Security risk dynamic assessment system and method based on multi-source heterogeneous data analysis
Through multi-source heterogeneous data analysis, dynamic knowledge graph and multi-dimensional evaluation model are constructed, combined with scenario simulation and streaming data processing, the problem of single risk assessment dimensions and insufficient prediction capabilities in the existing technology is solved, and the safety risks of chemical parks is achieved Comprehensive and real-time assessment and early warning ensure the safety and stability of the park.
Patent Information
- Application Number
- CN202411390563.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-08
- Publication Date
- 2024-11-05
AI Technical Summary
The prior art relies on historical data and real-time state data in security risk assessment, lacks comprehensive coverage of multiple risk factors, and is difficult to predict future risk trends and process non-text data, resulting in a single dimension of risk assessment and limited processing capabilities.
Using a dynamic security risk assessment method based on multi-source heterogeneous data analysis, a dynamic knowledge graph is constructed through active data acquisition and preprocessing, combining multi-dimensional evaluation indicators and scenario simulation technology to predict the evolutionary paths and consequences in risk scenarios, and through flow Data processing and multi-level early warning mechanisms realize real-time risk assessment and emergency response.
It improves the comprehensiveness and accuracy of safety risk assessment, realizes real-time understanding of complex and variable data and dynamic quantitative prediction of risks, promptly triggers early warnings and emergency responses, and ensures the safe and stable operation of the chemical park.
Smart Images

Figure CN118898397A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of security risk management and control, and specifically to a security risk dynamic assessment system and method based on multi-source heterogeneous data analysis. Background Art
[0002] With the rapid development of information technology, various industries have accumulated a large amount of data resources. These data resources often come from different information systems, sensors, and equipment, forming multi-source heterogeneous data. Due to the characteristics of multi-source heterogeneous data with wide sources, diverse formats, and complex structures, it brings huge challenges to data analysis and application. At the same time, in the field of security risk assessment, traditional risk assessment methods mainly rely on experience judgment, qualitative analysis, and a small amount of historical data, which is difficult to fully and accurately reflect the actual security risk situation.
[0003] For example, the Chinese patent application with publication number CN117829601A discloses a risk management method and system for a production park, including: obtaining a historical safety analysis report of the production park, and determining the inherent risk data of the production park based on the historical safety analysis report; obtaining the real-time status data of each production system in the production park, and analyzing the real-time status data based on a preset risk assessment algorithm to obtain the real-time risk data of the production park; obtaining a geographic information system map of the production park; generating a dynamic risk heat map of the production park based on the inherent risk data, real-time risk data and geographic information system map; and performing risk management on the production park based on the dynamic risk heat map. This technical solution solves the technical problem that the risk management solution in the related technology is difficult to discover potential safety risk areas.
[0004] For example, a Chinese patent with authorization announcement number CN118071159B discloses a smart park safety emergency management system and method based on GPT, including: data collection and management module, database construction module, data preprocessing module, GPT model fine-tuning module and GPT model publishing and calling module. This technical solution uses the GPT model to analyze and mine various types of data in the park, realize risk quantification and visualization, generate park safety risk identification and assessment specifications and safety risk assessment implementation methods, formulate safety risk classification management mechanism and emergency plan, and form a double prevention mechanism; conduct intelligent monitoring and early warning of major hazardous sources, special operations, closed management, etc. in the park, and realize real-time perception and dynamic adjustment.
[0005] The above existing technologies all have the following problems: they rely on historical safety analysis reports and real-time status data to assess risks. Although inherent risks and real-time risks are taken into account, they do not fully cover all risk factors that affect safety, so the risk assessment dimension is single. Moreover, although real-time data is combined, there may be a lack of prediction and scenario simulation of future risk evolution trends; they are relatively brief in describing real-time perception and dynamic adjustment, and have limited processing capabilities for non-text data such as images, videos, and sensor data. Summary of the invention
[0006] In view of the shortcomings of the existing technology, the present invention proposes a dynamic safety risk assessment system and method based on multi-source heterogeneous data analysis. Through active data collection and preprocessing, multi-source heterogeneous data are integrated to construct a dynamic knowledge graph; multi-dimensional evaluation indicators and hybrid risk assessment models are used, combined with scenario simulation technology, to predict the evolution path and consequences under different risk scenarios; streaming data processing technology is used to calculate the safety risk value in real time, and thresholds are set to automatically trigger a multi-level early warning mechanism, so that emergency response measures can be formulated in a timely manner; the accuracy and timeliness of safety risk assessment in chemical parks are improved.
[0007] To achieve the above object, the present invention provides the following technical solutions:
[0008] The security risk dynamic assessment method based on multi-source heterogeneous data analysis includes:
[0009] Step S1: Collect multi-source heterogeneous data through active data collection mechanism and perform preprocessing;
[0010] Step S2: Use a dynamic fusion strategy to fuse the preprocessed multi-source heterogeneous data to obtain multi-source heterogeneous fused data, and construct a dynamic knowledge graph of the chemical park based on the multi-source heterogeneous fused data;
[0011] Step S3: Set multidimensional evaluation indicators, build a hybrid risk assessment model based on the multidimensional evaluation indicators, and introduce scenario simulation methods to simulate the evolution path and consequences under different risk scenarios;
[0012] Step S4: using a streaming data processing method, inputting the multi-source heterogeneous fusion data received in real time into the hybrid risk assessment model, calculating and outputting the security risk value;
[0013] Step S5: Set a risk threshold. When the security risk value exceeds the threshold, the multi-level early warning mechanism is automatically triggered and emergency response measures are formulated.
[0014] Specifically, the dynamic fusion strategy in step S2 adopts a dynamic weighted fusion algorithm, and the formula is:
[0015] ;
[0016] in, Represents multi-source heterogeneous fusion data, represents the dynamic weight of the i-th data source at time t, represents the quality of the i-th data source at time t, represents the attenuation of the i-th data source at time t, represents the external factors affecting the i-th data source at time t, represents the data value of the i-th data source at time t, n represents the number of multi-source heterogeneous data sources, and t represents the current time.
[0017] Specifically, the specific steps of step S3 include:
[0018] S3.1: According to the risk assessment requirements of the chemical park, set multi-dimensional assessment indicators and obtain multi-source heterogeneous fusion data , the evaluation index formula is:
[0019] ;
[0020] in, represents the Nth multi-source heterogeneous fusion data, N represents the number of multi-source heterogeneous fusion data, R represents the comprehensive risk assessment index, represents the weight of the kth sub-indicator, represents the initial event failure rate, represents the protection layer failure rate, Indicates the degree of exposure, Indicates vulnerability, Indicates the severity of the consequences, Indicates the threat frequency, Indicates the effectiveness of security control measures. Indicates environmental sensitivity. represents the comprehensive evaluation function of the kth sub-indicator;
[0021] S3.2: Based on multi-dimensional evaluation indicators, a hybrid risk assessment model is constructed by combining the protection layer analysis method with the probability graph model. At the same time, risk scenarios are defined in the hybrid risk assessment model and Input the hybrid risk assessment model for quantitative analysis and evaluation and calculate the risk frequency.
[0022] Specifically, the specific steps of step S3 also include:
[0023] S3.3: Based on the output of the hybrid risk assessment model, set different risk scenario parameters and use scenario simulation software to simulate the consequences of different risk scenarios;
[0024] S3.4: Based on the scenario simulation results, evaluate the risk level and severity under different risk scenarios. At the same time, use the risk matrix method, take risk frequency and severity as two dimensions, draw a risk matrix diagram, find the risk points in the matrix diagram, and determine the priority and urgency of the risk according to the location of the risk points;
[0025] S3.5: Based on the results of risk assessment and priority sorting, adaptive algorithms are used to automatically generate and adjust risk response measures, and the effects of the response measures after implementation are fed back to the hybrid risk assessment model for model verification and optimization.
[0026] Specifically, the specific steps of S3.2 include:
[0027] S3.21: Obtain multi-dimensional evaluation indicators and multi-source heterogeneous fusion data ;
[0028] S3.22: Obtain the causes of historical accidents in the chemical park, and use the causes of historical accidents as initial events. Perform a protection layer analysis on each initial event, determine the independent protection layer of each initial event, and evaluate the failure rate of each independent protection layer. The formula is:
[0029] ;
[0030] in, represents the instantaneous failure rate, represents the internal state parameter vector of the protection layer, represents the external environmental condition parameter vector, represents the maintenance history and operation parameter vector, represents the probability function, Represents the internal state of the protection layer, Indicates external environmental conditions, represents the maintenance history and operating conditions, T represents the time when the failure occurred, represents the time step, lim represents the limit;
[0031] S3.23: Based on the results of the protection layer analysis and the multi-dimensional evaluation indicators, a probabilistic graph model is constructed, and the probability distribution of each node in the probabilistic graph model is set.
[0032] Specifically, the specific steps of S3.2 also include:
[0033] S3.24: Collect historical accident data, facilities and equipment, hazardous materials data, and park profile data of chemical parks, and integrate them into historical park data sets by splicing. Based on the historical park data sets, identify the risk sources that lead to accidents;
[0034] S3.25: Based on the risk sources and the actual situation of the park, define the risk scenarios that may occur. At the same time, determine the occurrence conditions, development process and consequences of each risk scenario, and input the defined risk scenarios into the hybrid risk assessment model;
[0035] S3.26: Use the built-in algorithm of the probabilistic graphical model to calculate the probability distribution of each node state under a given risk scenario, and output the probability of each risk scenario leading to the expected consequence. The formula is:
[0036] ;
[0037] in, represents the probability of the consequence occurring under the mth risk scenario, represents the conditional probability of the consequences occurring under the risk scenario, represents the probability of risk occurrence under the mth risk scenario, m represents the number of risk scenario combinations, q represents the resulting consequences, represents the mth risk scenario;
[0038] S3.27: Calculate the final risk frequency for each risk scenario by combining the frequency of the initial event and the failure rate of the protection layer ,in, Represents the weight of the mth risk scenario.
[0039] Specifically, the specific steps of S3.4 include:
[0040] S3.41: Obtain the risk scenarios in S3.3, and for each risk scenario, collect risk scenario parameters in historical risk scenarios;
[0041] S3.42: The risk frequency is divided into five levels: low, low, medium, high and high. At the same time, the consequences of different risk scenarios obtained in step S3 are quantitatively evaluated to obtain the risk severity, which is divided into five levels: negligible, slight, medium, severe and catastrophic. The formula is:
[0042] ;
[0043] in, represents the frequency of risk, Indicates the severity of the risk. represents the result of the risk frequency classification, and , , , , Represents lower, low, medium, high and higher risk frequencies, respectively. , , , , They represent the risk severity levels as negligible, slight, moderate, severe and catastrophic respectively;
[0044] S3.43: Create a two-dimensional chart with the horizontal axis representing the risk frequency and the vertical axis representing the risk severity. According to the division results of risk frequency and risk severity in step S3.42, locate each risk scenario at the corresponding position in the matrix to obtain the risk point;
[0045] S3.44: Determine the priority and urgency of risks based on their location in the matrix.
[0046] Specifically, the specific steps of the adaptive algorithm in S3.5 include:
[0047] S3.51: Load risk assessment results and priority rankings, and initialize the response measures library;
[0048] S3.52: For each high-risk risk scenario, traverse the response measures library, screen out the response measures according to the characteristics of the risk scenario and the applicable conditions of the response measures, and use the utility evaluation function to sort the screened response measures. The formula of the utility evaluation function is:
[0049] ;
[0050] Among them, F represents the utility evaluation function, Indicates the effectiveness score of the response measures, represents the adjustment factor for cost factors, represents the adjustment factor for the time factor, represents the adjustment factor for the feasibility factor, represents the adjustment factor for side effects, Indicates the contribution of response measures to long-term sustainability, b. , , , , Both represent weight factors;
[0051] S3.53: using an optimization algorithm to adjust the utility evaluation function, obtaining optimized countermeasures according to the adjusted utility evaluation function, and arranging the optimized countermeasures according to priority and execution order to generate a countermeasure list;
[0052] S3.54: After implementing the countermeasures, collect data on the implementation effects and feed the implementation effect data back to the hybrid risk assessment model to verify and optimize the hybrid risk assessment model. At the same time, update the countermeasure library and utility evaluation function based on the feedback results.
[0053] Specifically, the multi-source heterogeneous data in step S1 include: process parameter data, equipment operation status data, chemical composition data, law enforcement inspection data, and environmental monitoring data in the chemical park.
[0054] The security risk dynamic assessment system based on multi-source heterogeneous data analysis includes: data processing module, data fusion module, risk assessment module, and early warning module;
[0055] The data processing module is used to collect multi-source heterogeneous data and perform pre-processing;
[0056] The data fusion module is used to dynamically fuse the pre-processed multi-source heterogeneous data to construct a dynamic knowledge graph of the chemical park;
[0057] The risk assessment module is used to construct a hybrid risk assessment model and introduce a scenario simulation method to obtain risk assessment results;
[0058] The early warning module is used to compare the safety risk value obtained by the risk assessment module with the preset risk threshold. When the safety risk value exceeds the threshold, the early warning module will automatically trigger the multi-level early warning mechanism, send early warning information to the staff, and provide emergency response suggestions or guidance based on the preset emergency response measures library.
[0059] Specifically, the risk assessment module includes: an assessment index setting unit, a model building unit, a scenario simulation unit, and a risk assessment calculation unit;
[0060] The evaluation index setting unit is used to set multi-dimensional evaluation indicators according to the characteristics of the chemical park and risk assessment requirements;
[0061] The model building unit is used to build a hybrid risk assessment model based on the set multi-dimensional assessment indicators;
[0062] The scenario simulation unit is used to simulate the evolution paths and consequences under different risk scenarios using a scenario simulation method;
[0063] The risk assessment calculation unit is used to receive the multi-source heterogeneous fusion data output by the data fusion module, and input it into the hybrid risk assessment model for calculation, and obtain the security risk value through calculation and analysis.
[0064] Compared with the prior art, the present invention has the following beneficial effects:
[0065] 1. The present invention proposes a security risk dynamic assessment system based on multi-source heterogeneous data analysis, and optimizes and improves the architecture, operation steps and processes. The system has the advantages of simple process, low investment and operation costs, and low production work costs.
[0066] 2. The present invention proposes a dynamic safety risk assessment method based on multi-source heterogeneous data analysis. Through active data collection and preprocessing, combined with a dynamic fusion strategy, a dynamic knowledge graph of the chemical park is constructed. It can comprehensively and real-time integrate and understand the complex and changeable multi-source heterogeneous data in the park, which not only enhances the effective use of data, but also improves the comprehensiveness and accuracy of risk assessment.
[0067] 3. The present invention proposes a dynamic safety risk assessment method based on multi-source heterogeneous data analysis. By setting multi-dimensional assessment indicators, constructing a hybrid risk assessment model, and introducing scenario simulation technology, it can simulate the evolution paths and consequences under different risk scenarios, and realize dynamic quantification and forward-looking prediction of safety risks. With the support of real-time data streams, the system can respond quickly to risk changes. When the safety risk value exceeds the preset threshold, it automatically triggers a multi-level early warning mechanism, and promptly formulates and implements emergency response measures, thereby effectively preventing and mitigating potential safety risks and ensuring the safe and stable operation of the chemical park. BRIEF DESCRIPTION OF THE DRAWINGS
[0068] Figure 1 A schematic diagram of a method for dynamic security risk assessment based on multi-source heterogeneous data analysis according to the present invention;
[0069] Figure 2 This is a principle flow chart of the method for dynamic security risk assessment based on multi-source heterogeneous data analysis of the present invention;
[0070] Figure 3 It is a risk scenario simulation flow chart of the security risk dynamic assessment method based on multi-source heterogeneous data analysis of the present invention;
[0071] Figure 4 This is an architecture diagram of the security risk dynamic assessment system based on multi-source heterogeneous data analysis of the present invention. DETAILED DESCRIPTION
[0072] Example 1
[0073] See also Figure 1-Figure 2 , an embodiment provided by the present invention: a security risk dynamic assessment method based on multi-source heterogeneous data analysis, comprising the following steps:
[0074] Step S1: Collect multi-source heterogeneous data through active data collection mechanism and perform preprocessing;
[0075] Furthermore, the multi-source heterogeneous data in step S1 include: process parameter data, equipment operation status data, chemical composition data, law enforcement inspection data, and environmental monitoring data in the chemical park.
[0076] In the present invention, by introducing an active data collection mechanism, not only can data be collected regularly, but also data collection can be automatically triggered according to preset sensitive events, such as environmental change thresholds and equipment abnormal signals, to ensure the timeliness and pertinence of the data.
[0077] Step S2: Use a dynamic fusion strategy to fuse the preprocessed multi-source heterogeneous data to obtain multi-source heterogeneous fused data, and construct a dynamic knowledge graph of the chemical park based on the multi-source heterogeneous fused data;
[0078] Furthermore, the specific steps of step S2 include:
[0079] S2.1: Obtain preprocessed multi-source heterogeneous data and perform cleaning, standardization and transformation;
[0080] S2.2: Design dynamic fusion strategies based on data characteristics and requirements, and assign dynamic weights to different data sources;
[0081] S2.3: Apply the dynamic fusion strategy to fuse the preprocessed multi-source heterogeneous data according to the assigned weights to obtain multi-source heterogeneous fused data;
[0082] S2.4: Identify entities in the chemical park from multi-source heterogeneous fusion data, such as equipment, chemicals, and process steps, and use natural language processing methods to extract the relationships between entities from multi-source heterogeneous fusion data, such as the connection relationship between equipment and the reaction relationship between chemicals;
[0083] S2.5: Organize entities and relationships in the form of graphs to build a dynamic knowledge graph of the chemical park and support real-time updates.
[0084] Step S3: Set multidimensional evaluation indicators, build a hybrid risk assessment model based on the multidimensional evaluation indicators, and introduce scenario simulation methods to simulate the evolution path and consequences under different risk scenarios;
[0085] Step S4: using a streaming data processing method, inputting the multi-source heterogeneous fusion data received in real time into the hybrid risk assessment model, calculating and outputting the security risk value;
[0086] Furthermore, the specific steps of step S4 include:
[0087] S4.1: Use the Apache Kafka streaming framework to process multi-source heterogeneous fusion data in real time. Stream processing allows data to be received, processed, and output results in the form of a continuous stream without waiting for the entire data set to arrive.
[0088] S4.2: Input the real-time received streaming data into the pre-trained hybrid risk assessment model. The hybrid risk assessment model calculates the security risk value based on the input data, combined with multi-dimensional evaluation indicators and machine learning algorithms. The security risk value calculation formula is:
[0089] ;
[0090] in, represents the security risk value, represents the parameters of the hybrid risk assessment model, represents the features extracted from multi-source heterogeneous fusion data, u represents the number of features extracted from multi-source heterogeneous fusion data, and The setting mode is determined by those skilled in the art through a large number of experiments;
[0091] S4.3: Output the calculated safety risk value to the corresponding system or interface.
[0092] Step S5: Set a risk threshold. When the security risk value exceeds the threshold, the multi-level early warning mechanism is automatically triggered and emergency response measures are formulated.
[0093] Furthermore, the specific steps of step S5 include:
[0094] S5.1: Set risk thresholds for different risk types or scenarios based on historical data, industry standards, expert opinions, or internal organizational policies;
[0095] S5.2: Design a multi-level early warning mechanism, and divide the warning into different levels, such as low, medium, and high, according to the different ranges of security risk values, and each level corresponds to different warning signals, notification methods, and urgency;
[0096] S5.3: Integrate the risk assessment model with the early warning system to ensure that when the security risk value is calculated, it can be automatically compared with the set threshold;
[0097] S5.4: Configure the early warning system parameters, including the user group that receives the early warning information and the notification template. When the security risk value exceeds the set threshold, the early warning system automatically triggers the corresponding level of warning. At the same time, the early warning information is sent to the responsible person or team according to the preset notification method to ensure that they can understand the risk situation in a timely manner;
[0098] S5.5: For each warning level, emergency response measures and processes should be formulated in advance. During the implementation of emergency response measures, the risk changes should be continuously monitored. Emergency response measures include but are not limited to: establishing an emergency response team; formulating an emergency response plan; establishing an emergency response liaison mechanism; preparing and deploying resources, such as fire-fighting equipment, emergency medicines, and communication equipment; formulating and implementing emergency response plans, such as personnel evacuation, accident isolation, and on-site rescue;
[0099] S5.6: Evaluate the effectiveness of the implementation of measures and adjust and optimize early warning mechanisms and emergency response measures as needed.
[0100] The dynamic fusion strategy in step S2 adopts a dynamic weighted fusion algorithm, and the formula is:
[0101] ;
[0102] in, Represents multi-source heterogeneous fusion data, represents the dynamic weight of the i-th data source at time t, represents the quality of the i-th data source at time t, represents the attenuation of the i-th data source at time t, represents the external factors affecting the i-th data source at time t, represents the data value of the i-th data source at time t, n represents the number of multi-source heterogeneous data sources, and t represents the current time.
[0103] Example 2
[0104] See also Figure 3 In this embodiment, the specific steps of step S3 include:
[0105] S3.1: Set multi-dimensional evaluation indicators to obtain multi-source heterogeneous fusion data , the evaluation index formula is:
[0106] ;
[0107] in, represents the Nth multi-source heterogeneous fusion data, N represents the number of multi-source heterogeneous fusion data, R represents the comprehensive risk assessment index, represents the weight of the kth sub-indicator, represents the initial event failure rate, represents the protection layer failure rate, Indicates the degree of exposure, Indicates vulnerability, Indicates the severity of the consequences, Indicates the threat frequency, Indicates the effectiveness of security control measures. Indicates environmental sensitivity. represents the comprehensive evaluation function of the kth sub-indicator;
[0108] S3.2: Based on multi-dimensional evaluation indicators, a hybrid risk assessment model is constructed by combining the protection layer analysis method with the probability graph model. At the same time, risk scenarios are defined in the hybrid risk assessment model and Input the hybrid risk assessment model for quantitative analysis and evaluation, and calculate the risk frequency;
[0109] S3.3: Based on the output of the hybrid risk assessment model, set different risk scenario parameters and use scenario simulation software to simulate the consequences of different risk scenarios;
[0110] Furthermore, the specific steps of S3.3 include:
[0111] S3.31: Use the constructed hybrid risk assessment model to assess the target, output the safety risk value and risk index, and analyze these output results to identify the main risk factors, risk sources and their interactions;
[0112] S3.32: Based on the output of the risk assessment model, combined with historical data, expert opinions and industry standards, set risk scenario parameters, including risk type, severity, probability of occurrence and scope of impact;
[0113] S3.33: Construct a hybrid risk assessment model in the scenario simulation software, input the set risk scenario parameters into the hybrid risk assessment model, and configure the hybrid risk assessment model parameters, such as simulation time, step size, and number of iterations;
[0114] S3.34: Run scenario simulation software to simulate different risk scenarios. At the same time, observe and record changes in system status, occurrence of risk events and their consequences during the simulation process.
[0115] S3.4: Based on the scenario simulation results, evaluate the risk level and severity under different risk scenarios. At the same time, use the risk matrix method, take risk frequency and severity as two dimensions, draw a risk matrix diagram, find the risk points in the matrix diagram, and determine the priority and urgency of the risk according to the location of the risk points;
[0116] S3.5: Based on the results of risk assessment and priority sorting, adaptive algorithms are used to automatically generate and adjust risk response measures, and the effects of the response measures after implementation are fed back to the hybrid risk assessment model for model verification and optimization.
[0117] The specific steps of S3.2 include:
[0118] S3.21: Obtain multi-dimensional evaluation indicators and multi-source heterogeneous fusion data ;
[0119] S3.22: Obtain the causes of historical accidents in the chemical park, and use the causes of historical accidents as initial events. Perform a protection layer analysis on each initial event, determine the independent protection layer of each initial event, and evaluate the failure rate of each independent protection layer. The formula is:
[0120] ;
[0121] in, represents the instantaneous failure rate, represents the internal state parameter vector of the protection layer, represents the external environmental condition parameter vector, represents the maintenance history and operation parameter vector, represents the probability function, Represents the internal state of the protection layer, Indicates external environmental conditions, represents the maintenance history and operating conditions, T represents the time when the failure occurred, represents the time step, lim represents the limit;
[0122] S3.23: Based on the results of the protection layer analysis and the multi-dimensional evaluation indicators, a probability graph model is constructed, and the probability distribution of each node in the probability graph model is set;
[0123] Furthermore, the specific steps of S3.23 include:
[0124] (1) Clarify the objectives and scope of the protection layer analysis, identify the key variables that affect the protection layer performance, such as internal state, external environment, and maintenance history, and map these variables to nodes in the probabilistic graphical model;
[0125] (2) Construct a directed graph probabilistic graphical model based on the nature of the problem and evaluate the balance between model complexity and data availability;
[0126] The specific steps of constructing a directed graph probabilistic graph model include:
[0127] a. Determine the scope and objectives of the cover analysis and determine which factors or variables have an impact on the cover performance;
[0128] b. Collect multidimensional data related to the performance of the protection layer, including internal status, external environment, and maintenance history, and pre-process the multidimensional data, including cleaning the data, processing missing values, outliers, and standardization;
[0129] c. Identify variables that affect the performance of the protection layer from multidimensional data, and use these variables as nodes in the Bayesian network;
[0130] d. Determine the causal relationship between variables through data analysis, expert consultation or literature research, that is, which variables are causes or parent nodes and which variables are results or child nodes;
[0131] e. Use graphical representations, such as DAG graphs, to draw a preliminary sketch of the Bayesian network, with nodes representing variables and directed edges representing causal relationships, and determine directionality;
[0132] (3) Determine the dependencies between nodes, such as causality and correlation, and use graphical representation to draw the structure of the directed graph probabilistic graphical model;
[0133] (4) Select a binomial distribution for each node and estimate the parameters of the binomial distribution, such as mean, variance, and probability, based on historical data or expert knowledge;
[0134] (5) Use test data to verify the accuracy of the model and adjust the model structure and probability distribution based on the verification results.
[0135] S3.24: Collect historical accident data, facilities and equipment, hazardous materials data, and park profile data of chemical parks, and integrate them into historical park data sets by splicing. Based on the historical park data sets, identify the risk sources that lead to accidents;
[0136] Among them, the risk sources of accidents include but are not limited to equipment failure, operational errors, and natural disasters.
[0137] The concatenation method is to directly connect the beginning and the end of the data, such as data A=[1,2,3], data B=[4,5,6], then the concatenated data C=[1,2,3,4,5,6].
[0138] S3.25: Based on the risk sources and the actual situation of the park, define the risk scenarios that may occur. At the same time, determine the occurrence conditions, development process and consequences of each risk scenario, and input the defined risk scenarios into the hybrid risk assessment model;
[0139] Among them, the defined risk scenarios include: equipment leakage, fire, and explosion.
[0140] S3.26: Use the built-in algorithm of the probabilistic graphical model to calculate the probability distribution of each node state under a given risk scenario, and output the probability of each risk scenario leading to the expected consequence. The formula is:
[0141] ;
[0142] in, represents the probability of the consequence occurring under the mth risk scenario, represents the conditional probability of the consequences occurring under the risk scenario, represents the probability of risk occurrence under the mth risk scenario, m represents the number of risk scenario combinations, q represents the resulting consequences, represents the mth risk scenario;
[0143] S3.27: Calculate the final risk frequency for each risk scenario by combining the frequency of the initial event and the failure rate of the protection layer ,in, Represents the weight of the mth risk scenario.
[0144] The specific steps of S3.4 include:
[0145] S3.41: Obtain the risk scenarios in S3.3, and for each risk scenario, collect risk scenario parameters in historical risk scenarios;
[0146] S3.42: The risk frequency is divided into five levels: low, low, medium, high and high. At the same time, the consequences of different risk scenarios obtained in step S3 are quantitatively evaluated to obtain the risk severity, which is divided into five levels: negligible, slight, medium, severe and catastrophic. The formula is:
[0147] ;
[0148] in, represents the frequency of risk, Indicates the severity of the risk. represents the result of the risk frequency classification, and , , , , Represents lower, low, medium, high and higher risk frequencies, respectively. , , , , They represent the risk severity levels as negligible, slight, moderate, severe and catastrophic respectively;
[0149] S3.43: Create a two-dimensional chart with the horizontal axis representing the risk frequency and the vertical axis representing the risk severity. According to the division results of risk frequency and risk severity in step S3.42, locate each risk scenario at the corresponding position in the matrix to obtain the risk point;
[0150] S3.44: Determine the priority and urgency of risks based on their location in the matrix.
[0151] The specific steps of the adaptive algorithm in S3.5 include:
[0152] S3.51: Load risk assessment results and priority ranking, and initialize the response measures library, including various response measures and their applicable conditions and effect evaluation;
[0153] S3.52: For each high-risk risk scenario, traverse the response measures library, screen out potential response measures based on the characteristics of the risk scenario, such as risk type, impact scope, and applicable conditions of the response measures, and use the utility evaluation function to sort the screened response measures. The formula of the utility evaluation function is:
[0154] ;
[0155] Among them, F represents the utility evaluation function, Indicates the effectiveness score of the response measures, represents the adjustment factor for cost factors, represents the adjustment factor for the time factor, represents the adjustment factor for the feasibility factor, represents the adjustment factor for side effects, Indicates the contribution of response measures to long-term sustainability, b. , , , , Both represent weight factors, and b, , , , , The setting mode is determined by those skilled in the art through a large number of experiments;
[0156] Furthermore, the criteria for determining high-risk risk scenarios are:
[0157] (1) Risk likelihood: The probability of a risk event occurring is high;
[0158] (2) Impact level: Once a risk event occurs, it will cause significant economic, social or environmental impact;
[0159] (3) Potential losses: Risk events may lead to large direct and indirect losses;
[0160] (4) Recovery difficulty: After a risk event occurs, the time, resources and costs required to return to normal are high.
[0161] For example, the database of an enterprise or organization is illegally hacked, resulting in the leakage of sensitive information such as customer information and trade secrets, which is a high-risk scenario. This is because data leakage may damage the company's reputation, trigger legal disputes, and even lead to customer loss and business interruption. Therefore, it is necessary to strengthen network security protection, conduct security audits and vulnerability scans regularly, and establish data backup and recovery mechanisms.
[0162] S3.53: Using an optimization algorithm to adjust the utility evaluation function, obtaining optimized countermeasures according to the adjusted utility evaluation function, and arranging the optimized countermeasures according to priority and execution order to generate a countermeasure list. In the present invention, the optimization algorithm adopts a genetic optimization algorithm, but the genetic optimization algorithm is a prior art in this field and is not an inventive solution of the present application, and will not be described in detail here;
[0163] S3.54: After implementing the countermeasures, collect data on the implementation effects and feed the implementation effect data back to the hybrid risk assessment model to verify and optimize the hybrid risk assessment model. At the same time, based on the feedback results, update the countermeasure library and utility evaluation function to improve the accuracy and efficiency of future countermeasure generation.
[0164] Example 3
[0165] See also Figure 4 Another embodiment provided by the present invention is a security risk dynamic assessment system based on multi-source heterogeneous data analysis, comprising:
[0166] Data processing module, data fusion module, risk assessment module, and early warning module;
[0167] Data processing module, used to collect multi-source heterogeneous data and perform pre-processing;
[0168] The data fusion module is used to dynamically fuse the pre-processed multi-source heterogeneous data to build a dynamic knowledge graph of the chemical park;
[0169] The risk assessment module is used to build a hybrid risk assessment model and introduce scenario simulation methods to obtain risk assessment results;
[0170] The early warning module is used to compare the safety risk value obtained by the risk assessment module with the preset risk threshold. When the safety risk value exceeds the threshold, the early warning module will automatically trigger the multi-level early warning mechanism and send early warning information to the staff through sound, light signals, text messages, and emails. At the same time, the early warning module also provides emergency response suggestions or guidance to the staff based on the preset emergency response measures library.
[0171] When the security risk value exceeds the preset threshold, the multi-level early warning mechanism is automatically triggered and emergency response measures are taken.
[0172] The data fusion module includes: data fusion unit and knowledge graph construction unit;
[0173] A data fusion unit is used to fuse the pre-processed multi-source heterogeneous data using a dynamic fusion strategy to generate multi-source heterogeneous fused data;
[0174] The knowledge graph construction unit is used to construct a dynamic knowledge graph of the chemical park based on multi-source heterogeneous fusion data. The graph contains information on various facilities, equipment, personnel, and environment in the park and their interrelationships.
[0175] The risk assessment module includes: assessment index setting unit, model building unit, scenario simulation unit, and risk assessment calculation unit;
[0176] The evaluation index setting unit is used to set multi-dimensional evaluation indicators, such as equipment failure rate, environmental pollution index, and personnel safety index, according to the characteristics of the chemical park and risk assessment requirements;
[0177] The model building unit is used to build a hybrid risk assessment model based on the set multi-dimensional assessment indicators. The model combines quantitative analysis and qualitative analysis methods to improve the accuracy and comprehensiveness of risk assessment and realize the quantitative assessment of complex security risks.
[0178] The scenario simulation unit is used to simulate the evolution paths and consequences of different risk scenarios using scenario simulation methods, and intuitively understand the potential impact and possible development trend of risks through simulation analysis;
[0179] The risk assessment calculation unit is used to receive the multi-source heterogeneous fusion data output by the data fusion module, and input it into the hybrid risk assessment model for calculation, and obtain the safety risk value through calculation and analysis.
[0180] The embodiments of the present invention are described above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned specific implementation modes, which are merely illustrative rather than restrictive. Under the guidance of the present invention, ordinary technicians in the field may also change, modify, replace and modify the above-mentioned embodiments without departing from the purpose and scope of protection of the present invention, and all of these are within the protection of the present invention.
Claims
1. A security risk dynamic assessment method based on multi-source heterogeneous data analysis, characterized in that: include: Step S1: Collect multi-source heterogeneous data through active data collection mechanism and perform preprocessing; Step S2: Use a dynamic fusion strategy to fuse the preprocessed multi-source heterogeneous data to obtain multi-source heterogeneous fused data, and construct a dynamic knowledge graph of the chemical park based on the multi-source heterogeneous fused data; Step S3: Set multidimensional evaluation indicators, build a hybrid risk assessment model based on the multidimensional evaluation indicators, and introduce scenario simulation methods to simulate the evolution path and consequences under different risk scenarios; Step S4: using a streaming data processing method, inputting the multi-source heterogeneous fusion data received in real time into the hybrid risk assessment model, calculating and outputting the security risk value; Step S5: Set a risk threshold. When the security risk value exceeds the threshold, the multi-level early warning mechanism is automatically triggered and emergency response measures are formulated.
2. The method for dynamic security risk assessment based on multi-source heterogeneous data analysis according to claim 1, characterized in that: The dynamic fusion strategy in step S2 adopts a dynamic weighted fusion algorithm, and the formula is: ; in, Represents multi-source heterogeneous fusion data, represents the dynamic weight of the i-th data source at time t, represents the quality of the i-th data source at time t, represents the attenuation of the i-th data source at time t, represents the external factors affecting the i-th data source at time t, represents the data value of the i-th data source at time t, n represents the number of multi-source heterogeneous data sources, and t represents the current time.
3. The method for dynamic security risk assessment based on multi-source heterogeneous data analysis according to claim 2, characterized in that: The specific steps of step S3 include: S3.1: According to the risk assessment requirements of the chemical park, set multi-dimensional assessment indicators and obtain multi-source heterogeneous fusion data , the evaluation index formula is: ; in, represents the Nth multi-source heterogeneous fusion data, N represents the number of multi-source heterogeneous fusion data, R represents the comprehensive risk assessment index, represents the weight of the kth sub-indicator, represents the initial event failure rate, represents the protection layer failure rate, Indicates the degree of exposure, Indicates vulnerability, Indicates the severity of the consequences, Indicates the threat frequency, Indicates the effectiveness of security control measures. Indicates environmental sensitivity. represents the comprehensive evaluation function of the kth sub-indicator; S3.2: Based on multi-dimensional evaluation indicators, a hybrid risk assessment model is constructed by combining the protection layer analysis method with the probability graph model. At the same time, risk scenarios are defined in the hybrid risk assessment model and Input the hybrid risk assessment model for quantitative analysis and evaluation and calculate the risk frequency.
4. The method for dynamic security risk assessment based on multi-source heterogeneous data analysis according to claim 3, characterized in that: The specific steps of step S3 also include: S3.3: Based on the output of the hybrid risk assessment model, set different risk scenario parameters and use scenario simulation software to simulate the consequences of different risk scenarios; S3.4: Based on the scenario simulation results, evaluate the risk level and severity under different risk scenarios. At the same time, use the risk matrix method, take risk frequency and severity as two dimensions, draw a risk matrix diagram, find the risk points in the matrix diagram, and determine the priority and urgency of the risk according to the location of the risk points; S3.5: Based on the results of risk assessment and priority sorting, adaptive algorithms are used to automatically generate and adjust risk response measures, and the effects of the response measures after implementation are fed back to the hybrid risk assessment model for model verification and optimization.
5. The method for dynamic security risk assessment based on multi-source heterogeneous data analysis according to claim 4, characterized in that: The specific steps of S3.2 include: S3.21: Obtain multi-dimensional evaluation indicators and multi-source heterogeneous fusion data ; S3.22: Obtain the causes of historical accidents in the chemical park, and use the causes of historical accidents as initial events. Perform a protection layer analysis on each initial event, determine the independent protection layer of each initial event, and evaluate the failure rate of each independent protection layer. The formula is: ; in, represents the instantaneous failure rate, represents the internal state parameter vector of the protection layer, represents the external environmental condition parameter vector, represents the maintenance history and operation parameter vector, represents the probability function, Represents the internal state of the protection layer, Indicates external environmental conditions, represents the maintenance history and operating conditions, T represents the time when the failure occurred, represents the time step, lim represents the limit; S3.23: Based on the results of the protection layer analysis and the multi-dimensional evaluation indicators, a probabilistic graph model is constructed, and the probability distribution of each node in the probabilistic graph model is set.
6. The method for dynamic security risk assessment based on multi-source heterogeneous data analysis according to claim 5, characterized in that: The specific steps of S3.2 also include: S3.24: Collect historical accident data, facilities and equipment, hazardous materials data, and park profile data of chemical parks, and integrate them into historical park data sets by splicing. Based on the historical park data sets, identify the risk sources that lead to accidents; S3.25: Based on the risk sources and the actual situation of the park, define the risk scenarios that may occur. At the same time, determine the occurrence conditions, development process and consequences of each risk scenario, and input the defined risk scenarios into the hybrid risk assessment model; S3.26: Use the built-in algorithm of the probabilistic graphical model to calculate the probability distribution of each node state under a given risk scenario, and output the probability of each risk scenario leading to the expected consequence. The formula is: ; in, represents the probability of the consequence occurring under the mth risk scenario, represents the conditional probability of the consequences occurring under the risk scenario, represents the probability of risk occurrence under the mth risk scenario, m represents the number of risk scenario combinations, q represents the resulting consequences, represents the mth risk scenario; S3.27: Calculate the final risk frequency for each risk scenario by combining the frequency of the initial event and the failure rate of the protection layer ,in, Represents the weight of the mth risk scenario.
7. The method for dynamic security risk assessment based on multi-source heterogeneous data analysis according to claim 6, characterized in that: The specific steps of S3.4 include: S3.41: Obtain the risk scenarios in S3.3, and for each risk scenario, collect risk scenario parameters in historical risk scenarios; S3.42: The risk frequency is divided into five levels: low, low, medium, high and high. At the same time, the consequences of different risk scenarios obtained in step S3 are quantitatively evaluated to obtain the risk severity, which is divided into five levels: negligible, slight, medium, severe and catastrophic. The formula is: ; in, represents the frequency of risk, Indicates the severity of the risk. represents the result of the risk frequency classification, and , , , , Represents lower, low, medium, high and higher risk frequencies, respectively. , , , , They represent the risk severity levels as negligible, slight, moderate, severe and catastrophic respectively; S3.43: Create a two-dimensional chart with the horizontal axis representing the risk frequency and the vertical axis representing the risk severity. According to the division results of risk frequency and risk severity in step S3.42, locate each risk scenario at the corresponding position in the matrix to obtain the risk point; S3.44: Determine the priority and urgency of risks based on their location in the matrix.
8. The method for dynamic security risk assessment based on multi-source heterogeneous data analysis according to claim 7, characterized in that: The specific steps of the adaptive algorithm in S3.5 include: S3.51: Load risk assessment results and priority rankings, and initialize the response measures library; S3.52: For each high-risk risk scenario, traverse the response measures library, screen out the response measures according to the characteristics of the risk scenario and the applicable conditions of the response measures, and use the utility evaluation function to sort the screened response measures. The formula of the utility evaluation function is: ; Among them, F represents the utility evaluation function, Indicates the effectiveness score of the response measures, represents the adjustment factor for cost factors, represents the adjustment factor for the time factor, represents the adjustment factor for the feasibility factor, represents the adjustment factor for side effects, Indicates the contribution of response measures to long-term sustainability, b. , , , , Both represent weight factors; S3.53: using an optimization algorithm to adjust the utility evaluation function, obtaining optimized countermeasures according to the adjusted utility evaluation function, and arranging the optimized countermeasures according to priority and execution order to generate a countermeasure list; S3.54: After implementing the countermeasures, collect data on the implementation effects and feed the implementation effect data back to the hybrid risk assessment model to verify and optimize the hybrid risk assessment model. At the same time, update the countermeasure library and utility evaluation function based on the feedback results.
9. The method for dynamic security risk assessment based on multi-source heterogeneous data analysis according to claim 8, characterized in that: The multi-source heterogeneous data in step S1 include: process parameter data, equipment operation status data, chemical composition data, law enforcement inspection data, and environmental monitoring data in the chemical park.
10. A security risk dynamic assessment system based on multi-source heterogeneous data analysis, which is used to implement the security risk dynamic assessment method based on multi-source heterogeneous data analysis according to any one of claims 1 to 9, characterized in that: include: Data processing module, data fusion module, risk assessment module, and early warning module; The data processing module is used to collect multi-source heterogeneous data and perform pre-processing; The data fusion module is used to dynamically fuse the pre-processed multi-source heterogeneous data to construct a dynamic knowledge graph of the chemical park; The risk assessment module is used to construct a hybrid risk assessment model and introduce a scenario simulation method to obtain risk assessment results; The early warning module is used to compare the safety risk value obtained by the risk assessment module with the preset risk threshold. When the safety risk value exceeds the threshold, the early warning module will automatically trigger the multi-level early warning mechanism, send early warning information to the staff, and provide emergency response suggestions or guidance based on the preset emergency response measures library.
11. The security risk dynamic assessment system based on multi-source heterogeneous data analysis according to claim 10, characterized in that: The risk assessment module includes: an assessment index setting unit, a model building unit, a scenario simulation unit, and a risk assessment calculation unit; The evaluation index setting unit is used to set multi-dimensional evaluation indicators according to the characteristics of the chemical park and risk assessment requirements; The model building unit is used to build a hybrid risk assessment model based on the set multi-dimensional assessment indicators; The scenario simulation unit is used to simulate the evolution paths and consequences under different risk scenarios using a scenario simulation method; The risk assessment calculation unit is used to receive the multi-source heterogeneous fusion data output by the data fusion module, and input it into the hybrid risk assessment model for calculation, and obtain the security risk value through calculation and analysis.
Citation Information
Patent Citations
Dynamic fusion system, method and equipment for multi-source data and medium
CN115034290A
Water quality state fusion perception and prediction traceability method
CN118070234A
Smart park safety emergency management system and method based on GPT
CN118071159A
Emergency scene intelligent analysis and decision support method based on AI large model
CN118378912A
Platform for scenario development and risk assessment of accidents in hydrogen facilities utilizing railway infrastructure for renewable energy generation
KR102580834B1
Cited By
Data development method and platform based on multi-source data integration
CN119149623A
Building safety alert level dynamic adjustment method and system based on artificial intelligence driving
CN119204699A
Multi-source heterogeneous data acquisition method and system for construction site
CN119249171A
Data center security assessment method and system
CN119299322A
Public security event identification method based on small sample learning and knowledge graph
CN119540015A
