How to move long objects

The sling aid with a convex portion and rollers facilitates the easy separation and slinging of bundled construction materials, enhancing efficiency and safety in handling heavy materials.

JP7567880B2Active Publication Date: 2024-10-16SEKISUI HOUSE KK
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2022149688
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-09-21
Publication Date
2024-10-16
Estimated Expiration
2042-09-21

AI Technical Summary

Technical Problem

Existing methods for handling long materials, such as construction materials, require manual separation of bundles to facilitate slinging, which is cumbersome and inefficient, especially when dealing with heavy materials like steel.

Method used

A sling aid with a support part and opposing arms featuring a convex portion that separates bundles by inserting between them, along with rollers and stoppers to guide and secure the bundles for easy slinging.

Benefits of technology

Enables easy and efficient separation and slinging of multiple bundles of long materials, allowing them to be moved one by one to processing equipment, reducing manual effort and improving safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007567880000001
    Figure 0007567880000001
  • Figure 0007567880000002
    Figure 0007567880000002
  • Figure 0007567880000003
    Figure 0007567880000003
Patent Text Reader

Abstract

To facilitate slinging work for each bundle for a plurality of bundles of long materials put together in one.SOLUTION: A sling auxiliary tool 10 comprises: a support 20; a first arm 21 that extends from the support 20 in a first extending direction E1; and a second arm 22 that extends in a second extending direction E2 relative to the first arm 21. The support 20 has a projected part 25 that projects above a first upper surface 49 of the first arm 21 and a second upper surface 69 of the second arm 22.SELECTED DRAWING: Figure 11
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a slinging aid that assists in slinging construction materials and a method for moving long objects using the same. [Background technology]

[0002] Long materials are loaded onto the bed of a truck or the like, transported to a factory, work site, etc., and then unloaded. Patent Document 1 discloses that a concrete pole loaded onto the bed of a truck is unwound from a wire rope that is looped around it and unloaded onto the ground along an inclined guide. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Japanese Patent Application Publication No. 4-75839 Summary of the Invention [Problem to be solved by the invention]

[0004] Long materials include, for example, construction materials to be processed into pillars, beams, etc. About five pieces of construction materials are bundled together with wire or the like and loaded onto a truck or the like and transported to a factory. A bundle of construction materials is placed, for example, on the loading platform of a truck or the like, with multiple bundles lined up. Depending on the width of the bundle, for example, two bundles are further bundled together with wire or the like and placed on the loading platform.

[0005] Construction materials are stored on racks or the like until they are processed. For example, two bundles of construction materials are stored on racks or the like. When construction materials are processed, the construction materials stored on racks or the like are lifted by a crane or the like and moved to a processing device. Here, the construction materials are moved to the processing device one by one. For example, the bundle of construction materials lifted by a crane or the like is moved to a predetermined position of a conveying device that conveys the construction materials one by one. Since the number of construction materials that can be placed at a predetermined position of the conveying device is limited, for example, one bundle of construction materials out of two bundles stored on a rack or the like is moved to a predetermined position of the conveying device. When a wire for lifting two bundles of construction materials bundled together is sling-hung on one bundle by a crane, it is necessary to separate the two bundles of construction materials and secure a space for the wire to be hung around them. For example, for heavy construction materials such as steel, a worker needs to climb up on a rack and insert an iron pipe or the like between the two bundles of construction materials to separate them.

[0006] The present invention has been made in consideration of the above-mentioned circumstances, and its object is to provide a means for facilitating the work of slinging each bundle of long materials that are bundled together. [Means for solving the problem]

[0007] (1) Claim 1 is a slinging aid comprising a support part and arms extending in opposite directions from the support part, the support part having a convex part protruding upward above the upper surface of the arm.

[0008] When the two bundles of long objects are lifted together with the space between them positioned above the protruding portion, the long objects are lowered, causing the protruding portion to enter between the two bundles and pull the two bundles apart one by one. This makes it easy to perform the slinging work on each bundle.

[0009] (2) Claim 2 is a slinging aid as described in claim 1, wherein each of the arms has a stopper protruding upward from the upper surface of the extending end portion extending from the support portion, and the upper surface slopes downward as it extends from the support portion.

[0010] Each bundle of long objects separated by the convex portion can be further separated by the inclined arm.

[0011] (3) Claim 3 is a slinging aid according to claim 1 or 2, wherein the convex portion has a tapered shape tapering upward.

[0012] The tapered shape of the convex portion separates the two bundles of long objects one by one.

[0013] (4) A lifting aid as described in any one of claims 1 to 3, wherein each of the arms further has a roller rotating about an axis along a transverse direction intersecting the extension direction, and the rollers are arranged in multiple rows along the extension direction, and a portion of each roller surface bulges from the upper surface.

[0014] The bundle of long objects moves smoothly over the upper surface of the roller.

[0015] (5) A method for moving long objects includes an arrangement process in which at least a pair of slinging auxiliary devices, each of which has a support part and an arm extending in an opposing extension direction from the support part, and the support part has a convex part protruding above an upper surface of the arm, are arranged in a direction intersecting the extension direction; a lifting process in which two bundles of long objects placed on a rack are slinged together and lifted up; a positioning process in which each of the two lifted bundles of long objects is positioned above the pair of convex parts; a lowering process in which the two bundles of long objects are lowered toward the pair of convex parts; a separating process in which the two bundles of long objects are separated along the convex parts and the arms; and a moving process in which each of the separated bundles of long objects is slinged, lifted, and moved to a conveying device.

[0016] It is easy to move two bundles of long objects placed on a rack one by one to the conveying device. Effect of the Invention

[0017] According to the present invention, it is easy to lift and sling each bundle of long materials that are bundled together. [Brief description of the drawings]

[0018] [Figure 1] FIG. 1 is a schematic diagram showing the procedure for carrying an H-shaped steel beam 11 from a truck 14 into a factory. [Diagram 2] FIG. 2 is a front view showing the slinging aid 10 according to one embodiment of the present invention. [Diagram 3] FIG. 3 is a plan view of the slinging aid 10 shown in FIG. [Figure 4] FIG. 4 is a plan view of the support portion 20. As shown in FIG. [Diagram 5] FIG. 5 is a front view showing the slinging auxiliary device 10 together with the H-shaped steel beam 11. [Figure 6] FIG. 6 is an enlarged cross-sectional view showing the periphery of leg 23 of slinging aid 10. As shown in FIG. [Figure 7] FIG. 7 is a diagram for explaining the process of arranging the two slinging auxiliary devices 10, 10 in the procedure for moving the H-shaped steel 11. FIG. [Figure 8] FIG. 8 is a diagram for explaining a step of hoisting the H-shaped steel 11 from the rack 14 in the procedure for moving the H-shaped steel 11. As shown in FIG. [Figure 9] FIG. 9 is a diagram for explaining a step of positioning the H-shaped steel 11 in the positioning portion 30 in the procedure for moving the H-shaped steel 11. As shown in FIG. [Figure 10] FIG. 10 is a diagram for explaining a step of lowering the H-shaped steel 11 to the positioning section 30 in the procedure for moving the H-shaped steel 11. As shown in FIG. [Figure 11] 11(a) and 11(b) are diagrams for explaining a step of separating two bundles of H-shaped steel 11 into individual bundles and separating them in the procedure for moving the H-shaped steel 11. FIG. [Figure 12]FIG. 12 is a diagram for explaining a process of moving the H-shaped steel 11 from the slinging auxiliary devices 10, 10 to the transport device 15 in the procedure for moving the H-shaped steel 11. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] Hereinafter, an embodiment of the present invention will be described. Note that the embodiment described below is merely an example of the present invention, and it goes without saying that the embodiment of the present invention can be appropriately modified without departing from the gist of the present invention.

[0020] In the following, the vertical direction based on the ground G on which the slinging aid 10 is installed is defined as the up-down direction 1. Among the horizontal directions, the direction in which the first arm 21 and the second arm 22 of the slinging aid 10 extend when viewed from the up-down direction 1 is defined as the left-right direction 2. The direction perpendicular to the up-down direction 1 and the left-right direction 2 is defined as the front-rear direction 3.

[0021] As shown in Fig. 1, H-shaped steel beams (an example of a long object) 11 used as construction materials are loaded onto the platform of a truck 12 or the like in bundles of five steel beams bound together with wire 16, and are then lifted up by a crane 13 in bundles of two and carried into a factory. The H-shaped steel beams 11 carried into the factory are stored in bundles of two from the platform of the truck 12 on a rack 14. As will be described in detail later, the H-shaped steel beams 11 stored on the rack 14 are lowered from the lifted state by the crane 13 onto the auxiliary slinging tool 10, which is then separated into individual bundles and moved to a conveying device 15 one by one. In the conveying device 15, the H-shaped steel beams 11 are processed one by one.

[0022] The slinging aid 10 is used while installed on the ground G, and separates two bundles of H-shaped steel 11, each of which has five steel pieces bound together by wire 16, into one bundle. As shown in Figures 2 and 3, the slinging aid 10 comprises a support part 20, a first arm (an example of an arm) 21, a second arm (an example of an arm) 22 extending from the support part 20 opposite to the first arm 21, and a leg part 23.

[0023] The support portion 20 has a protruding portion 25 and a base portion 26 that supports the protruding portion 25. The protruding portion 25 has a tapered shape in which the width along the left-right direction 2 tapers upward, and separates two bundles of H-shaped steel 11 lowered by the crane 13 one by one. More specifically, the protruding portion 25 has two tapered walls 27, left-right walls 28 located below the tapered walls 27 and facing the left-right direction 2, and a front-rear wall 29 located between the left-right walls 28 and facing the front-rear direction 3. The two tapered walls 27 have tapered surfaces 27a facing outward. The two tapered walls 27 are supported by the left-right walls 28. A part of the tapered surface 27a is located above a first upper surface 49 and a second upper surface 69 described later.

[0024] A positioning portion 30 is located at the upper ends of the two tapered walls 27. The positioning portion 30 is a linear ridge formed by joining the two tapered walls 27. The positioning portion 30 is aligned along the front-rear direction 3 and is perpendicular to a first extension direction (an example of an extension direction) E1 in which the first arm 21 extends from the support portion 20 and a second extension direction (an example of an extension direction) E2 in which the second arm 22 extends from the support portion 20.

[0025] As shown in FIG. 2 and FIG. 4, the base 26 is located below the protrusion 25. The base 26 is rectangular when viewed from the top-bottom direction 1, and has through holes 33 near the four corners. The base 26 has a flat surface 34 that extends along the left-right direction 2 and the front-rear direction 3 on the surface facing upward, a first inclined surface 35 that slopes downward from the flat surface 34 toward the right, and a second inclined surface 36 that slopes downward from the flat surface 34 toward the left. The front and rear walls 29 are located on the flat surface 34. The left end of the first arm 21 is located on the first inclined surface 35 along the inclined surface. The right end of the second arm 22 is located on the second inclined surface 36 along the inclined surface.

[0026] As shown in FIG. 2 and FIG. 3, the first arm 21 has a first lower wall 44, a first upper wall 45, a first front wall 46, a first rear wall 47, a first roller (one example of a roller) 41, and a first stopper 42. The first lower wall 44 has a flat plate shape and is bridged between the first inclined surface 35 and the ground G. A through hole (not shown) is formed in the first lower wall 44 at the front and rear positions of the left end portion. The first upper wall 45 is located above the first lower wall 44. The first upper wall 45 is a pair of flat plates spaced apart from each other in the front-rear direction 3, and each of the first upper wall 45 is parallel to the first lower wall 44. The first upper wall 45 has a first upper surface (one example of an upper surface) 49 facing upward. The first front wall 46 is located between the front end of the first lower wall 44 and the front end of the first upper wall 45. The first front wall 46 has a flat plate shape that extends in the up-down direction 1 and the left-right direction 2. The first rear wall 47 is located between the rear end of the first lower wall 44 and the rear end of the first upper wall 45. The first rear wall 47 has a flat plate shape that is parallel to the first front wall 46.

[0027] The first rollers 41 support one bundle of H-shaped steel 11 that is slid above the first upper surface 49. Five first rollers 41 are arranged along the first extension direction E1. The first rollers 41 are supported by first roller support parts 50 that rotate three times in the front-rear direction. The first roller support parts 50 are rotatably supported on the first front wall 46 and the first rear wall 47. Each of the first rollers 41 has a first roller surface (an example of a roller surface) 51 on its outer circumferential surface. A portion of the first roller surface 51 bulges out from the first upper surface 49.

[0028] 5, the first stopper 42 supports one bundle of H-shaped steel 11 on the first arm 21 which is slid above the first upper surface 49 by the first roller 41. The first stopper 42 protrudes upward from the first upper surface 49 at a first extending end (one example of an extending end) 52 of the first arm 21 extending from the support part 20. The first extending end 52 is located at the tip portion of the first arm 21 in the first extending direction E1. The first stopper 42 has a rectangular column shape and is fixed at the front and rear positions at the right end of the first upper wall 45 by bolts 55 and nuts (not shown).

[0029] The second arm 22 has a second lower wall 64, a second upper wall 65, a second front wall 66, a second rear wall 67, a second roller (one example of a roller) 61, and a second stopper 62. The second lower wall 64 has a through hole (not shown) formed at the front and rear positions of the right end. The second upper wall 65 is located above the second lower wall 64. The second upper wall 65 is a pair of flat plates spaced apart in the front-rear direction 3, and each is parallel to the second lower wall 64. The second upper wall 65 has a second upper surface (one example of an upper surface) 69 facing upward. The second front wall 66 is located between the front end of the second lower wall 64 and the front end of the second upper wall 65. The second front wall 66 has a flat plate shape extending in the up-down direction 1 and the left-right direction 2. The second rear wall 67 is located between the rear end of the second lower wall 64 and the rear end of the second upper wall 65. The second rear wall 67 has a flat plate shape parallel to the second front wall 66 .

[0030] The second rollers 61 support one bundle of H-shaped steel beams 11 that slides above the second upper surface 69. Five second rollers 61 are arranged along the second extension direction E2. The second rollers 61 are supported by second roller support parts 70 that rotate three times in the front-rear direction. The second roller support parts 70 are rotatably supported by the second front wall 66 and the second rear wall 67. Each second roller 61 has a second roller surface (an example of a roller surface) 71 on its outer circumferential surface. A portion of the second roller surface 71 bulges out from the second upper surface 69.

[0031] 5, the second stopper 62 supports one bundle of H-shaped steel 11 on the second arm 22, which is slid above the second upper surface 69 by the second roller 61. The second stopper 62 protrudes upward from the second upper surface 69 at a second extending end (an example of an extending end) 72 of the second arm 22 extending from the support part 20. The second extending end 72 is located at the tip portion of the second arm 22 in the second extending direction E2. The second stopper 62 has a rectangular column shape, and is fixed at the front and rear positions at the left end of the second upper wall 65 by bolts 75 and nuts (not shown).

[0032] Legs 23 are positioned at the four corners of base 26 through through holes 33 shown in Fig. 4, and support base 26, first arm 21, and second arm 22 as shown in Fig. 6. Specifically, legs 23 have a foot 81 that is placed on the ground G, and a body 82 that has a thread formed thereon and extends upward from foot 81. Foot 81 is made up of three disc-shaped members with an outer diameter larger than that of body 82 stacked in the vertical direction 1.

[0033] A first nut 84 is screwed onto the body 82. In the body 82, the base 26 is placed on the first nut 84. In the body 82, the first lower wall 44 is placed on the first inclined surface 35 of the base 26, and the second lower wall 64 is placed on the second inclined surface 36 of the base 26. A second nut 85 is screwed onto the first lower wall 44 and the second lower wall 64 of the body 82. The base 26 and the first lower wall 44, and the base 26 and the second lower wall 64 are fixed by the first nut 84 and the second nut 85 in the body 82, respectively. The first nut 84 can be rotated relative to the body 82 to adjust its vertical position relative to the body 82. Therefore, the base 26 can be adjusted to a horizontal state by adjusting the height positions of the four legs 23.

[0034] [Movement of H-beam 11] Below, the procedure for moving H-shaped steel beams 11 (see Figure 1), which are placed in bundles of two with five beams tied together with wire 16 on a rack 14, to a conveying device 15 will be described with reference to Figures 7 to 12.

[0035] 7, first, before the H-shaped steel 11 is transported from the rack 14, a worker lines up the two slinging auxiliary tools 10, 10 so that their positioning portions 30 are aligned along a straight line L perpendicular to the first extension direction E1 and the second extension direction E2 (an example of an arrangement process). At this time, the two slinging auxiliary tools 10, 10 are parallel to each other when viewed from the up-down direction 1. The two slinging auxiliary tools 10, 10 are arranged with a distance S between them that is greater than half the longitudinal dimension D1 of the H-shaped steel 11 so that the H-shaped steel 11 can be stably supported.

[0036] Next, as shown in Fig. 8, a worker slings two bundles of H-shaped steel 11 together on a rack 14 and lifts them up with a crane 13 (an example of a lifting process). As shown in Fig. 9, the two lifted bundles of H-shaped steel 11 are positioned by a worker so that the space between the bundles is located directly above the positioning portions 30 of the slinging auxiliary devices 10, 10 (an example of a positioning process).

[0037] As shown in Fig. 10, a worker lowers the two bundles of H-shaped steel 11, which have been positioned in a lifted state, towards the positioning section 30 (an example of a lowering process). As shown in Fig. 11(a) and Fig. 11(b), the two bundles of H-shaped steel 11 each come into contact with the positioning section 30 and are further lowered by the crane 13, so that they are separated into individual bundles along the tapered surface 27a and pulled apart along the first arm 21 and the second arm 22 (an example of a pulling apart process).

[0038] At this time, the right bundle of H-shaped steel 11 separated by tapered surface 27a is positioned on the first roller 41 after the lower surface abuts against the upper end of the first upper surface 49 and moves along the first extension direction E1. On the other hand, the left bundle is positioned on the second roller 61 after the lower surface abuts against the upper end of the second upper surface 69 and moves along the second extension direction E2. The right bundle moved by the first roller 41 is restricted in its movement in the first extension direction E1 by the first stopper 42, and the left bundle moved by the second roller 61 is restricted in its movement in the second extension direction E2 by the second stopper 62. In this state, since each bundle of H-shaped steel 11 is supported by the first arm 21 and the second arm 22, a gap is formed between and below the right and left bundles of H-shaped steel 11, through which the wire 86 can be slinged.

[0039] 12, workers sling wires 86 onto each bundle of H-shaped steel 11, and lift each bundle with a crane 13 and move them to the conveying device 15 (an example of a moving process). In the conveying device 15, the bundles of the H-shaped steel 11 are removed and the steel is processed one by one.

[0040] [Effects of the embodiment] The two bundles of H-shaped steel 11 that have been bundled together and lifted by the crane 13 are lowered with the space between the bundles positioned above the protruding portion 25. At this time, the protruding portion 25 enters between the two bundles, and each of the two bundles of H-shaped steel 11 is pulled apart to the left and right. This allows the worker to easily perform the slinging work by tying the wire 86 around each bundle, even if the H-shaped steel 11 is heavy.

[0041] Each bundle of H-shaped steel 11 separated by the convex portion 25 can be further separated by the first arm 21 and the second arm 22 which are inclined downward as they extend from the support portion 20.

[0042] By positioning the tapered convex portion 25 between the two bundles of H-shaped steel 11, each of the two bundles of H-shaped steel 11 slides down along the taper, so that the two bundles of H-shaped steel 11 can be separated one by one.

[0043] The bundles of H-shaped steel beams 11 positioned on the first arm 21 and the second arm 22 move smoothly over the first upper surface 49 of the first roller 41 and the second upper surface of the second roller 61, respectively.

[0044] The two bundles of H-shaped steel 11 are separated along the convex portion 25, and the H-shaped steel 11 are pulled apart by the first arm 21 and the second arm 22, creating a gap that facilitates rigging work, and facilitating the work of moving each bundle of H-shaped steel 11 placed on the rack 14 to the conveying device 15.

[0045] [Variation 1] In the above embodiment, an example has been described in which the first arm 21 has the first roller 41, the second arm 22 has the second roller, and the bundle of H-shaped steel 11 is supported on the first upper surface 49 and the second upper surface 69, but this configuration is not limited to this. The first arm 21 and the second arm 22 do not have to have the first roller 41 and the second roller 61, respectively. In this case, in the first arm 21 and the second arm 22, the bundles of H-shaped steel 11 are placed directly on the first upper surface 49 and the second upper surface 69 one by one, and slide along the incline.

[0046] [Variation 2] In the above embodiment, the first arm 21 and the second arm 22 have the first stopper 42 and the second stopper 62 that regulate the movement of the bundle of H-shaped steel 11 that slides along the incline above the first upper surface 49 and the second upper surface 69, respectively, but the present invention is not limited to this configuration. The first arm 21 and the second arm 22 do not have to have the first stopper 42 and the second stopper 62, respectively. In this case, in the first arm 21 and the second arm 22, the bundle of H-shaped steel 11 slides down to the ground G along the incline.

[0047] [Variation 3] In the above embodiment, the first upper surface 49 and the second upper surface 69 are inclined, but the present invention is not limited to this configuration. The first upper surface 49 and the second upper surface 69 may be horizontal surfaces on which two bundles of H-shaped steel 11 separated by the tapered surface 27a can be placed one by one.

[0048] [Other variations] In the above embodiment, the case of transporting H-shaped steel 11 used as a construction material has been described as an example, but the present invention is not limited to this case. It may be an I-shaped steel, a wooden beam, or any other long member used as a construction material. In addition, the construction materials may be bundled in groups of less than five pieces or in groups of more than five pieces.

[0049] In the above embodiment, the protrusion 25 has been described as having a tapered shape tapering upward, but the present invention is not limited to this configuration. The protrusion 25 may be formed in a triangular pyramid, a square pyramid, or a cone shape, or may simply bulge out in a mountain shape, as long as it is formed so that the two bundles of H-shaped steel placed on the upper end are pulled apart. In this case, the protrusion 25 does not need to have the positioning portion 30.

[0050] In the above embodiment, a case has been described as an example in which a part of tapered surface 27a is located above first upper surface 49 of first arm 21 and second upper surface 69 of second arm 22, but the present invention is not limited to this configuration. Tapered surface 27a may be entirely located above first upper surface 49 of first arm 21 and second upper surface 69 of second arm 22.

[0051] In the above embodiment, an example has been described in which two slinging aids 10 are arranged with a gap between them so that the H-shaped steel 11 can be supported in a well-balanced manner, but this is not limited to the above. As long as the two bundles of H-shaped steel 11 can be separated one by one, only one slinging aid 10 may be arranged, or three or more may be arranged.

[0052] In the above embodiment, the leg portions 23 are positioned at the four corners of the base portion 26 through the through holes 33, but the present invention is not limited to this configuration. The leg portions 23 may be supported by three or less legs 23, or may be supported by five or more legs 23.

[0053] In the above embodiment, the case where the base portion 26 and the first lower wall 44 and the second lower wall 64 are fixed to the body portion 82 by the first nut 84 and the second nut 85 has been described as an example, but the present invention is not limited thereto. For example, the base portion 26 and the first lower wall 44 and the second lower wall 64 do not have to be fixed to the body portion 82 by the second nut 85, and may simply be inserted into the body portion 82 and placed on the first nut 84. In other words, it is sufficient that the first arm 21 and the second arm 22 are connected so as to stably support the H-shaped steel 11 along the first extension direction E1 and the second extension direction E2.

[0054] [Claim 1] A support portion; and arms extending in opposite directions from the support portion, The support portion has a protrusion that protrudes upward from the upper surface of the arm.

[0055] [Claim 2] Each of the arms has a stopper protruding upward from an upper surface of an extension end portion extending from the support portion, 2. The slinging aid according to claim 1, wherein the upper surface slopes downward as it extends from the support portion.

[0056] [Claim 3] 3. The slinging aid according to claim 1, wherein the convex portion has a tapered shape tapering upward.

[0057] [Claim 4] Each of the arms further includes a roller that rotates about an axis along a direction intersecting the extension direction, 3. The slinging aid according to claim 1, wherein a plurality of the rollers are arranged along the extension direction, and a portion of each roller surface bulges from the upper surface.

[0058] [Claim 5] an arrangement step of arranging at least a pair of slinging auxiliary devices, each of which includes a support portion and an arm extending in a direction opposite to the extension direction from the support portion, the support portion having a protrusion protruding above an upper surface of the arm, in a direction intersecting the extension direction; A lifting process in which two bundles of long objects placed on a rack are hoisted together using a sling; a positioning step of positioning the two lifted bundles of elongated objects above the pair of protrusions; a lowering step of lowering the two bundles of elongated objects toward the pair of protruding portions; a separating step of separating the two bundles of elongated objects along the protrusion and the arm; A method for moving long objects includes a moving step of hoisting each of the separated long objects in the bundle using a sling and moving them to a conveying device. [Explanation of symbols]

[0059] 10...Sling aid 11...H type steel (long item) 14...Rack 15. Transport device 20...Support part 21...First arm (arm) 22...Second arm (arm) 25... Convex part 41... First roller (roller) 42... First stopper (stopper) 49...1st top surface (top surface) 51...First roller surface (roller surface) 52...First extension end (extension end) 61...Second roller (roller) 62...Second stopper (stopper) 69...Second top surface (top surface) 71...Second roller surface (roller surface) 72...Second extension end (extension end)

Claims

1. an arrangement step of arranging at least a pair of slinging auxiliary devices, each of which includes a support portion and an arm extending in a direction opposite to the extension direction from the support portion, the support portion having a protrusion protruding above an upper surface of the arm, in a direction intersecting the extension direction; a lifting process in which two bundles of long objects placed on a rack are hoisted together; a positioning step of positioning the two lifted bundles of elongated objects above the pair of protrusions; a lowering step of lowering the two bundles of elongated objects toward the pair of protruding portions; a separating step of separating the two bundles of elongated objects along the protrusion and the arm; a slinging step of slinging each of the separated long objects of the bundle on the arm; A method for moving long objects, comprising the steps of: lifting each of the sling-hung bundle of long objects and moving them to a conveying device.

2. The slinging aid further comprises a stopper protruding upward from an upper surface of the extension end of each of the arms extending from the support portion, and the upper surface of the arm is inclined downward as it extends from the support portion, 2. The method for moving a long object according to claim 1, wherein the slinging step includes restricting the movement of each of the separated long objects in the bundle in the extension direction by the stopper.

Citation Information

Patent Citations

  • Steel arch rib single-hook air turning-over device and use method therefor

    CN113911904A

  • JP1976134607U

  • Separating and feeding method for veneer

    JP1981078764A

  • Machining schedule producing method for machine tool with automatic tool exchanging device

    JP1992075839A

  • Automatic release device for lifting slings

    US4251099A