Workpiece manufacturing method and manufacturing device

The method and apparatus optimize energy use by cooling specific workpiece portions and utilizing residual heat for temperature adjustments, addressing energy loss in manufacturing shaft members by minimizing re-heating needs.

JP7567412B2Active Publication Date: 2024-10-16TOYOTA JIDOSHA KK
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
JP2020200782
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-12-03
Publication Date
2024-10-16
Estimated Expiration
2040-12-03

AI Technical Summary

Technical Problem

Existing methods for manufacturing shaft members of rolling bearing devices result in significant energy loss due to the need to cool and reheat workpieces between hot and cold forging processes, as shot blasting generates dust and requires temperature adjustments.

Method used

A method and apparatus that includes cooling only a portion of the workpiece to a specific temperature for shot blasting, utilizing residual heat from another portion for subsequent cold forging, and arranging surface treatment and cold forging devices at a predetermined interval to minimize energy loss.

Benefits of technology

Reduces energy consumption by leveraging residual heat for temperature adjustments, allowing continuous processing without re-heating, thus optimizing energy use and maintaining efficient temperature control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007567412000001
    Figure 0007567412000001
  • Figure 0007567412000002
    Figure 0007567412000002
  • Figure 0007567412000003
    Figure 0007567412000003
Patent Text Reader

Abstract

To reduce energy loss when processing a workpiece.SOLUTION: A manufacturing method for a workpiece includes: a hot-forging step which performs forging after raising temperature of a workpiece to hot-forging temperature; a cooling step which cools only a part of the workpiece to blast processing temperature lower than cold-forging temperature including a first part to which cold-forging of the workpiece after the hot-forging step; a surface treatment step which performs blast processing of the first part at the blast processing temperature; a temperature raising step which raises temperature of the first part to cold-forging temperature by using residual heat during the heat-forging remaining in the second part other than the one part of the workpiece after the surface treatment step; and a cold-forging step which forges the first part at the cold-forging temperature.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a method and an apparatus for manufacturing a workpiece. [Background technology]

[0002] Patent Document 1 discloses a manufacturing method for a shaft member of a wheel rolling bearing device, in which hot forging is performed, followed by shot blasting, and then cold forging. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2013-146769 A Summary of the Invention [Problem to be solved by the invention]

[0004] When performing shot blasting, dust particles fly around inside the device. For this reason, after hot forging, the workpiece is cooled to a low temperature and then shot blasted. The temperature of the workpiece in the subsequent cold forging is higher than the temperature when shot blasting is performed. Therefore, the temperature of the workpiece is first lowered for shot blasting, and then the temperature of the workpiece is raised during cold forging. This causes a problem of large energy loss. [Means for solving the problem]

[0005] The present disclosure can be realized in the following forms.

[0006] (1) According to one aspect of the present disclosure, there is provided a method for manufacturing a workpiece, the method comprising the steps of: heat The temperature was raised to the forging temperature. The workpiece is hot-forged in a hot forging device. forging do A hot forging process, and after the hot forging process, Moving the workpiece;A cooling process in which only a portion of the workpiece including a first portion to be cold forged is cooled to a blasting temperature that is lower than a cold forging temperature; After the portion of the workpiece including the first portion is cooled to the blasting temperature, the cooling step is terminated and the workpiece is moved to a surface treatment device; At the blasting temperature, the first portion Surface a surface treatment process for performing a blasting process on the workpiece; and after the surface treatment process, using the residual heat from the hot forging remaining in a second portion other than the one portion of the workpiece, the temperature of the first portion is raised to a cold forging temperature. While moving the workpiece to a cold forging device, A temperature increasing step; In the cold forging apparatus, and a cold forging process for forging the first portion at the cold forging temperature. According to this embodiment, the temperature of the first portion is raised by using the heat from the hot forging remaining in the second portion, thereby reducing energy loss. (2) In the above embodiment, in the cooling step, the first portion may be cooled by contacting a cooling jig with at least a part of the first portion. According to this embodiment, since the cooling jig is used, the part to be cooled can be limited. (3) In the above aspect, in the cooling step, the first portion may be cooled by applying a coolant sprayed from a nozzle to at least a part of the first portion. According to this aspect, the first portion can be cooled regardless of a shape of the first portion. (4) In the above embodiment, the hot forging step is performed The above The workpiece may be continuously transported from the hot forging device to a surface treatment device that performs the surface treatment step, and the cooling step may be performed while the workpiece is being transported. According to this embodiment, the hot forging step to the surface treatment step are performed continuously as a series of steps, and the workpiece can be cooled. (5) In the above embodiment, a holding jig that covers the second portion may be used in the surface treatment step. According to this embodiment, the second portion can be prevented from being treated in the surface treatment step. (6) In the above embodiment, the holding jig may have a hole having a cross-sectional shape of a boundary between the first portion and the second portion of the workpiece, and the second portion may be fitted into the hole. According to this embodiment, the second portion is fitted into the hole of the holding jig, so that the second portion can be protected with a simple structure. (7) According to one embodiment of the present disclosure, there is provided a workpiece manufacturing apparatus, the workpiece manufacturing apparatus including a conveying device for conveying a workpiece, and a conveying device for conveying the workpiece, the conveying device being configured to convey the workpiece by heating the workpiece to a hot forging temperature and then conveying the workpiece to a hot forging temperature. Hot A hot forging device that performs forging, and a cooling device that cools only a portion of the workpiece including a first portion of the workpiece that is to be cold forged to a blasting temperature; After a portion of the workpiece including the first portion is cooled to the blast processing temperature, the cooling by the cooling device is terminated; The first part On the surface of the hot forging device, the cooling device, the surface treatment device, and the cold forging device are sequentially arranged from the upstream side to the downstream side of the conveying device, and the surface treatment device and the cold forging device are arranged at a predetermined interval, of providing a conveying device for conveying the workpiece from the surface treatment device to the cold forging device; The workpiece is transferred to the cold forging device. During this process, the residual heat remaining in the second portion other than the first portion during hot forging is conducted to the first portion. Then, the temperature of the first portion is raised to a cold forging temperature. According to this embodiment, the surface treatment device and the cold forging device are arranged at a predetermined distance from each other, so that the residual heat from hot forging remaining in the second portion is conducted to the first portion while the workpiece is transported from the surface treatment device to the cold forging device, thereby reducing energy loss. (8) In the above embodiment, the cooling device may have a cooling jig that cools the first portion, and may cool the first portion by bringing the cooling jig into contact with at least a part of the first portion. According to this embodiment, the cooling jig is used, so that the part to be cooled can be limited. (9) In the above aspect, the cooling device may have a nozzle that sprays a refrigerant, and the first portion may be cooled by applying the refrigerant sprayed from the nozzle to at least a part of the first portion. According to this aspect, the first portion can be cooled regardless of the shape of the first portion. (10) In the above-described embodiment, the surface treatment device may have a holding jig that covers the second portion. According to this embodiment, it is possible to prevent the second portion from being treated in the surface treatment step. (11) In the above embodiment, the holding jig may have a hole having a cross-sectional shape of a boundary between the first portion and the second portion of the work, and the second portion may be fitted into the hole. According to this embodiment, the part other than the first portion is fitted into the hole of the holding jig, so that the second portion can be protected with a simple structure.

[0007] The present disclosure may be realized in various forms other than a workpiece manufacturing method and manufacturing apparatus, for example, a workpiece forging method and forging apparatus. [Brief description of the drawings]

[0008] [Figure 1] FIG. 2 is an explanatory diagram showing a workpiece manufacturing device. [Diagram 2] FIG. 2 is an explanatory diagram showing an example of a workpiece. [Diagram 3] FIG. 4 is an explanatory diagram showing a method for manufacturing a workpiece. [Figure 4] FIG. 4 is an explanatory diagram showing a transition of the temperature of a workpiece. [Diagram 5] FIG. 2 is an explanatory diagram showing a workpiece and a cooling jig. [Figure 6] FIG. 2 is an explanatory diagram showing a workpiece and a nozzle. [Figure 7] FIG. 2 is an explanatory diagram showing a workpiece and a holding jig. [Figure 8] FIG. 2 is an explanatory diagram showing a workpiece and a holding jig. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] First embodiment: FIG. 1 is an explanatory diagram showing a manufacturing apparatus 10 for a workpiece 100. The manufacturing apparatus 10 includes a conveying device 20 for conveying the workpiece 100 from upstream to downstream, a heating device 30, a hot forging device 40, a cooling device 50, a surface treatment device 60, and a cold forging device 70, which are arranged in sequence from the upstream side to the downstream side of the conveying device 20. The surface treatment device 60 and the cold forging device 70 are arranged at a predetermined interval, and no device that performs processing on the workpiece 100 is arranged between them. In this embodiment, the conveying device 20 is, for example, a conveyor, and the workpiece 100 is placed on the conveying device 20 and conveyed continuously from the heating device 30 to the cold forging device 70. A robot arm may be used as the conveying device 20.

[0010] The heating device 30 uses a heater to heat the workpiece 100 to a hot forging temperature, for example, 1000 to 1300° C., which is equal to or higher than the transformation point temperature of the material constituting the workpiece 100.

[0011] The hot forging device 40 executes a hot forging process in which the heated workpiece 100 is forged.

[0012] The cooling device 50 executes a cooling step of cooling the workpiece 100 to a blasting temperature that is lower than the cold forging temperature. Since dust is generated during the blasting process, the blasting temperature is preferably, for example, less than 100°C. The cold forging temperature is 100 to 150°C. During the blasting process, particles called blasting material collide with the workpiece 100, as described later, and the temperature of the workpiece 100 rises. Therefore, it is preferable that the cooling device cools the workpiece 100 to a temperature that does not exceed 100°C during the blasting process.

[0013] As described above, in the hot forging process, the temperature of the workpiece 100 is heated to 1000 to 1300°C. Therefore, an oxide film (also called "scale") is formed on the surface of the workpiece 100. The surface treatment device 60 performs a surface treatment process in which the oxide film formed on the surface of the workpiece 100 is removed by colliding granules called blasting material with the workpiece 100. The blasting process is a general term for shot blasting using fine steel balls as blasting material, sand blasting using silica sand, and grid blasting using iron particles with acute angles, and an appropriate blasting material is selected depending on the processing purpose. In this embodiment, the oxide film formed on the surface of the first portion 100a of the workpiece 100 is removed by shot blasting. In this embodiment, sand blasting or grid blasting may be performed.

[0014] The cold forging device 70 executes a cold forging process in which the workpiece 100 is forged at a temperature of 100 to 150°C.

[0015] 2 is an explanatory diagram showing an example of the workpiece 100. The workpiece 100 is made of metal and includes a first portion 100a and a second portion 100b. The first portion 100a is a portion to which blast processing and cold forging are performed, and the second portion 100b is a portion to which blast processing and cold forging are not performed.

[0016] Fig. 3 is an explanatory diagram showing a manufacturing method of the workpiece 100. Fig. 4 is an explanatory diagram showing the transition of the temperature of the workpiece 100. In step S10 from time t0 to t1, the heating device 30 heats the entire workpiece 100 moving on the BELCO conveyor 20. Therefore, the temperature of the entire workpiece 100 rises. When the temperature of the workpiece 100 reaches 1000 to 1300°C, the workpiece 100 on the BELCO conveyor 20 leaves the heating device 30 and enters the hot forging device 40, and the process proceeds to step S20.

[0017] In step S20 from time t1 to t2, the hot forging device 40 executes a hot forging process to perform hot forging on the workpiece 100. In the hot forging process, the workpiece 100 receives collision energy due to forging, but since the temperature of the workpiece 100 is high, the temperature of the workpiece 100 gradually decreases due to the balance between the two. When the hot forging process is completed, the workpiece 100 on the BELCO conveyor 20 leaves the hot forging device 40 and enters the cooling device 50, and the process proceeds to step S30.

[0018] Since the temperature transitions of the first portion 100a and the second portion 100b of the workpiece 100 are not the same, the temperature transitions of the first portion 100a and the second portion 100b will be described separately.

[0019] First, the first portion 100a will be described. In step S30 from time t2 to t3 after the hot forging step of step S20, the cooling device 50 executes a cooling step of forcibly cooling a portion of the workpiece 100 including at least a portion of the first portion 100a of the workpiece 100. The "portion of the workpiece 100 including at least a portion of the first portion 100a of the workpiece 100" may be at least a portion of the first portion 100a to be cold forged, or may be a portion larger than the first portion 100a to be cold forged by a predetermined range. FIG. 5 is an explanatory diagram showing the workpiece 100 and a cooling jig 52. The cooling jig 52 is cooled to a temperature lower than the cold forging temperature. The cooling device 50 cools the first portion of the workpiece 100 by bringing the cooling jig 52 into contact with the first portion 100a from the inside and outside of the first portion 100a of the workpiece 100. Since the cooling jig 52 does not contact the second portion 100b, the first portion 100a can be cooled without cooling the second portion 100b. At time t3, when the temperature of the first portion 100a of the workpiece 100 becomes less than 100°C and becomes a temperature suitable for blast processing, the workpiece 100 on the VELCO conveyor 20 leaves the cooling device 50 after the cooling jig 52 is removed and enters the surface processing device 60, and the process proceeds to step S40. Note that the cooling jig 52 does not need to be in contact with the entire surface of the first portion 100a, and it is sufficient that the cooling jig 52 is in contact with the first portion 100a so that the temperature of the entire first portion 100a is reduced to the blast processing temperature. Also, the cooling jig 52 may be in slight contact with the second portion 100b.

[0020] In step S40 from time t3 to t4 after the cooling step of step S30, the surface treatment device 60 executes a surface treatment step of removing an oxide film formed on the surface of the first portion 100a of the workpiece 100 by shot blasting. After the oxide film is removed, the workpiece 100 on the transport device 20 leaves the surface treatment device 60, and the process proceeds to step S50. Note that, since the cooling jig 52 is removed during the blasting process, the temperature of the first portion 100a of the workpiece 100 rises slightly due to heat conduction from the second portion 100b.

[0021] In step S50 from time t4 to t5 after the surface treatment step of step S40, the workpiece 100 on the conveying device 20 moves toward the cold forging device 70. During this time, the heat remaining in the second portion 100b is thermally conducted to the first portion 100a, so that the temperature of the first portion 100a of the workpiece 100 rises. That is, step S50 is a temperature raising step in which the temperature of the first portion 100a is raised to the cold forging temperature using the residual heat of the hot forging temperature remaining in the second portion 100b. When raising the temperature to the cold forging temperature using the heat remaining in the second portion 100b, the temperature may be raised only by the heat remaining in the second portion 100b, or the temperature may be raised by auxiliary heating using a heater or the like. Auxiliary heating may be performed not only when the total amount of residual heat is insufficient to raise the temperature of the second portion, but also when the total amount of residual heat is sufficient to raise the temperature of the second portion, for example, to shorten the temperature raising time. A heater or the like may be provided between the surface treatment device 60 and the cold forging device 70 as an auxiliary device.

[0022] Next, the second portion 100b will be described. Step S60 from time t2 to t5 In the above, the second portion 100b of the workpiece 100 is naturally cooled. "Naturally cooling the second portion 100b" means that the second portion 100b is not forcibly cooled. As described above, the first portion 100a and the second portion 100b of the workpiece 100 are connected. Therefore, when the first portion 100a is cooled by the cooling jig 52 of the cooling device 50, the temperature of the first portion 100a becomes lower than the temperature of the second portion 100b. Therefore, while the temperature of the first portion 100a is lower than the temperature of the second portion 100b, the temperature of the second portion 100b decreases due to natural cooling and heat conduction to the first portion 100a. However, the second portion 100b does not become lower in temperature than the first portion 100a.

[0023] At time t5, the temperature of the first portion 100a rises to a cold forging temperature suitable for cold forging. The workpiece 100 enters the cold forging device 70, and the process proceeds to step S70. The temperature of the first portion 100a may be lower than the temperature of the second portion 100b, and as shown in FIG. 4, the temperature of the first portion 100a and the temperature of the second portion 100b may be approximately the same.

[0024] In step S70 from time t5 to t6 after the temperature increasing step in step S50, the cold forging device 70 executes a cold forging step for forging the first portion 100a of the workpiece. Note that, although the graph in FIG. 4 shows that the temperature of the workpiece 100 remains almost constant during the cold forging step, the temperature of the workpiece 100 changes depending on the balance between the heat dissipated from the workpiece 100 to the atmosphere and the collision energy received during forging. When the cold forging step is completed, the workpiece 100 leaves the cold forging device 70, and the process proceeds to step S80.

[0025] In step S80 from time t6 to t7, the workpiece 100 is naturally cooled.

[0026] As described above, according to the first embodiment, the surface treatment device 60 and the cold forging device 70 are arranged at a predetermined interval. Therefore, during the period of step S70 from when the workpiece 100 on the conveying device 20 leaves the surface treatment device 60 to when it enters the cold forging device 70, a heating process is executed in which the temperature of the first portion 100a is raised to the cold forging temperature using the residual heat of the hot forging temperature remaining in the second portion 100b. Therefore, there is no need to reheat the first portion 100a using a heater, and no energy loss occurs. As described above, the surface treatment device 60 and the cold forging device 70 are arranged at a predetermined interval, but this predetermined interval may be an interval necessary for the heat of the second portion 100b of the workpiece 100 to be conducted to the first portion 100a to raise the temperature of the first portion 100a to the cold forging temperature. Furthermore, according to this embodiment, the temperature of the second portion 100b does not drop to the blast processing temperature, so even when the first portion 100a is reheated, less energy is required to reheat the first portion 100a than when the temperature of the second portion 100b is lowered to the blast processing temperature.

[0027] Second embodiment: FIG. 6 is an explanatory diagram showing the workpiece 100 and the nozzle 54. In the first embodiment, the cooling device 50 cools the first portion 100a of the workpiece 100 by bringing the cooling jig 52 into contact with the first portion 100a. In the second embodiment, the cooling device 50 cools the first portion 100a by spraying the refrigerant 55 from the nozzle 54 onto the first portion 100a. Nitrogen or carbon dioxide gas can be used as the refrigerant 55. A low-temperature refrigerant 55 may be prepared and applied to the first portion 100a, or a high-pressure refrigerant 55 may be sprayed from the nozzle 54 to adiabatically expand the refrigerant 55, lowering its temperature, and then applied to the first portion 100a.

[0028] According to the second embodiment, the first portion 100a is cooled using the coolant 55 sprayed from the nozzle 54, so that the first portion 100a can be cooled even if the shape of the first portion 100a is complex.

[0029] 7 and 8 are explanatory diagrams showing the work 100 and the holding jig 62. FIG. 7 shows a cross section of the work 100 and the holding jig 62 cut by a plane passing through the central axis O, and FIG. 8 shows a cross section cut by a plane perpendicular to the central axis O. The holding jig 62 used in this embodiment includes a cylindrical portion 62a having an opening 62b on one side, a bottom surface 62c provided on the opposite side of the opening 62b of the cylindrical portion 62a, and a hole 62d formed in the bottom surface 62c. The hole 62d corresponds to the shape of a cross section perpendicular to the central axis O at the boundary between the first portion 100a and the second portion 100b of the work 100, and the holding jig 62 can store the work in a state in which the first portion 100a of the work 100 is exposed to the outside of the holding jig 62 and the second portion 100b is fitted inside the holding jig 62.

[0030] Since the holding jig 62 covers the second portion 100b of the workpiece 100, during the blasting process, granules called blasting material hit the first portion 100a of the workpiece 100 but do not hit the second portion 100b, and therefore the oxide film can be removed only from the first portion 100a. In other words, the holding jig 62 can prevent the second portion 100b from being blasted.

[0031] The holding jig 62 can also be used in the cooling device 50. For example, when the first portion 100a is cooled using the coolant 55 sprayed from the nozzle 54, the holding jig 62 prevents the coolant 55 from hitting the second portion 100b, so that the second portion 100b can retain the heat in the hot forging process, and in the heating process of step S50, the first portion 100a can be heated by conducting the heat of the second portion 100b to the first portion 100a.

[0032] The present disclosure is not limited to the above-mentioned embodiment, and can be realized in various configurations without departing from the spirit of the present disclosure. For example, the technical features of the embodiments corresponding to the technical features in each aspect described in the Summary of the Invention can be appropriately replaced or combined to solve some or all of the above-mentioned problems or to achieve some or all of the above-mentioned effects. Furthermore, if a technical feature is not described as essential in this specification, it can be appropriately deleted. [Explanation of symbols]

[0033] Reference Signs List 10... manufacturing equipment, 20... conveying equipment, 30... heating equipment, 40... hot forging equipment, 50... cooling equipment, 52... cooling jig, 54... nozzle, 55... refrigerant, 60... surface treatment equipment, 62... holding jig, 62a... cylindrical portion, 62b... opening, 62c... bottom surface, 62d... hole, 70... cold forging equipment, 100... workpiece, 100a... first portion, 100b... second portion, O... central axis, t0 to t6... time

Claims

1. A method for manufacturing a workpiece, comprising: A hot forging process in which the workpiece heated to the hot forging temperature is hot forged in a hot forging device; a cooling step of moving the workpiece after the hot forging step and cooling only a portion of the workpiece including a first portion of the workpiece to be cold forged to a blast processing temperature that is lower than the cold forging temperature; a surface treatment step of terminating the cooling step after a portion of the workpiece including the first portion has been cooled to the blast processing temperature, moving the workpiece to a surface treatment device, and performing blast processing on a surface of the first portion at the blast processing temperature; A heating process in which the temperature of the first portion is raised to a cold forging temperature using residual heat from the hot forging remaining in a second portion other than the portion of the workpiece after the surface treatment process, and the workpiece is moved to a cold forging device. a cold forging step of forging the first portion at the cold forging temperature in the cold forging device; A method for manufacturing a workpiece, comprising:

2. The method for manufacturing a workpiece according to claim 1, A method for manufacturing a workpiece, wherein in the cooling step, the first portion is cooled by contacting a cooling jig with at least a portion of the first portion.

3. A method for manufacturing a workpiece according to claim 1, A method for manufacturing a workpiece, wherein the cooling step cools the first portion by applying a coolant sprayed from a nozzle to at least a portion of the first portion.

4. A method for manufacturing a workpiece according to any one of claims 1 to 3, A method for manufacturing a workpiece, in which the workpiece is continuously transported from the hot forging device that performs the hot forging step to the surface treatment device that performs the surface treatment step, and the cooling step is performed while the workpiece is being transported.

5. A method for manufacturing a workpiece according to any one of claims 1 to 4, A method for manufacturing a workpiece, in which a holding jig that covers the second portion is used in the surface treatment process.

6. The method for manufacturing a workpiece according to claim 5, A method for manufacturing a workpiece, wherein the holding jig has a hole having a cross-sectional shape at the boundary between the first and second parts of the workpiece, and the second part is fitted into the hole.

7. A workpiece manufacturing apparatus, A conveying device that conveys the workpiece; A hot forging device that heats the workpiece to a hot forging temperature and then performs hot forging; A cooling device that cools only a portion of the workpiece, including a first portion to be cold forged, to a blasting temperature; a surface treatment device that, after a portion of the workpiece including the first portion is cooled to the blast processing temperature, stops cooling by the cooling device and performs blast processing on a surface of the first portion; a cold forging device for forging the first portion; Equipped with The hot forging device, the cooling device, the surface treatment device, and the cold forging device are sequentially arranged from the upstream side to the downstream side of the conveying device, The surface treatment device and the cold forging device are disposed at a predetermined interval, A conveying device is provided for conveying the workpiece from the surface treatment device to the cold forging device, and while the workpiece is being moved to the cold forging device, the residual heat remaining in the second portion other than the one portion during the hot forging is conducted to the first portion, and the temperature of the first portion is raised to the cold forging temperature. Workpiece manufacturing equipment.

8. The workpiece manufacturing apparatus according to claim 7, The cooling device is a workpiece manufacturing apparatus having a cooling jig that cools the first portion, and cools the first portion by contacting the cooling jig with at least a portion of the first portion.

9. The workpiece manufacturing apparatus according to claim 7, The cooling device is a workpiece manufacturing apparatus having a nozzle for spraying a coolant, and cools the first portion by directing the coolant sprayed from the nozzle against at least a portion of the first portion.

10. The workpiece manufacturing apparatus according to any one of claims 7 to 9, The surface treatment device is a workpiece manufacturing device having a holding jig that covers the second portion.

11. The workpiece manufacturing apparatus according to claim 10, A workpiece manufacturing device, wherein the holding jig has a hole having a cross-sectional shape at the boundary between the first part and the second part of the workpiece, and the second part is fitted into the hole.

Citation Information

Patent Citations

  • Machine part and production thereof

    JP1998008136A

  • Method and device for hardening journal of assembled camshaft

    JP2002166365A

  • Manufacturing method for cold-coining strengthened connecting-rod

    JP2005014078A

  • Method of manufacturing bearing device for wheel

    JP2007024273A

  • Hot forging equipment

    JP2007044764A