Flow rate measuring method and substrate processing apparatus

The flow rate measurement method using a flow meter at metal window supply ports in an atmospheric environment addresses the challenge of inaccurate gas flow rate measurement, ensuring uniform gas distribution and detecting assembly errors in substrate processing apparatuses.

JP7563846B2Active Publication Date: 2024-10-08TOKYO ELECTRON LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2020211855
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-12-21
Publication Date
2024-10-08
Estimated Expiration
2040-12-21

AI Technical Summary

Technical Problem

Existing substrate processing apparatuses lack the ability to accurately measure the flow rate of gases branched by branch gas pipes and supplied into the processing chamber, leading to potential non-uniform processing and product defects.

Method used

A flow rate measurement method involving the use of a flow meter attached to the supply ports of metal windows in an atmospheric environment, allowing for accurate measurement of gas flow rates without permanent installation, and enabling detection of assembly errors in gas piping.

Benefits of technology

Enables precise measurement of gas flow rates through branch gas pipes, ensuring uniform gas distribution and detecting assembly errors, thereby preventing non-uniform processing and defects in substrates.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007563846000001
    Figure 0007563846000001
  • Figure 0007563846000002
    Figure 0007563846000002
  • Figure 0007563846000003
    Figure 0007563846000003
Patent Text Reader

Abstract

To accurately measures the flow rate of gas after branching, which is shunted by a branch gas pipe and flows into a processing chamber.SOLUTION: A flow rate measuring method for measuring the flow rate of gas in a substrate processing device including a gas supply pipe that supplies gas, a plurality of branched gas pipes that are branched from the gas supply pipe, a metal window that communicates with the plurality of branched gas pipes, and a shower head located at the bottom of the metal window and having a gas discharge hole for passing the gas through the metal window includes a step of arranging a flow meter at a supply port of the metal window communicating with the plurality of the branched gas pipes and measuring the flow rate of gas flowing to the supply port of the metal window by the flow meter.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a flow rate measurement method and a substrate processing apparatus. [Background technology]

[0002] For example, Patent Document 1 proposes providing a flow controller in a branch pipe section that communicates with a gas diffusion chamber, each of which has a group of gas ejection holes, and inspecting the showerhead by measuring the pressure inside the branch pipe. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2018-29153 A Summary of the Invention [Problem to be solved by the invention]

[0004] In order to obtain a higher degree of processing uniformity in a substrate processing apparatus, it is important to control the distribution of the processing gas supplied into the processing chamber. Therefore, it is desirable to accurately measure the flow rate of the gas that is branched by the branch gas piping and supplied into the processing chamber in order to prevent product defects.

[0005] The present disclosure provides a flow rate measuring method and a substrate processing apparatus that accurately measure the flow rate of a gas that is branched by a branch gas pipe and flows into a processing chamber. [Means for solving the problem]

[0006] According to one aspect of the present disclosure, there is provided a substrate processing apparatus including: a gas supply pipe for supplying a gas; a plurality of branch gas pipes branching from the gas supply pipe; a metal window communicating with the plurality of branch gas pipes; and a showerhead disposed at a bottom of the metal window and having gas outlet holes for passing the gas from the metal window. The above A flow rate measurement method for measuring a flow rate of a gas, comprising the steps of: In the atmospheric environment, A flow meter is disposed at a supply port of the metal window communicating with the plurality of branch gas pipes, and the flow meter measures the amount of gas flowing to the supply port of the metal window. The above A method for measuring flow rate is provided, comprising the steps of measuring a flow rate of a gas. Effect of the Invention

[0007] According to one aspect, the flow rate of the branched gas that is branched by the branch gas pipe and flows into the processing chamber can be measured with high accuracy. [Brief description of the drawings]

[0008] [Figure 1] 1 is a schematic cross-sectional view showing an example of a substrate processing apparatus according to an embodiment; [Diagram 2] 3A to 3C are diagrams illustrating an example of a surface of a metal window, a diffusion chamber, and a flow meter according to an embodiment. [Diagram 3] FIG. 2 is a diagram illustrating an example of a gas system according to an embodiment. [Figure 4] FIG. 3 is a cross-sectional view of the section AA in FIG. [Diagram 5] FIG. 11 is a diagram showing an example of measured values ​​and calculated values ​​in a center area by a flow meter according to an embodiment. [Figure 6] FIG. 11 is a diagram showing an example of measurement values ​​of each part in each identical area according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, an embodiment of the present disclosure will be described with reference to the drawings. In the drawings, the same components are denoted by the same reference numerals, and duplicated descriptions may be omitted.

[0010] [Substrate processing equipment] First, a substrate processing apparatus 100 according to an embodiment will be described with reference to Fig. 1 and Fig. 2. Fig. 1 is a schematic cross-sectional view showing an example of the substrate processing apparatus 100 according to an embodiment. The substrate processing apparatus 100 is an example of an apparatus capable of performing a flow rate measurement method according to an embodiment.

[0011] The substrate processing apparatus 100 is, for example, a plasma processing apparatus, and generates an inductively coupled plasma (ICP). The substrate processing apparatus 100 performs plasma processing such as etching, ashing, and film formation on a rectangular substrate G using the generated plasma. In this embodiment, the substrate G is, for example, a glass substrate for an FPD (Flat Panel Display).

[0012] The substrate processing apparatus 100 includes a processing vessel 20 and a control device (control unit) 90. The processing vessel 20 is, for example, a rectangular parallelepiped box-shaped vessel formed of a conductive material such as aluminum whose inner wall surface is anodized, and its interior is a processing chamber S for processing a substrate G. The processing vessel 20 is grounded. The processing vessel 20 is divided into an upper lid 11 and a lower body 15 by a partition wall 14 having a plurality of shower heads 34. The plurality of shower heads 34 face the substrate G and have a plurality of metal windows 32A to 32F (collectively referred to as "metal windows 32") at the top. The body 15 is provided with a loading / unloading port 18 for loading and unloading the substrate G, and the loading / unloading port 18 is configured to be freely opened and closed by a gate valve 24.

[0013] An insulating member 37 is disposed between the partition wall 14 and the shower head 34 and between adjacent shower heads 34, and the shower heads 34 are electrically insulated from each other by the insulating member 37. Instead of the shower head 34, a dielectric window may be formed.

[0014] The processing vessel 20 is divided into an antenna chamber A, which is an upper space separated vertically by a partition wall 14, and a processing chamber S. The space surrounded by the partition wall 14 and the main body 15 becomes the processing chamber S. The lid 11 and the main body 15 are normally sealed but can be separated at the bottom surface of the partition wall 14, and when the substrate processing apparatus 100 is assembled, the lid 11 side is moved, for example, upward and separated from the main body 15, thereby opening the inside of the main body 15 (processing chamber S) to the atmosphere.

[0015] A branch gas pipe 52 is formed inside each of the metal windows 32A to 32F. Each branch gas pipe 52 is a pipe for supplying gas supplied from the outside of the processing vessel 20 to each metal window 32. The branch gas pipe 52 is connected to the diffusion chamber 33 in the metal window 32. The bottom of the diffusion chamber 33 in the metal window 32 is formed by the shower head 34. The shower head 34 is formed with a gas discharge hole 36. The gas supplied from the branch gas pipe 52 to the metal window 32 is diffused in the diffusion chamber 33 in the metal window 32. The gas flows from the diffusion chamber 33 to the gas discharge hole 36 formed in the shower head 34 and is supplied to the processing chamber S. The branch gas pipes 52 communicating with the metal windows 32A to 32F are connected to the branch gas pipes L1 to L6. A portion where the branch gas pipe 52 communicates with the diffusion chamber 33 formed in the metal window 32 is called a supply port 35 of the metal window 32. The branch gas pipes L1 to L6 are collectively referred to as the branch gas pipe L.

[0016] The branch gas pipes L1 to L6 are connected to a process gas pipe 68 via a branching device 65, and the process gas pipe 68 is connected to a gas supply unit 60. The process gas introduced from the gas supply unit 60 to the process gas pipe 68 is branched by the branching device 65. The branched process gas flows through the branch gas pipes L1 to L6 and is introduced in a shower-like manner into the process chamber S from a large number of gas discharge holes 36 communicating with the diffusion chamber 33 in the metal windows 32A to 32F.

[0017] That is, the processing gas pipe 68 communicates from the outside of the processing vessel 20 to the multiple metal windows 32A-32F inside the processing vessel 20. The gas supply unit 60 includes a processing gas supply source 64 and a valve 62. The processing gas pipe 68 is connected to the processing gas supply source 64 via the valve 62. The valve 62 controls supply and stop of the processing gas by opening and closing.

[0018] The process gas pipe 68 is connected to a branching device 65, which branches the process gas pipes L1 to L6. The branched gas pipes L1 to L6 are connected to the branched gas pipes 52 provided in the metal windows 32A to 32F, and the branched gas pipes 52 are connected to the metal windows 32A to 32F located in different regions of the partition wall 14. The branched gas pipes L1 to L6 each have a flow ratio controller (FRC) 63A to 63F. The flow ratio controllers 63A to 63F distribute the flow rate determined by a flow rate controller such as a mass flow controller (MFC) in the process gas supply source 64 at a predetermined ratio. The flow ratio controllers 63A to 63F and the branching device 65 adjust the gas flow rate and gas distribution of the process gas, thereby controlling the distribution of the process gas supplied into the process chamber S.

[0019] In addition, the gas supply unit 60 includes an inert gas supply source 67, an external gas pipe 66, inert gas branch pipes 61A to 61F, and valves 69A to 69F. The external gas pipe 66 is connected to the inert gas supply source 67. The inert gas branch pipes 61A to 61F are branched from the external gas pipe 66. The branched inert gas branch pipes 61A to 61F are connected to the branch gas pipes L1 to L6. The inert gas branch pipes 61A to 61F and the branch gas pipes L1 to L6 are connected between the flow ratio controllers 63A to 63F and the branch gas pipe 52. The valves 69A to 69F are provided in the inert gas branch pipes 61A to 61F. The valves 69A to 69F control the supply and stop of the inert gas by opening and closing.

[0020] The external gas pipe 66 is connected to the inert gas branch pipes 61A to 61F and branches into the branch gas pipes L1 to L6. A flow rate controller such as an MFC (Mass Flow Controller) in the inert gas supply source 67 supplies a predetermined gas flow rate to the branch gas pipes L1 to L6.

[0021] For example, in the flow rate measuring method according to the present embodiment, when assembling the substrate processing apparatus 100, the lid 11 is opened to open the inside of the main body 15 (processing chamber S) to the atmosphere, and the valve 62 is closed to stop the supply of the processing gas. Then, the valves 69A to 69F are opened to supply an inert gas such as argon (Ar) gas or helium (He) gas from the inert gas supply source 67 to the metal window 32. During substrate processing, the lid 11 is closed to maintain the inside of the main body 15 (processing chamber S) in a predetermined reduced pressure state, the valves 69A to 69F are closed to stop the supply of the inert gas, and the valve 62 is opened to supply the processing gas to the processing chamber S.

[0022] In the flow rate measuring method according to this embodiment, dry air may be supplied instead of the inert gas from the external gas piping 66 when the substrate processing apparatus 100 is assembled.

[0023] A plurality of exhaust ports 19 are opened in the main body 15, and a gas exhaust pipe 25 is connected to the exhaust port 19, and the gas exhaust pipe 25 is connected to an exhaust device 27 via an on-off valve 26. A gas exhaust section 28 is formed by the gas exhaust pipe 25, the on-off valve 26, and the exhaust device 27. The exhaust device 27 has a vacuum pump such as a turbo molecular pump, and is configured to be able to freely evacuate the inside of the main body 15 to a predetermined vacuum level during the process.

[0024] A high-frequency antenna 51 is disposed in antenna chamber A, which is the space above metal window 32, at a distance from metal window 32. High-frequency antenna 51 contributes to plasma generation and is formed by winding an antenna wire made of a conductive metal such as copper in a circular or spiral shape. For example, multiple circular antenna wires may be disposed. High-frequency antenna 51 is connected to a high-frequency power source 56 via a matching box 55 that performs impedance matching.

[0025] When high frequency power of, for example, 13.56 MHz is applied to the high frequency antenna 51 from the high frequency power supply 56, an inductive electric field is formed in the processing chamber S via the metal window 32. Due to this inductive electric field, the processing gas supplied from the shower head 34 to the processing chamber S is converted into plasma, generating inductively coupled plasma, and ions in the plasma are provided to the substrate G.

[0026] A substrate support 70 is provided inside the processing chamber S surrounded by the partition 14 and the main body 15. The substrate support 70 supports a substrate G. The substrate support 70 is connected to a high frequency power supply 83, which is a bias source, via a matching device 82 that performs impedance matching. By applying high frequency power of, for example, 3.2 MHz from the high frequency power supply 83 to the substrate support 70, an RF bias is generated, and ions generated by the high frequency power supply 56 can be attracted to the substrate G.

[0027] The high frequency power supply 56 is a source for generating plasma, and the high frequency power supply 83 connected to the substrate support 70 is a bias source that attracts the generated ions and imparts kinetic energy to them. In this way, the source generates plasma using inductive coupling, and a bias source, which is a separate power supply, is connected to the substrate support 70 to control the ion energy. This allows the generation of plasma and the control of ion energy to be performed independently, increasing the degree of freedom in the process. The frequency of the high frequency power output from the high frequency power supply 56 is preferably set within the range of 0.1 MHz to 500 MHz.

[0028] The substrate processing apparatus 100 may further include a control device 90. The control device 90 may be a computer including a processor, a storage unit such as a memory, an input device, a display device, a signal input / output interface, and the like. The control device 90 controls each unit of the substrate processing apparatus 100. In the control apparatus 90, an operator can use the input device to input commands and the like to manage the substrate processing apparatus 100. In addition, in the control apparatus 90, the display device can visualize and display the operating status of the substrate processing apparatus 100. Furthermore, the storage unit stores a control program and recipe data. The control program is executed by the processor to execute various processes in the substrate processing apparatus 100. The processor executes the control program and controls each unit of the substrate processing apparatus 100 according to the recipe data.

[0029] [Flow Control] In order to obtain a higher degree of processing uniformity in the substrate processing apparatus 100, it is important to control the plasma density and the distribution of the processing gas in the processing chamber S. However, conventionally, it has not been possible to actually measure the flow rate of gas diverted at each of the metal windows 32A-32F. On the other hand, if gas flows from the metal windows 32A-32F into the processing chamber S at a flow rate different from that expected, this may cause product defects in the substrate. Furthermore, if the flow rate of gas supplied into the processing chamber S from the metal windows 32A-32F cannot be measured correctly, if there is an error in the assembly of the gas piping in the manufacturing process of the substrate processing apparatus 100, the mistake cannot be detected.

[0030] Therefore, in this embodiment, the lid 11 is opened, the main body 15 is opened to the atmosphere, the shower head 34 is removed, the metal windows 32A-32F are placed upside down, and a flow meter is attached to the supply port 35 of each of the metal windows 32A-32F. Then, the flow rate of the gas after branching is measured at the supply port 35 of each of the metal windows 32A-32F. The supply port 35 of the metal windows 32A-32F is a portion where the branch gas pipe 52 communicates with the diffusion chamber 33 formed in each of the metal windows 32A-32F.

[0031] The flow rate measurement method according to this embodiment makes it possible to simultaneously measure the flow rate of gas flowing through the supply ports 35 of the metal windows 32 that are arranged in the same predetermined area among the multiple metal windows 32. Furthermore, the flow rate measurement method according to this embodiment does not require a permanently installed sensor such as a flow meter or a vacuum environment. When assembling the substrate processing apparatus 100, a flow meter is disposed at the supply ports 35 of each area of ​​the multiple metal windows 32A-32F. Then, the flow rate of gas in each area is measured by the flow meter. This makes it possible to accurately measure the flow rate of gas supplied to the processing chamber S from each area of ​​the metal windows 32A-32F, and to detect assembly errors around the gas piping.

[0032] As shown in Fig. 2, the flow meter 200 is attached to the supply port of the metal window 32 when the substrate processing apparatus 100 is assembled. Fig. 2 shows the surface of the metal window 32 that is electrically insulated by an insulating member 37. That is, Fig. 2 is a diagram showing an example of the surface of the metal window 32, the inside of the diffusion chamber 33, and the flow meter 200, which is turned upside down with the shower head 34 at the bottom of the metal window 32 in Fig. 1 removed.

[0033] The metal window 32 is divided into a plurality of parts for each area, and a flow meter 200 is attached to the gas supply port 35 of each of the plurality of parts.

[0034] The following describes the multiple areas of the metal window 32. In the example of Fig. 2, the metal window 32 is divided into a center area C in the center, an edge area O on the periphery, and a middle area M between the center area C and the edge area O, and the edge area O and middle area M on the periphery are further divided into multiple areas.

[0035] [Gas system] 2 and 3, an example of a gas system and an area according to the embodiment will be described. In the center area C, the metal window 32A is divided into four parts C1 to C4, and one flow meter 200 is attached to each of the supply ports 35 of the metal windows 32A of the parts C1 to C4. As shown in Fig. 2, the parts C1 and C3 are triangular, and the parts C2 and C4 are trapezoidal.

[0036] For example, referring to the lower diagram of Fig. 2 which shows an enlarged view of part C4 of metal window 32A, flow meter 200 is fixed to metal window 32A by flow measurement jig 201, and flow meter 200 is attached to supply port 35 of metal window 32A of part C4. The structure of the attachment portion of flow meter 200 will be described later with reference to Fig. 4 which shows a cross section taken along line AA in Fig. 2.

[0037] 3 shows a gas system for each area, and for example, parts C1 to C4 of the metal window 32A are set in advance in the center area C of the same area. The branch gas pipe L1 branches into four, and the branch gas pipes 52 after the four branches are connected to the parts C1 to C4 of the metal window 32A, and simultaneously flow gas into the supply ports 35 of the metal windows 32A provided in each of the four parts C1 to C4 in the same area. This allows the flowmeter 200 to simultaneously measure the flow rates of gas flowing through the supply ports 35 of the metal windows 32A provided in each of the parts C1 to C4 in the C area.

[0038] In the center area M, the parts ML1 to ML4 of the metal window 32B are set in advance in the same area, and the parts MS1 to MS4 of the metal window 32C are set in advance in the same area. The branch gas pipe L2 branches into four, and the branch gas pipes 52 after the four branches are connected to the parts ML1 to ML4 of the metal window 32B, and simultaneously flow gas into the supply ports 35 of the metal windows 32B provided in each of the four parts ML1 to ML4 in the same area. This allows the flowmeter 200 to simultaneously measure the flow rates of gas flowing through the supply ports 35 of the metal windows 32B provided in each of the parts ML1 to ML4 in the ML area.

[0039] The branch gas pipe L3 branches into four, and the branch gas pipes 52 after the four branches are connected to the parts MS1 to MS4 of the metal window 32C, and simultaneously flow gas into the supply ports 35 of the metal windows 32C provided in each of the four parts MS1 to MS4 in the same area. This allows the flowmeter 200 to simultaneously measure the flow rates of gas flowing through the supply ports 35 of the metal windows 32C provided in each of the parts MS1 to MS4 in the MS area.

[0040] In the edge area O, the parts OC1 to OC8 of the metal window 32D are set in advance in the same area, and the parts OLS1 and OLS2 of the metal window 32E are set in advance in the same area. Furthermore, the parts OSS1 and OSS2 of the metal window 32F are set in advance in the same area. The branch gas pipe L4 branches into eight parts, and the branch gas pipes 52 after the eight branches are connected to the parts OC1 to OC8 of the metal window 32D, and simultaneously flow gas into the supply ports 35 of the metal window 32D provided in each of the eight parts OC1 to OC8 in the same area. This allows the flowmeter 200 to simultaneously measure the flow rates of gas flowing through the supply ports 35 of the metal window 32D provided in each of the parts OC1 to OC8 in the OC area.

[0041] The branch gas pipe L5 branches into two, and the branch gas pipe 52 after the branching is connected to the parts OLS1 and OLS2 of the metal window 32E, and simultaneously flows gas into the supply ports 35 of the metal windows 32E provided in each of the two parts OLS1 and OLS2 in the same area. This allows the flowmeter 200 to simultaneously measure the flow rates of the gas flowing through the supply ports 35 of the metal windows 32E provided in each of the parts OLS1 and OLS2 in the OLS area.

[0042] The branch gas pipe L6 branches into two, and the branch gas pipe 52 after the branching is connected to the parts OSS1 and OSS2 of the metal window 32F, and simultaneously flows gas into the supply ports 35 of the metal windows 32F provided in each of the two parts OSS1 and OSS2 in the same area. This allows the flowmeter 200 to simultaneously measure the flow rates of gas flowing through the supply ports 35 of the metal windows 32F provided in each of the parts OSS1 and OSS2 in the OSS area.

[0043] [Flow meter] Next, an example of the arrangement of the flowmeter 200 will be described with reference to Fig. 4. Fig. 4 is a diagram showing a cross section taken along line AA in Fig. 2. As shown in Figs. 4(a) and (b), a flow measurement jig 201 is fixed onto the metal window 32 (on the surface of the metal window), and the flowmeter 200 is fixed to the metal window 32 by the flow measurement jig 201. A measurement tube 200a in the flowmeter 200 and an end portion 35a of a supply port 35 of the metal window 32 communicate with each other, and the flowmeter 200 measures the flow rate of gas passing through the end portion 35a of the supply port 35 of the metal window 32.

[0044] Fig. 4(a) shows the arrangement of the flow meter 200 near the supply port 35 of the metal window 32 when the branch gas pipe 52 is not provided with an orifice 105. Fig. 4(b) shows the arrangement of the flow meter 200 near the supply port 35 of the metal window 32 when the branch gas pipe 52 is provided with an orifice 105.

[0045] 4(a) and (b), the supply port 35 of the metal window 32 is formed by a branch gas pipe 52 formed in the metal window 32. The branch gas pipe 52 is made of, for example, ceramics.

[0046] The flow rate measuring jig 201 is disposed on the metal window 32 at the end (tip) of the gas hole of the branch gas pipe 52 that forms the end portion 35a of the supply port 35 of the metal window 32 via the seal member 101. The gas hole of the branch gas pipe 52 and the measurement pipe 200a in the flowmeter 200 penetrate the seal member 101 and the flow rate measuring jig 201. A seal member 104 is provided between the seal member 101 and the branch gas pipe 52, and a seal member 103 is provided between the seal member 101 and the flow rate measuring jig 201. The seal members 101, 103, and 104 seal the gas flowing through the supply port 35. The seal member 101 may be made of, for example, SUS. The seal members 103 and 104 may be made of, for example, O-rings.

[0047] The flow meter 200 is attached to a flow measurement fixture 201 at the end 35 a of the supply port 35 of the metal window 32 .

[0048] In the example of Fig. 4(b), an orifice 105 is disposed adjacent to the base end 35b of the supply port 35, and the orifice 105 is configured to throttle the flow of gas flowing from the supply port 35 of the metal window 32 into the diffusion chamber 33. Also, in the example of Fig. 4(b), a spiral groove 52a is provided on the inner wall of the supply port 35, and the gas throttled by the orifice 105 is smoothly sent to the end end 35a of the supply port 35. Note that, although the spiral groove 52a is not provided on the inner wall of the supply port 35 in the example of Fig. 4(a), the groove 52a may be provided.

[0049] In this configuration, the flow meter 200 is attached when the substrate processing apparatus 100 is assembled in a factory after the substrate processing apparatus 100 is manufactured. In other words, the flow meter 200 is not permanently installed, but is attached when measuring the gas flow rate flowing through the supply port 35 of the metal window 32 of the substrate processing apparatus 100 assembled in a factory after the substrate processing apparatus 100 is manufactured, and is removed from the metal window 32 after the measurement is completed. Therefore, when the substrate processing apparatus 100 performs a desired process on the substrate G, the flow meter 200 is in a removed state.

[0050] The control device 90 controls the process of measuring the flow rate of gas flowing into the supply ports 35 of the metal windows 32A to 32F with the flow meter 200. The flow meter 200 is disposed at the supply ports 35 of the metal windows 32 in an atmospheric environment, and the flow rate of gas flowing into the end portions 35a of the supply ports 35 is measured by the flow meter 200. After measurement, the flow meter 200 can be removed from the supply ports 35 of the metal windows 32.

[0051] In addition, in measuring the gas flow rate, the metal window 32 can be divided into a plurality of areas, and the flow rates of gas flowing through the supply ports 35 of the metal window 32 in the same area can be measured simultaneously.

[0052] 1 is closed to stop the supply of the process gas, and valves 69A to 69F are opened to allow the inert gas output from the inert gas supply source 67 to flow through the supply ports 35 of the metal windows 32A to 32F. Dry air may be allowed to flow through the supply ports 35 of the metal windows 32A to 32F instead of the inert gas.

[0053] In the process of measuring the gas flow rate, the metal window 32 is divided into a plurality of areas, and the flow rates of gas flowing through the supply ports 35 of the metal window 32 in the same area can be measured simultaneously.

[0054] [Measurement results] The metal window 32 is divided into six areas (C area, ML area, MS area, OC area, OLS area, and OSS area) shown in Fig. 3, and the results of simultaneously measuring the gas flow rate flowing into the supply port 35 of the metal window 32 in the same area will be described with reference to Fig. 5. Fig. 5 is a diagram showing an example of the measurement result and calculation result of the gas flow rate by the flowmeter 200 according to the embodiment.

[0055] Fig. 5(a) shows actual measured values ​​by the flowmeter 200, which are the result of simultaneously measuring the flow rates of gas flowing into the supply ports 35 of the metal windows 32 in the C area. Fig. 5(b) shows calculated values ​​of the simulation results when a simulation was performed under the condition that a gas with a flow rate equal to the total flow rate of inert gas actually supplied from the inert gas supply source 67 was supplied to the metal window 32 in the C area in order to obtain the measurement results of Fig. 5(a). In both cases, the flow rates of gas flowing simultaneously into the end portions 35a of the supply ports 35 of parts C1 to C4 of the metal windows 32 in the same area 1 of the C area are obtained.

[0056] As a result, the flow rate flowing through the end portion 35a of the supply port 35 shown on the vertical axis of Figures 5(a) and (b) was almost the same between the actual measured value in Figure 5(a) and the calculated value in Figure 5(b). This confirmed the effectiveness of the flow rate measurement method according to the embodiment. It was also found that gas was evenly supplied to the supply ports 35 of the parts C1 to C4 of the metal window 32 in the C area. From the above, according to the flow rate measurement method according to the embodiment, the flow rate of the gas branched by the branch gas pipe 52 and flowing into the processing chamber S can be measured with high accuracy.

[0057] As shown in FIG. 2, the parts C1 and C3 have smaller areas than the parts C2 and C4. In other areas, the areas of the parts of the metal window 32 are roughly the same. Therefore, a mechanism having an orifice 105 as shown in FIG. 4(b) is used for the parts C1 and C3, and a mechanism having no orifice 105 as shown in FIG. 4(a) is used for the parts C2 and C4. In this way, the hole at the base end 35b of the supply port 35 of the parts C1 and C3, which have smaller areas than the parts C2 and C4, is controlled by the orifice 105, and the flow rate of the gas supplied to the parts C1 and C3 is narrowed.

[0058] As a result, in Figures 5(a) and (b), the flow rate (L / min) of gas flowing into the end portion 35a of the supply port 35 of parts C2 and C4 was greater than the flow rate (L / min) of gas flowing into the end portion 35a of the supply port 35 of parts C1 and C3.

[0059] For example, when assembling the substrate processing apparatus 100, a mechanism not provided with the orifice 105 shown in Fig. 4(a) is attached to the parts C2 and C4, and a mechanism provided with the orifice 105 shown in Fig. 4(b) is attached to the parts C1 and C3. However, there may be a mistake in attaching the mechanism not provided with the orifice 105 shown in Fig. 4(a) to the parts C1 and C3, and the mechanism provided with the orifice 105 shown in Fig. 4(b) to the parts C2 and C4. In this case, the measured value of the flow rate of the gas flowing through the supply port 35 of the parts C2 and C4 obtained by the flow rate measuring method according to the present embodiment is smaller than the measured value of the flow rate of the gas flowing through the supply port 35 of the parts C1 and C3.

[0060] In other words, the magnitude relationship between the parts C1, C3 and the parts C2, C4 in the bar graphs of Fig. 5(a) is reversed from the current bar graph of Fig. 5(a), which enables the worker to discover that there is an error in the installation position of the branch gas pipe 52 between the parts C1, C3 and the parts C2, C4.

[0061] As described above, the flow rate measurement method according to this embodiment can detect assembly errors in gas piping and the like during the manufacturing process of the substrate processing apparatus 100. In addition, for example, a threshold value for detecting assembly errors may be set in advance, and the control device 90 may automatically compare the measured value (actual measured value) of the gas flow rate measured by the flow rate measurement method according to this embodiment with the threshold value. The control device 90 may automatically determine that an assembly error has occurred when the measured value deviates from the threshold value by a predetermined amount or more.

[0062] 6 is a diagram showing an example of the measured gas flow rate (actual measured value) of each part in each area (C area, ML area, MS area, OC area, OLS area, OSS area) according to the embodiment, measured by the flow rate measurement method according to the embodiment. In this experiment, dry air was supplied instead of inert gas.

[0063] FIG. 6(a) shows the results of measuring the gas flow rate at the supply port of the metal window 32A of each of the parts C1 to C4 in the C area. FIG. 6(b) shows the results of measuring the gas flow rate at the supply port of the metal window 32B of each of the parts ML1 to ML4 in the ML area. FIG. 6(c) shows the results of measuring the gas flow rate at the supply port of the metal window 32C of each of the parts MS1 to MS4 in the MS area. FIG. 6(d) shows the results of measuring the gas flow rate at the supply port of the metal window 32D of each of the parts OC1 to OC8 in the OC area. FIG. 6(e) shows the results of measuring the gas flow rate at the supply port of the metal window 32E of each of the parts OLS1 and OLS2 in the OLS area. FIG. 6(f) shows the results of measuring the gas flow rate at the supply port of the metal window 32F of each of the parts OSS1 and OSS2 in the OSS area.

[0064] As a result, the measured values ​​of each part in the same area shown in Figures 6(b) to 6(f) were almost the same. In Figure 6(a), the measured values ​​of the flow rate of parts C1 and C3 were almost the same, and the measured values ​​of the flow rate of parts C2 and C4 were almost the same. The reason for the difference between the measured values ​​of the flow rate of parts C1 and C3 and the measured values ​​of the flow rate of parts C2 and C4 is, as mentioned above, that the orifice 105 was used to restrict the gas flow rate in parts C1 and C3, and the orifice 105 was not used in parts C2 and C4.

[0065] As described above, the flow rate measuring method and the substrate processing apparatus according to this embodiment can accurately measure the flow rate of the branched gas that is branched by the branch gas piping and flows into the processing chamber. Also, it is possible to detect assembly errors in the gas piping during the manufacturing process of the substrate processing apparatus 100. This makes it possible to prevent the substrate processing apparatus after assembly from supplying gas at a flow rate different from the set flow rate into the processing chamber.

[0066] The flow rate measurement method and the substrate processing apparatus according to the presently disclosed embodiments should be considered as illustrative and not restrictive in all respects. The embodiments can be modified and improved in various ways without departing from the scope and spirit of the appended claims. The matters described in the above embodiments can be configured in other ways without contradiction, and can be combined without contradiction.

[0067] The substrate processing apparatus of the present disclosure can be applied to any type of apparatus, including Atomic Layer Deposition (ALD) apparatus, Capacitively Coupled Plasma (CCP), Inductively Coupled Plasma (ICP), Radial Line Slot Antenna (RLSA), Electron Cyclotron Resonance Plasma (ECR), and Helicon Wave Plasma (HWP).

[0068] Furthermore, although a plasma processing apparatus has been given as an example of a substrate processing apparatus, the substrate processing apparatus may be an apparatus that performs a predetermined process on a substrate (e.g., a film formation process, an etching process, etc.) and is not limited to a plasma processing apparatus. [Explanation of symbols]

[0069] 11 Lid 14 Bulkhead 15 Main unit 20 Processing vessel 32, 32A~32F Metal windows 33 Diffusion Chamber 34 Shower Head 35 Metal window supply port 52 Branch gas piping 60 Gas Supply Section 61A~61F Inert gas branch piping 63A~63F Flow Ratio Controller 65 Switch 66 External gas piping 67 Inert Gas Supply Source 68 Process gas piping 70 Substrate support 90 Control device (control unit) 100 Substrate processing apparatus 101 Sealing material 200 flow meter 200a Measuring pipe 201 Flow rate measuring fixture L, L1~L6 Branch gas piping S Processing Room

Claims

1. a gas supply pipe for supplying gas; A plurality of branch gas pipes branched from the gas supply pipe; a metal window communicating with the plurality of branch gas pipes; a showerhead disposed at a bottom of the metal window and having a gas outlet hole for passing the gas through the metal window; A flow rate measuring method for measuring a flow rate of the gas in a substrate processing apparatus comprising: A flow rate measuring method comprising the steps of: disposing a flow meter at a supply port of the metal window communicating with a plurality of the branch gas pipes in an atmospheric environment; and measuring a flow rate of the gas flowing into the supply port of the metal window using the flow meter.

2. The step of measuring the flow rate of the gas includes: Positioning the flow meter at the feed end of the metal window; The method of claim 1 .

3. The step of measuring the flow rate of the gas includes: For a plurality of areas of the metal window divided in advance, it is possible to measure the flow rate of the gas flowing simultaneously to the supply port of the metal window in the same area. The flow rate measuring method according to claim 1 or 2.

4. The flow meter is removable from the supply port of the metal window. The flow rate measuring method according to any one of claims 1 to 3.

5. The step of measuring the flow rate of the gas includes: measuring the flow rate of the gas flowing into the supply port of the metal window in an atmospheric environment; The flow rate measuring method according to any one of claims 1 to 4.

6. a gas supply pipe for supplying gas; A plurality of branch gas pipes branched from the gas supply pipe; a metal window communicating with the plurality of branch gas pipes; a shower head disposed at a bottom of the metal window and having a gas outlet hole for passing the gas through the metal window; and a control unit; The control unit is a flow meter disposed at the supply port of the metal window communicating with the plurality of branch gas pipes to measure a flow rate of the gas flowing into the supply port of the metal window in an atmospheric environment.

Citation Information

Patent Citations

  • Method of manufacturing gas distribution member for plasma processing apparatus

    JP2008537628A

  • Apparatus and method of plasma processing

    JP2011187507A

  • Gas processing device and multi-division shower head used for the same

    JP2016225018A

  • Film deposition method and film deposition apparatus

    JP2018026494A

  • Method of inspecting shower plate of plasma processing apparatus

    JP2018029153A