AI Technical Summary
【0008】 本開示によれば、段取り時間の異常を精度良く判定することができる。
Smart Images

Figure 0007561352000008 
Figure 0007561352000009 
Figure 0007561352000010
Abstract
Description
[Technical field]
[0001] The present disclosure relates to an information processing method and an information processing device. [Background technology]
[0002] Patent Document 1 discloses a bottleneck process identifying device that determines the productivity of a process based on the setup time corresponding to the process, and identifies a bottleneck process based on the determined productivity. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] Patent No. 6703836 [Patent Document 2] International Publication No. 2020 / 166236 Summary of the Invention [Problem to be solved by the invention]
[0004] An object of the present disclosure is to provide an information processing method and an information processing device that can accurately determine an abnormality in setup time. [Means for solving the problem]
[0005] An information processing method according to one aspect of the present disclosure includes a calculation step of calculating a probability density distribution of an operation time, which is at least a part of a setup time, which is a time required for setup work between lots, based on production performance data read out from a memory unit, a determination step of determining whether or not the operation time is abnormal based on the probability density distribution, and an output step of outputting a result of the determination in the determination step.
[0006] An information processing device according to one embodiment of the present disclosure includes a calculation unit that calculates a probability density distribution of a work time, which is at least a part of a setup time, which is the time required for setup work between lots, based on production performance data read from a memory unit, a judgment unit that judges whether the work time is abnormal or not based on the probability density distribution, and an output unit that outputs a result of the judgment made by the judgment unit.
[0007] Moreover, one aspect of the present disclosure can be realized as a program that causes a computer to execute the information processing method. Alternatively, one aspect of the present disclosure can be realized as a computer-readable non-transitory recording medium storing the program. Effect of the Invention
[0008] According to the present disclosure, abnormalities in setup time can be determined with high accuracy. [Brief description of the drawings]
[0009] [Figure 1] FIG. 1 is a diagram showing the breakdown of process lead times. [Diagram 2] FIG. 2 is a diagram showing the relationship between the setup work required for manufacturing multiple lots and the manufacturing time. [Diagram 3] FIG. 3 is a diagram showing a breakdown of the setup time. [Figure 4] FIG. 4 is a block diagram showing a functional configuration of a production abnormality inferring device according to an embodiment. [Diagram 5] FIG. 5 is a diagram for explaining the process of the manufacturing time estimation unit. [Figure 6] FIG. 6 is a diagram for explaining the process of the setup time estimation unit. [Figure 7] FIG. 7 is a diagram for explaining the processing of the process lead time estimation unit. [Figure 8] FIG. 8 is a diagram for explaining a method for calculating the degree of abnormality. [Figure 9] FIG. 9 is a diagram showing occurrence of abnormalities in process lead times. [Figure 10]FIG. 10 is a diagram for explaining a method of calculating the influence degree. [Figure 11] FIG. 11 is a diagram illustrating an example of the calculated influence degree. [Figure 12] FIG. 12 is a flowchart showing the operation of the production abnormality inferring device according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] (Findings on which this disclosure is based) In conventional manufacturing, it was common to mass-produce a small number of products. The number of setup tasks, such as changing the product type, was small, and the setup tasks were performed by skilled workers who were accustomed to the same tasks by repeatedly performing them. Therefore, the setup time required for the setup tasks had little variation and was insignificant compared to the manufacturing time.
[0011] However, in recent manufacturing sites, the number of product varieties has increased and the production volume of each variety has decreased. This has resulted in a large number of setup tasks, and the content of each setup task has become more diverse. In addition, due to the decrease in skilled workers, the setup time fluctuates greatly and takes up a large proportion of the process lead time.
[0012] For this reason, simply shortening the manufacturing time, which is the time it takes to manufacture a product, is not enough to sufficiently improve production efficiency. From the perspective of improving production efficiency, it is necessary to shorten the setup time.
[0013] The setup time depends on the contents of the setup work, the equipment, the workers, etc. For example, depending on the contents of the setup work, there are cases where the time can be significantly reduced and cases where it is practically impossible to reduce the time. For this reason, it is necessary to appropriately identify the setup time that can be reduced. The setup time that can be reduced is the setup time that took a long time to complete even though it should have been completed in a short time, that is, abnormal setup time.
[0014] Therefore, an object of the present disclosure is to provide an information processing method and an information processing device that can accurately determine an abnormality in setup time.
[0015] An information processing method according to one aspect of the present disclosure includes a calculation step of calculating a probability density distribution of an operation time, which is at least a part of a setup time, which is a time required for setup work between lots, based on production performance data read out from a memory unit, a determination step of determining whether or not the operation time is abnormal based on the probability density distribution, and an output step of outputting a result of the determination in the determination step.
[0016] In this way, by utilizing the probability density distribution of the operation time, which is at least a part of the setup time, it is possible to accurately determine whether the operation time is abnormal. Therefore, it is possible to accurately determine whether the setup time including the abnormal operation time, i.e., whether the setup time is abnormal or not.
[0017] Also, for example, the setup time may include a first working time required for post-processing of a first lot, a second working time required for preparation for manufacturing a second lot to be manufactured after the first lot, and a third working time between the first working time and the second working time, and in the calculation step, a probability density distribution of each of the first working time, the second working time, and the third working time may be calculated based on working conditions of the setup time, and in the determination step, it may be determined whether each of the calculated first working time, the second working time, and the third working time is abnormal.
[0018] This allows the setup time to be divided into at least three task times for analysis, making it possible to more accurately determine whether the setup time is abnormal or not. If the setup time is determined to be abnormal, the cause of the abnormality can be identified with high accuracy, which can be useful for improving setup work.
[0019] Also, for example, the work conditions may be defined by a plurality of items including the first lot, the second lot, equipment that manufactured the first lot and the second lot, and a worker that performs the setup work.
[0020] This improves the accuracy of estimating the probability density distribution because the work conditions include information on the first and second lots manufactured before and after the setup work, and information on the worker who performs the setup work, and therefore the accuracy of determining abnormalities in the setup time can be improved.
[0021] Also, for example, the calculation step may further calculate a probability density distribution of a process lead time including the setup time and the manufacturing time of the lot manufactured immediately after the setup time based on the production performance data, and the determination step may further determine whether or not the process lead time is abnormal based on the probability density distribution of the process lead time.
[0022] This allows for the determination of abnormalities in process lead times, which directly contribute to improved productivity, and therefore allows for efficient productivity improvement by taking measures to shorten process lead times determined to be abnormal.
[0023] Also, for example, in the judgment step, if it is judged that the process lead time is abnormal, the degree of influence of the working time on the abnormality of the process lead time may be calculated based on the probability density distribution of each of the process lead time and the working time, and it may be judged whether or not the working time is abnormal based on the calculated degree of influence.
[0024] This allows the cause of an anomaly to be identified by calculating the degree of influence of each time period included in the process lead time. By identifying the cause of an anomaly, measures to increase productivity can be effectively implemented.
[0025] Also, for example, the production time may include an operation time of equipment that produced the lot, a stoppage loss time caused by stoppage of the equipment, and a defect loss time caused by production of a defective product by the equipment, and the calculation step may further calculate a probability density distribution of each of the operation time, the stoppage loss time, and the defect loss time based on the production record data, and the determination step may further calculate, when it is determined that the process lead time is abnormal, a degree of influence of each of the operation time, the stoppage loss time, and the defect loss time on an abnormality of the process lead time based on the probability density distribution of each of the process lead time, the operation time, the stoppage loss time, and the defect loss time, and determine whether or not each of the operation time, the stoppage loss time, and the defect loss time is abnormal based on the calculated degrees of influence.
[0026] This makes it possible to identify not only setup time but also performance loss time, stoppage loss time, defect loss time, and the like as causes of an abnormality, thereby making it possible to take measures against the abnormality more effectively.
[0027] Also, for example, in the calculation step, the probability density distribution of the process lead time may be calculated as the sum of a distribution obtained by multiplying the probability density distribution of the takt time required to manufacture one good product by the number of good products, the probability density distribution of the setup time, and a predetermined correction parameter.
[0028] This makes it possible to accurately calculate the probability density distribution of the process lead time.
[0029] Moreover, a program according to one aspect of the present disclosure is a program for causing a computer to execute the information processing method according to each of the above aspects.
[0030] This makes it possible to accurately determine abnormalities in setup time, similarly to the above-mentioned information processing method.
[0031] In addition, an information processing device according to one embodiment of the present disclosure includes a calculation unit that calculates a probability density distribution of a work time, which is at least a part of a setup time, which is a time required for setup work between lots, based on production performance data read from a memory unit, a judgment unit that judges whether the work time is abnormal or not based on the probability density distribution, and an output unit that outputs a result of the judgment made by the judgment unit.
[0032] This makes it possible to accurately determine abnormalities in setup time, similarly to the above-mentioned information processing method.
[0033] Hereinafter, the embodiment will be specifically described with reference to the drawings.
[0034] The embodiments described below are all comprehensive or specific examples. The numerical values, shapes, materials, components, component arrangements and connection forms, steps, and order of steps shown in the following embodiments are merely examples and are not intended to limit the present disclosure. Furthermore, among the components in the following embodiments, components that are not described in the independent claims are described as optional components.
[0035] In addition, each figure is a schematic diagram and is not necessarily illustrated precisely. Therefore, for example, the scales in each figure do not necessarily match. In addition, in each figure, substantially the same configurations are given the same reference numerals, and duplicated explanations are omitted or simplified.
[0036] In addition, in this specification, ordinal numbers such as "first" and "second" do not refer to the number or order of components, unless otherwise specified, but are used for the purpose of avoiding confusion between and distinguishing between components of the same type.
[0037] Furthermore, in this specification, the terms "production" and "manufacturing" are used, but these terms are used substantially interchangeably.
[0038] In addition, in this specification, a "lot" refers to a production unit of a product, and is composed of a predetermined number of products produced under the same production conditions. "Manufacturing a lot" means manufacturing a predetermined number of products that make up a lot. The predetermined number may be one or more. The predetermined number of products that make up a lot are of the same type (only one type). When multiple lots are manufactured continuously in one facility, at least one of the type and production number of each lot may be the same or different.
[0039] (Embodiment) [1. Lost time] First, a description will be given of lost time, which is a cause of reduced productivity and should be identified by the information processing device or information processing method according to the present embodiment. Lost time is time that is not actually needed and is time that is required more than usual due to some factor. Lost time is included in the process lead time.
[0040] Figure 1 shows the process lead time L T FIG. 1 is a diagram showing the breakdown of the process lead time L T is the time required from the start to the completion of the target process. Process lead time L T It includes not only the time that the equipment that performs the target process is actually operating, but also the time that the equipment is stopped due to factors such as errors, and the preparation time for operating the equipment.
[0041] Specifically, as shown in Figure 1, the process lead time L T includes the manufacturing time and the setup time s. More specifically, the process lead time L T is the total time of manufacturing time and setup time s.
[0042] The production time is the operating time t0 and the downtime loss time f i Specifically, the manufacturing time includes the operation time t0 and the stoppage loss time f i and the defect loss time y.
[0043] The operating time t0 is the operating time of the equipment that produced the lot. Specifically, the operating time t0 is the time during which the equipment is producing good products. The operating time t0 is the total time of the maximum performance production time and the performance loss time. The maximum performance production time is the time during which the equipment is able to perform at its maximum and produce good products. The performance loss time is the time lost due to a decrease in the performance of the equipment, that is, the extra time required due to the performance degradation. For example, performance loss time occurs due to a decrease in the production speed of the equipment.
[0044] Stop loss time f i is the lost time due to the equipment being stopped, that is, the extra time required due to the equipment being stopped. For example, the downtime loss time f i is the downtime from when the equipment stops until it is restored. The subscript i is an identification number assigned to each cause of the stoppage. When multiple stoppages occur due to multiple causes, the downtime loss time f i The total time is included in the production time.
[0045] The defect loss time y is the loss time caused by the production of defective products by the equipment, that is, the extra time required due to the production of defective products. For example, the defect loss time y is the production time of defective products.
[0046] The setup time s is the time required for setup work between lots. The setup time s includes the setup loss time and the minimum required setup time. Specifically, the setup time s is the total time of the minimum required setup time and the setup loss time.
[0047] The minimum required setup time is the minimum time required for a setup operation. Even if the type and production quantity of the lots before and after the setup operation are the same, the setup operation is still necessary.
[0048] Setup loss time is the extra time required during setup work due to some factor, that is, the loss time related to setup work. For example, setup loss time occurs due to lack of worker skills, improper work order, improper work content, etc.
[0049] For example, the process lead time L for the molding process of a resin product T For example, the performance loss time and outage loss time f i The defect loss time y and setup loss time occur in the following situations, for example. The performance loss time occurs when production is performed at a speed slower than the optimal speed immediately after the die is installed in order to check the equipment status. The downtime loss time f i is caused by poor resin injection due to insufficient equipment maintenance. Defective loss time y is caused by an increase in defective products due to improper mold installation. Setup loss time is caused by a large number of operations in product changeover work, which takes more time than usual for setup work.
[0050] The above-mentioned causes of loss time are merely examples. The process to be considered is not limited to the molding process, but may be a coating process on a metal plate or a component mounting process.
[0051] As mentioned above, the process lead time L T The factors that cause productivity to decrease are performance loss time and downtime loss time f i , defect loss time y, and setup loss time. In the information processing method according to the present embodiment, T The system detects abnormalities (i.e., decline in productivity) and identifies which of the four loss times is the cause of the detected abnormality. In other words, the performance loss time and downtime loss time f i In addition to the defect loss time y and the defect loss time y, the setup loss time is included as a candidate for the cause of the abnormality. Therefore, according to the information processing method of the present embodiment, it is possible to determine whether or not the setup time is abnormal, in addition to the abnormality in the manufacturing time. This makes it possible to take effective measures such as improving the setup work, leading to improved productivity.
[0052] [2. Setup time] Next, the details of the setup time will be described with reference to FIG. 2 and FIG.
[0053] Fig. 2 is a diagram showing the relationship between the setup work required for manufacturing multiple lots and the manufacturing time, and Fig. 3 is a diagram showing the breakdown of the setup time s.
[0054] 2, when lots A and B are manufactured consecutively in that order, workers perform setup work before manufacturing lot A, and after manufacturing lot A and before manufacturing lot B. The setup time s is the time from the end of the manufacturing of the previous lot to the start of the manufacturing of the next lot.
[0055] Note that lot A is an example of a first lot, and lot B is an example of a second lot. The second lot is a lot that is manufactured after the first lot in the same facility. No other lots are manufactured in the same facility between the manufacture of the first lot and the manufacture of the second lot. In the following explanation, the first lot may be referred to as the "previous lot" and the second lot as the "next lot." The later lot is manufactured after the process lead time L T In this embodiment, the setup time s is the process lead time L T is included.
[0056] In this embodiment, the setup time s is a multiple operation time s j Includes multiple work hours j are the elements (setup elements) into which the setup time s is divided. Specifically, as shown in FIG. 3, the setup time s is divided into the post-production operation time s α and pre-production work time s β and other times h The subscript j represents either α, β, or h.
[0057] Working time after manufacturing α is the first operation time required for the post-processing of the previous lot. The post-processing is, for example, the clearing out of the materials and / or parts used in the production of the previous lot (removal from the equipment). αIt mainly depends on the variety and production quantity of the previous lot.
[0058] Pre-production work time s β is the second operation time required for preparation for manufacturing the subsequent lot (pre-processing). The preparation for manufacturing (pre-processing) is, for example, the installation of materials and / or parts to be used in the manufacturing of the subsequent lot, and the setting of control parameters of the equipment. β It depends mainly on the type and number of subsequent lots.
[0059] Other times h is the post-production work time s α and pre-production work time s β The third work time is between s h is the time required for operations that are neither post-processing of the previous lot nor preparation for manufacturing the next lot.
[0060] Generally, in manufacturing sites such as factories, many pieces of equipment are installed and many workers are working on them. In addition, the timing and working time of the workers for the setup work are usually different. For this reason, it is necessary to calculate the post-production work time s α , pre-production work time s β and other times h Therefore, in the information processing method or information processing device according to the present embodiment, each task time s j is calculated based on the working conditions of the setup work.
[0061] [3. Overview of the production anomaly estimation device and data used] Next, an overview of a production abnormality estimating device, which is an example of an information processing device according to the present embodiment, and data used by the production abnormality estimating device will be described with reference to FIG.
[0062] FIG. 4 is a block diagram showing a functional configuration of a production abnormality estimation device 100 according to the present embodiment. The production abnormality estimation device 100 shown in FIG. 4 is a computer device that executes an information processing method according to the present embodiment. The production abnormality estimation device 100 may be one computer device, or may be a plurality of computer devices connected via a network. The production abnormality estimation device 100 includes, for example, a non-volatile memory in which a program is stored, a volatile memory that is a temporary storage area for executing the program, an input / output port, and a processor that executes the program. The processor executes the processing of each functional processing unit included in the production abnormality estimation device 100 in cooperation with the memory and the like.
[0063] The production abnormality estimation device 100 reads out necessary data from the storage unit 200 and executes each process using the read out data. In this embodiment, the storage unit 200 is a storage device separate from the production abnormality estimation device 100 and is connected to the production abnormality estimation device 100 so as to be able to communicate with the production abnormality estimation device 100 via wired or wireless communication. The storage unit 200 is an HDD (Hard Disk Drive) or an SDD (Solid State Drive) or the like. The production abnormality estimation device 100 may have the storage unit 200 built in.
[0064] The storage unit 200 stores accumulated data 210 and data to be determined 220.
[0065] The accumulated data 210 is data related to past production and is obtained based on the manufacturing log data. The accumulated data 210 includes the operation time t0, the downtime f i , defect loss time y and setup time s (work time s j The accumulated data 210 includes manufacturing conditions 211 and performance data 212.
[0066] The manufacturing conditions 211 are defined for each process by a plurality of items. The plurality of items include, for example, the type and number of production of the lot, the equipment that produced the lot, and the worker who performs the setup work included in the process. The work conditions of the setup work can be specified based on the manufacturing conditions 211.
[0067] The performance data 212 is production performance data showing the production performance of multiple lots carried out in the past. Specifically, the performance data 212 includes the production start time, production end time, equipment stop history, product defect rate, etc. The equipment stop history includes, for example, the equipment that was stopped, the stop time, and the recovery time.
[0068] The judgment target data 220 is data that is the target of the abnormality judgment by the production abnormality estimation device 100. The judgment target data 220 includes manufacturing conditions 221 and performance data 222. Specific elements of the manufacturing conditions 221 and the performance data 222 are the same as the manufacturing conditions 211 and the performance data 212 of the accumulated data 210. For example, when the target of the abnormality judgment is only one process, information on the lot (previous lot) of the immediately preceding process is also used to estimate the setup time s, so the manufacturing conditions 221 and the performance data 222 include data of the target process and data of the process immediately preceding it.
[0069] [4. Functional configuration of the production abnormality estimation device] Next, the functional configuration of the production abnormality estimating device 100 will be described with reference to FIG.
[0070] 4, the production abnormality estimating device 100 includes a time calculation unit 110, a setup element calculation unit 120, a manufacturing time estimation unit 130, a setup time estimation unit 140, a process lead time estimation unit 150, an identification unit 160, and a display unit 170. Specific processing of each functional component will be described below in order.
[0071] [4-1. Time calculation section] The time calculation unit 110 calculates the process lead time L T , operation time t0, downtime loss time f iand calculate the defect loss time y. T As shown in FIG. 2, is obtained by subtracting the production end time of the previous lot from the production end time of the next lot.
[0072] As shown in Figure 1, the operating time t0 is the time from the production time to the downtime loss time f i and defect loss time y. The production time is obtained by subtracting the production start time of the subsequent lot from the production end time of the subsequent lot, as shown in FIG.
[0073] Stop loss time f i is calculated based on the stop time and recovery time included in the range from the production start time to the production end time of the subsequent lot. The duration of one stop is the time obtained by subtracting the stop time from the recovery time. When multiple stop times and multiple recovery times are included, that is, when multiple stoppages occur, the stoppage loss time f is calculated by adding up the stoppage times for each stoppage. i is obtained.
[0074] The defect loss time y is the product of the production time and the stoppage loss time f i The time subtracted from the production time - downtime loss time f i ) by the defect rate. The defect rate is the ratio of defective products to the number of products manufactured in the next lot. The number of products manufactured is the sum of the number of good products and the number of defective products.
[0075] The time calculation unit 110 calculates the process lead time L based on the accumulated data 210 and the judgment target data 220. T , operation time t0, downtime loss time f i and defect loss time y are calculated for each process. The calculated times are actual measurements obtained from performance data 212 and 222.
[0076] The actual measurement values obtained from the performance data 212 of the accumulated data 210 are used to create the estimation model. i The actual measured values of the defect loss time y and the defect loss time y are output to the model creation unit 131 of the manufacturing time estimation unit 130.T The actual measured value is output to the model creation unit 151 of the process lead time estimation unit 150.
[0077] The actual measurement value obtained from the performance data 222 of the judgment target data 220 is used for the abnormality judgment. T , operation time t0, downtime loss time f i The actual measured values of the defect loss time y and the defect loss time y are output to the identifying unit 160.
[0078] In addition, in Figure 4, L T , t0, f i , y and s j By adding an overline ( ̄) to each symbol, the actual measured value at each time is represented. Symbols without an overline ( ̄) represent estimated values at each time. Also, in Fig. 4, the flow of stored data 210 is represented by solid arrows, and the flow of judgment target data 220 is represented by dashed arrows. These notation methods are the same in Figs. 5 to 7 described later.
[0079] [4-2. Setup element calculation section] The setup element calculation unit 120 calculates a plurality of operation times s included in the setup time s. j Specifically, the setup element calculation unit 120 calculates the post-production operation time s α , pre-production work time s β and other times h is calculated for each process. The setup time s is obtained by subtracting the production end time of the previous lot from the production start time of the next lot, as shown in FIG.
[0080] Working time after manufacturing α is the time element α, which depends on the production volume y and a time element α that does not depend on the production volume z and Pre-production work time s β Similarly, the time factor β y and the time factor β that does not depend on the production volume z If the number of production lots in the previous lot is n and the number of production lots in the next lot is m, the post-production work time sα and pre-production work time s β is expressed by the following equations (1) and (2).
[0081] (1) s α = n × α y +α z (2) s β = m × β y +β z
[0082] Therefore, α y , α z , β y and β z By calculating α and pre-production work time s β is calculated. In addition, other times s h does not depend on the number of units produced.
[0083] α y , α z , β y and β z can be calculated using the following formula (3) when the performance data 212 of the accumulated data 210 contains four pieces of performance data for work conditions in which only the production quantities n and m differ (other items are the same). The performance data is expressed as a combination of (n, m, s). The other items specifically include the type of the previous lot, the type of the next lot, the equipment, and the workers.
[0084] (3) s=s α +s β +s h = n × α y +α z +m×β y +β z +s h
[0085] For example, the four pieces of performance data are (n1, m1, s1), (n2, m2, s2), (n3, m3, s3), and (n4, m4, s4). All of these values are known. By substituting these four pieces of performance data into equation (3), the following equations (4) to (7) are obtained.
[0086] (4) s1 = n1 × α y +α z +m1×β y +β z +s h (5) s2=n2×α y +α z +m2×β y +β z +s h (6) s3=n3×α y +α z +m3×β y +β z +s h (7) s4=n4×α y +α z +m4×β y +β z +s h
[0087] By solving the simultaneous equations (4) to (7), α is obtained as the following equations (8) and (9). y and β y can be obtained.
[0088]
number
[0089] α z , β z and s h is calculated using the following equations (10) and (11).
[0090] (10) τ=t-(n×α y +m×β y ) (11) α z +β z +s h = τ
[0091] In the following explanation, α under a given production condition P z and β z respectively, α zP and β z P First, for simplicity, let us assume that there is only one production condition P (specifically, a single type of product is manufactured by a common worker using a common facility). In this case, the above formula (11) becomes the following formula (12).
[0092] (12) α z P +β z P +s h = τ
[0093] However, with only this one equation, α z , β z and s h Therefore, we express equation (12) as a matrix. Specifically, D=(1 1 1), w=(α z β z s h ) T , b=(τ), equation (12) can be expressed as the following equation (13), where the subscript T represents a transposed matrix.
[0094] (13) Dw=b
[0095] In this embodiment, the setup element calculation unit 120 determines w as in equation (14) by taking the L2 norm minimum point as the solution.
[0096] (14) w=D T (DD T ) -1 b
[0097] Since there is only one working condition P, w can be obtained as shown in equation (15).
[0098]
number
[0099] When production condition Q is included in addition to production condition P, there are four possible setup work conditions: P→P, P→Q, Q→P, and Q→Q. Note that the start point of "→" represents the production conditions of the previous lot, and the end point of "→" represents the production conditions of the next lot. In other words, "P→P" and "Q→Q" mean that the production conditions have not changed between lots.
[0100] Equations (16) to (19) are obtained from equation (11) based on the performance data for four types of work conditions.
[0101] (16) α z P +β z P +s h = τ1 (17) α z P +β z Q +s h = τ2 (18) α z Q +β z P +s h = τ3 (19) α z Q +β z Q +s h = τ4
[0102] By rearranging equations (16) to (19), the following equations (20) to (22) are obtained.
[0103] (20) α z P +β z Q +s h = τ2 (21) β z P -β z Q = τ3-τ4 (22) α z Q +β z Q +s h = τ4
[0104] As in the case where there is only one production condition, equations (20) to (22) are expressed as the determinant of equation (13). In this case, D, w, and b are as shown in the following equations (23) to (25).
[0105]
number
[0106] This allows w to be calculated based on equation (14) in the same way as when there is one condition. Even when there are three or more conditions, α can be calculated in the same way. z , β z and s h can be calculated.
[0107] In addition, the calculated data is calculated based on multiple performance data, so the number of data is smaller than the original performance data. For example, one set of α y and β y We obtain α z , β z and s h The same is true for . To increase the number of data items after calculation, the combination of the original performance data items can be changed. By increasing the number of data items after calculation, the accuracy of the estimation model can be improved, and as a result, the accuracy of the anomaly determination can be improved.
[0108] The setup element calculation unit 120 calculates each operation time s α , s β and s h Each calculated time is regarded as an actual measurement value obtained from the performance data 212 and 222.
[0109] The actual measurement values obtained from the performance data 212 of the accumulated data 210 are used to create the estimation model. α , s β and s hThe respective measured values are output to the model creation unit 141 of the setup time estimation unit 140.
[0110] The actual measurement value obtained from the performance data 222 of the judgment target data 220 is used for the abnormality judgment. α , s β and s h The respective measured values are output to the identification unit 160.
[0111] [4-3. Manufacturing time estimation section] The manufacturing time estimation unit 130 estimates the operation time t0 and the downtime loss time f based on the manufacturing conditions 211 and the performance data 212 read from the storage unit 200. i and defect loss time y, and calculates a probability density distribution of each of them. As shown in Fig. 4 and Fig. 5, the manufacturing time estimation unit 130 includes a model creation unit 131 and a time estimation unit 132. Fig. 5 is a diagram for explaining the processing of the manufacturing time estimation unit 130.
[0112] The model creation unit 131 uses the manufacturing conditions 211 of the accumulated data 210, and the operation time t0 and downtime loss time f calculated by the time calculation unit 110 based on the accumulated data 210. i Based on the actual measured values of the defect loss time y and the defect loss time y, an estimation model of the manufacturing time is created. For example, the model creation unit 131 performs the evaluation using an effective takt time t1, which is the time required to manufacture one good product. The estimation model of the effective takt time t1 can be created using, for example, the method disclosed in Patent Document 2.
[0113] Specifically, the model creation unit 131 determines production conditions including the type and equipment of the subsequent lot, the operation time t0, the downtime f i From the actual measured values of the defective loss time y, the operating time t0 and the downtime f i An estimation model is created for each of the defect loss time y and the defect loss time y. The estimation model is a probability density distribution of expected performance values (for each target time) for the production conditions (specifically, the product type and equipment), and is defined by the parameters of the probability density distribution.
[0114] The model creation unit 131 estimates parameters of the probability density distribution based on, for example, Bayesian estimation. For example, when the probability density distribution is a normal distribution, the parameters of the probability density distribution are the mean μ and the standard deviation σ (or variance σ 2 ) In Bayesian estimation, parameters such as the mean μ and standard deviation σ are also estimated as a probability distribution (posterior probability distribution) that each value can take. The probability distribution of parameters based on Bayesian estimation can be estimated by a sampling method such as Markov chain Monte Carlo simulation (MCMC) or by variational estimation such as the VB-EM algorithm.
[0115] The probability density distribution can be normal distribution, log-normal distribution, zero-excessive exponential distribution, gamma distribution, etc., and the operating time t0, downtime loss time f i An appropriate distribution is determined for each of the failure loss time y and the operation time t0. For example, the probability density distribution of the operation time t0 is a log-normal distribution. i The probability density distribution of is a 0-over-exponential distribution. The probability density distribution of defect loss time y is a gamma distribution. The probability density distribution of effective takt time t1 is a t0-over-f1 distribution. i and defect loss time y.
[0116] The time estimation unit 132 calculates an estimated value of the manufacturing time by inputting the manufacturing conditions 221 of the judgment target data 220 to the estimation model created by the model creation unit 131. Specifically, the time estimation unit 132 calculates an estimated value of the manufacturing time by inputting the operating time t0, the downtime loss time f i and defect loss time y are calculated. The calculated estimated values are output to the process lead time estimation unit 150 and the specification unit 160. The estimated values of each time are represented by their respective probability density distributions under predetermined manufacturing conditions.
[0117] [4-4. Setup time estimation section] The setup time estimation unit 140 calculates a probability density distribution of the setup time s based on the manufacturing conditions 211 and the performance data 212 read from the storage unit 200. Specifically, the setup time estimation unit 140 calculates a probability density distribution of the operation time s included in the setup time s. j4 and 6, the setup time estimation unit 140 includes a model creation unit 141 and a time estimation unit 142. FIG. 6 is a diagram for explaining the processing of the setup time estimation unit 140.
[0118] The model creation unit 141 uses the manufacturing conditions 211 of the accumulated data 210 and the operation time s calculated by the setup element calculation unit 120 based on the accumulated data 210. j Based on the actual measured value and the work time s j Specifically, the model creation unit 141 creates an estimation model of the post-production work time s α , pre-production work time s β and other times h The model creation unit 141 determines parameters of the probability density distribution of each of the above probability density distributions based on, for example, Bayesian estimation, in the same manner as the model creation unit 131.
[0119] As shown in FIG. 6, the post-production work time s α To determine the parameters of the probability density distribution of , work conditions including five items, namely, the type and number of production of the previous lot, the equipment, the type of the next lot, and the worker, are used. The work conditions can be obtained based on the manufacturing conditions 211 of the accumulated data 210. The model creation unit 141 determines the weighting coefficients w α1 ~w α5 and a weighting factor w that is independent of the working conditions α0 For example, the post-production work time s α The probability density distribution of the estimate of is set as a normal distribution N(μ,σ) with mean μ and standard deviation σ. In this case, μ and σ are expressed by the following equations (26) and (27), respectively.
[0120] (26) μ=μ y ×(Number of units manufactured in the previous lot) + μ z μ y =w μy1 ×(Facilities)+w μy2 × (Previous lot variety) × (Next lot variety) Variety)+w μy3×(Variety of previous lot) + w μy4 ×(Worker) μ z =w μz1 ×(Facilities)+w μz2 × (Previous lot variety) × (Next lot variety) Variety)+w μz3 ×(Variety of previous lot) + w μz4 ×(Worker) (27) σ=σ y × (Number of units manufactured in the previous lot) + σ z σ y =w σy1 ×(Facilities)+w σy2 × (Previous lot variety) × (Next lot variety) Variety)+w σy3 ×(Variety of previous lot) + w σy4 ×(Worker) σ z =w σz1 ×(Facilities)+w σz2 × (Previous lot variety) × (Next lot variety) Variety)+w σz3 ×(Variety of previous lot) + w σz4 ×(Worker)
[0121] In the above formulas (26) and (27), w μy1 , w μy2 , w μy3 , w μy4 , w μz1 , w μz2 , w μz3 , w μz4 , w σy1 , w σy2 , w σy3 , w σy4 , w σz1 , w σz2 , w σz3 and w σz4 corresponds to the parameters of the probability density distribution, and based on these, the w α1 ~w α5 and w α0 The model creation unit 141 can determine the post-production operation time s calculated by the setup element calculation unit 120 based on the accumulated data 210. αEach parameter is calculated based on the actual measured values and the process conditions included in the manufacturing conditions 211.
[0122] Pre-production work time s β The parameters of the probability density distribution of α Specifically, in equations (26) and (27), the production number of the subsequent lot should be used instead of the production number of the previous lot. Also, w μy3 , w μz3 , w σy3 and w σz3 The product type of the subsequent lot may be used instead of the product type of the previous lot.
[0123] Also, other times h The estimation model of does not depend on the work conditions, so it is defined as a model without input of the work conditions. h The parameters of the probability density distribution of are, for example, w shown in Figure 6. h0 Only.
[0124] The time estimation unit 142 inputs the manufacturing conditions 221 of the judgment target data 220 into the estimation model created by the model creation unit 141, and estimates each operation time s j Specifically, the time estimation unit 142 calculates an estimate of the pre-manufacturing operation time s α , working time after manufacturing β and other times h The calculated estimated values are output to the process lead time estimation unit 150 and the specification unit 160. The estimated values of each operation time are represented by their respective probability density distributions under predetermined operation conditions.
[0125] [4-5. Process lead time estimation section] The process lead time estimation unit 150 estimates the process lead time L based on the manufacturing conditions 211 and the performance data 212 read from the storage unit 200. T4 and 7, the process lead time estimation unit 150 includes a model creation unit 151 and a time estimation unit 152. FIG. 7 is a diagram for explaining the processing of the process lead time estimation unit 150.
[0126] The model creation unit 151 calculates the operation time t0 and the downtime loss time f i and the estimated value of each of the defect loss time y and the setup time s calculated by the setup time estimation unit 140. j and the process lead time L calculated by the time calculation unit 110. T Based on the actual measured value and the process lead time L T Specifically, the model creation unit 151 creates an estimation model of the process lead time L T The model creation unit 151 determines parameters of the probability density distribution of the probability density distribution of the vectors . Similarly to the model creation unit 131, the model creation unit 151 estimates parameters of the probability density distribution based on, for example, Bayesian estimation.
[0127] Process lead time L T As shown in Figure 1, the manufacturing time is the sum of the manufacturing time and the setup time s. Note that this sum is the actual process lead time L T In this embodiment, a correction parameter w T This sets the process lead time L T The estimation model of is an estimation model of the manufacturing time, an estimation model of the setup time s, and a correction parameter w T It can be expressed as a combined model of
[0128] As shown in FIG. 7, the model creation unit 151 calculates the operation time t0 and the downtime loss time f i and the estimated value of the defect loss time y, and the estimated value of the setup time s calculated by the setup time estimation unit 140 (specifically, each operation time s j ) and the process lead time L T Using the actual measured value of and, the process lead time LT Determine the parameters of the probability density distribution of . Specifically, the correction parameter w T The manufacturing time estimation unit 130 calculates the effective takt time by calculating the operation time t0 per one good product and the downtime loss time f i Since the estimated values of the defect loss time y and the defect loss time y are calculated, the model creation unit 151 assigns the number of non-defective products n to each estimated value. g Specifically, the model creation unit 151 uses the operation time t0, the downtime loss time f i and the estimated value of defect loss time y for each g and post-production work time s α , pre-production work time s β and other times h Add up the estimated values of each of and to obtain the process lead time L T The correction parameter w is calculated by subtracting it from the actual measured value. T Calculate.
[0129] The time estimation unit 152 inputs the estimated values of each time calculated into the estimation model created by the model creation unit 151, thereby estimating the process lead time L T The estimated value is output to the determination unit 160. T The estimate of is expressed as a probability density distribution for a given manufacturing condition.
[0130] [4-6. Specific part] The determination unit 160 determines the process lead time L T The process lead time estimation unit 150 determines whether the process lead time L is abnormal, and if it is determined to be abnormal, identifies the cause of the abnormality. T Based on the estimated value (probability density distribution) of T The degree of anomaly of the actual measured value is calculated. The degree of anomaly is an index showing the degree of deviation between the actual measured value and the estimated value.
[0131] FIG. 8 is a diagram for explaining a method for calculating the degree of abnormality. In FIG. 8, the horizontal axis represents the process lead time L T The vertical axis represents the process lead time LT The graph shown in FIG. 8 represents the probability density of the process lead time L T is a probability density distribution that is an estimate of
[0132] In this embodiment, the specification unit 160 specifies the process lead time L T The lower probability calculated based on the actual measured value of is calculated as the degree of anomaly. The lower probability corresponds to the area shaded with dots in FIG. 8. The larger the lower probability, the greater the process lead time L T This means that the actual measurement value of is far from the estimated value, that is, the degree of abnormality is high. For example, the identification unit 160 calculates the degree of abnormality (lower probability) of the actual measurement value and compares the calculated degree of abnormality with a threshold value. If the calculated degree of abnormality is equal to or greater than the threshold value, the identification unit 160 T If the calculated abnormality degree is less than the threshold value, the identifying unit 160 determines that the process lead time L T is determined to be normal (not abnormal).
[0133] Figure 9 shows the process lead time L T 9 is a diagram showing the occurrence of abnormalities in the process. In FIG. 9, the horizontal axis represents the date (time) and the vertical axis represents the process lead time L T In addition, Fig. 9 shows the actual measurement value of the process lead time L T The predetermined range based on the estimated value of is represented by dot shading. The predetermined range is a range determined based on the probability density distribution, which is the estimated value, and is the process lead time L T is not abnormal. In other words, the predetermined range is the process lead time L T The range is.
[0134] Therefore, the process lead time L T Even if the lead time L becomes longer, it may be within the normal range depending on the manufacturing conditions, and is not necessarily determined to be abnormal. In the example shown in FIG. 9, the process lead time L THowever, only 6 / 29 is judged to be abnormal. T Compared to when judging based only on the length of the process lead time L T It is possible to accurately determine abnormalities in the
[0135] In this embodiment, the specification unit 160 specifies the process lead time L T If it is judged to be abnormal, the process lead time L T Specifically, the identifying unit 160 identifies the cause of the abnormality in the process lead time L T If it is judged to be abnormal, the process lead time L T The operating time t0 and downtime f i The impact of each of the defective loss time y and the setup time s j Calculate the impact of work time s j Specifically, the impact of the post-production work time s α , pre-production work time s β and other times h The degree of influence of each of these.
[0136] The impact is that each time is the process lead time L T The time when the impact is large is the process lead time L T In other words, by determining whether the influence of each time is large, it is possible to determine whether each time is abnormal.
[0137] Specifically, the impact is calculated by replacing the estimated values of each time with the actual values of the process lead time L T 10 is a diagram for explaining a method for calculating the influence degree. In FIG. 10, P(x) is the increase in the upper probability of the process lead time L calculated by the process lead time estimation unit 150. T P'(x) represents the probability density distribution of the process lead time L when the estimated value of the time to be judged is replaced with the actual value. T This represents the probability density distribution of
[0138] Process lead time L T As described above, since it is expressed as the sum of each time, it is expressed by the following equation (28).
[0139] (28) L T =t0+f i +y+s α +s β +s h +w T
[0140] Each term in equation (28) is an estimate. For example, the post-production work time s α When calculating the influence of, we can obtain equation (29) by replacing the estimated value in equation (28) with the actual measured value. In equation (29), the actual measured value is represented by an overline ( ̄).
[0141]
number
[0142] Working time after manufacturing α If the cause of the abnormality is, the process lead time L' obtained by equation (29) T is more likely to be determined not to be an abnormal value. In other words, the upper probability in the probability density distribution P'(x) after replacement becomes larger. Thus, there is a correlation between the increase in the upper probability and the influence. In this embodiment, the specification unit 160 calculates the influence I(q) of time q based on the following formula (30).
[0143]
number
[0144] In addition, in the formula (30),
[0145]
number
[0146]
number
[0147] FIG. 11 is a diagram showing an example of the calculated impact. Note that, although FIG. 11 shows an example in which the impact of the entire setup time s is calculated, the impact may be calculated for each element. In the example shown in FIG. 11, it can be seen that the setup loss included in the setup time s has the greatest impact. This shows that the setup loss is the largest impact when compared to the process lead time L T It can be determined that this is the cause of the abnormality.
[0148] [4-7.Display section] The display unit 170 is an example of an output unit that outputs the result of the determination made by the specification unit 160. The display unit 170 is, for example, a liquid crystal display device or an organic EL (Electroluminescence) display device, but is not limited to this.
[0149] Specifically, the display unit 170 displays the process lead time L T The image showing the judgment result of whether or not the process lead time L is abnormal is displayed. T If the image is abnormal, information specifying the cause of the abnormality may be included in the image displayed by the display unit 170. For example, the display unit 170 displays a table shown in FIG.
[0150] Instead of the display unit 170, the production abnormality estimating device 100 may include an audio output unit that outputs the result of the determination as audio and / or a communication unit that transmits a signal including the result of the determination.
[0151] [5. Operation] Next, the operation of the production abnormality estimation device 100 according to the present embodiment (i.e., a production abnormality estimation method which is an example of an information processing method) will be described with reference to Fig. 12. Fig. 12 is a flowchart showing the operation of the production abnormality estimation device 100 according to the present embodiment.
[0152] 12, first, the production abnormality estimation device 100 reads and acquires the accumulated data 210 and the judgment target data 220 from the storage unit 200 (S10). Next, the time calculation unit 110 calculates the process lead time L T , operation time t0, downtime loss time f i And the defect loss time y is calculated (S11).
[0153] Next, the model creation unit 131 of the manufacturing time estimation unit 130 calculates the operation time t0 and the downtime loss time f i Based on the defective loss time y and the manufacturing conditions 211, the operation time t0 and the stoppage loss time f i Next, the time estimation unit 132 of the manufacturing time estimation unit 130 creates an estimation model for each of the operation time t0, the stoppage loss time f i and the defect loss time y are estimated (S13).
[0154] Next, the setup element calculation unit 120 calculates the operation time for each setup element (S14). Specifically, the setup element calculation unit 120 calculates the post-production operation time s α , pre-production work time s β and other times h Calculate.
[0155] Next, the model creation unit 141 of the setup time estimation unit 140 calculates the post-production operation time s α , pre-production work time s β and other times h Based on the manufacturing conditions 211, the post-manufacturing work time s α , pre-production work time s β and other times hNext, the time estimation unit 142 of the setup time estimation unit 140 estimates the post-production operation time s α , pre-production work time s β and other times h Then, a probability density distribution, which is an estimate of each of the above, is calculated (S16).
[0156] Next, the model creation unit 151 of the process lead time estimation unit 150 calculates the calculated operation time t0 and downtime loss time f i The estimated values of the defect loss time y and the calculated post-production work time s α , pre-production work time s β and other times h and the process lead time L T Based on the actual measured value and the process lead time L T Next, the time estimation unit 152 of the process lead time estimation unit 150 creates an estimation model of the process lead time L based on the manufacturing conditions 221 of the judgment target data 220. T A probability density distribution, which is an estimate of the value of (S18).
[0157] Next, the determination unit 160 calculates the probability density distribution and the process lead time L T Based on the actual measured value, the identification unit 160 calculates the degree of abnormality of the actual measured value (S19). Next, the identification unit 160 compares the calculated degree of abnormality with a threshold value (S20).
[0158] If the abnormality degree is equal to or greater than the threshold (Yes in S20), the identifying unit 160 i The influence of each of the defective loss time y and the post-production work time s α , pre-production work time s β and other times h The determination unit 160 calculates the degree of influence of each of the process lead times L TAlternatively, the identifying unit 160 may identify, as the cause of the abnormality, one or more times corresponding to one or more influences greater than a predetermined threshold among the calculated influences. The calculation of the influence is performed based on the operating time t0, the downtime loss time f i , defect loss time y, post-production work time s α , pre-production work time s β and other times h It is not necessary to calculate the influence of any of the above.
[0159] Next, the display unit 170 displays the abnormality determination result and the cause identification result (S22). If the abnormality degree is less than the threshold value (No in S20), the display of the determination result by the display unit 170 may be omitted.
[0160] Note that the process shown in FIG. 12 is merely an example, and each process may be performed in an order different from that shown in the figure. For example, j The calculation process (S14) is the process lead time L T It may be performed prior to the calculation process (S11) such as above.
[0161] In addition, some of the processes shown in the figure may not be performed. For example, the calculation process of the influence degree (S21) may not be performed. T , operation time t0, downtime loss time f i The calculation process of the defect loss time y, the model creation process, and the calculation process of the estimated value (S11 to S13) may not be performed. Also, the calculation process of the operation time for each setup element (S14) may not be performed. In this case, in step S15, an estimation model of the setup time s may be created, and in step S16, a probability density distribution that is an estimated value of the setup time s may be calculated. Also, the process lead time L T Instead of performing abnormality judgment for the work time s j Alternatively, an abnormality judgment may be performed on the setup time s.
[0162] (Other embodiments) Although the information processing method and the information processing device according to one or more aspects have been described based on the embodiments, the present disclosure is not limited to these embodiments. As long as it does not deviate from the gist of the present disclosure, various modifications conceived by a person skilled in the art to the present embodiment and forms constructed by combining components in different embodiments are also included within the scope of the present disclosure.
[0163] For example, in the above embodiment, the production abnormality estimation device 100 divides the setup time s into each element to determine whether or not there is an abnormality, but this is not limited to the above. The production abnormality estimation device 100 may determine whether or not the setup time s is abnormal. In this case, the production abnormality estimation device 100 does not need to include the setup element calculation unit 120.
[0164] In addition, for example, the production abnormality estimation device 100 may T In addition, the production abnormality estimation device 100 does not need to perform the abnormality judgment based on the operation time t0 and the downtime loss time f i In other words, the production abnormality estimation device 100 does not need to judge whether an abnormality exists in each of the operation time s j In this case, the production abnormality estimation device 100 does not need to include the time calculation unit 110, the manufacturing time estimation unit 130, and the process lead time estimation unit 150. For example, the identification unit 160 may determine whether or not the actual measurement value (or a value that can be considered as the actual measurement value) calculated by the setup element calculation unit 120 is abnormal, based on the estimated value estimated by the setup time estimation unit 140.
[0165] Also, for example, setup time s includes other time s h The setup time s is not included in the post-production work time s α and pre-production work time s β The time period may include only two of the above.
[0166] Furthermore, the communication method between the devices described in the above embodiment is not particularly limited. When wireless communication is performed between the devices, the wireless communication method (communication standard) is, for example, short-distance wireless communication such as ZigBee (registered trademark), Bluetooth (registered trademark), or wireless LAN (Local Area Network). Alternatively, the wireless communication method (communication standard) may be communication via a wide area communication network such as the Internet. Furthermore, wired communication may be performed between the devices instead of wireless communication. Specifically, the wired communication is communication using power line communication (PLC) or a wired LAN.
[0167] In the above embodiment, the process executed by a specific processing unit may be executed by another processing unit. The order of multiple processes may be changed, or multiple processes may be executed in parallel.
[0168] For example, the processes described in the above embodiments may be realized by centralized processing using a single device (system), or may be realized by distributed processing using multiple devices. Also, the processor that executes the above programs may be single or multiple. That is, centralized processing or distributed processing may be performed.
[0169] In the above embodiment, all or part of the components such as the control unit may be configured with dedicated hardware, or may be realized by executing a software program suitable for each component. Each component may be realized by a program execution unit such as a CPU (Central Processing Unit) or a processor reading and executing a software program recorded on a recording medium such as a HDD or a semiconductor memory.
[0170] Furthermore, components such as the control unit may be configured with one or more electronic circuits. Each of the one or more electronic circuits may be a general-purpose circuit or a dedicated circuit.
[0171] The one or more electronic circuits may include, for example, a semiconductor device, an integrated circuit (IC), or a large scale integration (LSI). The IC or LSI may be integrated into one chip or into multiple chips. Here, the IC or LSI is referred to as an IC or LSI, but the name may vary depending on the degree of integration, and may be called a system LSI, a very large scale integration (VLSI), or an ultra large scale integration (ULSI). Also, a field programmable gate array (FPGA) that is programmed after the LSI is manufactured can be used for the same purpose.
[0172] In addition, the general or specific aspects of the present disclosure may be realized as a system, an apparatus, a method, an integrated circuit, or a computer program. Alternatively, the present disclosure may be realized as a computer-readable non-transitory recording medium such as an optical disk, a HDD, or a semiconductor memory in which the computer program is stored. Furthermore, the present disclosure may be realized as any combination of a system, an apparatus, a method, an integrated circuit, a computer program, and a recording medium.
[0173] Furthermore, each of the above embodiments can be modified, replaced, added, omitted, and so on within the scope of the claims or their equivalents. [Industrial Applicability]
[0174] The present disclosure can be used as an information processing method capable of accurately determining abnormalities in setup time, and can be used, for example, in management devices, analysis devices, and support devices for production systems in factories and the like. [Explanation of symbols]
[0175] 100 Production abnormality estimation device 110 Time calculation section 120 Setup element calculation section 130 Manufacturing time estimation section 131, 141, 151 Model Creation Department 132, 142, 152 Time Estimation Section 140 Setup time estimation unit 150 Process Lead Time Estimation Department 160 Specific section 170 Display section 200 Storage section 210 Accumulated Data 211, 221 Manufacturing conditions 212, 222 Performance data 220 Data to be judged
Claims
1. a calculation step of calculating a probability density distribution of an operation time, which is at least a part of a setup time, which is a time required for a setup operation between lots, based on the production performance data read out from the storage unit; a determination step of determining whether the operation time is abnormal or not based on the probability density distribution; an output step of outputting a result of the determination in the determination step, The setup time is A first operation time required for post-processing of the first lot; A second operation time required for preparation for manufacturing a second lot to be manufactured following the first lot; a third operation time between the first operation time and the second operation time, In the calculation step, a probability density distribution of each of the first operation time, the second operation time, and the third operation time is calculated, In the determination step, Calculating the first operation time, the second operation time, and the third operation time based on the operation condition of the setup time; determining whether or not each of the calculated first operation time, the second operation time, and the third operation time is abnormal; Information processing methods.
2. The work conditions are defined by a plurality of items including the first lot, the second lot, equipment that manufactured the first lot and the second lot, and a worker that performs the setup work. The information processing method according to claim 1 .
3. A calculation step of calculating a probability density distribution of an operation time, which is at least a part of a setup time, which is a time required for a setup operation between lots, based on the production performance data read out from a storage unit; a determination step of determining whether the operation time is abnormal or not based on the probability density distribution; an output step of outputting a result of the determination in the determination step, The calculation step further includes calculating a probability density distribution of a process lead time including the setup time and a manufacturing time of a lot manufactured immediately after the setup time, based on the production performance data; The determining step further includes determining whether or not the process lead time is abnormal based on a probability density distribution of the process lead time. Information processing methods.
4. The determining step further comprises: when it is determined that the process lead time is abnormal, calculating an influence of the operation time on the abnormality of the process lead time based on a probability density distribution of each of the process lead time and the operation time; determining whether the operation time is abnormal or not based on the calculated degree of influence; The information processing method according to claim 3.
5. The manufacturing time is The operation time of the equipment that produced the lot; The downtime loss due to the stoppage of the equipment; The defective loss time caused by the production of defective products by the equipment, The calculation step further includes calculating a probability density distribution of each of the operation time, the downtime loss time, and the defect loss time based on the production performance data, The determining step further comprises: when it is determined that the process lead time is abnormal, calculating an influence of each of the operation time, the stoppage loss time, and the defect loss time on the abnormality of the process lead time based on a probability density distribution of each of the process lead time, the operation time, the stoppage loss time, and the defect loss time; determining whether or not each of the operation time, the downtime loss time, and the defect loss time is abnormal based on the calculated degree of influence; 5. The information processing method according to claim 3.
6. In the calculation step, a probability density distribution of the process lead time is calculated as a sum of a probability density distribution of a takt time required for manufacturing one good product multiplied by the number of good products, a probability density distribution of the setup time, and a predetermined correction parameter. The information processing method according to any one of claims 3 to 5.
7. A program for causing a computer to execute the information processing method according to any one of claims 1 to 6.
8. a calculation unit that calculates a probability density distribution of an operation time, which is at least a part of a setup time, which is a time required for a setup operation between lots, based on the production performance data read out from the storage unit; a determination unit that determines whether the operation time is abnormal or not based on the probability density distribution; an output unit that outputs a result of the determination by the determination unit, The setup time is: A first operation time required for post-processing of the first lot; A second operation time required for preparation for manufacturing a second lot to be manufactured following the first lot; a third operation time between the first operation time and the second operation time, the calculation unit calculates a probability density distribution of each of the first work time, the second work time, and the third work time; The determination unit is Calculating the first operation time, the second operation time, and the third operation time based on the operation condition of the setup time; determining whether or not each of the calculated first operation time, the second operation time, and the third operation time is abnormal; Information processing device.
9. a calculation unit that calculates a probability density distribution of an operation time, which is at least a part of a setup time, which is a time required for a setup operation between lots, based on the production performance data read out from the storage unit; a determination unit that determines whether the operation time is abnormal or not based on the probability density distribution; an output unit that outputs a result of the determination by the determination unit, The calculation unit further calculates a probability density distribution of a process lead time including the setup time and a manufacturing time of a lot manufactured immediately after the setup time, based on the production performance data; The determination unit further determines whether or not the process lead time is abnormal based on a probability density distribution of the process lead time. Information processing device.
Citation Information
Patent Citations
Job shop type production system, tracking device, tracking method, program and recording medium
JP2004355172A
Process improvement support system
JP2006202255A
Method and device for supporting line production management
JP2009245043A
Processing order management system and processing order management program of lot in processing inspection device
JP2014127070A
Device and method for identifying bottleneck processes
JP6703836B2