Transport System

The conveyance system optimizes transport efficiency by strategically selecting temporary storage locations based on candidate processing devices and transport times, addressing inefficiencies caused by destination changes in existing systems.

JP7567852B2Active Publication Date: 2024-10-16MURATA MASCH LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2022073049
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-04-27
Publication Date
2024-10-16
Estimated Expiration
2042-04-27

AI Technical Summary

Technical Problem

Existing conveyance systems face inefficiencies when the transport destination of semiconductor cassettes is changed to a location farther than initially scheduled, leading to increased transport distances and decreased efficiency.

Method used

A conveyance system that includes a conveyance vehicle, temporary storage units, and a controller to manage the transport of articles between processing devices, selecting optimal temporary storage locations based on candidate processing devices and transport times to minimize overall transport time and improve efficiency.

Benefits of technology

The system enhances conveyance efficiency by allowing articles to be temporarily stored at strategic locations, reducing transport times and ensuring efficient delivery even when the final destination is uncertain or changes, thereby optimizing the transport process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007567852000002
    Figure 0007567852000002
  • Figure 0007567852000003
    Figure 0007567852000003
  • Figure 0007567852000004
    Figure 0007567852000004
Patent Text Reader

Abstract

To provide a conveyance system that can improve the efficiency of conveyance of articles even when a destination to which the articles are conveyed by the conveyance system is not settled.SOLUTION: The present invention is a conveyance system (1) having conveyance vehicles (2) that convey articles, a plurality of temporary storage units (4) that temporarily store the articles, and a controller (10) that causes the conveyance vehicles to convey articles processed by a first processing apparatus to the temporary storage units, and causes the conveyance vehicles to convey the articles to a second processing apparatus. The controller has: a candidate processing apparatus extraction unit (10b) that extracts a plurality of candidate processing apparatuses (12b, 12c, 12d) that are expected to perform subsequent processing on the articles processed by the first processing apparatus (12a); and a temporary storage unit selection unit (10c) that, based on the plurality of candidate processing apparatuses, selects the temporary storage unit temporarily storing the articles processed by the first processing apparatus.SELECTED DRAWING: Figure 5
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a transport system, and more particularly to a transport system for transporting articles between a plurality of processing devices. [Background technology]

[0002] Japanese Patent No. 4782194 (Patent Document 1) describes a transport system. This transport system has an intra-bay route along which transport vehicles run, and an inter-bay route connecting the intra-bay routes, and a plurality of relay buffers are provided along these intra-bay routes and inter-bay routes for storing semiconductor cassettes to be transported. The transport system described in Patent Document 1 also has a transport command creation means, which, when a transport request is generated specifying an arrival time at a destination processing device, creates a first transport command from the source processing device to the relay buffer, a transport command between the relay buffers, and a second transport command from the last relay buffer to the destination processing device. The semiconductor cassette passes through a plurality of relay buffers, and is temporarily stored in the relay buffer for time adjustment. This allows the semiconductor cassette to arrive at the destination processing device at the specified arrival time. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Patent No. 4782194 Summary of the Invention [Problem to be solved by the invention]

[0004] However, in the transport system described in Patent Document 1, after the semiconductor cassette is stored in the relay buffer, the destination may be changed to another destination farther from the relay buffer than the original destination. In such a case, the transport distance of the semiconductor cassette becomes longer, and the transport efficiency decreases.

[0005] The present invention aims to provide a conveying system that can improve the efficiency of transporting items even when the destination of the items transported by the conveying system may change or when the destination of the items has not been determined. [Means for solving the problem]

[0006] In order to solve the above-mentioned problems, the present invention provides a transport system for transporting articles between a plurality of processing devices, the transport system comprising: a transport vehicle for transporting articles to be processed in the processing devices; a plurality of temporary storage units for temporarily storing the articles to be transported; and a controller for controlling the transport vehicle to transport articles processed in a first processing device to the temporary storage unit, and, when the articles are stored in the temporary storage unit and a second processing device for processing the articles in a next step is determined, for transporting the articles to the second processing device, the controller comprising: a candidate processing device extraction unit for extracting a plurality of candidate processing devices which are second processing devices expected to perform a next process on the articles processed in the first processing device; and a temporary storage unit selection unit for selecting a temporary storage unit for temporarily storing the articles processed in the first processing device based on the plurality of candidate processing devices extracted by the candidate processing device extraction unit. The temporary storage unit selection unit specifies a transport time for each combination of a plurality of temporary storage units capable of temporarily storing an article and a plurality of candidate processing devices extracted by the candidate processing device extraction unit, and selects a temporary storage unit for temporarily storing the article processed in the first processing device based on the specified transport time. It is characterized by the following.

[0007] In the present invention thus configured, the transport vehicle transports the article processed in the first processing device to the temporary storage section. Also, when the article is stored in the temporary storage section and a second processing device that will perform a next step on the article is determined, the transport vehicle transports the article to the second processing device.

[0008] According to the present invention configured in this way, when processing of an item is completed in the first processing device, the item is transported to the temporary storage unit even if the second processing device that will perform the next process has not been determined, so that the item does not remain near the first processing device, and transport efficiency can be improved. Also, according to the present invention configured as above, a temporary storage unit that temporarily stores the item processed in the first processing device is selected based on the multiple candidate processing devices extracted by the candidate processing device extraction unit. Therefore, a temporary storage unit that is easy to transport the item to each candidate processing device can be selected, and transport efficiency can be improved even when the destination of the item may be changed or the destination of the item has not been determined.

[0010] According to the present invention configured in this manner, a temporary storage unit is selected based on the transport time from the temporary storage unit to each candidate processing device extracted by the candidate processing device extraction unit, so that a temporary storage unit can be selected so as to shorten the transport time to each candidate processing device, which is expected to shorten the transport time.

[0011] In the present invention, preferably, the temporary storage unit selection unit selects a temporary storage unit based on at least one of the average value of the transport time from the temporary storage unit to each candidate processing device, the variation in the transport time from the temporary storage unit to each candidate processing device, and the maximum value of the transport time from the temporary storage unit to each candidate processing device.

[0012] According to the present invention configured as described above, the temporary storage unit is selected based on at least one of the average transfer time, the variation in the transfer time, and the maximum transfer time. Therefore, no matter which processing device among the candidate processing devices is selected as the processing device for the next process, it is possible to avoid the transfer time becoming extremely long, and it is expected that the overall transfer efficiency will be improved.

[0013] In the present invention, preferably, the temporary storage unit selection unit selects a temporary storage unit that minimizes the sum of at least two of the average value of the transport time from the temporary storage unit to each candidate processing device, the variation in the transport time from the temporary storage unit to each candidate processing device, and the maximum value of the transport time from the temporary storage unit to each candidate processing device, multiplied by a predetermined weighting coefficient.

[0014] According to the present invention configured in this manner, a temporary storage unit is selected that minimizes the sum of the numbers obtained by multiplying at least two of the average transport time, the variation in transport time, and the maximum transport time by a predetermined weighting coefficient, thereby making it possible to select an appropriate temporary storage unit depending on the characteristics of the transport system.

[0015] In the present invention, the controller preferably has a candidate device table storing candidate processing devices that may perform the next processing on an item that has been processed in a certain processing device, and the candidate processing device extraction unit extracts the candidate processing devices using the candidate device table.

[0016] According to the present invention thus configured, since the controller is provided with the candidate device table, the candidate device extracting section can quickly extract candidate device candidates.

[0017] In the present invention, the candidate device table is preferably generated based on a record of past article transportation by the transportation system.

[0018] According to the present invention configured in this manner, the candidate device table is generated based on the past item transport records by the transport system, so that the candidate device table can be generated automatically without the user having to create the candidate device table.

[0019] In the present invention, preferably, the multiple transport vehicles are ceiling transport vehicles that run along a running track provided on the ceiling, the running track being composed of multiple intrabay tracks capable of transferring articles between the multiple processing devices and an interbay track connecting these intrabay tracks, and the candidate processing device extraction unit extracts processing devices corresponding to the different intrabay tracks.

[0020] According to the present invention configured in this manner, even if the travel track of the transport vehicle is composed of multiple intra-bay tracks and inter-bay tracks, and the processing devices extracted by the candidate processing device extraction unit correspond to different intra-bay orbits, a temporary storage unit in an appropriate location can be selected, thereby improving transport efficiency.

[0021] In the present invention, the interbay track is preferably configured to connect intrabay tracks provided in each of a plurality of buildings, and the candidate processing device extraction unit extracts processing devices corresponding to the intrabay tracks provided in different buildings.

[0022] According to the present invention configured in this manner, the interbay track is configured to connect intrabay tracks provided in each of a number of buildings, and even if the processing devices extracted by the candidate processing device extraction unit correspond to intrabay tracks provided in different buildings, a temporary storage unit in an appropriate location can be selected, thereby improving transportation efficiency. Effect of the Invention

[0023] According to the conveying system of the present invention, the efficiency of transporting items can be improved even when there is a possibility that the destination of the transported item may change or when the destination of the item has not been determined. [Brief description of the drawings]

[0024] [Figure 1] FIG. 1 is a plan view illustrating a transport system according to a first embodiment of the present invention. [Diagram 2]1 is a side view showing a transport vehicle and a buffer provided in the transport system according to a first embodiment of the present invention. [Diagram 3] FIG. 2 is a block diagram showing a configuration of a controller provided in the transport system according to the first embodiment of the present invention. [Figure 4] 5 is a flowchart showing a process in a controller provided in the transport system according to the first embodiment of the present invention. [Diagram 5] 1 is a plan view showing a schematic diagram of an example of a semiconductor manufacturing factory to which a transfer system according to a first embodiment of the present invention is applied; [Figure 6] FIG. 4 is a diagram showing an example of transport times from each buffer to each candidate processing device in the transport system according to the first embodiment of the present invention. [Figure 7] FIG. 11 is a plan view illustrating a transport system according to a second embodiment of the present invention. [Figure 8] FIG. 11 is a diagram showing an example of transport times from each buffer to each candidate processing device in the transport system according to the second embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0025] Next, a transport system according to an embodiment of the present invention will be described with reference to the accompanying drawings. First, a transfer system according to a first embodiment of the present invention will be described with reference to FIGS. In this embodiment, the present invention is applied to a transport system that transports items such as FOUPs containing semiconductor wafers and reticle pods containing reticles within a clean room of a semiconductor manufacturing factory.

[0026] Fig. 1 is a plan view showing a schematic diagram of a transport system according to a first embodiment of the present invention. Fig. 2 is a side view showing a transport vehicle and a buffer provided in the transport system according to the first embodiment of the present invention. Fig. 3 is a block diagram showing a configuration of a controller provided in the transport system according to the first embodiment of the present invention.

[0027] As shown in Fig. 1, the conveying system 1 according to the first embodiment of the present invention includes a conveying vehicle 2 that conveys an article to be processed in a processing device, a plurality of buffers 4 that are temporary storage units that temporarily store the article to be conveyed, a plurality of intrabay tracks 6 that can convey the article to a processing device 12, and an interbay track 8 that connects these intrabay tracks 6. Furthermore, the conveying system 1 includes a controller 10 that controls the conveying vehicle 2 to convey the article that has been processed in the first processing device 12 to the buffer 4, and after the article is stored in the buffer 4, the controller 10 conveys the article to the second processing device 12 when a second processing device 12 that will perform the next process on the article is determined.

[0028] First, the intrabay track 6 is a traveling track formed by rails installed on the ceiling, and a plurality of processing equipment 12 are arranged along the intrabay track 6 so that an article can be transported to the processing equipment. The transport vehicle 2 can transport an article M from one processing equipment 12 arranged along the intrabay track 6 to another processing equipment 12 by traveling while being suspended from the intrabay track 6. Therefore, in this embodiment, the transport vehicle 2 is a ceiling transport vehicle that travels along a traveling track installed on the ceiling. In addition, the transport system 1 of this embodiment is equipped with a plurality of intrabay tracks 6, and the rails constituting each intrabay track 6 are suspended from the ceiling of the semiconductor manufacturing factory.

[0029] Next, the interbay track 8 is a traveling track formed by a circular rail suspended from the ceiling of the semiconductor manufacturing plant, and is connected to each intrabay track 6 via the branch track 6a. This allows the transport vehicle 2 provided in the transport system 1 to move from one intrabay track 6 to another intrabay track 6 via the interbay track 8. In other words, the transport system 1 can transport the article M from a processing device 12 arranged along one intrabay track 6 to another processing device 12 arranged along another intrabay track 6.

[0030] In this embodiment, one phase 14 of a semiconductor manufacturing plant is constituted by a group of processing equipment 12 arranged along four intrabay tracks 6 shown in FIG. 1. In this embodiment, the interbay track 8 is configured to connect one phase 14 shown in FIG. 1 to other phases 14 each consisting of a group of processing equipment 12 having the same function. That is, processing equipment 12 having the same function as one processing equipment 12 belonging to a certain phase 14 is also provided in the other phases 14. Therefore, in this embodiment, there is at least one second processing equipment capable of processing the next step for the article M that has been processed by the first processing equipment in the same phase as the first processing equipment that performed the processing, and in the other phases.

[0031] Next, the configuration of the carrier 2 and the buffer 4 will be described with reference to FIG. 2, the transport vehicle 2 can travel to a target position by using a traveling mechanism 15 while being suspended from rails constituting the intrabay track 6 or the interbay track 8. The transport vehicle 2 also includes a slide mechanism 16 and a gripping mechanism 18.

[0032] The slide mechanism 16 can be extended and retracted horizontally by a ball screw drive mechanism (not shown), and a gripping mechanism 18 is attached to the tip thereof for gripping a flange M1 provided on the article M. The gripping mechanism 18 also includes a suspending belt 18a and a gripper 18b. Four suspension belts 18a are provided for each transport vehicle 2, and are wound around a reel (not shown) provided at the tip of the slide mechanism 16. In addition, the gripper 18b has an opening and closing function that allows it to grip the flange M1 of the article M.

[0033] The grippers 18b are suspended from four suspending belts 18a, and are adapted to move up and down via the suspending belts 18a by forward and reverse rotation of the reel by a driving device (not shown) such as a motor. The length of the suspending belts 18a is set so that the grippers 18b can grip the article M on the fixed shelf 22a of the buffer 4 and move it up and down. When the slide mechanism 16 extends and the gripping mechanism 18 moves to a position directly above the article M, the grippers 18b are lowered to above the article M. Furthermore, the grippers 18b are configured to open and close to grip the flange M1.

[0034] 1, the buffer 4 is a temporary storage section disposed between the processing devices 12 for temporarily storing the items M. Furthermore, as shown in FIG. 2, in this embodiment, the buffer 4 is an overhead buffer (OHB) that is composed of a hanging rod 22b and a fixed shelf 22a and is entirely suspended from the ceiling.

[0035] Since the processing contents of each process by the processing device 12 are different, the processing time also differs, and an irregular waiting time occurs before the next process can be processed. A stocker (not shown) can be provided as a device to store the item M during this time, but this has the disadvantage that it is difficult to respond quickly because it is far from the processing device 12 and it takes time to enter and exit the storage. Therefore, a buffer 4 is provided near the processing device 12 as a simple storage location for the item M during this waiting time. However, any configuration that can store items, such as a stocker (not shown), can also be used as a temporary storage unit (buffer).

[0036] Next, the principle of how the transport vehicle 2 places and carries the article M on and off the buffer 4 will be described. The operation of carrying out the item M is as follows. The transport vehicle 2, which has traveled along the intrabay track 6 and stopped at a position opposite the buffer 4, deploys the slide mechanism 16 toward the buffer 4. This causes the gripper 18b of the gripping mechanism 18 that is not gripping the item M to move to just above the item M. After the gripper 18b has moved to just above the target item M, the suspension belt 18a is extended, and the gripper 18b is lowered to just above the specified item M in the buffer 4, and the gripper 18b grips the flange M1 arranged on the item M.

[0037] Next, after gripping the article M, the reel (not shown) is rotated to wind up the suspension belt 18a, raising the article M together with the gripper 18b, and then the slide mechanism 16 is retracted. Thereafter, the transport vehicle 2 travels on the intrabay track 6 and the interbay track 8 toward the next destination of the article M.

[0038] Similarly, when the transport vehicle 2 places the item M on the buffer 4, the placing operation can be performed in the reverse order to the unloading operation. That is, the transport vehicle 2, which has been traveling along the intrabay track 6 with the item M gripped by the gripper 18b, stops at a predetermined opposite position of the buffer 4 on which the item M is to be placed. Next, the slide mechanism 16 is unwound to move the item M directly above the fixed shelf 22a, and the suspension belt 18a is extended by rotating the reel (not shown), and the gripper 18b holding the item M is lowered to the height position of the fixed shelf 22a on which the item M is to be placed. Thereafter, the gripper 18b is released to place the item M on the buffer 4.

[0039] Thus, in this embodiment, the slide mechanism 16 extends laterally from the transport vehicle 2, and the article M is placed on the fixed shelf 22a of the buffer 4 located on the side of the transport vehicle 2 in a top view. In contrast to this, as a modified example, the present invention can also be configured so that the transport vehicle 2 places the article M on the shelf of a buffer located vertically below. Also, in this embodiment, the buffer 4 is disposed between each of the processing devices 12, but the buffer can be disposed at any position, such as above the processing devices 12. Alternatively, the buffer can be disposed along the interbay track 8.

[0040] Next, the configuration of the controller 10 will be described with reference to FIG. As shown in Figure 3, the controller 10 has a signal input unit 10a to which a signal is input notifying that processing of item M has been completed in the first processing device, a candidate processing device extraction unit 10b that extracts multiple candidate processing devices which are second processing devices expected to perform the next processing on the item M, a temporary storage unit selection unit 10c that selects a buffer 4 for temporarily storing the item M processed in the first processing device based on the multiple extracted candidate processing devices, and a command signal transmission unit 10d that transmits a command signal to the transport vehicle 2 to transport the item M to the selected buffer 4.

[0041] Furthermore, the controller 10 is provided with a candidate device table 10e that stores candidate processing devices that may perform the next processing of the article M that has been processed in a certain processing device 12, and a transport time database 10f that records the transport time from a certain processing device 12 to another processing device 12 (candidate processing device). Specifically, the controller 10 is composed of a microprocessor, a memory, an interface circuit, a transceiver, an external storage device, software for operating these devices, etc. (all not shown).

[0042] The signal input unit 10a is configured to receive a signal from a higher-level controller 20 notifying that processing of an item M has been completed in a certain processing device 12. That is, in a semiconductor manufacturing factory, when processing of a semiconductor wafer is completed in a certain processing device 12 (first processing device), a FOUP (item M) containing the semiconductor wafer is transported to another processing device 12 (second processing device) that performs a next process on the semiconductor wafer. Here, since the transport system 1 of this embodiment performs transport by a so-called push method, when processing in the first processing device is completed, the FOUP is unloaded from the first processing device and temporarily stored in a predetermined buffer 4 even if the second processing device that will perform the next process has not been determined.

[0043] In this embodiment, the host controller 20 is a controller that controls the entire semiconductor manufacturing process, and inputs a signal to the signal input unit 10a of the controller 10 to notify that processing in the first processing device has been completed in the semiconductor manufacturing process. When such a signal is input to the signal input unit 10a, the controller 10 unloads the item M from the first processing device and transports it to the buffer 4, where the item M is temporarily stored. Note that, although the host controller 20 and the controller 10 are configured separately in this embodiment, they may also be configured as an integrated unit.

[0044] The candidate processing device extracting unit 10b is configured to extract candidates for a second processing device that performs a next process on a semiconductor wafer processed in a first processing device. That is, the next process to be performed on a semiconductor wafer after a process performed by a certain processing device 12 is generally determined, but when there are multiple processing devices 12 capable of performing the next process in a factory, it is not possible to identify one processing device 12 that will perform the next process.

[0045] Here, all the processing devices 12 capable of executing the process to be executed next to the process executed by the first processing device are listed as candidate processing devices in the candidate processing device table 10e provided in the controller 10. When a signal notifying that the process in the first processing device has been completed is input, the candidate processing device extracting unit 10b is configured to refer to the candidate processing device table 10e and extract all the processing devices 12 capable of executing the process of the next step as candidate processing devices. Also, when there are multiple processes that can be executed next to the process executed by the first processing device, all the processing devices 12 capable of executing those processes are extracted as candidate processing devices by the candidate processing device extracting unit 10b.

[0046] The candidate equipment table 10e may be created by a user who uses the transport system 1 according to the manufacturing process of the semiconductor wafer. Alternatively, the present invention may be configured so that a newly introduced transport system 1 is operated for a predetermined period of time in a pull method (a transport method in which the article M is stored in a buffer near a processing device that performs the next process after the processing device is determined), and the candidate equipment table 10e is automatically generated based on the acquired transport records of past articles.

[0047] The temporary storage unit selection unit 10c is configured to select a buffer 4 for temporarily storing the item M processed in the first processing device, based on the multiple candidate processing devices extracted by the candidate processing device extraction unit 10b. That is, the temporary storage unit selection unit 10c selects a buffer 4 for temporarily storing the item M from all currently available buffers 4 (where no other item M is currently being stored) based on the transport time to each candidate processing device.

[0048] Here, the transfer time database 10f provided in the controller 10 stores average transfer times from all the buffers 4 in the semiconductor manufacturing factory to all the processing equipment 12 in the factory. Basically, if the distance from a certain buffer 4 to a certain processing equipment 12 is short, the transfer time therebetween is relatively short, and if the distance is long, the transfer time therebetween is relatively long. However, in reality, the transfer time varies depending on whether or not the intrabay track 6 or the interbay track 8, which can run at high speed, is passed through, or whether or not the intrabay track 6 or the interbay track 8, which is often congested due to the large traffic of the transport vehicle 2, is passed through. For this reason, the transfer time between each buffer 4 and each processing equipment 12 stored in the transfer time database 10f is an average value of the transfer time based on the past transfer results.

[0049] In a transport system in which the distance an item must be transported is roughly proportional to the transport time, the present invention can be configured to select a buffer 4 for temporarily storing the item based on the transport distance instead of the transport time. Alternatively, the present invention can be configured to score the transport time according to a predetermined rule, and select a buffer 4 for temporarily storing the item based on this score.

[0050] When the candidate processing equipment extractor 10b extracts the candidate processing equipment, the temporary storage unit selector 10c uses the transport time database 10f to identify the transport time from all currently available buffers 4 to each candidate processing equipment. Furthermore, in this embodiment, the temporary storage unit selector 10c selects a buffer 4 for temporarily storing the item M based on the average transport time from the buffer 4 to each candidate processing equipment and the variation in the transport time from the buffer 4 to each candidate processing equipment.

[0051] Specifically, the temporary storage unit selection unit 10c uses an evaluation function f i Select buffer 4, which has the smallest value. TIFF0007567852000001.tif6150In the above formula, cost ij represents the average transfer time from the available i-th buffer 4 to the j-th candidate processing device, α represents a weighting coefficient multiplied by the average of the average transfer times, and β represents a weighting coefficient multiplied by the standard deviation (variation) of the average transfer times. ij stdev() represents the average of cost ij It represents the standard deviation (variation).

[0052] In this embodiment, the buffer 4 with the smallest value is selected by the temporary storage unit selector 10c based on the sum of the average value of the transfer time from the buffer 4 to each candidate processing device and the variation (standard deviation) of the transfer time from the buffer 4 to each candidate processing device multiplied by the predetermined weighting coefficients (α, β). iIn this embodiment, the standard deviation is used as an index representing the variation in the transfer time, but various indexes such as the variance of the transfer time can be used as an index representing the variation in the transfer time. In this embodiment, the buffer 4 is selected based on the average value of the transfer time and the variation in the transfer time, but in addition to or instead of these, the present invention can also be configured so that the buffer 4 is selected based on the maximum value of the transfer time from the buffer 4 to each candidate processing device.

[0053] That is, the present invention can be configured so that the buffer 4 is selected based on at least one of the average value of the transport time from the buffer 4 to each of the candidate processing devices, the variation in the transport time from the buffer 4 to each of the candidate processing devices, and the maximum value of the transport time from the buffer 4 to each of the candidate processing devices. Also, the present invention can be configured so that the buffer 4 is selected based on the sum of a number obtained by multiplying at least two of the average value of the transport time from the buffer 4 to each of the candidate processing devices, the variation in the transport time from the buffer 4 to each of the candidate processing devices, and the maximum value of the transport time from the buffer 4 to each of the candidate processing devices by a predetermined weighting coefficient.

[0054] The evaluation function used to select the buffer 4 should be set according to the characteristics of the transport system to be applied. That is, in a transport system in which the transport efficiency does not decrease significantly even if the transport time from the buffer 4 to the processing device 12 of the next process is short in most cases and the transport time is occasionally long, it is preferable to use an evaluation function using only the average transport time, or an evaluation function with a large weighting coefficient (α) multiplied by the average transport time. Conversely, there are transport systems in which the transport efficiency as a whole decreases significantly when the transport time is occasionally long, even if the average transport time from the buffer 4 to the processing device 12 of the next process is short. In such a transport system, it is preferable to use an evaluation function using the variation and / or the maximum value of the transport time, or an evaluation function with a large weighting coefficient multiplied by the variation and / or the maximum value of the transport time.

[0055] Next, the command signal transmitting unit 10d of the controller 10 is configured to transmit a command signal to the transport vehicle 2 to transport the item M that has been processed in the first processing device to the buffer 4 selected by the temporary storage unit selecting unit 10c. In addition, the command signal transmitting unit 10d is configured to transmit a command signal to transport the item M from the buffer 4 to the processing device 12 that will perform the next process for the item M temporarily stored in the buffer 4 when the processing device 12 that will perform the next process is determined.

[0056] Next, the operation of the transport system 1 according to the first embodiment of the present invention will be described with reference to FIGS. Fig. 4 is a flowchart showing the process in the controller provided in the transfer system according to the first embodiment of the present invention. Fig. 5 is a plan view showing a schematic example of an example of a semiconductor manufacturing factory to which the transfer system according to the first embodiment of the present invention is applied. Fig. 6 is a diagram showing an example of the transfer time from each buffer to each candidate processing device.

[0057] In addition, while each processing device arranged in the factory is designated by the symbol "12" in Fig. 1, in Fig. 5, the individual processing devices are designated by the symbols "12a", "12b", etc. to distinguish them from one another. Similarly, while each buffer is designated by the symbol "4" and each phase is designated by the symbol "14" in Fig. 1, in Fig. 5, they are designated by the symbols "4a", "4b", etc., "14a", "14b", etc.

[0058] First, in step S1 of Fig. 4, a command signal from a higher-level controller 20 is input to a signal input unit 10a of the controller 10. The command signal from the higher-level controller 20 includes a signal indicating that processing of an item M in a certain processing device 12 has been completed, a signal indicating that a processing device 12 performing a next process on an item M temporarily stored in a certain buffer 4 is now able to accept the item M, and the like. For example, in the example shown in Fig. 5, a signal indicating that processing of an item M has been completed in a first processing device 12a belonging to a first phase 14a is input to the signal input unit 10a.

[0059] Next, in step S2, the candidate processing device extracting unit 10b of the controller 10 refers to the candidate processing device table 10e to extract a plurality of candidates for the second processing device that is expected to perform the next processing on the article M processed by the first processing device 12a. For example, in the example shown in FIG. 5, when the first processing device 12a finishes processing the step k on the article M, the candidate processing device extracting unit 10b extracts a processing device that can perform the step k+1, which is the next step of the step k. For example, the processing of the step k+1 can be performed by the processing device 12b in the first phase 14a, but the processing of the step k+1 can also be performed by the processing device 12c in the second phase 14b and by the processing device 12d in the third phase 14c. Therefore, the processing devices 12b, 12c, and 12d are extracted as candidate processing devices that are expected to perform the next processing. Here, the candidate processing devices extracted by the candidate processing device extracting unit 10b often belong to different phases, and therefore the article is transported to each candidate processing device via different intrabay tracks 6.

[0060] Furthermore, in step S3, the temporary storage unit selection unit 10c of the controller 10 calculates the value of the evaluation function f for the currently available buffer 4 using formula (1). For example, in the example shown in FIG. 5, buffers 4a, 4b, and 4c are currently available as buffers (buffers capable of temporarily storing items). Therefore, in this example, as shown in FIG. 6, the value of the evaluation function f is calculated based on the transport time from the three buffers 4a, 4b, and 4c to the three processing devices 12b, 12c, and 12d that are candidate processing devices. The average transport time from each of these buffers 4 to each processing device 12 is stored in the transport time database 10f of the controller 10.

[0061] 6, the average transfer time from the first buffer 4a to the processing device 12b, which is the first candidate processing device, is 30 seconds, and the average transfer time from the first buffer 4a to the processing devices 12c and 12d, which are the second and third candidate processing devices, is 90 seconds and 150 seconds, respectively. Similarly, the average transfer time from the second buffer 4b to the processing devices 12b, 12c, and 12d, which are the first, second, and third candidate processing devices, is 90 seconds, 30 seconds, and 90 seconds, respectively, and the average transfer time from the third buffer 4c to the processing devices 12b, 12c, and 12d, which are the first, second, and third candidate processing devices, is 150 seconds, 90 seconds, and 30 seconds, respectively.

[0062] Next, based on these transport times, the evaluation function f i In the example shown below, the weighting coefficients α=1 and β=1 in the formula (1). First, the transfer times from the first buffer 4a to the first to third candidate processing devices (processing devices 12b, 12c, and 12d) are 30 seconds, 90 seconds, and 150 seconds, respectively, so the average transfer time to each candidate processing device for the first buffer 4a is calculated to be 90 seconds. Furthermore, the standard deviation of the transfer time from the first buffer 4a to each candidate processing device is calculated to be approximately 48 seconds. Therefore, the value of the evaluation function f1 for the first buffer 4a is calculated to be approximately 138 seconds.

[0063] Similarly, the transfer times from the second buffer 4b to the candidate processing devices No. 1 to No. 3 are 90 seconds, 30 seconds, and 90 seconds, respectively, so the average transfer time to each candidate processing device for the second buffer 4b is calculated to be 70 seconds. Furthermore, the standard deviation of the transfer time from the second buffer 4b to each candidate processing device is calculated to be about 28 seconds. Therefore, the value of the evaluation function f2 for the second buffer 4b is calculated to be about 98 seconds. Furthermore, the transfer times from the third buffer 4c to the candidate processing devices No. 1 to No. 3 are 150 seconds, 90 seconds, and 30 seconds, respectively, so the average transfer time to each candidate processing device for the third buffer 4c is calculated to be 90 seconds. Furthermore, the standard deviation of the transfer time from the third buffer 4c to each candidate processing device is calculated to be about 48 seconds. Therefore, the value of the evaluation function f3 for the third buffer 4c is calculated to be about 138 seconds.

[0064] Next, in step S4 of FIG. 4, the temporary storage unit selection unit 10c of the controller 10 selects the evaluation function f i 6, the evaluation function f1 for the first buffer 4a is calculated as f1=138 seconds, the evaluation function f2 for the second buffer 4b as f2=98 seconds, and the evaluation function f3 for the third buffer 4c as f3=138 seconds, so the second buffer 4b, which has the smallest evaluation function value, is selected.

[0065] Furthermore, in step S4, the command signal transmitting unit 10d of the controller 10 transmits a control signal to the transport vehicle 2 to transport the article M that has been processed in the processing device 12a (FIG. 5) to the buffer 4b selected by the temporary storage unit selecting unit 10c. As a result, the article M that has been processed in the processing device 12a is transported to the buffer 4b by the transport vehicle 2. Next, the process in the flowchart of FIG. 4 returns to step S1, and the processes of steps S1 to S5 are repeatedly executed.

[0066] Furthermore, when the processing device 12 that will perform the next process for the item M temporarily stored in the selected buffer 4b is determined, a command signal is input from the higher-level controller 20 to the controller 10. The command signal transmission unit 10d of the controller 10 controls the transport vehicle 2 based on this command signal, and transports the item M stored in the buffer 4b to the designated processing device 12. As described above, when the processing device 12b is designated as the second processing device that will perform the next process, the time required to transport the item M to this processing device 12b is approximately 90 seconds. Similarly, when the processing device 12c is designated as the second processing device, the transport time is approximately 30 seconds, and when the processing device 12d is designated, the transport time is approximately 90 seconds.

[0067] In this way, by selecting the buffer 4b as a buffer for temporarily storing the article processed in the first processing device 12a based on the multiple candidate processing devices extracted by the candidate processing device extractor 10b, the transport time to the second processing device for the next process can be reduced to about 90 seconds or less. In contrast, as a comparative example, it is also possible to temporarily store the article M processed in the processing device 12a in the buffer 4a that belongs to the same phase 14a as the processing device 12a. However, in this comparative example, if the processing device 12d that belongs to the phase 14c is designated as the second processing device for the next process, the transport time to this processing device 12d will be about 150 seconds, and the transport efficiency of the transport system 1 will be reduced.

[0068] According to the transport system 1 of the first embodiment of the present invention, when the processing of the item M is completed in the first processing device 12a, the item M is transported to the buffer 4 even if the second processing device that will perform the processing of the next step has not been determined. Therefore, the item M does not stop near the first processing device 12a, and transport efficiency can be improved. Furthermore, according to the transport system 1 of this embodiment, the buffer 4b for temporarily storing the item M processed in the first processing device 12a is selected based on the multiple candidate processing devices 12b, 12c, and 12d extracted by the candidate processing device extraction unit 10b. Therefore, it is possible to select a buffer 4 that is easy to transport the item M to each of the candidate processing devices 12b, 12c, and 12d, and transport efficiency can be further improved.

[0069] Furthermore, according to the conveying system 1 of this embodiment, the buffer 4 is selected based on the conveying time (FIG. 6) to each of the candidate processing devices 12b, 12c, and 12d extracted by the candidate processing device extraction unit 10b, so that the buffer 4 can be selected so as to shorten the conveying time to each of the candidate processing devices 12b, 12c, and 12d, thereby shortening the conveying time.

[0070] Furthermore, according to the transport system 1 of this embodiment, the buffer 4 is selected based on the average value of the transport time and the variation (standard deviation) of the transport time (Formula 1). Therefore, no matter which of the candidate processing devices 12b, 12c, and 12d is selected as the processing device to perform the next process, it is possible to prevent the transport time from becoming extremely long, and the overall transport efficiency can be improved.

[0071] Furthermore, according to the conveying system 1 of this embodiment, a buffer 4 is selected based on the sum of the numbers obtained by multiplying the average value of the conveying time and the variation in the conveying time by predetermined weighting coefficients (α and β in Formula 1), respectively, so that an appropriate buffer 4 can be selected according to the characteristics of the conveying system.

[0072] Furthermore, according to the transport system 1 of this embodiment, since the controller 10 includes the candidate equipment table 10e (FIG. 3), the candidate equipment extracting unit 10b can quickly extract candidate equipment.

[0073] Furthermore, according to the conveying system 1 of this embodiment, even if the traveling track of the conveying vehicle 2 is composed of multiple intra-bay tracks 6 and inter-bay tracks 8, and the processing devices 12 extracted by the candidate processing device extraction unit 10b are those that convey items M via different intra-bay tracks 6, a buffer 4 located in an appropriate position can be selected, thereby improving conveying efficiency.

[0074] Next, a transfer system according to a second embodiment of the present invention will be described with reference to Fig. 7 and Fig. 8. Fig. 7 is a plan view showing a schematic diagram of a transfer system according to the second embodiment of the present invention. Fig. 8 is a diagram showing an example of a transfer time from each buffer to each candidate processing device.

[0075] The conveying system of this embodiment differs from the first embodiment of the present invention in that the entire system is distributed across two buildings, and the interbay tracks in each building are connected by an intermediate interbay track. Therefore, only the differences between the second embodiment of the present invention and the first embodiment will be described here, and the same configurations, actions, and effects will be omitted.

[0076] As shown in FIG. 7, the transport system 100 according to the second embodiment of the present invention is provided in a first building 105a and a second building 105b. In the first building 105a, a circular first interbay track 108a and a plurality of intrabay tracks 106 connected to the first interbay track 108a are arranged. On the other hand, in the second building 105b, a circular second interbay track 108b and a plurality of intrabay tracks 106 connected to the second interbay track 108b are arranged. Furthermore, the first interbay track 108a in the first building 105a and the second interbay track 108b in the second building 105b are connected by an intermediate interbay track 108c.

[0077] The transport system 100 of this embodiment is also equipped with a plurality of transport vehicles for transporting the article M, and these transport vehicles can transport the article along each interbay track and each intrabay track. In FIG. 7, the transport vehicles are omitted in order to simplify the drawing. Furthermore, in this embodiment, a plurality of processing devices are also arranged along each intrabay track 106, and are configured to perform each processing step on the article. In FIG. 7, only processing devices 112a, 112b, and 112c are shown in order to simplify the drawing, but in reality, a large number of processing devices are arranged along each intrabay track 106.

[0078] Also in this embodiment, a plurality of buffers, which are temporary storage units, are arranged along each intrabay track 106, and are configured to temporarily store articles that have been processed in a certain processing device. Note that in Fig. 7, in order to simplify the drawing, only buffers 104a, 104b, and 104c are shown, but in reality, a large number of buffers are arranged along each intrabay track 106 or each interbay track.

[0079] Furthermore, the conveying system 100 has a controller 110, which controls a conveying vehicle (not shown in FIG. 7) to convey an item processed in a first processing device to a buffer, and after the item is stored in the buffer, when a second processing device that will perform the next process on the item is determined, conveys the item to the second processing device.

[0080] First, in the transport system 100, for example, the value of the evaluation function f is calculated for a case where the processing of an article in the first processing device 112a is completed and processing devices 112b and 112c are extracted as candidate processing devices for performing the processing of the next step. Here, the processing devices 112b and 112c extracted as candidate processing devices are often located in different buildings, and articles are transported to these processing devices via intrabay tracks 106 provided in the different buildings.

[0081] Here, if an article is temporarily stored in the buffer 104a near the processing device 112b, the average transport time to the processing device 112b is 30 seconds, and the average transport time to the processing device 112c is 340 seconds, as shown in FIG. 8. That is, in the case where the transport system 100 is distributed between the first building 105a and the second building 105b as in this embodiment, the time to transport an article to a candidate processing device in the same building as the buffer where the article was temporarily stored is short, but the transport time to transport an article to a candidate processing device in a building different from the buffer where the article was stored is extremely long. As a result, for the buffer 104a, the average transport time to each candidate processing device is calculated to be 185 seconds. Furthermore, the standard deviation of the transport time from the buffer 104a to each candidate processing device is calculated to be about 155 seconds. Therefore, the evaluation function f a The value of is calculated to be about 340 seconds using equation (1) (weighting coefficients α=1, β=1).

[0082] Next, if an item is temporarily stored in buffer 104b, which is relatively far from both candidate processing equipment 112b and 112c, the average transport time to processing equipment 112b is 190 seconds, and the average transport time to processing equipment 112c is 150 seconds, as shown in FIG. 8. In other words, by storing an item in buffer 104b, which is far from both candidate processing equipment 112b and 112c and close to the midpoint between them, the difference in transport time to each candidate processing equipment becomes smaller. As a result, for buffer 104b, the average transport time to each candidate processing equipment is calculated to be 170 seconds. Furthermore, the standard deviation of the transport time from buffer 104b to each candidate processing equipment is calculated to be approximately 20 seconds. Therefore, the evaluation function f b The value is calculated to be approximately 190 seconds (with weighting factors α=1, β=1).

[0083] Therefore, when the only available buffers at the time when the processing in the processing device 112a is completed are the buffers 104a and 104b, the temporary storage unit selection unit (not shown in FIG. 7) of the controller 110 selects the buffer 104b which has a smaller value of the evaluation function. In this way, in the transport system 100 in which the objects are distributed among multiple buildings, the transport time varies greatly between when the objects are transported to another building and when the objects are transported within the same building, and the standard deviation of the transport time becomes large. For this reason, it becomes easier to select a buffer which reduces the variation in the transport time.

[0084] Furthermore, when it is possible to provide a buffer along the intermediate interbay track 108c, such as buffer 104c, the variation in transport time can be suppressed. That is, when an item is temporarily stored in buffer 104c arranged along the intermediate interbay track 108c, as shown in FIG. 8, the average transport time to processing device 112b is 110 seconds, and the average transport time to processing device 112c is 170 seconds. As a result, for buffer 104c, the average transport time to each candidate processing device is calculated to be 140 seconds. Furthermore, the standard deviation of the transport time from buffer 104c to each candidate processing device is calculated to be approximately 30 seconds. Therefore, the evaluation function f for buffer 104c is c The value of is calculated to be about 170 seconds (with weighting coefficients α=1, β=1), and the value of the evaluation function can be further reduced.

[0085] According to the transport system 100 of the second embodiment of the present invention, the interbay tracks 108a, 108b, and 108c are configured to connect the intrabay tracks 106 provided in the multiple buildings 105a and 105b. Even if the processing devices 112b and 112c extracted by the candidate processing device extraction unit are those that transport the article M via the intrabay tracks 106 provided in different buildings, the buffer 104b or 104c located in an appropriate position can be selected, thereby improving transport efficiency.

[0086] Although the embodiment of the present invention has been described above, various modifications can be made to the above-mentioned embodiment. In particular, in the above-mentioned embodiment, the present invention is applied to a transport system using an overhead hoist transport in which a ceiling transport vehicle travels along a travel track provided on the ceiling. However, the present invention can be applied to various transport systems, such as an automated guided vehicle (AGV) in which a transport vehicle travels along a track (path) on the floor surface, and a transport system using a track-guided automated guided vehicle (RGV). In addition, in the above-mentioned embodiment, a FOUP containing a semiconductor wafer and a reticle pod containing a reticle are transported as the article, but the present invention can be applied to a transport system that transports any article. In the above-mentioned embodiment, the track on which each transport vehicle travels is configured by a rail, but the track on which each transport vehicle travels does not have to be configured by a physical member such as a "rail". [Explanation of symbols]

[0087] 1. Transport system 2. Transport vehicle (ceiling transport vehicle) 4 Buffer (temporary storage) 6 Intra-bay track (running track) 6a Branching orbit 8 Interbay track (running track) 10 Controller 10a Signal input section 10b Candidate processing device extraction unit 10c Temporary Storage Section Selection Section 10d Command signal transmitter 10e Candidate Device Table 10f Delivery time database 12 Processing equipment 14 Phase 15 Running mechanism 16 Slide mechanism 18 Gripping mechanism 18a Suspension belt 18b Gripper 20 Top Controllers 22a Fixed shelf 22b Suspension rod 100 Transport System 104a Buffer 104b Buffer 104c Buffer 105a First Building 105b Second Building 106 Intrabay Orbit 108a First Interbay Track 108b 2nd Interbay Orbit 108c Intermediate Interbay Track 112a Processing device 112b Processing device 112c Processing Equipment

Claims

1. A conveying system for conveying articles between a plurality of processing devices, comprising: A transport vehicle that transports an article to be processed in the processing device; A plurality of temporary storage units for temporarily storing items to be transported; a controller that controls the transport vehicle to transport the article processed in the first processing device to the temporary storage unit, and when the article is stored in the temporary storage unit and a second processing device that will perform a next process on the article is determined, causes the controller to transport the article to the second processing device; having The controller includes a candidate processing device extracting unit that extracts a plurality of candidate processing devices, which are second processing devices that are expected to perform a next process on the article processed by the first processing device; a temporary storage unit selection unit that selects a temporary storage unit for temporarily storing the articles processed in the first processing device based on the plurality of candidate processing devices extracted by the candidate processing device extraction unit; having The temporary storage unit selection unit specifies a transport time for each combination of a plurality of temporary storage units capable of temporarily storing items and a plurality of candidate processing devices extracted by the candidate processing device extraction unit, and selects a temporary storage unit for temporarily storing items processed in the first processing device based on the specified transport time.

2. The transport system of claim 1, wherein the temporary storage unit selection unit selects a temporary storage unit based on at least one of the average transport time from the temporary storage unit to each candidate processing device, the variation in the transport time from the temporary storage unit to each candidate processing device, and the maximum transport time from the temporary storage unit to each candidate processing device.

3. The transport system described in claim 2, wherein the temporary storage unit selection unit selects a temporary storage unit that minimizes the sum of at least two of the average value of the transport time from the temporary storage unit to each candidate processing device, the variation in the transport time from the temporary storage unit to each candidate processing device, and the maximum value of the transport time from the temporary storage unit to each candidate processing device multiplied by a predetermined weighting coefficient.

4. A conveying system as described in any one of claims 1 to 3, wherein the controller is provided with a candidate device table storing candidate processing devices that may perform the next processing on an item processed by a certain processing device, and the candidate processing device extraction unit extracts candidate processing devices using the candidate device table.

5. 5. The transport system according to claim 4, wherein the candidate device table is generated based on a record of past article transports by the transport system.

6. The conveying system of claim 1, wherein the multiple transport vehicles are ceiling transport vehicles that run along a running track provided on the ceiling, the running track being composed of multiple intrabay tracks capable of transferring items between multiple processing devices and an interbay track connecting these intrabay tracks, and the candidate processing device extraction unit extracts processing devices corresponding to the different intrabay tracks.

7. The transportation system according to claim 6, wherein the interbay track is configured to connect intrabay tracks provided in each of a plurality of buildings, and the candidate processing device extraction unit extracts processing devices corresponding to the intrabay tracks provided in different buildings.

Citation Information

Patent Citations

  • Manufacturing installation of semiconductor

    JP1992352343A

  • Carrying control method to batch-type ic-manufacturing / treatment device

    JP1999297785A

  • Carrying system

    JP2003285906A

  • Access allocation system for semiconductor manufacturing equipment and method of use and operation thereof

    JP2015527754A

  • Conveying system

    JP4782194B2