Component switching simulation device, component switching simulation method, and component switching simulation program
The parts switching simulation device facilitates timely component switching by associating source and destination components, updating manufacturing instructions, and recalculating stock quantities, addressing the challenge of manufacturing discontinuation.
Patent Information
- Application Number
- JP2021109428
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-06-30
- Publication Date
- 2024-10-04
- Estimated Expiration
- 2041-06-30
AI Technical Summary
Existing systems fail to provide an efficient method for easily confirming the timing of switching from a switching source component to a switching destination component due to manufacturing discontinuation.
A parts switching simulation device and method that includes a storage section associating switching source and destination components, updating manufacturing instruction information, and recalculating planned stock quantities to facilitate seamless switching.
Enables easy confirmation of the timing for switching components and allows for simultaneous update of manufacturing instructions, enhancing business efficiency and reducing waste.
Smart Images

Figure 0007561702000001 
Figure 0007561702000002 
Figure 0007561702000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a component switching simulation device, a component switching simulation method, and a component switching simulation program. [Background technology]
[0002] For example, when a part used in manufacturing a product is discontinued, it is necessary to check the date when the stock will be insufficient for each part number on the receipt and delivery schedule inquiry screen based on the discontinued production list, and then switch the part. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2004-265085 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, the above-mentioned Patent Document 1 does not disclose anything about simply checking the timing to switch from a source part to a destination part due to discontinuation of production or the like.
[0005] The present invention has been made in consideration of the above, and aims to provide a part switching simulation device, a part switching simulation method, and a part switching simulation program that make it possible to easily check the timing for switching a source part to a destination part due to discontinuation of production, etc. [Means for solving the problem]
[0006] In order to solve the above-mentioned problems and achieve the object, the present invention provides a part switching simulation device having a memory unit and a control unit, wherein the memory unit stores a master in which a switching source part and a switching destination part are registered in association with each other, inventory information in which the inventory quantity of each part is registered for each warehouse, a manufacturing instruction number, a part to be used, a warehouse, and manufacturing instruction information including the number of withdrawal instructions for the part, and the control unit, on an inquiry screen displayed on a display unit, refers to the inventory information and the manufacturing instruction information for the switching source part registered in the master, and displays a list of details of switching target candidate withdrawal instructions for the manufacturing instruction information using the switching source part, including the manufacturing instruction number, the scheduled withdrawal date, the warehouse, the number of withdrawal instructions, and the scheduled inventory quantity which is the inventory quantity - the number of withdrawal instructions, in the list of details, in response to an operation by an operator, selects a row to be switched to a switching destination part corresponding to the switching source part of the master in the list of details, and for the selected row, switches the switching source part to the switching destination part, recalculates the scheduled inventory quantity, and updates the list of details.
[0007] According to another aspect of the present invention, the control unit may further include a change unit that changes the manufacturing instruction information collectively based on an updated detail list.
[0008] In order to solve the above-mentioned problems and achieve the object, the present invention provides a part switching simulation method executed by an information processing device having a control unit and a storage unit, the storage unit stores a master in which a switching source part and a switching destination part are associated with each other and registered, inventory information in which the inventory quantity of each part is registered for each warehouse, a manufacturing instruction number, a part to be used, a warehouse, and manufacturing instruction information including a number of withdrawal instructions for the part, and the control unit executes a simulation process of: in an inquiry screen displayed on a display unit, for a switching source part registered in the master, referring to the inventory information and the manufacturing instruction information, displaying a list of details of switching target candidate withdrawal instructions including a manufacturing instruction number, a scheduled withdrawal date, a warehouse, a number of withdrawal instructions, and a scheduled inventory quantity which is the inventory quantity-the number of withdrawal instructions for the part, for the manufacturing instruction information using the switching source part, and selecting a row in the list of details to be switched to a switching destination part corresponding to the switching source part of the master in response to an operation by an operator, and updating the list of details by switching the switching source part to the switching destination part for the selected row and recalculating the scheduled inventory quantity.
[0009] In order to solve the above-mentioned problems and achieve the object, the present invention provides a component switching simulation program to be executed by an information processing device having a control unit and a storage unit, The storage unit stores a master in which a source part and a destination part are associated with each other, inventory information in which the inventory quantity of each part is registered for each warehouse, a manufacturing instruction number, the part to be used, the warehouse, and manufacturing instruction information including the number of withdrawal instructions for the part, and the control unit, on an inquiry screen displayed on a display unit, displays a list of details of candidate withdrawal instructions for switching, including the manufacturing instruction number, the planned withdrawal date, the warehouse, the number of withdrawal instructions, and the planned inventory quantity which is the inventory quantity - the number of withdrawal instructions, for the source part registered in the master, on a query screen displayed on a display unit, and displays a list of details of candidate withdrawal instructions for switching, including the manufacturing instruction number, the planned withdrawal date, the warehouse, the number of withdrawal instructions, and the planned inventory quantity which is the inventory quantity - the number of withdrawal instructions, for the manufacturing instruction information using the source part, and selects, in the details list, a row to be switched to a destination part corresponding to the source part of the master in response to an operation by an operator, and for the selected row, switches the source part to the destination part, recalculates the planned inventory quantity, and updates the details list. Effect of the Invention
[0010] According to the present invention, it is possible to easily check the timing for switching a switching source part to a switching destination part due to a production stoppage or the like. [Brief description of the drawings]
[0011] [Figure 1] FIG. 1 is a diagram for explaining an outline of a conventional technique for switching components. [Diagram 2] FIG. 2 is a diagram for explaining an outline of part switching according to the present embodiment. [Diagram 3] FIG. 3 is a block diagram showing an example of a configuration of a component switching simulation device according to this embodiment. [Figure 4] FIG. 4 is a flowchart for explaining the overall process flow of the control unit of the component switching simulation device according to the present embodiment. [Diagram 5] FIG. 5 is a diagram for explaining a specific example of the process of the control unit of the part switching simulation device according to the present embodiment. [Figure 6]FIG. 6 is a diagram for explaining a specific example of the process of the control unit of the part switching simulation device according to the present embodiment. [Figure 7] FIG. 7 is a diagram for explaining a specific example of the process of the control unit of the part switching simulation device according to the present embodiment. [Figure 8] FIG. 8 is a diagram for explaining a specific example of the process of the control unit of the part switching simulation device according to the present embodiment. [Figure 9] FIG. 9 is a diagram for explaining a specific example of the process of the control unit of the part switching simulation device according to the present embodiment. [Figure 10] FIG. 10 is a diagram for explaining a specific example of the process of the control unit of the part switching simulation device according to the present embodiment. [Figure 11] FIG. 11 is a diagram for explaining a specific example of the process of the control unit of the part switching simulation device according to the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described in detail with reference to the drawings. However, the present invention is not limited to the embodiment.
[0013] [1. Overview] For example, if a part used to manufacture a product was discontinued, it was necessary to check the date when inventory would be insufficient for each part number on the receipt and delivery schedule inquiry screen based on the discontinued production list, and then switch the part.
[0014] Figure 1 is a diagram for explaining an overview of the conventional technology for parts changeover. In Figure 1, when production is discontinued, a changeover parts list (T2) is created based on a discontinued production list (T1). Based on the discontinued production list, the date when stock will run out is confirmed for each item by checking the planned stock (T3). For production instructions after the date when stock will run out, the parts to be used are changed to new parts by referring to the changeover parts list (T4). This was repeated for each part.
[0015] Therefore, in this embodiment, in order to smoothly switch discontinued products, it is possible to simulate manufacturing instructions that use up the parts to be switched over (old parts) from the inquiry screen (parts delivery schedule inquiry screen), and based on the simulation results, it is possible to make a bulk change in manufacturing instruction information from the parts to be switched over to the parts to be switched over to (new parts).
[0016] Fig. 2 is a diagram for explaining an outline of part switching in this embodiment. In Fig. 2, a switching source part and a switching destination part are registered in a part switching master (T12) based on a manufacturing discontinuation list (T11). A simulation of a manufacturing instruction to use up the switching source part is performed from a switching part dispatch schedule inquiry screen, and a bulk change of manufacturing instruction information is performed from the switching source part to the switching destination part based on the simulation result (T13).
[0017] According to the present embodiment, it is possible to easily check the timing of switching from the source part to the destination part by simulating a manufacturing instruction that uses up the source part. Also, it is possible to collectively update the manufacturing instruction information from the source part to the destination part.
[0018] The part switching simulation device of this embodiment can be widely used in businesses and manufacturers that manufacture products by assembling production configurations.
[0019] [2. Configuration] An example of a part switching simulation device according to the present embodiment will be described with reference to FIG. 3. FIG. 3 is a block diagram showing an example of the configuration of the part switching simulation device according to the present embodiment. In FIG. 3, the part switching simulation device 100 is a commercially available desktop personal computer. The part switching simulation device 100 is not limited to a stationary information processing device such as a desktop personal computer, but may be a portable information processing device such as a commercially available notebook personal computer, a PDA (Personal Digital Assistant), a smartphone, or a tablet personal computer. The part switching simulation device 100 includes a control unit 102, a communication interface unit 104, a storage unit 106, and an input / output interface unit 108. Each unit included in the part switching simulation device 100 is connected to be able to communicate with each other via an arbitrary communication path.
[0020] The communication interface unit 104 communicably connects the component switching simulation device 100 to a network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with other devices via the communication line. Here, the network 300 has a function of connecting the component switching simulation device 100 and the terminal device 200 to each other so that they can communicate with each other, and is, for example, the Internet or a LAN (Local Area Network).
[0021] An input device 112 and an output device 114 are connected to the input / output interface unit 108. The output device 114 may be a monitor (including a home television), a speaker, or a printer. The input device 112 may be a keyboard, a mouse, a microphone, or a monitor that cooperates with a mouse to realize a pointing device function. In the following, the output device 114 may be referred to as a monitor 114.
[0022] The storage unit 106 stores various databases, tables, files, and the like. The storage unit 106 records computer programs for cooperating with an OS (Operating System) to give instructions to a CPU (Central Processing Unit) to perform various processes. For example, memory devices such as RAM (Random Access Memory) and ROM (Read Only Memory), fixed disk devices such as hard disks, flexible disks, and optical disks can be used as the storage unit 106. The storage unit 106 also includes a switching component master 106a and a data file 106b.
[0023] The switching part master 106a is a master for setting source parts and destination parts, and can be configured with a table or the like in which source part codes, source part names, destination part codes, and destination part names are associated and registered (see Fig. 9). In the example of the switching part master 106a shown in Fig. 9, the first line contains the source part code "KIKAI-BUHIN-A", the source part name "machine part A", the destination part code "KIKAI-BUHIN-A2", and the destination part name "machine part A2 (new)".
[0024] The data file 106b is a file for storing various data such as inventory information and manufacturing instruction information. The inventory information may include a warehouse code, a part code, and a current inventory quantity (see FIG. 10). In the example of inventory information shown in FIG. 10, the warehouse code is "01002: Ibaraki Parts Warehouse," the part code is "KIKAI-BUHIN-A: Machine Part A," and the current inventory quantity is "10."
[0025] The manufacturing instruction information may be composed of manufacturing instruction data, manufacturing instruction receipt detail data, and manufacturing instruction issue detail data. The manufacturing instruction data may include a manufacturing instruction number, a manufacturing instruction date, and a warehouse code (see FIG. 11). The manufacturing instruction receipt detail data may include a manufacturing instruction number, a manufacturing start date, a manufacturing delivery date, a product code, and a number of received instructions (see FIG. 11). The manufacturing instruction issue detail data may include a manufacturing instruction number, a row, a warehouse code, a product code, and a number of issued instructions (see FIG. 11).
[0026] Returning to Fig. 3, the control unit 102 is a CPU or the like that performs overall control of the part switching simulation device 100. The control unit 102 has an internal memory for storing control programs such as an OS, programs that define various processing procedures, and required data, and executes various information processing based on these stored programs. The control unit 102 conceptually includes a data registration unit 102a, a master maintenance unit 102b, a simulation unit 102c, a change unit 102d, and a screen display control unit 102e in terms of functions.
[0027] The data registration unit 102a inputs manufacturing instruction information, inventory information, and the like in response to an operator's operation on an input screen (not shown) displayed on the monitor 114, and registers the information in the data file 106b.
[0028] The master maintenance unit 102b is for performing settings such as input, addition, and change of data to the switching part master 106a in response to an operator's operation on a master maintenance screen (see 5) displayed on the monitor 114, for example.
[0029] For example, on the part dispensing schedule inquiry screen (see FIG. 6) displayed on the monitor 114, the simulation unit 102c refers to the inventory information and manufacturing instruction information in the data file 106b for the source part registered in the switching part master 106a, displays a detailed list of switching target candidate dispensing instructions for the manufacturing instruction information using the source part, including the manufacturing instruction number, the scheduled dispensing date, the warehouse, the number of dispensing instructions, and the scheduled inventory number which is the inventory number - the number of dispensing instructions, and selects in the detailed list a row to be switched to a destination part corresponding to the source part in the switching part master 106a in response to the operator's operation, switches the source part to the destination part for the selected row, recalculates the scheduled inventory number, and updates the detailed list.
[0030] The change unit 102d changes the manufacturing instruction information all at once based on the updated detail list.
[0031] The screen display control unit 102e controls, for example, the display of various screens (for example, a parts delivery schedule inquiry screen, a master maintenance screen, etc.) displayed on the monitor 114 and the reception of inputs therefor.
[0032] [3. Specific Examples] A specific example of the process of the control unit 102 of the part switching simulation device 100 according to the present embodiment will be described with reference to Fig. 3 to Fig. 11. Fig. 4 is a diagram showing a flow for explaining the overall process flow of the control unit 102 of the part switching simulation device 100 according to the present embodiment. Figs. 5 to 10 are diagrams for explaining a specific example of the process of the control unit 102 of the part switching simulation device 100 according to the present embodiment.
[0033] (3-1. Overall processing) The overall process flow of the part switching simulation device 100 according to this embodiment will be described with reference to Fig. 4. In Fig. 4, the master maintenance unit 102b executes master maintenance processing (step S1). Specifically, in the master maintenance processing, the master maintenance unit 102b sets data for the switching part master 106a in response to an operator's operation on a master maintenance screen (see 5) displayed on the monitor 114, for example.
[0034] The simulation unit 102c executes a part switching simulation process (step S2). Specifically, in the part switching simulation process, the simulation unit 102c, for example, in a switching part dispatch schedule inquiry screen (see FIG. 6) displayed on the monitor 114, refers to the inventory information and manufacturing instruction information in the data file 106b for a switching source part registered in the switching part master 106a, displays a list of details of switching target candidate dispatch instructions including a manufacturing instruction number, a scheduled dispatch date, a warehouse, a dispatch instruction number, and a scheduled inventory number which is the inventory number-the dispatch instruction number for the manufacturing instruction information using the switching source part, selects a row to be switched to a switching destination part corresponding to the switching source part in the switching part master 106a in response to an operation by an operator, switches the switching source part to the switching destination part for the selected row, recalculates the scheduled inventory number, and updates the list of details.
[0035] The change unit 102d executes a batch update process (step S3). Specifically, in the batch update process, the change unit 102d changes the manufacturing instruction information in a batch based on the list of details updated by the simulation unit 102c.
[0036] (3-2. Master maintenance processing) Fig. 5 is a diagram for explaining the master maintenance process. Fig. 5(A) shows an example of a discontinued production list, Fig. 5(B) shows an example of a master maintenance screen, and Fig. 5(C) shows an example of registration of the switching part master 106a.
[0037] The operator registers the switching source parts and the switching destination parts on the master maintenance screen shown in FIG. 5(B) based on the discontinued production list shown in FIG. 5(A), and the switching source parts and the switching destination parts are set in the switching part master 106a as shown in FIG. 5(C).
[0038] In the example of the switching part master 106a shown in FIG. 5(C), the source part code is “KIKAI-BUHIN-A”, the source part name is “machine part A”, the destination part code is “KIKAI-BUHIN-A2”, and the destination part name is “machine part A2 (new)”.
[0039] (3-2. Part switching simulation processing and batch change processing) 6 to 9 are diagrams for explaining the part switching simulation process and the collective change process, and show examples of the display of the switching part delivery schedule inquiry screen. Here, an example of a simulation will be explained using sample data of the switching part master 106a in Fig. 9, the inventory information in Fig. 10, and the manufacturing instruction information (manufacturing instruction data, manufacturing instruction receipt detail data, and manufacturing instruction delivery detail data) in Fig. 11 (A), (B), and (C).
[0040] The simulation unit 102c, in the switching part dispensing schedule inquiry screen, refers to the inventory information and manufacturing instruction information in the data file 106b for the specified warehouse and switching source part, and lists details of switching target candidate dispensing instructions for the manufacturing instruction information using the switching source part, including the manufacturing instruction number, scheduled dispensing date, warehouse, number of dispensing instructions, and scheduled inventory number (= inventory number in inventory information - number of dispensing instructions).
[0041] The example of the switching part dispatch schedule inquiry screen shown in Fig. 6 has a header area for specifying the business establishment, warehouse, and switching source part, and a details list area for the inquiry results of the specified warehouse and switching source part. The details list displays a switching check box for selecting the row for switching the switching source part to the switching destination part, the scheduled dispatch date, production order number, row, warehouse, product, dispatch instruction quantity, and scheduled inventory quantity (inventory quantity in inventory information - dispatch instruction quantity).
[0042] The first line displays the specified warehouse and the current inventory of the original part. In the list of details, only the switch checkbox can be changed by operation. However, the switch checkbox for the current inventory line on the first line is displayed as unavailable. The scheduled issue date is linked to the production start date.
[0043] Here, an example is explained in which the warehouse "01002: Ibaraki Parts Warehouse" and the source part "KIKAI-BUHIN-A: Machine Part A" are specified.
[0044] In the example shown in Figure 6, the first line of the detail list displays the warehouse "01002: Ibaraki Parts Warehouse", the source part "KIKAI-BUHIN-A: Machine Part A", and the planned inventory quantity "10". The second line displays the planned withdrawal date "2021 / 04 / 20, manufacturing order number "SSS100000200", warehouse "01002: Ibaraki Parts Warehouse", part "KIKAI-BUHIN-A: Machine Part A", withdrawal instruction quantity "6", and planned inventory quantity "4". The third line has the planned issue date "2021 / 04 / 30", manufacturing instruction number "SSS100000300", warehouse "01002: Ibaraki Parts Warehouse", part "KIKAI-BUHIN-A: Machine Part A", issue instruction quantity "7", and planned inventory quantity "-3". Since the planned inventory quantity is negative, the source part needs to be switched to the destination part.
[0045] When the operator checks the switch checkbox and presses the execute button (not shown), the simulation unit 102c switches the display to the switch destination part in the switch destination part master 106a for the selected row, excludes it, recalculates the expected inventory quantity, and updates the details list. This makes it possible to simulate a manufacturing instruction that uses up the switch source part. In this example, the switch destination part is "KIKAI-BUHIN-A2 Machine Part A2 (New)".
[0046] An example of the simulation results is shown in Figure 7. Here, by checking the selection boxes on the third and fourth lines to switch the production order numbers "SSS100000300" and "SSS100000301" to the switch-to products, a simulation can be performed in which the planned inventory quantity is set to "0" and the pre-switch product is used up.
[0047] 8, if there is no problem with the simulation result, the operator can change the dispensing product of the manufacturing instruction information from the pre-switching part to the post-switching part by pressing the registration button. When the registration button is pressed, the change unit 102d changes the manufacturing instruction information all at once based on the updated details list (simulation result).
[0048] (3-4. Sample data) Figure 9 shows sample data of the switching part master 106a, Figure 10 shows sample data of inventory information, Figures 11(A), (B), and (C) show sample data of manufacturing instruction information (manufacturing instruction data, manufacturing instruction acceptance detail data, and manufacturing instruction issue detail data), and Figures 11(D), (E), and (F) show sample data of manufacturing instruction information that has been changed in bulk (manufacturing instruction data, manufacturing instruction acceptance detail data, and manufacturing instruction issue detail data).
[0049] In Fig. 9, the switching source part "KIKAI-BUHIN-A Machine Part A" in the first row of the switching part master 106a is the target of the part switching simulation process (switching part dispatch schedule inquiry). In the manufacturing instruction information (manufacturing instruction data, manufacturing instruction acceptance detail data, manufacturing instruction dispatch detail data) shown in Figs. 11(A), (B), and (C), the rows marked with "O" are the targets for collective output of the detail list on the switching part dispatch schedule inquiry screen. The manufacturing instruction information (manufacturing instruction data, manufacturing instruction acceptance detail data, manufacturing instruction dispatch detail data) shown in Figs. 11(A), (B), and (C) is changed as shown in Figs. 11(D), (E), and (F) by collective change of the simulation result (updated detail list) in Fig. 8 above.
[0050] As described above, according to this embodiment, the switching part master 106a in which the switching source parts and the switching destination parts are registered in association with each other, and the switching part dispensing schedule inquiry screen refers to the inventory information and manufacturing instruction information for the switching source parts registered in the switching part master 106a, and displays a list of details of switching target candidate dispensing instructions including the manufacturing instruction number, the scheduled dispensing date, the warehouse, the number of dispensing instructions, and the scheduled inventory number which is the inventory number-the number of dispensing instructions for the manufacturing instruction information using the switching source parts, and in the details list, a row to be switched to a switching destination part corresponding to the switching source part of the master is selected in response to an operation by an operator, and for the selected row, the switching source part is switched to the switching destination part, the scheduled inventory number is recalculated, and the details list is updated. Therefore, it is possible to easily check the timing of switching the switching source part to the switching destination part due to a production stoppage, etc.
[0051] [4. Contribution to the United Nations-led Sustainable Development Goals (SDGs)] This embodiment can contribute to improving business efficiency and promoting appropriate management decisions by companies, thereby contributing to goals 8 and 9 of the SDGs.
[0052] Furthermore, this embodiment can contribute to reducing waste and promoting paperless and electronic systems, thereby contributing to the achievement of SDGs Goals 12, 13, and 15.
[0053] Furthermore, this embodiment can contribute to strengthening control and governance, making it possible to contribute to Goal 16 of the SDGs.
[0054] 5. Other embodiments The present invention may be embodied in various different embodiments other than those described above within the scope of the technical concept set forth in the claims.
[0055] For example, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually, or all or part of the processes described as being performed manually can be performed automatically using known methods.
[0056] In addition, the processing procedures, control procedures, specific names, information including parameters such as registered data and search conditions for each process, screen examples, and database configurations shown in this specification and drawings may be changed as desired unless otherwise specified.
[0057] Moreover, with regard to the component switching simulation device 100, the components shown in the figures are merely conceptual functional elements, and do not necessarily have to be physically configured as shown in the figures.
[0058] For example, the processing functions of the part switching simulation device 100, particularly the processing functions performed by the control unit 102, may be realized in whole or in part by a CPU and a program interpreted and executed by the CPU, or may be realized as hardware using wired logic. The program is recorded in a non-transient computer-readable recording medium including programmed instructions for causing the information processing device to execute the processes described in the present embodiment, and is mechanically read by the part switching simulation device 100 as necessary. That is, a computer program for giving instructions to the CPU in cooperation with the OS and performing various processes is recorded in the storage unit 106 such as a ROM or HDD (Hard Disk Drive). The computer program is executed by being loaded into the RAM, and constitutes the control unit 102 in cooperation with the CPU.
[0059] In addition, this computer program may be stored in an application program server connected to the component switching simulation device 100 via an arbitrary network, and it is also possible to download all or a part of it as necessary.
[0060] In addition, the program for executing the process described in this embodiment may be stored in a non-transient computer-readable recording medium, or may be configured as a program product. Here, the "recording medium" includes any "portable physical medium" such as a memory card, a Universal Serial Bus (USB) memory, a Secure Digital (SD) card, a flexible disk, a magneto-optical disk, a ROM, an Erasable Programmable Read Only Memory (EPROM), an Electrically Erasable and Programmable Read Only Memory (EEPROM (registered trademark)), a Compact Disk Read Only Memory (CD-ROM), a Magneto-Optical disk (MO), a Digital Versatile Disk (DVD), and a Blu-ray (registered trademark) Disc.
[0061] Moreover, a "program" is a data processing method written in any language or description method, and may be in any form, such as source code or binary code. Note that a "program" is not necessarily limited to a single configuration, but also includes a distributed configuration as multiple modules or libraries, and a program that works with a separate program, such as an OS, to achieve its function. Note that the specific configuration and reading procedure for reading a recording medium in each device shown in the embodiments, as well as the installation procedure after reading, may use well-known configurations and procedures.
[0062] The various databases etc. stored in the memory unit 106 are storage means such as memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and optical disks, and store various programs, tables, databases, and web page files etc. used for various processes and providing websites.
[0063] The part switching simulation device 100 may be configured as an information processing device such as a known personal computer or a workstation, or may be configured as the information processing device to which any peripheral device is connected. The part switching simulation device 100 may be realized by installing software (including programs or data, etc.) that causes the information processing device to realize the processing described in this embodiment.
[0064] Furthermore, the specific form of distribution and integration of the devices is not limited to those shown in the drawings, and all or part of them can be functionally or physically distributed and integrated in any unit according to various additions or function additions. In other words, the above-mentioned embodiments can be implemented in any combination, or the embodiments can be implemented selectively. [Explanation of symbols]
[0065] 100 Parts switching simulation device 102 Control section 102a Data Registration Section 102b Master Maintenance Department 102c Simulation Department 102d Changes 102e Screen display control unit 104 Communication interface section 106 Storage section 106a Switching parts master 106b Data File 108 Input / Output Interface Section 112 Input Devices 114 Output Device 200 Servers 300 Network
Claims
1. A part switching simulation device including a storage unit and a control unit, The storage unit includes: Master data that associates and registers the switching source parts and switching destination parts, Inventory information that registers the stock quantity of each part for each warehouse, Manufacturing instruction information including a manufacturing instruction number, a part to be used, a warehouse, and a delivery instruction number of the part; is stored, The control unit is a simulation means for displaying, on an inquiry screen displayed on a display unit, a list of details of candidate removal instructions for replacement, including a manufacturing instruction number, a planned removal date, a warehouse, a removal instruction quantity, and a planned inventory quantity which is the inventory quantity - the removal instruction quantity, for a replacement source part registered in the master, by referring to the inventory information and the manufacturing instruction information on the inquiry screen displayed on a display unit, and for manufacturing instruction information using the replacement source part, selecting a row in the details list to be replaced with a replacement destination part corresponding to the replacement source part in the master in response to an operator's operation, and for the selected row, switching the replacement source part to the replacement destination part, recalculating the planned inventory quantity, and updating the details list.
2. The control unit further 2. The part switching simulation device according to claim 1, further comprising a change unit for changing the manufacturing instruction information collectively based on an updated detail list.
3. A component switching simulation method executed by an information processing device including a control unit and a storage unit, The storage unit includes: Master data that associates and registers the switching source parts and switching destination parts, Inventory information that registers the stock quantity of each part for each warehouse, Manufacturing instruction information including a manufacturing instruction number, a part to be used, a warehouse, and a delivery instruction number of the part; is stored, Executed in the control unit: a simulation step of: on an inquiry screen displayed on a display unit, referring to the inventory information and manufacturing instruction information for a source part registered in the master, displaying a list of details of candidate removal instructions for removal including the manufacturing instruction number, the planned removal date, the warehouse, the number of removal instructions, and the planned inventory number which is the inventory number - the number of removal instructions for removal, for the manufacturing instruction information using the source part; selecting, in the details list, a row to be switched to a destination part corresponding to the source part in the master in response to an operator's operation; and, for the selected row, switching the source part to the destination part, recalculating the planned inventory number, and updating the details list.
4. A part switching simulation program to be executed by an information processing device having a control unit and a storage unit, The storage unit includes: Master data that associates and registers the switching source parts and switching destination parts, Inventory information that registers the stock quantity of each part for each warehouse, Manufacturing instruction information including a manufacturing instruction number, a part to be used, a warehouse, and a delivery instruction number of the part; is stored, In the control unit, A part switching simulation program for executing a simulation process in which, on an inquiry screen displayed on a display unit, for a source part registered in the master, the inventory information and the manufacturing instruction information are referenced, and a list of details of candidate removal instructions for switching, including the manufacturing instruction number, the planned removal date, the warehouse, the number of removal instructions, and the planned inventory number which is the inventory number - the number of removal instructions, is displayed for the manufacturing instruction information using the source part, and in the details list, a row is selected in response to an operator's operation to be switched to a destination part corresponding to the source part in the master, and for the selected row, the source part is switched to the destination part, the planned inventory number is recalculated, and the details list is updated.
Citation Information
Patent Citations
Method for planning amount of material required
JP2003288110A
Repair parts shipping system
JP2004265085A
Production planning supporting device and method, program, and computer readable storage medium
JP2010122902A
Production management system and production management method
JP2013101489A
Inventory management apparatus and inventory management program
JP2015138393A
