Roof construction tool and roof construction method using the same
The roof construction jig with hooks and a turnbuckle system simplifies the alignment of roofing materials by applying tension, addressing the inefficiencies of manual correction in conventional methods and reducing labor needs.
Patent Information
- Application Number
- JP2020164955
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-09-30
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2040-09-30
AI Technical Summary
Conventional roof construction methods require manual labor to adjust and correct the parallel positioning of roofing materials and anchor hooks, often leading to inefficiencies and the need for multiple workers to apply sufficient force.
A roof construction jig with a groove-shaped cross section, comprising first and second hooks connected by a turnbuckle, which engages with upright portions of roofing materials to apply tension and correct their positions, reducing the need for manual labor and ensuring parallel alignment.
The jig simplifies the positioning and correction of roofing materials, allowing for efficient alignment without manual force application, maintaining parallelism and reducing labor requirements during roof construction.
Smart Images

Figure 0007563929000001 
Figure 0007563929000002 
Figure 0007563929000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a roof construction tool that corrects the position of roof materials when fixing multiple roof materials by adjoining the upright portions on both side edges of a flat plate portion, and a roof construction method using the same. [Background technology]
[0002] A roof construction method has been known in the past in which roofing materials having upright portions on both side edges of a flat plate portion are placed side by side with the upright portions butted together and the pair of adjacent roofing materials are fixed together via anchor hooks (see, for example, Patent Document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2014-118764 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, when fixing a pair of roofing materials and the anchor hook placed between them, it is necessary to adjust their positions so that their longitudinal directions are parallel to each other in advance. In contrast, in conventional roof construction methods, workers correct the positions of the roofing materials and anchor hooks by applying force with their hands and feet. This causes problems such as insufficient force to completely correct the position of the roofing materials, etc., or the need for multiple workers to compensate for the lack of force.
[0005] The present invention has been made in consideration of the above-mentioned problems, and aims to provide a roof construction tool and a roof construction method using the same that reduce the labor required for positioning and correcting the position of roofing materials during roof construction and can easily correct the position of the roofing material. [Means for solving the problem]
[0006] In order to achieve the above object, the roof construction jig of the present invention is a roof construction jig for correcting the position of a roofing material having upright portions on both side edges of a flat plate portion, and is provided with: a first hook having a groove-shaped cross section, covering one upright portion of a first roofing material and one upright portion of a second roofing material adjacent to the one upright portion of the first roofing material, and engaging with the upright portion of the second roofing material; a second hook having a groove-shaped cross section, covering the other upright portion of the first roofing material and one upright portion of a third roofing material adjacent to the other upright portion of the first roofing material, and engaging with the upright portion of the third roofing material; and a tension adjustment device having one end connected to the first hook and the other end connected to the second hook, which applies a force to the first hook and the second hook in a direction that draws them toward each other. The first hook has a flat portion formed by bending a tip inward, and a folded portion formed by folding an end of the flat portion upward, with the inward surface serving as an abutment surface that abuts against the standing portion, and the second hook has a flat portion formed by bending a tip inward, and a folded portion formed by folding an end of the flat portion upward, with the inward surface serving as an abutment surface that abuts against the standing portion. do.
[0007] In addition, in order to achieve the above-mentioned object, the roof construction method of the present invention includes inserting a first anchor hook between one upright portion of a first roofing material and an upright portion of a second roofing material adjacent to the one upright portion of the first roofing material, inserting a second anchor hook between the other upright portion of the first roofing material and an upright portion of a third roofing material adjacent to the other upright portion of the first roofing material, placing a first hook of a roof construction jig over the one upright portion of the first roofing material and the upright portion of the second roofing material, placing a second hook of the roof construction jig over the other upright portion of the first roofing material and the upright portion of the third roofing material, and applying a force to the first hook and the second hook in a direction pulling them toward each other using a tension adjustment device of the roof construction jig. Effect of the Invention
[0008] Therefore, the roof construction jig and roof construction method of the present invention reduce the labor required to position and correct the position of the roof material during roof construction, and make it easy to correct the position of the roof material. [Brief description of the drawings]
[0009] [Figure 1] FIG. 2 is an exploded perspective view showing a roof constructed using the roof construction jig of the first embodiment. [Diagram 2]1. (a) is an enlarged view of part A in FIG. 1, and (b) is an enlarged view of part B in FIG. [Diagram 3] FIG. 11 is a cross-sectional view showing the roof after construction. [Figure 4] FIG. 2 is a perspective view showing the roof construction jig of the first embodiment. [Diagram 5] FIG. 2 is an explanatory diagram showing an installed state of the roof construction jig of the first embodiment. [Figure 6A] FIG. 2 is an explanatory diagram of the roof material arrangement process of the roof construction method of Example 1. [Figure 6B] FIG. 4 is an explanatory diagram showing a jig installation step in the roof construction method of the first embodiment. [Figure 6C] FIG. 2 is an explanatory diagram showing a position correction step of the roof material in the roof construction method of the first embodiment. [Figure 7] FIG. 11 is an explanatory diagram showing a state in which a plurality of roof construction jigs are installed in succession. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a description will be given of an embodiment for carrying out a roof construction jig and a roof construction method of the present invention based on a first embodiment shown in the drawings.
[0011] Example 1 The roof constructed using the roof construction jig 10 of the first embodiment is the roof of a building such as a modular building, and is constructed by fixing a number of roofing materials 20, which are vertical roofing materials, to a sheathing board 40 via anchor hooks 30, as shown in Fig. 1. Note that vertical roofing materials are long roofing materials that are constructed so that their longitudinal direction is parallel to the roof slope.
[0012] 2(a), the roofing material 20 has a flat plate portion 21 made of a strip-shaped steel plate, and a pair of standing portions 22 formed on both side edges of the flat plate portion 21. The standing portions 22 are formed by bending both side edges along the longitudinal direction of the flat plate portion 21 upward, and have a folded portion 23 at the tip that is folded toward the center of the flat plate portion 21.
[0013] The anchor hook 30 is a long member having a groove shape that opens upward. As shown in Fig. 2(b), both ends of the anchor hook 30 facing upward are folded back outward to form a pair of locking pieces 31 extending in the longitudinal direction.
[0014] During roof construction, first, multiple roof materials 20 are lined up on the sheathing board 40 with their upright portions 22 butted together. Next, an anchor hook 30 is inserted between the opposing upright portions 22, 22 of a pair of adjacent roof materials 20, 20. At this time, as shown in FIG. 3, a locking piece 31 is inserted into the folded portion 23 at the tip of each upright portion 22, and the pair of roof materials 20, 20 are loosely connected via the anchor hook 30.
[0015] Further, a screw hole (not shown) into which a screw 33 is inserted is formed in the bottom 32 of the anchor hook 30. The screw 33 penetrates the sheathing board 40 on which the anchor hook 30 and the roof material 20 are placed, and is screwed into a rafter (not shown) supporting the sheathing board 40. As a result, the anchor hook 30 is pressed against the sheathing board 40, and the pair of roof materials 20, 20 are fixed to the sheathing board 40. After being fixed by the screw 33, a joint cover 41 is attached to the anchor hook 30 as shown in FIG. 3.
[0016] The roof construction jig 10 of Example 1 is used to correct the position of the roof material 20 so that the longitudinal directions of the roof material 20 and the anchor hooks 30 are parallel before the anchor hooks 30 are fixed with the screws 33.
[0017] As shown in FIG. 4, the roof construction jig 10 includes a first hook 11, a second hook 12, and a turnbuckle 13 (tension adjustment tool).
[0018] The first hook 11 has a groove shape that opens downward, and has a flat portion 11a at both ends facing downward, and a folded portion 11b that is continuous with the flat portion 11a. The flat portion 11a is formed by bending the tip of the first hook 11 inward, and is approximately parallel to the upper surface 11c. The folded portion 11b is formed by folding the end of the flat portion 11a upward. In addition, the first hook 11 has a through hole 11d formed on the side surface facing the second hook 12. The through hole 11d has a screw groove formed on the inner peripheral surface, and the first rod 13a of the turnbuckle 13 described later can be screwed in. Furthermore, the folded portion 11b at the tip of the side surface where the through hole 11d is not formed has a surface facing inward of the first hook 11 that becomes an abutting surface 11e that abuts against the rising portion 22 of the roof material 20.
[0019] When the roof construction jig 10 is used, the first hook 11 is engaged with the first anchor hook 30A in advance and covered with one of the adjacent upright portions 22α of the first roof material 20A and one of the upright portions 22β of the second roof material 20B as shown in Fig. 5. This causes the first hook 11 to cover the two upright portions 22α, 22β. At this time, the flat portion 11a contacts the flat plate portion 21 of the first roof material 20A and the flat plate portion 21 of the second roof material 20B.
[0020] The second hook 12 has a groove shape that opens downward, and has a flat portion 12a at the tip facing downward and a folded portion 12b that is continuous with the flat portion 12a. The flat portion 12a is formed by bending the tip of the second hook 12 inward and is approximately parallel to the upper surface 12c. The folded portion 12b is formed by folding the end of the flat portion 12a upward. In addition, the second hook 12 has a through hole 12d formed on the side surface facing the first hook 11. The through hole 12d has a screw groove formed on the inner peripheral surface, so that the second rod 13b of the turnbuckle 13 described later can be screwed in. Furthermore, the folded portion 12b at the tip of the side surface where the through hole 12d is not formed has a surface facing inward of the second hook 12 that becomes an abutting surface 12e that abuts against the rising portion 22 of the roof material 20.
[0021] When the roof construction jig 10 is used, the second hook 12 is engaged with the second anchor hook 30B in advance and covered with the other standing portion 22x of the adjacent first roof material 20A and one standing portion 22y of the adjacent third roof material 20C, as shown in Fig. 5. This causes the second hook 12 to cover the two standing portions 22x, 22y. At this time, the flat portion 12a contacts the flat plate portion 21 of the first roof material 20A and the flat plate portion 21 of the third roof material 20C.
[0022] Furthermore, in Example 1, the first hook 11 and the second hook 12 are both elongated members formed of lip channel steel. Therefore, the flat parts 11a, 12a, the folded parts 11b, 12b, and the abutment surfaces 11e, 12e of the first hook 11 and the second hook 12 all extend along the longitudinal direction of the roof material 20, which is an elongated member.
[0023] The turnbuckle 13 is a tension adjuster that adjusts the tension acting along the axial direction, and has a first rod 13a, a second rod 13b, and a body portion 13c.
[0024] The first rod 13a and the second rod 13b are metal rods each having a screw groove formed on the circumferential surface. One end of the first rod 13a is screwed into the through hole 11d of the first hook 11, connecting the first hook 11 and the turnbuckle 13. One end of the second rod 13b is screwed into the through hole 12d of the second hook 12, connecting the second hook 12 and the turnbuckle 13.
[0025] The body 13c has a metal frame shape, and has female thread grooves formed at both ends, into which the other ends of the first rod 13a and the second rod 13b can be screwed. Here, the female thread groove formed at one end of the body 13c and the female thread groove formed at the other end of the body 13c have a reverse thread relationship. As a result, by rotating the body 13c, the first rod 13a and the second rod 13b screwed into both ends are simultaneously tightened or loosened, thereby adjusting the axial tension.
[0026] In other words, the turnbuckle 13 contracts in the axial direction by rotating the body 13c and tightening the first rod 13a and the second rod 13b simultaneously, and applies a force to the first hook 11 and the second hook 12 in a direction that draws them toward each other.
[0027] Hereinafter, the procedure of the roof construction method using the roof construction jig 10 of the embodiment 1 will be described with reference to Figs. 6A to 6C.
[0028] When constructing a roof, first, the three roofing materials 20A to 20C and the two anchor hooks 30A and 30B are arranged alternately on the sheathing board 40. Then, first, the first anchor hook 30A is inserted between one standing portion 22α of the first roofing material 20A and the standing portion 22β of the second roofing material 20B adjacent to one standing portion 22α of the first roofing material 20A. At this time, one locking piece 31 of the first anchor hook 30A is inserted into the folded portion 23 of the standing portion 22α, and the other locking piece 31 of the first anchor hook 30A is inserted into the folded portion 23 of the standing portion 22β. As a result, the first roofing material 20A and the second roofing material 20B are loosely connected via the first anchor hook 30A as shown in FIG. 6A.
[0029] Next, the second anchor hook 30B is inserted between the other standing portion 22x of the first roof material 20A and the standing portion 22y of the third roof material 20C adjacent to the other standing portion 22x of the first roof material 20A. At this time, one locking piece 31 of the second anchor hook 30B is inserted into the folded portion 23 of the standing portion 22x, and the other locking piece 31 of the second anchor hook 30B is inserted into the folded portion 23 of the standing portion 22y. As a result, the first roof material 20A and the third roof material 20C are loosely connected via the second anchor hook 30B as shown in FIG. 6A.
[0030] After the three roofing materials 20A-20C and the two anchor hooks 30A, 30B are placed on the sheathing board 40, the first hook 11 of the roofing construction jig 10 is placed over one of the rising portions 22α of the first roofing material 20A and one of the rising portions 22β of the second roofing material 20B, as shown in Fig. 6B. At the same time, the second hook 12 of the roofing construction jig 10 is placed over the other of the rising portions 22x of the first roofing material 20A and one of the rising portions 22y of the third roofing material 20C.
[0031] At this time, the turnbuckle 13 has the first rod 13a connected to the first hook 11 and the second rod 13b connected to the second hook 12. The first rod 13a and the second rod 13b are protruding from the body portion 13c, and the first hook 11 and the second hook 12 are spaced apart from each other.
[0032] After the first hook 11 and the second hook 12 are positioned, the body 13c of the turnbuckle 13 is rotated and the first rod 13a and the second rod 13b are tightened simultaneously, as shown in Fig. 6C. This causes the first rod 13a and the second rod 13b to enter the body 13c, and the turnbuckle 13 contracts in the axial direction, causing a force to act on the first hook 11 and the second hook 12 in a direction that draws them toward each other.
[0033] Therefore, the first hook 11 engages with the rising portion 22β of the second roofing material 20B, and the abutment surface 11e comes into contact with the rising portion 22β. Then, the first hook 11 presses the second roofing material 20B toward the first roofing material 20A. Also, the second hook 12 engages with the rising portion 22y of the third roofing material 20C, and the abutment surface 12e comes into contact with the rising portion 22y. Then, the second hook 12 presses the third roofing material 20C toward the first roofing material 20A. As a result, the second roofing material 20B and the third roofing material 20C are drawn toward the first roofing material 20A, and the positions of the second roofing material 20B and the third roofing material 20C are corrected so that their longitudinal directions are parallel to each other. Then, the labor required for positioning and position correction of the roofing materials 20A to 20C during roof construction is reduced, and the positions of the roofing materials 20A to 20C can be easily corrected.
[0034] After the positions of the roof materials 20A to 20C have been corrected, the first anchor hook 30A and the second anchor hook 30B are each fixed to the sheathing board 40 with a screw 33. At this time, by leaving the roof construction jig 10 attached, the positions of the roof materials 20A to 20C can be maintained, eliminating the need for the worker to hold down the roof materials 20A to 20C.
[0035] Thus, the roof construction jig 10 of Example 1 comprises a first hook 11 having a groove-shaped cross section, covering one standing portion 22α of the first roofing material 20A and one standing portion 22β of the second roofing material 20B adjacent to this standing portion 22α, and engaging with the standing portion 22β, a second hook 12 having a groove-shaped cross section, covering the other standing portion 22x of the first roofing material 20A and one standing portion 22y of the third roofing material 20C adjacent to this standing portion 22x, and engaging with the standing portion 22y, and a turnbuckle 13 having one end connected to the first hook 11 and the other end connected to the second hook 12, and applying a force to the first hook 11 and the second hook 12 in a direction pulling them toward each other.
[0036] As a result, by rotating the body 13c of the turnbuckle 13 and shortening the axial length of the turnbuckle 13, the second roofing material 20B and the third roofing material 20C arranged on both sides of the first roofing material 20A can be attracted to the first roofing material 20A. In addition, by adjusting the number of rotations and direction of the body 13c, the force acting on the first hook 11 and the second hook 12 in the direction of attracting each other can be adjusted. This reduces the effort required to position and correct the positions of the roofing materials 20A to 20C during roof construction, and makes it easy to correct the positions of the roofing materials 20A to 20C.
[0037] Furthermore, the positions of the roof materials 20A to 20C are maintained by installing the roof construction jig 10. As a result, when fixing the anchor hooks 30A, 30B with the screws 33, the worker does not need to hold down the roof materials 20A to 20C with his or her hands or feet, and can let go of the roof materials.
[0038] In addition, in the roof construction jig 10 of Example 1, the first hook 11 and the second hook 12 are elongated members formed by lip channel steel, and the abutment surfaces 11e, 12e that abut against the upright portion 22β and the upright portion 22y extend along the longitudinal direction of the elongated roof materials 20A to 20C.
[0039] This allows the contact area between the standing portion 22β and the abutment surface 11e and the contact area between the standing portion 22y and the abutment surface 12e to be elongated along the longitudinal direction of the roof materials 20A-20C, and when correcting the positions of the roof materials 20A-20C, the force acting on the standing portion 22β and the standing portion 22y can be dispersed and the force can be prevented from being applied locally. Therefore, it is possible to prevent the standing portion 22β and the standing portion 22y from being locally deformed.
[0040] Furthermore, in the roof construction jig 10 of Example 1, the first hook 11 and the second hook 12 both have flat portions 11a, 12a that come into contact with the flat plate portions 21 of the roof materials 20A to 20C.
[0041] This allows the first hook 11 and the second hook 12 to be stably positioned on the roof materials 20A to 20C, and prevents tilting when a force acts on the first hook 11 and the second hook 12 in a direction that pulls them toward each other. As a result, bending of the standing portion 22β and the standing portion 22y is suppressed, and the positions of the roof materials 20A to 20C can be properly corrected.
[0042] In addition, in the example shown in Figure 5, a construction method has been described in which one roof construction jig 10 is used to pull the second roofing material 20B and the third roofing material 20C arranged on either side of the first roofing material 20A toward each other, but this is not limited to this.
[0043] For example, as shown in Fig. 7, the first hook 11β of the second roof construction jig 10β is placed over the other standing portion 22x of the first roof material 20A and one standing portion 22y of the third roof material 20C, which are covered by the second hook 12α of the first roof construction jig 10α. Furthermore, the second hook 12β of the second roof construction jig 10β is placed over the other standing portion 221 of the third roof material 20C and one standing portion 222 of the fourth roof material 20D adjacent to the standing portion 221.
[0044] This allows the first roof construction jig 10α and the second roof construction jig 10β to be installed consecutively, and allows the positions of the multiple (four) roof materials 20A to 20D to be corrected and fixed simultaneously.
[0045] The roof construction jig and roof construction method of the present invention have been explained above based on Example 1, but the specific configuration is not limited to this Example, and design changes and additions are permitted as long as they do not deviate from the gist of the invention related to each claim in the scope of the claims.
[0046] In the roof construction jig 10 in the first embodiment, the first hook 11 and the second hook 12 are formed by lip channel steel, but the present invention is not limited to this. For example, they may be formed by channel steel.
[0047] Furthermore, in the roof construction jig 10 of Example 1, an example was shown in which the turnbuckle 13 was used as the tension adjuster, but as long as both ends are connected to the first hook 11 and the second hook 12 and a force can be applied to the first hook 11 and the second hook 12 in a direction that draws them toward each other, the turnbuckle 13 can be used as the tension adjuster. In other words, the tension adjuster may be, for example, an elastic body such as a DC buckle, a ratchet gear, a ratchet buckle, or a spring. [Explanation of symbols]
[0048] 10 Roof construction jig 11 First Hook 12 2nd Hook 11a, 12a flat part 11b, 12b folded part 11e, 12e Contact surface 13 Turnbuckle (tension adjustment device) 20 Roofing materials 21 Flat plate part 22 Standing part 20A First roofing material 20B Second roofing material 20C Third roofing material 22α One upright part of the first roof material 22β One of the upright parts of the second roof material 22x The other upright part of the first roof material 22y One of the rising parts of the third roof material 30 Anchor Hook 31 Locking part 40 Field board
Claims
1. A roof construction jig for correcting the position of a roof material having upright portions on both side edges of a flat plate portion, A first hook having a groove-shaped cross section, covering one upright portion of a first roof material and one upright portion of a second roof material adjacent to the one upright portion of the first roof material, and engaging with the upright portion of the second roof material; A second hook having a groove-shaped cross section, covering the other upright portion of the first roof material and the upright portion of a third roof material adjacent to the other upright portion of the first roof material, and engaged with the upright portion of the third roof material; a tension adjuster having one end connected to the first hook and the other end connected to the second hook, and applying a force to the first hook and the second hook in a direction that attracts them to each other, the first hook has a flat portion formed by bending a tip end inward, and a folded portion formed by folding an end of the flat portion upward, the folded portion having an inward surface that serves as an abutment surface that abuts against the upright portion, The second hook has a flat portion formed by bending a tip end inward, and a folded portion formed by folding an end of the flat portion upward, the folded portion having an inward surface that serves as an abutment surface that abuts against the upright portion. A roof construction tool characterized by the above.
2. The roof construction tool according to claim 1, The first hook and the second hook have contact surfaces that contact the upright portion and extend along the longitudinal direction of the long roof material. A roof construction tool characterized by the above.
3. The roof construction tool according to claim 1 or 2, The first hook and the second hook are such that the flat portion contacts the flat plate portion. A roof construction tool characterized by the above.
4. A roof construction method using the roof construction jig according to any one of claims 1 to 3, A first anchor hook is inserted between one of the upright portions of a first roof material and a upright portion of a second roof material adjacent to the one of the upright portions of the first roof material, and a second anchor hook is inserted between the other of the upright portions of the first roof material and a upright portion of a third roof material adjacent to the other of the upright portions of the first roof material; A first hook of the roof construction jig is placed over one of the upright portions of the first roof material and the upright portion of the second roof material, and a second hook of the roof construction jig is placed over the other upright portion of the first roof material and the upright portion of the third roof material; A tension adjusting tool of the roof construction jig applies a force to the first hook and the second hook in a direction in which the first hook and the second hook are pulled toward each other. A roof construction method characterized by the above.
5. The roof construction method according to claim 4, The first hook of a second roof construction jig is placed over the other upright portion of the first roofing material and one upright portion of the third roofing material that are covered by the second hook of the first roof construction jig, and the second hook of the second roof construction jig is placed over the other upright portion of the third roofing material and the upright portion of a fourth roofing material adjacent to the other upright portion of the third roofing material. A roof construction method characterized by the above.
Citation Information
Patent Citations
Column adjustment tool
JP1985046749U
Roofing-assisting gadget
JP1992194159A
Shape adjusting tool for fascia backing board
JP1998061136A
Waterproof structure between roofs
JP2014118764A