Control System

The control system and display device provide a user-friendly interface for power storage device users by predicting and displaying energy management request outcomes, allowing users to make informed decisions based on power storage and remuneration, thus addressing the challenge of intuitive decision-making.

JP7567612B2Active Publication Date: 2024-10-16TOYOTA JIDOSHA KK
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2021053235
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-03-26
Publication Date
2024-10-16
Estimated Expiration
2041-03-26

AI Technical Summary

Technical Problem

Users of power storage devices face challenges in deciding whether to respond to energy management requests due to the lack of an intuitive interface showing the advantages and disadvantages of such responses, leading to a need for a user-friendly interface that facilitates informed decision-making.

Method used

A control system and display device that predictively display the remaining power amount and remuneration for energy management requests on a shared timeline, allowing users to easily weigh the merits and demerits of responding to energy management demands.

Benefits of technology

Enables users to make informed decisions about energy management requests by visually presenting the power storage device's state and potential rewards or penalties, enhancing user convenience and control over their power storage devices.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007567612000001
    Figure 0007567612000001
  • Figure 0007567612000002
    Figure 0007567612000002
  • Figure 0007567612000003
    Figure 0007567612000003
Patent Text Reader

Abstract

To provide a control system and a display device capable of showing the advantages and disadvantages of responding to a request for energy management in an easily understandable form to a user.SOLUTION: The display device is configured to display a screen showing the predicted transition of a first parameter regarding the remaining storage capacity of a power storage device and the predicted transition of a second parameter regarding the reward amount for energy management on the same time axis when it is assumed that charge / discharge control of the power storage device has been executed in accordance with a request of energy management.SELECTED DRAWING: Figure 5
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a control system and a display device, and in particular to an energy management technology. [Background technology]

[0002] There is a known mechanism for paying rewards (incentives) to consumers who respond to requests for energy management from an electricity market (e.g., a supply and demand adjustment market) or an electricity supplier (e.g., a power company). JP 2019-165547 A (Patent Document 1) discloses a control system that, when a power supply request is made, discharges an electricity storage device during the request period. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2019-165547 A Summary of the Invention [Problem to be solved by the invention]

[0004] A user of a power storage device can receive a reward by charging or discharging the power storage device in accordance with an energy management request (e.g., a power supply request). However, depending on the situation, the user of the power storage device may prefer to use the power storage device for a different purpose rather than charging or discharging the power storage device as requested and receiving a reward. It is desirable for the user to be able to decide whether or not to comply with the request of energy management after understanding the advantages and disadvantages of complying with the request. Therefore, a user interface is required that shows the advantages and disadvantages of complying with the energy management request to the user in an easy-to-understand manner.

[0005] The present disclosure has been made to solve the above-mentioned problems, and its purpose is to provide a control system and a display device that can show the user the advantages and disadvantages of meeting energy management requirements in an easily understandable manner. [Means for solving the problem]

[0006] A control system according to a first aspect of the present disclosure includes a power storage device, a display device, a first control device that controls charging and discharging of the power storage device, and a second control device that controls display of the display device. The second control device causes the display device to display a screen showing, on the same time axis, a predicted transition of a first parameter related to the remaining amount of stored power of the power storage device and a predicted transition of a second parameter related to the amount of remuneration for energy management, assuming that the first control device executes charging and discharging control of the power storage device in accordance with a request for energy management.

[0007] In the above control system, the screen (hereinafter also referred to as the "prediction screen") displayed by the display device shows predicted transitions of the first and second parameters on the same time axis when it is assumed that charge / discharge control of the power storage device is performed in accordance with the energy management request. The first parameter is a parameter related to the remaining amount of stored power in the power storage device. The second parameter is a parameter related to the amount of remuneration for energy management. From the prediction screen, the user can easily understand how much power remains in the power storage device during the time period when the user wishes to use the power storage device. In addition, from the prediction screen, the user can confirm the amount of remuneration for responding to the energy management request. This makes it easier for the user to compare the advantages and disadvantages of responding to the energy management request. And, the user can easily make an accurate decision on whether or not to respond to the request.

[0008] The remuneration for energy management includes the amount of incentive that a user can receive when he or she performs energy management, as well as the amount of penalty that is imposed when the user does not perform energy management. This is because a user avoiding a penalty by performing energy management is essentially the same as a user receiving a remuneration equal to the amount of the penalty by performing energy management. Note that in a case where a user pays a higher electricity bill when he or she does not perform energy management than when the user performs energy management, the higher electricity bill corresponds to the penalty.

[0009] The control system may further include a communication device configured to be able to communicate with an external computer, an input device that accepts input from a user, and a third control device that executes a predetermined process based on the user's input to the input device. The second control device may be configured to cause the display device to display a prediction screen when the communication device receives a request for energy management from the external computer. The third control device may be configured to notify the external computer of whether or not to accept the request for energy management when information indicating whether or not to accept the request for energy management is input to the input device after the prediction screen is displayed.

[0010] According to the above configuration, after the user views the prediction screen and decides whether or not to respond to the energy management request, the user can respond to the external computer by operating the input device to select either acceptance or rejection of the request. Note that the first to third control devices may be implemented together in one unit, or may be implemented separately in multiple units.

[0011] The external computer may be a computer that manages a power grid. The energy management may be a supply and demand adjustment of the power grid. The first control device may be configured to execute charge and discharge control of the power storage device according to a charge and discharge command from the external computer in a state where the power storage device is electrically connected to the power grid.

[0012] The second control device may be configured to be operable in each of a first control mode and a second control mode. The third control device may be configured to switch the control mode of the second control device based on a user's input to an input device. The second control device operating in the first control mode may be configured to cause a display device to display a prediction screen when the communication device receives a request for energy management from an external computer. The second control device operating in the second control mode may be configured to determine whether or not to accept the request based on a predetermined condition when the communication device receives a request for energy management from an external computer, and then notify the external computer of the determination result.

[0013] According to the above configuration, the user can switch between a first control mode in which the user determines whether or not to perform energy management (i.e., determines whether or not to respond to a request for energy management) and a second control mode in which the determination whether or not to perform energy management is performed automatically, thereby improving user convenience.

[0014] The predetermined condition may specify a lower limit value of a remaining amount of stored power in the power storage device. The second control device operating in the second control mode may be configured to determine to reject the request when it is predicted that the remaining amount of stored power in the power storage device will fall below a lower limit value when the first control device executes charge / discharge control of the power storage device in accordance with a request for energy management.

[0015] According to the above configuration, it is possible to prevent the remaining amount of stored power of the power storage device from decreasing too much by energy management. The lower limit value of the remaining amount of stored power of the power storage device may be set to an arbitrary value by a user or may be automatically set to a predetermined value.

[0016] The predetermined condition may specify an upper limit value of a remaining amount of stored power in the power storage device. The second control device operating in the second control mode may be configured to determine to reject the request when it is predicted that the remaining amount of stored power in the power storage device will exceed an upper limit value when the first control device executes charge / discharge control of the power storage device in accordance with the request of energy management.

[0017] According to the above configuration, it is possible to prevent the remaining amount of stored power in the power storage device from increasing too much through energy management. The upper limit value may be set to an arbitrary value by a user, or may be automatically set to a predetermined value. Furthermore, the predetermined condition may specify both a lower limit value and an upper limit value of the remaining amount of stored power in the power storage device.

[0018] The predetermined condition may specify a requested remuneration amount. The second control device operating in the second control mode may be configured to determine to accept the request if the remuneration amount generated when the first control device executes charge / discharge control of the power storage device in accordance with the energy management request is equal to or greater than the requested remuneration amount. This configuration makes it easier to participate in high-remuneration energy management. The requested remuneration amount may be set to an arbitrary value by the user, or may be automatically set to a predetermined value.

[0019] In any of the above-described control systems, the power storage device may be mounted on a vehicle. The second control device operating in the second control mode may be configured to determine to reject the request when it is predicted that the vehicle will not be able to travel according to the travel plan if the first control device executes charge / discharge control of the power storage device in accordance with the request of energy management.

[0020] According to the above configuration, it is possible to prevent the vehicle from being unable to travel according to the travel plan due to energy management.

[0021] The second control device may be configured to cause the display device to display a screen showing, on the same time axis, a predicted transition of one or more first parameters selected from a first option including the SOC of the power storage device and a cruising distance of a vehicle equipped with the power storage device and a predicted transition of one or more second parameters selected from a second option including a remuneration unit price and an accumulated remuneration amount. The third control device may be configured to select one or more first parameters from the first option and select one or more second parameters from the second option based on a user's input to the input device.

[0022] According to the above configuration, the user can select a first parameter to be displayed on the display device from a plurality of candidates (e.g., the SOC of the power storage device and the vehicle's cruising range). The user can also select a second parameter to be displayed on the display device from a plurality of candidates (e.g., the remuneration unit price and the accumulated remuneration amount). The display device may display a plurality of first parameters (or a plurality of second parameters) simultaneously on the prediction screen.

[0023] The method of determining the first and second parameters is not limited to the above and may be arbitrary. For example, when the energy management request is to discharge the power storage device, the first parameter may be the SOC of the power storage device, and the second parameter may be the remuneration unit price. Note that the SOC (State Of Charge) indicates the remaining amount of power storage, and is, for example, the ratio of the current amount of power storage to the amount of power storage in a fully charged state, expressed as 0 to 100%.

[0024] Any of the above-mentioned control systems may be mounted on an electric vehicle. An electric vehicle is a vehicle configured to run using electric power stored in a power storage device. Electric vehicles include EVs (electric vehicles), HVs (hybrid vehicles), and PHVs (plug-in hybrid vehicles), as well as FC vehicles (fuel cell vehicles), range extender EVs, and the like.

[0025] In any of the above-mentioned control systems, if the request for energy management is accepted, remote operation of the first control device may be permitted, and if the request for energy management is rejected, remote operation of the first control device may be prohibited.

[0026] According to the above configuration, for example, an external computer can remotely operate the first control device to control charging and discharging of the power storage device in accordance with the accepted request.

[0027] A display device according to a second aspect of the present disclosure is configured to display a screen showing, on the same time axis, a predicted trend of a first parameter relating to the remaining storage capacity of the energy storage device and a predicted trend of a second parameter relating to the amount of compensation for energy management, assuming that charging and discharging control of the energy storage device is performed in accordance with a request for energy management.

[0028] Like the control system described above, the display device makes it possible to present to the user in an easily understandable manner the advantages and disadvantages of meeting energy management requirements. Effect of the Invention

[0029] According to the present disclosure, it is possible to provide a control system and a display device that can show the advantages and disadvantages of meeting energy management requirements to a user in an easily understandable manner. [Brief description of the drawings]

[0030] [Figure 1] 1 is a diagram showing a configuration of a vehicle equipped with a control system according to an embodiment of the present disclosure. [Diagram 2] 1 is a diagram illustrating a configuration of a power system according to an embodiment of the present disclosure. [Diagram 3] 2 is a diagram showing a detailed configuration of an ECU shown in FIG. 1. [Figure 4]4 is a flowchart showing an example of a process executed by an ECU when the second control unit shown in FIG. 3 operates in a user selection mode. [Diagram 5] FIG. 5 is a diagram showing an example of a prediction screen displayed in the process shown in FIG. 4. [Figure 6] FIG. 6 is a diagram for explaining the prediction screen shown in FIG. 5. [Figure 7] 4 is a flowchart showing an example of a process executed by an ECU when a second control unit shown in FIG. 3 operates in an automatic selection mode. [Figure 8] FIG. 8 is a diagram showing an example of an input screen displayed in the process shown in FIG. 7. [Figure 9] 10 is a flowchart showing charge / discharge control of a power storage device that is executed according to a charge / discharge schedule that meets a VPP request. [Figure 10] FIG. 6 is a diagram showing a first modified example of the prediction screen shown in FIG. [Figure 11] FIG. 6 is a diagram showing a second modified example of the prediction screen shown in FIG. [Figure 12] FIG. 13 is a diagram showing a predicted screen when discharge requested by a VPP request signal is rejected in the second modified example. [Figure 13] FIG. 9 is a diagram showing a first modified example of the input screen shown in FIG. [Figure 14] FIG. 9 is a diagram showing a second modified example of the input screen shown in FIG. [Figure 15] FIG. 9 is a diagram showing a third modified example of the input screen shown in FIG. [Figure 16] FIG. 9 is a diagram showing a fourth modified example of the input screen shown in FIG. [Figure 17] FIG. 8 is a diagram illustrating a modified example of the process shown in FIG. [Figure 18] FIG. 4 is a diagram showing a modified example of the configuration of the control system shown in FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0031] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the drawings. In the drawings, the same or corresponding parts are designated by the same reference characters and the description thereof will not be repeated.

[0032] Fig. 1 is a diagram showing the configuration of a vehicle 50 equipped with a control system according to this embodiment. Referring to Fig. 1, the vehicle 50 includes a battery 130 that stores electric power for traveling. The vehicle 50 is configured to be able to travel using the electric power stored in the battery 130. The vehicle 50 according to this embodiment is an electric vehicle (EV) that does not include an engine (internal combustion engine).

[0033] Battery 130 includes a secondary battery such as a lithium ion battery or a nickel metal hydride battery. In this embodiment, a battery pack including a plurality of lithium ion batteries is used as the secondary battery. The battery pack is configured by electrically connecting a plurality of secondary batteries (also generally referred to as "cells") to each other. Note that other power storage devices such as electric double layer capacitors may be used instead of the secondary batteries. Battery 130 according to this embodiment corresponds to an example of the "power storage device" according to the present disclosure.

[0034] The vehicle 50 includes an electronic control unit (hereinafter referred to as an "ECU (Electronic Control Unit)") 150. The ECU 150 is configured to perform charging control and discharging control of the battery 130. The ECU 150 is also configured to control communication between the vehicle 50 and the outside.

[0035] The vehicle 50 further includes a monitoring module 131 that monitors the state of the battery 130. The monitoring module 131 includes various sensors that detect the state of the battery 130 (for example, voltage, current, and temperature) and outputs the detection results to the ECU 150. The monitoring module 131 may be a BMS (Battery Management System) that further has a SOC (State Of Charge) estimation function, a SOH (State of Health) estimation function, a cell voltage equalization function, a diagnosis function, and a communication function in addition to the above sensor functions. The ECU 150 can obtain the state of the battery 130 (for example, temperature, current, voltage, SOC, and internal resistance) based on the output of the monitoring module 131.

[0036] The EVSE (Electric Vehicle Supply Equipment) 40 corresponds to a power supply facility outside the vehicle. The main body of the EVSE 40 includes a built-in power supply circuit 41. A charging cable 42 is connected to the main body of the EVSE 40. The charging cable 42 may be always connected to the main body of the EVSE 40, or may be detachable from the main body of the EVSE 40. The charging cable 42 has a connector 43 at its tip and includes a power line inside.

[0037] The vehicle 50 includes an inlet 110 for contact charging and a charger / discharger 120. The inlet 110 is configured to receive power supplied from outside the vehicle 50. The inlet 110 is configured to be connectable to a connector 43 of a charging cable 42. When the connector 43 of the charging cable 42 connected to the main body of the EVSE 40 is connected (plugged in) to the inlet 110 of the vehicle 50, the vehicle 50 enters a plugged-in state.

[0038] The EVSE 40 according to this embodiment is an AC power supply facility that supplies AC power. The EVSE 40 supports reverse power flow, which will be described in detail later. Note that while Fig. 1 shows only the inlet 110 and the charger / discharger 120 that support the power supply method of the EVSE 40, the vehicle 50 may be provided with multiple inlets so as to support multiple types of power supply methods (for example, AC and DC methods).

[0039] The charger / discharger 120 is located between the inlet 110 and the battery 130. The charger / discharger 120 includes a relay that switches between connection and disconnection of a power path from the inlet 110 to the battery 130, and a power conversion circuit (both not shown). The power conversion circuit is configured to perform bidirectional AC / DC conversion. The power conversion circuit is configured to convert AC power supplied from the EVSE 40 into DC power and output it to the battery 130, and to convert DC power supplied from the battery 130 into AC power and output it to the inlet 110. For example, a bidirectional inverter can be used as the power conversion circuit. The charger / discharger 120 may further include at least one of a rectifier circuit, a power factor correction circuit, an insulating circuit, a transformer (for example, an insulating transformer), and a filter circuit. Each of the relays and the power conversion circuit included in the charger / discharger 120 is controlled by the ECU 150.

[0040] The vehicle 50 further includes a monitoring module 121 that monitors the state of the charger / discharger 120. The monitoring module 121 includes various sensors that detect the state of the charger / discharger 120, and outputs the detection results to the ECU 150. In this embodiment, the monitoring module 121 is configured to detect the voltage and current input to the power conversion circuit and the voltage and current output from the power conversion circuit. The monitoring module 121 is configured to be able to detect the charging power and discharging power of the battery 130.

[0041] In the plugged-in state, the vehicle 50 is capable of external charging (i.e., charging the battery 130 with power supplied from outside the vehicle) and external power supply (i.e., supplying power from the vehicle 50 to the outside of the vehicle). Power for external charging is supplied, for example, from the EVSE 40 to the inlet 110. The charger / discharger 120 is configured to convert the power received by the inlet 110 into power suitable for charging the battery 130 and output the converted power to the battery 130. Power for external power supply is supplied from the battery 130 to the charger / discharger 120. The charger / discharger 120 is configured to convert the power supplied from the battery 130 into power suitable for external power supply and output the converted power to the inlet 110. When either external charging or external power supply is performed, the relay of the charger / discharger 120 is closed (connected), and when neither external charging nor external power supply is performed, the relay of the charger / discharger 120 is opened (disconnected).

[0042] The ECU 150 includes a processor 151, a RAM (Random Access Memory) 152, a storage device 153, and a timer 154. The ECU 150 may be a computer. The processor 151 may be a CPU (Central Processing Unit). The RAM 152 functions as a working memory that temporarily stores data processed by the processor 151. The storage device 153 is configured to be able to save stored information. The storage device 153 includes, for example, a ROM (Read Only Memory) and a rewritable non-volatile memory. In addition to programs, information used in the programs (for example, maps, mathematical expressions, and various parameters) is stored in the storage device 153. In this embodiment, the processor 151 executes the programs stored in the storage device 153, thereby executing various types of control in the ECU 150. However, the various types of control in the ECU 150 are not limited to being executed by software, and can also be executed by dedicated hardware (electronic circuits). The number of processors included in the ECU 150 is arbitrary, and a processor may be provided for each predetermined control.

[0043] Timer 154 is configured to notify processor 151 of the arrival of a set time. When the time set in timer 154 arrives, timer 154 transmits a signal to notify processor 151 of the arrival of the set time. In this embodiment, a timer circuit is used as timer 154. However, timer 154 may be realized by software instead of hardware (timer circuit). Furthermore, ECU 150 can obtain the current time by using a real-time clock (RTC) circuit (not shown) built into ECU 150.

[0044] Vehicle 50 further includes a driving unit 140, an input device 161, a meter panel 162, a navigation system (hereinafter referred to as "NAVI") 170, a communication device 180, and driving wheels W. The drive system of vehicle 50 is not limited to the front-wheel drive shown in FIG. 1, and may be rear-wheel drive or four-wheel drive.

[0045] The traveling drive unit 140 includes a PCU (Power Control Unit) and an MG (Motor Generator), not shown, and is configured to run the vehicle 50 using the power stored in the battery 130. The PCU includes, for example, an inverter, a converter, and a relay (hereinafter, referred to as an "SMR (System Main Relay)") (all not shown). The PCU is controlled by the ECU 150. The MG is, for example, a three-phase AC motor generator. The MG is configured to be driven by the PCU and to rotate the driving wheels W. The PCU drives the MG using the power supplied from the battery 130. The MG is also configured to perform regenerative power generation and supply the generated power to the battery 130. The SMR is configured to switch between connection and disconnection of a power path from the battery 130 to the MG. The SMR is in a closed state (connected state) when the vehicle 50 is traveling.

[0046] The input device 161 is a device that accepts input from a user. The input device 161 is operated by a user and outputs a signal corresponding to the user's operation to the ECU 150. Examples of the input device 161 include various switches, various pointing devices, a keyboard, and a touch panel. The input device 161 may include a smart speaker that accepts voice input.

[0047] The meter panel 162 is configured to display information related to the vehicle 50. The meter panel 162 displays various information related to the vehicle 50 measured by various sensors mounted on the vehicle 50, for example. The information displayed on the meter panel 162 may include at least one of an outside air temperature, a traveling speed of the vehicle 50, an SOC of the battery 130, an electricity consumption of the vehicle 50, and a traveling distance of the vehicle 50. The meter panel 162 may be a touch panel display. The meter panel 162 is controlled by the ECU 150. The ECU 150 may cause the meter panel 162 to display a message or a warning light for a user when a predetermined condition is met.

[0048] NAVI170 includes a processor, a storage device, a touch panel display, and a GPS (Global Positioning System) module (none of which are shown). The storage device stores map information. The touch panel display accepts input from a user and displays the map and other information. The GPS module is configured to receive signals from GPS satellites (hereinafter referred to as "GPS signals"). NAVI170 can identify the position of the vehicle 50 using the GPS signals. NAVI170 is configured to perform a route search to find a driving route (e.g., the shortest route) from the current position of the vehicle 50 to a destination, and to display the driving route found by the route search on a map.

[0049] The communication device 180 is configured to include various communication I / Fs (interfaces). The communication device 180 includes a communication I / F for wireless communication with a server 30 (see FIG. 2) described later. The communication device 180 may include a DCM (Data Communication Module). The communication device 180 may include a communication I / F compatible with 5G (fifth generation mobile communication system). The ECU 150 is configured to communicate with a communication device outside the vehicle 50 through the communication device 180. The communication device 180 according to this embodiment corresponds to an example of a "communication device" according to the present disclosure.

[0050] FIG. 2 is a diagram showing a configuration of a power system according to this embodiment. The power system 1 shown in FIG. 2 is a vehicle grid integration (VGI) system. The power system 1 functions as a virtual power plant (VPP). The VPP is a mechanism for bundling a large number of distributed energy resources (hereinafter also referred to as "Distributed Energy Resources (DER)") by an advanced energy management technology using the Internet of Things (IoT), and for remotely and integrally controlling these DERs to function as if they were one power plant. An example of a DER is an energy resource owned by each consumer (hereinafter also referred to as "Demand Side Resources (DSR)"). In the power system 1, a vehicle 50 (i.e., an electric vehicle equipped with a power storage device) is adopted as a DSR for realizing the VPP. For example, the vehicle 50 is a POV (personally owned vehicle). The EVSE 40 is a home EVSE installed in the home of a user of the vehicle 50.

[0051] In this embodiment, a power system 1 is constructed by a power grid PG, servers 10 and 30, a smart meter 11, a plurality of EVSEs (only EVSE 40 is shown), and a plurality of DSRs (only vehicle 50 is shown). The number of electric vehicles and EVSEs included in the power system 1 is each independently arbitrary, and may be 10 or more, or may be 100 or more.

[0052] The mobile terminal 80 corresponds to a mobile terminal carried by a user of the vehicle 50. In this embodiment, a smartphone equipped with a touch panel display is adopted as each mobile terminal 80. However, this is not limited thereto, and any mobile terminal can be adopted as each mobile terminal 80, and a tablet terminal, a wearable device (for example, a smart watch), or an electronic key can also be adopted.

[0053] The vehicle 50 shown in Fig. 2 is electrically connected to the EVSE 40. When a connector 43 of a charging cable 42 connected to a main body of the EVSE 40 is connected to an inlet 110 of the vehicle 50, communication between the vehicle 50 and the EVSE 40 becomes possible, and power can be exchanged between the EVSE 40 and the vehicle 50. This completes preparations for external charging and external power supply. A communication device 180 mounted on the vehicle 50 is configured to communicate with the EVSE 40 via the charging cable 42. Any communication method may be used between the EVSE 40 and the vehicle 50, and may be, for example, a controller area network (CAN) or a PLC.

[0054] A power supply circuit 41 built into the main body of the EVSE 40 is electrically connected to the power system PG via the smart meter 11. For example, power is supplied from the power system PG to the vehicle 50 via the power supply circuit 41 and the charging cable 42, thereby performing external charging of the battery 130. In addition, by the vehicle 50 performing external power supply to the EVSE 40, it is possible to cause a reverse flow of power from the vehicle 50 to the power system PG via the charging cable 42 and the power supply circuit 41. The power supply circuit 41 converts the power supplied from the power system PG into power suitable for external charging, and also converts the power supplied from the vehicle 50 into power suitable for reverse flow.

[0055] The smart meter 11 is configured to measure the amount of power supplied from the EVSE 40 to the vehicle 50. The smart meter 11 is also configured to measure the amount of power flowed backward from the vehicle 50 to the EVSE 40. The smart meter 11 is configured to measure the amount of power usage every predetermined time (for example, every 30 minutes), store the measured amount of power usage, and transmit it to the server 10. The server 10 transmits the measurement value of the smart meter 11 to the server 30 as needed. The server 10 may transmit the measurement value periodically, or may transmit the measurement value in response to a request from the server 30.

[0056] The communication device 180 mounted on the vehicle 50 is configured to wirelessly communicate with the server 30. The server 30 according to this embodiment corresponds to an example of the "external computer" according to the present disclosure. Signals exchanged between the communication device 180 and the server 30 may be encrypted. Furthermore, in this embodiment, the communication device 180 mounted on the vehicle 50 and the mobile terminal 80 are configured to wirelessly communicate with each other. The ECU 150 can control the mobile terminal 80 by wireless communication to cause the mobile terminal 80 to notify the user. The communication between the communication device 180 and the mobile terminal 80 may be short-range communication (for example, direct communication within the vehicle and the area around the vehicle) such as Bluetooth (registered trademark).

[0057] Predetermined application software (hereinafter simply referred to as "app") is installed in the mobile terminal 80. The mobile terminal 80 is carried by the user of the vehicle 50, and can exchange information with the server 30 through the app. The user can operate the app, for example, through a touch panel display (not shown) of the mobile terminal 80. In addition, the touch panel display of the mobile terminal 80 is configured to be able to notify the user of the vehicle 50.

[0058] The server 10 is a server belonging to an electricity transmission and distribution business operator. In this embodiment, an electric power company serves as both a power generation business operator and an electricity transmission and distribution business operator. A power grid (i.e., a power system PG) is constructed by power plants and electricity transmission and distribution facilities (not shown). The electricity transmission and distribution facilities include transmission lines, substations, and distribution lines, and are configured to transmit and distribute electricity supplied from power plants. Examples of power plants include thermal power plants, hydroelectric power plants, nuclear power plants, and variable natural energy sources (such as solar power generation facilities and wind power generation facilities).

[0059] The electric power company maintains and manages the server 10, the smart meter 11, and the electric power system PG. The electric power company can make a profit, for example, by conducting transactions with consumers (for example, individuals or companies) who use electric power. The EVSE 40 is connected to the electric power system PG via the smart meter 11. In this embodiment, the electric power company corresponds to a system operator that operates the electric power system PG.

[0060] An electric utility that provides energy management services by bundling DERs is called an "aggregator." For example, an electric power company can adjust the power of the power system PG (for example, adjust supply and demand) by cooperating with an aggregator. The electric power company or the aggregator requests each consumer to adjust the power of the power system PG, and each consumer adjusts the power of the power system PG in response to the request. This mechanism is generally called "DR (demand response)." Hereinafter, a request for power adjustment of the power system PG is also called a "VPP request." The VPP request may be a request for charging promotion (upward DR), a request for charging suppression (downward DR), or a discharge request (downward DR). The VPP request corresponds to an example of an "energy management request" according to the present disclosure.

[0061] Each of the servers 10 and 30 corresponds to a management computer that manages the power system PG. The server 30 is a server belonging to an aggregator. An automobile manufacturer may also serve as an aggregator. It is easy for an automobile manufacturer to obtain information on each vehicle that it manufactures. Each vehicle included in the power system 1 is registered in the server 30. Then, vehicle information (for example, the vehicle's position, the connection state of the charging cable, and the amount of stored power, etc.) is sequentially transmitted from each vehicle to the server 30. The server 30 includes a control device 31, a storage device 32, and a communication device 33. The control device 31 may be a computer. The control device 31 includes a processor and is configured to perform predetermined information processing and control the communication device 33. The storage device 32 is configured to be able to store various information. The communication device 33 includes various communication I / Fs. The control device 31 is configured to communicate with the outside through the communication device 33.

[0062] The server 30 is configured to be able to communicate with each of the server 10, the vehicle 50, and the mobile terminal 80. In this embodiment, the aggregator terminal (server 30) is configured to be able to communicate with each of the power company terminal (server 10) and the vehicle user terminal (communication device 180 and mobile terminal 80). However, this is not limited, and the power system 1 may include a server that contacts the power company and a server that contacts the vehicle user separately. These servers may be managed by different electric power suppliers (for example, upper / lower aggregators).

[0063] When the server 10 adjusts power, it first selects a number of aggregators required for the power adjustment from among a number of aggregators, and makes a VPP request to the selected aggregators. The server 30 then selects a number of VPP-cooperating vehicles required to respond to the VPP request from the server 10. The VPP-cooperating vehicles are vehicles that will participate in the VPP (requested power adjustment). The VPP-cooperating vehicles are selected from a number of vehicles (including the vehicle 50) belonging to users who have signed a contract with an aggregator in advance. The users who have signed this contract can receive a predetermined reward (incentive) by charging and discharging in accordance with the request from the aggregator. On the other hand, a predetermined penalty may be imposed on users who do not comply with the request according to the contract.

[0064] In this embodiment, when the selection of the VPP cooperation vehicles is completed, the server 30 determines a charge / discharge schedule for each VPP cooperation vehicle and transmits a VPP request signal to the user of each VPP cooperation vehicle. The VPP request signal includes a type of power adjustment requested (e.g., charging promotion, charging suppression, or discharging), a VPP request period (more specifically, a start time and an end time of the requested power adjustment), a charge / discharge schedule during the VPP request period (e.g., a transition of charge / discharge power), and reward information. The VPP request signal according to this embodiment requests the user of the VPP cooperation vehicle to put the VPP cooperation vehicle on standby so that the server 30 can remotely control the charge / discharge of the VPP cooperation vehicle during the VPP request period. Then, when the start time of the VPP request period set for the VPP cooperation vehicle arrives, the server 30 transmits a charge / discharge command (more specifically, a command to cause the VPP cooperation vehicle to perform charge / discharge control) to the VPP cooperation vehicle, thereby performing the power adjustment requested by the server 10. The reward information indicates an incentive to be given to a user who responds to a request from the server 30.

[0065] The server 30 measures the amount of power adjustment for each VPP cooperating vehicle using a predetermined watt-hour meter. The predetermined watt-hour meter may be the smart meter 11 or a watt-hour meter (e.g., the monitoring modules 121 and 131) mounted on the vehicle 50. The watt-hour meter may be installed anywhere. The watt-hour meter may be built into the EVSE 40. The watt-hour meter may be attached to a portable charging cable.

[0066] The server 30 manages the incentive information of each user by distinguishing it by the user ID. The incentive information includes, for example, an incentive acquisition amount. The incentive acquisition amount is the total amount of remuneration acquired by the user by performing power adjustment in response to a VPP request. The server 30 may calculate the remuneration amount for power adjustment according to, for example, a formula such as "remuneration amount = incentive unit price x power adjustment amount". In this embodiment, the incentive unit price is linked to the market price. Therefore, the incentive unit price varies depending on the time period. In addition, in this embodiment, an incentive point system is adopted. That is, the incentive acquisition amount is counted by points (number of points). A higher number of points means a higher value. The points may be treated like virtual currency or may be convertible into cash. Also, the points may be converted into goods or rights (for example, the right to receive a service corresponding to the number of points). However, the incentive mechanism is not limited to the above-mentioned incentive point system and can be arbitrarily determined by contract.

[0067] In this embodiment, no communication is performed between the server 30 and the EVSE 40, but the server 30 and the EVSE 40 may be configured to be able to communicate with each other. The server 30 may be configured to communicate with the vehicle 50 via the EVSE 40. The EVSE 40 may be configured to be able to communicate with an EVSE management cloud. The communication protocol between the EVSE 40 and the EVSE management cloud may be OCPP (Open Charge Point Protocol).

[0068] FIG. 3 is a diagram showing a detailed configuration of the ECU 150 of the vehicle 50. Referring to FIG. 3 together with FIG. 1 and FIG. 2, the ECU 150 includes a first control unit 511, a second control unit 512, and a third control unit 513. In this embodiment, the first control unit 511, the second control unit 512, and the third control unit 513 correspond to examples of the "first control unit", the "second control unit", and the "third control unit" according to the present disclosure, respectively. In the ECU 150 according to this embodiment, the above-mentioned units are embodied by the processor 151 shown in FIG. 1 and a program executed by the processor 151 (for example, a program stored in the storage device 153). However, without being limited thereto, the above-mentioned units may be embodied by dedicated hardware (electronic circuits).

[0069] Detection values ​​of various sensors mounted on the vehicle 50 are input to the ECU 150. In addition to the above-mentioned monitoring modules 121 and 131, the vehicle 50 is also equipped with a position sensor, a vehicle speed sensor, an accelerator sensor, an outside air temperature sensor, a charging cable connection detection circuit, and the like (not shown). The ECU 150 uses these detection values ​​for control as necessary. Furthermore, the ECU 150 sequentially transmits the state of the vehicle 50 (including, for example, the connection state of the charging cable and the SOC of the battery 130) to the server 30. For example, during a VPP request period, the server 30 remotely operates the vehicle 50 while referring to the information received from the vehicle 50.

[0070] The first control unit 511 is configured to control charging and discharging of the battery 130. The second control unit 512 is configured to control the display of the meter panel 162, the NAVI 170, and the mobile terminal 80. The third control unit 513 is configured to execute a predetermined process based on a user's input to each of the input device 161, the NAVI 170, and the mobile terminal 80.

[0071] The second control unit 512 is configured to be operable in each of the control modes of a user selection mode (first control mode) and an automatic selection mode (second control mode). The third control unit 513 is configured to switch the control mode (user selection mode / automatic selection mode) of the second control unit 512 based on a user's input to a predetermined input device (hereinafter referred to as a "mode input device"). In this embodiment, the input device 161 is the mode input device. However, this is not limited to this, and at least one of the NAVI 170 and the mobile terminal 80 may be adopted as the mode input device instead of or in addition to the input device 161.

[0072] For example, when the user selects the user selection mode through the mode input device, the second control unit 512 operates in the user selection mode. FIG. 4 is a flowchart showing an example of a process executed by the ECU 150 when the second control unit 512 operates in the user selection mode. The process shown in this flowchart is started, for example, when the vehicle 50 receives a VPP request signal while the second control unit 512 is operating in the user selection mode. In this embodiment, when the vehicle 50 is selected as a VPP cooperation vehicle, the server 30 transmits a VPP request signal to the communication device 180 of the vehicle 50. Hereinafter, each step in the flowchart will be simply denoted as "S".

[0073] 1 to 3 as well as FIG. 4, in S11, the second control unit 512 determines a charge / discharge schedule for a predetermined target period, and predicts changes in the first and second parameters during the target period. In this embodiment, the target period is a period from the present time (i.e., the timing when the vehicle 50 receives the VPP request signal) until a predetermined time (e.g., 24 hours) has elapsed. The target period includes the VPP request period. The first parameter is a parameter related to the remaining amount of stored power in the battery 130. In this embodiment, the SOC of the battery 130 is adopted as the first parameter. The second parameter is a parameter related to the amount of reward for energy management. In this embodiment, the unit price of an incentive given to a user who responds to a VPP request is adopted as the second parameter.

[0074] In the example described here, the energy management requested by the VPP request signal is discharging. By the process of S11 above, a charge / discharge schedule (change in charge / discharge power) for the target period is determined so that discharging requested by the VPP request signal is executed during the VPP request period, and charging is executed outside the VPP request period to bring the SOC of the battery 130 closer to a predetermined target value (e.g., 80%).

[0075] In S12, the second control unit 512 displays a prediction screen on a predetermined display device (hereinafter referred to as a "screen display device"). The prediction screen is a screen showing predicted transitions of the first and second parameters in the target period on the same time axis, assuming that the first control unit 511 executes charge / discharge control of the battery 130 in accordance with the request of the VPP request signal. The screen display device is, for example, at least one of the input device 161, the NAVI 170, and the mobile terminal 80. As described above, in this embodiment, when the second control unit 512 operates in the user selection mode and the communication device 180 receives a VPP request signal from the server 30, the second control unit 512 displays the prediction screen on the screen display device.

[0076] Fig. 5 is a diagram showing an example of a prediction screen. Referring to Fig. 5, this prediction screen displays a graph M11, a message M12, a "Yes" button M13, and a "No" button M14, and prompts the user to select either acceptance or rejection of the VPP request.

[0077] Graph M11 shows, on the same time axis, the predicted transitions of the first and second parameters when it is assumed that the first control unit 511 executes charge / discharge control of the battery 130 in accordance with the request of the VPP request signal. More specifically, graph M11 in Fig. 5 shows, on the same time axis, the predicted transition (line L1) of the remaining battery capacity (SOC of the battery 130) during the target period and the predicted transition (line L2) of the incentive unit price during the target period when it is assumed that the first control unit 511 executes charge / discharge control of the battery 130 during the target period in accordance with the charge / discharge schedule determined in S11 of Fig. 4.

[0078] The message M12 shows an explanation of the "Yes" button M13 and the "No" button M14. The user can select either the "Yes" button M13 or the "No" button M14, for example, by touching the screen. Note that these buttons are not limited to virtual buttons displayed on a touch panel display, and may be physical buttons.

[0079] Fig. 6 is a diagram for explaining the prediction screen shown in Fig. 5. As shown in Fig. 6, when the prediction screen is displayed on a touch panel display, the user can touch the graph M11 to display on the prediction screen the remaining battery level and the incentive unit price (for example, balloon M1 in Fig. 6) at any time during the target period. Note that the time may be specified by a pointing device other than the touch panel, or by inputting a numerical value.

[0080] From the prediction screen, the user can easily understand how much power is remaining in the battery 130 during the time period when the user wants to use the battery 130. For example, if the user plans to depart in the vehicle 50 at 24:00, the user checks whether the SOC of the battery 130 at 24:00 is sufficient for the vehicle 50 to run. If the user determines that the SOC of the battery 130 at 24:00 is sufficient, the user can accept the VPP request by selecting the "Yes" button M13. Selection of the "Yes" button M13 means that information indicating that the VPP request has been accepted has been input to a predetermined input device (for example, a touch panel of a screen display device). On the other hand, if the user determines that the SOC of the battery 130 at 24:00 is insufficient, the user can reject the VPP request by selecting the "No" button M14. Selection of the "No" button M14 means that information indicating that the VPP request has been rejected has been input to a predetermined input device (for example, a touch panel of a screen display device).

[0081] 1 to 3 and FIG. 4 again, in S13, the third control unit 513 judges whether or not the VPP request has been accepted. If the "Yes" button M13 is selected by the user, the third control unit 513 judges YES in S13, and if the "No" button M14 is selected by the user, the third control unit 513 judges NO in S13. Furthermore, if a predetermined time (for example, 100 seconds) has passed without any button being selected after the prediction screen was displayed in S12, the third control unit 513 also judges NO in S13.

[0082] If the determination in S13 is YES, the third control unit 513 notifies the server 30 of the acceptance of the request in S14. Then, the third control unit 513 sets the charge / discharge schedule for the target period in the first control unit 511 in S15, and the series of processes shown in FIG. 4 ends. This allows the server 30 to remotely control the first control unit 511. The charge / discharge schedule for the target period is the charge / discharge schedule determined in S11. The target period in this embodiment is longer than the VPP request period. The VPP request period corresponds to a period during which power adjustment (e.g., discharging the battery 130) in accordance with the accepted VPP request is performed.

[0083] If the result of S13 is NO, the third control unit 513 notifies the server 30 in S16 that the request has been rejected. The server 30 that has received the request rejection notification may cancel the selection of the vehicle 50 and select a VPP cooperation vehicle in place of the vehicle 50. Then, the series of processes shown in FIG. 4 ends without setting a charge / discharge schedule in the first control unit 511 (S17). In this embodiment, a charge / discharge schedule that meets the VPP request is set in the first control unit 511, thereby permitting remote control of the first control unit 511. Therefore, when the charge / discharge schedule is not set (S17), remote control of the first control unit 511 by the server 30 is prohibited.

[0084] The charge and discharge control of battery 130 is performed within a predetermined SOC range (hereinafter referred to as the "operational SOC range"). The operational SOC range may be 10% to 90%. For example, if the SOC of battery 130 reaches a lower limit of the operational SOC range during discharging of battery 130, first control unit 511 stops discharging battery 130. If second control unit 512 cannot create a charge and discharge schedule within the operational SOC range in S11 described above, vehicle 50 cannot respond to the VPP request, and therefore NO is determined in S13.

[0085] The user selection mode has been described above. Next, the automatic selection mode will be described. When the user selects the automatic selection mode through the mode input device, the second control unit 512 operates in the automatic selection mode. FIG. 7 is a flowchart showing an example of a process executed by the ECU 150 when the second control unit 512 operates in the automatic selection mode. The process shown in this flowchart is started, for example, when the vehicle 50 receives a VPP request signal while the second control unit 512 is operating in the automatic selection mode. Below, an example will be described in which the energy management requested by the VPP request signal is discharging.

[0086] 1 to 3 and FIG. 7, in S21, third control unit 513 displays an input screen on a predetermined display device. In this embodiment, the predetermined display device is the same as the above-mentioned screen display device. Although details will be described later, the input screen is a screen that accepts input from a user.

[0087] In S22, it is determined whether or not the input from the user is complete. Until the input from the user is complete, the screen display device displays the input screen to accept the input from the user. When the input from the user is complete (YES in S22), the third control unit 513 sets the VPP participation condition based on the value input by the user in S23. Next, in S24, the second control unit 512 determines a charge / discharge schedule for a target period and predicts the transition of the remaining battery amount (SOC of the battery 130) in the target period. The target period here is the same as the above-mentioned target period in the process of FIG. 4, for example. Also, the method of determining the charge / discharge schedule in S24 is the same as S11 in FIG. 4 described above. Next, in S25, the second control unit 512 determines whether or not the VPP participation condition is established based on the predicted transition of the remaining battery amount estimated in S24.

[0088] If the VPP participation condition is met (YES in S25), the second control unit 512 notifies the server 30 of the acceptance of the request in S26. Then, the second control unit 512 sets the charge / discharge schedule for the target period determined in S24 in the first control unit 511 in S27, and the series of processes shown in Fig. 7 ends. This allows the server 30 to remotely control the first control unit 511.

[0089] If the VPP participation condition is not met (NO in S25), second control unit 512 notifies server 30 of the request refusal in S28. Then, the charge / discharge schedule is not set in first control unit 511 (S29), and the series of processes shown in Fig. 7 ends. In this case, remote operation of first control unit 511 is prohibited.

[0090] As described above, when the second control unit 512 is operating in the automatic selection mode and the communication device 180 receives a VPP request signal from the server 30, the second control unit 512 determines whether to accept the VPP request based on predetermined conditions (VPP participation conditions) (S25), and then notifies the server 30 of the result of the determination (S26 and S28).

[0091] FIG. 8 is a diagram showing an example of an input screen displayed in S21 of FIG. 7. Referring to FIG. 8 together with FIG. 7, this input screen displays a message M21, an input field M22, and a "OK" button M23. The message M21 prompts the user to input a VPP participation condition. The input field M22 is a space in which the lower limit value of the SOC of the battery 130 during VPP is input. However, in this embodiment, the numerical value that can be input in the input field M22 is limited to a value higher than the lower limit value of the above-mentioned operating SOC range. When the user inputs a numerical value in the input field M22 and then presses the "OK" button M23, YES is determined in S22 of FIG. 7. For example, when "30%" is input in the input field M22 and the "OK" button M23 is pressed, in S23, the VPP participation condition is set such that the SOC of the battery 130 during VPP is not lower than 30%. Then, in S25, it is determined whether the SOC of battery 130 during VPP implementation (VPP request period) will not fall below 30%. If the minimum SOC of battery 130 during VPP implementation is predicted to be 30% or greater, it is determined that the VPP participation condition is met (YES in S25), and processing proceeds to S26. On the other hand, if the SOC of battery 130 during VPP implementation is predicted to fall below 30%, it is determined that the VPP participation condition is not met (NO in S25), and processing proceeds to S28.

[0092] In this way, the VPP participation condition specifies the lower limit of the SOC of the battery 130. Then, the second control unit 512 operating in the automatic selection mode determines to reject the VPP request when it is predicted that the SOC of the battery 130 will fall below the lower limit when the first control unit 511 executes charge / discharge control of the battery 130 in accordance with the VPP request. With this configuration, it is possible to prevent the remaining amount of stored power in the battery 130 from decreasing too much by energy management. The user can leave power corresponding to the lower limit in the battery 130. The power corresponding to the lower limit may be power that leaves a sufficient amount of running capacity in the vehicle 50 to give the user peace of mind, or may be power that the user can use during a power outage.

[0093] The automatic selection mode has been described above. The ECU 150 according to this embodiment is configured to allow a user to switch between a user selection mode in which the user determines whether to respond to a request for energy management and an automatic selection mode in which the determination of whether to respond to a request for energy management is automatically performed. For example, the user may initially adopt the user selection mode, view the prediction screen, and carefully determine whether to respond to the request for energy management, and when a certain degree of tendency is grasped, switch to the automatic selection mode to automatically determine whether to respond to the request for energy management.

[0094] The second control unit 512 may be configured to update the VPP participation conditions by learning using the history data when operating in the user selection mode. The judgment criteria (VPP participation conditions) used in the automatic judgment are updated by learning using the history data of the user judgment, so that the automatic judgment is more likely to be performed in a manner similar to the user judgment. The history data may include a predicted transition of the first parameter, a predicted transition of the second parameter, and information indicating whether the request has been accepted. The second control unit 512 may set the VPP participation conditions by statistical analysis so that the automatic judgment based on the VPP participation conditions will result in a result equivalent to the user judgment. The second control unit 512 can grasp the tendency of the user judgment by learning using the history data. The learning accuracy may be improved by using AI (artificial intelligence).

[0095] Fig. 9 is a flowchart showing charge / discharge control of the battery 130 executed according to a charge / discharge schedule that responds to a VPP request. The process shown in this flowchart starts when the start time (start time of the target period) of the charge / discharge schedule set in the first control unit 511 arrives while the vehicle 50 is in a plugged-in state. During the target period (including the VPP request period), a charge / discharge command is transmitted from the server 30 to the vehicle 50. Note that if a charge / discharge schedule is not set in the first control unit 511, the process shown in Fig. 9 is not executed.

[0096] 1 to 3, referring to FIG. 9, in S31, the first control unit 511 performs charge / discharge control of the battery 130 according to a charge / discharge command received from the server 30. Then, in the following S32, the first control unit 511 judges whether the end time of the set charge / discharge schedule has arrived. The processes of S31 and S32 are repeated until the end time of the charge / discharge schedule arrives. Then, when the end time of the charge / discharge schedule arrives (YES in S32), the first control unit 511 issues an end notification to the server 30 in S33. Thereafter, when the first control unit 511 resets the charge / discharge schedule in S34, the series of processes shown in FIG. 9 ends. By resetting the charge / discharge schedule in S34, the first control unit 511 enters a state in which the charge / discharge schedule is not set. This prohibits remote operation of the first control unit 511.

[0097] As described above, the vehicle 50 performs charging and discharging in accordance with the charge and discharge schedule set in the first control unit 511 (i.e., the agreed charge and discharge) in a plugged-in state in accordance with a command from the server 30. The server 30 controls the vehicle 50 in a plugged-in state by remote control so that the battery 130 is charged and discharged in accordance with the charge and discharge schedule set in the first control unit 511, by the process shown in Fig. 9 above. The charge and discharge control of the battery 130 is performed in a state in which the power system PG and the battery 130 are electrically connected. In an example in which the energy management requested by the VPP request signal is discharging, external power supply is performed during the VPP request period by the remote control.

[0098] As described above, the control system according to this embodiment is mounted on the vehicle 50 and includes the battery 130, a screen display device (for example, at least one of the input device 161, the NAVI 170, and the mobile terminal 80), and the ECU 150. The ECU 150 includes a first control unit 511 that controls charging and discharging the battery 130, and a second control unit 512 that controls display of the screen display device. The second control unit 512 displays a prediction screen (i.e., a screen showing a predicted transition of a first parameter related to the remaining amount of stored power of the battery 130 and a predicted transition of a second parameter related to the amount of remuneration for energy management on the same time axis, assuming that the first control unit 511 executes charging and discharging control of the battery 130 in accordance with a request for energy management) on the screen display device. From the prediction screen, the user can easily grasp how much power is remaining in the battery 130 during the time period when the user wants to use the battery 130. In addition, the user can confirm the amount of remuneration when the request for energy management is met from the prediction screen. This allows the user to easily compare the advantages and disadvantages of responding to the energy management request, and makes it easier for the user to accurately decide whether or not to respond to the request.

[0099] In the above embodiment, a charge / discharge command is transmitted from server 30 to vehicle 50 during the target period (including the VPP request period). Then, during the target period, charge / discharge control of battery 130 is performed by remote control. However, the present invention is not limited to this configuration, and only charge / discharge control during the VPP request period may be performed by remote control, and charge / discharge control outside the VPP request period may be executed by local control of ECU 150, not by remote control (command from an external computer).

[0100] Furthermore, it is not essential that the vehicle 50 be remotely operated during the VPP request period. For example, when the start time of the charge / discharge schedule set in the first control unit 511 in S15 of Fig. 4 or S27 of Fig. 7 arrives, the first control unit 511 may execute charge / discharge control of the battery 130 according to the charge / discharge schedule.

[0101] The prediction screen is not limited to the screen shown in FIG. 5, and can be changed as appropriate. For example, the prediction screen shown in FIG. 5 shows the predicted transition in a line graph, but the display form of the predicted transition is arbitrary. For example, the prediction screen may show the predicted transition in a scatter diagram. In the prediction screen shown in FIG. 5, the first parameter is the SOC of the battery 130, and the second parameter is the incentive unit price (reward unit price). However, each of the first and second parameters shown on the prediction screen can be changed as appropriate. The prediction screen shown in FIG. 5 may be changed as shown below.

[0102] FIG. 10 is a diagram showing a first modified example of the prediction screen shown in FIG. 5. Referring to FIG. 10, this prediction screen displays a graph M11A instead of the graph M11 shown in FIG. 5, and further displays a "SOC" button M15, a "Cruise Distance" button M16, an "Incentive Unit Price" button M17, and an "Incentive Accumulated Amount" button M18. The user can switch between displaying and hiding the items corresponding to the buttons (SOC of the battery 130, cruising distance of the vehicle 50, incentive unit price, and incentive accumulated amount) by operating the buttons. Each of the SOC of the battery 130 and the cruising distance of the vehicle 50 corresponds to a first parameter. The higher the SOC of the battery 130, the longer the cruising distance of the vehicle 50. Each of the incentive unit price and the incentive accumulated amount corresponds to a second parameter.

[0103] The prediction screen according to the first modification shows on the same time axis the items for which "display" has been selected by the above-mentioned buttons. For example, the graph M11A shown in FIG. 10 shows on the same time axis the predicted transition of the cruising distance of the vehicle 50 during the target period (line L3), the predicted transition of the incentive unit price during the target period (line L41), and the predicted transition of the incentive integrated amount of the VPP request during the target period (line L42), assuming that the first control unit 511 executes the charge / discharge control of the battery 130 in accordance with the VPP request. In the example shown in FIG. 10, the SOC (SOC of the battery 130) among the four items is hidden. However, the user can switch the SOC from hidden to displayed by operating the "SOC" button M15.

[0104] As described above, in the modified example shown in FIG. 10, the third control unit 513 is configured to select one or more first parameters from a first option including the SOC of the battery 130 and the cruising distance of the vehicle 50, and to select one or more second parameters from a second option including an incentive unit price (reward unit price) and an incentive accumulated amount (reward accumulated amount), based on a user's input to a predetermined input device (for example, a touch panel of a screen display device). Then, the second control unit 512 is configured to display, on the screen display device, a prediction screen (FIG. 10) showing the predicted transition of one or more first parameters selected from the first option and the predicted transition of one or more second parameters selected from the second option on the same time axis. With this configuration, the user can arbitrarily select the first and second parameters shown on the prediction screen from predetermined candidates. In addition, the user can check multiple first parameters (or multiple second parameters) at the same time.

[0105] FIG. 11 is a diagram showing a second modified example of the prediction screen shown in FIG. 5. Referring to FIG. 11, in this modified example, the target period includes a first time slot in which charging promotion is requested, a second time slot in which charging suppression is requested, and a third time slot in which discharging is requested. Among the time slots in which discharging is not requested, charging promotion is requested in a time slot in which the electricity rate is equal to or lower than a predetermined reference rate, and charging suppression is requested in a time slot in which the electricity rate exceeds the predetermined reference rate. In this modified example, in S11 of FIG. 4, a charge / discharge schedule (transition of charge / discharge power) in the target period is determined so that charging according to the VPP request is performed in the first time slot, charging is prohibited in accordance with the VPP request in the second time slot, and discharging according to the VPP request is performed in the third time slot. The first control unit 511 executes charge / discharge control of the battery 130 according to this charge / discharge schedule, so that the vehicle 50 can respond to all of the requested charge promotion, charge suppression, and discharging. However, the user can change the charge / discharge schedule after the prediction screen is displayed.

[0106] The prediction screen shown in Fig. 11 displays a graph M11B instead of the graph M11 shown in Fig. 5, and further displays a "charge promotion" button M15A, a "charge suppression" button M16A, and a "discharge" button M17A. By operating the buttons, the user can switch between accepting and rejecting the energy management request (charge promotion, charge suppression, and discharge) corresponding to each button.

[0107] The prediction screen according to the second modification shows the predicted transitions of the first and second parameters on the same time axis, assuming that the energy management request approved by the above buttons is satisfied. For example, the graph M11B shown in FIG. 11 shows the predicted transition (line L51) of the remaining battery level (SOC of the battery 130) during the target period, the predicted transition (line L61) of the electricity rate during the target period, and the predicted transition (line L7) of the incentive rate for the VPP request during the target period, assuming that the battery 130 is charged and discharged according to the above charge and discharge schedule (i.e., all of the requested charging promotion, charging suppression, and discharging are satisfied), on the same time axis. Regarding the predicted transition (line L61) of the electricity rate, the portion where charging is not performed is shown by a dashed line. The electricity rate corresponds to the second parameter. Instead of the electricity rate, an accumulated electricity rate may be adopted.

[0108] FIG. 12 is a diagram showing a prediction screen in the case where the discharge requested by the VPP request signal is rejected in the second modified example. Referring to FIG. 12, when the "Discharge" button M17A is operated on the prediction screen shown in FIG. 11 and the discharge is changed from permitted to rejected, the charge / discharge schedule in the target period is changed so that the discharge is not performed in the third time slot. The first control unit 511 executes the charge / discharge control of the battery 130 according to the changed charge / discharge schedule, so that the vehicle 50 can respond to the requested charge promotion and charge suppression. Then, the graph M11B shown in FIG. 11 changes to the graph M11C shown in FIG. 12. The graph M11C shows a predicted transition (line L52) of the remaining battery amount (SOC of the battery 130) in the target period and a predicted transition (line L62) of the electricity rate unit price in the target period on the same time axis, assuming that the battery 130 is charged / discharged according to the changed charge / discharge schedule (i.e., responds to the requested charge promotion and charge suppression).

[0109] The prediction screen according to the second modified example is displayed, for example, in S12 of Fig. 4. When the user rejects some of the requests (for example, any one of charging promotion, charging suppression, and discharging) and selects the "Yes" button M13, both the accepted and rejected requests are notified to the server 30 in S14. For example, when the "Yes" button M13 is selected in the state shown in Fig. 12, the requests for charging promotion and charging suppression are accepted, and the request for discharging is rejected. Then, in S15, the charge / discharge schedule accepted by the user (i.e., the charge / discharge schedule that meets the requests accepted by the user) is set in the first control unit 511.

[0110] The input screen is not limited to the screen shown in FIG. 8 and can be changed as appropriate. FIG. 13 is a diagram showing a first modified example of the input screen shown in FIG. 8. Referring to FIG. 13 together with FIG. 7, the input screen according to the first modified example is displayed, for example, when the energy management requested by the VPP request signal is discharging. The input screen shown in FIG. 13 displays input fields M22A and M22B instead of the input field M22 shown in FIG. 8, and further displays a field M24 indicating a VPP request period. The input field M22A is a space in which the running start time is input. The input field M22B is a space in which the lower limit value of the SOC of the battery 130 at the running start time is input. For example, when "24:00" is input in the input field M22A and "30%" is input in the input field M22B, and the "Enter" button M23 is pressed, in S23, the SOC of the battery 130 at 24:00 does not fall below 30% is set as a VPP participation condition. Then, in S25, it is determined whether the SOC of battery 130 at 24:00 is below 30%. If the SOC of battery 130 at 24:00 is 30% or higher, it is determined that the VPP participation condition is met (YES in S25), and processing proceeds to S26. On the other hand, if the SOC of battery 130 at 24:00 is below 30%, it is determined that the VPP participation condition is not met (NO in S25), and processing proceeds to S28.

[0111] Fig. 14 is a diagram showing a second modified example of the input screen shown in Fig. 8. Referring to Fig. 14 together with Fig. 7, this input screen further displays a "Do not implement VPP" button M25 in addition to the message M21, input field M22, and "OK" button M23 shown in Fig. 8. When the "Do not implement VPP" button M25 is pressed by the user, a NO determination is made in S25 of Fig. 7.

[0112] FIG. 15 is a diagram showing a third modified example of the input screen shown in FIG. 8. Referring to FIG. 15 together with FIG. 7, the input screen according to the third modified example is displayed, for example, when the energy management requested by the VPP request signal is charging promotion. The input screen shown in FIG. 15 displays an input field M22C instead of the input field M22 shown in FIG. 8. The input field M22C is a space for inputting the upper limit value of the SOC of the battery 130 during VPP implementation. However, in this modified example, the numerical value that can be inputted into the input field M22C is limited to a value lower than the upper limit value of the above-mentioned operating SOC range. For example, when "80%" is inputted into the input field M22C and the "Enter" button M23 is pressed, in S23 of FIG. 7, it is set as a VPP participation condition that the SOC of the battery 130 during VPP implementation does not exceed 80%. Then, in S25, it is determined whether or not the SOC of the battery 130 during VPP implementation does not exceed 80%. If the maximum SOC of battery 130 during VPP is predicted to be 80% or less, it is determined that the VPP participation condition is met (YES in S25) and processing proceeds to S26. On the other hand, if the SOC of battery 130 during VPP is predicted to exceed 80%, it is determined that the VPP participation condition is not met (NO in S25) and processing proceeds to S28.

[0113] The VPP participation condition according to the third modified example specifies an upper limit value of the SOC of the battery 130. The second control unit 512 operating in the automatic selection mode determines to reject the VPP request when it is predicted that the SOC of the battery 130 will exceed the upper limit value when the first control unit 511 executes charge / discharge control of the battery 130 in accordance with the VPP request. With this configuration, it is possible to prevent the remaining charge of the battery 130 from increasing too much by energy management. By preventing the remaining charge of the battery 130 from increasing too much, deterioration of the battery 130 is suppressed. Note that the VPP participation condition may specify both the lower limit value and the upper limit value of the remaining charge of the battery 130.

[0114] FIG. 16 is a diagram showing a fourth modified example of the input screen shown in FIG. 8. Referring to FIG. 16 together with FIG. 7, this input screen displays an input field M22D instead of the input field M22 shown in FIG. 8. In the input field M22D, a desired amount of reward (requested reward amount) to be acquired by the user participating in the current VPP (i.e., responding to the request for energy management) is input. For example, when "1000 points" is input in the input field M22D and the "OK" button M23 is pressed, in S23 of FIG. 7, the amount of reward given to the user who responded to the current request is set to be 1000 points or more as a VPP participation condition. Then, in S25, it is determined whether the reward amount indicated by the VPP request signal is 1000 points or more. If the reward amount indicated by the VPP request signal is 1000 points or more, it is determined that the VPP participation condition is established (YES in S25), and the process proceeds to S26. On the other hand, if the remuneration amount indicated by the VPP request signal is less than 1000 points, it is determined that the VPP participation condition is not met (NO in S25), and the process proceeds to S28.

[0115] The VPP participation condition according to the fourth modification specifies a requested remuneration amount. The second control unit 512 operating in the automatic selection mode determines to accept the request if the remuneration amount generated when the first control unit 511 executes charge / discharge control of the battery 130 in accordance with the VPP request is equal to or greater than the desired amount (requested remuneration amount). This configuration makes it easier to participate in energy management with a high remuneration amount.

[0116] Although the modified example of the input screen has been described above, it is not essential that the input screen is displayed. The VPP participation conditions may be set without being input by the user. When the second control unit 512 operates in the automatic selection mode, the ECU 150 may execute the process shown in FIG. 17, which will be described below, instead of the process shown in FIG. 7.

[0117] Fig. 17 is a diagram showing a modified example of the process shown in Fig. 7. The process shown in Fig. 17 is similar to the process shown in Fig. 7 except that S21A, S23A, and S25A are adopted instead of S21, S22, S23, and S25 (Fig. 7). The process shown in Fig. 17 will be described below, focusing on the differences from the process shown in Fig. 7.

[0118] In S21A, the second control unit 512 acquires a driving plan. The driving plan includes, for example, a scheduled departure time and a scheduled driving distance. The driving plan may be set in the NAVI 170 in advance. For example, when the user inputs a scheduled departure time (travel start time) and a destination to the NAVI 170, the NAVI 170 detects the current position of the vehicle 50 based on a GPS signal and determines a driving route from the current position to the destination. Then, the NAVI 170 calculates a driving distance from the current position to the destination (i.e., a scheduled driving distance) according to the determined driving route. The second control unit 512 may acquire a driving plan from the NAVI 170 in S21A. Also, if a driving plan is not set in the NAVI 170, the second control unit 512 may request the user to set a driving plan.

[0119] Next, in S23A, the second control unit 512 sets a VPP participation condition. If the scheduled departure time is after the end time of the VPP request period, the VPP participation condition is set such that the cruising range of the vehicle 50 at the scheduled departure time is equal to or greater than the scheduled driving distance. Although not shown in FIG. 17, if the scheduled departure time is before the end time of the VPP request period (including the case where the scheduled departure time is within the VPP request period), it is determined that the VPP participation condition is not satisfied, and the process proceeds to S28.

[0120] Next, in S24, the second control unit 512 determines a charge / discharge schedule for the target period, and predicts the transition of the remaining battery power (SOC of the battery 130) during the target period. Then, in S25A, it is determined whether the cruising distance of the vehicle 50 at the scheduled departure time is equal to or greater than the planned driving distance. The higher the SOC of the battery 130 at the scheduled departure time, the longer the cruising distance of the vehicle 50 at the scheduled departure time. Then, if the cruising distance of the vehicle 50 at the scheduled departure time is equal to or greater than the planned driving distance, it is determined that the VPP participation condition is met (YES in S25A), and the process proceeds to S26. On the other hand, if the cruising distance of the vehicle 50 at the scheduled departure time is shorter than the planned driving distance, it is determined that the VPP participation condition is not met (NO in S25A), and the process proceeds to S28.

[0121] In the above modification, the second control unit 512 operating in the automatic selection mode determines to reject the request when it is predicted that the vehicle 50 will not be able to travel according to the travel plan if the first control unit 511 executes charge / discharge control of the battery 130 in accordance with the VPP request. With this configuration, it is possible to prevent the vehicle 50 from being unable to travel according to the travel plan due to energy management. More specifically, it is possible to prevent the vehicle 50 from being unable to travel according to the travel plan due to the remaining charge of the battery 130 being reduced too much due to energy management. In addition, if the scheduled departure time is before the end time of the VPP request period, the vehicle 50 does not participate in the VPP, and therefore it is also possible to prevent the vehicle 50 from being delayed due to energy management and being unable to depart at the scheduled departure time (the departure time of the travel plan).

[0122] The mobile terminal 80 may be configured to display a prediction screen. For example, the functions of the second control unit 512 and the third control unit 513 implemented in the vehicle 50 may be implemented in the mobile terminal 80. Fig. 18 is a diagram showing a modified example of the configuration of the control system shown in Fig. 3.

[0123] 18, mobile terminal 80A according to this modification includes second control unit 512A and third control unit 513A. Vehicle 50A according to this modification includes ECU 150A, which includes first control unit 511A. First control unit 511A, second control unit 512A, and third control unit 513A have functions equivalent to first control unit 511, second control unit 512, and third control unit 513 of ECU 150 shown in FIG. 3, respectively. In this modification, first control unit 511A, second control unit 512A, and third control unit 513A correspond to examples of the "first control device," "second control device," and "third control device" according to the present disclosure, respectively.

[0124] The mobile terminal 80A includes a control device 81, a touch panel display 82, and a communication device 83. The control device 81 may be a computer. The control device 81 includes a processor and performs predetermined information processing. The control device 81 is configured to wirelessly communicate with the outside through the communication device 83. The control device 81 includes a second control unit 512A and a third control unit 513A. The second control unit 512A and the third control unit 513A are embodied, for example, by a processor and a program executed by the processor. However, without being limited thereto, each of these units may be embodied by dedicated hardware (electronic circuitry).

[0125] The mobile terminal 80A is carried by the user of the vehicle 50A and functions as a user interface. In the mobile terminal 80A, the touch panel display 82 functions as a mode input device and a screen display device. When the vehicle 50A is selected as a VPP cooperation vehicle, a VPP request signal is transmitted from the server 30 to the mobile terminal 80A.

[0126] When the second control unit 512A operates in the user selection mode, if the mobile terminal 80A receives the VPP request signal, the process shown in FIG. 4 is executed, and the second control unit 512A displays a predicted screen (for example, see FIG. 5 and FIG. 10 to FIG. 12) on the touch panel display 82 (S12). In this case, the user of the vehicle 50A can decide whether or not to accept the request by looking at the predicted screen. Then, when the user of the vehicle 50A inputs request acceptance to the mobile terminal 80A (YES in S13), the mobile terminal 80A notifies the server 30 of the request acceptance (S14). Thereafter, the mobile terminal 80A transmits a VPP request signal to the vehicle 50A (FIG. 18). On the other hand, when the user of the vehicle 50A inputs request rejection to the mobile terminal 80A (NO in S13), the mobile terminal 80A notifies the server 30 of the request rejection (S16).

[0127] When second control unit 512A is operating in the automatic selection mode, if mobile terminal 80A receives the VPP request signal, the process shown in Fig. 7 is executed. If the request is accepted (YES in S25), mobile terminal 80A notifies server 30 of the request acceptance (S26). Thereafter, mobile terminal 80A transmits a VPP request signal to vehicle 50A (Fig. 18). On the other hand, if the request is rejected (NO in S25), mobile terminal 80A notifies server 30 of the request rejection (S28).

[0128] The mobile terminal 80A according to the above modification is configured to display a prediction screen showing, on the same time axis, a predicted transition of a first parameter related to the remaining charge of the battery 130 and a predicted transition of a second parameter related to the amount of remuneration for energy management, assuming that charging and discharging control of the battery 130 is performed in accordance with the energy management request. With such a display device (mobile terminal 80A), it becomes possible to show the user the advantages and disadvantages of complying with the energy management request in an easily understandable manner.

[0129] It is not necessary for each of second control unit 512 (FIG. 3) and second control unit 512A (FIG. 18) to be configured to be able to operate in multiple control modes, and each of second control unit 512 and second control unit 512A may always operate in a user-selected mode.

[0130] The configuration of the power system including the power grid management computer is not limited to the configuration shown in FIG. 2. For example, the functions of the server 30 may be installed in the server 10, and the server 30 may be omitted. The server 10 may function as a power grid management computer. The power company may be divided into separate companies by business. The power generation company and the power transmission and distribution company may be different companies. The vehicle 50 may be a vehicle belonging to a user who has concluded an incentive contract with the power generation company or the power transmission and distribution company. The power grid is not limited to a large-scale power grid (power system) established as infrastructure, and may be a microgrid. The computer that transmits the VPP request signal may be a server in an electricity market (for example, a supply and demand adjustment market).

[0131] The configuration of the vehicle is not limited to the configuration shown in FIG. 1. For example, the vehicle may be configured to be capable of contactless charging. The vehicle is not limited to a passenger car, but may be a bus or a truck. The vehicle is not limited to a POV, but may be a MaaS (Mobility as a Service) vehicle. The vehicle may be configured to be capable of autonomous driving, or may have a flying function. The vehicle may be a vehicle capable of running unmanned (for example, an automated guided vehicle (AGV) or agricultural machinery).

[0132] The vehicle may be configured to be capable of DC (direct current) charging. The vehicle may use a DC type EVSE to meet the demand for energy management. The power conversion circuit of the charger / discharger 120 may be mounted on the EVSE instead of the vehicle. An external computer (for example, server 30) may perform energy management by remotely operating the power conversion circuit mounted on the EVSE.

[0133] The vehicle is not limited to an EV, and may be a PHV. In a PHV, the total distance of a cruising distance by the electric motor (distance corresponding to the remaining amount of stored electricity) and a cruising distance by the internal combustion engine (distance corresponding to the remaining amount of fuel) may be adopted as the first parameter. Also, instead of or in addition to the total distance, the cruising distance by the electric motor may be adopted as the first parameter.

[0134] The vehicle may be configured to enable only external charging out of external charging and external power supply, and may be configured to respond only to energy management requests related to charging (e.g., requests to promote charging or suppress charging). The vehicle may respond to energy management requests related to charging by using an EVSE that does not support reverse power flow.

[0135] The power storage device used for energy management may be mounted on a power regulation resource other than a vehicle. The power regulation resource may be a moving body other than a vehicle (such as a ship, an airplane, a drone, a walking robot, a robot cleaner, or a space probe) or may be a stationary ESS (Energy Storage System).

[0136] The above-described various modifications may be implemented in any combination. The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present invention is defined by the claims, not by the description of the embodiments described above, and is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]

[0137] 1 Power system, 10, 30 Server, 31 Control device, 32 Storage device, 33 Communication device, 40 EVSE, 50, 50A Vehicle, 80, 80A Mobile terminal, 81 Control device, 82 Touch panel display, 83 Communication device, 110 Inlet, 120 Charger / discharger, 121, 131 Monitoring module, 130 Battery, 150, 150A ECU, 151 Processor, 152 RAM, 153 Storage device, 154 Timer, 161 Input device, 162 Meter panel, 170 NAVI, 180 Communication device, 511, 511A First control unit, 512, 512A Second control unit, 513, 513A Third control unit, PG Power system.

Claims

1. A first control device that controls charging and discharging of a power storage device; a second control device that controls the display of the display device; A communication device configured to be able to communicate with an external computer; an input device for accepting input from a user; a third control device that executes a predetermined process based on a user's input to the input device; A control system comprising: The second control device is configured to be operable in each of a first control mode and a second control mode, The third control device is configured to switch a control mode of the second control device based on a user's input to the input device; When the communication device receives a request for energy management from the external computer, the second control device operating in the first control mode displays on the display device a screen showing, on the same time axis, a predicted transition of a first parameter related to the remaining amount of storage of the power storage device and a predicted transition of a second parameter related to a remuneration amount for the energy management, assuming that the first control device executes charge / discharge control of the power storage device in accordance with the energy management request; and when information indicating whether or not to accept the request is input to the input device after the screen is displayed, the third control device notifies the external computer of whether or not to accept the request; When the communication device receives a request for energy management from the external computer, the second control device operating in the second control mode determines whether to accept the request based on a predetermined condition, and then notifies the external computer of the result of the determination; the predetermined condition designates a lower limit value of the remaining charge of the power storage device, A control system in which the second control device operating in the second control mode determines to reject the request if it is predicted that the remaining storage capacity of the storage device will fall below the lower limit value when the first control device executes charging / discharging control of the storage device in accordance with the energy management request.

2. A first control device that controls charging and discharging of a power storage device; a second control device that controls the display of the display device; A communication device configured to be able to communicate with an external computer; an input device for accepting input from a user; a third control device that executes a predetermined process based on a user's input to the input device; A control system comprising: The second control device is configured to be operable in each of a first control mode and a second control mode, The third control device is configured to switch a control mode of the second control device based on a user's input to the input device; When the communication device receives a request for energy management from the external computer, the second control device operating in the first control mode displays on the display device a screen showing, on the same time axis, a predicted transition of a first parameter related to the remaining amount of storage of the power storage device and a predicted transition of a second parameter related to a remuneration amount for the energy management, assuming that the first control device executes charge / discharge control of the power storage device in accordance with the energy management request; and when information indicating whether or not to accept the request is input to the input device after the screen is displayed, the third control device notifies the external computer of whether or not to accept the request; When the communication device receives a request for energy management from the external computer, the second control device operating in the second control mode determines whether to accept the request based on a predetermined condition, and then notifies the external computer of the result of the determination; the predetermined condition specifies an upper limit value of a remaining amount of stored electricity of the electricity storage device, A control system in which the second control device operating in the second control mode determines to reject the request if it is predicted that the remaining storage capacity of the storage device will exceed the upper limit value when the first control device executes charging / discharging control of the storage device in accordance with the energy management request.

3. A first control device that controls charging and discharging of a storage device; a second control device that controls the display of the display device; A communication device configured to be able to communicate with an external computer; an input device for accepting input from a user; a third control device that executes a predetermined process based on a user's input to the input device; A control system comprising: The second control device is configured to be operable in each of a first control mode and a second control mode, The third control device is configured to switch a control mode of the second control device based on a user's input to the input device; When the communication device receives a request for energy management from the external computer, the second control device operating in the first control mode displays on the display device a screen showing, on the same time axis, a predicted transition of a first parameter related to the remaining amount of storage of the power storage device and a predicted transition of a second parameter related to a remuneration amount for the energy management, assuming that the first control device executes charge / discharge control of the power storage device in accordance with the energy management request; and when information indicating whether or not to accept the request is input to the input device after the screen is displayed, the third control device notifies the external computer of whether or not to accept the request; When the communication device receives a request for energy management from the external computer, the second control device operating in the second control mode determines whether to accept the request based on a predetermined condition, and then notifies the external computer of the result of the determination; The predetermined condition specifies a requested remuneration amount, A control system in which the second control device operating in the second control mode determines to accept the request if the amount of remuneration generated when the first control device executes charging / discharging control of the storage device in accordance with the energy management request is equal to or greater than the requested remuneration amount.

4. A first control device that controls charging and discharging of a storage device mounted on a vehicle; a second control device that controls the display of the display device; A communication device configured to be able to communicate with an external computer; an input device for accepting input from a user; a third control device that executes a predetermined process based on a user's input to the input device; A control system comprising: The second control device is configured to be operable in each of a first control mode and a second control mode, The third control device is configured to switch a control mode of the second control device based on a user's input to the input device; When the communication device receives a request for energy management from the external computer, the second control device operating in the first control mode displays on the display device a screen showing, on the same time axis, a predicted transition of a first parameter related to the remaining amount of storage of the power storage device and a predicted transition of a second parameter related to a remuneration amount for the energy management, assuming that the first control device executes charge / discharge control of the power storage device in accordance with the energy management request; and when information indicating whether or not to accept the request is input to the input device after the screen is displayed, the third control device notifies the external computer of whether or not to accept the request; When the communication device receives a request for energy management from the external computer, the second control device operating in the second control mode determines whether to accept the request based on a predetermined condition, and then notifies the external computer of the result of the determination; A control system in which the second control device operating in the second control mode determines to reject the request if it is predicted that the vehicle will not be able to travel according to the driving plan if the first control device executes charging and discharging control of the storage device in accordance with the energy management request.

5. A first control device that controls charging and discharging of a power storage device; a second control device that controls the display of the display device; A communication device configured to be able to communicate with an external computer; an input device for accepting input from a user; a third control device that executes a predetermined process based on a user's input to the input device; A control system comprising: The second control device causes the display device to display a screen showing, on the same time axis, a predicted transition of a first parameter related to a remaining amount of storage of the power storage device and a predicted transition of a second parameter related to a remuneration amount for the energy management, when it is assumed that the first control device executes charge / discharge control of the power storage device in accordance with a request for energy management; The second control device is configured to cause the display device to display the screen when the communication device receives the energy management request from the external computer, When information indicating whether or not to accept the request is input to the input device after the screen is displayed, the third control device notifies the external computer of whether or not to accept the request; The second control device is configured to display, on the display device, a screen showing, on the same time axis, a predicted transition of one or more of the first parameters selected from a first option including an SOC of the power storage device and a cruising distance of a vehicle equipped with the power storage device, and a predicted transition of one or more of the second parameters selected from a second option including a remuneration unit price and an accumulated remuneration amount; The third control device is configured to select one or more of the first parameters from the first options and select one or more of the second parameters from the second options based on user input to the input device.

6. The request for energy management includes a request for discharging the power storage device, The control system according to any one of claims 1 to 4, wherein the first parameter is an SOC of the power storage device, and the second parameter is a remuneration unit price.

7. A control system according to any one of claims 1 to 6, wherein if the request is accepted, remote operation of the first control device is permitted, and if the request is rejected, remote operation of the first control device is prohibited.

Citation Information

Patent Citations

  • In-vehicle navigation device and charging / discharging control method of in-vehicle battery

    JP2012080748A

  • Power supply system and power supply control method

    JP2019165547A

  • Charging management based on demand response events

    US20150283912A1

  • Power control device, power control method, and program

    WO2017013754A1