Method and apparatus for tertiary control of microgrids with integration of overcurrent protection
The tertiary control method with overcurrent protection optimizes power flow by grouping resources and adjusting interties, addressing complex network challenges and preventing overcurrent issues in power distribution systems.
Patent Information
- Application Number
- JP2022525067
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2019-10-28
- Filing Date
- 2020-10-28
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2040-10-28
AI Technical Summary
Existing power distribution systems face challenges in handling complex networks with distributed resources, leading to impractical and complex numerical solutions that are not feasible for optimizing power flow while avoiding overcurrent issues, which can lead to system failures.
A method and apparatus for tertiary control with overcurrent protection that divides the power system into groups based on current contributions, recalculating optimal power flow to avoid overcurrent violations, using a K-matrix to identify contributing and non-contributing resources, and adjusting interties to maintain system stability.
This approach simplifies resource-constrained optimization, allowing for higher load capacity with existing equipment and reducing the risk of overcurrent-induced failures by optimizing power distribution efficiently.
Smart Images

Figure 0007566896000005 
Figure 0007566896000006 
Figure 0007566896000007
Abstract
Description
[Technical field]
[0001] FIELD OF THE DISCLOSURE Embodiments of the present disclosure relate generally to tertiary control for power systems, and more particularly to tertiary control with overcurrent protection. [Background technology]
[0002] "Tertiary Control" is a term used to describe a control system that optimizes power flows through interconnected power systems to optimize "area economy" (i.e., minimize operating costs). There are a variety of techniques employed to achieve this, but most involve some sort of hierarchical market structure.
[0003] In a hierarchical market, the grid is divided into control areas. All resources are "bid" into the regional market, and the manager determines the optimal dispatch to all participants that meets the net area requirement (regional demand + net intertie requirement) at the lowest possible cost. If the area is part of a larger network, the manager also creates aggregate bids based on the regional results and places one aggregate bid to the upstream market, which then updates the new optimal dispatch for each sub-area within the region. This process is repeated periodically for each hierarchical level of the power system.
[0004] Market managers in utility power systems must also be careful not to operate the network outside of its safe operating range: power flows that may be technically optimal from an operating cost perspective may overload the transmission portion of the distribution line, or may be too dependent on power provided by some pieces of interconnected equipment, making the entire system vulnerable to failure.
[0005] When these factors are considered, it is known as "resource-constrained" economic dispatch, and the solution of resource-constrained dispatch is commonly known in the art as Optimal-Power-Flow (OPF) analysis.
[0006] Today's utilities generally deal with very complex networks and associated network limitations, and therefore must use complex numerical solutions to address the problem. As more and more distributed resources are utilized within the grid's power distribution system, the number of nodes that these solutions must handle grows exponentially, making them impractical for use in such distributed power systems. Summary of the Invention [Problem to be solved by the invention]
[0007] Therefore, there is a need in the prior art for a simpler, more distributed, resource-constrained optimization. [Means for solving the problem]
[0008] Embodiments of the present invention relate generally to tertiary control of a power system as shown in and / or described in connection with at least one of the Figures.
[0009] These and other features and advantages of the present disclosure can be understood by considering the following detailed description of the disclosure in conjunction with the accompanying drawings, in which like reference characters refer to like parts throughout.
[0010] So that the above-enumerated features of the invention may be understood in detail, a more particular description of the invention briefly summarized above can be made by reference to embodiments, some of which are illustrated in the accompanying drawings, it being noted, however, that the accompanying drawings merely depict typical embodiments of the invention and therefore should not be considered limiting of its scope, as the invention may admit of other equally effective embodiments. [Brief description of the drawings]
[0011] [Figure 1] FIG. 1 is a block diagram of a power system in accordance with one or more embodiments of the present invention. [Diagram 2] FIG. 1 illustrates a power network in accordance with one or more embodiments of the present invention. [Diagram 3] FIG. 4 is a state diagram illustrating states of the tertiary control technique described herein in accordance with one or more embodiments of the present invention. [Figure 4] FIG. 2 is a block diagram of a controller in accordance with one or more embodiments of the present invention. [Diagram 5] FIG. 1 is a flow diagram of a methodology for distributed resource-constrained optimization. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] Embodiments of the present invention generally relate to methods and apparatus for coordinated overcurrent protection in electrical distribution systems as part of an overall tertiary control process. Such overcurrent protection schemes allow microgrids to utilize smaller, and therefore more cost-effective, distribution wires. In existing electrical distribution systems, the techniques described herein allow for higher levels of over-subscription, thereby allowing more loads to be served by existing equipment.
[0013] 1 is a block diagram of a power system 100 in accordance with one or more embodiments of the present invention. The block diagram merely depicts one variation of countless possible system configurations. The present invention can function in a variety of environments and systems.
[0014] The power system 100 includes a power source 102 (such as a conventional utility power source) and a number of microgrids 150-1, 150-2, ..., 150-X (collectively referred to as microgrids 150) coupled to the power source 102 via a power grid 104 (e.g., a three-phase power grid). By virtue of their connection to the power grid 104, each microgrid 150 can also receive energy from or sink energy into the power grid 104 as a whole. In some embodiments, the coupling of energy to the utility power grid is tightly controlled by regulations, and the microgrids 150 maintain or aim to maintain a zero energy production policy.
[0015] Each microgrid 150 can operate without energy being supplied from a power source 102 and can cover a neighborhood, village, small town, or the like, as the term "microgrid" is not intended to imply a particular system size.
[0016] Microgrids 150-2 through 150-X are similar to microgrid 150-1, as shown in detail in FIGURE 1 and described herein, although the number and / or types of various microgrid components may vary among microgrids 150.
[0017] Microgrid 150-1 includes multiple microgrid members 152-1, 152-2, ..., 152-M (collectively referred to as microgrid elements 152), each of which is a microgrid that can operate when isolated from the rest of microgrid 150. Microgrid elements 152 are coupled to a regional grid 132, which is in turn coupled to power grid 104 via a microgrid interconnect device (MID) 134 (also sometimes referred to as an island interconnect device, or IID). Regional grid 132 may be a trunk of power grid 104 or a regional grid designed specifically for microgrid 150-1. In some embodiments, regional grid 132 may be a three-phase grid, while in other embodiments it may be a single-phase grid.
[0018] The MID 134 generally includes a controller having a processor (not shown) that determines when to disconnect / connect the microgrid 150-1 from / to the power grid 104 and performs the disconnect / connect (although in some embodiments, the MID 134 may receive instructions from another component or system for disconnecting / connecting to / from the power grid 104). The microgrid 150-1 operates in a grid connected (GC) mode when connected to the power grid 104 and operates in an islanded (IS) mode when disconnected from the power grid 104. For example, the MID 134 may detect fluctuations, disturbances, or outages on the power grid 104 and, as a result, disconnect the microgrid 150-1 from the power grid 104. The MID 134 may also disconnect the microgrid 150-1 from the power grid 104 when the microgrid 150-1 is either overproducing energy or overloading the power grid 104. Once microgrid 150-1 is disconnected from power grid 104, it can continue to generate power as an intentional island without posing a safety risk to any line workers who may be working on power grid 104. MID 134 may additionally include a transceiver (not shown) for communicating with one or more of the microgrid components. In certain embodiments, MID 134 can send command and control signals to one or more microgrid element components (e.g., controller 108, power conditioner 110, generator 130, and load 118), such as secondary control commands (e.g., active and reactive current commands to a resource controller), which may be generated by MID 134 or received from another device.
[0019] Microgrid element 152-1 includes a building 116 (e.g., a residential or commercial building, etc.) coupled to a load center 126, which may be within or outside of the building 116. The load center 126 is coupled to a regional grid 132, a distributed energy resource (DER) 106, a generator 130, and a number of loads 118,..., 118-P (collectively referred to as loads 118) via a power meter 120 and a regional MID 122 to couple power between these components. Microgrid element 152-1 is shown in detail in FIG. 1 and described herein, and microgrid elements 152-2 through 152-M are similar to microgrid element 152-1. However, the number and / or type of various microgrid element components may vary between microgrid elements 152.
[0020] The local MID 122 generally includes a controller having a processor (not shown) that determines when to disconnect / connect the microgrid element 152-1 from the regional grid 132 and performs the disconnection / connection (although in some embodiments the local MID 122 may receive instructions from another component or system for disconnecting / connecting to the regional grid 132). For example, the local MID 122 may detect a grid fluctuation, disturbance, or outage and, as a result, disconnect the microgrid element 152-1 from the regional grid 132. The MID 122 may also disconnect the microgrid element 152-1 from the regional grid 132 when the microgrid element 152-1 is either overproducing energy or overloading the regional grid 132. The microgrid element 152-1 operates in a grid-connected (GC) mode when connected to the regional grid 132 and the microgrid element 152-1 operates in an islanded (IS) mode when disconnected from the regional grid 132. Once the microgrid element 152-1 is disconnected from the regional grid 132, it can continue to generate power as an intentional island without posing a safety risk to any line workers who may be working on the regional grid 132. The regional MID 122 may also include a transceiver (not shown) for communicating with one or more of the microgrid element components. In certain embodiments, the MID 122 can send command and control signals (e.g., secondary control commands such as active and reactive current commands to a resource controller, which may be generated by the MID 122 or received from another device) to one or more of the controller 108, the power conditioner 110, the generator 130, and the load 118.
[0021] The meter 120 measures energy ingress and egress for the microgrid element 152-1, and in some embodiments, the meter 120 includes the MID 122 or a portion thereof. The meter 120 generally measures active power flow (kWh), reactive power flow (kVAR), grid frequency, and grid voltage (referred to herein as measured parameters). In certain embodiments, these measured parameters may be communicated to a microgrid monitoring system (not shown) that monitors each of the microgrid elements 152.
[0022] DER 106 includes power conditioners 110-1,..., 110-N, 110-N+1 coupled in parallel to bus 124, which is further coupled to load center 126. Generally, power conditioners 110 are bidirectional inverters, where a first subset of power conditioners 110 generate power from DC energy sources (e.g., renewable energy sources such as wind, solar, and hydro) while a second subset of power conditioners 110 generate power from / couple energy to energy storage / supply devices (e.g., batteries, etc.). The combination of a DC energy source and a corresponding power conditioner 110 may be referred to herein as a DER generator (e.g., DER generators 162-1-162-N). In those embodiments in which power regulator 110 is a DC / AC inverter, power regulator 110 and coupled to the energy storage / delivery device may both be referred to as an AC battery, and in those embodiments in which power regulator 110 is a DC / DC converter, power regulator 110 and coupled to the energy storage / delivery device may both be referred to as a battery DC supply.
[0023] 1, power regulators 110-1,...,110-N are respectively coupled to DC energy sources 112-1,...,112-N (e.g., renewable energy sources such as wind, solar, and hydro) to receive DC power and generate utility grid-compliant AC power that is coupled to bus 124. In some of these embodiments, each DC source 112 is a photovoltaic (PV) module. In some alternative embodiments, multiple DC sources 112 are coupled to a single power regulator 110 (e.g., a single centralized power regulator).
[0024] As further shown in FIG. 1 , power conditioner 110-N+1 is coupled to energy storage / delivery device 114 to form AC battery 180. Power conditioner 110 of AC battery 180 can convert AC power from bus 124 to energy stored in energy storage / delivery device 114 and can further convert energy from energy storage / delivery device 114 to utility grid-compliant AC power coupled to bus 124. Energy storage / delivery device 114 may be any energy storage device having a “charge level,” such as a battery, a flywheel, or compressed air storage. Although only a single AC battery 180 is shown in FIG. 1 , other embodiments may include more AC batteries 180 or even no AC battery 180 at all.
[0025] Each power regulator 110 includes a power regulator controller 140 for controlling the corresponding power regulator 110, which may include a primary control technique, such as implementing a droop control technique that enables the power regulator 110 to share the load in a safe and stable manner when the microgrid element 152-1 is disconnected from the power source 102 or the local grid 132 (or alternatively, when operating in a grid-tied mode).
[0026] The controller 108 is coupled to the bus 124 via a load center 126 and communicates (e.g., via power line communication (PLC) and / or other types of wired and / or wireless techniques) with the power regulators 110, the generators 130, and the loads 118. The controller 108 can send command and control signals (e.g., secondary control instructions such as active and reactive current commands to a resource controller, which may be generated by the controller 108 or received from another device) to one or more of the power regulators 110, the generators 130, and the loads 118 and / or receive data (e.g., status information, performance data, etc.) from one or more of the power regulators 110, the generators 130, and the loads 118. In some embodiments, controller 108 may be a gateway that is further coupled to master controller 170 by wireless and / or wired techniques via a communication network 172 (e.g., the Internet) to communicate / receive data (e.g., performance information, alarms, messages, control instructions, etc.) to / from master controller 170. In some embodiments, master controller 170 may send command and control signals (e.g., secondary control instructions such as active and reactive current commands to resource controllers, which may be generated by master controller 170 or received from another device) to one or more of controller 108, power regulator 110, generator 130, and load 118.
[0027] In certain embodiments, the controller 108 includes a regional MID 122 or a portion of the regional MID 122 (e.g., an islanding module for monitoring grid health, detecting grid faults and disturbances, determining when to disconnect / connect to the regional grid 132, and accordingly driving disconnection components that may be part of the controller 108 or alternatively separate from the DER controller 108). In some embodiments, the controller 108 may interface with the regional MID 122, for example using a PLC.
[0028] 1 as having a single DER 106, in other embodiments, microgrid element 152-1 may have additional DERs, each of which may be a different type (e.g., solar, wind, etc.). In some alternative embodiments, the DER controller 108 and DER generator 162 are not present in microgrid element 152-1, and the DER 106 includes only one or more AC batteries 180.
[0029] The generator 130 is an energy generator, such as a diesel generator, that automatically increases or reduces energy output in response to the demands of the microgrid element 152-1. The generator 130 includes a generator controller 129. The generator controller 129 may optimize the operation of the generator 130 with respect to the microgrid element 152-1 and / or the microgrid 150-1 (e.g., by generating control instructions for the generator 130), implement control instructions for operating the generator 130 (e.g., instructions received from another component, such as the controller 108, or from another system), obtain data (e.g., performance data, operational data, etc.) regarding the generator 130 that may be further communicated to another component or system, or perform similar functions. The generator controller 129 may implement droop control techniques to control the operation of the generator 130 when the microgrid element 152-1 is operating in an islanded mode, although in some alternative embodiments, the generator 130 may also be controlled with droop control when operating in a grid-tied mode.
[0030] In one or more embodiments, power regulator 110 and generator 130 are droop controlled so that when microgrid element 152-1 is disconnected from local grid 132 or power grid 104 (e.g., using MID 122 and / or MID 134) and is operating in an autonomous mode, power regulator 110 and generator 130 will operate in parallel employing the same droop control techniques without the need for any common control circuitry or communication between the components.
[0031] The loads 118 are non-critical loads (e.g., water heaters, refrigerators, HVAC equipment, pumps, electric vehicles, and indoor lighting) that consume energy from the power lines that electrically interconnect the microgrid components (which may be referred to as a grid of microgrid elements, a grid of microgrids, or simply a grid) available through the load center 126. Although the loads 118 are shown in FIG. 1 as being within the building 116, one or more of the loads 118 may be located outside the building 116. The loads 118 may be static loads, dynamic loads, or some combination thereof (i.e., some of the loads 118 are static loads and other loads 118 are dynamic loads).
[0032] The loads 118 are intelligent loads (sometimes referred to as “smart loads”) that each include a load controller 128 for controlling the operation of the corresponding load 118 (e.g., for implementing preset control instructions and / or control instructions received from another component, such as the controller 108, e.g., via a PLC), for obtaining data (e.g., performance data, operating data, etc.) regarding the corresponding load 118 that can be further communicated to another component or system, and / or for similar functions.
[0033] Each of the controllers 108, 128, 129, 140, and 170 may be configured with hardware, software, or a combination thereof, and in certain embodiments may include a central processing unit (CPU) and memory coupled to each of the support circuits. Each of the controllers 108, 128, 129, 140, and 170 may be implemented using a general-purpose computer that, upon execution of certain software, becomes a dedicated computer for performing various embodiments of the present invention. In those embodiments in which the controller includes a CPU, the CPU may include one or more conventionally available microprocessors, microcontrollers, and the like capable of performing the processing described herein, for example, the CPU may be a microcontroller that includes internal memory for storing controller firmware that, upon execution, performs the functions described herein. In certain embodiments, the CPU may include one or more application specific integrated circuits (ASICs). The support circuits coupled to the CPU are well-known circuits used to facilitate the function of the CPU (e.g., cache, power supplies, clock circuits, buses, network cards, input / output (I / O) circuits, etc.). The memory coupled to the CPU may include random access memory, read-only memory, removable disk memory, flash memory, and various combinations of these types of memory. The memory may be referred to as main memory, and may be used in part as cache memory or buffer memory. The memory typically stores the controller's operating system (OS), which may be one of several commercially available OSes, such as, but not limited to, Linux, and a Real-Time Operating System (RTOS). The memory typically stores various forms of application software that, when executed, performs one or more functions described herein.
[0034] The technique described herein works by first requiring each market manager to calculate the economically optimal power flow ignoring all local network restrictions. The manager then calculates the net power flow on each section of the power line using a "K matrix," which is a function of the network design and contains information about the contribution that the current injection on each bus makes to the total current on each section of the power network. The "K matrix" will be M×N, where M is the number of sections in the system and N is the number of buses on the system with current injection. This approach is much simpler than the generalized admittance matrix (i.e., "Y matrix") of the power system, since there are no concerns about system voltage or modeling contributions from buses that have no current at all.
[0035] Once the market manager analyzes the total current on each interval, it compares it to an acceptable level, which may be time / temperature dependent or based on some other dynamic limit calculation. If the tertiary controller calculates a scheduled intertie that violates any stress threshold, the scheduled current on one or more of the resources (which may include both current generators and loads) that contribute to the stress current must be reduced and the tertiary optimization must be redone. To do this optimally, the system is divided into two groups. Group A contains the resources / loads that contribute to the current on the overloaded interval and Group B contains the resources that do not contribute. The net intertie for Group A is set to the stress limit and the new net intertie for Group B is set such that the total net current of Group A and Group B is unchanged. The tertiary biases for all resources in Group A and Group B are then recalculated separately. The stress calculation is then recalculated for Group B only (i.e., the rows for Group A are removed from the K matrix and the resource currents). This process is repeated until there are no more stress violations or only one row remains. If this process is down to only one row that is overloaded, meaning there is no solution that meets the stress requirements, then a notification may be generated, for example an emergency SYSTEM WIRING OVERLOAD warning is flagged, and the whole process is rerun with an increase in the stress matrix (i.e. increase by some amount, say 10%, try again, if still no solution increase by a further amount, say another 10%, etc.).
[0036] 2 is an illustration of a power network 200 in accordance with one or more embodiments of the present invention. Power network 200 is an example network for illustrating the tertiary control described herein.
[0037] Power network 200 is an area including houses 1, 2, and 3 coupled to a power distribution grid. Power network 200 includes high voltage power line section S8 coupled to power line section S7 via a step-down transformer at utility pole P4. House H1 including one or more resources for generating current I1 is coupled to power line section S1. House H2 including one or more resources for generating current I2 is coupled to power line section S2. House H3 including one or more resources for generating current I3 is coupled to power line section S3. Power line section S1 is further coupled at utility pole P1 to power line section S4 extending between utility poles P1 and P2. Power line section S2 is further coupled at utility pole P2 to power line section S5 extending between utility poles P2 and P4 and coupled to section S7 at utility pole P4. Power line section S3 is further coupled at pole P3 to power line section S6 which extends between poles P3 and P4 and is coupled to section S7 at pole P4.
[0038] The first step in this process is to derive the K matrix. Because this network is simple, the matrix can be directly inferred to generate the K matrix shown in equation (1).
[0039]
number
[0040] The first iteration of the cubic controller calculates the optimal allocation of I1 = +30A from house 1, I2 = +20A from house 2, and I3 = -50A from house 3.
[0041] Next, the K matrix is used to calculate the current on each wire section, as shown in equation (2).
[0042]
number
[0043] In some embodiments, one or more homes may have wiring with a maximum allowable current that is less than the maximum allowable current of wiring in other homes. For example, home 1 may be built far away from other homes, and to save costs, its wiring may only be capable of handling 20 A, while all other elements of the distribution system have been designed to handle 100 A. In such embodiments, violations of lines 1 and 4 may be found, as shown in (3).
[0044]
number
[0045] Therefore, the algorithm will first divide the control areas into two groups, i.e., those that contribute to the initial violation and those that do not. To know what interties are contributing to the overstress in row 1, the non-zero values in row 1 of the K matrix are identified as shown in (4). K[1,:]=
[0100] (4)
[0046] So, it can be seen that only house 1 intertie is contributing to this overstress. This would then be classified into a separate control area and the target intertie would be set to 20A to reach its distribution elements to their maximum limits. Houses 2 and 3 would then be separated into a second control area with a new net intertie of -20A to keep the total net intertie for both areas at the original 0A. At this point, the tertiary controller would recalculate the optimal intertie for the individual systems that make up each control area. Here, area 1 is made up of only house 1 and therefore its intertie would only be 20A. For example, if the tertiary calculation resulted in an export of 25A for house 2 and an import of 45A for house 3, as shown in equation (5), then the stress calculation would now be:
[0047]
number
[0048] It can be seen that the overstress in both row 1 and row 4 has been eliminated. The reason for this is that row 1 and row 4 of the stress coefficient matrix K are identical (i.e., elements 1 and 4 always have the same current passing through them). Therefore, when the stress in one row is eliminated, the stress in the other row is automatically eliminated. To improve the efficiency of the OCP algorithm, the matrix can be reduced by first removing all rows with overlaps that have the same or smaller maximum current tolerance (i.e., it is enough to protect the weakest link).
[0049] This process can be explained in the form of a state machine by the diagram shown in FIG.
[0050] 3 is a state diagram 300 illustrating states of the tertiary control technique described herein, in accordance with one or more embodiments of the present invention. In one or more embodiments, state diagram 300 illustrates states associated with tertiary control implemented by tertiary control module 416 and outlined in method 500, both of which are further described below.
[0051] The system may begin at state 302 where an optimal intertie for the area is calculated, and in various embodiments state 302 is entered upon receiving a new NET intertie target from an upstream controller. From state 302, the system transitions to state 304 where stress calculations are performed (using the computed optimal intertie and the K matrix) to compute the currents on each section of power line for the area. The system transitions to state 306 where it determines if an overcurrent is detected. If an overcurrent is not detected, the system transitions to state 308 where a tertiary control command is sent and implemented. If an overcurrent is detected in state 306, the system transitions to state 310.
[0052] In state 310 it is determined whether the last section has been reached. If the last node has been reached, the system transitions to state 314. In state 314 an alarm is sent (indicating, for example, overloading of the system wiring) and the stress matrix is increased, for example, by 10%. The system transitions back to state 302.
[0053] If in state 310 it is determined that the last node has not been reached, the system transitions to state 312. In state 312, the area is divided into two areas, a first area with those resources / loads that contribute to the current on the overloaded section and a second area with those resources / loads that do not contribute. The net target interties are computed separately for each of the areas and the system transitions to state 304 where the stresses are recalculated.
[0054] 4 is a block diagram of a controller 400 in accordance with one or more embodiments of the present invention. The controller 400 is similar to the various controllers described above with respect to FIG.
[0055] In one or more embodiments, controller 400 is an area controller that includes a tertiary control module (sometimes referred to as a market manager) for managing tertiary control in its area. An area controller controls its assigned resources but need not be physically located in the area it controls, and in one or more embodiments, the area controller can control physical disconnection from upstream devices. The area controller includes a tertiary control module (described below), and in various embodiments also includes a primary control module for implementing primary control and / or a secondary control module for implementing secondary control. Any of the controllers described above with respect to FIG. 1 may be an area controller, with each area controller managing its downstream resources within a hierarchy of area controllers in system 100. For example, controller 108 may be an area controller that manages the resources of microgrid element 152-1, with each of microgrid elements 152-2 through 152-M in microgrid 150-1 having a similar area controller, and master controller 170 being the area controller that manages the resources of microgrid 150-1. 1 may be present and function as area controllers for various areas of system 100, for example, another controller may be present and function as an area controller for microgrid element 152-1 (e.g., controller 160 coupled (shown in dashed lines) between regional MID 122 and regional grid 134). The area controller may communicate with its resources by any suitable communication technique, such as wired (e.g., power line communication) and / or wireless techniques.
[0056] The controller 400 comprises support circuits 404, one or more transceivers 420, and memory 406, each of which is coupled to a central processing unit (CPU) 402. The one or more transceivers 420 communicate with other devices in the system 100 by any suitable wired and / or wireless communication technique (e.g., power line communication). The CPU 402 can include one or more conventionally available microprocessors or microcontrollers, or alternatively, the CPU 402 may include one or more application specific integrated circuits (ASICs). The support circuits 404 are well-known circuits used to facilitate the functions of the CPU 402. Such circuits include, but are not limited to, cache, power supplies, clock circuits, buses, and input / output (I / O) circuits. The controller 400 may be implemented using a general-purpose computer that, upon execution of specific software, becomes a dedicated computer for performing various embodiments of the present invention. In other embodiments, the CPU 402 may be a microcontroller that includes internal memory for storing controller firmware that, upon execution, provides the controller functions described herein. The controller 400 may be configured in hardware, firmware, local software, or cloud software, or any combination thereof.
[0057] The memory 406 may include random access memory, read-only memory, removable disk memory, flash memory, and various combinations of these types of memory. The memory 406 may be referred to as a main memory and may be used in part as a cache memory or buffer memory. The memory 406 generally stores an operating system (OS) 408, which may be supported by the CPU capabilities as needed. In some embodiments, the OS 408 may be one of several commercially available operating systems, such as, but not limited to, Linux, and a real-time operating system (RTOS). The memory 406 further stores non-transitory processor-executable instructions and / or data that may be executed and / or used by the CPU 402. These processor-executable instructions may include firmware, software, and the like, or some combination thereof. The memory 406 may additionally store a database 412 for storing data, such as data related to the present invention (e.g., stress thresholds).
[0058] Memory 406 stores various forms of application software, such as an entity control module 414 for controlling one or more entities associated with controller 400. For example, if control module 400 is a power regulator controller 140, entity control module 414 controls power conversion within a corresponding power regulator 110.
[0059] In those embodiments in which the controller 400 is an area controller, the memory 406 further comprises a tertiary control module 416 for implementing the tertiary control functions described herein. In those embodiments in which the controller 400 receives and controls resources to implement secondary control commands, the memory 406 further comprises a tertiary control command implementation module 418 for implementing received secondary control commands as described herein.
[0060] 5 is a flow diagram of a method 500 for distributed resource-constrained optimization in accordance with one or more embodiments of the present invention. In some embodiments, the method 500 may be performed with respect to the system 100, which may itself be an area of a power distribution network and / or have multiple hierarchical areas therein. In other embodiments, the method 500 may be performed with respect to the power network area shown in FIG. 2. In various embodiments, the method 500 is an implementation of the tertiary control module 416 (sometimes referred to as a market manager for that area) described above. In certain embodiments, a computer-readable medium includes a program that, when executed by a processor (such as the processor described above), performs the method 500.
[0061] The method 500 begins at step 502 and proceeds to step 504. In step 504, a stress factor matrix is derived for an area of a power distribution network. The stress factor matrix, sometimes referred to herein as a "K matrix," contains information about the contribution that current injection on each bus makes to the total current on each section of the power network derived for the area. As explained above, the K matrix is an M by N matrix, where M is the number of sections (number of power line sections) in the system area and N is the number of buses on the system area with current injection. One example of a K matrix is shown above in equation (1).
[0062] Method 500 proceeds to step 506. In step 506 (corresponding to state 302 in state diagram 300), all regional network restrictions are ignored and the economically optimal power flow for the area (sometimes referred to as an unlimited net intertie target, or unlimited net intertie schedule) is calculated. For example, in the exemplary embodiment described above with respect to FIG. 2, the optimal power flow for the area is determined to be 0 A. Method 500 proceeds to step 508.
[0063] At step 508 (corresponding to state 302 in state diagram 300), an optimal allocation from each resource in the area (sometimes referred to as the scheduled current of each resource) is computed to achieve an economically optimal power flow for the area. For example, in the exemplary embodiment described above with respect to Figure 2, the optimal allocations for resources 1, 2, and 3 are computed as +20A, +30A, and -50A, respectively. Method 500 proceeds to step 510.
[0064] In step 510 (corresponding to state 304 in state diagram 300), a stress calculation is performed to calculate the current on each power line section in the area. The stress calculation is performed using the K matrix determined in step 504 and the optimal distribution computed in step 508. One example of the stress calculation is shown above in equation (2).
[0065] In step 512 (corresponding to state 306 in state diagram 300), a determination is made whether any of the calculated currents for the power line sections exceed the corresponding stress threshold. This determination may be made by comparing the computer-calculated optimal currents on each section to the allowable current levels. In some embodiments, one or more of the allowable levels (i.e., stress thresholds) may be based on dynamic limit calculations, e.g., one or more of the allowable levels may be time-dependent, temperature-dependent, or the like. If the result of the determination is "NO" that none of the calculated scheduled currents violate the corresponding stress thresholds, the method 500 proceeds to step 524, where the calculated optimal resource allocation is scheduled to implement according to the tertiary control for the area. For example, commands to implement the optimal allocation (i.e., inter-tie schedule) may be sent to the controllable current producing / consuming resources of the microgrid elements 152-1, such as the power conditioner 110, the generator 130, and the smart load 118. The method 500 then proceeds to step 526, where it ends.
[0066] If the result of the determination in step 512 is "YES" that one or more of the calculated currents for the power line sections exceed the corresponding stress threshold, the method 500 proceeds to step 514 (corresponding to state 310 in state diagram 300). In step 514, a determination is made whether there is more than one row remaining in the K matrix (i.e., whether there is more than one section remaining for analysis). If the result of the determination is "YES" that there is only one row remaining in the K matrix, the one remaining section is overloaded and therefore no solution exists that meets the stress requirements. The method 500 then proceeds to step 520 (corresponding to state 314 in state diagram 300), where an emergency alert is generated indicating overloading of the system wiring. The method 500 then proceeds to step 522 (corresponding to state 314 in state diagram 300), where the stress matrix (i.e., the K matrix) is increased (e.g., by 10%) and the method 500 returns to step 506.
[0067] If the result of the determination in step 514 is "YES" that there is more than one row remaining, the method 500 proceeds to step 516 (corresponding to state 312 in state diagram 300) where stress calculations are first performed with all resources and K matrices, then the method 500 performs grouping, limits those that exceed the threshold, and sets a new net for the second group so that the total net remains the same. In step 516, the area is divided into two new areas. The first area is defined as containing those resources / loads that contribute to the current on the overloaded section, and the second area is defined as containing those that do not contribute. The method 500 proceeds to step 518.
[0068] At step 518, net intertie targets are set separately for the first area and the second area. In the first area, the net intertie target (which may be in terms of power or current) is set to the corresponding stress limit, and in the second area, the net intertie target is set such that the total net current of the first area and the second area is not changed from the original net target intertie for the original area. Method 500 proceeds to step 520.
[0069] In step 520, the optimal allocation from each resource in terms of the net inter-tie target for the first area and the second area is calculated. Method 500 then returns to step 510 to repeat the stress calculation for only the second area, although in some other embodiments the stress calculation may be repeated using both areas (e.g., as described above with respect to FIG. 2). To perform the stress calculation for the second area, the row of the K matrix that pertains to the first area is deleted from the K matrix and the resource currents. Method 500 then proceeds to step 512.
[0070] In one or more embodiments, the K matrix can be reduced by first removing all rows that have overlaps with the same or smaller maximum current tolerance (i.e., it is sufficient to protect the weakest link).
[0071] While the forgoing is directed to embodiments of the present invention, other and further embodiments of the invention may be devised without departing from the basic scope thereof, which is defined by the appended claims. [Explanation of symbols]
[0072] 1, 2, 3, H1, H2, H3 House 1, 2, 3 Home, Resources 100 Power Systems 102 Power supply 104 Power Grid 106 Distributed Energy Resources, DER 108 Controller 110, 110-1,..., 110-N, 110-N+1 power regulator 112, 112-1, 112-N DC energy source 114 Energy Storage / Supply Devices 116 Building 118,...,118-P load 120 Instruments 122 Regional MID 124 Bus 126 Load Center 128 Load Controller 129 Generator Controller 130 Generator 132 Regional Grid 134 Microgrid Interconnection Device, MID 140 Power Regulator Controller 150, 150-1, 150-2, ..., 150-X Microgrid 152, 152-1, 152-2, . . ., 152-M Microgrid Elements 162 DER Generator 170 Master Controller 172 Communication Networks 180 AC Battery 200 Power Network 300 State Diagram 400 Controller 402 Central Processing Unit, CPU 404 Support Circuit 406 Memory 408 OS 412 Database 414 Entity Control Module 416 Tertiary Control Module 418 Tertiary Control Command Implementation Module 420 Transmitter / Receiver 500 ways I1, I2, I3 current P1, P2, P3, and P4 utility poles S1, S2, S3, S4, S5, S6, S7, and S8 power line sections
Claims
1. 1. A method for tertiary control with overcurrent protection, comprising: calculating at least one unlimited optimal intertie target for an area of the power distribution network; calculating, for each resource of a plurality of resources in the area, an optimal scheduled current for achieving the at least one unlimited optimal intertie objective; calculating a net scheduled current for each power line section in the area using the optimal scheduled current and a plurality of stress factors; comparing the net scheduled current with a corresponding stress threshold to identify a stress violation; if the comparing step identifies one or more stress violations, reducing the optimal scheduled current for one or more resources of the plurality of resources that contribute to the one or more stress violations; if the comparing step identifies one or more stress violations, calculating updated optimal scheduled currents for one or more resources of the plurality of resources that do not contribute to the one or more stress violations; A method comprising:
2. determining a first net intertie target for a first area including the one or more resources contributing to the one or more stress violations; determining a second net intertie target for a second area including the one or more resources that do not contribute to the one or more stress violations; The method of claim 1, further comprising:
3. The method of claim 2 , wherein the updated optimal scheduled current is calculated to achieve the second net intertie goal.
4. 3. The method of claim 2, wherein a net current for the first net intertie target and the second net intertie target is equal to a net current for the at least one unlimited optimal intertie target.
5. The method of claim 2 , wherein the first net intertie target is equal to a stress threshold corresponding to the one or more stress violations.
6. the plurality of stress coefficients is in the form of an M×N matrix; 2. The method of claim 1, wherein M is a number of power line sections in the area and N is a number of buses in the area with current injection.
7. The method of claim 1 , wherein one or more of the corresponding stress thresholds are based on a dynamic limit calculation.
8. 1. An apparatus for tertiary control with overcurrent protection, comprising: A controller including at least one processor, calculating at least one unlimited optimal intertie target for an area of the power distribution network; Calculating, for each resource of a plurality of resources in the area, an optimal scheduled current for achieving the at least one unlimited optimal intertie objective; calculating a net scheduled current for each power line section in the area using the optimal scheduled current and a plurality of stress factors; comparing the net scheduled current to a corresponding stress threshold to identify a stress violation; if one or more stress violations are identified by the comparing, reducing the optimal scheduled current for one or more resources of the plurality of resources that contribute to the one or more stress violations; calculating updated optimal scheduled currents for one or more resources of the plurality of resources that do not contribute to the one or more stress violations when the comparing identifies the one or more stress violations; The controller An apparatus comprising:
9. The controller: determining a first net intertie target for a first area including the one or more resources contributing to the one or more stress violations; determining a second net intertie target for a second area including the one or more resources that do not contribute to the one or more stress violations; The apparatus of claim 8, further comprising:
10. The apparatus of claim 9 , wherein the updated optimal scheduled current is calculated to achieve the second net intertie goal.
11. 10. The apparatus of claim 9, wherein a net current for the first net intertie target and the second net intertie target is equal to a net current for the at least one unlimited optimal intertie target.
12. 10. The apparatus of claim 9, wherein the first net intertie goal is equal to a stress threshold corresponding to the one or more stress violations.
13. the plurality of stress coefficients is in the form of an M×N matrix; 9. The apparatus of claim 8, wherein M is a number of power line sections in the area and N is a number of buses in the area with current injection.
14. The apparatus of claim 8 , wherein one or more of the corresponding stress thresholds are based on a dynamic limit calculation.
15. 1. A computer-readable recording medium having a program stored thereon, the program, when executed by a processor, performing a method for tertiary control with overcurrent protection, the method comprising: calculating at least one unlimited optimal intertie target for an area of the power distribution network; calculating, for each resource of a plurality of resources in the area, an optimal scheduled current for achieving the at least one unlimited optimal intertie objective; calculating a net scheduled current for each power line section in the area using the optimal scheduled current and a plurality of stress factors; comparing the net scheduled current with a corresponding stress threshold to identify a stress violation; if the comparing step identifies one or more stress violations, reducing the optimal scheduled current for one or more resources of the plurality of resources that contribute to the one or more stress violations; if the comparing step identifies one or more stress violations, calculating updated optimal scheduled currents for one or more resources of the plurality of resources that do not contribute to the one or more stress violations; A computer-readable recording medium comprising:
16. The method further comprising: determining a first net intertie target for a first area including the one or more resources contributing to the one or more stress violations; determining a second net intertie target for a second area including the one or more resources that do not contribute to the one or more stress violations; 16. The computer-readable storage medium of claim 15, further comprising:
17. 17. The computer-readable medium of claim 16, wherein the updated optimal scheduled current is calculated to achieve the second net intertie goal.
18. 17. The computer-readable medium of claim 16, wherein a net current for the first net intertie target and the second net intertie target is equal to a net current for the at least one unlimited optimal intertie target.
19. 20. The computer-readable medium of claim 16, wherein the first net intertie goal is equal to a stress threshold corresponding to the one or more stress violations.
20. the plurality of stress coefficients is in the form of an M×N matrix; 16. The computer-readable medium of claim 15, wherein M is a number of power line sections in the area and N is a number of buses in the area with current injection.
Citation Information
Patent Citations
Settling apparatus for power system overload
JP1988245221A
Power system monitoring control system
JP2013172537A
Congestion management system and power-system management system for relieving overload of transmission line
US20180138706A1
Method for estimating the topology of an electric power network using metering data
WO2019053588A1