processing object detecting means; having a process information management means for recording the process information in which the process specification information of each of the processing steps is associated with the processing object identification information included in the second tag information based on the process information acquired from the process information generation means for each of the work areas. A process information management system comprising:
2. a first wireless tag having the first tag information is attached to a storage unit that stores a member used in each of the processing steps, and the process identification information includes member information related to the member; The process information management means records the process information including component information related to the component used for the processing object in each of the processing steps based on the collected process information.
2. The process information management system according to claim 1 .
3. 3. The process information management system according to claim 1, wherein the material used in each of the processing steps includes a liquid or a gas.
4. 4. The process information management system according to claim 1, wherein the process information includes identification information of a worker who performed each of the processing steps.
5. 5. The process information management system according to claim 1, wherein the process information includes equipment identification information for identifying equipment used in each of the processing steps.
Citation Information
Patent Citations
Manufacture history management system
JP2005149004A
Production management method and production system
JP2006026843A
Surface mount technology system and method and carrier in surface mount technology system
JP2020025107A
Parts management program, part management method, and parts management device
WO2008038434A1
