Scaffolding device for inside a spherical tank and method for assembling the scaffolding device for inside a spherical tank
The scaffolding device in spherical tanks addresses safety concerns by using a rotatable column and adjustable handrail frames to ensure complete handrail coverage, enhancing worker safety during assembly.
Patent Information
- Application Number
- JP2020096876
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-06-03
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2040-06-03
AI Technical Summary
Conventional scaffolding devices in spherical tanks face safety concerns during handrail installation due to the varying distances from the column to the inner wall, making it difficult to attach handrails using the advance handrail method, which ensures safety by always having handrails present.
The scaffolding device includes a column rotatable around an axis with horizontally extending scaffolding members, adjustable handrail frames, and a stopper mechanism, allowing for precise attachment of handrails at any position along the inner wall, ensuring safety and complete coverage.
The solution enables safe and complete installation of handrails on scaffolding members, improving worker safety by ensuring handrails are always present, even at varying distances from the column, and allowing for precise adjustment and attachment.
Smart Images

Figure 0007563900000001 
Figure 0007563900000002 
Figure 0007563900000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a scaffolding device for use in a spherical tank and a method for assembling a scaffolding device for use in a spherical tank. [Background technology]
[0002] The scaffolding device for spherical tanks is assembled inside spherical tanks that store liquefied natural gas or the like, and is used for maintenance work such as painting and inspection of the inner walls of the spherical tanks.
[0003] Conventional scaffolding devices for use inside spherical tanks include a pillar that is arranged inside the spherical tank along the vertical center line of the spherical tank and is supported rotatably around its axis, a number of scaffolding members that extend horizontally to the left and right from the pillar toward the inner wall of the spherical tank and are arranged at predetermined intervals above and below along the axial direction of the pillar, and have scaffolding boards, and handrails that are installed along the extension direction of the scaffolding members (see, for example, Patent Document 1).
[0004] In such a scaffolding device for use inside a spherical tank, the scaffolding members can be positioned to face any position on the inner wall of the spherical tank by rotating the pillars in the circumferential direction. In addition, handrails are provided on the tip side of the scaffolding members that faces the inner wall of the spherical tank, preventing workers performing maintenance work on the spherical tank from falling off the scaffolding device. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] Japanese Utility Model Application Publication No. 58-101100 Summary of the Invention [Problem to be solved by the invention]
[0006] Conventional scaffolding systems for use in spherical tanks are assembled by attaching scaffolding members to columns that span the upper and lower ends of the spherical tank, starting from the bottom up. In addition, workers who assemble the scaffolding system attach handrails to the tip of scaffolding members that do not have handrails.
[0007] However, when installing handrails in this manner, workers must install the handrails on scaffolding members that do not have handrails installed, which poses safety concerns.
[0008] For this reason, it is desirable to install handrails using the so-called leading handrail method, in which the handrails are made up of multiple handrail frames set to the same width, and workers lift each handrail frame from the top of the lower scaffolding member and install each handrail frame in a row along the extension direction of the scaffolding member on the upper scaffolding member. When handrails are installed on scaffolding members in this way using the leading handrail method, workers can always work safely on the scaffolding members on which the handrails are installed.
[0009] Here, the cross section of the inner wall of the spherical tank is arc-shaped, and since the distance from the pillar to the inner wall of the spherical tank varies depending on the height position, the length of the extension direction of the scaffolding member also varies depending on the height position of the scaffolding member.
[0010] Therefore, when handrail frames of the same width are installed side by side along the extension direction of the scaffolding member, depending on the height position of the scaffolding member, there is a risk that there will be places where a handrail frame is not installed at the point where the scaffolding board is installed at the tip side of the scaffolding member.
[0011] Therefore, in the case of conventional scaffolding systems for use inside spherical tanks, when assembling the scaffolding system for use inside spherical tanks, the handrail frame installation work could not be carried out using the leading handrail method.
[0012] Therefore, an object of the present invention is to provide a scaffolding device for use inside a spherical tank that enables handrail frame installation work during assembly to be performed using the leading handrail method. [Means for solving the problem]
[0013] In order to achieve the above object, the scaffolding device for use in a spherical tank of the present invention comprises a pillar body that is disposed inside the spherical tank along the vertical center line of the spherical tank and supported rotatably around an axis, a plurality of scaffolding members that extend horizontally from the pillar body toward the inner wall of the spherical tank and are disposed vertically at predetermined intervals along the axial direction of the pillar body, and a plurality of handrail frames that are attached in a line along the extension direction of the scaffolding members, the handrail frames having a pair of vertical supports that stand up from the scaffolding members at a predetermined interval along the extension direction of the scaffolding members, and a handrail main body that is spanned between the pair of vertical supports, and one of the pair of vertical supports is capable of supporting any position of the handrail main body. From the bottom Supportable Upward The vertical support has a hook, and the other vertical support of the pair of vertical supports has a bracket that can hold the handrail main body in any position. With this configuration, the left and right position of the handrail main body relative to the vertical support can be adjusted.
[0014] In addition, in the scaffolding device for use in a spherical tank of the present invention, the handrail body may be a rectangular frame having upper and lower rails arranged above and below, and left and right rails connecting both ends of the upper and lower rails, respectively, and the one vertical support may have the hook that supports either the upper or lower rail of the handrail body, and a retaining metal fitting that can hold either the lower or the other of the upper rail of the handrail body at any position. With this configuration, the handrail body becomes a two-stage handrail with an upper and lower rail, improving safety. Furthermore, since the handrail body is held not only by the other vertical support but also by one vertical support, the handrail body is prevented from floating up.
[0015] In addition, in the scaffolding device for inside the spherical tank of the present invention, the scaffolding members may include a pair of horizontal beams extending horizontally from the column body toward the inner wall of the spherical tank, beam members attached to any position in the extension direction of each of the horizontal beams and extending along the extension direction of the horizontal beams, and a scaffolding board bridged between the opposing beam members. According to this configuration, by adjusting the attachment position of the beam members relative to the horizontal beams, the length of the beam members protruding from the horizontal beams toward the inner wall of the spherical tank can be adjusted, so that the scaffolding members can be extended up to close to the inner wall of the spherical tank.
[0016] In addition, in the scaffolding device for use in a spherical tank of the present invention, the beam may have three or more support brackets arranged at predetermined intervals along the extension direction of the beam and capable of holding the vertical supports. With this configuration, the distance between a pair of vertical supports can be adjusted, so that a handrail body of any width can be selected according to the distance to the inner wall of the spherical tank.
[0017] The scaffolding device in the spherical tank of the present invention may further include a stopper that is provided on at least one of the scaffolding members and is movable toward and away from the inner wall, and that prevents the rotation of the pillar when the stopper comes into contact with the inner wall. With this configuration, the pillar is rotated to bring the scaffolding member into opposition to any position on the inner wall of the spherical tank, and then the rotation of the pillar is stopped, thereby allowing the scaffolding member to be stopped at any position.
[0018] The method for assembling the scaffolding device in the spherical tank of the present invention includes the steps of attaching the beam member with the one vertical support held by one of the support brackets to the horizontal beam of the upper stage from above the scaffolding member of the lower stage, hanging the handrail body connected to the other vertical support via the bracket on the hook of the one vertical support from above the scaffolding member of the lower stage, and attaching the other vertical support to one of the support brackets from above the scaffolding member of the lower stage. With this configuration, the handrail frame can be installed on the scaffolding member in a leading handrail method while adjusting the position of the handrail frame. Effect of the Invention
[0019] According to the scaffolding device inside a spherical tank of the present invention, the handrail frame can be attached to the scaffolding members using the leading handrail method, thereby improving the safety of workers when assembling the scaffolding device inside the spherical tank. [Brief description of the drawings]
[0020] [Figure 1] FIG. 1 is a front view showing an entire scaffolding device for use inside a spherical tank according to this embodiment assembled inside the spherical tank. [Diagram 2] FIG. 2 is an enlarged side view of the column body of the present embodiment. [Diagram 3] 1 is a side cross-sectional view of a scaffolding member according to the present embodiment. FIG. [Figure 4] FIG. 2 is a partially enlarged perspective view of the scaffolding member of the present embodiment. [Diagram 5] 5(A) is an enlarged front view of the scaffolding member of the present embodiment, and (B) is a partially enlarged front view showing an enlarged support bracket of the scaffolding member shown in FIG. [Figure 6] 1A is a side view of one vertical support post of the handrail frame of the present embodiment, and FIG. 1B is a side view of the other vertical support post of the handrail frame of the present embodiment. [Figure 7] 13 is an enlarged side view of a stopper provided on the first stage scaffolding member of the present embodiment. FIG. [Figure 8] This figure explains the process of attaching a beam material holding one of the vertical supports to the horizontal beam of the upper scaffolding member during the assembly work of the scaffolding device inside the spherical tank of this embodiment. [Figure 9] This figure explains the process of attaching the other vertical support that holds the handrail body to the upper beam and installing the handrail frame on the horizontal beam during the assembly work of the scaffolding device inside the spherical tank of this embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0021] The present embodiment will now be described with reference to the drawings, in which like reference numerals denote like parts throughout the several views.
[0022] The scaffolding device 1 for use within a spherical tank in this embodiment is assembled inside the spherical tank T. The spherical tank T is a hollow sphere supported by a number of pillars (not shown) and can store liquefied natural gas or the like inside. As shown in Fig. 1, the upper and lower parts of the spherical tank T are provided with an upper opening T1 and a lower opening T2, respectively, which communicate between the inside and outside of the spherical tank T.
[0023] As shown in Fig. 1, the scaffolding device 1 in a spherical tank comprises a pillar 2 disposed inside the spherical tank T along the vertical center line of the spherical tank T and supported rotatably around its axis, and a scaffolding structure 10 connected to the pillar 2. The scaffolding structure 10 has multiple layers of scaffolding members 3 extending horizontally from the pillar 2 toward the inner wall of the spherical tank T and disposed at predetermined intervals vertically along the axial direction of the pillar 2, and multiple handrail frames 6 attached in a line along the extension direction of the scaffolding members 3.
[0024] In the present embodiment, the scaffolding device 1 in the spherical tank can rotate the pillar body 2 to make the scaffolding structure 10 face any position on the inner wall of the spherical tank T. This allows workers to perform maintenance work such as painting and inspection on any part of the inner wall of the spherical tank T.
[0025] Next, each part of the scaffolding device 1 in the spherical tank will be described in detail. As shown in FIG. 2, the column body 2 in this embodiment has a pair of vertical members 2a, 2a, a plurality of horizontal members 2b that are spanned between the vertical members 2a, 2a at a predetermined interval, and a plurality of reinforcing members 2c that are spanned diagonally so as to cross each other between the opposing vertical members 2a, 2a. The vertical members 2a also have a plurality of vertical member segments (not shown) and a connecting member 2d that is interposed between the vertical member segments and connects the vertical member segments to each other. Although not described in detail, the connecting member 2d has a mechanism that holds the vertical member segments at the top and bottom, a mechanism that holds the horizontal beams of the scaffolding member 3 described later at the left and right, and a mechanism that holds the ends of the diagonal members described later.
[0026] As shown in FIG. 1, at the upper and lower parts of the spherical tank T, an upper support 4 that rotatably supports the upper end of the column 2 and a lower support 5 that rotatably supports the lower end of the column 2 are provided along the vertical center line of the spherical tank T.
[0027] As a result, the pillar 2 in this embodiment is positioned inside the spherical tank T along the vertical center line of the spherical tank T via the upper support 4 and the lower support 5, and is supported rotatably around an axis.
[0028] As shown in FIG. 1, the scaffolding structure 10 of this embodiment includes scaffolding members 3 that extend horizontally from the pillar 2 toward the inner wall of the spherical tank T and are provided across multiple levels. The scaffolding structure 10 also has a plurality of handrail frames 6 that are attached to the scaffolding members 3 in a line along the extension direction of the scaffolding members 3. The scaffolding structure 10 also has a plurality of vertical members 7 that are vertically spanned between the upper and lower opposing scaffolding members 3, 3 and connect the upper and lower opposing scaffolding members 3, 3, and a plurality of diagonal members 8 that are obliquely spanned between the pillar 2 and each scaffolding member 3, 3 and suspend the scaffolding members 3. As a result, the scaffolding structure 10 is suspended from the pillar 2, so that each scaffolding member 3 is maintained in a horizontal state.
[0029] 1 and 3, the scaffolding member 3 has a pair of horizontal beams 11, 11 whose one end is connected to the column body 2 via a connecting member 2d and extends horizontally from the column body 2 toward the inner wall of the spherical tank T, beam members 9 that are attached to any position in the extension direction of each horizontal beam 11 and extend along the extension direction of the horizontal beams 11, and a scaffolding board 19 that is bridged between the opposing beam members 9, 9. The scaffolding member 3 also has a plurality of tie rods 12 that are bridged at regular intervals between the horizontal beams 11, 11 to connect the horizontal beams 11, 11 to each other and to which the ends of the vertical members 7 and the diagonal members 8 are connected.
[0030] 3, the horizontal beam 11 has a rectangular prism shape and has horizontal holes 11a that are arranged at predetermined intervals in the extension direction of the horizontal beam 11 and pass through the horizontal beam 11 in the horizontal direction when viewed from the axial direction. Furthermore, the horizontal beam 11 has a plurality of vertical holes 11b that are arranged at predetermined intervals in the extension direction of the horizontal beam 11 and pass through the horizontal beam 11 from top to bottom.
[0031] 3, the tie rod 12 has an outer tube 13a and an inner tube 13b movably inserted into the outer tube 13a, and is configured to be extendable and retractable. The tie rod 12 has an extendable section 13 having a diameter larger than the horizontal hole 11a of the horizontal beam 11, and an insertion section 14 provided at both ends of the extendable section 13 and capable of fitting into the horizontal hole 11a. A threaded section 14a is formed on the tip side of the insertion section 14. The axial length of the insertion section 14 is longer than the horizontal width of the horizontal beam 11 as viewed from the axial direction.
[0032] In addition, the outer tube 13a and the inner tube 13b of the telescopic part 13 each have holes (not shown) that face each other when the telescopic part 13 is fully extended. As shown in FIG. 3, the telescopic part 13 is locked in the fully extended state by inserting a lock pin 15 into the holes while facing each other. At this time, an elastic ring 16 is wound around one end and the other end of the lock pin 15. As a result, the lock pin 15 is pulled in the radial direction by the elastic force of the elastic ring 16, so that the frictional force generated between the outer circumference of the lock pin 15 and the outer tube 13a and the inner tube 13b becomes large. Therefore, the lock pin 15 is prevented from coming out of the holes formed in the outer tube 13a and the inner tube 13b.
[0033] As shown in Fig. 3, the vertical members 7 are metal rods having plates (not shown) with mounting holes (not shown) formed at both ends. Also, as shown in Fig. 3, the diagonal members 8 are metal wires having plates (not shown) with mounting holes (not shown) formed at both ends.
[0034] Next, as shown in FIG. 3, a detailed description will be given of a procedure for connecting the tie rod 12 between the horizontal beams 11, 11 and attaching the ends of the vertical members 7 and the diagonal members 8 to the tie rod 12. First, the tie rod 12 is placed between the horizontal beams 11, 11 with the telescopic portion 13 contracted. Next, with each insertion portion 14 facing each horizontal hole 11a of the horizontal beam 11, the telescopic portion 13 is extended to insert each insertion portion 14 into each opposing horizontal hole 11a, and the tip of each insertion portion 14 protrudes from each horizontal beam 11. After that, a lock pin 15 is inserted into holes provided in the outer tube 13a and inner tube 13b of the telescopic portion 13 to lock the telescopic portion 13. This prevents the tie rod 12 from contracting and coming off between the horizontal beams 11, 11. Finally, multiple diagonal members 8 and vertical members 7 are fitted into the insertion portion 14 through the mounting holes, and a nut 18 is screwed into the threaded portion 14a and tightened, thereby connecting the tie rod 12 between the horizontal beams 11, 11 and attaching the ends of the vertical members 7 and the diagonal members 8 to the tie rod 12.
[0035] In this way, by connecting each end of the vertical member 7 to each of the tie rods 12 facing each other above and below in the upper scaffolding member 3 and the lower scaffolding member 3, the facing scaffolding members 3, 3 are connected by multiple vertical members 7 arranged along the extension direction of the scaffolding members 3, as shown in Figure 1.
[0036] Similarly, by connecting each end of the diagonal member 8 to each connecting member 2d of the column body 2 and each tie rod 12 arranged below the tip side of each connecting member 2d, each scaffolding member 3 is suspended by multiple diagonal members 8 as shown in Figure 1.
[0037] Returning to the present embodiment, the beam material 9 will be described in detail. For convenience of explanation, the opposing beam material 9 side will be referred to as the "inner side" and the opposite side will be referred to as the "outer side." As shown in Figures 3, 4 and 5, a plurality of beam materials 9 are arranged in a line on top of the horizontal beam 11 along the extension direction of the horizontal beam 11, and function as baseboards that prevent tools and the like from falling from the scaffolding member 3.
[0038] Specifically, as shown in FIG. 3, the beam material 9 in this embodiment has a mounting piece 9a fixed to the upper part of the horizontal beam 11 and protruding inward, a vertical piece 9b standing vertically from the outer end of the mounting piece 9a, a horizontal piece 9c extending horizontally inward from the upper end of the vertical piece 9b, a bent piece 9d formed by bending the inner end of the horizontal piece 9c downward, and a regulating piece 9e standing vertically from a position opposite the bent piece 9d of the mounting piece 9a.
[0039] The installation piece 9a has a plurality of holes 9f arranged at a predetermined interval in the extension direction and penetrating the installation piece 9a from top to bottom. The horizontal beam 11 has a plurality of vertical holes 11b along the extension direction. The hole 9f in the installation piece 9a is made to face any vertical hole 11b in the horizontal beam 11, and a bolt B1 is inserted into the facing hole 9f and vertical hole 11b, and then tightened with a nut N1 from the opposite side. In this way, the beam material 9 is attached to any position in the extension direction of the horizontal beam 11. However, the method of attaching the beam material 9 to the horizontal beam 11 is not limited to the above method, as long as the beam material 9 can be detachably connected to any position in the extension direction of the horizontal beam 11.
[0040] 4 and 5, the horizontal piece 9c is provided with four insertion holes 9g that are arranged at a predetermined interval in the extension direction and penetrate the horizontal piece 9c from top to bottom. A support bracket 90 capable of holding the vertical supports 60, 61 of the handrail frame 6, which will be described later, is provided at a position corresponding to each insertion hole 9g of the beam material 9. The number of insertion holes 9g and support brackets 90 is not limited to four, and it is sufficient that at least two are provided.
[0041] 4 and 5, a connecting plate 9h having a bolt hole (not shown) is provided at each end in the extension direction of the beam material 9. Then, the adjacent beam materials 9, 9 are connected to each other by inserting a bolt B2 into each bolt hole provided in the connecting plate 9h of adjacent beam materials 9, 9 and tightening it with a nut N2 from the opposite side.
[0042] In addition, in this embodiment, as shown in FIG. 4, a baseboard 91 is connected between the connecting plates 9h, 9h of the opposing beam members 9, 9 located at the tip side, which is the inner wall side, of the spherical tank T, to prevent tools and the like from falling between the scaffolding member 3 and the inner wall of the spherical tank T.
[0043] Specifically, the skirting board 91 of this embodiment has a rectangular skirting board body 91a and hook portions 91b, 91b formed by cutting out the short side ends of the skirting board body 91a in the short direction. Then, in a state where the bolt B3 is inserted into a bolt hole formed in the connecting plate 9h of each beam material 9 and the bolt B3 protrudes from the connecting plate 9h, the hook portion 91b of the skirting board 91 is hooked onto the bolt B3 and then tightened with a nut N3, whereby the skirting board 91 is connected to the tip side of the scaffolding member 3.
[0044] The scaffolding board 19 of this embodiment is composed of a plurality of rectangular plate materials 19a, as shown in FIG. 4. As shown in FIG. 3 and FIG. 4, the scaffolding board 19 is arranged in the extension direction of the beam material 9 with the longitudinal side of the plurality of plate materials 19a, and is installed between the beam materials 9, 9 by bridging the installation pieces 9a, 9a of the beam material 9 facing each other in the lateral direction without any gaps. At this time, the longitudinal width of the plate material 19a is approximately equal to the width between the regulating pieces 9e, 9e of the beam material 9. Therefore, the plate material 19a is fitted between the regulating pieces 9e, 9e of the beam material 9. As a result, the movement of each plate material 19a in the lateral direction when viewed from the axial direction of the beam material 9 is restricted, so that the scaffolding board 19 does not rattle when the worker moves on the scaffolding member 3.
[0045] 5, the handrail frame 6 of this embodiment has a pair of vertical supports 60, 61 that stand at a predetermined interval from the scaffolding member 3 along the extension direction of the scaffolding member 3, and a handrail main body 62 that is bridged between the pair of vertical supports 60, 61, and is attached to a beam material 9 via a support bracket 90. In addition, one of the pair of vertical supports 60, 61, the vertical support 60, has a hook 63 that can support the handrail main body 62 at any position, and the other of the pair of vertical supports 60, 61, has a bracket 64 that can hold the handrail main body 62 at any position.
[0046] Specifically, the handrail body 62 is formed in a rectangular frame shape, with an upper rail 62a and a lower rail 62b arranged vertically, and a left rail 62c and a right rail 62d connecting both ends of the upper rail 62a and the lower rail 62b, respectively, as shown in Fig. 5. The vertical support 60 (61) is hollow and tubular, and has a pair of grooves 60a (61a) cut into a U-shape at the lower end and facing each other, as shown in Fig. 6. Furthermore, above the groove 60a (61a) of the vertical support 60 (61), there is provided a pin hole 60b (61b) that penetrates the vertical support 60 (61) in the radial direction, and a support hole 60c (61c) that penetrates the vertical support 60 (61) with a gap above the pin hole 60b (61b).
[0047] 5, the support bracket 90 provided on the beam 9 has a pair of opposing support plates 90a, 90a that are installed between the horizontal piece 9c and the installation piece 9a with an insertion hole 9g provided in the horizontal piece 9c of the beam 9 on either side, and a shaft 90b that is installed across the lower ends of the support plates 90a, 90a. Furthermore, above the shaft 90b of each support plate 90a, opposing communication holes (not shown) are formed.
[0048] Next, a procedure for attaching the vertical support 60 (61) to the beam material 9 via the support bracket 90 will be described. First, the vertical support 60 (61) is inserted between the pair of support plates 90a, 90a via the insertion hole 9g, and the shaft 90b is fitted into the groove 60a (6a) formed at the lower end of the vertical support 60 (61). Then, the vertical support 60 (61) is prevented from rotating by the shaft 90b and cannot rotate in the circumferential direction. Next, the fixing pin 92 is inserted with the pin hole 60b (61b) of the vertical support 60 (61) facing the communication hole of the support bracket 90. In this way, the vertical support 60 (61) is attached to the beam material 9 via the support bracket 90 without coming off from the support bracket 90. In addition, the pin hole 60b (61b) of the vertical support 60 (61) is provided at a position facing the communication hole formed in the support plate 90a, 90a when the groove 60a (61a) of the vertical support 60 (61) is fitted onto the shaft 90b, so that the positioning is automatically determined. In addition, in this embodiment, a toggle pin having a mechanism for preventing it from coming off is used as the fixing pin 92, but the type of the fixing pin 92 is not particularly limited.
[0049] Returning to the above, one of the pair of vertical posts 60, 61 (the right side in Figure 5) has a hook 63 that can support any position of the upper rail 62a of the handrail main body 62, and a retaining bracket 65 that is arranged below the hook 63 and can hold the lower rail 62b of the handrail main body 62 at any position, as shown in Figures 5 and 6 (A).
[0050] The hook 63 in this embodiment has a tubular portion 63a that is fitted onto the outer periphery of one of the vertical struts 60, and an L-shaped hook portion 63b that is fixed to the tubular portion 63a with its tip facing upward. Opposite holes (not shown) are formed in the tubular portion 63a and the one of the vertical struts 60, and the hook 63 is connected to the outer periphery of the one of the vertical struts 60 by inserting a lock pin 63c into these holes. Note that the shape of the hook portion 63b is merely an example, and is not particularly limited as long as it can support any position of the upper rail 62a.
[0051] The retaining metal fitting 65 of this embodiment has a tubular portion 66 fitted to the outer periphery of one of the vertical struts 60 so as to be axially movable, and a clamp portion 67 fixed to the tubular portion 66. A long hole 66a is formed in the tubular portion 66 of the retaining metal fitting 65 along the axial direction of the one of the vertical struts 60, and a hole (not shown) capable of facing the long hole 66a is formed in the one of the vertical struts 60. Then, by inserting a lock pin 66b into the holes while the long hole 66a of the tubular portion 66 faces the hole of the one of the vertical struts 60, the retaining metal fitting 65 is attached to the one of the vertical struts 60 so as to be axially movable.
[0052] Furthermore, when the retaining metal fitting 65 holds the lower rail 62b of the handrail main body 62, it is disposed in a position where the lock pin 66b abuts against the lower end of the long hole 66a, as shown in Fig. 6(A). In contrast, in a natural state where the retaining metal fitting 65 is not holding the lower rail 62b of the handrail main body 62, the retaining metal fitting 65 moves by its own weight to a position where the lock pin 66b abuts against the upper end of the long hole 66a, and thus moves away from the hook 63. However, the retaining metal fitting 65 may be fixed to one of the vertical supports 60 so that it cannot move in the axial direction.
[0053] The clamping portion 67 has an L-shaped base 67a fixed to the tube portion 66, a semicircular opening / closing portion 67b rotatably connected to one end of the base 67a, a bolt 67c connected to the other end of the base 67a so as to be able to rise and fall, a fitting portion 67d provided at the other end of the opening / closing portion 67b and having a groove into which the bolt 67c is fitted, and a nut 67e screwed onto the tip of the bolt 67c. The clamping portion 67 is configured such that, with the lower rail 62b of the handrail body 62 placed between the base 67a and the opening / closing portion 67b, the bolt 67c is inserted into the fitting portion 67d to hold the lower rail 62b in the clamping portion 67, and the nut 67e is tightened to hold the lower rail 62b by clamping it between the base 67a and the opening / closing portion 67b. The configuration of the holding fitting 65 is an example, and is not particularly limited as long as it is configured to hold the lower rail 62b at any position.
[0054] On the other hand, the other vertical support 61 (left side in Figure 5) of the pair of vertical supports 60, 61 is arranged side by side above and below as shown in Figures 5 and 6 (B), and has two brackets 64, 68 that can respectively hold any position of the upper rail 62a and the lower rail 62b of the handrail main body 62. The bracket 64 (68) in this embodiment has an L-shaped base 64a (68a) connected to the other vertical support 61 with a bolt and a nut, a semicircular opening / closing portion 64b (68b) rotatably connected to one end of the base 64a (68a), a bolt 64c (68c) connected to the other end of the base 64a (68a) so that it can be raised and lowered, a fitting portion 64d (68d) provided at the other end of the opening / closing portion 64b (68b) and having a groove into which the bolt 64c (68c) is fitted, and a nut 64e (68e) screwed onto the tip of the bolt 64c (68c). In each bracket 64, 68, when the upper rail 62a or the lower rail 62b of the handrail body 62 is placed between the base 64a (68a) and the opening / closing part 64b (68b), the bolt 64c (68c) is inserted into the fitting part 64d (68d) to hold the upper rail 62a or the lower rail 62b in the bracket 64 (68), and then the nut 64e (68e) is tightened, the upper rail 62a or the lower rail 62b can be sandwiched and held between the base 64a (68a) and the opening / closing part 64b (68b). Note that the configuration of each bracket 64, 68 in this embodiment is an example, and is not particularly limited as long as it is configured to hold the lower rail 62b at any position.
[0055] In this embodiment, as shown in FIG. 1, the first-stage scaffolding member 3 is provided with a stopper 70 that can move toward and away from the inner wall of the spherical tank T and prevents the rotation of the column 2 when it abuts against the inner wall of the spherical tank T. Specifically, as shown in FIG. 7, the stopper 70 in this embodiment has a base 71 fixed to the outside of the vertical piece 9b of the beam material 9, a rotating shaft 72 connected to the base 71 so as to be rotatable in the circumferential direction, a nut part 73 that is cylindrical and connected to the end of the rotating shaft 72 opposite the base in a direction perpendicular to the axial direction of the rotating shaft 72, a screw shaft 74 that is screwed into the nut part 73 and moves in the axial direction when rotated relative to the nut part 73, a rubber friction material 75 provided at one end of the screw shaft 74, and an L-shaped operating part 76 provided at the other end of the screw shaft 74. The stopper 70 also has a locking mechanism that can prevent the rotating shaft 72 from rotating in the circumferential direction. At this time, since the screw shaft 74 is screwed into the nut portion 73, when the screw shaft 74 is rotated in the circumferential direction, the screw shaft 74 is moved in the axial direction by the feed screw mechanism.
[0056] The base 71 has a cylindrical tubular portion 71a with a top that is fixed to the inside of the beam 9, and a partition plate 71b that divides the inside of the tubular portion 71a in the axial direction. A hole (not shown) through which the rotating shaft 72 is inserted is provided in the top 71c of the tubular portion and the partition plate 71b, and the rotating shaft 72 is inserted into the tubular portion 71a by penetrating the top 71c of the tubular portion 71a and the partition plate 71b. The rotating shaft 72 has a screw groove on its outer periphery, and a first nut 77 and a second nut 78 are screwed into positions that sandwich the top 71c and the partition plate 71b on the tip and base ends. Then, when the first nut 77 screwed from the tip side of the rotating shaft 72 is tightened until it abuts against the partition plate 71b, the second nut 78 screwed from the base end side of the rotating shaft 72 is tightened, and the top 71c of the cylindrical part 71a and the partition plate 71b are sandwiched between the first nut 77 and the second nut 78. This locks the circumferential rotation of the rotating shaft 72. The cylindrical part 71a is provided with a notch (not shown), which allows the first nut 77 to be tightened from the outside. That is, in this embodiment, the lock mechanism is composed of the partition plate 71b, the top 71c, the first nut 77, and the second nut 78. The partition plate 71b may be omitted and the top 71c may be sandwiched between the first nut 77 and the second nut 78, but the provision of the partition plate 71b allows the rotating shaft 72 to be stably supported in a horizontal position.
[0057] Next, a method of operating the stopper 70 will be described. First, the worker rotates the rotating shaft 72 and, with the friction material 75 facing an arbitrary position on the inner wall of the spherical tank T, tightens the second nut 78 to lock the circumferential rotation of the rotating shaft 72. Next, the worker grips the operating part 76 to rotate the screw shaft 74 in the circumferential direction and moves the screw shaft 74 toward the inner wall of the spherical tank T until the friction material 75 abuts against the inner wall of the spherical tank T. Then, the friction material 75 is pressed against the inner wall of the spherical tank T, so that friction occurs between the friction material 75 and the spherical tank T, and the rotation of the columnar body 2 is prevented. However, the configuration of the stopper 70 in this embodiment is only an example and is not limited to the above configuration.
[0058] Although not shown, each scaffolding member 3 is provided with an opening (not shown) that opens toward the lower scaffolding member 3. As shown in Fig. 1, a climbing ladder 40 that can move between the upper and lower scaffolding members 3, 3 through the opening is stretched between the upper and lower opposing scaffolding members 3, 3.
[0059] Although not described in detail, as shown in Fig. 1, the scaffolding device 1 in the spherical tank of this embodiment is provided with a ladder 50 for a worker to move from the bottom of the spherical tank T to the first stage of the scaffolding member 3. This ladder 50 is hung from the bottom of the spherical tank T to the horizontal beam 11 of the second stage of the scaffolding member 3.
[0060] Next, a method of assembling the scaffolding device 1 in the spherical tank of this embodiment will be described. First, a winch (not shown) capable of unwinding and winding a wire to the top of the spherical tank T through the upper opening T1 is installed at the upper end of the spherical tank T. Next, with the end of the wire lowered to the bottom of the spherical tank T, the upper support 4 is connected to the end of the wire and suspended. Furthermore, while winding up the wire with the winch, the column body 2, horizontal beam 11, vertical member 7, and diagonal member 8 are assembled to the upper support 4. Then, when the upper support 4 is lifted up to the upper opening T1, the upper support 4 is connected to the upper opening T1 of the spherical tank T. After that, the lower support 5 is connected to the lower end of the column body 2, and the lower support 5 is fixed to the bottom of the spherical tank T.
[0061] Next, the scaffolding members 3 are assembled in order from the bottom up. First, for the first stage, which is the lowest stage, the worker attaches the beam material 9 to the horizontal beam 11 from above the bottom of the spherical tank T, and spans the scaffolding boards 19 between the beam materials 9, 9. After that, the handrail frame 6 and the stopper 70 are installed on the beam material 9.
[0062] For the second-stage scaffolding member 3, which is the upper stage of the first-stage scaffolding member 3, the worker attaches the beam material 9 with one vertical support 60 held by one of the support brackets 90 to the horizontal beam 11 of the upper stage from above the first-stage scaffolding member 3, which is the lower stage, as shown in Fig. 8. Next, the worker uses the jig J to lift the other vertical support 61 to which one end side of the upper rail 62a of the handrail main body 62 is connected via the upper bracket 64 from above the lower stage scaffolding member 3, as shown in Fig. 9, and hooks the other end side of the upper rail 62a of the handrail main body 62 to the hook 63 of one vertical support 61. Although not described in detail, the jig J of this embodiment has a pin portion (not shown) that can be inserted into the support hole 60c (61c) formed in each vertical support 60, 61, and is capable of supporting the vertical support 60 (61) by inserting the pin portion into the support hole 60c (61c). However, the jig J is not limited to the above configuration as long as it is capable of supporting the vertical support 60 (61).
[0063] After that, the worker attaches the other vertical support 61 to one of the support brackets 90. This completes the installation of the handrail frame 6 on the upper scaffolding member 3. This work is repeated the number of times equal to the number of handrail frames 6 to be installed on the scaffolding member 3.
[0064] At this time, by adjusting the support position of the upper rail 62a of the hook 63 and the holding position of the upper rail 62a of the upper bracket 64, the length by which the handrail main body 62 protrudes in the left-right direction from between the pair of vertical supports 60, 61 can be adjusted. This allows the scaffolding device 1 inside the spherical tank to install the handrail frame 6 up to the tip side of the scaffolding member 3 while reducing the gap between the handrail main bodies 62, 62 of adjacent handrail frames 6, 6. Therefore, with the scaffolding device 1 inside the spherical tank of this embodiment, it is designed so that there is no place on the scaffolding member 3 where the handrail frame 6 is not installed.
[0065] In addition, at this time, the handrail body 62 is held only by the upper bracket 64, and is not held by the lower bracket 68. In this way, when the other vertical support 61 is lifted, the handrail body 62 tilts diagonally with the upper bracket 64 as a fulcrum, as shown in FIG. 9, making it easier to hook the handrail body 62 on the hook 63. Also, as described above, the retaining metal fitting 65 of one vertical support 60 is connected to the other vertical support 60 so as to be movable in the axial direction, and is designed to move away from the hook in the natural state. This prevents the lower rail 62b of the handrail body 62 from interfering with the retaining metal fitting 65 when the upper rail 62a of the handrail body 62 is hooked on the hook 63.
[0066] Next, the worker spans the scaffolding board 19 between the upper beams 9, 9 from above the lower scaffolding member 3. Finally, from above the upper scaffolding member 3, the worker connects one end of the lower rail 62b of the handrail main body 62 to the other vertical support 61 via the lower bracket 68, and connects the other end of the lower rail 62b of the handrail main body 62 to one vertical support 60 via a retaining metal fitting 65. This allows the handrail main body 62 to be firmly fixed by the pair of vertical supports 60, 61. The third and subsequent scaffolding members 3 are assembled by repeating the above operations.
[0067] According to this method, workers can work on the second and subsequent scaffolding members 3 with the handrail frames 6 always installed, so that workers can safely assemble the scaffolding members.
[0068] As described above, the scaffolding device 1 in the spherical tank according to this embodiment includes a column body 2 that is arranged inside the spherical tank T along the vertical center line of the spherical tank T and is supported rotatably around its axis, a plurality of scaffolding members 3 that extend horizontally from the column body 2 toward the inner wall of the spherical tank T and are arranged vertically at predetermined intervals along the axial direction of the column body 2, and a plurality of handrail frames 6 that are attached in a line along the extension direction of the scaffolding members 3, and the handrail frame 6 has a pair of vertical supports 60, 61 that stand upright at a predetermined interval from the scaffolding members 3 along the extension direction of the scaffolding members 3, and a handrail main body 62 that is spanned between the pair of vertical supports 60, 61, and one of the pair of vertical supports 60, 61 has a hook 63 that can support any position of the handrail main body 62, and the other of the pair of vertical supports 60, 61 has a bracket 64 that can hold any position of the handrail main body 62.
[0069] According to this configuration, the hook 63 can support any position of the handrail body 62, and the bracket 64 can hold any position of the handrail body 62, so the mounting position of the handrail body 62 can be set to any position. This allows the length of the handrail body 62 that protrudes in the left-right direction from between the pair of vertical supports 60, 61 to be adjusted. In other words, the left-right position of the handrail body 62 relative to the vertical supports 60, 61 can be adjusted. Therefore, the handrail frame 6 can be installed up to the tip side of the scaffolding member 3 while reducing the gap between the handrail bodies 62, 62 of the adjacent handrail frames 6, 6. Therefore, in the scaffolding device 1 in the spherical tank of this embodiment, the handrail frame 6 can always be installed at the location where the scaffolding board 19 of the scaffolding member 3 is installed. In other words, in the scaffolding device 1 in the spherical tank of this embodiment, even if the handrail frame 6 is attached to the scaffolding member 3 by the leading handrail method, the handrail frame 6 can always be installed at the location where the scaffolding board 19 of the scaffolding member 3 is installed.
[0070] As described above, in this embodiment, the handrail frame 6 can be attached to the scaffolding member 3 by the leading handrail method, which improves the safety of workers when assembling the scaffolding device 1 inside the spherical tank.
[0071] In addition, in the scaffolding device 1 inside the spherical tank of this embodiment, the handrail main body 62 is a rectangular frame having upper rails 62a and lower rails 62b arranged above and below, and left rails 62c and right rails 62d connecting both ends of the upper rails 62a and lower rails 62b, respectively, and one of the vertical supports 60 has a hook 63 that supports the upper rail 62a of the handrail main body 62, and a retaining bracket 65 that can hold the lower rail 62b of the handrail main body 62 at any position.
[0072] With this configuration, the handrail body 62 is a two-stage handrail with an upper rail 62a and a lower rail 62b, improving safety. Furthermore, the handrail body 62 is held not only by the other vertical support 61 but also by one vertical support 60, preventing the handrail body 62 from floating up.
[0073] In this embodiment, the hook 63 supports the upper rail 62a, and the retaining metal fitting 65 holds the lower rail 62b, but the hook 63 may support the lower rail 62b, and the retaining metal fitting 65 may hold the upper rail 62a. In this embodiment, the handrail main body 62 is formed in a rectangular frame shape, but this is not limited to this, and it may be formed in a rod shape, for example. If the handrail main body 62 is formed in a rod shape, the retaining metal fitting 65 and the lower bracket 68 that hold the lower rail 62b of the handrail main body 62 can be omitted.
[0074] In addition, in the scaffolding device 1 inside the spherical tank of this embodiment, the scaffolding member 3 has a pair of horizontal beams 11, 11 extending horizontally from the pillar 2 toward the inner wall of the spherical tank T, beam members 9 attached to any position in the extension direction of each horizontal beam 11 and extending along the extension direction of the horizontal beams 11, and a scaffolding board 19 bridged between the opposing beam members 9, 9.
[0075] According to this configuration, by adjusting the mounting position of the beam material 9 relative to the horizontal beam 11, the length by which the beam material 9 protrudes from the horizontal beam 11 toward the inner wall of the spherical tank T can be adjusted, so that the scaffolding member 3 can be extended up to very close to the inner wall of the spherical tank T.
[0076] Moreover, in the scaffolding device 1 in the spherical tank of this embodiment, the beam 9 has three or more support brackets 90 arranged at predetermined intervals along the extension direction of the beam 9 and capable of holding the vertical supports 60, 61. With this configuration, the distance between a pair of vertical supports 60, 61 can be adjusted, so that the handrail main body 62 of any width can be selected according to the distance to the inner wall of the spherical tank T. However, if the width of the handrail main body 62 of each handrail frame 6 is all constant, at least two support brackets 90 need to be provided for the beam 9.
[0077] In addition, the scaffolding device 1 inside the spherical tank in this embodiment is provided on at least one scaffolding member 3, is capable of moving toward and away from the inner wall of the spherical tank T, and is equipped with a stopper 70 that prevents the cylinder 2 from rotating when it abuts against the inner wall of the spherical tank T.
[0078] According to this configuration, the scaffolding member 3 can be stopped at any position by rotating the columnar body 2 to make the scaffolding member 3 face any position on the inner wall of the spherical tank T, and then stopping the rotation of the columnar body 2. In this embodiment, the stopper 70 is provided on the first stage of the scaffolding member 3, but it may be provided on the second stage or subsequent stages of the scaffolding member 3. However, providing the stopper on the first stage of the scaffolding member 3 allows the operation of moving the stopper 70 toward or away from the inner wall of the spherical tank T to be performed from above the bottom of the spherical tank T, so that the operation can be performed safely without worrying about the worker falling.
[0079] In addition, the method of assembling the scaffolding device 1 inside the spherical tank in this embodiment includes the steps of attaching the beam material 9, with one vertical support 60 held by one of the support brackets 90, to the upper horizontal beam 11 from above the lower scaffolding member 3, hanging the handrail main body 62 connected to the other vertical support 61 via a bracket 64 onto the hook 63 of one of the vertical supports 60 from above the lower scaffolding member 3, and attaching the other vertical support 61 to one of the support brackets 90 from above the lower scaffolding member 3.
[0080] According to this configuration, the handrail frame 6 can be installed on the scaffolding member 3 in the leading handrail method while adjusting the position of the handrail frame 6.
[0081] Although the preferred embodiment of the present invention has been described in detail above, it will be appreciated that modifications, variations and changes can be made thereto without departing from the scope of the appended claims. [Explanation of symbols]
[0082] 1...Scaffolding device in spherical tank, 2...Column body, 3...Scaffolding member, 6...Handrail frame, 9...Beam material, 11...Horizontal beam, 19...Scaffolding board, 60, 61...Vertical support, 62...Handrail body, 62a...Upper rail, 62b...Lower rail, 62c...Left rail, 62d...Right rail, 63...Hook, 64...Bracket, 65...Retaining metal fitting, 70...Stopper, 90...Support bracket, T...Spherical tank
Claims
1. a columnar body disposed inside the spherical tank along a center line in a vertical direction of the spherical tank and supported rotatably around an axis; A plurality of scaffolding members extending horizontally from the pillar toward the inner wall of the spherical tank and arranged at predetermined intervals vertically along the axial direction of the pillar; A plurality of handrail frames are attached in a line along the extension direction of the scaffolding members, The handrail frame includes a pair of vertical posts standing at a predetermined interval from the scaffold member along the extension direction of the scaffold member, and a handrail body spanned between the pair of vertical posts, One of the pair of vertical supports has an upward hook that can support any position of the handrail body from below, The other of the pair of vertical supports has a bracket that can hold the handrail body at any position. A scaffolding device for use in a spherical tank.
2. The handrail body is a rectangular frame having an upper rail and a lower rail arranged vertically, and a left rail and a right rail connecting both ends of the upper rail and the lower rail, respectively. The one vertical support has the hook that supports either the upper rail or the lower rail of the handrail body, and a retaining metal fitting that can hold the other of the lower rail or the upper rail of the handrail body at any position.
2. A scaffolding device for use in a spherical tank according to claim 1.
3. The scaffolding member includes a pair of horizontal beams extending horizontally from the pillar toward the inner wall of the spherical tank, beam members attached to any position in the extension direction of each horizontal beam and extending along the extension direction of the horizontal beams, and a scaffolding board spanned between the opposing beam members.
3. A scaffolding device for use in a spherical tank according to claim 1 or 2.
4. The beam material has three or more support brackets arranged at predetermined intervals along the extension direction of the beam material and capable of holding the vertical supports. A scaffolding device for use in a spherical tank according to claim 3.
5. A stopper is provided on at least one of the scaffolding members, is movable toward and away from the inner wall, and prevents the column from rotating when the stopper comes into contact with the inner wall. A scaffolding device for use in a spherical tank according to any one of claims 1 to 4.
6. A method for assembling a scaffolding device in a spherical tank according to claim 4 or claim 5 which refers to claim 4, a step of attaching the beam material, with one of the vertical supports held by one of the support brackets, to the horizontal beam of the upper stage from above the scaffolding member of the lower stage; A step of hanging the handrail main body connected to the other vertical support via the bracket on the hook of the one vertical support from above the scaffolding member of the lower stage; and attaching the other vertical support to one of the support brackets from above the lower scaffolding member. A method for assembling a scaffolding device inside a spherical tank.
Citation Information
Patent Citations
Sphericalltankkcontained scaffolding
JP1980057799A
In the scaffolding of a spherical tank
JP1983101100U
Mobile type bench for spherical tank
JP1983216574A
The internal scaffolding for a spherical tank
JP1985102349U
Handrail post and temporary handrail
JP2003105966A
