Vehicle power supply device

JP7561310B2Active Publication Date: 2024-10-04AUTONETWORKS TECH LTD +2
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2020202378
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-12-07
Publication Date
2024-10-04
Estimated Expiration
2040-12-07

AI Technical Summary

Benefits of technology

【0007】 本開示によれば、適切に電圧変換できなくなる事態の発生を抑制することができる。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007561310000001
    Figure 0007561310000001
  • Figure 0007561310000002
    Figure 0007561310000002
  • Figure 0007561310000003
    Figure 0007561310000003
Patent Text Reader

Abstract

To appropriately suppress the occurrence of a situation of voltage conversion impossibility.SOLUTION: An on-vehicle power supply device 1 comprises a voltage conversion unit 6 and a control unit 12. The control unit 12 executes first control for causing the voltage conversion unit 6 to carry out only a step-down operation, second control for causing the voltage conversion unit to carry out only a step-up operation, and third control for causing the voltage conversion unit to carry out both the step-down and step-up operations. The control unit 12 executes the third control when a first duty of an on-off signal applied to a first switching element T1 becomes equal to or higher than an upper limit threshold value during the first control or a second duty of an on-off signal applied to a second switching element T2 becomes equal to or higher than a lower limit threshold value during the second control.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to an in-vehicle power supply device. [Background technology]

[0002] Patent Document 1 discloses a voltage conversion device that includes a step-down switching element and a step-up switching element that are switched by PWM control, and that performs step-down or step-up conversion of an input voltage and outputs the converted voltage. In this voltage conversion device, the duty of a step-down PWM signal is gradually increased up to 100% in the step-down conversion. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2014-222969 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, depending on the configuration, when the duty ratio of the step-down PWM signal approaches 100%, normal switching may not be possible. For example, when the step-down switching element is an N-channel FET, the gate voltage must be made higher than the source voltage in order to turn the step-down switching element on. Therefore, it is conceivable to use a bootstrap circuit to make the gate voltage higher than the source voltage. However, in this configuration, when the duty ratio of the step-down PWM signal approaches 100%, the charging of the capacitor in the bootstrap circuit becomes insufficient, and the step-down switching element may not be able to be turned on normally. In this case, voltage conversion will not be performed properly.

[0005] Therefore, an object of the present disclosure is to provide a technique capable of suppressing the occurrence of a situation in which appropriate voltage conversion is not possible. [Means for solving the problem]

[0006] The in-vehicle power supply device of the present disclosure is A vehicle-mounted power supply device including a voltage conversion unit that performs voltage conversion between a first conduction path and a second conduction path, and a control unit that controls the voltage conversion unit, the voltage conversion unit has a first switching element and a second switching element, and performs a step-down operation of stepping down a voltage applied to the first conductive path and applying the voltage to the second conductive path by turning on and off the first switching element, and a step-up operation of stepping up the voltage applied to the first conductive path and applying the voltage to the second conductive path by turning on and off the second switching element, the control unit performs a first control of causing the voltage conversion unit to perform only the step-down operation of the step-down operation and the step-up operation, a second control of causing the voltage conversion unit to perform only the step-up operation, and a third control of causing the voltage conversion unit to perform both the step-down operation and the step-up operation; The third control is performed when a first duty of an on / off signal provided to the first switching element during the first control becomes equal to or greater than an upper threshold, or when a second duty of an on / off signal provided to the second switching element during the second control becomes equal to or less than a lower threshold. Effect of the Invention

[0007] According to the present disclosure, it is possible to prevent occurrence of a situation in which appropriate voltage conversion is not possible. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is a circuit diagram showing a schematic configuration of an in-vehicle power supply system according to the first embodiment. [Diagram 2] FIG. 2 is a flowchart showing the flow of the transition process from the first control to the second control. [Diagram 3] FIG. 3 is a graph showing changes over time in the first duty and the second duty when transitioning from the first control to the second control. [Figure 4] FIG. 4 is a flowchart showing the flow of the transition process from the second control to the first control. [Diagram 5] FIG. 5 is a graph showing changes over time in the first duty and the second duty when transitioning from the second control to the first control. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] [Description of the embodiments of the present disclosure] First, the embodiments of the present disclosure will be listed and described.

[0010] [1] An in-vehicle power supply device comprising a voltage conversion unit that performs voltage conversion between a first conductive path and a second conductive path, and a control unit that controls the voltage conversion unit, wherein the voltage conversion unit has a first switching element and a second switching element, and performs a step-down operation in which the first switching element is turned on and off to step down a voltage applied to the first conductive path and apply it to the second conductive path, and a step-up operation in which the second switching element is turned on and off to step-up the voltage applied to the first conductive path and apply it to the second conductive path, wherein the control unit performs a first control for causing the voltage conversion unit to perform only the step-down operation of the step-down operation and the step-up operation, a second control for causing the voltage conversion unit to perform only the step-up operation, and a third control for causing the voltage conversion unit to perform both the step-down operation and the step-up operation, and performs the third control when a first duty of an on / off signal provided to the first switching element during the first control becomes equal to or greater than an upper threshold value, or when a second duty of an on / off signal provided to the second switching element during the second control becomes equal to or less than a lower threshold value.

[0011] According to this configuration, during the first control, only the step-down operation is performed until the first duty becomes equal to or greater than the upper threshold, thereby reducing power consumption, and when the first duty becomes equal to or greater than the upper threshold, the third control is performed to realize voltage conversion that is difficult to achieve with only the step-down operation. Alternatively, according to this configuration, during the second control, only the step-up operation is performed until the second duty becomes equal to or less than the lower threshold, thereby reducing power consumption, and when the second duty becomes equal to or less than the lower threshold, the third control is performed to realize voltage conversion that is difficult to achieve with only the step-up operation. Therefore, it is possible to suppress the occurrence of a situation in which voltage conversion cannot be performed appropriately while suppressing power consumption.

[0012] [2] The control unit, when transitioning from the first control to the second control, performs an increase control in the first control to gradually increase the first duty, switches to the third control when the first duty reaches the upper limit threshold in the increase control, and performs the second control after the third control.

[0013] This configuration makes it possible to prevent the occurrence of a situation in which voltage conversion cannot be performed appropriately during the process of transition from the step-down operation to the step-up operation.

[0014] [3] The control unit, when transitioning from the second control to the first control, performs a reduction control to gradually reduce the second duty, and when the second duty reaches the lower threshold during the reduction control, switches to the third control, and performs the first control after the third control.

[0015] According to this configuration, it is possible to prevent the occurrence of a situation in which the voltage cannot be converted appropriately during the process of transition from the step-up operation to the step-down operation.

[0016] [4] An in-vehicle power supply device as described in any one of [1] to [3], wherein the control unit, when switching from the first control or the second control to the third control, adjusts the first duty and the second duty so that the voltage conversion rate is the same before and after the switching.

[0017] According to this configuration, it is possible to suppress a large change in the output voltage before and after switching from the first control or the second control to the third control.

[0018] First Embodiment [Configuration of an in-vehicle power supply system] The in-vehicle power supply system 100 shown in FIG. 1 includes an in-vehicle power supply device 1, a first power supply unit 101, and a second power supply unit 102, and is configured as a system capable of supplying power to in-vehicle loads such as loads 111 and 112.

[0019] The in-vehicle power supply device 1 is configured, for example, as an in-vehicle step-up / step-down type DCDC converter, and is configured to step-up or step-down a DC voltage applied to one of the first conductive path 91 or the second conductive path 92, and output it to the other conductive path.

[0020] The in-vehicle power supply device 1 includes a first conductive path 91 and a second conductive path 92 serving as power lines. The first conductive path 91 is electrically connected to a high-potential terminal of a first power supply unit 101, which is a high-voltage power supply unit, and is a wiring that is conductive with this high-potential terminal, and is configured so that a predetermined DC voltage is applied from the first power supply unit 101. The second conductive path 92 is electrically connected to a high-potential terminal of a second power supply unit 102, which is a low-voltage power supply unit, and is a wiring that is conductive with this high-potential terminal, and is configured so that a predetermined DC voltage is applied from the second power supply unit 102.

[0021] The first power supply unit 101 and the second power supply unit 102 are configured by known power storage means such as, for example, a lead storage battery, a lithium ion battery, an electric double layer capacitor, a lithium ion capacitor, or other power storage units. The output voltage of the first power supply unit 101 may be higher than the output voltage of the second power supply unit 102, and the specific values ​​of the respective output voltages are not particularly limited. The low-potential side terminals of the first power supply unit 101 and the second power supply unit 102 are electrically connected to a ground (not shown) and are maintained at a predetermined ground potential (0 V).

[0022] A load 111 is electrically connected to a first conductive path 91 electrically connected to the first power supply unit 101, and the load 111 is configured to receive power from the first power supply unit 101. A load 112 is electrically connected to a second conductive path 92 electrically connected to the second power supply unit 102, and the load 112 is configured to receive power from the second power supply unit 102. The loads 111 and 112 are well-known in-vehicle electrical components, and the types are not particularly limited.

[0023] The vehicle-mounted power supply device 1 includes a voltage conversion unit 6, voltage detection units 21 and 22, a control unit 12, drive circuits 41, 42, 43, and 44, and capacitors 81 and 82.

[0024] The voltage conversion unit 6 performs voltage conversion between the first conductive path 91 and the second conductive path 92. The voltage conversion unit 6 has a first switching element T1, a second switching element T2, a third switching element T3, a fourth switching element T4 (hereinafter also referred to as switching elements T1, T2, T3, T4), and an inductor L. The switching elements T1, T2, T3, T4 are configured as, for example, N-channel MOSFETs. The switching elements T1, T2, T3, T4 are arranged in an H-bridge structure. The switching elements T1, T2, T3, T4 are turned on and off when an on-off signal is given. The on-off signal is, for example, a PWM (Pulse Width Modulation) signal. The inductor L is configured as a known coil. The voltage conversion unit 6 functions as a so-called bidirectional DC-DC converter.

[0025] The first switching element T1 and the third switching element T3 are connected in series between the first conductive path 91 and the ground. The drain of the first switching element T1 is electrically connected to the first conductive path 91, and the source of the first switching element T1 is electrically connected to the drain of the third switching element T3 and one end of the inductor L. The source of the third switching element T3 is electrically connected to the ground.

[0026] The fourth switching element T4 and the second switching element T2 are connected in series between the second conductive path 92 and ground. The drain of the fourth switching element T4 is electrically connected to the second conductive path 92. The source of the fourth switching element T4 is electrically connected to the drain of the second switching element T2 and the other end of the inductor L. The source of the second switching element T2 is electrically connected to ground.

[0027] One end of the capacitor 81 is electrically connected to the first conductive path 91, and the other end of the capacitor 81 is electrically connected to the ground. One end of the capacitor 82 is electrically connected to the second conductive path 92, and the other end of the capacitor 82 is electrically connected to the ground.

[0028] The voltage conversion unit 6 performs a step-down operation in which the voltage applied to the first conductive path 91 is stepped down and applied to the second conductive path 92 by turning on and off the first switching element T1. In addition, the voltage conversion unit 6 performs a step-up operation in which the voltage applied to the first conductive path 91 is stepped up and applied to the second conductive path 92 by turning on and off the second switching element T2.

[0029] The voltage detection units 21 and 22 are configured as, for example, known voltage detection circuits. The voltage detection unit 21 detects the voltage of the first conductive path 91. The voltage detection unit 22 detects the voltage of the second conductive path 92.

[0030] The control unit 12 is configured as, for example, a microcomputer and includes a CPU, a ROM, a RAM, a non-volatile memory, etc. Voltage detection units 21 and 22 are electrically connected to the control unit 12, and signals indicating voltages detected by the voltage detection units 21 and 22 are input.

[0031] The control unit 12 is electrically connected to the voltage conversion unit 6 via the drive circuits 41, 42, 43, and 44, and causes the voltage conversion unit 6 to perform a step-down operation and a step-up operation. When causing the voltage conversion unit 6 to perform the step-down operation and the step-up operation, the control unit 12 performs feedback control so that the voltage of the second conductive path 92 approaches a target voltage value. The feedback control is, for example, PI control, PID control, or the like. The target voltage value may be a value set by the control unit 12, or may be a value instructed by an external device such as an external ECU (Electronic Control Unit).

[0032] Specifically, the control unit 12 performs a known feedback calculation such as a PID calculation or a PI calculation based on the deviation between the voltage of the second conductive path 92 and the target voltage value, thereby determining the duty of the on / off signal so as to bring the voltage of the second conductive path 92 closer to the target voltage value. The duty is an on time relative to a switching period. The control unit 12 periodically performs the feedback calculation to periodically update the duty. The duty includes a first duty for stepping down the voltage for controlling the on / off of the first switching element T1, and a second duty for stepping up the voltage for controlling the on / off of the second switching element T2.

[0033] When the control unit 12 causes the voltage conversion unit 6 to perform a step-down operation, the control unit 12 determines a first duty and provides an on / off signal of the determined first duty to the drive circuits 41 and 43. When the drive circuit 41 receives an on / off signal from the control unit 12, the drive circuit 41 outputs an on / off signal of the same period and duty as the on / off signal to the gate of the first switching element T1. When the drive circuit 43 receives an on / off signal from the control unit 12, the drive circuit 43 inverts the on / off state and outputs an on / off signal complementary to the on / off signal output by the drive circuit 41 to the gate of the first switching element T1 to the gate of the third switching element T3. As a result, synchronous rectification control is performed when the step-down operation is performed.

[0034] When the control unit 12 causes the voltage conversion unit 6 to perform a boost operation, the control unit 12 determines a second duty and provides an on / off signal of the determined second duty to the drive circuits 42, 44. When the drive circuit 42 receives an on / off signal from the control unit 12, the drive circuit 42 outputs an on / off signal having the same period and duty as the on / off signal to the gate of the second switching element T2. When the drive circuit 44 receives an on / off signal from the control unit 12, the drive circuit 44 inverts the on / off state and outputs an on / off signal complementary to the on / off signal output by the drive circuit 42 to the gate of the second switching element T2 to the gate of the fourth switching element T4. As a result, synchronous rectification control is performed when the boost operation is performed.

[0035] Each of the drive circuits 41, 44 that control the high-side switching elements T1, T4 has, for example, a bootstrap circuit (not shown). When the drive circuits 41, 44 provide an ON signal to the gates of the switching elements T1, T4, the bootstrap circuit applies a voltage higher than the source voltage of the switching elements T1, T4 to the gates. In this embodiment, the ON signal is a high-level signal, and the OFF signal is a low-level signal.

[0036] The control unit 12 performs a first control for making the voltage conversion unit 6 perform only the step-down operation out of the step-down operation and the step-up operation, a second control for making the voltage conversion unit 6 perform only the step-up operation, and a third control for making the voltage conversion unit 6 perform both the step-down operation and the step-up operation. The control unit 12 performs the third control when the first duty becomes equal to or greater than the upper threshold during the first control. The control unit 12 performs the third control when the second duty becomes equal to or less than the lower threshold during the second control. In this embodiment, the upper threshold is set to a value smaller than the upper limit value, but may be set to the same value as the upper limit value. Also, in this embodiment, the lower threshold is set to a value larger than the lower limit value, but may be set to the same value as the lower limit value.

[0037] Here, the upper limit and the lower limit will be described. As described above, the drive circuits 41 and 44 apply the voltage boosted by the bootstrap circuit to the gates of the switching elements T1 and T4. Therefore, when the duty of the on / off signal generated by the drive circuits 41 and 44 approaches 100%, the off time becomes shorter and the charging of the capacitor included in the bootstrap circuit becomes insufficient. As a result, there is a risk that the drive circuits 41 and 44 will not be able to control the switching elements T1 and T4 to be on. Therefore, an upper limit is set for the first duty for controlling the on / off of the first switching element T1. Also, even during the boost operation, if the fourth switching element T4 does not switch to the on state, the on / off control cannot be performed by the synchronous rectification method. Therefore, as a range in which synchronous rectification is possible, a value obtained by subtracting the above upper limit from 100% is set as the lower limit for the second duty for controlling the on / off of the second switching element T2. The upper limit, the lower limit, the upper threshold, and the lower threshold are stored in advance in the control unit 12. In this embodiment, the upper limit is 97% and the lower limit is 3%, the upper threshold is 95% and the lower threshold is 5%.

[0038] When shifting from the first control to the second control, the control unit 12 performs an increase control to gradually increase the first duty of the on / off signal provided to the first switching element T1 in the first control. When the first duty reaches an upper limit threshold in the increase control, the control unit 12 switches to the third control and performs the second control after the third control.

[0039] When transitioning from the second control to the first control, the control unit 12 performs a reduction control to gradually reduce the second duty of the on / off signal provided to the second switching element T2 in the second control. When the second duty reaches a lower limit threshold in the reduction control, the control unit 12 switches to the third control and performs the first control after the third control.

[0040] When switching from the first control to the third control, the control unit 12 adjusts the first duty and the second duty so that the voltage conversion ratio is the same before and after the switching. Also, when switching from the second control to the third control, the control unit 12 adjusts the first duty and the second duty so that the voltage conversion ratio is the same before and after the switching. "Voltage conversion ratio" refers to the ratio of the output voltage to the input voltage. "The voltage conversion ratio is the same" does not only refer to the case where the voltage conversion ratio is completely the same, but also includes the case where the voltage conversion ratio is substantially the same. "The voltage conversion ratio is substantially the same" means, for example, that the difference in the voltage conversion ratio before and after the switching is within a predetermined small difference.

[0041] [Transition process from first control to second control] Next, the flow of transition from the first control to the second control will be described with reference to FIG. For example, when a start switch (e.g., an ignition switch) of the vehicle is turned on, the control unit 12 starts the process shown in Fig. 2. For example, the control unit 12 can grasp the on / off state of the start switch of the vehicle by receiving a signal indicating the on / off state of the start switch of the vehicle from an external ECU (Electronic Control Unit).

[0042] When the control unit 12 starts the process shown in FIG. 2, it determines whether or not a transition condition to the second control is satisfied (step S10). The "transition condition to the second control" may be, for example, "the start switch of the vehicle is turned on", "detection values ​​by various sensors exceed a predetermined value", or "a predetermined operation is performed by the user". If the transition condition to the second control is not satisfied (No in step S10), the control unit 12 returns to step S10. That is, the control unit 12 repeats the determination of whether or not the transition condition to the second control is satisfied until the transition condition to the second control is satisfied. Note that, before the transition condition to the second control is satisfied, the control unit 12 is performing the first control, or is not performing any of the first control, the second control, and the third control.

[0043] When the condition for transitioning to the second control is met (Yes in step S10), the control unit 12 starts the increase control (step S11). For example, when the first control is already being performed, the control unit 12 gradually increases the first duty while fixing the second duty at 0% in the first control being performed. When the first control is not being performed, the control unit 12 starts the first control and gradually increases the first duty while fixing the second duty at 0%. This causes the output voltage of the voltage conversion unit 6 to gradually increase.

[0044] After starting the increase control, the control unit 12 determines whether the first duty is equal to or greater than the upper threshold (step S12). If the first duty is not equal to or greater than the upper threshold (No in step S12), the control unit 12 returns to the process of step S12. That is, the control unit 12 repeats the determination whether the first duty is equal to or greater than the upper threshold while continuing the increase control. If the first duty is equal to or greater than the upper threshold (Yes in step S12), the control unit 12 switches to the third control (step S13). At this time, the control unit 12 adjusts the first duty and the second duty so that the voltage conversion rate is the same before and after the switch.

[0045] Here, an example of a method for adjusting the first duty and the second duty will be described. The voltage conversion ratio is calculated by the following formula (1). The voltage conversion ratio is "TR [%]", the first duty is "D1 [%]", and the second duty is "D2 [%]". TR=D1×(100 / (100-D2)) Formula (1) In the state before switching, D2=0, so TR just before switching can be found by substituting the current D1 into equation (1). For example, if D1=95, then TR=95. In this way, the voltage transfer rate just before switching is found. In other words, the first duty and second duty just after switching are D1 and D2 that satisfy equation (2) obtained by substituting TR=95 into equation (1). 95=D1×(100 / (100-D2))...Equation (2) For example, D1 can be calculated by substituting 3% which is the lower limit of the second duty for D2 in formula (2). In this case, D1=92.15. That is, immediately after switching, the first duty of the on / off signal given to the first switching element T1 is 92.15%, and the third duty of the on / off signal given to the third switching element T3 is 7.85%. The second duty of the on / off signal given to the second switching element T2 is 3%, and the fourth duty of the on / off signal given to the fourth switching element T4 is 97%.

[0046] When switching from the first control to the third control, the control unit 12 switches to the first mode of the third control (step S13). The first mode of the third control is a mode in which the first duty is gradually increased while the second duty is fixed. After switching to the first mode of the third control, the control unit 12 determines whether or not a condition for switching to the second mode of the third control is satisfied (step S14). The "condition for switching to the second mode" may be, for example, "the first duty has reached an upper limit value" or "the elapsed time since switching to the third control has reached a predetermined time". If the condition for switching to the second mode is not satisfied (No in step S14), the control unit 12 returns to the process of step S14. That is, the control unit 12 continues the first mode and gradually increases the first duty, while repeatedly determining whether or not the condition for switching to the second mode is satisfied. If the condition for switching to the second mode is satisfied (Yes in step S14), the control unit 12 switches to the second mode of the third control (step S15). The second mode of the third control is a mode in which the second duty is increased while the first duty is fixed. Note that the first duty and the second duty are the same before and after switching from the first mode to the second mode.

[0047] After switching to the second mode in step S15, the control unit 12 determines whether or not a condition for switching to the second control is satisfied (step S16). The "condition for switching to the second control" may be, for example, "the second duty is equal to or greater than a switching threshold for boosting", "the voltage conversion ratio is equal to the voltage conversion ratio when the first duty is 100% and the second duty is the lower limit threshold", or "the elapsed time since switching to the second mode reaches a predetermined time".

[0048] If the condition for switching to the second control is not satisfied (No in step S16), the control unit 12 returns to the process of step S16. That is, the control unit 12 continues the second mode of the third control and repeatedly determines whether the condition for switching to the second control is satisfied. If the condition for switching to the second control is satisfied (Yes in step S16), the control unit 12 switches to the second control (step S17). When switching from the third control to the second control, the control unit 12 adjusts the first duty and the second duty so that the voltage conversion ratio is the same before and after the switching. As an adjustment method, for example, the current voltage conversion ratio is first calculated based on the formula (1). Then, in the formula (1), the current voltage conversion ratio is substituted for TR and 100[%] is substituted for D1 to obtain D2. As a result, the second duty after the switching is obtained. As another adjustment method, the first duty and the second duty after switching may be determined in advance, and switching to the second control may be performed at the timing when the current voltage conversion ratio in the third control becomes the same as the voltage conversion ratio after switching. After switching to the second control, the control unit 12 gradually increases the second duty while maintaining the first duty at 100% so that the output voltage of the voltage conversion unit 6 becomes the target voltage value.

[0049] Next, the change over time of the duty when the first control is switched to the second control will be described. In the example shown in FIG. 3, the control unit 12 does not perform any of the first control, the second control, and the third control before the timing T10. The control unit 12 starts the increase control based on the fact that the condition for switching to the second control is satisfied at the timing T10. As a result, the first duty gradually increases, and the output voltage from the voltage conversion unit 6 gradually increases. Thereafter, at the timing T11, the first duty reaches the upper limit threshold. Therefore, the control unit 12 switches from the first control to the third control so that the voltage conversion rate is the same before and after the switching. As a result, the first duty decreases compared to immediately before the switching, and the second duty increases compared to immediately before the switching. The control unit 12 switches from the first control to the first mode of the third control at the timing T11. Therefore, only the first duty gradually increases while the second duty remains fixed. Thereafter, when the condition for switching to the second mode is satisfied at the timing T12, the control unit 12 switches to the second mode. As a result, the second duty gradually increases while the first duty remains fixed. Furthermore, at timing T13, when the condition for switching to the second control is met, the control unit 12 switches from the third control to the second control so that the voltage conversion rate is the same before and after the switching. At the time of switching, the first duty increases to 100% and the second duty decreases to, for example, a lower limit threshold. Thereafter, the second duty gradually increases while the first duty remains fixed at 100%.

[0050] [Transition process from second control to first control] Next, the flow of transition from the second control to the first control will be described with reference to FIG. The control unit 12 starts the process shown in FIG. 4 when the control is shifted to the second control by the above-mentioned shift process from the first control to the second control, for example.

[0051] When the control unit 12 starts the process shown in FIG. 4, it determines whether or not a transition condition to the first control is satisfied (step S30). The "transition condition to the first control" may be, for example, "the start switch of the vehicle is turned off," "detection values ​​by various sensors exceed a predetermined value," or "a predetermined operation is performed by the user." If the transition condition to the first control is not satisfied (No in step S30), the control unit 12 returns to step S30. That is, the control unit 12 repeats the determination of whether or not the transition condition to the first control is satisfied until the transition condition to the first control is satisfied. Note that the control unit 12 performs the second control before the transition condition to the first control is satisfied.

[0052] When the condition for shifting to the first control is satisfied (Yes in step S30), the control unit 12 starts the reduction control (step S31). Specifically, the control unit 12 gradually reduces the second duty while fixing the first duty at 100% in the second control being executed. This causes the output voltage of the voltage conversion unit 6 to gradually decrease.

[0053] After starting the reduction control, the control unit 12 determines whether the second duty is equal to or less than the lower threshold (step S32). If the second duty is not equal to or less than the lower threshold (No in step S32), the control unit 12 returns to the process of step S32. That is, the control unit 12 continues the reduction control and repeatedly determines whether the second duty is equal to or less than the lower threshold. If the second duty is equal to or less than the lower threshold (Yes in step S32), the control unit 12 switches to the third control (step S33). At this time, the control unit 12 adjusts the first duty and the second duty so that the voltage conversion rate is the same before and after the switch.

[0054] The first duty and the second duty immediately after switching to the third control are obtained, for example, by using the above-mentioned formula (1). Specifically, first, the voltage conversion ratio immediately before switching is calculated. Since D1=100 in the state before switching, the voltage conversion ratio immediately before switching is obtained by substituting the current D2 into formula (1). In the state before switching, for example, if D2 is 5% then TR is approximately 105.26%. In other words, the voltage conversion ratio immediately before switching is approximately 105.26%. The first duty and the second duty immediately after switching are D1 and D2 that satisfy formula (2) obtained by substituting 105.26% for TR in formula (1). 105.26=D1×(100 / (100-D2))...Equation (3) For example, D1 can be obtained by substituting 97%, which is the upper limit of the first duty, for D1 in formula (3). In this case, D2 is approximately 7.85%. That is, immediately after switching, the first duty of the on / off signal given to the first switching element T1 is 97%, and the third duty of the on / off signal given to the third switching element T3 is 3%. Then, the second duty of the on / off signal given to the second switching element T2 is 7.85%, and the fourth duty of the on / off signal given to the fourth switching element T4 is 92.15%.

[0055] When switching from the second control to the third control, the control unit 12 switches to the third mode of the third control (step S33). The third mode of the third control is a mode in which the second duty is gradually reduced while the first duty is fixed. After switching to the third mode of the third control, the control unit 12 determines whether or not a condition for switching to the fourth mode of the third control is satisfied (step S34). The "condition for switching to the fourth mode" may be, for example, "the second duty has reached a lower limit value" or "the elapsed time since switching to the third control has reached a predetermined time". If the condition for switching to the fourth mode is not satisfied (No in step S34), the control unit 12 returns to the process of step S34. That is, the control unit 12 continues the third mode and gradually reduces the second duty, while repeatedly determining whether or not the condition for switching to the fourth mode is satisfied. If the condition for switching to the fourth mode is satisfied (Yes in step S34), the control unit 12 switches to the fourth mode of the third control (step S35). The fourth mode of the third control is a mode in which the first duty is reduced while the second duty is fixed. Note that the first duty and the second duty are the same before and after switching from the first mode to the second mode.

[0056] After switching to the fourth mode in step S35, the control unit 12 determines whether or not a condition for switching to the first control is satisfied (step S36). The "condition for switching to the first control" may be, for example, "the first duty is equal to or lower than a switching threshold for step-down", "the voltage conversion ratio is equal to the voltage conversion ratio when the first duty is the upper limit threshold and the second duty is 0%", or "the elapsed time from switching to the fourth mode reaches a predetermined time".

[0057] If the condition for switching to the first control is not satisfied (No in step S36), the control unit 12 returns to the process of step S36. That is, the control unit 12 continues the fourth mode of the third control and repeatedly determines whether the condition for switching to the first control is satisfied. If the condition for switching to the first control is satisfied (Yes in step S36), the control unit 12 switches to the first control (step S37). When switching from the third control to the first control, the control unit 12 adjusts the first duty and the second duty so that the voltage conversion ratio is the same before and after the switching. As an adjustment method, for example, the current voltage conversion ratio is first calculated based on the formula (1). Then, in the formula (1), the current voltage conversion ratio is substituted for TR and 0 [%] is substituted for D2 to obtain D1. As a result, the first duty immediately after the switching is obtained. As another adjustment method, the first duty and the second duty after the switching may be determined in advance, and the control may be switched to the first control at a timing when the current voltage conversion ratio in the third control becomes the same as the voltage conversion ratio after the switching. After switching to the first control, the control unit 12 gradually reduces the first duty so that the output voltage of the voltage conversion unit 6 becomes the target voltage value while maintaining the second duty at 0%.

[0058] Next, the change over time of the duty when shifting from the second control to the first control will be described. In the example shown in FIG. 5, the control unit 12 performs the second control in a stage before timing T30. The control unit 12 starts the reduction control based on the fact that the condition for shifting to the first control is satisfied at timing T30. As a result, the second duty gradually decreases, and the output voltage from the voltage conversion unit 6 gradually decreases. Thereafter, at timing T31, the second duty reaches the lower limit threshold. Therefore, the control unit 12 switches from the second control to the third control so that the voltage conversion rate is the same before and after the switching. As a result, the first duty decreases compared to immediately before the switching, and the second duty increases compared to immediately before the switching. The control unit 12 switches from the second control to the third mode of the third control at timing T31. Therefore, only the second duty gradually decreases while the first duty remains fixed. Thereafter, when the condition for switching to the fourth mode is satisfied at timing T32, the control unit 12 switches to the fourth mode. As a result, the first duty gradually decreases while the second duty remains fixed. Furthermore, at timing T33, when the condition for switching to the first control is met, the control unit 12 switches from the third control to the first control so that the voltage conversion rate is the same before and after the switching. At the time of switching, the first duty increases to, for example, an upper limit threshold value, and the second duty becomes 0%. Thereafter, the first duty gradually decreases while the second duty remains fixed at 0%.

[0059] Next, the effects of this configuration will be illustrated. The in-vehicle power supply device 1 of the present disclosure includes a voltage conversion unit 6 and a control unit 12. The control unit 12 performs a first control for causing the voltage conversion unit 6 to perform only a step-down operation, a second control for causing the voltage conversion unit 6 to perform only a step-up operation, and a third control for causing the voltage conversion unit 6 to perform both a step-down operation and a step-up operation. The control unit 12 performs the third control when the first duty becomes equal to or greater than an upper threshold during the first control. The control unit 12 also performs the third control when the second duty becomes equal to or less than a lower threshold during the second control. According to this configuration, in the first control, only the step-down operation is performed until the first duty becomes equal to or greater than the upper threshold, so that power consumption can be suppressed. When the first duty becomes equal to or greater than the upper threshold, the third control is performed to realize voltage conversion that is difficult to achieve with only the step-down operation. The term "voltage conversion that is difficult to achieve with only the step-down operation" refers to voltage conversion that is difficult to achieve with only the step-down operation among voltage conversions in which the voltage conversion ratio is smaller than 1, and specifically refers to voltage conversion in which the first duty exceeds the upper limit value. Furthermore, in the second control, only the step-up operation is performed until the second duty becomes equal to or less than the lower threshold, so that power consumption can be suppressed. When the second duty becomes equal to or less than the lower threshold, the third control is performed to realize voltage conversion that is difficult to achieve with only the step-up operation. The term "voltage conversion that is difficult to achieve with only the step-up operation" refers to voltage conversion that is difficult to achieve with only the step-up operation among voltage conversions in which the voltage conversion ratio is larger than 1, and specifically refers to voltage conversion in which the second duty exceeds the lower limit value. According to this configuration, it is possible to suppress the occurrence of a situation in which the voltage cannot be appropriately converted even when converting to an output voltage close to the input voltage, while suppressing power consumption.

[0060] Furthermore, when transitioning from the first control to the second control, the control unit 12 performs an increase control to gradually increase the first duty in the first control. Then, when the first duty reaches an upper limit threshold in the increase control, the control unit 12 switches to the third control and performs the second control after the third control. This configuration makes it possible to prevent the occurrence of a situation in which voltage conversion cannot be performed appropriately during the process of transition from the step-down operation to the step-up operation.

[0061] Furthermore, when transitioning from the second control to the first control, the control unit 12 performs a reduction control to gradually reduce the second duty in the second control. Then, when the second duty reaches a lower limit threshold in the reduction control, the control unit 12 switches to the third control and performs the first control after the third control. According to this configuration, it is possible to prevent the occurrence of a situation in which the voltage cannot be converted appropriately during the process of transition from the step-up operation to the step-down operation.

[0062] When switching from the first control or the second control to the third control, the control unit 12 adjusts the first duty and the second duty so that the voltage conversion rate is the same before and after the switching. According to this configuration, it is possible to suppress a large change in the output voltage before and after switching from the first control or the second control to the third control.

[0063] <Other embodiments> The present disclosure is not limited to the embodiments described above and in the drawings. For example, the features of the above or later described embodiments can be combined in any combination within a range that does not contradict. In addition, any feature of the above or later described embodiments can be omitted unless it is clearly stated as essential. Furthermore, the above-mentioned embodiment may be modified as follows.

[0064] In the above first embodiment, the control unit is configured to perform the third control in both cases of "when the first duty becomes equal to or greater than the upper threshold during the first control" and "when the second duty becomes equal to or greater than the lower threshold during the second control." In contrast, the control unit may be configured to perform the third control only in either one of the cases.

[0065] In the above first embodiment, the control unit is mainly configured with a microcomputer, but it may be realized by a plurality of hardware circuits other than a microcomputer.

[0066] It should be noted that the embodiments disclosed herein are illustrative and not restrictive in all respects. The scope of the present invention is not limited to the embodiments disclosed herein, and is intended to include all modifications within the scope indicated by the claims or within the scope equivalent to the claims. [Explanation of symbols]

[0067] 1: Automotive power supply unit 6: Voltage conversion section 12: Control section 21: Voltage detection section 22: Voltage detection section 41: Drive circuit 42: Drive circuit 43: Drive circuit 44: Drive circuit 81: Capacitor 82: Capacitor 91: First conductive path 92: Second conductive path 100: Automotive power supply system 101: 1st power supply section 102:Second power supply section 111: Load 112: Load L: Inductor T1: First switching element T2: Second switching element T3: Third switching element T4: Fourth switching element

Claims

1. A vehicle-mounted power supply device including a voltage conversion unit that performs voltage conversion between a first conduction path and a second conduction path, and a control unit that controls the voltage conversion unit, the voltage conversion unit has a first switching element and a second switching element, and performs a step-down operation of stepping down a voltage applied to the first conductive path and applying the voltage to the second conductive path by turning on and off the first switching element, and a step-up operation of stepping up the voltage applied to the first conductive path and applying the voltage to the second conductive path by turning on and off the second switching element, the control unit performs a first control of causing the voltage conversion unit to perform only the step-down operation of the step-down operation and the step-up operation, a second control of causing the voltage conversion unit to perform only the step-up operation, and a third control of causing the voltage conversion unit to perform both the step-down operation and the step-up operation; performing the third control when a first duty of an on / off signal provided to the first switching element during the first control becomes equal to or greater than an upper limit threshold; When switching from the first control to the third control, switching to a first mode of the third control; the first mode is a mode in which the first duty of an on / off signal provided to the second switching element is gradually increased while a second duty of the on / off signal is fixed; Furthermore, when switching from the first control to the third control, the control unit adjusts the first duty and the second duty so that a voltage conversion rate is the same before and after the switching. Automotive power supply device.

2. An on-board power supply device comprising: a voltage conversion unit that performs voltage conversion between a first conductive path and a second conductive path; and a control unit that controls the voltage conversion unit, the voltage conversion unit has a first switching element and a second switching element, and performs a step-down operation of stepping down a voltage applied to the first conductive path and applying the voltage to the second conductive path by turning on and off the first switching element, and a step-up operation of stepping up the voltage applied to the first conductive path and applying the voltage to the second conductive path by turning on and off the second switching element, the control unit performs a first control of causing the voltage conversion unit to perform only the step-down operation of the step-down operation and the step-up operation, a second control of causing the voltage conversion unit to perform only the step-up operation, and a third control of causing the voltage conversion unit to perform both the step-down operation and the step-up operation; performing the third control when a second duty of an on / off signal provided to the second switching element during the second control becomes equal to or less than a lower limit threshold; When switching from the second control to the third control, switching to a third mode of the third control; the third mode is a mode in which a first duty of an on / off signal provided to the first switching element is fixed and a second duty is gradually reduced, Furthermore, when switching from the second control to the third control, the control unit adjusts the first duty and the second duty so that a voltage conversion rate is the same before and after the switching. Automotive power supply device.

3. The automotive power supply device of claim 1, wherein the control unit, when transitioning from the first control to the second control, performs an increase control in the first control to gradually increase the first duty, switches to the third control when the first duty reaches the upper limit threshold in the increase control, and performs the second control after the third control.

4. The automotive power supply device of claim 2, wherein the control unit performs a reduction control to gradually reduce the second duty when transitioning from the second control to the first control, switches to the third control when the second duty reaches the lower threshold during the reduction control, and performs the first control after the third control.

Citation Information

Patent Citations

  • Voltage conversion device

    JP2014222969A

  • DC-DC converter

    JP2016116337A

  • Switching control circuit and switching control method

    JP2016163447A

  • Power supply circuit and electric vehicle

    WO2018116699A1