Business support device, business support method, and program

The business support device automates the verification of subcontractor compliance with legal requirements, addressing inefficiencies and legal risks in construction work selection by ensuring accurate and efficient partner selection.

JP7565961B2Active Publication Date: 2024-10-11OBIC CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2022021936
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-02-16
Publication Date
2024-10-11
Estimated Expiration
2042-02-16

AI Technical Summary

Technical Problem

Construction companies face a burden in determining whether subcontractors meet legal requirements for construction work, such as having the necessary licenses and insurance, and setting correct quotation periods, leading to potential legal issues and inefficiencies.

Method used

A business support device and method that includes a control unit to manage and verify supplier information, quotation data, and legal requirements, ensuring compliance with laws and regulations by automating the determination of whether subcontractors meet these criteria.

Benefits of technology

Reduces the burden on workers by efficiently selecting compliant business partners, minimizing errors, and ensuring adherence to legal requirements, thereby improving operational efficiency and reducing legal risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007565961000001
    Figure 0007565961000001
  • Figure 0007565961000002
    Figure 0007565961000002
  • Figure 0007565961000003
    Figure 0007565961000003
Patent Text Reader

Abstract

To provide a business support device, a business support method, and a program for efficiently selecting a client by reducing a load on a worker in a task for requesting a quotation for a construction work.SOLUTION: In a business support device 100 that includes a control unit 102, the control unit 102 includes: an obtaining unit 102a that obtains quotation requesting data which contains information for identifying a vendor that undertakes a construction work, and information necessary for a quotation request to the vendor regarding the construction work; and a determining unit 102b that determines whether or not the vendor identified by the information included in the quotation requesting data satisfies requirements on the basis of the quotation requesting data obtained by the obtaining unit 102a, a basic information master 106d that stores standards defined by a rule relating to the undertaking of the construction work, and a vendor master 106e that stores, for each vendor, information which relates to the vendor that undertakes the construction work and is utilized to determine whether or not the vendor satisfies the requirements defined by the rule.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a business support device, a business support method, and a program. [Background technology]

[0002] Patent document 1 describes how the general contractor of a construction project inputs information to a support server via a general contractor terminal to request the creation of an estimate, and the cooperating company that carries out the construction project checks the information input to the support server via a cooperating terminal. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent Publication No. 2021-081931 Summary of the Invention [Problem to be solved by the invention]

[0004] When a prime contractor requests a subcontractor to prepare an estimate for construction work, the subcontractor must meet the requirements stipulated in the law, enforcement order, enforcement regulations, guidelines of the Ministry of Land, Infrastructure, Transport and Tourism, etc. In order to determine whether a subcontractor meets the requirements stipulated in the law, enforcement order, enforcement regulations, guidelines of the Ministry of Land, Infrastructure, Transport and Tourism, etc., the workers making the request at the prime contractor must be familiar with the law, enforcement order, enforcement regulations, guidelines of the Ministry of Land, Infrastructure, Transport and Tourism, etc. Making an incorrect judgment in this regard will result in illegal conduct and will damage the company's credibility, so the task of making this judgment is a burden for the workers.

[0005] The present invention has been made in consideration of the above, and aims to provide a business support device, a business support method, and a program that reduce the burden on workers in the task of requesting estimates for construction work, and enable them to efficiently select business partners. [Means for solving the problem]

[0006] In order to solve the above problems and achieve the object, a business support device according to the present invention is a business support device including a control unit, the control unit being configured to receive information for identifying a supplier who will undertake a construction work, information required for requesting an estimate for the construction work from the supplier, , the estimated period for the construction work to be requested from the supplier, and storing the quotation request data acquired by the acquisition means and standards prescribed by rules relating to the contracting of construction work. , including the base number of days for the estimated period A basic information master and a supplier master storing, for each supplier, information related to the supplier undertaking the construction work and used to determine whether the supplier satisfies the requirements stipulated by the rules, and a judgment means for judging whether the supplier specified by the information included in the quotation request data satisfies the requirements, based on the basic information master and the supplier master storing, for each supplier, information related to the supplier undertaking the construction work and used to determine whether the supplier satisfies the requirements stipulated by the rules, The control unit determines that an estimate period specified in the requirement is provided when the number of days of the estimate period included in the estimate request data is equal to or greater than the reference number of days. It is characterized by the fact that

[0007] In addition, in the business support device of the present invention, the quotation request data may include a type of construction work to be requested from a supplier identified by information contained in the quotation request data, and the judgment means may correspond the supplier identified by information contained in the quotation request data to the type of construction work contained in the quotation request data, and judge that the requirements are met when information indicating permission for the construction work of that type is stored in the purchase master.

[0008] In addition, in the business support device of the present invention, the purchasing master may include a status of enrollment in insurance specified by the rules, and the judgment means may judge that the requirements are met when the enrollment status in the purchasing master associated with a supplier identified by information included in the quotation request data indicates that the insurance is enrolled.

[0009] In the business support device according to the present invention, the quotation request data is The control unit includes an order form category master that includes the order form category of the construction work to be requested from the supplier and stores the check category of the estimated period for each order form category, and the control unit does not judge the estimated period included in the estimate request data when the order form category included in the estimate request data is a category that does not check the estimated period, and judges the estimated period included in the estimate request data when the order form category is a category that does check the estimated period. This may be done.

[0010] The business support method according to the present invention is a business support method executed by a business support device having a control unit, the business support method including: , the estimated period for the construction work to be requested from the supplier, An acquisition step of acquiring quotation request data including the above, and storing the quotation request data acquired in the acquisition step and standards prescribed by rules related to the contracting of construction work. , including the base number of days for the estimated period a judgment step of judging whether or not a supplier specified by information included in the quotation request data satisfies the requirements based on a basic information master and a supplier master in which information related to the supplier undertaking the construction work and used to judge whether or not the supplier satisfies the requirements stipulated by the rules is stored for each supplier; When the number of days of the estimated period included in the quotation request data is equal to or greater than the reference number of days, it is determined that the estimated period specified in the requirement is provided; The present invention is characterized by comprising:

[0011] The program according to the present invention also includes a program for causing a computer to input information for identifying a supplier who will undertake a construction work, information required for requesting an estimate for the construction work from the supplier, and , the estimated period for the construction work to be requested from the supplier, An acquisition process for acquiring quotation request data including the above, and storing the quotation request data acquired in the acquisition process and standards stipulated by rules related to the contracting of construction work. , including the base number of days for the estimated period a judgment process for judging whether a supplier specified by information included in the quotation request data satisfies the requirements based on a basic information master and a supplier master in which information related to the supplier undertaking the construction work and used to judge whether the supplier satisfies the requirements stipulated by the rules is stored for each supplier; a process of determining that an estimate period stipulated in the requirement is provided when the number of days of the estimate period included in the estimate request data is equal to or greater than the reference number of days; The present invention is characterized in that the above-mentioned is executed. Effect of the Invention

[0012] According to the present invention, it is possible to reduce the burden on workers in the task of requesting estimates for construction work and to efficiently select business partners. [Brief description of the drawings]

[0013] [Figure 1]FIG. 1 is a block diagram illustrating an example of a configuration of a task assistance device according to an embodiment. [Diagram 2] FIG. 2 is a diagram illustrating an example of construction basic information data, contract information data, and estimate request data stored in the storage unit according to the embodiment. [Diagram 3] FIG. 3 is a diagram illustrating an example of a basic information master stored in the storage unit according to the embodiment. [Figure 4] FIG. 4 is a diagram illustrating an example of a supplier master stored in the storage unit according to the embodiment. [Diagram 5] FIG. 5 is a diagram illustrating an example of the supplier construction business license master stored in the storage unit according to the embodiment. [Figure 6] FIG. 6 is a diagram illustrating an example of the order form category master stored in the storage unit according to the embodiment. [Figure 7] FIG. 7 is a diagram showing an example of a quotation request slip registration screen displayed on the business support device according to the embodiment. [Figure 8] FIG. 8 is a flowchart illustrating an example of a procedure of a process executed by the task assistance device according to the embodiment. [Figure 9] FIG. 9 is a flowchart illustrating an example of a procedure of a process executed by the task assistance device according to the embodiment. [Figure 10] FIG. 10 is a flowchart illustrating an example of a procedure of a process executed by the task assistance device according to the embodiment. [Figure 11] FIG. 11 is a flowchart illustrating an example of a procedure of a process executed by the task assistance device according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, preferred embodiments of a task support device, a task support method, and a program according to the present invention will be described in detail with reference to the accompanying drawings. Note that the present invention is not limited to the preferred embodiments.

[0015] [1. Overview] In the construction industry, when selecting a business partner to entrust with work, the business partner must meet the requirements stipulated in laws, enforcement orders, enforcement regulations, guidelines from the Ministry of Land, Infrastructure, Transport and Tourism, etc. Specifically, when selecting a business partner, the following requirements (1)-1 and (1)-2 must be met. (1)-1: If the contract price of the construction work to be ordered exceeds the amount stipulated in the Construction Business Act, the business partner has a construction business license for the type of construction work for which an estimate is being requested. (1)-2: The business partner has insurance that is required when undertaking construction work. The requirements for (1)-1 are stipulated in the Construction Business Law (Article 3) and the Construction Business Law Enforcement Order (Article 1-2). The requirements for (1)-2 are stipulated in the Construction Business Law (Article 7), the Construction Business Law Enforcement Regulations (Article 7-2), and the Ministry of Land, Infrastructure, Transport and Tourism's "Guidelines for Subcontractors Concerning Enrollment in Social Insurance."

[0016] In addition, when requesting a quotation from a supplier, the following requirement (2)-1 must be met. (2)-1: A certain estimation period as stipulated in the Construction Business Act must be set according to the requested quotation amount. The requirements for (2)-1 are stipulated in the Construction Business Law Enforcement Order (Article 6).

[0017] In this way, when selecting a business partner and requesting a quote from the business partner, the requesting person in charge needs to be familiar with the law, enforcement order, enforcement regulations, and guidelines, and it is a heavy burden for them to judge whether they are in violation. Therefore, in this embodiment, a business support device, a business support method, and a program are provided that can reduce the burden on the worker in the task of requesting a quote and efficiently select a business partner. The specific configuration and operation are described below.

[0018] [2. Configuration] An example of the configuration of a task assistance device 100 according to the present embodiment will be described with reference to Fig. 1. Fig. 1 is a block diagram showing an example of the configuration of the task assistance device 100 according to the embodiment.

[0019] The business support device 100 is installed, for example, in the business premises of a prime contractor in the construction industry who orders construction work from subcontractors. The business support device 100 is, for example, a device that registers information related to requests for estimates for construction work ordered from the prime contractor to the subcontractors, and manages the requests for estimates to the subcontractors who are its business partners.

[0020] The business support device 100 is, for example, a commercially available desktop personal computer. However, the business support device 100 is not limited to a stationary information processing device such as a desktop personal computer, and may be a portable information processing device such as a commercially available notebook personal computer, a PDA (Personal Digital Assistant), a smartphone, or a tablet personal computer.

[0021] The business support device 100 includes a control unit 102, a communication interface unit 104, a storage unit 106, and an input / output interface unit 108. Each unit included in the business support device 100 is connected to each other so as to be able to communicate with each other via an arbitrary communication path.

[0022] The communication interface unit 104 communicatively connects the task support device 100 to the network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with other devices via the communication line. Here, the network 300 has a function of connecting the task support device 100 and the server 200 so that they can communicate with each other, and is, for example, the Internet or a LAN (Local Area Network). Note that the data stored in the memory unit 106 may be stored in, for example, the server 200, and the data processed by the control unit 102 may be acquired from the server 200.

[0023] An input device 112 and an output device 114 are connected to the input / output interface unit 108. The output device 114 may be a monitor (including a home television), a speaker, or a printer. The input device 112 may be a keyboard, a mouse, a microphone, or a monitor that cooperates with a mouse to realize a pointing device function. In the following, the output device 114 may be referred to as the monitor 114, and the input device 112 may be referred to as the keyboard 112 or the mouse 112.

[0024] Various databases, tables, files, etc. are stored in the storage unit 106. Computer programs for cooperating with an OS (Operating System) to give instructions to a CPU (Central Processing Unit) to perform various processes are recorded in the storage unit 106. For example, memory devices such as RAM (Random Access Memory) and ROM (Read Only Memory), fixed disk devices such as hard disks, flexible disks, and optical disks can be used as the storage unit 106.

[0025] The storage unit 106 stores, for example, construction basic information data 106a, contract information data 106b, and quotation request data 106c as data. Fig. 2 shows examples of the construction basic information data 106a, contract information data 106b, and quotation request data 106c. The storage unit 106 also stores, for example, master data, basic information master 106d, supplier master 106e, supplier construction business license master 106f, and purchase order type master 106g. Fig. 3 shows an example of the basic information master 106d, Fig. 4 shows an example of the supplier master 106e, Fig. 5 shows an example of the supplier construction business license master 106f, and Fig. 6 shows an example of the purchase order type master 106g.

[0026] The construction basic information data 106a shown in FIG. 2 includes items related to the construction work that a prime contractor who owns the business support device 100 has received an order for from a client of the construction work. The construction basic information data 106a includes a project number, a project name, a construction start date, a construction end date, and the like. Note that items other than those related to the present invention are omitted from the construction basic information data 106a shown in FIG. 2. The construction basic information data 106a may include items other than those shown in FIG. 2. The project number is a number for identifying a construction work project that has been received an order for from a client. The project name is the name of the construction work project that has been received an order for from a client of the construction work. The construction start date is the start date of the construction work identified by the project number, and the construction end date is the end date of the construction work identified by the project number.

[0027] The contract information data 106b shown in FIG. 2 is data including items related to a contract between an orderer and a prime contractor for a construction work identified by a project number. The contract information data 106b includes the project number, order number, contract name, contract start date, contract end date, etc. It should be noted that items other than those related to the present invention are omitted from the contract information data 106b shown in FIG. 2. The contract information data 106b may include items other than those shown in FIG. 2. The order number is a number for identifying a contract for a construction work order received from an orderer. The contract name is the name of the contract for the construction work order received. The contract start date is the start date of the contract for the construction work order received, and the contract end date is the end date of the contract for the construction work order received.

[0028] The quotation request data 106c shown in FIG. 2 includes items related to a quotation request made by a prime contractor having the business support device 100 to a subcontractor. The quotation request data 106c includes a quotation request number, a quotation request date, a quotation submission deadline, a supplier, a construction business license type classification, a purchase order type, a project number, an order number, an order detail number, and a total quotation request amount. The quotation request number is a number for identifying the quotation request. The quotation request date is the date on which the quotation is requested. The quotation submission deadline is the deadline for submitting a quotation requested to a subcontractor. The supplier is the subcontractor to whom the quotation is requested. The construction business license type classification is the construction business license type classification held by the supplier. The purchase order type classification is the classification of the purchase order related to the work requested by the prime contractor to the subcontractor. The order detail number is a number for identifying the construction work to be ordered from the prime contractor to the subcontractor. The quotation request total amount is the estimated amount of the construction work to be ordered from the party to whom the quotation is requested.

[0029] The basic information master 106d shown in Fig. 3 is a master that stores information related to requirements necessary for making a request for quotation. The basic information master 106d as a purchase master includes a construction business license check category, a construction business law order reference amount, a construction business law estimate period check reference amount 1, a construction business law estimate period check reference amount 2, a construction business law estimate period check number of days 1, and a construction business law estimate period check number of days 2. For example, if the requirements necessary for making a request for quotation change due to a legal revision, it can be handled by editing the contents of the master.

[0030] The supplier master 106e shown in Fig. 4 is a master that stores information related to subcontractors who are requested by the prime contractor to carry out construction work. The supplier master 106e as a supplier master includes a supplier code, a supplier name, a health insurance category, a pension insurance category, an employment insurance category, a construction business license management category, and a purchase order category.

[0031] The supplier construction business permit master 106f shown in Fig. 5 is a master that stores information related to construction business permits held by subcontractors who are requested by prime contractors to carry out construction work. The supplier construction business permit master 106f as a supplier master includes the supplier code, construction business permit type classification, specific general classification, construction business permit classification, construction business permit number, permit expiration date (start), and permit expiration date (end).

[0032] The purchase order type master 106g shown in Fig. 6 is used when checking whether the subcontractor who is the main contractor's request for construction work has insurance or the deadline for the quotation request to the subcontractor. The purchase order type master 106g includes the purchase order type, purchase order type name, social insurance check type, quotation request construction business license check type, and quotation request deadline check type.

[0033] The control unit 102 is a CPU or the like that performs overall control of the business support device 100. The control unit 102 has an internal memory for storing control programs such as an OS, programs that define various processing procedures, and required data, and executes various information processing based on these stored programs. In terms of functional concepts, the control unit 102 includes an acquisition unit 102a, a determination unit 102b, and a notification unit 102c.

[0034] The acquiring unit 102a as an acquiring means acquires information inputted by the input device 112 to a quotation request slip registration screen, which will be described later, as quotation request data 106c.

[0035] The judgment unit 102b as a judgment means judges whether a supplier undertaking construction work satisfies the requirements stipulated by rules related to the undertaking of construction work, such as laws, enforcement orders, enforcement regulations, guidelines of the Ministry of Land, Infrastructure, Transport and Tourism, based on the acquired quotation request data 106c, basic information master 106d, supplier master 106e, supplier construction business license master 106f, and purchase order type master 106g.

[0036] The notification unit 102c, which serves as a notification means, notifies the output device 114 of the result of the determination made by the determination unit 102b.

[0037] The registration unit 102d as a registration means registers the quotation request data 106c acquired by the acquisition unit 102a as data related to a quotation request slip for requesting a quotation from a supplier.

[0038] [3. Specific examples of processing] Here, a specific example of the process executed by the task assistance device 100 will be described with reference to FIGS.

[0039] 7 is a diagram showing an example of a quotation request slip registration screen displayed by the business support device 100 when a prime contractor requests a subcontractor to provide an estimate for construction work to be ordered from the subcontractor. The operator operates the input device 112 to input information required for the estimate into the quotation request slip registration screen 501 displayed on the output device 114 when requesting an estimate from the subcontractor to whom the construction work is to be requested. Regarding the order form category, when the supplier is input, the order form category associated with the supplier code input in the supplier master 106e is automatically input. The automatically input order form category can be changed by the operator operating the input device 112. Furthermore, the quotation request number may be configured to be automatically assigned.

[0040] When the operator operates input device 112 to input information into quotation request form registration screen 501 and then clicks the "Register" button displayed on quotation request form registration screen 501, control unit 102 executes the processing shown in Figures 8 to 11.

[0041] First, the control unit 102 acquires the information entered on the quotation request slip registration screen 501 as quotation request data (step S11). Next, the control unit 102 stores the supplier information from the information acquired in step S11 in a variable S (step S12). In addition, the control unit 102 stores the purchase order type information from the information acquired in step S11 in a variable C (step S13).

[0042] Next, the control unit 102 stores the information stored in the basic information master 106d in a variable. Specifically, the control unit 102 stores the Construction Business Law order reference amount stored in the basic information master 106d in a variable K (step S14). The control unit 102 stores the Construction Business Law estimate period check reference amount 1 stored in the basic information master 106d in a variable M1 (step S15). The control unit 102 stores the Construction Business Law estimate period check reference amount 2 stored in the basic information master 106d in a variable M2 (step S16). The control unit 102 stores the Construction Business Law estimate period check number of days 1 stored in the basic information master 106d in a variable MK1 (step S17). In addition, the control unit 102 stores the Construction Business Law estimate period check number of days 2 stored in the basic information master 106d in a variable MK2 (step S18).

[0043] Next, the control unit 102 determines whether the social insurance check category associated with the acquired order form category in the order form category master 106g, that is, variable C, is 0 (step S21). If the social insurance check category associated with the acquired order form category in the order form category master 106g is 0 (YES in step S21), the control unit 102 shifts the process flow to step S31.

[0044] When the social insurance check category associated with the acquired order form category in the order form category master 106g is not 0 (NO in step S21), the control unit 102 judges whether the social insurance check category associated with the acquired order form category in the order form category master 106g is 1 (step S22). When the social insurance check category associated with the acquired order form category in the order form category master 106g is 1 (YES in step S22), the control unit 102 judges whether the variable S, i.e., the acquired supplier, is subscribed to insurance required for undertaking the construction work in the supplier master 106e (step S23). Specifically, the control unit 102 here judges whether all of the health insurance category, pension insurance category, and employment insurance category associated with the acquired supplier in the supplier master 106e are subscribed. If the health insurance category, pension insurance category, and employment insurance category associated with the acquired supplier in the supplier master 106e are all covered (YES in step S23), the control unit 102 shifts the process flow to step S31.

[0045] If the control unit 102 finds in the supplier master 106e that the acquired supplier is not covered by all of the health insurance categories, pension insurance categories, and employment insurance categories (NO in step S23), it causes the output device 114 to display a screen including a warning message warning that the supplier does not meet the requirements stipulated in the law, enforcement regulations, guidelines, etc., and a message asking whether or not to continue the registration process of the quotation request invoice (step S24).

[0046] Next, control unit 102 determines whether the operator has operated input device 112 to perform an operation to continue the registration process of the quotation request form on the screen displayed in step S24 (step S25). If an operation to continue the registration process of the quotation request form has been performed (YES in step S25), control unit 102 proceeds to step S31. If an operation to cancel the registration process of the quotation request form has been performed (NO in step S25), control unit 102 ends the registration process of the quotation request form.

[0047] Returning to the explanation of step S22, if the social insurance check category associated with the acquired purchase order category in the purchase order category master 106g is not 1 (NO in step S22), the control unit 102 judges whether the acquired supplier is subscribed to insurance required for undertaking the construction work in the supplier master 106e, as in step S23 (step S26). Here, the control unit 102 judges whether the acquired supplier is subscribed to all of the health insurance category, pension insurance category, and employment insurance category associated with the acquired supplier in the supplier master 106e. If the acquired supplier is subscribed to all of the health insurance category, pension insurance category, and employment insurance category in the supplier master 106e (YES in step S26), the control unit 102 shifts the flow of processing to step S31. If the control unit 102 determines in the supplier master 106e that the supplier is not covered under all of the health insurance categories, pension insurance categories, and employment insurance categories associated with the acquired supplier (NO in step S26), it displays an error screen (step S27) and terminates the registration process of the quotation request form.

[0048] Next, the process after step S31 will be described. The control unit 102 refers to the order form category master 106g and judges whether the variable C, i.e., the quotation request construction business license check category associated with the acquired order form category, is 0 (step S31). If the quotation request construction business license check category associated with the acquired order form category in the order form category master 106g is 0 (YES in step S31), the control unit 102 shifts the process flow to step S41.

[0049] When the quotation request construction business license check category associated with the acquired order form category in the order form category master 106g is not 0 (NO in step S31), the control unit 102 determines whether the quotation request construction business license check category associated with the acquired order form category in the order form category master 106g is 1 (step S32). When the quotation request construction business license check category associated with the acquired order form category in the order form category master 106g is 1 (YES in step S32), the control unit 102 determines whether the quotation request total amount acquired in step S11 is less than the variable K (step S33). When the quotation request total amount acquired in step S11 is less than the variable K (YES in step S33), the control unit 102 moves the process flow to step S41.

[0050] If the total quotation request amount acquired in step S11 is not less than the variable K (NO in step S33), the control unit 102 determines whether the construction business license category associated with the pair of variable S and construction business license category in the supplier construction business license master 106f, i.e., the acquired pair of supplier and construction business license category, is licensed (step S34). If the construction business license category associated with the acquired pair of supplier and construction business license category in the supplier construction business license master 106f is licensed (YES in step S34), the control unit 102 proceeds to step S41.

[0051] If the construction business license category associated with the acquired pair of supplier and construction business license category in the supplier construction business license master 106f is "no license" (NO in step S34), the control unit 102 causes the output device 114 to display a screen including a warning message warning that the supplier does not meet the requirements stipulated in the law, enforcement regulations, guidelines, etc., and a message asking whether or not to continue the registration process of the quotation request invoice (step S35).

[0052] Next, control unit 102 determines whether the operator has operated input device 112 to perform an operation to continue the registration process of the quotation request form on the screen displayed in step S35 (step S36). If an operation to continue the registration process of the quotation request form has been performed (YES in step S36), control unit 102 proceeds to step S41. If an operation to cancel the registration process of the quotation request form has been performed (NO in step S36), control unit 102 ends the registration process of the quotation request form.

[0053] Returning to the explanation of step S32, if the quotation request construction business license check category associated with the acquired order form category in the order form category master 106g is not 1 (NO in step S32), the control unit 102 determines whether the total quotation request amount acquired in step S11 is less than the variable K (step S37). If the total quotation request amount acquired in step S11 is less than the variable K (YES in step S37), the control unit 102 shifts the process flow to step S41.

[0054] If the total quotation request amount acquired in step S11 is not less than variable K (NO in step S37), the control unit 102 determines whether the construction business license category associated with the pair of variable S and construction business license category in the supplier construction business license master 106f, i.e., the acquired pair of supplier and construction business license category, is licensed (step S38), as in step S34. If the construction business license category associated with the acquired pair of supplier and construction business license category in the supplier construction business license master 106f is licensed (YES in step S38), the control unit 102 proceeds to step S41.

[0055] If the construction business license category associated with the acquired pair of supplier and construction business license category in the supplier construction business license master 106f indicates no license (NO in step S38), the control unit 102 displays an error screen (step S39) and terminates the registration process of the quotation request form.

[0056] Next, the process after step S41 will be described. The control unit 102 judges whether the variable C, i.e., the quotation request deadline check category associated with the acquired order form category in the order form category master 106g, is 0 (step S41). If the quotation request deadline check category associated with the acquired order form category in the order form category master 106g is 0 (YES in step S41), the control unit 102 stores the information acquired in step S11 in the storage unit 106 as quotation request data 106c, and registers it as data related to a quotation request slip for requesting a quotation from a supplier (step S42).

[0057] When the quotation request deadline check category associated with the acquired order form category in the order form category master 106g is not 0 (NO in step S41), the control unit 102 determines whether the quotation request deadline check category associated with the acquired order form category is 1 (step S43). When the quotation request deadline check category associated with the acquired order form category in the order form category master 106g is 1 (YES in step S43), the control unit 102 determines whether the total quotation request amount acquired in step S11 is less than variable M1, is equal to or greater than variable M1 and less than variable M2, or is equal to or greater than variable M2 (step S44). When the total quotation request amount acquired in step S11 is less than variable M1 (less than variable M1 in step S44), the control unit 102 executes the process of step S42.

[0058] If the total quotation request amount acquired in step S11 is equal to or greater than variable M1 but less than variable M2 (variable M1 or greater but less than variable M2 in step S44), the control unit 102 determines whether the quotation period, which is the period from the quotation request date acquired in step S11 to the quotation submission deadline, is equal to or greater than variable MK1 (step S45). If the quotation period is equal to or greater than variable MK1 (YES in step S45), the control unit 102 executes the process of step S42.

[0059] If the quotation period is not equal to or longer than the variable MK1 (NO in step S45), the control unit 102 causes the output device 114 to display a screen including a warning message warning that the period from the input quotation request date to the quotation submission deadline is shorter than the specified number of days, and a message asking whether or not to continue the registration process of the quotation request form (step S46).

[0060] Next, control unit 102 determines whether the operator has operated input device 112 to perform an operation to continue the registration process of the quotation request form on the screen displayed in step S46 (step S47). If an operation to continue the registration process of the quotation request form has been performed (YES in step S47), control unit 102 executes the process of step S42. If an operation to cancel the registration process of the quotation request form has been performed (NO in step S47), control unit 102 displays an error screen (step S54) and ends the registration process of the quotation request form.

[0061] Returning to the explanation of step S44, when the total quotation request amount acquired in step S11 is equal to or greater than variable M2 (variable M2 or greater in step S44), control unit 102 determines whether the quotation period, which is the period from the quotation request date acquired in step S11 to the quotation submission deadline, is equal to or greater than variable MK2 (step S48). When the quotation period is equal to or greater than variable MK2 (YES in step S48), control unit 102 executes the process of step S42.

[0062] If the quotation period is not equal to or longer than the variable MK2 (NO in step S48), the control unit 102 causes the output device 114 to display a screen including a warning message warning that the period from the input quotation request date to the quotation submission deadline is shorter than the specified number of days, and a message asking whether or not to continue the registration process of the quotation request form (step S49).

[0063] Next, control unit 102 determines whether the operator has operated input device 112 to perform an operation to continue the registration process of the quotation request form on the screen displayed in step S49 (step S50). If an operation to continue the registration process of the quotation request form has been performed (YES in step S50), control unit 102 executes the process of step S42. If an operation to cancel the registration process of the quotation request form has been performed (NO in step S50), control unit 102 ends the registration process of the quotation request form.

[0064] Returning to the explanation of step S43, if the quotation request deadline check category associated with the acquired order form category in the order form category master 106g is not 1 (NO in step S43), the control unit 102 determines whether the total quotation request amount acquired in step S11 is less than variable M1, equal to or greater than variable M1 and less than variable M2, or equal to or greater than variable M2 (step S51). If the total quotation request amount acquired in step S11 is less than variable M1 (less than variable M1 in step S51), the control unit 102 executes the process of step S42.

[0065] If the total quotation request amount acquired in step S11 is equal to or greater than variable M1 but less than variable M2 (equal to or greater than variable M1 but less than variable M2 in step S51), the control unit 102 determines whether the quotation period, which is the period from the quotation request date acquired in step S11 to the quotation submission deadline, is equal to or greater than variable MK1 (step S52). If the quotation period is equal to or greater than variable MK1 (YES in step S52), the control unit 102 executes the process of step S42. If the quotation period is not equal to or greater than variable MK1 (NO in step S52), the control unit 102 displays an error screen (step S54) and ends the registration process of the quotation request slip.

[0066] Returning to the explanation of step S51, when the total quotation request amount acquired in step S11 is equal to or greater than variable M2 (variable M2 or greater in step S51), the control unit 102 determines whether the quotation period, which is the period from the quotation request date acquired in step S11 to the quotation submission deadline, is equal to or greater than variable MK2 (step S53). When the quotation period is equal to or greater than variable MK2 (YES in step S53), the control unit 102 executes the process of step S42. When the quotation period is not equal to or greater than variable MK2 (NO in step S53), the control unit 102 displays an error screen (step S54) and ends the registration process of the quotation request slip.

[0067] In this embodiment, not only the requirements stipulated in the Construction Business Law, the Construction Business Law Enforcement Order, the Construction Business Law Enforcement Regulations, and the Guidelines, but also the requirements stipulated in other laws, enforcement orders, enforcement regulations, and guidelines may be stored in the master, and it may be determined whether or not the business partner meets the requirements. Also, in this embodiment, the supplier master 106e and the supplier construction business license master 106f may be integrated.

[0068] [4. Effects of the embodiment] According to the embodiment, the business support device 100 judges whether the contract price for the requested construction exceeds the amount stipulated in the Construction Business Law, so that the burden of judgment by the operator can be reduced. Also, according to the business support device 100, when the contract price for the requested construction exceeds the amount stipulated in the Construction Business Law, the business support device 100 judges whether the requestee has a construction business license, so that the burden of judgment by the operator can be reduced. Also, according to the business support device 100, the business support device 100 judges whether the requestee has insurance required to be subscribed to in order to undertake the construction work, so that the burden of judgment by the operator can be reduced and the requestee for the construction work can be efficiently selected. Also, according to the business support device 100, the business support device 100 judges whether the estimate period stipulated in the Construction Business Law is set according to the amount of the estimate request, so that the burden of judgment by the operator can be reduced. In summary, in the business of requesting an estimate, by managing the requirements necessary for confirmation and the information required for confirmation in a master, the burden of judgment by the operator can be reduced and a business partner can be efficiently selected. In addition, by complying with the rules, operators can reduce mistakes in selecting business partners.

[0069] [5. Contribution to the United Nations-led Sustainable Development Goals (SDGs)] This embodiment can contribute to improving business efficiency and promoting appropriate management decisions by companies, thereby contributing to goals 8 and 9 of the SDGs.

[0070] Furthermore, this embodiment can contribute to reducing waste and promoting paperless and electronic systems, thereby contributing to the achievement of SDGs Goals 12, 13, and 15.

[0071] Furthermore, this embodiment can contribute to strengthening control and governance, making it possible to contribute to Goal 16 of the SDGs.

[0072] 6. Other embodiments The present invention may be embodied in various different embodiments other than those described above within the scope of the technical concept set forth in the claims.

[0073] For example, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually, or all or part of the processes described as being performed manually can be performed automatically using known methods.

[0074] In addition, the processing procedures, control procedures, specific names, information including parameters such as registered data and search conditions for each process, screen examples, and database configurations shown in this specification and drawings may be changed as desired unless otherwise specified.

[0075] Moreover, with regard to the task support device 100, each of the components shown in the figures is a functional concept, and does not necessarily have to be physically configured as shown in the figures.

[0076] For example, the processing functions of the business support device 100, particularly the processing functions performed by the control unit 102, may be realized in whole or in part by a CPU and a program interpreted and executed by the CPU, or may be realized as hardware using wired logic. The program is recorded in a non-transient computer-readable recording medium including programmed instructions for causing the business support device to execute the processes described in the present embodiment, and is mechanically read by the business support device 100 as necessary. That is, a computer program for giving instructions to the CPU in cooperation with the OS and performing various processes is recorded in a storage unit such as a ROM or HDD (Hard Disk Drive). The computer program is executed by being loaded into a RAM, and constitutes the control unit 102 in cooperation with the CPU.

[0077] In addition, this computer program may be stored in an application program server connected to the task support device 100 via any network, and it is also possible to download all or a part of it as necessary.

[0078] In addition, the program for executing the process described in this embodiment may be stored in a non-transient computer-readable recording medium, or may be configured as a program product. Here, the "recording medium" includes any "portable physical medium" such as a memory card, a Universal Serial Bus (USB) memory, a Secure Digital (SD) card, a flexible disk, a magneto-optical disk, a ROM, an Erasable Programmable Read Only Memory (EPROM), an Electrically Erasable and Programmable Read Only Memory (EEPROM (registered trademark)), a Compact Disk Read Only Memory (CD-ROM), a Magneto-Optical disk (MO), a Digital Versatile Disk (DVD), and a Blu-ray (registered trademark) Disc.

[0079] Moreover, a "program" is a data processing method written in any language or description method, and may be in any form, such as source code or binary code. Note that a "program" is not necessarily limited to a single configuration, but also includes a distributed configuration as multiple modules or libraries, and a program that works with a separate program, such as an OS, to achieve its function. Note that the specific configuration and reading procedure for reading a recording medium in each device shown in the embodiments, as well as the installation procedure after reading, may use well-known configurations and procedures.

[0080] The various databases etc. stored in the memory unit 106 are storage means such as memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and optical disks, and store various programs, tables, databases, and web page files etc. used for various processes and providing websites.

[0081] The business support device 100 may be configured as a business support device such as a known personal computer or a workstation, or may be configured as the business support device 100 connected to any peripheral device. The business support device 100 may be realized by installing software (including programs, data, etc.) that causes the business support device to realize the processing described in this embodiment.

[0082] Furthermore, the specific form of distribution and integration of the devices is not limited to those shown in the drawings, and all or part of them can be functionally or physically distributed and integrated in any unit according to various additions or function additions. In other words, the above-mentioned embodiments can be implemented in any combination, or the embodiments can be implemented selectively. [Industrial Applicability]

[0083] The present invention is useful for construction companies that order construction work. [Explanation of symbols]

[0084] 100 Business support equipment 102 Control section 102a Acquisition Department 102b Judgment section 102c Notification Department 102d Registration Department 104 Communication interface section 106 Storage section 106a Construction Basic Information Data 106b Contract information data 106c Request for quotation data 106d Basic Information Master 106e Supplier Master 106f Supplier construction business license master 106g Purchase Order Classification Master 108 Input / Output Interface Section 112 Input Device (Keyboard) 114 Output device (monitor) 200 Servers 300 Network 501 Request for quotation slip registration screen

Claims

1. A business support device including a control unit, The control unit is An acquisition means for acquiring quotation request data including information for identifying a supplier who will undertake a construction work, information required for requesting a quotation for the construction work from the supplier, and an estimated period for the construction work to be requested from the supplier; a judgment means for judging whether a supplier specified by information included in the quotation request data satisfies the requirements based on the quotation request data acquired by the acquisition means, a basic information master storing standards defined by rules related to the undertaking of construction work and including the standard number of days for the quotation period, and a supplier master storing, for each supplier, information related to the supplier undertaking the construction work and used to judge whether the supplier satisfies the requirements defined by the rules; Equipped with The control unit determines that an estimate period specified in the requirements has been set when the number of days in the estimate period included in the estimate request data is equal to or greater than the reference number of days.

2. The quotation request data includes a type of construction work to be requested from a supplier identified by information included in the quotation request data, The determination means determines that the requirements are met when information on a supplier specified by information included in the quotation request data and a type of construction work included in the quotation request data are stored in the purchase master in association with the type of construction work that is permitted for the construction work. The business support device according to claim 1 .

3. The purchase master includes the insurance subscription status defined by the rules, The determination means determines that the requirement is satisfied when the participation status associated with the supplier specified by the information included in the quotation request data in the purchase master indicates participation. The business support device according to claim 1 or 2.

4. The quotation request data includes a purchase order type for the construction work to be requested from the supplier, A purchase order type master that stores the check type of the estimate period for each purchase order type is provided, The control unit does not judge the estimated period included in the quotation request data when the order form category included in the quotation request data is a category that does not check the estimated period, and judges the estimated period included in the quotation request data when the order form category is a category that checks the estimated period. The business support device according to any one of claims 1 to 3.

5. A business support method executed by a business support device having a control unit, Executed by the control unit, An acquisition step of acquiring quotation request data including information for identifying a supplier who will undertake the construction work, information required for requesting a quotation for the construction work from the supplier, and an estimated period for the construction work to be requested from the supplier; a judgment step of judging whether or not a supplier specified by information included in the quotation request data satisfies the requirements based on the quotation request data acquired in the acquisition step, a basic information master storing standards defined by rules related to the undertaking of construction work and including the standard number of days for the quotation period, and a supplier master storing, for each supplier, information related to the supplier undertaking the construction work and used to judge whether or not the supplier satisfies the requirements defined by the rules; When the number of days of the estimated period included in the quotation request data is equal to or greater than the reference number of days, it is determined that the estimated period specified in the requirement is provided; A business support method comprising:

6. On the computer, An acquisition process for acquiring quotation request data including information for identifying a supplier who will undertake the construction work, information required for requesting a quotation for the construction work from the supplier, and an estimated period for the construction work to be requested from the supplier; a judgment process for judging whether a supplier specified by information included in the quotation request data satisfies the requirements based on the quotation request data acquired in the acquisition process, a basic information master storing standards stipulated by rules related to the undertaking of construction work and including the standard number of days for the quotation period, and a supplier master storing, for each supplier, information related to the supplier undertaking the construction work and used to judge whether the supplier satisfies the requirements stipulated by the rules; a process of determining that an estimate period stipulated in the requirement is provided when the number of days of the estimate period included in the estimate request data is equal to or greater than the reference number of days; A program for executing.

Citation Information

Patent Citations

  • Work contract company selection system

    JP2005266960A

  • Trader selection support device, trader selection support method, and trader selection support program

    JP2015102996A

  • Order-reception / placement-matching system

    JP2021026677A

  • Repair work support system

    JP2021081931A

  • Construction business operator matching server, construction business operator matching system and construction business operator matching method

    JP2021144671A